Anda di halaman 1dari 24

Offices:

Rosemount House
21- 23 Sydenham Road
Belfast BT3 9HA
T: + 44 (0) 28 9045 5531
F: + 44 (0) 28 9045 8940

40 Northwood Court
Northwood Business Campus
Santry
Company Profile
Dublin
T: + 353 (0)1 816 1990
F: + 353 (0)1 862 5761

Unit C2
Fairways Business Park
Deer Park Avenue
Livingston EH54 8AF
T: + 44 (0)1506 476 430

Clonmacken Toll Administration Building


Clonmacken
Limerick
T: + 353 (0)61 322 500

Corrin Administration Building


Ballyoran
Castlelyons
Fermoy
Cork
T: + 353 (0)25 51864

Old Mill House


Thorney Mill Road
West Drayton
Middlesex UB7 7EJ
T: + 44 (0)1895 444849
F: + 44 (0)1895 443882

5850 Cranswick Ct.


Haymarket
VA 20169
USA
T: 001 703 901 3570
F: 001 888 434 0172

www.laganconstructiongroup.com

People delivering expertise

ROADS AIRPORTS WATER ENERGY MARINE BUILDING PILING INFRASTRUCTURE OPERATION


INVESTMENT & MAINTENANCE
We deliver high quality, innovative civil engineering and
building solutions for roads, airports, water, energy, marine,
and building.

We specialise in developing bespoke piling and foundation


solutions for all civil engineering and building structures.
We offer infrastructure investment advice and management of
whole life cost solutions including operation & maintenance
for all project types.

3
content
contents
At Lagan Construction Group we are dedicated to providing infrastructure
and building solutions for tomorrows world. We combine creative planning,
design and construction with innovative engineering techniques to develop
the most appropriate solutions, working sustainably to conserve energy,
protect the environment and build communities.

About us 6
Our businesses, our culture, our behaviour

Expertise 8
Our specialisms, our capabilities

Responsible 10
Safeguarding people, communities and the environment

Lagan Construction 14
Working in key sectors - roads, airports, water,
energy, marine and building.

Piling 38
Piling and foundation solutions from FK Lowry Piling
and Dew Piling

Infrastructure Investment 42

Operation and Maintenance (O&M) 44

Limerick Tunnel PPP, Republic of Ireland.

4 5
about u
Cyclists line up to road test the newly opened Newry Bypass, part of the DBFO 2 road project. Community Awareness Day at Rathcoole -
Watermains Rehabilitation Framework, Northern Ireland.

about us
There are many reasons why people choose to work with the
Lagan Construction Group. Operating in key markets we provide
innovative and high quality civil engineering and building
solutions, alongside specialisms in piling and foundations,
operation & maintenance (O&M) and infrastructure investment.

At the heart of our work is the desire to make a real difference in


everything we do, helping to transform lives and communities. We use
the best people and the best resources to help us realise this goal.
The quality of our partners and suppliers, coupled with our transparent
management processes, ensures we consistently deliver a professional
service that is second to none.

As a private family business, the Lagan Construction Group is founded


on more than 45 years experience, employing the best people and the
best resources to make a real difference. We are proud of our values
and our culture which are at the heart of our company and set the
standard for how we behave. Our business is driven by the needs of
our clients, our partners and our people.

As a dynamic and innovative company, we continually explore new


market opportunities to develop and expand our business. We are
proud of our reputation and our people. We are proud to make a
difference.

The Lagan Construction Group operates across the UK, Ireland and
worldwide.

People delivering expertise

Greystones Marina, Republic of Ireland.


6 7
expertis
expertise
The Lagan Construction Group is a major force in international
construction and infrastructure schemes offering clients a single
strong base of pooled talent and expertise in the domestic and
overseas civil engineering and building markets.

Our specialist teams have proven expertise and experience in delivering


projects across a range of sectors including roads, airports, water,
energy, marine and building. We provide specialist piling and foundation
solutions for all civil engineering and building requirements. We also provide
infrastructure investment advice and support, whole life cost solutions
including operation & maintenance of projects. Our extensive in-house fleet
of plant and equipment can be mobilised efficiently and relocated locally or
globally, to the most remote environments, bringing specific sector
expertise, innovation and strategic thinking to every scheme we work on.

Our qualified civil engineers, construction specialists and project managers


work with global clients, partners and our long established supply chain to
develop innovative technical, design and commercial solutions for projects
of all sizes and complexity, including funding. We have particular experience
in the developing world, where we have provided facilities and resources for
roads, airports and marine schemes, many of them challenging and in remote
island locations.

We undertake contracts through Design & Build and as consortium


members, with each project managed in adherence to industry standards
and best practice for health and safety, quality and the environment.
We believe in taking responsibility for our actions as we strive to become
a truly sustainable business.

As we consolidate our business for future growth and expand our portfolio
of projects, the strength of our teams and the expertise and dedication of
our people will continue to be at the forefront. We are proud of our
reputation for quality and delivering what we promise.

People delivering expertise


Downshire Sea Defences for NIR, Northern Ireland. Fermoy Bypass PPP roads scheme, North Coast Highway Improvement, Jamaica.
Republic of Ireland.

Griffin Wind Farm, Scotland.


8 9
respons
responsible
At Lagan Construction Group we recognise that everything we do has an
impact on people and the environment. We believe that contributing to
the economic, environmental and social well-being of the communities
where we live and work is not only our responsibility but our duty.

Acting safely, responsibly and transparently is the very cornerstone of our


culture and is central to the way we behave. Conducting business in an
ethical manner is key to our success, enabling us to achieve our goal of
sustainable growth whilst demonstrating social and economic responsibility,
safeguarding our employees and protecting the environment.

Lough Key civils works and playground, Republic of Ireland.

Safety first Caring for the environment


Safety is an investment - for today, tomorrow In line with our policy of zero tolerance to poor safety, As a caring business we strive to continuously
and for our future. We are committed to we audit all our sites on a monthly basis to monitor health
improve our environmental performance and
and safety procedures and practices. Latest results show
providing a safe place of work for everyone maximise on opportunities to work as a team
greater than 85% compliance with our OHSAS 18001
and strive relentlessly to ensure all our management systems and our lowest ever Accident with our people, partners, customers and the
employees and partners understand their Frequency Rate which has been consistently below 0.3 public to create a better environment for all.
role in maintaining high safety standards. for the last two years, significantly lower than the industry Specific safety and environmental measures were required during
This is supported by extensive health and average. We also train our people to identify and speak We welcome the rising demand across every industry rock blasting on the construction of the new A1 at Cloghogue.

safety training programmes and a behavioural out when they see unsafe behaviours and to build on to reduce the carbon footprint. Our ISO 14001:2004 Our commitment to the environment was recognised
best practice to reduce unsafe acts. Environmental Management System includes procedures,
safety drive aimed at instilling a strong safety in 2009 when we won a Green Apple Award for
guidance and best practice to manage our construction sites Environmental Best Practice for the rainwater
culture that Our commitment to health and safety was recognised and office activities. We engage with our employees and the harvesting solution devised at Enniskilllen Wastewater
changes the when we received a certificate of distinction in the supply chain to promote environmental awareness and Treatment Works. On the A2 Maydown in the City of
way we think National Irish Safety Organisation/Northern Ireland responsible behaviour through initiatives including awareness Derry Airport project we received a Bronze Award in
and behave. Safety Group All Ireland Awards for 2011. We were also
training, regular audits and inspections, impact assessments the 2011 Considerate Constructors Scheme National
winners of the Right Place to Work Award in the Irish Site accolades.
and liaison with local agencies such as EHS, FEPA and SEPA.
News 2011 Workplace and Employment Awards.

On environmentally sensitive schemes we identify and


implement best practice to minimise the impact of our work -
protecting water courses, vegetation, wildlife and people.
Following detailed ecological assessment on our DBFO 2 road
scheme in Northern Ireland we installed mammal underpasses
beneath highways, adopted special bat mitigation measures on
nearby trees and provided sustainable urban drainage solutions.
During rock cutting on the A1 at Cloghogue we set up a safety
zone and regular monitoring of noise and vibration during blasts.
Winners in the Irish News 2011 Workplace and Fire fighting practice on North Coast Highway Crane rescue drill on Obel Tower Footbridge over the A2 providing access for local school children.
Employment Awards. Improvement scheme, Jamaica. Basement Car Park, Belfast, NI.

10 11
Working with communities Our wide ranging activities support many local and
national organisations including The Princes Trust,
In line with our commitment Business in the Community, Co-operation Ireland,
to Corporate Social Red Cross, Action Aid and Save the Children.
Under the Time to Read initiative a number of our
Responsibility we work with
employees are involved in helping primary school
schools, colleges, charities
children improve their literacy skills. In Northern
and neighbourhood groups Ireland, our teams have transformed a patch of
to provide support and disused land at Divis Mountain near Belfast into a
funding where its most community picnic area for local people to enjoy.
needed. Each year we
donate over 100,000 to We also provide a
number of sponsorship
various good causes and
and placement
contribute hundreds of
opportunities within our
hours of our employees business to encourage
time to give something young people to consider
back to communities. civil engineering as a
career.

Our People Development Programme provides a


range of training options for employees at every
level in the business, enabling them to learn new
skills and qualifications. As part of this, we aim to
provide at least four training days each year to every
member of staff. In addition, in 2008 we recruited 20
people onto our Graduate Programme to study for
professional qualifications in Civil Engineering or
Quantity Surveying, along with 18 year-long
Empowering our people placements and 14 summer placements.

We are proud of our people whose enthusiasm,


The benefits are evident in the results of our regular
skill and entrepreneurial spirit are key to our staff surveys which show consistently high levels of
success. We are committed to motivating and engaged and motivated employees, a measure of
developing each and every one of them by how we are viewed by our people.
providing excellent training and career
In 2010 we received a Belfast Telegraph Northern
opportunities.
Ireland Business Award in the category of Excellence
in People Development. All our businesses are
accredited to the Investors in People standard.

Working sustainably
We work sustainably by providing a first class Our runway improvement scheme at Luis Muoz Marin
service and treating our customers, partners International Airport was named Outstanding Civil
and suppliers with fairness and integrity at all Engineering Project of the Year in the 2008 Institution
of Civil Engineers of Puerto Rico Awards.
times. We work with all stakeholders to drive
down costs and achieve best value. In 2011 we were honoured to receive a CEF Excellence
Award in the Transport Infrastructure category for our
We are committed to developing innovative project work on the DBFO 2 road scheme. In the same year,
solutions through value engineering to shorten construction we received a Northern Ireland Chamber of Commerce
programmes and provide integrated options to exceed Award for Finding New International Markets.
customer requirements. Our efforts were rewarded when
we won the Achieving Excellence Partnering Award in the In addition we have been awarded two further
2008 CEF Specify Construction Excellence Awards for the prestigious accolades - Project Finance Deal of the Year
Dunore to Hydepark (D2H) Trunk Main project delivered by 2006 and Law Society Legal Deal of the Year, also 2006.
the Murphy-Lagan joint venture.

12 13
ROADS AIRPORTS WATER

ENERGY MARINE BUILDING

PILING INFRASTRUCTURE OPERATION


INVESTMENT & MAINTENANCE

roads
roads
We have a proven expertise and an excellent track record in the
roads sector, working as main contractor on traditional schemes
or as a partner on larger design and construct projects, whether
PROJECT: ROADS SERVICE DBFO PACKAGE 2
Commissioned by the DRD Roads Service, DBFO 2
was the largest ever highway scheme to be
awarded in Northern Ireland and has significantly
improved the regions infrastructure.

The 30-year 250 million roads contract was


delivered by the Amey Lagan Roads Public Private
frameworks or Public Private Partnerships (PPPs).
Partnership (PPP) under a design, build, finance and
operate agreement. We undertook the design and
Working closely with clients, our partners and the supply chain throughout
construction works, divided into three separate
the project life cycle, we combine creative planning, design and construction
schemes, as part of the Lagan Ferrovial joint venture.
services to develop the most appropriate infrastructure solutions for urban
and rural schemes, ensuring we exceed customer expectations every time.
DBFO 2 is a key project within Northern Irelands
We encourage and promote a partnering approach on every project we 18 billion investment strategy and aims to improve
deliver, focusing on innovative engineering techniques and advanced the road links between Belfast and Dublin and
technologies to minimise waste and reduce costs. between Belfast and Ballygawley.

Our teams can mobilise quickly to difficult and far spread international The works involved an upgrade of the existing A1 -
locations, utilising and operating our in-house range of up-to-date plant and including the provision of a new outer by-pass of the
FACT: In the last 10 years equipment to create better value and increased efficiencies for clients. existing dual carriageway at Newry, between Beech
we have delivered over
Hill and Cloghogue - provision of a new dual
500km We have the expertise and resources to support and deliver bespoke carriageway for the A4 from Dungannon to
of new roads
throughout Ireland, transport solutions from toll roads to arterial roads, access improvements, Ballygawley and the operation and maintenance of
the UK, Jamaica bypasses, bridges and associated infrastructure. the entire 125km length of road for 30 years,
and Puerto Rico.
including maintenance of pavements and structures.
Our experienced civil engineers and planners know what it takes to
deliver a programme of works to satisfy a clients requirements. We also
understand the necessity of providing solutions that address not just todays
but tomorrows infrastructure requirements.

We deliver roads projects for clients worldwide including local councils,


regional authorities, national governments, transport organisations and
private developers including business parks and retail developments.

People delivering expertise


Vieques National Wildlife Reserve road rehabilitation project, Puerto Rico. Limerick Tunnel Bypass PPP scheme - south approach, Republic of Ireland.

14 15
North Coast Highway Improvement, Jamaica. Fermoy Bypass PPP roads scheme, Republic of Ireland.

PROJECT: VIEQUES NATIONAL WILDLIFE


RESERVE ROAD REHABILITATION

Endangered species at a Caribbean wildlife


reserve are being protected following 3.8 million
of infrastructure improvement works carried out
by our international team. PROJECT: NEWCASTLE STREETSCAPE
AND PROMENADE
Situated eight miles off the coast of Puerto Rico, The revamp of Newcastle Streetscape and Promenade
the tiny island of Vieques is an area of ecological, in Northern Ireland has re-established the town as a
archaeological and historic significance popular seaside destination and returned it to its
containing several ecologically distinct habitats former Victorian splendour.
including beaches, coastal lagoons, mangrove
wetlands and upland forested areas as well as The 5.5 million environmental improvement
some of the best examples of sub-tropical dry programme in County Down successfully showcases
forest in the Caribbean. It is home to at least two contemporary design against the natural settings of
plants and eight animals on the US Federal the Mourne Mountains. We were commissioned by
endangered species list including the West Indian Scott Wilson on behalf of Down District Council to
manatee, the Brown Pelican and four types of deliver the project.
sea turtles.
The works included the realignment of Main Street,
We were commissioned by the US Department of some 1,200 linear metres, which involved the break
Transportation, Eastern Federal Lands Highways up of existing footpaths and their reinstatement with
Division, to repair 13 miles of local rural roads 12,000m2 of granite paving, as well as realignment of
within the reserve. A significant amount of granite road kerbs, replacement of the wearing course
earthworks were carried out and new culvert surface on Main Street, new services in footpaths,
pipes installed at creek crossings after which the street lighting, traffic signals and street furniture.
roads were resurfaced with a graded gravel
course in keeping with the natural surroundings. Promenade work included the construction of a
flood defence wall, new public toilets, timber board
walks, granite paving and a new raised reinforced
concrete promenade. Steps and ramps were built to
improve access to the beach in addition to the extension
and resurfacing of Downs Road car park, new lighting,
street furniture and associated soft landscaping.

Soufriere to Black Bay road scheme, St Lucia. North Coast Highway Improvement, Jamaica.

16 17
ROADS AIRPORTS WATER

ENERGY MARINE BUILDING

PILING INFRASTRUCTURE OPERATION


INVESTMENT & MAINTENANCE

airports
airports
The airport industry is experiencing significant change as airport
expansion plans rise to the top of government agendas to meet
the growing demand from todays tourists and business travellers.
PROJECT: MoD BOSCOMBE DOWN
The military airfield at MoD Boscombe Down in
Wiltshire saw a major runway redevelopment in three
phases completed ahead of programme in under 11
months whilst the airfield remained operational.

Commissioned by QuinetiQ on behalf of the Ministry


of Defence, the 1 1.4 million design and build
project involved the replacement of the northern
and southern thresholds with Pavement Quality
concrete, a new ground lighting network and
improvements to the pit and duct system. The 3km
The world is becoming smaller and at Lagan Construction Group we are helping main runway was resurfaced in Marshall Asphalt
to facilitate the development of airport infrastructure and buildings internationally, with a porous friction overlay on the central landing
often in remote parts of the globe. strip and the adjoining northern taxiway was also
resurfaced with a 14mm SMA material.
Airport infrastructure works are a core part of our business and our teams are
experienced in providing the engineering skills and technologies necessary to Working on a live military airfield presented a
deliver both airside and groundside support facilities. significant challenge for the delivery team. Detailed
plans and specific safety procedures were developed
Working closely with airport operators, owners and carriers - as well as with the to manage the operational risk and the partners
general public we understand the need for maximum safety and security within implemented regular workshops to monitor
live environments. Utilising our own batching plants and pavers to lay both asphalt performance and identify potential improvements.
or Pavement Quality Concrete (PQC), we work within tight time frames, minimising
lead times to reduce the impact of our works on customers and end users.
Our teams set up concrete and asphalt batching plants
on site to control the quality of the materials produced
FACT: Our specialist airport teams In every project location we utilise the expertise of our dedicated and long
and avoid any delays in delivery. In total, over 40,000
have laid in excess of established supply chain, working together to develop optimum solutions that
tonnes of asphalt, 10,000 tonnes of SMA and
6 million tonnes provide best value and exceed customer expectations.
11,000m3 of concrete was manufactured and laid.
of asphalt and concrete
at airports worldwide.
Our projects are delivered through a variety of procurement routes including
Design and Build, as consortium members and as international partners. In the last
ten years we have completed over 40 airfield projects worldwide - including the
development of new runways and taxiways, the improvement and upgrade of
existing infrastructure and the provision of a range of support facilities.

In the last 20 years we have completed infrastructure solutions at airports


worldwide including: Heathrow, London Luton, Gatwick, Belfast, Cardiff, Bristol
and Bournemouth in the UK; in Puerto Rico, Bahamas, British Virgin Islands and
Bermuda in the Caribbean; and in Hong Kong and Pakistan in the Middle East.

People delivering expertise


Project Paradigm - Taxiway Alpha Runway upgrade - Lungi International Airport, Sierra Leone. Runway extension and associated
Rehabilitation, London Luton infrastructure - Wallblake Airport, Anguilla.
International Airport.

18 19
Bristol International Airport runway and taxiways. Heathrow International Airport, Luis Muoz Marin International Airport, Puerto Rico.
Terminal 5C - Stands 561 and 562.

PROJECT: LONDON LUTON


INTERNATIONAL AIRPORT
The first of three contracts undertaken at London
Luton Airport, Project Lunar saw Lagan Construction
deliver a 14.2 million resurfacing and upgrade of
PROJECT: LUIS MUOZ MARIN
the runway in a record breaking 12 weeks. INTERNATIONAL AIRPORT
Our reconstruction of Luis Muoz Marin
A project of this type had never before been International Airport in San Juan, Puerto Rico
completed in shifts of less than six hours and within won a prestigious international award, beating off
such a tight programme. London Luton - a single
competition from more than 20 nominated
runway airport facilitating a number of low cost
schemes from leading contractors.
airlines - had originally been looking at 30 weeks
but thanks to significant contingency planning and
The 36 million project was named as Outstanding
risk management on the part of Lagan Construction,
Civil Engineering Project of the Year by the Institute
this was compressed to just 12 weeks, whilst
of Civil Engineers of Puerto Rico in recognition of
ensuring the runway was handed back each
the innovative programming and work methods
morning.
which saw pavement quality concrete (PQC)
produced on site in a bespoke 200 cubic metre per
The work was carried out during a series of short
hour batching plant.
night time possession periods between 12 midnight
and 5.30am and involved 140 people and 80 vehicles
and specialist plant all owned by Lagan Construction. Work on Luis Muoz Marin runway 10-28 was
The project included the rehabilitation of the runway carried out during phased runway possessions
and taxiway pavements, replacement of airfield throughout the construction period, enabling
ground lighting, drainage and associated elements. critical areas of the airport to remain operational
In the main surfacing works, 48,000 tonnes of throughout the refurbishment. Our team laid a
Marshall Asphalt was laid. total of 227,000m2 of PQC using a slip form paving
train, 60,000m3 of granular base and 40,000
Such was the success of the Project Lunar that Lagan tonnes of asphalt in addition to new aircraft
Construction returned to London Luton for two further ground lighting and drainage systems.
schemes. Project Paradigm saw the contractor deliver
a 1.1 million rehabilitation of Taxiway Alpha as part The successful completion underlines our ability
of ongoing improvement and maintenance works. to bring specialist skills in runway improvement
projects and PQC to the forefront, both in the UK
This was followed by Project Zebedee, a 1.6 million and worldwide.
landside project involving alterations to the central
terminal area road system to ease traffic congestion
at peak times, increase parking capacity and improve
protection to the terminal building. The 21-week
programme included reconfiguring existing drop off
zones and constructing new ones, creating
additional short term parking and improving the
main roundabout at the central terminal area.

Terrence B Lettsome International Airport, Heathrow International Airport, Terminal 5C Benazir Bhutto International Airport, Pakistan.
British Virgin Islands. - Stands 561 and 562, UK.

20 21
ROADS AIRPORTS WATER

ENERGY MARINE BUILDING

PILING INFRASTRUCTURE OPERATION


INVESTMENT & MAINTENANCE

water
PROJECT: WATERMAINS REHABILITATION
FRAMEWORK PHASE 2
Northern Ireland Water reselected Lagan
Construction for the second phase of its multi

water
million pound investment programme to upgrade
more than 1,000km of pipeline across the province,
improving water quality and supply.

Lagan Construction successfully rehabilitated


Essential for life, water is fundamental to the health of people across 700,000 metres of water main under phase one of
all continents. At Lagan Construction Group we are committed to the Watermains Rehabilitation scheme and was
awarded phase two under a framework worth
delivering efficient, effective and environmentally friendly facilities for
approximately 75 million to Lagan over five years.
the distribution and treatment of both clean and dirty water supplies.
The framework involves all enabling works, design,
We have particular expertise in the design and construction of water planning and management of water mains
distribution and collection networks where our highly trained teams rehabilitation and ancillary works, construction of
procure and manage the delivery of complete projects - from route new water mains or the replacement or renovation
selection, laying technique, dealing with utilities, connecting in existing of existing pipelines up to 600mm nominal diameter,
services, testing, commissioning and reinstatement. as well as construction and commissioning of potable
water pumping stations and service reservoirs and
The importance of treating wastewater and recycling it for beneficial associated ancillary works.
re-use is widely recognised. Through our close association with process
and civil engineering specialists we can offer a unique design and Where possible, cost effective, trenchless technologies
construction solution, or alternatively provide the civil engineering are being used to replace or rehabilitate water mains
aspects of a project. to mitigate the disruption caused by open-cut
trench construction. Construction methods include
Our experience in the water industry is built upon a reputation for pipe-bursting, slip-lining, directional drilling, spray
FACT: We have laid over successfully delivering the full spectrum of water and wastewater projects
lining and open cut depending on suitability and
1,700km over a 20-year period. We have a strong background in providing the most
associated ground and traffic conditions.
of pipeline in the reliable and cost effective solutions to benefit customers and end users.
last 10 years.

Working internationally, we utilise our skills and knowledge to assist


governments and local authorities in the management and re-use of
this valuable and essential resource.

We have successfully delivered water and wastewater schemes across


Ireland, the UK, Isle of Man and overseas.

People delivering expertise


Working on the Dunore to Hydepark (D2H) Ballacallin Mains Connectivity project, Gravity Mains to Tamavua Water Treatment Works, Fiji.
water pipeline, Northern Ireland. Isle of Man.

22 23
Larne Wastewater Treatment Works, Northern Ireland. Meary Veg Sewage Treatment Plant, Isle of Man.
PROJECT: BELFAST CROSSTOWN
MAIN EXTENSION
PROJECT: ENNISKILLEN WASTEWATER With the capacity to supply 50 million litres of high
TREATMENT WORKS quality drinking water daily from Lough Neagh to
As part of the Lagan Construction-Enpure homes in south and east Belfast, the citys
consortium we successfully delivered an 11.4 Crosstown Main pipeline is one of the largest and
million project to develop a new wastewater most important in Northern Ireland.
treatment plant at Enniskillen in Northern Ireland.
Northern Ireland Water commissioned Lagan
The contract for Northern Ireland Water replaced the Construction to build a 2.8km extension to the
existing sewerage works which was built in the early trunk main from Barnetts Park to Newtownbreda
1970s. The new plant incorporates preliminary, Road, reinforcing the link from Dunore Water
primary and secondary treatment processes along Treatment Works.
with sludge storage and thickening facilities. It is
designed to process wastewater from 35,000 homes The 2.9 million project involved the removal and
(12.5 Mega litres per day) to a minimum standard replacement of the existing pipe bridge over the
quality of treated discharge water of 20:30 Biological River Lagan, construction of a cross connection
(including the installation of a pressure reducing
Oxygen Demand: Suspended Solids (BOD:SS).
valve and strainer) at Breda Reservoir, construction
of a cross connection including a flowmeter and
Challenges to the construction work included poor
actuated inlet control valve at Purdysburn Reservoir
ground conditions, a high water table and strict
and connections to existing pipework at Barnetts
limits on odour, noise and vibration outputs to
Park and Newtownbreda Road.
minimise environmental impact.

The contract also saw the sliplining of one of the


largest diameter mains in Northern Ireland, with
approximately 1.1km of 800mm HPPE pipe
sliplined up the existing 39 steel main on the
Omagh Mountjoy Wastewater Treatment Works, Northern Ireland.
Annadale Embankment. This main reinforces the
bulk supply of water to Belfast city centre.

Work was carried out on some of the busiest roads


in Belfast, but traffic disruption was minimised by
extensive planning and traffic management at key
junctions. In line with environmental commitments,
the route of the pipeline was revised to avoid an
unrecorded badger set.

Annaghmore Wastewater Treatment Works, Northern Ireland. Sulby Water Treatment Works, Isle of Man. Watermains Rehabilitation
Framework, Northern Ireland.

24 25
Wind energy 15
Completed project
Wind energy is the fastest growing energy 17
Ongoing project
18
source worldwide and a eco friendly
ROADS AIRPORTS WATER
Energy from waste project
14 16

supply of sustainable energy for industrial, 3 10


19
4 2
5
commercial and domestic use. With the UK 11
1
ENERGY MARINE BUILDING
the windiest country in Europe, the sector
has immense growth potential. 13
12
9
Lagan Construction has more than ten years experience in 8 76 21
PILING INFRASTRUCTURE OPERATION
INVESTMENT & MAINTENANCE the wind sector and a proven track record in delivering large

energy
and medium sized wind farms in some of the most challenging
and sensitive environments throughout the UK and Ireland. 20

1 Bindoo Wind Farm 12 Castledockrell Wind Farm


As experts, we have the ability to manage multi-interface 10MW, Enercon Gmbh
48MW, SSE Renewables
contracts and work with clients to develop a bespoke service
2 Bessy Bell Wind Farm 13 Lindhurst Wind Farm

energy
from a full Design and Build capability or as a civil infrastructure 9MW, SSE Renewables 10MW, RWE Npower Ltd
contractor. We also have deep peat and in-house piling 3 Slieve Kirk Wind Farm 14 Kelburn Wind Farm
28 MW, SSE Renewables 28MW, RES Ltd
expertise for locations with difficult ground conditions.
4 Cokermore Wind Farm
15 Griffin Wind Farm
10 MW, Eco Wind Power
160MW, SSE Renewables
The global energy sector is facing a major challenge as the To date our teams have constructed wind farms producing 5 Tappaghan Wind Farm
16
over 200 MW of energy and are currently building several 28.MW, SSE Renewables Pates Hill Wind Farm
search for new supplies intensifies, with power companies more facilities generating a further 250MW of wind power. 6 Caherdowney Wind farm
14MW, Your Energy Ltd
17
continually striving to optimise the value of existing assets to 9MW, Eco Wind Power Lochelbank Wind Farm
12MW, RWE Npower
7 Coomacheo Wind Farm
develop a more efficient energy mix. 41MW, SSE Renewables 18 Muirhall Wind Farm
8
10MW, private client
Pallas 110KV Sub-Station
110KV Substation, ESBC 19 Girvan Wood Pellet
We are committed to providing clean, safe, sustainable sources of energy
9 Grouselodge Wind Farm Production Facility and
and are experienced in managing a wide range of projects - both in the Biomass Plant Land Energy
12.5MW, ESB Wind
development of civil infrastructure foundations and the construction of 20
10 Garves Wind Farm Nuffield Road Waste Transfer
power stations, recycling plants and other structures associated with the 10MW, Your Energy Ltd Station and Household Waste
Recycling Centre
renewable energy market. 11 Balloo Wood
1MW, North Down Council 21 Suffolk energy to waste plant
Our teams have the capability to deliver all kinds of sustainable
construction projects and work with clients, specialists and others to
develop new and efficient methods of reducing the carbon footprint and
Energy from waste
reliance on traditional fossil fuels.
Energy from waste is an increasingly In recent years, Lagan Construction has been working with
process providers, technical advisors and clients within the waste
FACT: To date we have We have a broad range of capabilities in the field of wind power regeneration, recognised approach to resolving two to energy sector. Having focused on state-of-the-art Mass Burn
installed and are
constructing up to
having successfully delivered major projects for energy customers key issues in one: waste management technology, we have developed a partnership with French
throughout Ireland and the UK and view this as a key growth area in our
500MW business. We are also experienced in constructing power stations and and sustainable energy.
specialist CNIM - which designs, produces and commissions
of wind energy. clean technology waste treatment plants that meet the strictest
other waste facilities, as well as newer forms of power generation - standards for performance and control of environmental impacts.
such as energy from waste, wave energy and bio mass production - and Waste represents an increasingly important fuel source
remain closely involved at the forefront of this fast growing sector. which can provide important environmental benefits. It is
The CNIM/Lagan JV has recently won its first project in the UK to
not only a safe and cost-effective method of disposing of
deliver a 140 million energy to waste plant which will generate
Working in partnership with clients and the supply chain, we deliver waste but can also help to reduce CO2 emissions. sufficient electricity for 30,000 homes, saving the equivalent of
projects safely, on time and within budget. Our aim is to construct facilities
75,000 tonnes of CO2 each year. The scheme will be developed
that meet current and future demands with minimal use of natural Unlike many other renewable energy sources, EfW is in Suffolk, England and is expected to start in 2012. As of July
resources, balancing pollution prevention requirements with performance. available 24/7 year-round and could potentially supply 2011, plant operated by CNIM/Lagan achieved the RI energy
over 10% of the UKs future electricity generating efficient threshold meeting EC guidelines. This ensures that
capacity as well as large quantities of heat energy. It is a plant is classed as recovery rather than disposal under the
key factor in helping the UK achieve its renewable and waste hierarchy, offering a more sustainable prospect to clients,
People delivering expertise CO2 reduction targets. investors and planners.

26 27
PROJECT: SLIEVE KIRK WIND FARM PROJECT: GRIFFIN WIND FARM
Lagan Construction is involved in the design and We are also principal contractors to SSE
construction of a 28.5MW wind farm at Slieve Kirk Renewables in Scotland, where our teams are
Mountain in Northern Ireland for long term client delivering a new wind farm development between
SSE Renewables. Aberfeldy and Dunkeld in Perthshire.

The project is being delivered on an upland blanket bog


The giant 68-turbine Griffin Wind farm spans 30km3
situated where County Derry crosses into County
- mainly commercial forestry - and when completed
Tyrone. Work began in July 2010 to construct
will have a total capacity of 156MW. Work got
12 Siemens 2.3MW turbine bases and associated hard
standings, 8,000m of access tracks (suitable to carry underway in July 201 0 and includes the construction
loads up to 140 tonnes up an 18% gradient), 7,500m of of the turbine bases, associated hard standings and
20KV collector circuits, laydown areas and a 110KV 34,000m of access roads including three new
sub-station. The scheme also includes 6,000m of precast concrete flexi-arch bridges to improve the
public road upgrade works to the site entrance and a delivery time.
bespoke SUDS drainage scheme.
All 68 turbine bases are being imported and fixed
Due to the difficult terrain, construction of the with 4,000 tonnes of reinforcement and placed in
access tracks and foundations presented a number 27,000m3 of structural concrete. An on-site batching
of challenges including varied depths of peat and
plant has been set up to produce all the concrete
vast inclusions of schist rock. The project design also
and aggregate required for the project and is tested
required specific environment mitigation measures to
in an on-site lab prior to use.
be adopted to protect the environment and nearby PROJECT: KILROOT POWER STATION
sensitive wildlife habitats. Environmental improvement works have
The scheme also includes the development,
significantly reduced emissions at Kilroot Power
As principal contractor, we are managing and co- operation and reinstatement of borrow pits which
Station, securing the future of the plant which
ordinating all site activities including turbine delivery require blasting to enable the extraction of
supplies electricity to around one third of homes
and erection, electrical contracts and overhead line 300,000m3 of material. Once processed, the
and businesses in Northern Ireland.
work. The project is on target for completion in late extracted material is re-used as rock fill, capping and
2011 and has already set new health, safety and sub-base for the construction of the access roads.
environmental standards for the industry. Situated on Belfast Lough at Carrickfergus, Kilroot
We are also designing and building four met mast has undergone a significant upgrade involving the
PROJECT: WOOD PELLET PRODUCTION bases, two operational buildings to turnkey construction of a new Seawater Flue Gas
FACILITY AND BIOMASS PLANT standard, new permanent drainage which requires Desulphurisation (FGD) plant. Our team delivered
Lagan Construction is to deliver an innovative civil installation and maintenance of temporary the infrastructure works package for the scheme
engineering and building package for a new wood environmental mitigation measures during on behalf of an Alstom/Amec joint venture.
pellet and biomass power plant at Girvan in Scotland
construction as well as managing the felling,
in an industry first for low carbon energy specialist The FGD utilises sea water coolant to treat the
clearing and marketing of 71 2 hectares of forestry.
Land Energy. sulphur dioxide in the flue gas. Our main task was
to install the foundation platform for the new
The multi-million pound project will include the PROJECT: NUFFIELD ROAD WASTE TRANSFER structure which involved the construction of a
construction of an onsite biomass combined heat and STATION AND HOUSEHOLD WASTE
sheet-piled cut-off wall using specialist concrete
power (CHP) plant to supply process heat and
RECYCLING CENTRE
manufactured for the first time in Northern Ireland.
electricity to the new wood pellet factory. In a UK first, This unique refurbishment project at Poole in
wood pelleting and Organic Rankine Cycle (ORC) power Dorset, England, is an integral part of the waste
Other work included re-routing pipe work to
turbine technologies are being brought together. strategy for the town and will ensure the future of
accommodate the new structures and erecting
the facility for the next 20 years.
four concrete buildings (two over 13m in height)
Once completed, the new facility will generate
alongside the existing power plant.
enough wood pellets to provide sufficient heat energy The current site is in need of substantial repairs to
for up to 15,000 homes. The timber used in the improve safety for the public, reduce waiting times
production process will be supplied locally from and prevent queues forming on the highway. More of
Scottish commercial forestry, ensuring the the operations undertaken at the new site will be
sustainability of this source of renewable energy. enclosed, including the transfer of waste that is
currently carried out in the open.
We are undertaking all the civil, structural and
building works required to adapt the site including The waste transfer station holds co-mingled recyclates
the conversion of three existing buildings which are for Poole and Bournemouth prior to transport to
being re-used as part of the new processing plant. material recovery facilities and for holding residual
Work will be delivered in two phases beginning in waste destined for energy from waste.
July 2011 with completion due in March 2012.
Griffin Wind Farm, Scotland. Islay Wave Energy Project, Scotland. Slieve Kirk Wind Farm, Northern Ireland.

28 29
ROADS AIRPORTS WATER

ENERGY MARINE BUILDING

PILING INFRASTRUCTURE OPERATION


INVESTMENT & MAINTENANCE

marine
marine
Throughout our history we have been closely associated with
marine projects and have acquired vast experience in developing
ports and harbour schemes both locally and internationally.
PROJECT: GREYSTONES MARINA PPP
Hailed as one of Irelands most challenging civil
engineering contracts, a 300 million marina and
housing development at Greystones in County
Wicklow has revitalised the towns Victorian
harbour which had fallen into disrepair.

Working in the most difficult construction environments, our knowledge The PPP Greystones Marina project was delivered
and expertise of this sector - coupled with modern construction by Sispar, a joint venture between John Sisk & Sons
techniques and the use of our own advanced plant and equipment - and Park Developments, and comprised a new
enables us to provide practical yet innovative value for money solutions harbour, marina, commercial units, luxury
on every project we undertake. apartments and a new coastguard station along
with significant reclamation and coastal
We work either as main contractor offering a complete design and
protection works.
construct solution or alternatively as a project partner delivering the civil
engineering works. Each scheme is project managed, enabling manpower,
Our teams undertook 50 million worth of marine
plant and logistics to be carefully planned, ensuring seamless and efficient
works including the construction of flood barriers,
construction to the highest standards throughout the programme.
breakwaters, quay walls and reclaiming land for
FACT: At Greystones Marina the new marina basin, multi-user slipways for
we have laid We place an emphasis on planning, safety and responsible working
small craft, swing moorings for existing fishing
4,900 methods which respect the environment and the local communities where
vessels, reconfiguration of the beach in the
precast concrete we operate.
existing harbour, a 230-berth marina and coastal
blocks and
protection works.
3,600 Operating internationally, we have been responsible for delivering several
precast revetments. major schemes in this important sector, working in the UK, Ireland, in the
Caribbean and South Pacific.

Our marine experience can be traced back to 1829, through the acquisition
of successful Scottish contractor Charles Brand Ltd, and includes all types
of marine construction from simple rock armour schemes to complex
breakwaters and harbour refurbishments.

People delivering expertise


Marine works, Solomon Islands. Marine infrastructure project, Solomon Islands.

30 31
Two views of Port Oriel modernisation project, Republic of Ireland. Quay wall repair, Port of Leith, Scotland.

PROJECT: LIMERICK TUNNEL PPP


We were a member of the DirectRoute consortium
which successfully delivered the 400 million
Limerick Tunnel PPP project, part of a larger PROJECT: WARRENPOINT
scheme to construct the final link in the citys ring RO-RO FERRY TERMINAL
road and integral to one of Irelands strategic Situated at the western end of Carlingford Lough in
national primary routes. County Down, Northern Ireland, Warrenpoint
Harbour is a busy sea port open to marine traffic
The contract for National Roads Authority (NRA) from all over the world. The 4.3 million project to
was undertaken on the basis of a design, build, install a new ro-ro ferry terminal had to be completed
finance and operate agreement over 35 years. during a planned shut down over the festive period.

A key aspect was the construction of a 675m long There were seven berths including a roll-on roll-off
tube tunnel running beneath the River Shannon. berth which required upgrading for use by larger
Five precast segments were constructed then vessels. We were commissioned to design and
floated out, immersed into a dredged underwater construct a new floating pontoon and two new
channel and joined together to form the tunnel. linkspan bridges, two berthing dolphins (including
walkways, fendering and mooring points) and
In addition, 10km of new dual carriageway, five river reclamation works.
crossings, four major interchanges, 17 structures
and two toll plazas along with associated utilities The works had to be co-ordinated with port activity
and connecting roads were constructed. including the berthing and mooring requirements of
vessels and tugs and onshore traffic movements,
with tidal conditions dictating the time slots available.
Specific health and safety methods and working
systems were developed to prevent falls into the
water or onto vessels below.

The project was delivered successfully without


incident or accident thanks to our rigorous safety
training and procedures.

Two views of Bridgetown Port reformation and expansion, Barbados.

32 33
ROADS AIRPORTS WATER

ENERGY MARINE BUILDING

PROJECT: GAN INTERNATIONAL AIRPORT


The redevelopment of Gan Airport to international
PILING INFRASTRUCTURE OPERATION
INVESTMENT & MAINTENANCE standards was a key part of the commitment by the

building
Republic of the Maldives Government to support the
fast expanding tourist industry in the islands.

Situated on the island of Gan, the airport was built by


the Royal Navy then transferred to the Royal Air Force

building
as RAF Gan. It operated as a military airbase during
World War II and until 1976 when the British handed it
over to the Maldives government as a domestic airport.

The 10.6 million project was delivered as a design,


At Lagan Construction Group we provide a comprehensive building
build and finance scheme and despite significant
service which is delivered through our regional teams to national logistical challenges was delivered ahead of
and international clients operating across a wide range of markets. programme. The project involved the design and
construction of a new 120m x 40m terminal building
The combination of local knowledge and international presence gives housing a range of all facilities including security
us a unique strength and flexibility to offer an integrated capability and baggage handling equipment, in addition to
including construction, Design and Build, the securing of finance as refurbishment of the control tower, upgrades to
well as early contract involvement. Our creative approach and ability to taxiways, aprons, airfield lighting and the navigation
deliver a consistently high standard of service underpins the durability system and a new fuel farm and fuel loading jetty.
of our customer relationships.
Many of the construction materials had to be procured
Experienced in managing a wide range of projects in the public and internationally, requiring extensive logistical planning to
private sectors, we have the expertise to deliver all kinds of sustainable ensure delivery by the key milestone. These materials
construction projects, working with clients, specialists and others to were shipped through Sri Lanka and Male before
reduce the carbon footprint. We focus on the design and construction beginning a further 500km journey via sea on small
of innovative, cost effective and energy saving buildings and are sea vessels to the project site.
dedicated to delivering projects safely, with minimal impact on
communities and the environment.
Following completion, the redevelopment of Gan
Airport won the British Construction Firm of the Year
We are committed to developing bespoke solutions which not only
2004 accolade at the BCCB British International
meet but exceed the requirements of our customers. Utilising and
Expertise Awards.
operating our extensive in-house plant fleet - including specialist piling
equipment and capability - enables us to create better project value
and increased savings.

At every stage of a project our partnering ethos creates a culture of


trust and co-operation. We continually strive for excellence through
ongoing, open and honest dialogue with partners and responsible
management of our supply chain, ensuring we deliver projects on time
and to budget, irrespective of size and complexity.

People delivering expertise


Sulby substation, Isle of Man. Ballydugan Retail Park, Downpatrick, Northern Ireland. Rosemount House, Belfast, Northern Ireland.

34 35
Park Road Amenity Centre, Northern Ireland. Customs Desks at Gan International Airport, Maldives.

PROJECT: BALLYDUGAN RETAIL PARK


The second phase of building work at Ballydugan
Retail Park in Downpatrick, saw the construction of
four new retail units as part of an expansion of one
of the busiest out-of-town shopping centres in
County Down.

The 2.5 million project for a private client was


completed in just 28 weeks on a fixed price basis
and involved the construction of a 23,000 sq ft
extension built of a steel frame, flat roof and steel
PROJECT: ROSEMOUNT HOUSE, BELFAST
clad walls in addition to a service yard at the rear
Lagan Construction Group commissioned its own
of existing retail outlets.
Building team to deliver an extension at its Belfast
headquarters to provide extra workspace and
Prior to construction, some 400 precast concrete
extensive high spec facilities for employees.
piles were driven into very soft ground to form the
foundations of the new units after which
The 1.5 million project involved the design and
approximately 3500m3 of reinforced concrete
construction of an additional 7,000 sq ft of offices
slabs and walls were placed. The works also
and open plan areas to provide 53 new work stations.
included construction of superstructure shell,
The design also incorporated two new meeting
provision of all services to the units, new car
rooms and an 800 sq ft kitchen to provide improved
parking and exterior walkways and a 150m long
dining and social facilities for staff.
600mm diameter storm culvert supported by steel
hangers on piles.
A further 2,000 sq ft of storage was included to
accommodate the companys growing number of
archives.

The project also involved the construction of a fully


landscaped outdoor seating and relaxation area for
staff to use during the fine weather.

All works were delivered on time and within budget.

Gan International Airport, Maldives. Ballydugan Retail Park, Downpatrick, Northern Ireland.

36 37
Our expertise
We offer clients proven expertise across the full spectrum of piling solutions.
ROADS AIRPORTS WATER Precast Concrete Foundation System
Our precast concrete piles, caps and ground beam products
are fully insured and designed to British Standards and have
been installed throughout Ireland and in the UK as a quality
ENERGY MARINE BUILDING
fast-track building solution, ideal for housing and retail schemes.

Driven Precast and Steel Piles


We have more than 30 years experience installing driven
precast piles, whether steel H, steel sheet, steel tubular or
PILING INFRASTRUCTURE OPERATION precast concrete.
INVESTMENT & MAINTENANCE

piling
CFA Piling
A low noise and vibration free solution in comparison to
driven piling, CFA piles are used where the project
environment is sensitive to such issues.

Bored Displacement Piles

piling
Bored displacement piles are used where low
vibration and minimal spoil generation are important in
project delivery.

Large Diameter Rotary Bored Piles Resonance free vibrating hammer


As the specialist piling division of the Lagan Construction Group, we are Rotary Bored Piling methods are used when large diameter
When noise and vibration have to be reduced in
predominantly granular soil, we can install piles using a
dedicated to providing high quality foundation and infrastructure solutions piles are required to provide high load capacity or for dealing
resonance free vibrating hammer.
with difficult ground conditions such as boulders and rock.
for projects of all sizes and complexity from major civil engineering schemes Leader rigs
Rock Drilling (DTHH)
to large commercial developments and one-off residential contracts. We offer rock drilling using down the hole hammer (DTHH)
Our ABI telescopic leader rigs range in size from 19m to
12m most with resonance free vibratory hammers and
methods for sizes up to 600mm in diameter.
Operating throughout Ireland and the UK, we work in partnership with clients to deliver a emit reduced noise and vibration, allowing piles to be
professional service. We continually focus on developing the most innovate piling schemes, Conventional sheet piling installed in sensitive environments.
supported by industry knowledge and experience gained over four decades. Our conventional hydraulic drop hammers can be adapted to
drive sheet, tubular and H section piles. Where air hammers
Pilemaster
The Pilemaster is particularly useful for silently installing
are the only solution to a specific driving problem, we can
We have expertise in the full range of recognised piling disciplines and in recent years have lighter pile sections or where water cannot be utilised to
provide N series hammers as required.
improved our capability and expanded our business through a bespoke employee development assist with penetration.
programme and the creation of specialist sector teams. Alongside this, we have achieved the Secant and Contiguous Retaining Walls
highest standards of quality, environmental and health and safety performance through our We have extensive experience installing retaining walls,
Movac
accreditation to industry best practice and continue to invest in new plant, processes and the Particularly effective where there is restricted headroom or
both secant and contiguous. Other piles include rotary
latest technology. awkward access, the Movac uses a vibrating hammer
bored, CFA, DTHH, sheet and king post piles.
mounted on a 360* excavator, which pivots to allow pick up
We operate from two locations situated six miles from Belfast and at Oldham in the north of
Giken and tosa silent pilers and driving by gripping the top or side of the pile.
Our silent pilers can install 400mm, 500mm and 600mm
England, where our state-of-the-art plant fleets are stationed. We hold extensive pile stocks and
profile piles and produce zero vibration and minimal noise.
Low headroom vibratory piling
manufacture a range of precast concrete products at both facilities, in addition to an in-house We jointly developed the worlds first CHOWA CHV 400
design service. Soil disturbance multipiler capable of installing wider, longer sheet piles in
A purpose built auger motor and flight replaces the vibrator on the most inaccessible locations, setting us at the forefront
We have achieved all relevant industry accreditations and our integrated management system the leader rig mast to disturb the soil at pile clutch positions. of environmentally friendly, low noise, low vibration piling.
is certified to ISO 9001, 14001 and 18001 in recognition of our compliance with international
standards for quality, environment and health and safety. We have also won a number of industry
commendations and awards for our high standards of health and safety awareness, training
and performance.

Our culture of continuous improvement commits us to an ongoing effort to minimise the impact
of our operations on the environment and communities and enables us to fulfil our own high
standards of quality in all areas of product range, manufacturing standards, operations and service.

People delivering expertise

38 39
PROJECT: PORT OF TYNE, NEWCASTLE PROJECT: BLACKFRIARS ROAD, LONDON PROJECT: BRANSHOLME RESERVOIR PROJECT: NEWHAVEN WASTE TO ENERGY
FK Lowry Piling is at the vanguard of change to A foundation solution delivered by Dew Piling has Dew Piling delivered a combined precast concrete
FK Lowry Piling delivered its first foundation
cleaner energy after constructing the foundations for played a key role in improving flood defences along a and steel sheet piling foundation package at a state-
project in central London at Blackfriars Road in
a state-of-the-art biomass plant at the Port of Tyne. stretch of the River Hull. of-the-art waste to energy facility at Newhaven, part
the heart of the City.
of an ambitious plan to recover value from
The new handling and storage facility has the Part of a 3.7 million project at Bransholme Reservoir household rubbish.
capacity to manage 1.4 million tonnes of biomass near Kingston upon Hull, the 800,000 piling works
per year for use at the co-firing Drax Power Station were commissioned by main contractor Black and
in North Yorkshire. At 125m x 75m, the huge storage Veatch. The project involved the construction of a
shed is the size of an aircraft hangar, holding up temporary bridge over a culvert and installation of
70,000 tons of biomass. sealed sheet piles through the existing bund around
the reservoir.
C Spencer commissioned FK Lowry for the 1 million
project which was delivered in seven weeks. Driven Using a TOSA silent piler and also conventional piling,
precast concrete piles were used to construct the Dew Piling installed 1,800 3W 9m sheet steel piles
foundations for a new portal frame and RC slab to through the existing bund. A 2m pile projection was left
store imported wood fuel pellets. Three rigs were above the ground, which was then clutch welded to
employed to install 1,515 precast piles - 270mm give a water tight seal. The work was carried out with
square and up to 32m in length, bearing in gravel - minimal disturbance to the wildlife at the site which is
for loads of up to 1,150kN. home to several species of wildfowl.

The client was specific in the programming of the


works as the priority was the installation of the piles
for the ring beam supporting the portal frame. Upon
completion of this element of the project all three
rigs commenced installation of the slab piles inside The 160 million scheme at North Quay, will produce
the ring beam. electricity and supply power equivalent to the
energy consumption of 16,500 homes.
With each rig installing over 500 linear metres of
PROJECT: HELLRIG WIND FARM
piles per day, the logistics of delivery (80% from FK Dew was commissioned for the 1.9 million piling
A unique circular cofferdam installed by Dew Piling
Lowrys plant at Lisburn and 20% cast in Oldham) The 600,000 high profile scheme for McAleer & works by Hochtief. Following precast trial piling and
formed a key part in the construction of a new wind farm
were key to the success of the project. Rushe involved the construction of a 5m high secant testing, 485 jointed segmental piles were installed
being built at Silloth in Cumbria.
piled retaining wall to form a single storey basement using a PM20 rig equipped with a five tonne
for a new hotel development. hydraulic hammer. The second phase saw 350mm
The 85,000 contract for Linden Homes saw the
square piles supplied by FK Lowry Piling driven
installation of 150 steel sheet piles, 9m in length, using a
Some 350 CFA bored secant wall piles and a further to act as bearing piles for a number of structures at
silent press method to form a permanent retaining wall.
1 41 CFA bored bearing piles, 600mm in diameter, the waste plant.
Due to the required height of the retaining wall up to 4m
were driven to depths of up to 23m into London Clay in places the piling solution incorporated 21 Duckbill
to create the 4m high retaining wall. The bearing The sheet piling works involved installation of a
anchors capable of supporting a 60kn working load.
piles were designed to carry loads of up to 1 600kn temporary sheet piled cofferdam to the dry dock
each and were installed to lengths up to 25.5m. structure in unstable ground conditions. The
construction required a deep basement structure to
Due to the city centre location, FKL put in place a be built in a temporary location and floated within a
sensitive and restrictive traffic management plan to flooded sheet piled cofferdam into its permanent
co-ordinate plant and material deliveries. The site is position. The structure was immersed to a depth of
also bound on three sides by existing office and 18m within a permanent diaphragm wall circular
residential buildings and a double storey basement cofferdam itself constructed to a depth of 32m.
is situated within meters on one elevation. Vibration The basement was immersed in phases, allowing
monitoring was therefore carried out throughout the Dew was commissioned for the 160,000 project by calculated wall lifts to be constructed during
contract to minimise disruption to neighbours and a Hanson Contracting to design and install 153 VL606A immersion.
static load test undertaken along with integrity steel sheet piles measuring between 12m and 14m. The
testing on the bearing piles. team used an ABI 14/17v telescopic leader rig fitted with Dew supplied 836 tonnes of steel sheet piles from
a 1000kn resonance free Vibro hammer to drive the piles stock, all treated with a special bitumen based
FKL also built the temporary guide wall and was through the soft upper peat layers into stiff clays below. sealant to make them water-tight. The temporary
responsible for the full pile design on the project. The piles formed a completely circular cofferdam to sheet piles were later extracted once the float-out
The works were delivered in ten weeks. contain the mass fill of the first wind turbine base. was complete.

40 41
ROADS AIRPORTS WATER

ENERGY MARINE BUILDING

PILING INFRASTRUCTURE OPERATION


INVESTMENT & MAINTENANCE

infrastructure Concession Management


investment
We are industry leaders in the provision of Infrastructure Investment
The demand for Concession Management is growing and
we have the skills and expertise to deliver added value
through the efficient and cost effective operation of a range
of infrastructure and building projects.

for projects being developed through partnerships between the Our services include:
public and private sectors. Our services on major schemes can be
delivered direct or as part of a consortium with the aim of ensuring Project Management Management periods typically from Financial Close to
Concession End (usually 25 to 35 years)
improved public services. We focus on tried and tested processes to manage the
Management of initial funds and draw downs
conduct, production and delivery of investment bids from
start to finish.
Complete project management service through the
design, construction and build stages
We have experience in managing and delivering complex investment
bids in key growth sectors including highways, water, healthcare, This includes:
Complete project management service through the
operational stages including overseeing of routine
building and civil engineering. Our expertise in project management
maintenance, full asset management and life cycle
and design - combined with our construction knowledge, innovative Consortia selection replacement schemes
approach and operational know-how enable us to deliver safe, Bid process
reliable and cost effective solutions. Arranging and managing project finance Our projects include: Fermoy By-pass, Republic of Ireland;
Commercial management Kinnegar Wastewater Treatment Works, Northern Ireland;
We offer unrivalled experience in securing the financial investment
Our projects include: Fermoy By-pass, Republic of Ireland; Limerick Road Tunnel, Republic of Ireland and DBFO 2
required for projects of all sizes and complexity, transferring the risk
Kinnegar Wastewater Treatment Works, Northern Ireland; Roads Scheme, Northern Ireland.
from the public sector to special purpose vehicle (SPV) companies
Limerick Road Tunnel, Republic of Ireland; Male International
structured for the task.
Airport, Maldives and DBFO 2 Roads Scheme, Northern Ireland.

Throughout every project we work closely with clients, partners and


our supply teams to deliver real value and create lasting relationships.

People delivering expertise


Limerick Tunnel PPP, Republic of Ireland. DBFO 2 Roads Scheme, Northern Ireland. Kinnegar Wastewater Treatment Works,
Northern Ireland.

42 43
ROADS AIRPORTS WATER

ENERGY MARINE BUILDING

PILING INFRASTRUCTURE OPERATION


INVESTMENT & MAINTENANCE

operation Roads and highways Hard and soft


& maintenance Typical responsibilities include:

Routine daily inspections and reporting of the road and


associated structures, drainage and furniture
landscaping management
As a natural cross-over from the maintenance of roads and
highways we also offer a management and maintenance
We have developed leading edge services designed to meet the Repairs identified in routine inspections temporary and support service for retail and business parks, shopping
centres, commercial offices, leisure facilities and
growing demands of people, organisations and the environment. permanent

Our teams go beyond the final delivery of a project to provide


Environmental management drainage, gully emptying educational institutions. This includes:
and car park/road sweeping, sludge removal, ponds
ongoing care and support, ensuring customers achieve maximum maintenance, roadkill removal and picking and disposal Environmental management drainage, gully emptying
of litter and debris and car park/road sweeping, sludge removal from foul
return throughout the life cycle of their facilities. water treatment facilities/septic tanks, roadkill removal
Traffic management - design and implementation of and disposal, picking and disposal of litter and debris and
schemes in urban or high speed environments with the
As Operation & Maintenance specialists, we have a proven track record in pest control
use of mobile closures as necessary
managing the long term operations and maintenance of major infrastructure
Landscape management grass/shrub/tree cutting, Cleaning of surfaces, signage, drainage or cladding
and buildings. We combine a range of flexible support services to create tailored management and weed control
Landscape management gardening, grass and tree
cutting, weeding and removal of leaves
support packages for our customers, working mainly in hard asset operation
FACT: During the 2010/2011 and maintenance, for government, local authorities, highway agencies and
Electrical apparatus lighting/signage, cleaning and lamp Maintenance of surfacing and markings
changes, cleaning and monitoring emergency roadside
winter seasons utilities companies alongside private businesses and other organisations.
telephones and other communications systems
Electrical apparatus lighting/signage, cleaning and
we supplied over lamp changes

80,000 Working in partnership with customers, we take care of their outsourced Furniture and signage cleaning and repairs, barrier Temporary and permanent repairs identified by daily
tonnes of salt into the repairs, road markings and stud repairs inspections car park furniture (gates, fencing, bollards,
assets, treating their investments as our own. We choose suppliers with
UK and Irish markets. complementary skills and expertise, working with them to exceed client Winter maintenance monitoring weather conditions and barriers and signs)

expectations in a mutually supportive network.


treatment decisions interpreting weather data from 24-hour response to incidents and winter maintenance
weather stations, forecasts, software and actual requirements salt treatment

Health and safety is our top priority and key to the way we work. We operate a conditions, salt spreading treatments and snow clearance
zero tolerance approach to poor safety performance and train all our people 24-hour incident response road incidents, incident Salt Supply
for the jobs they do protecting our workers and your staff and customers too. reaction management, liaison with emergency services, As part of our Operation & Maintenance, we also offer a
debris clearance, temporary and permanent repairs and specialised Salt Supply service, which plays an important
Our activities include: vehicle removal role in helping to ensure the nations strategic routes
Day to day routine maintenance Mechanical and electrical works to buildings and remain free of snow, ice and frost. Developed initially to
Periodic maintenance structures support our winter maintenance operations on a number of
Life time and damage or failed items replacement works key highway schemes, the service is now available
People delivering expertise throughout Ireland and the UK through third party sales.

44 45
At Lagan Construction Group we aim to provide a professional
service that is second to none. Our company is driven by the
needs of our clients, our people and partners. We are motivated
by a passion to deliver excellence through expertise.

Talk to us when you require a partner for your investment,


construction, piling, operational or maintenance needs.

Talk to us when you need people to deliver expertise that counts.

46

Anda mungkin juga menyukai