Flow Proses Untuk Texmaco
Flow Proses Untuk Texmaco
1 SHELL BODY 1 1
Mat. Duplex
WAK TU 15 30 540 15 15 480 15 1140 15 1200 180 1020 960
M AN P OWER 1 2 1 1 2 3 3 3 3 3 3 3 2
NOTE : 1. WAKTU SATUAN MENIT
S UB ASS+
A LAT/MESIN PLASMA M ESIN M ESIN M ESIN
POS 3
2. MAN POWER PER ORANG
C UTTING R OLL R OLL R AFA MET I
VL
Mat. SUS 316 WAK TU 15 60 25920 11520 960 60 1440 240 2160 30
R AFA MET
M AN P OWER 1 2 1 3 3 1 3 3 3 1
A LAT/MESIN M ESIN M ESIN M ESIN M ESIN
PLA NER B ENDING L AS SAW R AFA MET
POS NO. 3000T
3 FINE 1 1
1, 3~7, 9,10
1,3~7 I MK GC GD I DR I
4 4
C UTTING B OR
FINE 1
POS NO.
2
S UB ASS
2
I MK GC GD I ML I
5 FINE 1 8 4 I MK GC GD I LL I
Mat. DUPLEX
S UB ASS
8 FINE 2 92
A LAT/MESIN
8 POS NO.
8
C UTTING FRAIS
WAK TU
M AN P OWER
1200
4
9
I MK GC GD I LL I
WAK TU 30 60 60 15 30 60 30
M AN P OWER 2 2 1 2 2 1 2
A LAT/MESIN PLASMA M ESIN
C UTTING B UBUT
SHELL SLEEVE OT
10 Mat. DUPLEX 1 1 I MK GC GD I RL I FU I FW RR RT
1 VL CDR I
SLEEVE
C UTTING R AFA MET S CODA
12 1
4~6&11
I MK GC GD I RL I FU FW I
13 SLEEVE I MK GC GD I
SLEEVE
C UTTING
14 1
POS NO.
8
2400 3360 1440 180
12~16
12, 13, 14, 15&16 WAK TU
R AFA MET
WAK TU 60 240 540 60 60 180 120 60
16 SLEEVE M AN P OWER
A LAT/MESIN
1 2 1
PLASMA
1 2 2
M ESIN
1
HAND
1
GC GD I
B OR TAP
WAK TU 1440 480 1440 480 480
M AN P OWER 4 2 4 2 4
C OMPRES SOR, PIC KLING
A LAT/MESIN
WAK TU 30 180 240 30 30 PRESS URE
1 2 1 2 2 GA TE
M AN P OWER
SLEEVE
18
A LAT/MESIN PLASMA
17
B AR,GATE
C UTTING
V ALVE
20
WAK TU 60 120 480 60 15 480 15 240 480 180 480 60
M AN P OWER 1 2 1 1 2 3 3 3 3 3 3 1
A LAT/MESIN PLASMA M ESIN M ESIN
R AFA MET
SLEEVE
C UTTING R OLL S UB ASS
+ PO S 24
19 1 I MK GC GD I RL I FU FW I VL I DR TP I
20 1 RL I FU FW I VL I
22
I MK GC GD I
21 SLEEVE RL I FU FW I VL I S UB ASS
1
I MK GC GD I
SLEEVE
+ PO S 27 M AN P OWER 5
22
DR TP I A LAT/MESIN
RL I FU FW I VL I
1
I MK GC GD I
23 SLEEVE I
1
I MK GC GD I RL I FU FW I VL
POS NO. 1
24 CONE
Mat.DuPLEX 1 1 I MK GC GD I BP I FU FW I VL I
M AN P OWER 1 2 1 2 2 3 3 3 3 3 3 1
A LAT/MESIN PLASMA M ESIN M ESIN
C UTTING B ENDING R AFA MET
3000T
POS NO. 2
25 CONE I MK ML BP FU I FW VL I
Mat.DuPLEX 2 1
WAK TU 30 240 4320 960 960 60 960 1200 60 S UB ASS
M AN P OWER 1 2 1 3 3 1 3 3 3 + POS 6
A LAT/MESIN M ESIN M ESIN M ESIN M ESIN DR TP I
PLA NER B ENDING L AS SAW R AFA MET
POS NO. 3 3000T
26 CONE S UB ASS
1
I MK ML BP FU I FW VL I WAK TU 240 1200 1200 180
Mat.DuPLEX 3 M AN P OWER
A LAT/MESIN
3 2
M ESIN HAND
2 2
27 CONE
Mat.SUS 316 4 1 POS NO. I MK GC GD I RL I FU I FW RR OT
4
28 CONE
1
POS NO. 7
Mat.SUS 316 7 I MK GC GD I
WAK TU 30 60 60 30 30
M AN P OWER 1 2 1 2 2
A LAT/MESIN PLASMA
C UTTING
Mat.SUS 316 6 6 I MK SW LL I
WAK TU 15 30 60 90 30
M AN P OWER 2 2 1 2 2
31 2
NO. 1~15
1~15
I MK SW LL I DR TP I
RAIL
GERGA JI B UBUT B OR TAP
32 2
I MK GC ML I FU I
Mat.DUPLEX 1~6
WAK TU 30 60 180 480 60 180 60
M AN P OWER 1 2 1 1 2 2 1
A LAT/MESIN PLASMA M ESIN HAND
C UTTING FRAIS TAP
NOTE : : Inspeksi SH : Shearing BP : Bending Press CDR :Drilling by CNC TP : Tapping PT : Penetrant test
: Storage SW : Sawing RL : Rolling CL : Turning by CNC FN : Finishing RT : Radiograpy Test
: Operation GD : Grinding FU : Fit Up VL : Vertical Turning ASS : Assembly UT : Ultrasonic Test
: Transportation SB : Sand blasting PA : Painting HB : Horizontal Boring HT : Heat Treatment MT : Magnetic Test
MK : Marking FW : Full Welding DR : Drilling ML : Milling VI : Visual Inspection HDT : Hidrostatic Test
GC : Gas Cutting BN : Bending LL : Turning HG : Hand Grinding DI : Dimensional inspection PNT : Pneumatic Test