Anda di halaman 1dari 2

COMMENT CONTROL SHEET

PROJECT: RPLC DEEP CONVERSION


DOC. No. V-SIE-EL001-COMMON-048-D
SIEMENS DOC. No. (4)G65076-D1001-402-D
DOCUMENT TITILE Transformer Protection Panel Drawings
REVISION D DATE 3/28/2014

Comment HYUNDAI-WISON Close-out


No. Sheet No. HYUNDAI-WISON Comment SIEMENS Reply
by Confirmation Status

Clarification shall be made below point


regarding to the Q0 open command from
PSCS.

This is the open command from PSCS


without through going Local/Remote
selector switch on the GIS local. Noted, this command will be removed from
1 10 H. Shimizu RCP drawings.
On the other hand, GIS Circuit diagram SIE-
EL001-COMMON-028 Rev B Sheet MA1
includes PSCS off command as well
through Local/Remote selector switch. It is
an operator confusing logic, which shall be
clarified by Siemens/HIWIN and corrected.
Typical Comment
If wiring to be connected with external
panels provided by Contractor, please state
"By
2 10 W. S. Park contractor" . See comment N 1.
We will inform you the name of panel and
number of terminals.
Siemens shall incorporate it on this
drawing.

Anda mungkin juga menyukai