PAGAR DEPAN
I PEKERJAAN PENDAHULUAN 5,062,903.50
II PEKERJAAN PONDASI 64,440,703.76
III PEKERJAAN STRUKTUR/ DINDING 158,927,965.53
IV PEKERJAAN PENGECATAN DAN AKHIR 1,850,136.40
V PEK. PLANK NAMA KANTOR 17,423,959.24
PAGAR BELAKANG
VI PEKERJAAN PENDAHULUAN 1,172,730.90
VI PEKERJAAN PONDASI 47,409,646.75
VIII PEKERJAAN STRUKTUR/ DINDING 2,500,000.00
IX PEKERJAAN PENGECATAN DAN AKHIR 987,217.95
Jumlah 299,775,264.03
PPn10 % 29,977,526.40
Jumlah termasuk PPn 329,752,790.43
Dibulatkan 329,752,700.00
Terbilang :
Err:511
VOLUME DAN
NO. JENIS PEKERJAAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp) TOTAL HARGA (Rp)
SATUAN
A B C D E F
PAGAR DEPAN
I. PEKERJAAN PENDAHULUAN
1 Pek. Pengukuran dan Pasangan Bowplank 15.70 M' 77,255.00 1,212,903.50
2 Pek. Plank Nama proyek 1.00 Ls 350,000.00 350,000.00
3 Pek. Pembongkaran (Bobok Beton) 1.00 Ls 3,500,000.00 3,500,000.00
Sub Total - I 5,062,903.50
II. PEKERJAAN PONDASI
1 Pek. Galian Tanah 14.63 M3 65,375.00 956,436.25
2 Pek. Pemasangan Cerucuk Dia. 6 - 8 CM 531.00 Btg 15,325.00 8,137,575.00
3 Pek. Urugan Pasir Bawah Pondasi 1.81 M3 359,150.00 650,061.50
4 Pek. Cor Lantai Kerja 1 : 3 : 5 Tebal 10 cm 1.81 M3 1,530,172.82 2,769,612.80
5 Pek. Pondasi Tapak Setempat Cor Beton Bertulang 1:2:3 2.52 M3 4,941,421.00 12,452,380.92
6 Pek. Pondasi Menerus 1 Batu Bata Camp. 1:2 25.65 M2 391,145.00 10,032,869.25
7 Pek. Raben Pondasi 51.30 M2 41,080.88 2,107,449.14
8 Pek. Balok Sloof 20/30 Beton Bertulang 1:2:3 5.13 M3 5,312,780.00 27,254,561.40
9 Pek. Urugan Tanah Kembali 3.66 M3 21,791.67 79,757.50
Sub Total - II 64,440,703.76
III. PEKERJAAN STRUKTUR/ DINDING
1 Pek. Kolom 30/30 cor Beton Bertulang Camp. 1:2:3 6.49 M3 6,997,375.28 45,412,965.53
2 Pek. Pas. Pagar Besi Segi Empat Hollow
Type 1 2.00 Unit 1,141,800.00 2,283,600.00
Type 2 12.00 Unit 2,283,600.00 27,403,200.00
Type 3 1.00 Unit 1,245,600.00 1,245,600.00
Type 4 12.00 Unit 2,179,800.00 26,157,600.00
Type 5 4.00 Unit 2,595,000.00 10,380,000.00
3 Pek. Pas. Pintu Pagar Besi Lengkap Terpasang 2.00 Bh 14,272,500.00 28,545,000.00
4 Pek. Profil Kolom Pagar Depan 35.00 Bh 250,000.00 8,750,000.00
5 Pek. Profil Pembesaran Kepala Kolom 35.00 Bh 250,000.00 8,750,000.00
Sub Total - III 158,927,965.53
IV. PEKERJAAN PENGECATAN DAN AKHIR
1 Pek. Cat Air (Dinding, Kolom) 45.28 M2 29,817.50 1,350,136.40
2 Pek. Finishing dan Pembersihan Akhir 1.00 M2 500,000.00 500,000.00
Sub Total - IV 1,850,136.40
V PEK. PLANK NAMA KANTOR
1 Pek. Cor Rabat Lantai 1.39 M3 1,530,172.82 2,126,940.22
2 Pek. Keramik lantai 20x20 6.72 M2 257,476.50 1,730,242.08
3 Pek. Dinding Bata 1/2 bata 1:2 5.00 M2 391,145.00 1,955,725.00
4 Pek. Plasteran Dinding 1:2 10.00 M2 72,238.68 722,386.80
5 Pek Profil Relif 1.00 Ls 2,500,000.00 2,500,000.00
6 Pek. Pas. Huruf Nama Kantor 1.00 Ls 3,500,000.00 3,500,000.00
7 Pek. Elektikal Lampu Hias (Terpasang) 2.00 Bh 1,250,000.00 2,500,000.00
8 Pas. Dinding Undersit 0.80 M2 550,000.00 440,000.00
9 Pek. Keramik Diniding 30x30 warna Hitam 3.15 M2 364,655.60 1,148,665.14
VOLUME DAN
NO. JENIS PEKERJAAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp) TOTAL HARGA (Rp)
SATUAN
A B C D E F
10 Pek. Penanaman Bunga 1.00 Ls 800,000.00 800,000.00
Sub Total - V 17,423,959.24
PAGAR BELAKANG
VI. PEKERJAAN PENDAHULUAN
1 Pek. Pengukuran dan Pasangan Bowplank 15.18 M' 77,255.00 1,172,730.90
Sub Total - VI 1,172,730.90
VOLUME DAN
NO. JENIS PEKERJAAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp) TOTAL HARGA (Rp)
SATUAN
A B C D E F
VII. PEKERJAAN PONDASI
1 Pek. Galian Tanah 7.70 M3 65,375.00 503,387.50
2 Pek. Pemasangan Cerucuk Dia. 6 - 8 CM 510.00 Btg 15,325.00 7,815,750.00
3 Pek. Urugan Pasir Bawah Pondasi 1.21 M3 359,150.00 434,571.50
4 Pek. Cor Lantai Kerja 1 : 3 : 5 Tebal 10 cm 1.21 M3 1,530,172.82 1,851,509.11
5 Pek. Pondasi Tapak Setempat Cor Beton Bertulang 1:2:3 0.29 M3 4,941,421.00 1,433,012.09
6 Pek. Pondasi Menerus 1 Batu Bata Camp. 1:2 23.01 M2 391,145.00 9,000,246.45
7 Pek. Raben Pondasi 46.02 M2 41,080.88 1,890,542.10
8 Pek. Balok Sloof 20/30 Beton Bertulang 1:2:3 4.60 M3 5,312,780.00 24,438,788.00
9 Pek. Urugan Tanah Kembali 1.92 M3 21,791.67 41,840.00
Sub Total -V II 47,409,646.75
VIII. PEKERJAAN STRUKTUR/ DINDING
1 Pek. Pemasangan Kembali Pagar BRC + Pengecatan 1.00 Ls 1,500,000.00 1,500,000.00
2 Pek. Profil Pembesaran Kepala Kolom 4.00 Bh 250,000.00 1,000,000.00
Sub Total - VIII 2,500,000.00
IX. PEKERJAAN PENGECATAN DAN AKHIR
1 Pek. Cat Air (Dinding, Kolom) 16.34 M2 29,817.50 487,217.95
2 Pek. Finishing dan Pembersihan Akhir 1.00 Ls 500,000.00 500,000.00
Sub Total - IX 987,217.95
TOTAL 299,775,264.03
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
JUMLAH
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN
UPAH BAHAN
1 2 3 4 5 6
JUMLAH
NO. JENIS BAHAN SATUAN HARGA
BAHAN/UPAH
1 2 3 4
I TENAGA KERJA
1 Mandor Oh 140,000.00
2 Kepala Tukang Oh 125,000.00
3 Tukang Oh 110,000.00
4 Pekerja Oh 82,500.00
II BAHAN
A. BAHAN PASANGAN
1 PB (Pasir Beton) M3 427,500.00
2 KR (Kerikil) M3 727,500.00
3 PC (Portland Cement ) Kg 2,070.00
4 PP (Pasir Pasang) M3 292,500.00
5 PU (Pasir Urug) M3 277,500.00
6 Batu Bata Bh 1,425.00
7 Semen Warna Kg 3,726.00
8 Tanah Timbun M3 187,500.00
9 Minyak Begisting Ltr 16,500.00
B. BAHAN KAYU
1 Kayu Kelas III M3 2,925,000.00
2 Kayu Kelas II M3 3,600,000.00
3 Lem Kayu Kg 22,500.00
4 Plywood Tebal 9 mm Lbr 202,500.00
5 Kayu Cerucuk Dia. 6-8 Cm Panjang 3 M Btg 9,000.00
6 Kayu Dolken Dia. 12 - 15 Cm Panjang 6 M Btg 28,500.00
C. BAHAN LISTRIK
1 Lampu Save Energy Setara Philips 18 Watt Bh 90,000.00
2 Saklar Tunggal Setara Broco Bh 37,500.00
3 Saklar Double Setara Broco Bh 52,500.00
4 Stop Kontak Setara Broco Bh 37,500.00
5 Fitting Lampu Standard Bh 30,000.00
6 Box Panel MCB Bh 157,500.00
D. BAHAN KUNCI/PENGGANTUNG
1 Engsel Jendela 3" Bh 14,250.00
2 Engsel Pintu 4" Bh 18,750.00
3 Grendel Jendela 2" Bh 12,000.00
4 Grendel Pintu 4" Bh 14,250.00
5 Kait angin Jendela Bh 16,500.00
6 Tangan-tangan Jendela Bh 19,500.00
7 Kaca Tebal 5 mm M2 172,500.00
8 Kunci Tanam Putar 2 Slag Setara SES Bh 135,000.00
JUMLAH
NO. JENIS BAHAN SATUAN HARGA
BAHAN/UPAH
1 2 3 4
E. BAHAN ATAP/RANGKA ATAP
1 Genteng Metal M2 123,750.00
2 Rabung Genteng Metal bh 46,500.00
3 Bola-bola Atap lbr 40,500.00
4 Rangka Atap Baja Ringan (Struktur terpasang) M2 202,500.00
F. BAHAN BESI/PAKU
1 Besi Beton Polos Kg 19,050.00
2 Kawat Beton Kg 27,000.00
3 Paku 1 - 2,5 Cm Kg 24,000.00
4 Paku Biasa Kg 24,000.00
5 Paku Skrup 3,5" Bh 825.00
6 Paku Screw Kg 30,000.00
7 Paku Tripleks Kg 25,500.00
8 Paku Atap Kg 30,000.00
9 Besi Strip Tebal 5 mm Kg 19,500.00
10 Kusen Alumunium 3" M' 125,250.00
G. BAHAN FINISHING
1 Plamir Alkalin Kg 31,500.00
2 Cat Minyak Kg 67,500.00
3 Minyak Cat Ltr 28,500.00###
4 Cat Dasar Kg 62,250.00
5 Cat Air Setara Nippon Kg 41,250.00
6 Cat Menie Kg 18,750.00
7 Residu Kg 9,000.00
8 Kuas Bh 11,250.00
H. BAHAN KERAMIK
1 Keramik 30 x 30 Bh 18,750.00
2 Keramik 20 x 20 Bh 4,500.00
3 Plint Keramik 10x40 Bh 4,687.50
I. BAHAN LOTENG/PLAFOND
1 GRC board 4 mm Lbr 102,000.00
2 List Kayu Profil M1 5,265.00
3 Gypsun 9mm Lbr 165,000.00
4 List Profil Gypsun lbr 9,375.00
5 Tepung Gypsun Kg 5,250.00
6 Metal Furing M1 9,375.00
7 Kassa Gypsun Rol 3,750.00
J. BAHAN SANITAIR
1 Pintu Fiber Set 360,000.00
2 Closet Jongkok Bh 270,000.00
TIME SCHEDULE
( Bobot & Kurva "S" )
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR
PEKERJAAN : PEMBANGUNAN PAGAR DINAS PERHUBUNGAN, KOMUNIKASI DAN INFORMATIKA KAB. BENGKALIS
LOKASI : KECAMATAN BENGKALIS
KAB/PROP : BENGKALIS/RIAU
TAHUN : 2015
PAGAR DEPAN
III PEKERJAAN STRUKTUR/ DINDING 53.016 7.574 7.574 7.574 7.574 7.574 7.574 3.787 3.787
PAGAR BELAKANG
50.00 %
VI PEKERJAAN PENDAHULUAN 0.391 0.391
- %
J U M L A H 100.000
RENCANA 1.689 2.687 5.374 5.374 5.374 2.687 7.574 7.574 10.601 12.845 12.845 10.488 6.002 6.002 1.937 0.946 Rencana
KOMULATIF RENCANA - 1.689 4.376 9.750 15.124 20.498 23.185 30.759 38.333 48.933 61.779 74.624 85.112 91.114 97.116 99.054 100.000 Realisasi
REALISASI
KOMULATIF REALISASI
DEVIASI ( + / - )
Jumlah Status
Merk dan Tahun Lokasi Bukti
No Nama Alat Alat Kapasitas Alat Kondisi Kepemilikan/
Tipe Pembuatan Sekarang Kepemilikan
Minimal Dukungan Sewa
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Catatan :
1. Penawaran dinyatakan memenuhi persyaratan sesuai Peralatan Minimal yang ditetapkan dalam Lampiran I Lembar Data Pemilihan (LDP) ini.
2. Pada Kolom (2) s/d (10) diisi sesuai persyaratan yang diminta dalam Lampiran I Lembar Data Pemilihan (LDP) ini.
3. Untuk Kolom (2), (3) dan (4) harus memenuhi persyaratan minimal yang dibutuhkan untuk melaksanakan pekerjaan.
4. Untuk Kolom (9) Jenis Peralatan dengan status Dukungan Sewa harus memiliki Bukti Dukungan Sewa (Asli Surat Dukungan dari pemilik beserta bukti kepemilikan alat)
5. Poin 1, 2, 3 dan 4 tersebut diatas dapat dibuktikan pada saat pembuktian kualifikasi
Bengkalis, 6 Juli 2015
CV. RIA RESTY
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10.a) (10.b)
Catatan :
1. Personil inti yang akan ditempatkan secara penuh sesuai dengan persyaratan sebagaimana tercantum dalam Lampiran II Lembar Data Pemilihan (LDP) ini.
2. Pada Kolom (1) s/d (10.b) diisi sesuai persyaratan yang diminta dalam Lampiran II Lembar Data Pemilihan (LDP) ini.
3. Untuk Kolom (4), (5), (6), (7), (8) harus memenuhi persyaratan minimal yang dibutuhkan untuk melaksanakan pekerjaan.
4. Pada Kolom (8) harus memiliki Sertifikat Keahlian (SKA) dan Sertifikat Ketera mpilan (SKT) yang telah terakreditasi oleh LPJ
5. Poin 2, 3 dan 4 tersebut diatas dapat dibuktikan pada saat pembuktian kualifikasi.
Bengkalis, 6 Juli 2015
CV. RIA RESTY
0
Pelaksana
0 0
Surveyor Draftman
2. Perusahaan / badan usaha yang kami pimpin tidak dalam pengawasan pengadilan,tidak pailit / bangkrut, kegiatan usaha tidak
sedang dihentikan dan atau direksi yang bertindak untuk dan atas nama perusahan tidak sedang menjalani sanksi pidana
3. Perusahaan / badan usaha yang kami pimpin dan salah satu manajemen / pengurusnya memiliki kenierja baik dan tidak
masuk dalam daftar sanksi atau daftar hitam disuatu instansi pemerintah
4. Semua dokunen kualifikasi yang kami sampaikan adalah benar , tidak ada pemalsuan dan tidak ada penciplakan dengan
dokumen badan usaha lain
6. Saya tidak sedang dan tidak akan terlibat pertentangan kepentingan dengan para pigak yang terkait langsung maupun tidak
langsung dalam proses pengadaan ini.
7. Kami tidak akan menuntut kepada panitia pengadaan barang / jasa dan pemerintah kabupaten bengkalis serta pihak
manapun, apabila paket pekerjaan yang kami minati dan / atau ditunjuk sebagai pemenang seleksi, ternyata paket pekerjaan
tersbut dikemudian hari
8. Surat pernyataan ini dibuat dengan sebenarnya dan kami sanggup dituntut dimuka pengadilan apabila salah satu atau semua
keterangan yang kami berikan ini tidak benar. Selain itu kami juga bersedia dikenakan sanksi administrasi yaiitu dimasukkan
dalam daftar Hitam rekanan
Demikianlah surat pernyataan ini dibuat dengan sebenarnya untuk digunakan sebagamana mestinya.
Menyatakan Bahwa :
1 Semua data dan informasi dokumen Penawaran perusahaan kami adalah benar dan tidak palsu.
2 Jika data atau salah satu data informasi yang kami sampaikan pada Panitia Pekerjaan .
Ternyata tidak benar/palsu maka perushaan kami dapat digugurkan secara sepihak dan bersedia dituntut sesuai
peraturan perundang-undangan yang berlaku dan kami bersedia dimasukkan kedalam daftar hitam rekanan.
Nama : #REF!
Jabatan : #REF!
Alamat : Bengkalis
Telepon / Fax : -
E-mail : -
Menyatakan bahwa :
Perusahaan kami tidak sedang dalam permasalahan terkait dengan pengadilan.
Demikian Pernyataan ini kami buat untuk dapat dipergunakan seperlunya.
#REF!
#REF!
MATERAI
Rp. 6000
#REF!
#REF!
SURAT PERNYATAAN MEMPUNYAI KINERJA BAIK
DAN TIDAK TERMASUK DALAM DAFTAR HITAM REKANAN
Nama : #REF!
Jabatan : #REF!
Alamat : Bengkalis
Telepon / Fax : -
E-Mail : -
Menyatakan bahwa :
Bahwa Perusahaan kami mempunyai kinerja baik dalam pelaksanaan pekerjaan dan perusahaan kami tidak
termasuk dalam daftar hitam rekanan.
Demikian pernyataan ini kami buat dengan penuh kesadaran dan rasa tanggung jawab.
#REF!
#REF!
MATERAI
Rp. 6000
#REF!
#REF!
JENIS, KAPASITAS, KOMPOSISI DAN JUMLAH PERALATAN MINIMUM
Catatan :
1. Dilengkapi dengan Foto Copy bukti kepemilikan/sewa/leasing alat.
Bengkalis, 6 Juli 2015
Penawar
0
Pengalaman
KATEGORI NAMA Jabatan Dalam Proyek Jumlah Minimum Kualifikasi Pendidikan SKA/SKT
(Orang) Minimum
(Tahun)
PROJECT MANAGER 1 S-I/TEKNIK SIPIL 3 SKA AHLI MUDA BANGUNAN
PELAKSANA 1 D-III/TEKNIK SIPIL 2 SKT PELAKSANA BANGUNAN
KATEGORI II
SURVEYOR 1 STM/SMU SEDERAJAT 2 SKT JURU UKUR
DRAFTER 1 STM/SMU SEDERAJAT 2 SKT JURU GAMBAR
Catatan :
1. Ringkasan pengalaman untuk masing-masing pekerjaan (Curiculum vitae) untuk personil inti
2. Foto copy dari Ijazah dan sertifikat (dilampirkan)
3. Bagan Organisasi dan personil yang di usulkan dilengkapi dengan uraian tugas dalam pelaksanaan pekerjaan.
4. Sertifikat keahlian (SKA/SKT) yang dilkeluarkan oleh Asosiasi Profesi yang telah diakreditasi oleh LPJK (Online).
5. Melampirkan daftar gaji dari perusahaan yang bersangkutan dan bukti setoran pajak untuk pegawai tetap.