JUMLAH
NO. URAIAN PEKERJAAN HARGA
(Rp.)
JUMLAH #REF!
PPN 10% #REF!
TOTAL JUMLAH #REF!
PEMBULATAN 1,395,702,900.00
Terbilang : // Satu milyar tiga ratus sembilan puluh lima juta tujuh ratus dua ribu sembilan ratus rupiah.//
#REF!
#REF!
#REF! 905,114,000.00 #REF!
#REF!
RENCANA ANGGARAN BIAYA
PEKERJAAN PENGADAAN DAN PEMASANGAN KABEL SKTM NA2XSY 1x150 mm2
PANDAN WANGI RESIDENT
HARGA
N0 URAIAN VOL. SAT. SATUAN
( Rp )
I MATERIAL UTAMA
SUB TOTAL I
II MATERIAL NON UTAMA
1 Pipa Galvanis stell 4" medium A u/pelindung Kabel di tiang lkp 1 Batang
2 Traves UNP 10x200 u/ Dudukan DS 1 Set
3 Terminating kabel 1x300 mm2 (Single core) OD 1 Set
4 Terminating kabel 1x300 mm (Single core) ID
2
1 Set
5 SKAT (8) 150 mm 2
6 Buah
6 Treck Schoor 1 Set
7 CCO 8T8 3 Buah
8 Light Arrester 24 KV 10 KA 3 Set
9 Besi UNP lkp klem u/ dudukan mof kabel 1 Set
10 Arde 5,5 M 1 Set
11 Scot 23 (3M) 20 KV 3 Set
12 Kain Lap Majun 2 Kg
13 Alkohol 95 % 3 Botol
SUB TOTAL II
HARGA
N0 URAIAN VOL. SAT. SATUAN
( Rp )
I MATERIAL UTAMA
SUB TOTAL I
II MATERIAL NON UTAMA
SUB TOTAL II
HARGA
N0 URAIAN VOL. SAT. SATUAN
( Rp )
I MATERIAL UTAMA
2 Incoming Unit Load Break Switch (LBS) 24 KV, 630 A, 16 KA Motorized 1 Set
Type :SM6-IM
Operating Mechanism : Manual
Dilengkapi : - Disconector SF6 24 KV,630 A
- Busbar 630 A
- Heater 50 220 Vac
- Voltage Indicator
- Motorized (Tegangan disesuaikan dengan power suplayof site
- Earthing Switch
SUB TOTAL I
II MATERIAL NON UTAMA
SUB TOTAL II
HARGA
N0 URAIAN VOL. SAT. SATUAN
( Rp )
I MATERIAL UTAMA
2 Incoming Unit Load Break Switch (LBS) 24 KV, 630 A, 16 KA Motorized 1 Set
Type :SM6-IM
Operating Mechanism : Manual
Dilengkapi : - Disconector SF6 24 KV,630 A
- Busbar 630 A
- Heater 50 220 Vac
- Voltage Indicator
- Motorized (Tegangan disesuaikan dengan power suplayof site
- Earthing Switch
7 AC 1 PK 1 Unit
SUB TOTAL I
II MATERIAL NON UTAMA
SUB TOTAL II
HARGA
N0 URAIAN VOL. SAT. SATUAN
( Rp )
I MATERIAL UTAMA
SUB TOTAL I
II MATERIAL NON UTAMA
SUB TOTAL II
HARGA
N0 URAIAN VOL. SAT. SATUAN
( Rp )
I MATERIAL UTAMA
SUB TOTAL I
II MATERIAL NON UTAMA
SUB TOTAL II
HARGA
N0 URAIAN VOL. SAT. SATUAN
( Rp )
I MATERIAL UTAMA
SUB TOTAL I
II MATERIAL NON UTAMA
SUB TOTAL II
HARGA
N0 URAIAN VOL. SAT. SATUAN
( Rp )
I MATERIAL UTAMA
SUB TOTAL I
II MATERIAL NON UTAMA
SUB TOTAL II
HARGA
N0 URAIAN VOL. SAT. SATUAN
( Rp )
I MATERIAL UTAMA
SUB TOTAL I
II MATERIAL NON UTAMA
SUB TOTAL II
HARGA
N0 URAIAN VOL. SAT. SATUAN
( Rp )
I MATERIAL UTAMA
SUB TOTAL I
II MATERIAL NON UTAMA
SUB TOTAL II
HARGA
N0 URAIAN VOL. SAT. SATUAN
( Rp )
I MATERIAL UTAMA
SUB TOTAL I
II MATERIAL NON UTAMA
SUB TOTAL II
HARGA
N0 URAIAN VOL. SAT. SATUAN
( Rp )
I MATERIAL UTAMA
SUB TOTAL I
II MATERIAL NON UTAMA
SUB TOTAL II
HARGA
N0 URAIAN VOLUME SATUAN SATUAN
(Rp)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
JUMLAH
HARGA
( Rp )
284,232,400.00
126,750,000.00
7,500,000.00
1,080,000.00
540,000.00
420,102,400.00
4,050,000.00
51,750,000.00
5,625,000.00
14,625,000.00
17,235,000.00
24,640,000.00
24,000,000.00
16,800,000.00
8,500,000.00
0.00
0.00
51,150,000.00
218,375,000.00
625,000.00
17,225,000.00
1,145,000.00
1,850,000.00
13,000,000.00
2,120,000.00
8,800,000.00
32,375,000.00
2,800,000.00
675,000.00
6,615,000.00
910,000.00
300,000.00
1,296,000.00
0.00
89,736,000.00
LN
JUMLAH
HARGA
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
N)
JUMLAH
HARGA
( Rp )
0.00
Pakai Fuse
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
JUMLAH
HARGA
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
JUMLAH
HARGA
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
JUMLAH
HARGA
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
JUMLAH
HARGA
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
JUMLAH
HARGA
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
JUMLAH
HARGA
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
JUMLAH
HARGA
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
JUMLAH
HARGA
( Rp )
0.00
0.00
0.00
0.00
0.00
0.00
0.00
RASI
JUMLAH
HARGA (Rp)
13,850,000
1,250,000
83,100,000
11,000,000
5,527,300
114,727,300
1,009,437,500
1,009,437,500