The decision to hire JP Cullen was the
right choice because JP Cullens ability to
combine the different trades under one hat
and work together as a team, pull in the
necessary subcontractors who accepted
the challenge, access materials and
equipment needed immediately, and their

ability to get the job done quickly and safely.
Manager Plant Engineering,
Hormel Foods Corporation

pg | 2
pg | 3
pg | 4
July 24, 2017

Frito-Lay
Adam Roth, Dresden Huston, and Tim Jackson
7701 Legacy Drive, 4A243
Plano, TX 75024

Dear Adam, Dresden, and Tim,

JP Cullen is uniquely qualified to bring Frito-Lay solutions that no other contractor can - we are confident the content of
this proposal will prove it. We respect your process and are proud to be invited to submit a proposal for the West Valley
FCP Warehouse project.
We have assembled a team of construction and engineering experts to ensure that this project is managed successfully
for Frito-Lay, your shareholders, your employees, and JP Cullen.
Some of JP Cullens recent similar projects include:
Frito-Lay Automations:

Beloit, WI TC3 Automation & PC 50 Automation


Rosenberg, TXSheeted TC Department Automation
San Antonio, TXPC Packaging Automation
Williamsport, PAPackaging Automation & PC Packaging Automation Phase 2
York, PATC Packaging Automation & PC Automation Phase 2
Frankfort, IN - TC & Popcorn Packaging Automation, (7) Tubes Popcorn (6) Tubes TC JPC Job
Rancho Cucamonga, CA - TC Packaging Automation

JP Cullen has completed processing and packaging jobs as well as equipment and conveyor installations projects very
similar to Frito-Lays for many Fortune 500 Clients and smaller clients throughout the United States and Wisconsin
including clients in the Food and Beverage, Aerospace, Automotive, Chemical, General Manufacturing and Power
industries.
Our clients have tough jobs with high expectations and no room for error with safety, budgets, or quality. From
conception to budgeting to project completion, we provide a full spectrum of construction services. Our extensive
experience in managing projects with budgets from $1,000 to over $80 million allows you to focus on your business and
daily activities, while JP Cullen executes the details of construction. You will receive a trustworthy and proven partner to
manage your project. Theres a reason weve stayed in business for 125 years - Let us show you.
We look forward to the opportunity to serve as your construction professional to meet and exceed your expectations for
this project.
Sincerely,

Chad Schakelman | VICE PRESIDENT, INDUSTRIAL DIVISION


JANESVILLE
E: chad.schakelman@JPCullen.com | P: 608.754.6601
MADISON
330 East Delavan Drive | Janesville, Wisconsin 53546 | p: 608.754.6601 | f: 608.754.9171
MILWAUKEE
JPCULLEN.COM
pg | 5
X E C U T I V E
E A R Y
SUMM
Four times, JP Cullen has been awarded by our industry association for the Marvin M. Black Excellence in
Partnering which recognizes quality, safety, and communication on the project. As an EPC, JP Cullen is not
just designing and constructing a building for Frito-Lay. Instead, JP Cullen is a business partner aligning our
strengths to help you, Frito-Lay, achieve your goals. It is our job as your EPC partner to finish your project
safely, on schedule, under budget and of the utmost quality. However, we understand that our real job is
assisting Frito-Lay in completing the West Valley City Processing project so you can begin producing Cheetos
Crunchy at a high rate and ultimately earn your Return on Investment.
Every EPC in our industry claims to provide the highest quality, best-qualified staff, up-to-the-minute
technology, modern equipment and dedication to client satisfaction. Any EPC that makes it as a finalist to this
proposal probably has those qualities. In fact, 90% of everything EPCs claim to do is the same. However, only
a few things will make the 10% difference between good and great on this project, including:

PRE-JOB PLANNING. A hallmark of JP Cullens approach to any project is


our pre-job planning. We will dedicate Tom Felstead, Erick Braaksma, and Brandon
Hill to an intense 2-week planning session in our planning center. During this time,

1
Tom, Ericks, and Brandons only responsibility is to plan the project using a checklist
we have developed that contains all of our lessons learned and best practices. At
the end, they will have finalized a comprehensive schedule that includes input
from all of the major subcontractors and Frito-Lay, and an execution plan that
incorporates the teams goals for the project.

JP Cullen studies Frito-Lays project and works closely with Frito-Lay to better
understand what will make this a successful project. For example, at Frito-Lays
Rosenberg, TX plant, JP Cullens BIM team went down ahead of the job team and
did some imaging to model the work area six weeks ahead of the crew going to the
site. Having these images and models was another reason for success. Frito-Lay
asked that we complete the job in 8 days and we met the challenge. We helped
them get to production faster so they can make chips and ultimately sell their
products and have a better ROI.

LASER SCANNING AND 3D BIM MODELING. JP Cullen has been


using Laser Scan Technology to help our clients eliminate assumptions and provide
you visual confirmation along with accurate dimensions resulting in reduced cost,
schedule savings, and risk mitigation. Using Laser Scanning saves time, reduces

2
costs, minimizes mistakes, and results in panoramic photographs. JP Cullen takes
the data we receive from the Laser Scan and creates 3D BIM Models. Our team
utilizes BIM to ensure that the detailed design and system components are both
integrated and coordinated to create a successful project. JP Cullen uses BIM for
greater MEPF coordination, team collaboration, and schedule savings as well as
reduction in change orders and project costs.
COLLABORATING TO DEVELOP COST SAVING ALTERNATIVES.
We listen and communicate with Frito-Lay and the entire team to develop innovative
solutions that meet your needs and wants while staying on budget and on schedule.

3 On a conveyor and equipment installation for a Fortune 500 Client, JP Cullens


team needed the field measurements of the existing steel to get the new structural
mezzanine steel designed and fabricated in time for installation prior to the
shutdown. The JP Cullen BIM (Building Information Modeling) team scanned
the existing steel, and the data was sent immediately to the steel fabricator.
With the new found knowledge of the existing steel, JP Cullens steel fabricator
could begin fabricating the steel and JP Cullen could begin reinforcing the trusses.
Due to JP Cullens use of laser scanning and pre-planning, Ball Corp was able to get
their production lines running 20% earlier than planned.

SELF-PERFORMED WORK. With 600+ skilled employees to draw on, we can


direct our schedule. We employ the most highly trained team of local construction
professionals in the industry today. Our company strives to self-perform as much of

4
the work on your project as possible. This benefits Frito-Lays project directly because
cost, project completion, and quality determine project success. Our trades include:
demolition, masonry, concrete, steel, carpentry and millwork.
We have developed a project execution schedule, reviewed deviations, cost
alternatives, and opportunities for Value Engineering, as well as developed a project
execution plan, assembled a strong project team with hundreds of years of experience
in delivering very similar projects and experience in working for Frito-Lay. We have the
design and construction ability to make this a successful project.

IF CHOOSING A TEAM OF DEDICATED AND EXPERIENCED


EXPERTS WHO WILL ENABLE SCHEDULE ACCELERATION,
HAVE A PROVEN TRACK RECORD OF ELIMINATING RISKS AND
UNCOVERING OPPORTUNITIES TO THE PROJECT BUDGET, AND
WHO YOU CAN COUNT ON TO KEEP THEIR COMMITMENTS, IS
IMPORTANT TO YOU, THEN SELECT JP CULLEN.
WITH US, YOU HAVE THE ASSURANCE OF A PROVEN TEAM THAT
WILL LEAD YOU TO A SUCCESSFUL PROJECT.

pg | 7
TA B L E
N T E N T S
O F C O
PROJECT PROJECT PROJECT
PRICING DEVIATIONS EXECUTION PLAN

PROJECT LIST OF SAFETY


SCHEDULE SUBCONTRACTORS PLAN

VALUE ADDED OUR TEAM & OTHER PROPOSAL


ENGINEERING EXPERIENCE REQUIREMENTS
I recognize the higher-level players that made the project
work, but these are the guys I dealt with every day.
They made a huge impression on me and reflect well
on JP Cullen. It was obvious that a great deal of training
and company support went into these people. They
wear their pride in the open and it shows in their work.

Charles A. Flynn, VP/Technical Director,


Bliss Communications, Inc.