Calculation of Sump Dimensions:

Design Data:
Total Discharge = 18.920 m3/sec
No. of Pumps = 5
Discharge through each pump = 3.7840 m3/sec

1. Calculation of Inlet Bell Diameter :

Permissible Inlet bell Velocity (V ) = 1.3 m/sec

Q = AxV
* D2
3.7840 = x 1.30
4
Inlet Bell Diametre ( D ) = 1.93 m
or say = 1.95 m

2. Calculation of Sump Dimensions :


a. Floor Clearance = 0.5 * D
= 0.5 x 1.95
= 0.975 m

b. Side Wall Clearance = 0.33 * D to 0. 5 * D


= 0.5 x 1.95
= 0.975 m

c. Back Wall Clearance = 0.25 * D to 0.33 * D


= 0.33 x 1.95
= 0.6435 m

d.Width of Pump Bay = 2.0 * D


= 2.0 x 1.95
= 3.9 m

e. Minimum Submergence = 1.5 * D


= 1.5 x 1.95
= 2.925 m

f. Straight Length = 6.0 * D


= 6.0 x 1.95
= 11.7 m
3. Calculation of Diameter of Pressure main :
Discharge through main = 18.920 m3/sec
Permissilbe velocity = 2.43 m/sec
* D2
18.920 = x 2.43
4
Diameter of Pressure Main ( D ) = 3.15 m
or say 3.150 m

Motor Floor
+ 428.000

Earth Dan

Trash rack

G.L. + 427.000

SECTION

C.L.of Pump
Trash rack
2.00

3.00

PLAN
Design of Pumps :

1. Design Data:
Total Discharge = 18.9200 Cumecs or 668.10 Cusecs
MDDL = + 413.000 m
FTL of dam = + 426.000 m
Delivery level = + 470.000 m
Pump Platform level = + 428.000 m
Sump floor level = + 409.100 m
Length of delivery pipe = 25.00 m or 82.025 feets
No. of Pumps = 6.0 no's
No. of rows of pressure main = 1.0 no.
Dia. of pressure main = 3.150 m or 10.34 feets
Length of pressure main = 12234.00 m or 40139.75 feets
Hazen William's Co-efficient ( C) = 130.00 (Steel Pipe)
Hazen William's Co-efficient ( C) = 130.00 (HDPE Pipe)
Efficiency of pump = 80.0 %
Pump speed = 740.0 rpm

2.Calculations:
Diacharge through Pressure main = 18.9200 Cumecs or 668.103 Cusecs
Diacharge through each pump = 3.1533 Cumecs or 111.351 Cusecs
or ### ussgpm

i. Static Pumping head


Head (H) = 470.000 - 413.000
= 57.000 m or 187.017 feets I

ii. Losses in Delivey pipe and column assembly


a. Delivey pipe dia. and losses
Diameter of delivery pipe (D) = 1.800 m
Area = 2.545 m2
Velocity (V) = 1.239 m/sec
Permissible Velocity = 3.650 m/sec
Hence OK
Losses due to fittings :
i. Due to bell mouth = 0.500 x V2
2g

= 0.500 x 1.239 ^2
2 x 9.81

= 0.039 m ( or ) 0.128 ft

ii. Due to butterfly valve = 0.200 x V2


2g

= 0.200 x 1.239 ^2
2 x 9.81

No's = 1.0

= 0.016 m ( or ) 0.051 ft
iii. Due to 90 deg. bend = 0.900 x V2
2g

= 0.900 x 1.239 ^2
2 x 9.81

= 0.070 m ( or ) 0.231 ft

iv. Due to long radius bend = 0.230 x V2


2g

= 0.230 x 1.239 ^2
2 x 9.81

= 0.018 m ( or ) 0.059 ft

v. Due to friction 1.85


hf = 10.670 x Q xL
D4.87 C
1.85
= 10.670 x 3.1533 x 25.00
1.800 ^4.87 130.00

= 0.016 m ( or ) 0.051 feets

Total loss in delivery pipe = 0.159 m ( or ) 0.521 feets

b. Coumn assembly dia., losses and shaft dia.


Approximate HP required = 62.450 Q x H x 1.3
550.0 x

= 62.450 x 3.1533 x 187.02 x 1.30


550.0 x 0.80

= 108.811 HP
i. Loss in line shaft
Dia. of line shaft = HP x 32100 0.33
7000.0 x Pump speed

= 108.811 x 32100.00 0.33


7000.000 x 740.00

= 0.878 feets

For every 100 feets of line shaft loss is 3.0 feets.


Length of line shaft = 17.925 m or 58.812 feets
100 - 3.000 feets
58.812 - 1.764 feets 0.538 m
ii. Entry loss = 0.500 x V2
2g

= 0.500 x 1.239 ^2
2 x 9.81

= 0.039 m ( or ) 0.128 ft

iii. Strainer loss = 0.110 x V2


2g

= 0.110 x 1.239 ^2
2 x 9.81

= 0.009 m ( or ) 0.028 ft

Total losses = 0.586 m ( or ) 1.921 ft

Total loss in column assembly and delivery pipe upto pressure mains
Total loss = a + b = 0.744 m ( or ) 2.442 ft II
iii. Loss due to friction in pressure main
a) Due to friction
1.85
hf = 10.670 x Q xL
D 4.87
C
1.85
= 10.670 x 18.9200 x 12234.00
3.150 ^4.87 130.00

= 13.819 m ( or ) 45.337 feets

b) Due to bends
Area = 7.793 m2
Velocity (V) = 2.428 m/sec

Bend type No's Loss co-efficient Losses(m)


90 deg. Bends 10 0.085 0.255
45 deg. Bends 10 0.100 0.300
Total 0.556

c) Exit = 1.000 x V2
2g

= 1.000 x 2.428 ^2
2 x 9.81

= 0.300 m ( or ) 0.986 ft
III
Total losses in Pressure main = 14.675 m ( or ) 16.628 ft

Total pumping Head including losses = I + II + III = 72.419 m ( or ) 237.608 ft

Add 10% towards agening of pipes = 7.242 m ( or ) 23.761 ft


Total Puming Head (H) = 79.661 m ( or ) 261.369 ft
Say 79.670 m ( or ) 261.397 ft

HGL at Pump = + 492.670 m (For SAP)

iv. Calculation of Specific Speed


Pump Speed (N) = 740.000 rpm

Specific speed (Ns) = N* Q


H 3/4

In US units = 740.0 x 49981.51


( 261.397 ) 3/4

= 2544.841

In SI units = 740.0 x 3.153 x 3.65


( 79.670 ) 3/4

= 179.862

v. Calculation of HP

HP of each Pump = * Q * H * PF
550 *
where
= Unit weight of water in lb/ft3 62.25
Q = Discharge in cusecs
H = Head in feets
PF = Power factor 1.3

HP = 62.250 x 111.351 x 261.40 x 1.30


550.0 x 0.80

= 5353.321 HP
Add 20% towards cushioning = 1070.664 HP

Total HP Required = 5353.321 + 1070.664


= 6423.985 HP
Say 6423.990 HP
= 4790.369 kW
Say 4790.370 kW