RESUMEN DE METRADOS

Cliente GOBIERNO REGIONAL DE LIMA


Lugar HUAURA - HUAURA - HUAURA

METRADOS DE ESTRUCTURAS
COD. DESCRIPCION UNIDAD METRADO

ESTRUCTURAS
OBRAS PROVISIONALES
ALMACEN, OFICINAS, CASETA DE GUARDIANIA Y COMEDOR glb 1.00
CARTEL DE OBRA 3.60 X 5.40 und 1.00
SERVICIOS HIGIENICOS glb 1.00
AGUA PARA LA OBRA glb 1.00
ENERGIA ELECTRICA PARA LA OBRA glb 1.00
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL m2 5,866.66
TRANSPORTE DE EQUIPO Y MAQUINARIA glb 1.00
TRAZO Y REPLANTEO m2 5,866.66
MOVIMIENTO DE TIERRAS
CORTE DE TERRENO PARA ALCANZAR NIVEL DE PLATAFORMA m3 2,346.66
EXCAV.ZANJAS Y ZAPATA RT<2KG/CM2 H < 2.0 M m3 1,737.30
RELLENO COMPACTADO C/EQUIPO MAT/PROPIO m3 710.99
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES m3 74.19
ELIMINACION MATERIAL EXCEDENTE C/MAQUINA m3 5,030.77
OBRAS DE CONCRETO SIMPLE
SUBCIMIENTOS Y SOLADOS
SOLADO DE CONCRETO E=4", 1:10 CEM/HORM m2 414.04
CIMIENTOS
CIMIENTOS CORRIDOS 1:10 + 30 % P.G. f'c >=100Kg/cm2 m3 395.70
CIMIENTO CORRIDO, ENCOFRADO Y DESENCOFRADO m2 2,323.56
SOBRECIMIENTOS
SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M. f'c >=100Kg/cm2 m3 118.28
SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO m2 1,573.09
FALSO PISO
FALSO PISO MEZCLA 1:8 e=4" m2 2,535.92
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS - CONCRETO PREMEZCLADO f'c = 210 kg/cm2. m3 207.02
ZAPATAS.- ENCOFRADO Y DESENCOFRADO m2 638.78
ZAPATAS - ACERO DE REFUERZO Fy=4200 kg/cm2 kg 6,829.87
PLACAS
PLACAS - CONCRETO PREMEZCLADO fc=280 kg/cm2 m3 61.00
PLACAS.- ENCOFRADO Y DESENCOFRADO m2 719.25
PLACAS - ACERO Fy=4200 KG/CM2 kg 36,230.47
COLUMNAS
COLUMNAS, CONCRETO PREMEZCLADO f`c=210 kg/cm2 m3 155.28
COLUMNAS.- ENCOFRADO Y DESENCOFRADO m2 1,846.57
COLUMNAS - ACERO DE REFUERZO Fy=4200 kg/cm2 kg 18,218.91
VIGAS
VIGAS, CONCRETO PREMEZCLADO f`c=210 kg/cm2 m3 214.96
VIGAS.- ENCOFRADO Y DESENCOFRADO m2 1,985.95
VIGAS - ACERO DE REFUERZO Fy=4200 kg/cm2 kg 18,596.34
LOSA ALIGERADA EN UN SENTIDO
LOSA ALIGERADA - CONCRETO PREMEZCLADO f'c = 210 kg/cm2. m3 122.93
LOSA ALIGERADA.- ENCOFRADO Y DESENCOFRADO m2 1,404.23
LOSA ALIGERADA - LADRILLO HUECO 20x30x30 und 11,655.00
LOSA ALIGERADA EN DOS SENTIDOS
LOSA ALIGERADA - CONCRETO PREMEZCLADO f'c = 210 kg/cm2. m3 98.66
LOSA ALIGERADA EN DOS SENTIDOS, ENCOFRADO Y DESENCOFRADO m2 822.15
LOSA ALIGERADA - ACERO DE REFUERZO Fy=4200 kg/cm2 kg 43,654.92
LOSA ALIGERADA - LADRILLO HUECO 20x30x30 und 3,964.00
DINTELES
DINTELES - CONCRETO fc=210 kg/cm2 m3 6.62
DINTELES - ENCOFRADO Y DESENCOFRADO NORMAL m2 121.39
DINTELES - ACERO DE REFUERZO Fy=4200 kg/cm2 kg 295.06
ESCALERAS
ESCALERAS - CONCRETO PREMEZCLADO f'c = 210 kg/cm2. m3 5.25
ESCALERAS.- ENCOFRADO Y DESENCOFRADO m2 32.64
ESCALERAS - ACERO DE REFUERZO Fy=4200 kg/cm2 kg 466.85
CISTERNA
CISTERNA - CONCRETO PREMEZCLADO f'c = 210 kg/cm2. m3 8.03
CISTERNA.- ENCOFRADO Y DESENCOFRADO m2 15.08
CISTERNA - ACERO DE REFUERZO Fy=4200 kg/cm2 kg 3,467.00

ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5 CM m2 4,981.46
REVOQUES, ENLUCIDOS Y MOLDURAS
TARRAJEO PRIMARIO, MORTERO C:A 1:5 m2 10,487.28
TARRAJEO FROTACHADO DE MUROS INTERIORES Y EXTERIORES,MEZCLA 1:4 , e = 1.5 cm m2 10,487.28
TARRAJEO DE COLUMNAS m2 1,352.80
TARRAJEO DE VIGAS m2 1,315.06
TARRAJEO DE MUROS DE CONCRETO m2 254.60
TARRAJEO CON IMPERMEABILIZANTE m2 13,409.74
TARRAJEO CON BARITINA m2 2,182.91
RESANE DE MUROS,PISOS,VIGAS,COLUMNAS Y CIELO RASO CON MORTERO m2 13,409.74
CIELO RASOS
CIELO RASO CON MEZCLA C:A 1:5 m2 2,226.38
CIELO RASO CON BARITINA m2 355.39
FALSO CIELO RASO CON BALDOSA ACUSTICA DE FIBRA MINERAL m2 460.64
ENCUENTROS CURVOS CIELO RASO-MURO Y MURO-MURO CON MEZCLA C:A 1:5 m 4,049.82
PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO DE 40 mm,, MEZCLA 1:5, ACABADO 1:2 m2 945.30
PISOS DE CEMENTO
PISO DE CEMENTO PULIDO Y BRUADO E=2" S/COLOREAR m2 596.04
PISOS LOSETA CERAMICA
PISO DE CERAMICO 30 x 30 ANTIDESLIZANTE m2 2,535.92
SARDINELES REVESTIDOS
SARDINEL DE DUCHA REVESTIDO CON TERRAZO, h=10 cm m 3.91
VEREDAS
VEREDA CONCRETO 140 KG/CM2 e=6" FROT.Y BRUADO m2 362.21
SARDINEL SUMERGIDO EN VEREDAS, CONCRETO fc= 140 kg/cm2 m3 26.94
ENCOFRADO DE SARDINEL m2 359.23
PAVIMENTOS
SUB - BASE E=0.15m m2 1,316.67
BASE E=0.20m, CON MATERIAL DE PRESTAMO m2 1,316.67
IMPRIMACION ASFALTICA m2 1,316.67
CARPETA ASFALTICA EN CALIENTE E=2" m2 1,316.67
CONTRAZOCALOS
CONTR.PORCELANATO H=1.60 cm MZ 1:2 e=1.5 cm m2 4,194.91
ZOCALOS
ZOCALO DE CERAMICA m2 235.20
GRADAS Y ESCALERAS
REVEST. DE PASOS Y DESCANSOS CON CERAMICO m2 57.75
REVEST. C/CEMENTO PULIDO CON ENDURECEDOR EN PASO Y CONTRAPASO DE ESCALERA m2 57.75
REVEST. C/CEMENTO PULIDO DE CONTRAPASO m 16.80
REVEST. DE FONDO DE ESCALERAS m2 21.00
CANTONERA DE ALUMINIO, PERFIL ARQUITECTONICO TIPO FURUKAWA 042045 m 75.60
COBERTURAS
CUBIERTA DE LADRILLO PASTELERO m2 2,393.12
JUNTA RELLENA CON MATERIAL ASFALTICO EN LADRILLO PASTELERO m 4,786.24
CARPINTERIA DE MADERA
PUERTAS
PUERTA CONTRAPLACADA m2 463.47
CARPINTERA METLICA Y HERRERA
VENTANAS CON MARCO DE ALUMINIO
VENTANAS DE ALUMINIO TIPO V1 m2 184.29
REJAS DE METAL
REJA EXTERIOR m2 66.60
BARANDAS EN ESCALERAS Y RAMPAS
BARANDA METALICA EN ESCALERA ADOSADA A PISO m 132.20
BARANDA METALICA EN ESCALERA ADOSADO A MURO m 32.50
BARANDA METALICA EN RAMPA ADOSADO A PARAPETO m 21.50
OTROS ELEMENTOS METALICOS
MARCO Y TAPA DE CISTERNA m2 1.08
ESCALERA DE GATO m 9.00
LETRERO DE HOSPITAL EN INGRESO und 1.00
CERRAJERA
CERRADURA TIPO A, LLAVE DE SEGURIDAD POR LOS LADOS und 342.00
BISAGRA DE 4"x4" PESADA pza 684.00
AMAESTRAMIENTO DE CERRADURAS und 342.00
VIDRIOS, CRISTALES Y SIMILARES
VIDRIOS DOBLES TRANSPARENTES 4.5 mm. m2 184.29
MAMPARAS CON VIDRIO LAMINADO e=6mm
MAMPARA TIPO PM-1 m2 16.10
MAMPARAS CON VIDRIO TEMPLADO e=10mm
MAMPARA TIPO PM-2 m2 10.60
PINTURA
PINTURA LATEX 2 MANOS EN CIELO RASO Y VIGAS m2 4,212.34
PINTURA LATEX 2 MANOS EN INTERIORES Y EXTERIORES m2 10,487.28
PINTURA ANTICORROSIVA Y ESMALTE EN CARPINTERA METALICA m2 937.63
PINTURA DE SEALIZACION DE TRAFICO m 9.00
VARIOS, LIMPIEZA Y JARDINERIA
LIMPIEZA PERMANENTE DE LA OBRA glb 1.00
BOTADERO REVESTIDO CON CERAMICO, TIPO B-65 Y B-67 und 20.00
SEMBRADO DE GRAS EN JARDINES m2 409.78
SEPARADORES DE CONCRETO EN VENTANAS e=0.15m und 141.00
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT.


01.00.00 ARQUITECTURA
01.01.00 MUROS Y TABIQUES DE ALBAILERIA
NGRESO VEHICULAR 1.00
NGRESO VEHICULAR 1.00
NGRESO VEHICULAR 1.00
MODULO A 1.00
MODULO A 1.00
MODULO B 1.00
MODULO B 1.00
MODULO C 1.00
MODULO C 1.00
MODULO D 1.00
MODULO D 1.00
MODULO E 1.00
MODULO E 1.00
MODULO F 1.00
MODULO F 1.00
MODULO G 1.00
MODULO G 1.00
MODULO H 1.00
MODULO H 1.00
MODULO I 1.00
MODULO I 1.00
MODULO J 1.00
MODULO J 1.00
MODULO K 1.00
MODULO K 1.00
MODULO L 1.00
MODULO L 1.00
CERCO PERIM. 1.00

REVOQUES, ENLUCIDOS Y MOLDADURAS


TARRAJEO PRIMARIO, MORTERO C:A 1:5
INGRESO VEHICULAR 2.00
INGRESO VEHICULAR 2.00
INGRESO VEHICULAR 2.00
MODULO A 2.00
MODULO A 2.00
MODULO B 2.00
MODULO B 2.00
MODULO C 2.00
MODULO C 2.00
MODULO D 2.00
MODULO D 2.00
MODULO E 2.00
MODULO E 2.00
MODULO F 2.00
MODULO F 2.00
MODULO G 2.00
MODULO G 2.00
MODULO H 2.00
MODULO H 2.00
MODULO I 2.00
MODULO I 2.00
MODULO J 2.00
MODULO J 2.00
MODULO K 2.00
MODULO K 2.00
MODULO L 2.00
MODULO L 2.00
CERCO PERIM. 2.00

TARRAJEO FROTACHADO DE MUROS INTERIORES Y EXTERIORES, MEZCLA 1:4, e=1.5cm


INGRESO VEHICULAR 2.00
INGRESO VEHICULAR 2.00
INGRESO VEHICULAR 2.00
MODULO A 2.00
MODULO A 2.00
MODULO B 2.00
MODULO B 2.00
MODULO C 2.00
MODULO C 2.00
MODULO D 2.00
MODULO D 2.00
MODULO E 2.00
MODULO E 2.00
MODULO F 2.00
MODULO F 2.00
MODULO G 2.00
MODULO G 2.00
MODULO H 2.00
MODULO H 2.00
MODULO I 2.00
MODULO I 2.00
MODULO J 2.00
MODULO J 2.00
MODULO K 2.00
MODULO K 2.00
MODULO L 2.00
MODULO L 2.00
CERCO PERIM. m3 2.00

TARRAJEO EN COLUMNAS
ING. VEHI. C-2 17.00
MODULO A C-1 10.00
MODULO B C-1 2.00
MODULO B C-4 14.00
MODULO C C-3 36.00
MODULO D C-4 10.00
MODULO D C-1 15.00
MODULO E C-4 4.00
MODULO E C-3 16.00
MODULO E C-1 20.00
MODULO E C-2 5.00
MODULO F C-4 28.00
MODULO G C-2 21.00
MODULO H C-1 9.00
MODULO I C-1 16.00
MODULO J C-1 12.00
MODULO K C-1 12.00
MODULO L C-1 6.00

TARRAJEO EN VIGAS

MODULO A VA-103 1.00


MODULO A VA-104 1.00
MODULO A VA-105 1.00
MODULO A VA-106 1.00
MODULO A VA-107 1.00
MODULO B VB.101 1.00
MODULO B VB.102 1.00
MODULO B VB.103 1.00
MODULO B VB.104 1.00
MODULO B VB.105 1.00
MODULO B VB.106 1.00
MODULO B VB.107 1.00
MODULO B VB.108 1.00
MODULO B VB.109 1.00
MODULO B VCH 1.00
MODULO C VC-101 1.00
MODULO C VC-102 1.00
MODULO C VC-103 1.00
MODULO C VC-104 1.00
MODULO C VC-105 1.00
MODULO C VC-106 1.00
MODULO C VC-107 1.00
MODULO C VC-108 1.00
MODULO C VC-109 1.00
MODULO C VC-110 1.00
MODULO C VC-111 1.00
MODULO C VC-112 1.00
MODULO C VC-113 1.00
MODULO C VCH 1.00
MODULO D VD-101 1.00
MODULO D VD-102 1.00
MODULO D VD-103 1.00
MODULO D VD-104 1.00
MODULO D VD-105 1.00
MODULO D VD-106 1.00
MODULO D VD-107 1.00
MODULO D VD-108 0.00
MODULO D VD-109 1.00
MODULO D VD-110 1.00
MODULO E VE-101 1.00
MODULO E VE-102 1.00
MODULO E VE-103 1.00
MODULO E VE-104 1.00
MODULO E VE-105 1.00
MODULO E VE-106 1.00
MODULO E VE-107 1.00
MODULO E VE-108 1.00
MODULO E VE-109 1.00
MODULO E VE-110 1.00
MODULO E VE-111 1.00
MODULO E VE-112 1.00
MODULO E VE-113 1.00
MODULO F VF-101 1.00
MODULO F VF-102 1.00
MODULO F VF-103 1.00
MODULO F VF-104 1.00
MODULO F VF-105 1.00
MODULO F VF-106 1.00
MODULO F VF-107 1.00
MODULO F VF-108 1.00
MODULO F VF-109 1.00
MODULO F VF-110 1.00
MODULO F VF-111 1.00
MODULO F VF-112 1.00
MODULO G VG-101 1.00
MODULO G VG-102 1.00
MODULO G VG-103 1.00
MODULO G VG-104 1.00
MODULO G VG-105 1.00
MODULO G VG-106 1.00
MODULO G VG-107 1.00
MODULO G VG-108 1.00
MODULO G VG-109 1.00
MODULO G VG-110 1.00
MODULO G VG-111 1.00
MODULO G VCH 1.00
MODULO H VH-101 1.00
MODULO H VH-102 1.00
MODULO H VH-103 1.00
MODULO H VH-104 1.00
MODULO H VH-105 1.00
MODULO H VH-106 1.00
MODULO I VI-101 1.00
MODULO I VI-102 1.00
MODULO I VI-103 1.00
MODULO I VI-104 1.00
MODULO I VI-105 1.00
MODULO I VI-106 1.00
MODULO I VI-107 1.00
MODULO I VI-108 1.00
MODULO J VJ-101 1.00
MODULO J VJ-102 1.00
MODULO J VJ-103 1.00
MODULO J VJ-104 1.00
MODULO J VJ-105 1.00
MODULO J VJ-106 1.00
MODULO J VJ-107 1.00
MODULO J VJ-108 1.00
MODULO J VJ-109 1.00
MODULO J V-CH 1.00
MODULO K VK-101 1.00
MODULO K VK-102 1.00
MODULO K VK-103 1.00
MODULO K VK-104 1.00
MODULO K VK-105 1.00
MODULO K VK-106 1.00
MODULO K VK-107 1.00
MODULO K VK-108 1.00
MODULO L VL-101 1.00
MODULO L VL-102 1.00
MODULO L VL-103 1.00
MODULO L V-CH 1.00
MODULO LL VL-101 1.00
MODULO LL VL-102 1.00
MODULO LL V-CH 1.00
MODULO M VM-101 1.00
MODULO M VM-102 1.00
MODULO M VM-103 1.00
MODULO M VM-104 1.00

TARRAJEO EN MUROS DE CONCRETO


MODULO A 1.00
MODULO G 1.00
MODULO G 1.00
MODULO H 1.00
MODULO J 1.00
MODULO K 1.00
ASCENSOR 1.00

TARRAJEO CON IMPERMEABILIZANTE


TARRAJEO FROTACHADO DE MUROS INTERIORES Y EXTERIORES, MEZCLA 1:4, e=1.5cm 1.00
TARRAJEO EN COLUMNAS 1.00
TARRAJEO EN VIGAS 1.00
TARRAJEO EN MUROS DE CONCRETO 1.00

TARRAJEO CON BARITINA


MUROS
MODULO E 2.00
MODULO E 2.00
COLUMNAS
MODULO E C-4 4.00
MODULO E C-3 16.00
MODULO E C-1 20.00
MODULO E C-2 5.00
VIGAS
MODULO E VE-101 1.00
MODULO E VE-102 1.00
MODULO E VE-103 1.00
MODULO E VE-104 1.00
MODULO E VE-105 1.00
MODULO E VE-106 1.00
MODULO E VE-107 1.00
MODULO E VE-108 1.00
MODULO E VE-109 1.00
MODULO E VE-110 1.00
MODULO E VE-111 1.00
MODULO E VE-112 1.00
MODULO E VE-113 1.00

RESANE DE MUROS, PISOS, VIGAS, COLUMNAS, Y CIELO RASO CON MORTERO


MUROS
TARRAJEO FROTACHADO DE MUROS INTERIORES Y EXTERIORES, MEZCLA 1:4, e=1.5cm 1.00
TARRAJEO EN COLUMNAS 1.00
TARRAJEO EN VIGAS 1.00
TARRAJEO EN MUROS DE CONCRETO 1.00

VESTIDURA DE DERRAMES, MEZCLA 1:5 , e = 1.5 cm (Incl. Pintura)


PUERTAS
MODULO A 3.00
MODULO A 1.00
MODULO B 5.00
MODULO B 6.00
MODULO B 2.00
MODULO C 17.00
MODULO C 2.00
MODULO C 2.00
MODULO D 11.00
MODULO D 2.00
MODULO E 9.00
MODULO E 10.00
MODULO E 5.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 2.00
MODULO F 1.00
MODULO F 1.00
MODULO F 8.00
MODULO F 5.00
MODULO F 3.00
MODULO F 5.00
MODULO F 4.00
MODULO G 4.00
MODULO G 11.00
MODULO G 6.00
MODULO G 2.00
MODULO G 1.00
MODULO G 1.00
MODULO H 2.00
MODULO H 2.00
MODULO I 3.00
MODULO I 5.00
MODULO I 2.00
MODULO J 8.00
MODULO J 1.00
MODULO J 2.00
MODULO K 2.00
MODULO K 5.00
MODULO K 4.00
MODULO L 2.00

CIELO RASOS
CIELO RASO CON MEZCLA C:A 1:5
MODULO A 1.00
MODULO C 1.00
MODULO D 1.00
MODULO E 1.00
MODULO F 1.00
MODULO G 1.00
MODULO H 1.00
MODULO I 1.00
MODULO J 1.00
MODULO K 1.00
MODULO L 1.00
MODULO LL 1.00
MODULO M 1.00
MODULO B 1.00
MODULO E 1.00
MODULO F 1.00

CIELO RASO CON BARITINA


MODULO E 1.00
MODULO E 1.00

FALSO CIELO RASO CON BALDOSA ACUSTICA DE FIBRA MINERAL


FALSO CIELO RASO CON BALDOSA ACUSTICA DE FIBRA MINERAL 1.00

ENCUENTROS CURVOS CIELO RASO-MURO Y MURO-MURO CON MEZCLA C:A 1:5


CIELO RASO - MURO
INGRESO VEHICULAR 2.00
INGRESO VEHICULAR 2.00
INGRESO VEHICULAR 2.00
MODULO A 2.00
MODULO A 2.00
MODULO B 2.00
MODULO B 2.00
MODULO C 2.00
MODULO C 2.00
MODULO D 2.00
MODULO D 2.00
MODULO E 2.00
MODULO E 2.00
MODULO F 2.00
MODULO F 2.00
MODULO G 2.00
MODULO G 2.00
MODULO H 2.00
MODULO H 2.00
MODULO I 2.00
MODULO I 2.00
MODULO J 2.00
MODULO J 2.00
MODULO K 2.00
MODULO K 2.00
MODULO L 2.00
MODULO L 2.00
CERCO PERIM. 2.00

MURO - MURO
INGRESO VEHICULAR 9.00
MODULO A 20.00
MODULO B 16.00
MODULO C 8.00
MODULO D 24.00
MODULO E 28.00
MODULO F 12.00
MODULO G 72.00
MODULO H 12.00
MODULO I 12.00
MODULO J 48.00
MODULO K 12.00
MODULO L 40.00
CERCO PERIM. 44.00

PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO DE 40 mm,, MEZCLA 1:5, ACABADO 1:2

PISOS DE CEMENTO
PISOS DE CEMENTO PULIDO Y BRUADO E=2" S/COLOREAR

PISOS LOSETA DE CERAMICA


PISO CERAMICO 30x30 ANTIDESLIZANTE
INGRESO VEHICULAR 1.00
MODULO A 1.00
MODULO B 1.00
MODULO C 1.00
MODULO D 1.00
MODULO E 1.00
MODULO F 1.00
MODULO G 1.00
MODULO H 1.00
MODULO I 1.00
MODULO J 1.00
MODULO K 1.00
MODULO L 1.00

SARDINELES REVESTIDOS
SARDINEL DE DUCHA REVESTIDO CON TERRAZO, h=10 cm
MODULA B 1.00
MODULA G 1.00
MODULA J 1.00
MODULA F 1.00
MODULA E 1.00

VEREDAS
VEREDA CONCRETO 140 KG/CM2 e=6" FROT.Y BRUADO
VEREDA CONCRETO 140 KG/CM2 e=6" FROT.Y BRUADO 1.00
VEREDA CONCRETO 140 KG/CM2 e=6" FROT.Y BRUADO 1.00

SARDINEL SUMERGIDO EN VEREDAS, CONCRETO fc= 140 kg/cm2


SARDINEL SUMERGIDO EN VEREDAS, CONCRETO fc= 140 kg/cm2 1.00
SARDINEL SUMERGIDO EN VEREDAS, CONCRETO fc= 140 kg/cm2 1.00

ENCOFRADO DE SARDINEL
SARDINEL SUMERGIDO EN VEREDAS, CONCRETO fc= 140 kg/cm2 1.00
ENCOFRADO DE SARDINEL 1.00

PAVIMENTOS
SUB BASE E=0.15m
ESTACIONAMIENTO VEHCULAR 1.00
INGRESO VEHICULAR 1.00

BASE E=0.20m, CON MATERIAL DE PRESTAMO


ESTACIONAMIENTO VEHCULAR 1.00
INGRESO VEHICULAR 1.00

IMPRIMACION ASFALTICA
ESTACIONAMIENTO VEHCULAR 1.00
INGRESO VEHICULAR 1.00

CARPETA ASFALTICA EN CALIENTE E=2"


ESTACIONAMIENTO VEHCULAR 1.00
INGRESO VEHICULAR 1.00

CONTRAZOCALOS
CONTR.PORCELANATO H=1.60 cm MZ 1:2 e=1.5 cm
INGRESO VEHICULAR 2.00
INGRESO VEHICULAR 2.00
INGRESO VEHICULAR 2.00
MODULO A 2.00
MODULO A 2.00
MODULO B 2.00
MODULO B 2.00
MODULO C 2.00
MODULO C 2.00
MODULO D 2.00
MODULO D 2.00
MODULO E 2.00
MODULO E 2.00
MODULO F 2.00
MODULO F 2.00
MODULO G 2.00
MODULO G 2.00
MODULO H 2.00
MODULO H 2.00
MODULO I 2.00
MODULO I 2.00
MODULO J 2.00
MODULO J 2.00
MODULO K 2.00
MODULO K 2.00
MODULO L 2.00
MODULO L 2.00
CERCO PERIM. 2.00

ZOCALO
ZOCALO DE CERAMICA
MODULO A 1.00
MODULO B 1.00
MODULO C 1.00
MODULO D 1.00
MODULO E 1.00
MODULO F 1.00
MODULO G 1.00
MODULO H 1.00
MODULO I 1.00
MODULO J 1.00
MODULO K 1.00
MODULO L 1.00

GRADAS Y ESCALERAS
REVEST. DE PASOS Y DESCANSOS CON CERAMICO
3.00

REVEST. C/CEMENTO PULIDO CON ENDURECEDOR EN PASO Y CONTRAPASO DE ESCALERA


3.00

REVEST. C/CEMENTO PULIDO DE CONTRAPASO


3.00

REVEST. DE FONDO DE ESCALERAS


3.00

CANTONERA DE ALUMINIO, PERFIL ARQUITECTONICO TIPO FURUKAWA 042045


3.00
COBERTURAS
CUBIERTA DE LADRILLO PASTELERO
MODULO A 1.00
MODULO B 1.00
MODULO C 1.00
MODULO D 1.00
MODULO E 1.00
MODULO F 1.00
MODULO G 1.00
MODULO H 1.00
MODULO I 1.00
MODULO J 1.00
MODULO K 1.00
MODULO L 1.00

JUNTA RELLENA CON MATERIAL ASFALTICO EN LADRILLO PASTELERO


MODULO A 1.00
MODULO B 1.00
MODULO C 1.00
MODULO D 1.00
MODULO E 1.00
MODULO F 1.00
MODULO G 1.00
MODULO H 1.00
MODULO I 1.00
MODULO J 1.00
MODULO K 1.00
MODULO L 1.00

CARPINTERIA DE MADERA
PUERTA CONTRAPLACADA
MODULO A 3.00
MODULO A 1.00
MODULO B 5.00
MODULO B 6.00
MODULO B 2.00
MODULO C 17.00
MODULO C 2.00
MODULO C 2.00
MODULO D 11.00
MODULO D 2.00
MODULO E 9.00
MODULO E 10.00
MODULO E 5.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 2.00
MODULO F 1.00
MODULO F 1.00
MODULO F 8.00
MODULO F 5.00
MODULO F 3.00
MODULO F 5.00
MODULO F 4.00
MODULO G 4.00
MODULO G 11.00
MODULO G 6.00
MODULO G 2.00
MODULO G 1.00
MODULO G 1.00
MODULO H 2.00
MODULO H 2.00
MODULO I 3.00
MODULO I 5.00
MODULO I 2.00
MODULO J 8.00
MODULO J 1.00
MODULO J 2.00
MODULO K 2.00
MODULO K 5.00
MODULO K 4.00
MODULO L 2.00

VENTANAS CON MARCO DE ALUMINIO


MODULO A 4.00
MODULO B 1.00
MODULO B 3.00
MODULO B 3.00
MODULO B 2.00
MODULO B 1.00
MODULO B 1.00
MODULO B 1.00
MODULO B 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 2.00
MODULO C 1.00
MODULO C 2.00
MODULO C 1.00
MODULO D 8.00
MODULO D 2.00
MODULO E 2.00
MODULO E 1.00
MODULO E 2.00
MODULO E 1.00
MODULO E 2.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 2.00
MODULO E 2.00
MODULO F 1.00
MODULO F 1.00
MODULO F 2.00
MODULO F 1.00
MODULO F 1.00
MODULO F 2.00
MODULO F 1.00
MODULO F 1.00
MODULO F 1.00
MODULO F 1.00
MODULO F 1.00
MODULO F 2.00
MODULO F 1.00
MODULO F 1.00
MODULO G 1.00
MODULO G 9.00
MODULO G 2.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO I 5.00
MODULO I 5.00
MODULO I 1.00
MODULO I 2.00
MODULO J 11.00
MODULO J 2.00
MODULO K 1.00
MODULO K 1.00
MODULO K 3.00
MODULO K 1.00
MODULO L 3.00

REJAS DE METAL
REJA EXTERIOR 1.00
BARANDAS EN ESCALERAS Y RAMPA
BARANDA METALICA EN ESCALERA ADOSADO A PISO 1.00

BARANDA METALICA EN ESCALERA ADOSADO A MURO 1.00

BARANDA METALICA EN RAMPA ADOSADO A PARAPETO 1.00

OTROS ELEMENTOS METALICOS


MARCO Y TAPA DE CISTERNA 3.00

ESCALERA DE GATO 3.00

LETREO DE HOSPITAL EN INGRESO 1.00

CERRAJERIA

CERRAJERIA
CERRADURAS 2.00

BISAGRA 4.00

AMAESTRAMIENTO DE CERRADURAS 2.00

VIDRIOS, CRISTALES Y SIMILARES e=6mm


VIDRIOS DOBLES TRANSPARENTES 4.5mm
MODULO A 4.00
MODULO B 1.00
MODULO B 3.00
MODULO B 3.00
MODULO B 2.00
MODULO B 1.00
MODULO B 1.00
MODULO B 1.00
MODULO B 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 2.00
MODULO C 1.00
MODULO C 2.00
MODULO C 1.00
MODULO D 8.00
MODULO D 2.00
MODULO E 2.00
MODULO E 1.00
MODULO E 2.00
MODULO E 1.00
MODULO E 2.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 2.00
MODULO E 2.00
MODULO F 1.00
MODULO F 1.00
MODULO F 2.00
MODULO F 1.00
MODULO F 1.00
MODULO F 2.00
MODULO F 1.00
MODULO F 1.00
MODULO F 1.00
MODULO F 1.00
MODULO F 1.00
MODULO F 2.00
MODULO F 1.00
MODULO F 1.00
MODULO G 1.00
MODULO G 9.00
MODULO G 2.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO I 5.00
MODULO I 5.00
MODULO I 1.00
MODULO I 2.00
MODULO J 11.00
MODULO J 2.00
MODULO K 1.00
MODULO K 1.00
MODULO K 3.00
MODULO K 1.00
MODULO L 3.00

MAMPARAS CON VIDRIO LAMINADO e=6mm


MODULO E 1.00
MODULO E 2.00
MODULO F 5.00
MODULO G 1.00

MAMPARA CON VIDRIO TEMPLADO e=10mm


PASADIZO 4.00
PASADIZO 2.00

PINTURA
PINTURA LATEX 2 MANOS EN CIELO RASO Y VIGAS
MODULO A 1.00
MODULO C 1.00
MODULO D 1.00
MODULO E 1.00
MODULO F 1.00
MODULO G 1.00
MODULO H 1.00
MODULO I 1.00
MODULO J 1.00
MODULO K 1.00
MODULO L 1.00
MODULO LL 1.00
MODULO M 1.00
MODULO B 1.00
MODULO E 1.00
MODULO F 1.00
MODULO A 1.00
MODULO A 1.00
MODULO A 1.00
MODULO A 1.00
MODULO A 1.00
MODULO B 1.00
MODULO B 1.00
MODULO B 1.00
MODULO B 1.00
MODULO B 1.00
MODULO B 1.00
MODULO B 1.00
MODULO B 1.00
MODULO B 1.00
MODULO B 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO D 1.00
MODULO D 1.00
MODULO D 1.00
MODULO D 1.00
MODULO D 1.00
MODULO D 1.00
MODULO D 1.00
MODULO D 1.00
MODULO D 1.00
MODULO D 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO F 1.00
MODULO F 1.00
MODULO F 1.00
MODULO F 1.00
MODULO F 1.00
MODULO F 1.00
MODULO F 1.00
MODULO F 1.00
MODULO F 1.00
MODULO F 1.00
MODULO F 1.00
MODULO F 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO H 1.00
MODULO H 1.00
MODULO H 1.00
MODULO H 1.00
MODULO H 1.00
MODULO H 1.00
MODULO I 1.00
MODULO I 1.00
MODULO I 1.00
MODULO I 1.00
MODULO I 1.00
MODULO I 1.00
MODULO I 1.00
MODULO I 1.00
MODULO J 1.00
MODULO J 1.00
MODULO J 1.00
MODULO J 1.00
MODULO J 1.00
MODULO J 1.00
MODULO J 1.00
MODULO J 1.00
MODULO J 1.00
MODULO J 1.00
MODULO K 1.00
MODULO K 1.00
MODULO K 1.00
MODULO K 1.00
MODULO K 1.00
MODULO K 1.00
MODULO K 1.00
MODULO K 1.00
MODULO L 1.00
MODULO L 1.00
MODULO L 1.00
MODULO L 1.00
MODULO LL 1.00
MODULO LL 1.00
MODULO LL 1.00
MODULO M 1.00
MODULO M 1.00
MODULO M 1.00
MODULO M 1.00

PINTURA LATEX 2 MANOS EN INTERIORES Y EXTERIORES


INGRESO VEHICULAR 2.00
INGRESO VEHICULAR 2.00
INGRESO VEHICULAR 2.00
MODULO A 2.00
MODULO A 2.00
MODULO B 2.00
MODULO B 2.00
MODULO C 2.00
MODULO C 2.00
MODULO D 2.00
MODULO D 2.00
MODULO E 2.00
MODULO E 2.00
MODULO F 2.00
MODULO F 2.00
MODULO G 2.00
MODULO G 2.00
MODULO H 2.00
MODULO H 2.00
MODULO I 2.00
MODULO I 2.00
MODULO J 2.00
MODULO J 2.00
MODULO K 2.00
MODULO K 2.00
MODULO L 2.00
MODULO L 2.00
CERCO PERIM. 2.00

PINTURA ANTICORROSIVA Y ESMALTADE EN CARPINTERIA


MODULO A 2.00 3.00
MODULO A 2.00 1.00
MODULO B 2.00 5.00
MODULO B 2.00 6.00
MODULO B 2.00 2.00
MODULO C 2.00 17.00
MODULO C 2.00 2.00
MODULO C 2.00 2.00
MODULO D 2.00 11.00
MODULO D 2.00 2.00
MODULO E 2.00 9.00
MODULO E 2.00 10.00
MODULO E 2.00 5.00
MODULO E 2.00 1.00
MODULO E 2.00 1.00
MODULO E 2.00 1.00
MODULO E 2.00 1.00
MODULO E 2.00 2.00
MODULO F 2.00 1.00
MODULO F 2.00 1.00
MODULO F 2.00 8.00
MODULO F 2.00 5.00
MODULO F 2.00 3.00
MODULO F 2.00 5.00
MODULO F 2.00 4.00
MODULO G 2.00 4.00
MODULO G 2.00 11.00
MODULO G 2.00 6.00
MODULO G 2.00 2.00
MODULO G 2.00 1.00
MODULO G 2.00 1.00
MODULO H 2.00 2.00
MODULO H 2.00 2.00
MODULO I 2.00 3.00
MODULO I 2.00 5.00
MODULO I 2.00 2.00
MODULO J 2.00 8.00
MODULO J 2.00 1.00
MODULO J 2.00 2.00
MODULO K 2.00 2.00
MODULO K 2.00 5.00
MODULO K 2.00 4.00
MODULO L 2.00 2.00

PINTURA DE SEALIZACION DE TRAFICO


PINTURA DE SEALIZACION DE TRAFICO 12.00

VARIOS, LIMPIEZA Y JARDINERIA


LIMPIEZA PERMANENTE DE LA OBRA 1.00

BOTADERO REVESTIDO CON CERAMICO, TIPO B-65 Y B-67 20.00

SEMBRADO DE GRAS EN JARDINES 1.00

SEPARADORES DE CONCRETO EN VENTANAS e=0.15m


MODULO A 4.00
MODULO B 1.00
MODULO B 3.00
MODULO B 3.00
MODULO B 2.00
MODULO B 1.00
MODULO B 1.00
MODULO B 1.00
MODULO B 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 1.00
MODULO C 2.00
MODULO C 1.00
MODULO C 2.00
MODULO C 1.00
MODULO D 8.00
MODULO D 2.00
MODULO E 2.00
MODULO E 1.00
MODULO E 2.00
MODULO E 1.00
MODULO E 2.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 1.00
MODULO E 2.00
MODULO E 2.00
MODULO F 1.00
MODULO F 1.00
MODULO F 2.00
MODULO F 1.00
MODULO F 1.00
MODULO F 2.00
MODULO F 1.00
MODULO F 1.00
MODULO F 1.00
MODULO F 1.00
MODULO F 1.00
MODULO F 2.00
MODULO F 1.00
MODULO F 1.00
MODULO G 1.00
MODULO G 9.00
MODULO G 2.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO G 1.00
MODULO I 5.00
MODULO I 5.00
MODULO I 1.00
MODULO I 2.00
MODULO J 11.00
MODULO J 2.00
MODULO K 1.00
MODULO K 1.00
MODULO K 3.00
MODULO K 1.00
MODULO L 3.00
LARGO ANCHO ALTURASUB TOTAL TOTAL

4981.46
21.05 3.80 79.99
2.10 3.80 7.98
5.00 3.80 19.00
6.66 3.80 25.31
13.81 3.80 52.48
54.65 3.80 207.67
37.48 3.80 142.42
87.61 3.80 332.92
109.87 3.80 417.51
39.10 3.80 148.58
54.89 3.80 208.58
105.53 3.80 401.01
106.93 3.80 406.33
70.89 3.80 269.38
63.82 3.80 242.52
52.38 3.80 199.04
43.33 3.80 164.65
25.90 3.80 98.42
16.58 3.80 63.00
36.98 3.80 140.52
26.75 3.80 101.65
18.89 3.80 71.78
33.93 3.80 128.93
20.92 3.80 79.50
17.63 3.80 66.99
6.63 3.80 25.19
9.54 3.80 36.25
222.06 3.80 843.83

10487.28
21.05 4.00 168.40
2.10 4.00 16.80
5.00 4.00 40.00
6.66 4.00 53.28
13.81 4.00 110.48
54.65 4.00 437.20
37.48 4.00 299.84
87.61 4.00 700.88
109.87 4.00 878.96
39.10 4.00 312.80
54.89 4.00 439.12
105.53 4.00 844.24
106.93 4.00 855.44
70.89 4.00 567.12
63.82 4.00 510.56
52.38 4.00 419.04
43.33 4.00 346.64
25.90 4.00 207.20
16.58 4.00 132.64
36.98 4.00 295.84
26.75 4.00 214.00
18.89 4.00 151.12
33.93 4.00 271.44
20.92 4.00 167.36
17.63 4.00 141.04
6.63 4.00 53.04
9.54 4.00 76.32
222.06 4.00 1776.48

10487.28
21.05 4.00 168.40
2.10 4.00 16.80
5.00 4.00 40.00
6.66 4.00 53.28
13.81 4.00 110.48
54.65 4.00 437.20
37.48 4.00 299.84
87.61 4.00 700.88
109.87 4.00 878.96
39.10 4.00 312.80
54.89 4.00 439.12
105.53 4.00 844.24
106.93 4.00 855.44
70.89 4.00 567.12
63.82 4.00 510.56
52.38 4.00 419.04
43.33 4.00 346.64
25.90 4.00 207.20
16.58 4.00 132.64
36.98 4.00 295.84
26.75 4.00 214.00
18.89 4.00 151.12
33.93 4.00 271.44
20.92 4.00 167.36
17.63 4.00 141.04
6.63 4.00 53.04
9.54 4.00 76.32
222.06 4.00 1776.48

1352.80
1.00 4.00 68.00
1.20 4.00 48.00
1.20 4.00 9.60
1.60 4.00 89.60
1.50 4.00 216.00
1.60 4.00 64.00
1.20 4.00 72.00
1.60 4.00 25.60
1.50 4.00 96.00
1.20 4.00 96.00
1.20 4.00 24.00
1.60 4.00 179.20
1.20 4.00 100.80
1.20 4.00 43.20
1.20 4.00 76.80
1.20 4.00 57.60
1.20 4.00 57.60
1.20 4.00 28.80

1315.06
2.90 0.30 0.15 1.74
2.90 0.30 0.15 1.74
2.90 0.30 0.15 1.74
15.35 0.30 0.15 9.21
15.35 0.30 0.15 9.21
14.37 0.30 0.35 14.37
14.37 0.30 0.35 14.37
13.50 0.30 0.35 13.50
13.50 0.30 0.35 13.50
13.50 0.30 0.35 13.50
15.65 0.30 0.15 9.39
15.65 0.30 0.15 9.39
3.51 0.30 0.15 2.11
15.65 0.30 0.15 9.39
31.30 0.30 0.05 12.52
18.51 0.25 0.30 15.73
18.51 0.25 0.30 15.73
18.51 0.25 0.30 15.73
13.00 0.25 0.30 11.05
13.00 0.25 0.30 11.05
18.51 0.25 0.30 15.73
19.00 0.25 0.30 16.15
19.00 0.25 0.30 16.15
19.00 0.25 0.30 16.15
28.91 0.25 0.20 18.79
28.91 0.25 0.20 18.79
28.91 0.25 0.20 18.79
28.91 0.25 0.20 18.79
6.88 0.25 0.05 2.41
14.50 0.30 0.15 8.70
14.50 0.30 0.15 8.70
14.50 0.30 0.15 8.70
14.50 0.30 0.15 8.70
14.50 0.30 0.15 8.70
23.25 0.30 0.30 20.93
23.25 0.30 0.30 20.93
23.25 0.30 0.30 20.93
23.25 0.30 0.30 20.93
23.25 0.30 0.30 20.93
17.45 0.25 0.30 14.83
17.45 0.25 0.30 14.83
17.45 0.25 0.30 14.83
17.45 0.25 0.30 14.83
14.50 0.30 0.30 13.05
14.50 0.30 0.30 13.05
14.50 0.30 0.30 13.05
14.50 0.30 0.30 13.05
28.91 0.30 0.30 26.02
28.91 0.30 0.30 26.02
28.91 0.30 0.30 26.02
28.91 0.30 0.30 26.02
28.91 0.30 0.30 26.02
32.00 0.30 0.30 28.80
32.00 0.30 0.30 28.80
32.00 0.30 0.30 28.80
32.00 0.30 0.30 28.80
16.45 0.30 0.30 14.81
16.45 0.30 0.30 14.81
16.45 0.30 0.30 14.81
16.45 0.30 0.30 14.81
16.45 0.30 0.30 14.81
16.45 0.30 0.30 14.81
16.45 0.30 0.30 14.81
16.45 0.30 0.30 14.81
18.00 0.25 0.20 11.70
18.00 0.25 0.20 11.70
18.00 0.25 0.20 11.70
18.00 0.25 0.20 11.70
18.00 0.25 0.20 11.70
13.45 0.25 0.20 8.74
13.45 0.25 0.20 8.74
13.45 0.25 0.20 8.74
3.68 0.25 0.20 2.39
7.26 0.25 0.20 4.72
13.45 0.25 0.20 8.74
6.02 0.25 0.20 3.91
8.02 0.30 0.20 5.61
8.02 0.30 0.20 5.61
8.02 0.30 0.20 5.61
8.23 0.30 0.20 5.76
8.23 0.30 0.20 5.76
8.23 0.30 0.20 5.76
19.55 0.30 0.25 15.64
19.55 0.30 0.25 15.64
4.95 0.30 0.25 3.96
4.95 0.30 0.25 3.96
4.95 0.30 0.25 3.96
4.95 0.30 0.25 3.96
4.95 0.30 0.25 3.96
4.95 0.30 0.25 3.96
5.63 0.30 0.25 4.50
5.63 0.30 0.25 4.50
5.63 0.30 0.25 4.50
9.01 0.30 0.30 8.11
9.01 0.30 0.30 8.11
16.94 0.30 0.25 13.55
10.28 0.30 0.25 8.22
4.18 0.30 0.25 3.34
4.18 0.30 0.25 3.34
6.96 0.30 0.05 2.78
18.85 0.30 0.20 13.20
18.85 0.30 0.20 13.20
4.00 0.30 0.20 2.80
4.00 0.30 0.20 2.80
4.00 0.30 0.20 2.80
4.00 0.30 0.20 2.80
4.00 0.30 0.20 2.80
4.00 0.30 0.20 2.80
5.36 0.30 0.25 4.29
5.36 0.30 0.25 4.29
5.36 0.30 0.25 4.29
11.34 0.30 0.05 4.54
7.20 0.30 0.30 6.48
7.20 0.30 0.30 6.48
7.88 0.30 0.05 3.15
5.02 0.30 0.20 3.51
5.02 0.30 0.20 3.51
4.69 0.30 0.20 3.28
4.69 0.30 0.20 3.28

254.60
11.70 4.00 46.80
9.54 4.00 38.16
2.99 4.00 11.96
10.88 4.00 43.52
9.56 4.00 38.24
9.48 4.00 37.92
9.50 4.00 38.00

13409.74
AREA= 10487.28
AREA= 1352.80
AREA= 1315.06
AREA= 254.60

2182.91

105.53 4.00 844.24


106.93 4.00 855.44

1.60 4.00 25.60


1.50 4.00 96.00
1.20 4.00 96.00
1.20 4.00 24.00
17.45 0.25 0.30 14.83
17.45 0.25 0.30 14.83
17.45 0.25 0.30 14.83
17.45 0.25 0.30 14.83
14.50 0.30 0.30 13.05
14.50 0.30 0.30 13.05
14.50 0.30 0.30 13.05
14.50 0.30 0.30 13.05
28.91 0.30 0.30 26.02
28.91 0.30 0.30 26.02
28.91 0.30 0.30 26.02
28.91 0.30 0.30 26.02
28.91 0.30 0.30 26.02

13409.74
AREA= 10487.28
AREA= 1352.8
AREA= 1315.057
AREA= 254.6

887.60
2.30 2.10 18.60
1.50 2.10 5.40
1.10 2.10 25.00
1.30 2.10 31.20
1.00 2.10 9.80
1.30 2.10 88.40
1.00 2.10 9.80
1.10 2.10 10.00
1.30 2.10 57.20
1.10 2.10 10.00
1.10 2.10 45.00
1.30 2.10 52.00
1.00 2.10 24.50
2.70 2.10 6.60
2.80 2.10 6.70
1.35 2.10 5.25
1.20 2.10 5.10
1.50 2.10 10.80
3.30 2.10 7.20
2.65 2.10 6.55
1.10 2.10 40.00
1.00 2.10 24.50
1.20 2.10 15.30
1.30 2.10 26.00
2.10 2.10 24.00
1.20 2.10 20.40
1.30 2.10 57.20
1.00 2.10 29.40
1.10 2.10 10.00
1.50 2.10 5.40
2.10 2.10 6.00
1.50 2.10 10.80
1.30 2.10 10.40
1.00 2.10 14.70
1.50 2.10 27.00
1.30 2.10 10.40
1.00 2.10 39.20
1.10 2.10 5.00
1.30 2.10 10.40
1.10 2.10 10.00
1.30 2.10 26.00
1.00 2.10 19.60
1.50 2.10 10.80

2226.38
AREA= 55.18
AREA= 417.10
AREA= 282.68
AREA= 27.43
AREA= 84.36
AREA= 204.18
AREA= 52.22
AREA= 77.20
AREA= 82.05
AREA= 57.99
AREA= 22.71
AREA= 23.03
AREA= 18.11
AREA= 171.40
AREA= 327.97
AREA= 322.78

355.39
AREA= 27.43
AREA= 327.97

AREA= 460.64 460.64

4049.82
21.05 42.10
2.10 4.20
5.00 10.00
6.66 13.32
13.81 27.62
54.65 109.30
37.48 74.96
87.61 175.22
109.87 219.74
39.10 78.20
54.89 109.78
105.53 211.06
106.93 213.86
70.89 141.78
63.82 127.64
52.38 104.76
43.33 86.66
25.90 51.80
16.58 33.16
36.98 73.96
26.75 53.50
18.89 37.78
33.93 67.86
20.92 41.84
17.63 35.26
6.63 13.26
9.54 19.08
222.06 444.12

4.00 36.00
4.00 80.00
4.00 64.00
4.00 32.00
4.00 96.00
4.00 112.00
4.00 48.00
4.00 288.00
4.00 48.00
4.00 48.00
4.00 192.00
4.00 48.00
4.00 160.00
4.00 176.00

AREA= 945.30 945.30

AREA= 596.04 596.04

2535.92
AREA= 5.15
AREA= 63.51
AREA= 216.55
AREA= 508.75
AREA= 323.01
AREA= 464.29
AREA= 328.97
AREA= 227.74
AREA= 88.02
AREA= 110.78
AREA= 101.53
AREA= 69.64
AREA= 27.97

3.91
1.44 0.15 0.10 0.50
3.85 0.15 0.10 1.35
1.13 0.15 0.10 0.40
3.60 0.15 0.10 1.26
1.15 0.15 0.10 0.40

362.21
AREA= 40.08
AREA= 322.13

26.94
274.04 0.15 0.60 24.66
25.32 0.15 0.60 2.28

359.23
274.04 0.15 0.60 328.84
25.32 0.15 0.60 30.38

1316.67
AREA= 861.49
AREA= 455.18

1316.67
AREA= 861.49
AREA= 455.18

1316.67
AREA= 861.49
AREA= 455.18

1316.67
AREA= 861.49
AREA= 455.18

4194.91
21.05 1.60 67.36
2.10 1.60 6.72
5.00 1.60 16.00
6.66 1.60 21.31
13.81 1.60 44.19
54.65 1.60 174.88
37.48 1.60 119.94
87.61 1.60 280.35
109.87 1.60 351.58
39.10 1.60 125.12
54.89 1.60 175.65
105.53 1.60 337.70
106.93 1.60 342.18
70.89 1.60 226.85
63.82 1.60 204.22
52.38 1.60 167.62
43.33 1.60 138.66
25.90 1.60 82.88
16.58 1.60 53.06
36.98 1.60 118.34
26.75 1.60 85.60
18.89 1.60 60.45
33.93 1.60 108.58
20.92 1.60 66.94
17.63 1.60 56.42
6.63 1.60 21.22
9.54 1.60 30.53
222.06 1.60 710.59

235.20
40.30 0.30 12.09
68.52 0.30 20.56
95.82 0.30 28.75
75.49 0.30 22.65
119.17 0.30 35.75
78.82 0.30 23.65
62.90 0.30 18.87
54.78 0.30 16.43
68.43 0.30 20.53
52.00 0.30 15.60
45.70 0.30 13.71
22.06 0.30 6.62

AREA= 19.25 57.75

ASO DE ESCALERA
AREA= 19.25 57.75

AREA= 5.60 16.80

AREA= 7.00 21.00

1.40 18.00 75.60

2393.12
AREA= 70.42
AREA= 219.60
AREA= 538.37
AREA= 337.11
AREA= 476.70
AREA= 78.82
AREA= 242.09
AREA= 94.39
AREA= 120.35
AREA= 109.45
AREA= 75.42
AREA= 30.40

4786.24
140.84 140.84
439.20 439.20
1076.74 1076.74
674.22 674.22
953.40 953.40
157.64 157.64
484.18 484.18
188.78 188.78
240.70 240.70
218.90 218.90
150.84 150.84
60.80 60.80

463.47
2.30 2.10 14.49
1.50 2.10 3.15
1.10 2.10 11.55
1.30 2.10 16.38
1.00 2.10 4.20
1.30 2.10 46.41
1.00 2.10 4.20
1.10 2.10 4.62
1.30 2.10 30.03
1.10 2.10 4.62
1.10 2.10 20.79
1.30 2.10 27.30
1.00 2.10 10.50
2.70 2.10 5.67
2.80 2.10 5.88
1.35 2.10 2.84
1.20 2.10 2.52
1.50 2.10 6.30
3.30 2.10 6.93
2.65 2.10 5.57
1.10 2.10 18.48
1.00 2.10 10.50
1.20 2.10 7.56
1.30 2.10 13.65
2.10 2.10 17.64
1.20 2.10 10.08
1.30 2.10 30.03
1.00 2.10 12.60
1.10 2.10 4.62
1.50 2.10 3.15
2.10 2.10 4.41
1.50 2.10 6.30
1.30 2.10 5.46
1.00 2.10 6.30
1.50 2.10 15.75
1.30 2.10 5.46
1.00 2.10 16.80
1.10 2.10 2.31
1.30 2.10 5.46
1.10 2.10 4.62
1.30 2.10 13.65
1.00 2.10 8.40
1.50 2.10 6.30

184.29
2.00 0.60 4.80
2.00 0.60 1.20
1.20 0.60 2.16
1.15 0.60 2.07
1.50 0.60 1.80
1.25 0.60 0.75
2.35 0.60 1.41
1.60 0.60 0.96
0.80 0.60 0.48
8.55 0.60 5.13
2.55 0.60 1.53
2.05 0.60 1.23
2.25 0.60 1.35
3.15 0.60 1.89
3.25 0.60 1.95
3.10 0.60 1.86
3.45 0.60 2.07
0.80 0.60 0.48
2.00 0.60 1.20
1.15 0.60 0.69
5.18 0.60 3.11
2.80 0.60 1.68
3.11 0.60 1.87
2.45 0.60 2.94
2.31 0.60 1.39
2.55 0.60 3.06
3.15 0.60 1.89
2.20 0.60 10.56
1.65 0.60 1.98
1.20 0.60 1.44
1.65 0.60 0.99
1.85 0.60 2.22
3.05 0.60 1.83
2.20 0.60 2.64
2.65 0.60 1.59
1.95 0.60 1.17
2.85 0.60 1.71
3.00 0.60 1.80
4.30 0.60 2.58
3.80 0.60 2.28
4.75 0.60 2.85
2.55 0.60 1.53
4.95 0.60 2.97
2.35 2.50 5.88
0.70 0.60 0.84
0.55 0.60 0.66
4.05 1.60 6.48
1.00 0.60 0.60
1.50 0.60 1.80
0.90 0.60 0.54
2.90 0.60 1.74
1.45 0.60 1.74
3.25 0.60 1.95
1.20 0.60 0.72
2.20 0.60 1.32
1.75 0.60 1.05
3.65 0.60 2.19
1.40 0.60 1.68
2.05 0.60 1.23
1.95 0.60 1.17
2.45 0.60 1.47
1.20 0.60 6.48
1.60 0.60 1.92
1.45 0.60 0.87
1.00 0.60 0.60
1.05 0.60 0.63
1.75 0.60 1.05
1.95 0.60 1.17
2.30 0.60 1.38
2.00 0.60 1.20
0.95 2.50 2.38
1.20 0.60 3.60
2.90 0.60 8.70
2.30 0.60 1.38
2.70 0.60 3.24
1.60 0.60 10.56
2.20 0.60 2.64
2.05 0.60 1.23
2.20 0.60 1.32
2.60 0.60 4.68
2.25 0.60 1.35
2.10 0.60 3.78

16.65 4.00 66.60 66.60


33.05 4.00 132.20 132.20

32.50 32.50 32.50

21.50 21.50 21.50

0.60 0.60 1.08 1.08

3.00 9.00 9.00

1.00 1.00

UNID= 171.00 342.00 342.00

UNID= 171.00 684.00 684.00

UNID= 171.00 342.00 342.00

184.29
2.00 0.60 4.80
2.00 0.60 1.20
1.20 0.60 2.16
1.15 0.60 2.07
1.50 0.60 1.80
1.25 0.60 0.75
2.35 0.60 1.41
1.60 0.60 0.96
0.80 0.60 0.48
8.55 0.60 5.13
2.55 0.60 1.53
2.05 0.60 1.23
2.25 0.60 1.35
3.15 0.60 1.89
3.25 0.60 1.95
3.10 0.60 1.86
3.45 0.60 2.07
0.80 0.60 0.48
2.00 0.60 1.20
1.15 0.60 0.69
5.18 0.60 3.11
2.80 0.60 1.68
3.11 0.60 1.87
2.45 0.60 2.94
2.31 0.60 1.39
2.55 0.60 3.06
3.15 0.60 1.89
2.20 0.60 10.56
1.65 0.60 1.98
1.20 0.60 1.44
1.65 0.60 0.99
1.85 0.60 2.22
3.05 0.60 1.83
2.20 0.60 2.64
2.65 0.60 1.59
1.95 0.60 1.17
2.85 0.60 1.71
3.00 0.60 1.80
4.30 0.60 2.58
3.80 0.60 2.28
4.75 0.60 2.85
2.55 0.60 1.53
4.95 0.60 2.97
2.35 2.50 5.88
0.70 0.60 0.84
0.55 0.60 0.66
4.05 1.60 6.48
1.00 0.60 0.60
1.50 0.60 1.80
0.90 0.60 0.54
2.90 0.60 1.74
1.45 0.60 1.74
3.25 0.60 1.95
1.20 0.60 0.72
2.20 0.60 1.32
1.75 0.60 1.05
3.65 0.60 2.19
1.40 0.60 1.68
2.05 0.60 1.23
1.95 0.60 1.17
2.45 0.60 1.47
1.20 0.60 6.48
1.60 0.60 1.92
1.45 0.60 0.87
1.00 0.60 0.60
1.05 0.60 0.63
1.75 0.60 1.05
1.95 0.60 1.17
2.30 0.60 1.38
2.00 0.60 1.20
0.95 2.50 2.38
1.20 0.60 3.60
2.90 0.60 8.70
2.30 0.60 1.38
2.70 0.60 3.24
1.60 0.60 10.56
2.20 0.60 2.64
2.05 0.60 1.23
2.20 0.60 1.32
2.60 0.60 4.68
2.25 0.60 1.35
2.10 0.60 3.78

16.10
1.80 1.80
1.75 3.50
1.80 9.00
1.80 1.80

10.60
1.75 7.00
1.80 3.60

4212.34
AREA= 55.18
AREA= 417.10
AREA= 282.68
AREA= 27.43
AREA= 84.36
AREA= 204.18
AREA= 52.22
AREA= 77.20
AREA= 82.05
AREA= 57.99
AREA= 22.71
AREA= 23.03
AREA= 18.11
AREA= 171.40
AREA= 327.97
AREA= 322.78
2.90 0.30 0.35 2.90
2.90 0.30 0.35 2.90
2.90 0.30 0.35 2.90
15.35 0.30 0.35 15.35
15.35 0.30 0.35 15.35
14.37 0.30 0.55 20.12
14.37 0.30 0.55 20.12
13.50 0.30 0.55 18.90
13.50 0.30 0.55 18.90
13.50 0.30 0.55 18.90
15.65 0.30 0.35 15.65
15.65 0.30 0.35 15.65
3.51 0.30 0.35 3.51
15.65 0.30 0.35 15.65
31.30 0.30 0.25 25.04
18.51 0.25 0.50 23.14
18.51 0.25 0.50 23.14
18.51 0.25 0.50 23.14
13.00 0.25 0.50 16.25
13.00 0.25 0.50 16.25
18.51 0.25 0.50 23.14
19.00 0.25 0.50 23.75
19.00 0.25 0.50 23.75
19.00 0.25 0.50 23.75
28.91 0.25 0.40 30.36
28.91 0.25 0.40 30.36
28.91 0.25 0.40 30.36
28.91 0.25 0.40 30.36
6.88 0.25 0.25 5.16
14.50 0.30 0.35 14.50
14.50 0.30 0.35 14.50
14.50 0.30 0.35 14.50
14.50 0.30 0.35 14.50
14.50 0.30 0.35 14.50
23.25 0.30 0.50 30.23
23.25 0.30 0.50 30.23
23.25 0.30 0.50 30.23
23.25 0.30 0.50 30.23
23.25 0.30 0.50 30.23
17.45 0.25 0.50 21.81
17.45 0.25 0.50 21.81
17.45 0.25 0.50 21.81
17.45 0.25 0.50 21.81
14.50 0.30 0.50 18.85
14.50 0.30 0.50 18.85
14.50 0.30 0.50 18.85
14.50 0.30 0.50 18.85
28.91 0.30 0.50 37.58
28.91 0.30 0.50 37.58
28.91 0.30 0.50 37.58
28.91 0.30 0.50 37.58
28.91 0.30 0.50 37.58
32.00 0.30 0.50 41.60
32.00 0.30 0.50 41.60
32.00 0.30 0.50 41.60
32.00 0.30 0.50 41.60
16.45 0.30 0.50 21.39
16.45 0.30 0.50 21.39
16.45 0.30 0.50 21.39
16.45 0.30 0.50 21.39
16.45 0.30 0.50 21.39
16.45 0.30 0.50 21.39
16.45 0.30 0.50 21.39
16.45 0.30 0.50 21.39
18.00 0.25 0.40 18.90
18.00 0.25 0.40 18.90
18.00 0.25 0.40 18.90
18.00 0.25 0.40 18.90
18.00 0.25 0.40 18.90
13.45 0.25 0.40 14.12
13.45 0.25 0.40 14.12
13.45 0.25 0.40 14.12
3.68 0.25 0.40 3.86
7.26 0.25 0.40 7.62
13.45 0.25 0.40 14.12
6.02 0.25 0.40 6.32
8.02 0.30 0.40 8.82
8.02 0.30 0.40 8.82
8.02 0.30 0.40 8.82
8.23 0.30 0.40 9.05
8.23 0.30 0.40 9.05
8.23 0.30 0.40 9.05
19.55 0.30 0.45 23.46
19.55 0.30 0.45 23.46
4.95 0.30 0.45 5.94
4.95 0.30 0.45 5.94
4.95 0.30 0.45 5.94
4.95 0.30 0.45 5.94
4.95 0.30 0.45 5.94
4.95 0.30 0.45 5.94
5.63 0.30 0.45 6.76
5.63 0.30 0.45 6.76
5.63 0.30 0.45 6.76
9.01 0.30 0.50 11.71
9.01 0.30 0.50 11.71
16.94 0.30 0.45 20.33
10.28 0.30 0.45 12.34
4.18 0.30 0.45 5.02
4.18 0.30 0.45 5.02
6.96 0.30 0.25 5.57
18.85 0.30 0.40 20.74
18.85 0.30 0.40 20.74
4.00 0.30 0.40 4.40
4.00 0.30 0.40 4.40
4.00 0.30 0.40 4.40
4.00 0.30 0.40 4.40
4.00 0.30 0.40 4.40
4.00 0.30 0.40 4.40
5.36 0.30 0.45 6.43
5.36 0.30 0.45 6.43
5.36 0.30 0.45 6.43
11.34 0.30 0.25 9.07
7.20 0.30 0.50 9.36
7.20 0.30 0.50 9.36
7.88 0.30 0.25 6.30
5.02 0.30 0.40 5.52
5.02 0.30 0.40 5.52
4.69 0.30 0.40 5.16
4.69 0.30 0.40 5.16

10487.28
21.05 4.00 168.40
2.10 4.00 16.80
5.00 4.00 40.00
6.66 4.00 53.28
13.81 4.00 110.48
54.65 4.00 437.20
37.48 4.00 299.84
87.61 4.00 700.88
109.87 4.00 878.96
39.10 4.00 312.80
54.89 4.00 439.12
105.53 4.00 844.24
106.93 4.00 855.44
70.89 4.00 567.12
63.82 4.00 510.56
52.38 4.00 419.04
43.33 4.00 346.64
25.90 4.00 207.20
16.58 4.00 132.64
36.98 4.00 295.84
26.75 4.00 214.00
18.89 4.00 151.12
33.93 4.00 271.44
20.92 4.00 167.36
17.63 4.00 141.04
6.63 4.00 53.04
9.54 4.00 76.32
222.06 4.00 1776.48

937.63
2.30 2.10 29.32
1.50 2.10 6.56
1.10 2.10 23.32
1.30 2.10 33.00
1.00 2.10 8.61
1.30 2.10 93.06
1.00 2.10 8.61
1.10 2.10 9.46
1.30 2.10 60.30
1.10 2.10 9.46
1.10 2.10 41.80
1.30 2.10 54.84
1.00 2.10 21.21
2.70 2.10 11.72
2.80 2.10 12.15
1.35 2.10 5.91
1.20 2.10 5.27
1.50 2.10 12.86
3.30 2.10 14.30
2.65 2.10 11.50
1.10 2.10 37.18
1.00 2.10 21.21
1.20 2.10 15.35
1.30 2.10 27.54
2.10 2.10 35.60
1.20 2.10 20.39
1.30 2.10 60.30
1.00 2.10 25.41
1.10 2.10 9.46
1.50 2.10 6.56
2.10 2.10 9.14
1.50 2.10 12.86
1.30 2.10 11.16
1.00 2.10 12.81
1.50 2.10 31.76
1.30 2.10 11.16
1.00 2.10 33.81
1.10 2.10 4.84
1.30 2.10 11.16
1.10 2.10 9.46
1.30 2.10 27.54
1.00 2.10 17.01
1.50 2.10 12.86

5.00 0.15 9.00 9.00

1.00

20.00

AREA= 409.78 409.78

141.00
4.00
1.00
3.00
3.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
2.00
1.00
8.00
2.00
2.00
1.00
2.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
2.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
9.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.00
5.00
1.00
2.00
11.00
2.00
1.00
1.00
3.00
1.00
3.00
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


01.00.00 ESTRUCTURAS
01.01.00 OBRAS PROVISIONALES
ALMACEN, OFICINAS, CASETAS DE GUARDIANIA Y COMEDOR glb. 1.00 1.00 1.00
CARTEL DE IDENTIFICACION 3.60x5.40 und. 1.00 1.00 1.00
SERVICIOS HIGIENICOS glb. 1.00 1.00 1.00
AGUA PARA OBRA glb. 1.00 1.00 1.00
ENERGIA ELECTRICA PARA LA OBRA glb. 1.00 1.00 1.00

TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL m2. 1.00 AREA= 5866.66 5866.66 5866.66
TRANSPORTE DE EQUIPO Y MAQUINARIA glb. 1.00 1.00 1.00
TRAZO Y REPLANTEO m2. 1.00 AREA= 5866.66 5866.66 5866.66

01.02.00 MOVIMIENTOS DE TIERRA


CORTE DE TERRENO PARA ALCANZAR NIVEL DE PLATAFORMA m3 1.00 0.40 AREA= 5866.66 2346.66 2346.66

01.02.01 EXCAVACION DE ZANJAS Y ZAPATAS <2KG/CM2 H<2 M. m3 1737.30


EXCAVACION DE ZAPATAS <2KG/CM2 H<2 M. 641.76
EXCAVACION EN INGRESO VEHICULAR Z-12 1.00 2.40 0.70 1.55 2.60
EXCAVACION EN INGRESO VEHICULAR Z-12 1.00 2.10 0.85 1.55 2.77
EXCAVACION EN INGRESO VEHICULAR Z-12 3.00 3.05 1.15 1.55 16.31
EXCAVACION EN INGRESO VEHICULAR Z-12 2.00 2.40 1.15 1.55 8.56
EXCAVACION EN MODULO A Z-1 8.00 1.20 1.20 1.55 17.86
EXCAVACION EN MODULO A Z-11 2.00 1.30 0.80 1.55 3.22
EXCAVACION EN MODULO B Z-5 12.00 1.50 1.30 1.55 36.27
EXCAVACION EN MODULO B Z-6 2.00 1.30 1.30 1.55 5.24
EXCAVACION EN MODULO B Z-10 3.00 1.50 0.80 1.55 5.58
EXCAVACION EN MODULO C Z-4 36.00 1.40 1.15 1.55 89.84
EXCAVACION EN MODULO D Z-1 15.00 1.20 1.20 1.55 33.48
EXCAVACION EN MODULO D Z-9 10.00 1.40 1.20 1.55 26.04
EXCAVACION EN MODULO E Z-6 20.00 1.30 1.30 1.55 52.39
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


EXCAVACION EN MODULO E Z-7 12.00 1.50 1.25 1.55 34.88
EXCAVACION EN MODULO E Z-8 5.00 1.25 1.25 1.55 12.11
EXCAVACION EN MODULO E Z-4 4.00 1.40 1.15 1.55 9.98
EXCAVACION EN MODULO E Z-5 4.00 1.50 1.30 1.55 12.09
EXCAVACION EN MODULO F Z-5 28.00 1.50 1.30 1.55 84.63
EXCAVACION EN MODULO G Z-2 21.00 1.15 1.15 1.55 43.05
EXCAVACION EN MODULO G Z-3 4.00 AREA= 2.00 1.55 12.38
EXCAVACION EN MODULO H Z-1 9.00 1.20 1.20 1.55 20.09
EXCAVACION EN MODULO H Z-3 4.00 AREA= 2.00 1.55 12.38
EXCAVACION EN MODULO I Z-1 14.00 1.20 1.20 1.55 31.25
EXCAVACION EN MODULO I Z-1 1.00 AREA= 2.25 1.55 3.49
EXCAVACION EN MODULO J Z-1 12.00 1.20 1.20 1.55 26.78
EXCAVACION EN MODULO K Z-1 12.00 1.20 1.20 1.55 26.78
EXCAVACION EN MODULO L Z-1 4.00 1.20 1.20 1.55 8.93
EXCAVACION EN MODULO L Z-1 2.00 1.20 0.75 1.55 2.79

EXCAVACION DE CIMIENTOS CORRIDOS <2KG/CM2 H<2 M. 748.08


EXCAVACION EN INGRESO VEHICULAR CORTE B-B LONGIT. 1.00 15.49 0.45 1.05 7.32
EXCAVACION EN INGRESO VEHICULAR CORTE A-A LONGIT. 1.00 6.70 0.50 1.05 3.52
EXCAVACION EN INGRESO VEHICULAR CORTE A-A TRANV.. 1.00 0.85 0.50 1.05 0.45
EXCAVACION DE CIMIENTO EN MODULO A CORTE B-B LONGIT. 1.00 2.90 0.45 1.05 1.37
EXCAVACION DE CIMIENTO EN MODULO A CORTE A-A LONGIT. 1.00 11.60 0.50 1.05 6.09
EXCAVACION DE CIMIENTO EN MODULO A CORTE A-A TRANSV. 1.00 15.23 0.50 1.05 7.99
EXCAVACION DE CIMIENTO EN MODULO B CORTE B-B LONGIT. 1.00 10.81 0.45 1.05 5.11
EXCAVACION DE CIMIENTO EN MODULO B CORTE A-A LONGIT. 1.00 42.35 0.50 1.05 22.23
EXCAVACION DE CIMIENTO EN MODULO B CORTE A-A TRANSV. 1.00 45.95 0.50 1.05 24.12
EXCAVACION DE CIMIENTO EN MODULO C CORTE A-A LONGIT. 1.00 96.96 0.50 1.05 50.90
EXCAVACION DE CIMIENTO EN MODULO C CORTE A-A TRANSV. 1.00 108.71 0.50 1.05 57.07
EXCAVACION DE CIMIENTO EN MODULO D CORTE A-A LONGIT. 1.00 50.43 0.50 1.05 26.48
EXCAVACION DE CIMIENTO EN MODULO D CORTE A-A TRANSV. 1.00 60.13 0.50 1.05 31.57
EXCAVACION DE CIMIENTO EN MODULO E CORTE A-A LONGIT. 1.00 115.79 0.50 1.05 60.79
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


EXCAVACION DE CIMIENTO EN MODULO E CORTE A-A TRANSV. 1.00 96.82 0.50 1.05 50.83
EXCAVACION DE CIMIENTO EN MODULO F CORTE A-A LONGIT. 1.00 79.53 0.50 1.05 41.75
EXCAVACION DE CIMIENTO EN MODULO F CORTE A-A TRANSV. 1.00 65.43 0.50 1.05 34.35
EXCAVACION DE CIMIENTO EN MODULO G CORTE A-A LONGIT. 1.00 77.14 0.50 1.05 40.50
EXCAVACION DE CIMIENTO EN MODULO G CORTE A-A TRANSV. 1.00 55.10 0.50 1.05 28.93
EXCAVACION DE CIMIENTO EN MODULO H CORTE A-A LONGIT. 1.00 25.30 0.50 1.05 13.28
EXCAVACION DE CIMIENTO EN MODULO H CORTE A-A TRANSV. 1.00 20.54 0.50 1.05 10.78
EXCAVACION DE CIMIENTO EN MODULO I CORTE A-A LONGIT. 1.00 42.50 0.50 1.05 22.31
EXCAVACION DE CIMIENTO EN MODULO I CORTE A-A TRANSV. 1.00 34.58 0.50 1.05 18.15
EXCAVACION DE CIMIENTO EN MODULO J CORTE A-A LONGIT. 1.00 29.94 0.50 1.05 15.72
EXCAVACION DE CIMIENTO EN MODULO J CORTE A-A TRANSV. 1.00 33.19 0.50 1.05 17.42
EXCAVACION DE CIMIENTO EN MODULO K CORTE A-A LONGIT. 1.00 25.12 0.50 1.05 13.19
EXCAVACION DE CIMIENTO EN MODULO K CORTE A-A TRANSV. 1.00 24.30 0.50 1.05 12.76
EXCAVACION DE CIMIENTO EN MODULO L CORTE A-A LONGIT. 1.00 7.14 0.50 1.05 3.75
EXCAVACION DE CIMIENTO EN MODULO L CORTE A-A TRANSV. 1.00 7.80 0.50 1.05 4.10
EXCAVACION DE CIMIENTO EN CERCO PE. CORTE B-B TRANSV. 1.00 243.90 0.45 1.05 115.24

Volumen excavado sin Esponjamiento 1389.84


Total de Volumen + 25% de Esponjamiento m3 1737.30

01.02.02 RELLENO COMPACTADO C/EQUIPO MAT/PROPIO m3 710.99


RELLENO COMPACTADO C/EQUIPO MAT/PROPIO EN ZAPATAS 636.80
INGRESO VEHICULAR Z-12 1.00 AREA= 1.31 0.15 0.20
INGRESO VEHICULAR Z-12 1.00 AREA= 1.41 0.15 0.21
INGRESO VEHICULAR Z-12 3.00 3.05 1.15 1.55 16.31
INGRESO VEHICULAR Z-12 2.00 2.40 1.15 1.55 8.56
MODULO A Z-1 8.00 1.20 1.20 1.55 17.86
MODULO A Z-11 2.00 1.30 0.80 1.55 3.22
MODULO B Z-5 12.00 1.50 1.30 1.55 36.27
MODULO B Z-6 2.00 1.30 1.30 1.55 5.24
MODULO B Z-10 3.00 1.50 0.80 1.55 5.58
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


MODULO C Z-4 36.00 1.40 1.15 1.55 89.84
MODULO D Z-1 15.00 1.20 1.20 1.55 33.48
MODULO D Z-9 10.00 1.40 1.20 1.55 26.04
MODULO E Z-6 20.00 1.30 1.30 1.55 52.39
MODULO E Z-7 12.00 1.50 1.25 1.55 34.88
MODULO E Z-8 5.00 1.25 1.25 1.55 12.11
MODULO E Z-4 4.00 1.40 1.15 1.55 9.98
MODULO E Z-5 4.00 1.50 1.30 1.55 12.09
MODULO F Z-5 28.00 1.50 1.30 1.55 84.63
MODULO G Z-2 21.00 1.15 1.15 1.55 43.05
MODULO G Z-3 4.00 AREA= 2.00 1.55 12.38
MODULO H Z-1 9.00 1.20 1.20 1.55 20.09
MODULO H Z-3 4.00 AREA= 2.00 1.55 12.38
MODULO I Z-1 14.00 1.20 1.20 1.55 31.25
MODULO I Z-1 1.00 AREA= 2.25 1.55 3.49
MODULO J Z-1 12.00 1.20 1.20 1.55 26.78
MODULO K Z-1 12.00 1.20 1.20 1.55 26.78
MODULO L Z-1 4.00 1.20 1.20 1.55 8.93
MODULO L Z-1 2.00 1.20 0.75 1.55 2.79

RELLENO COMPACTADO C/EQUIPO MAT/PROPIO EN CIMIENTOS 74.19


INGRESO VEHICULAR CORTE B-B LONGIT. 1.00 15.49 0.30 0.15 0.70
INGRESO VEHICULAR CORTE A-A LONGIT. 1.00 6.70 0.35 0.15 0.35
INGRESO VEHICULAR CORTE A-A TRANV.. 1.00 0.85 0.35 0.15 0.04
MODULO A CORTE B-B LONGIT. 1.00 2.90 0.30 0.15 0.13
MODULO A CORTE A-A LONGIT. 1.00 11.60 0.35 0.15 0.61
MODULO A CORTE A-A TRANSV. 1.00 15.23 0.35 0.15 0.80
MODULO B CORTE B-B LONGIT. 1.00 10.81 0.30 0.15 0.49
MODULO B CORTE A-A LONGIT. 1.00 42.35 0.35 0.15 2.22
MODULO B CORTE A-A TRANSV. 1.00 45.95 0.35 0.15 2.41
MODULO C CORTE A-A LONGIT. 1.00 96.96 0.35 0.15 5.09
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


MODULO C CORTE A-A TRANSV. 1.00 108.71 0.35 0.15 5.71
MODULO D CORTE A-A LONGIT. 1.00 50.43 0.35 0.15 2.65
MODULO D CORTE A-A TRANSV. 1.00 60.13 0.35 0.15 3.16
MODULO E CORTE A-A LONGIT. 1.00 115.79 0.35 0.15 6.08
MODULO E CORTE A-A TRANSV. 1.00 96.82 0.35 0.15 5.08
MODULO F CORTE A-A LONGIT. 1.00 79.53 0.35 0.15 4.18
MODULO F CORTE A-A TRANSV. 1.00 65.43 0.35 0.15 3.44
MODULO G CORTE A-A LONGIT. 1.00 77.14 0.35 0.15 4.05
MODULO G CORTE A-A TRANSV. 1.00 55.10 0.35 0.15 2.89
MODULO H CORTE A-A LONGIT. 1.00 25.30 0.35 0.15 1.33
MODULO H CORTE A-A TRANSV. 1.00 20.54 0.35 0.15 1.08
MODULO I CORTE A-A LONGIT. 1.00 42.50 0.35 0.15 2.23
MODULO I CORTE A-A TRANSV. 1.00 34.58 0.35 0.15 1.82
MODULO J CORTE A-A LONGIT. 1.00 29.94 0.35 0.15 1.57
MODULO J CORTE A-A TRANSV. 1.00 33.19 0.35 0.15 1.74
MODULO K CORTE A-A LONGIT. 1.00 25.12 0.35 0.15 1.32
MODULO K CORTE A-A TRANSV. 1.00 24.30 0.35 0.15 1.28
MODULO L CORTE A-A LONGIT. 1.00 7.14 0.35 0.15 0.37
MODULO L CORTE A-A TRANSV. 1.00 7.80 0.35 0.15 0.41
CERCO PERIM. CORTE B-B TRANSV. 1.00 243.90 0.30 0.15 10.98

01.02.02 ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES m3 74.19


ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES 1.00 74.19

01.02.02 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA m3 5030.77


ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA 1.00 5030.77

01.02.03 OBRAS DE CONCRETO SIMPLE


01.02.03.01 SOLADO DE CONCRETO E=4", 1:10 CEM/HORM. m2 414.04
SOLADO EN INGRESO VEHICULAR Z-12 1.00 2.40 0.70 1.68
SOLADO EN INGRESO VEHICULAR Z-12 1.00 2.10 0.85 1.79
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


SOLADO EN INGRESO VEHICULAR Z-12 3.00 3.05 1.15 10.52
SOLADO EN INGRESO VEHICULAR Z-12 2.00 2.40 1.15 5.52
SOLADO EN MODULO A Z-1 8.00 1.20 1.20 11.52
SOLADO EN MODULO A Z-11 2.00 1.30 0.80 2.08
SOLADO EN MODULO B Z-5 12.00 1.50 1.30 23.40
SOLADO EN MODULO B Z-6 2.00 1.30 1.30 3.38
SOLADO EN MODULO B Z-10 3.00 1.50 0.80 3.60
SOLADO EN MODULO C Z-4 36.00 1.40 1.15 57.96
SOLADO EN MODULO D Z-1 15.00 1.20 1.20 21.60
SOLADO EN MODULO D Z-9 10.00 1.40 1.20 16.80
SOLADO EN MODULO E Z-6 20.00 1.30 1.30 33.80
SOLADO EN MODULO E Z-7 12.00 1.50 1.25 22.50
SOLADO EN MODULO E Z-8 5.00 1.25 1.25 7.81
SOLADO EN MODULO E Z-4 4.00 1.40 1.15 6.44
SOLADO EN MODULO E Z-5 4.00 1.50 1.30 7.80
SOLADO EN MODULO F Z-5 28.00 1.50 1.30 54.60
SOLADO EN MODULO G Z-2 21.00 1.15 1.15 27.77
SOLADO EN MODULO G Z-3 4.00 AREA= 2.00 7.99
SOLADO EN MODULO H Z-1 9.00 1.20 1.20 12.96
SOLADO EN MODULO H Z-3 4.00 AREA= 2.00 7.99
SOLADO EN MODULO I Z-1 14.00 1.20 1.20 20.16
SOLADO EN MODULO I Z-1 1.00 AREA= 2.25 2.25
SOLADO EN MODULO J Z-1 12.00 1.20 1.20 17.28
SOLADO EN MODULO K Z-1 12.00 1.20 1.20 17.28
SOLADO EN MODULO L Z-1 4.00 1.20 1.20 5.76
SOLADO EN MODULO L Z-1 2.00 1.20 0.75 1.80

CIMIENTO CORRIDO 1:10+30%P.G. f'C>=100 KG/cm2 395.70


CIMIEN. CORRIDO EN INGRESO VEHICULAR CORTE B-B LONGIT. 1.00 15.49 0.30 0.80 3.72
CIMIEN. CORRIDO INGRESO VEHICULAR CORTE A-A LONGIT. 1.00 6.70 0.35 0.80 1.88
CIMIEN. CORRIDO INGRESO VEHICULAR CORTE A-A TRANV.. 1.00 0.85 0.35 0.80 0.24
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


CIMIEN. CORRIDO EN MODULO A CORTE B-B LONGIT. 1.00 2.90 0.30 0.80 0.70
CIMIEN. CORRIDO EN MODULO A CORTE A-A LONGIT. 1.00 11.60 0.35 0.80 3.25
CIMIEN. CORRIDO EN MODULO A CORTE A-A TRANSV. 1.00 15.23 0.35 0.80 4.26
CIMIEN. CORRIDO EN MODULO B CORTE B-B LONGIT. 1.00 10.81 0.30 0.80 2.59
CIMIEN. CORRIDO EN MODULO B CORTE A-A LONGIT. 1.00 42.35 0.35 0.80 11.86
CIMIEN. CORRIDO EN MODULO B CORTE A-A TRANSV. 1.00 45.95 0.35 0.80 12.87
CIMIEN. CORRIDO EN MODULO C CORTE A-A LONGIT. 1.00 96.96 0.35 0.80 27.15
CIMIEN. CORRIDO EN MODULO C CORTE A-A TRANSV. 1.00 108.71 0.35 0.80 30.44
CIMIEN. CORRIDO EN MODULO D CORTE A-A LONGIT. 1.00 50.43 0.35 0.80 14.12
CIMIEN. CORRIDO EN MODULO D CORTE A-A TRANSV. 1.00 60.13 0.35 0.80 16.84
CIMIEN. CORRIDO EN MODULO E CORTE A-A LONGIT. 1.00 115.79 0.35 0.80 32.42
CIMIEN. CORRIDO EN MODULO E CORTE A-A TRANSV. 1.00 96.82 0.35 0.80 27.11
CIMIEN. CORRIDO EN MODULO F CORTE A-A LONGIT. 1.00 79.53 0.35 0.80 22.27
CIMIEN. CORRIDO EN MODULO F CORTE A-A TRANSV. 1.00 65.43 0.35 0.80 18.32
CIMIEN. CORRIDO EN MODULO G CORTE A-A LONGIT. 1.00 77.14 0.35 0.80 21.60
CIMIEN. CORRIDO EN MODULO G CORTE A-A TRANSV. 1.00 55.10 0.35 0.80 15.43
CIMIEN. CORRIDO EN MODULO H CORTE A-A LONGIT. 1.00 25.30 0.35 0.80 7.08
CIMIEN. CORRIDO EN MODULO H CORTE A-A TRANSV. 1.00 20.54 0.35 0.80 5.75
CIMIEN. CORRIDO EN MODULO I CORTE A-A LONGIT. 1.00 42.50 0.35 0.80 11.90
CIMIEN. CORRIDO EN MODULO I CORTE A-A TRANSV. 1.00 34.58 0.35 0.80 9.68
CIMIEN. CORRIDO EN MODULO J CORTE A-A LONGIT. 1.00 29.94 0.35 0.80 8.38
CIMIEN. CORRIDO EN MODULO J CORTE A-A TRANSV. 1.00 33.19 0.35 0.80 9.29
CIMIEN. CORRIDO EN MODULO K CORTE A-A LONGIT. 1.00 25.12 0.35 0.80 7.03
CIMIEN. CORRIDO EN MODULO K CORTE A-A TRANSV. 1.00 24.30 0.35 0.80 6.80
CIMIEN. CORRIDO EN MODULO L CORTE A-A LONGIT. 1.00 7.14 0.35 0.80 2.00
CIMIEN. CORRIDO EN MODULO L CORTE A-A TRANSV. 1.00 7.80 0.35 0.80 2.18
CIMIEN. CORRIDO EN CERCO PERIM. CORTE B-B TRANSV. 1.00 243.90 0.30 0.80 58.54

CIMIENTO CORRIDO ENCOFRADO Y DESENCOFRADO 2323.56


CIMIEN. CORRIDO EN INGRESO VEHICULAR CORTE B-B LONGIT. 1.00 15.49 0.80 24.78
CIMIEN. CORRIDO INGRESO VEHICULAR CORTE A-A LONGIT. 1.00 6.70 0.80 10.72
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


CIMIEN. CORRIDO INGRESO VEHICULAR CORTE A-A TRANV.. 1.00 0.85 0.80 1.36
CIMIEN. CORRIDO EN MODULO A CORTE B-B LONGIT. 1.00 2.90 0.80 4.64
CIMIEN. CORRIDO EN MODULO A CORTE A-A LONGIT. 1.00 11.60 0.80 18.56
CIMIEN. CORRIDO EN MODULO A CORTE A-A TRANSV. 1.00 15.23 0.80 24.36
CIMIEN. CORRIDO EN MODULO B CORTE B-B LONGIT. 1.00 10.81 0.80 17.30
CIMIEN. CORRIDO EN MODULO B CORTE A-A LONGIT. 1.00 42.35 0.80 67.76
CIMIEN. CORRIDO EN MODULO B CORTE A-A TRANSV. 1.00 45.95 0.80 73.52
CIMIEN. CORRIDO EN MODULO C CORTE A-A LONGIT. 1.00 96.96 0.80 155.14
CIMIEN. CORRIDO EN MODULO C CORTE A-A TRANSV. 1.00 108.71 0.80 173.94
CIMIEN. CORRIDO EN MODULO D CORTE A-A LONGIT. 1.00 50.43 0.80 80.69
CIMIEN. CORRIDO EN MODULO D CORTE A-A TRANSV. 1.00 60.13 0.80 96.21
CIMIEN. CORRIDO EN MODULO E CORTE A-A LONGIT. 1.00 115.79 0.80 185.26
CIMIEN. CORRIDO EN MODULO E CORTE A-A TRANSV. 1.00 96.82 0.80 154.91
CIMIEN. CORRIDO EN MODULO F CORTE A-A LONGIT. 1.00 79.53 0.80 127.25
CIMIEN. CORRIDO EN MODULO F CORTE A-A TRANSV. 1.00 65.43 0.80 104.69
CIMIEN. CORRIDO EN MODULO G CORTE A-A LONGIT. 1.00 77.14 0.80 123.42
CIMIEN. CORRIDO EN MODULO G CORTE A-A TRANSV. 1.00 55.10 0.80 88.16
CIMIEN. CORRIDO EN MODULO H CORTE A-A LONGIT. 1.00 25.30 0.80 40.48
CIMIEN. CORRIDO EN MODULO H CORTE A-A TRANSV. 1.00 20.54 0.80 32.86
CIMIEN. CORRIDO EN MODULO I CORTE A-A LONGIT. 1.00 42.50 0.80 68.00
CIMIEN. CORRIDO EN MODULO I CORTE A-A TRANSV. 1.00 34.58 0.80 55.33
CIMIEN. CORRIDO EN MODULO J CORTE A-A LONGIT. 1.00 29.94 0.80 47.90
CIMIEN. CORRIDO EN MODULO J CORTE A-A TRANSV. 1.00 33.19 0.80 53.10
CIMIEN. CORRIDO EN MODULO K CORTE A-A LONGIT. 1.00 25.12 0.80 40.19
CIMIEN. CORRIDO EN MODULO K CORTE A-A TRANSV. 1.00 24.30 0.80 38.88
CIMIEN. CORRIDO EN MODULO L CORTE A-A LONGIT. 1.00 7.14 0.80 11.42
CIMIEN. CORRIDO EN MODULO L CORTE A-A TRANSV. 1.00 7.80 0.80 12.48
CIMIEN. CORRIDO EN CERCO PERIM. CORTE B-B TRANSV. 1.00 243.90 0.80 390.24

01.02.04 SOBRECIMIENTO
SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M. f'c >=100Kg/cm2 118.28
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


SOBRECIMIENTO EN INGRESO VEHICULAR LONGITUDINAL E=0.15m 1.00 21.05 0.15 0.60 1.89
SOBRECIMIENTO INGRESO VEHICULAR TRANSVERSAL E=0.15m 1.00 2.10 0.15 0.60 0.19
SOBRECIMIENTO INGRESO VEHICULAR TRANSVERSAL E=0.25m 1.00 5.00 0.25 0.60 0.75
SOBRECIMIENTO EN MODULO A LONGITUDINAL E=0.15m 1.00 6.66 0.15 0.60 0.60
SOBRECIMIENTO EN MODULO A TRANSVERSAL E=0.15m 1.00 13.81 0.15 0.60 1.24
SOBRECIMIENTO EN MODULO B LONGITUDINAL E=0.15m 1.00 54.65 0.15 0.60 4.92
SOBRECIMIENTO EN MODULO B TRANSVERSAL E=0.15m 1.00 37.48 0.15 0.60 3.37
SOBRECIMIENTO EN MODULO C LONGITUDINAL E=0.15m 1.00 87.61 0.15 0.60 7.88
SOBRECIMIENTO EN MODULO C TRANSVERSAL E=0.15m 1.00 109.87 0.15 0.60 9.89
SOBRECIMIENTO EN MODULO D LONGITUDINAL E=0.15m 1.00 39.10 0.15 0.60 3.52
SOBRECIMIENTO EN MODULO D TRANSVERSAL E=0.15m 1.00 54.89 0.15 0.60 4.94
SOBRECIMIENTO EN MODULO E LONGITUDINAL E=0.15m 1.00 105.53 0.15 0.60 9.50
SOBRECIMIENTO EN MODULO E TRANSVERSAL E=0.15m 1.00 106.93 0.15 0.60 9.62
SOBRECIMIENTO EN MODULO F LONGITUDINAL E=0.15m 1.00 70.89 0.15 0.60 6.38
SOBRECIMIENTO EN MODULO F TRANSVERSAL E=0.15m 1.00 63.82 0.15 0.60 5.74
SOBRECIMIENTO EN MODULO G LONGITUDINAL E=0.15m 1.00 52.38 0.15 0.60 4.71
SOBRECIMIENTO EN MODULO G TRANSVERSAL E=0.15m 1.00 43.33 0.15 0.60 3.90
SOBRECIMIENTO EN MODULO H LONGITUDINAL E=0.15m 1.00 25.90 0.15 0.60 2.33
SOBRECIMIENTO EN MODULO H TRANSVERSAL E=0.15m 1.00 16.58 0.15 0.60 1.49
SOBRECIMIENTO EN MODULO I LONGITUDINAL E=0.15m 1.00 36.98 0.15 0.60 3.33
SOBRECIMIENTO EN MODULO I TRANSVERSAL E=0.15m 1.00 26.75 0.15 0.60 2.41
SOBRECIMIENTO EN MODULO J LONGITUDINAL E=0.15m 1.00 18.89 0.15 0.60 1.70
SOBRECIMIENTO EN MODULO J TRANSVERSAL E=0.15m 1.00 33.93 0.15 0.60 3.05
SOBRECIMIENTO EN MODULO K LONGITUDINAL E=0.15m 1.00 20.92 0.15 0.60 1.88
SOBRECIMIENTO EN MODULO K TRANSVERSAL E=0.15m 1.00 17.63 0.15 0.60 1.59
SOBRECIMIENTO EN MODULO L LONGITUDINAL E=0.15m 1.00 6.63 0.15 0.60 0.60
SOBRECIMIENTO EN MODULO L TRANSVERSAL E=0.15m 1.00 9.54 0.15 0.60 0.86
SOBRECIMIENTO EN CERCO PERIM. LONGITUDINAL E=0.15m 1.00 222.06 0.15 0.60 19.99

SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO 1573.09


SOBRECIMIENTO EN INGRESO VEHICULAR LONGITUDINAL E=0.15m 2.00 21.05 0.60 25.26
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


SOBRECIMIENTO INGRESO VEHICULAR TRANSVERSAL E=0.15m 2.00 2.10 0.60 2.52
SOBRECIMIENTO INGRESO VEHICULAR TRANSVERSAL E=0.25m 2.00 5.00 0.60 6.00
SOBRECIMIENTO EN MODULO A LONGITUDINAL E=0.15m 2.00 6.66 0.60 7.99
SOBRECIMIENTO EN MODULO A TRANSVERSAL E=0.15m 2.00 13.81 0.60 16.57
SOBRECIMIENTO EN MODULO B LONGITUDINAL E=0.15m 2.00 54.65 0.60 65.58
SOBRECIMIENTO EN MODULO B TRANSVERSAL E=0.15m 2.00 37.48 0.60 44.98
SOBRECIMIENTO EN MODULO C LONGITUDINAL E=0.15m 2.00 87.61 0.60 105.13
SOBRECIMIENTO EN MODULO C TRANSVERSAL E=0.15m 2.00 109.87 0.60 131.84
SOBRECIMIENTO EN MODULO D LONGITUDINAL E=0.15m 2.00 39.10 0.60 46.92
SOBRECIMIENTO EN MODULO D TRANSVERSAL E=0.15m 2.00 54.89 0.60 65.87
SOBRECIMIENTO EN MODULO E LONGITUDINAL E=0.15m 2.00 105.53 0.60 126.64
SOBRECIMIENTO EN MODULO E TRANSVERSAL E=0.15m 2.00 106.93 0.60 128.32
SOBRECIMIENTO EN MODULO F LONGITUDINAL E=0.15m 2.00 70.89 0.60 85.07
SOBRECIMIENTO EN MODULO F TRANSVERSAL E=0.15m 2.00 63.82 0.60 76.58
SOBRECIMIENTO EN MODULO G LONGITUDINAL E=0.15m 2.00 52.38 0.60 62.86
SOBRECIMIENTO EN MODULO G TRANSVERSAL E=0.15m 2.00 43.33 0.60 52.00
SOBRECIMIENTO EN MODULO H LONGITUDINAL E=0.15m 2.00 25.90 0.60 31.08
SOBRECIMIENTO EN MODULO H TRANSVERSAL E=0.15m 2.00 16.58 0.60 19.90
SOBRECIMIENTO EN MODULO I LONGITUDINAL E=0.15m 2.00 36.98 0.60 44.38
SOBRECIMIENTO EN MODULO I TRANSVERSAL E=0.15m 2.00 26.75 0.60 32.10
SOBRECIMIENTO EN MODULO J LONGITUDINAL E=0.15m 2.00 18.89 0.60 22.67
SOBRECIMIENTO EN MODULO J TRANSVERSAL E=0.15m 2.00 33.93 0.60 40.72
SOBRECIMIENTO EN MODULO K LONGITUDINAL E=0.15m 2.00 20.92 0.60 25.10
SOBRECIMIENTO EN MODULO K TRANSVERSAL E=0.15m 2.00 17.63 0.60 21.16
SOBRECIMIENTO EN MODULO L LONGITUDINAL E=0.15m 2.00 6.63 0.60 7.96
SOBRECIMIENTO EN MODULO L TRANSVERSAL E=0.15m 2.00 9.54 0.60 11.45
SOBRECIMIENTO EN CERCO PERIM. LONGITUDINAL E=0.15m 2.00 222.06 0.60 266.47

FALSO PISO
FALSO PISO MEZCLA 1:8 e=4" 2535.92
INGRESO VEHICULAR 1.00 AREA= 5.15
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


MODULO A 1.00 AREA= 63.51
MODULO B 1.00 AREA= 216.55
MODULO C 1.00 AREA= 508.75
MODULO D 1.00 AREA= 323.01
MODULO E 1.00 AREA= 464.29
MODULO F 1.00 AREA= 328.97
MODULO G 1.00 AREA= 227.74
MODULO H 1.00 AREA= 88.02
MODULO I 1.00 AREA= 110.78
MODULO J 1.00 AREA= 101.53
MODULO K 1.00 AREA= 69.64
MODULO L 1.00 AREA= 27.97

OBRAS DE CONCRETO ARMADO


ZAPATAS
ZAPATAS - CONCRETO PREMEZCLADO f'c = 210 kg/cm2. 207.02
CONCR. ZAPATA EN INGRESO VEHICULAR Z-12 1.00 2.40 0.70 0.50 0.84
CONCR. ZAPATA EN INGRESO VEHICULAR Z-12 1.00 2.10 0.85 0.50 0.89
CONCR. ZAPATA EN INGRESO VEHICULAR Z-12 3.00 3.05 1.15 0.50 5.26
CONCR. ZAPATA EN INGRESO VEHICULAR Z-12 2.00 2.40 1.15 0.50 2.76
CONCR. ZAPATA EN MODULO A Z-1 8.00 1.20 1.20 0.50 5.76
CONCR. ZAPATA EN MODULO A Z-11 2.00 1.30 0.80 0.50 1.04
CONCR. ZAPATA EN MODULO B Z-5 12.00 1.50 1.30 0.50 11.70
CONCR. ZAPATA EN MODULO B Z-6 2.00 1.30 1.30 0.50 1.69
CONCR. ZAPATA EN MODULO B Z-10 3.00 1.50 0.80 0.50 1.80
CONCR. ZAPATA EN MODULO C Z-4 36.00 1.40 1.15 0.50 28.98
CONCR. ZAPATA EN MODULO D Z-1 15.00 1.20 1.20 0.50 10.80
CONCR. ZAPATA EN MODULO D Z-9 10.00 1.40 1.20 0.50 8.40
CONCR. ZAPATA EN MODULO E Z-6 20.00 1.30 1.30 0.50 16.90
CONCR. ZAPATA EN MODULO E Z-7 12.00 1.50 1.25 0.50 11.25
CONCR. ZAPATA EN MODULO E Z-8 5.00 1.25 1.25 0.50 3.91
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


CONCR. ZAPATA EN MODULO E Z-4 4.00 1.40 1.15 0.50 3.22
CONCR. ZAPATA EN MODULO E Z-5 4.00 1.50 1.30 0.50 3.90
CONCR. ZAPATA EN MODULO F Z-5 28.00 1.50 1.30 0.50 27.30
CONCR. ZAPATA EN MODULO G Z-2 21.00 1.15 1.15 0.50 13.89
CONCR. ZAPATA EN MODULO G Z-3 4.00 AREA= 2.00 0.50 4.00
CONCR. ZAPATA EN MODULO H Z-1 9.00 1.20 1.20 0.50 6.48
CONCR. ZAPATA EN MODULO H Z-3 4.00 AREA= 2.00 0.50 4.00
CONCR. ZAPATA EN MODULO I Z-1 14.00 1.20 1.20 0.50 10.08
CONCR. ZAPATA EN MODULO I Z-1 1.00 AREA= 2.25 0.50 1.12
CONCR. ZAPATA EN MODULO J Z-1 12.00 1.20 1.20 0.50 8.64
CONCR. ZAPATA EN MODULO K Z-1 12.00 1.20 1.20 0.50 8.64
CONCR. ZAPATA EN MODULO L Z-1 4.00 1.20 1.20 0.50 2.88
CONCR. ZAPATA EN MODULO L Z-1 2.00 1.20 0.75 0.50 0.90

ZAPATAS - ENCOFRADO Y DESENCOFRADO 638.78


ENC.Y DESENCF. EN INGRESO VEHICULAR Z-12 1.00 6.20 0.50 3.10
ENC.Y DESENCF. EN INGRESO VEHICULAR Z-12 1.00 5.90 0.50 2.95
ENC.Y DESENCF. EN INGRESO VEHICULAR Z-12 3.00 8.40 0.50 12.60
ENC.Y DESENCF. EN INGRESO VEHICULAR Z-12 2.00 7.10 0.50 7.10
ENC.Y DESENCF. EN MODULO A Z-1 8.00 4.80 0.50 19.20
ENC.Y DESENCF. EN MODULO A Z-11 2.00 4.20 0.50 4.20
ENC.Y DESENCF. EN MODULO B Z-5 12.00 5.60 0.50 33.60
ENC.Y DESENCF. EN MODULO B Z-6 2.00 5.20 0.50 5.20
ENC.Y DESENCF. EN MODULO B Z-10 3.00 4.60 0.50 6.90
ENC.Y DESENCF. EN MODULO C Z-4 36.00 5.10 0.50 91.80
ENC.Y DESENCF. EN MODULO D Z-1 15.00 4.80 0.50 36.00
ENC.Y DESENCF. EN MODULO D Z-9 10.00 5.20 0.50 26.00
ENC.Y DESENCF. EN MODULO E Z-6 20.00 5.20 0.50 52.00
ENC.Y DESENCF. EN MODULO E Z-7 12.00 5.50 0.50 33.00
ENC.Y DESENCF. EN MODULO E Z-8 5.00 5.00 0.50 12.50
ENC.Y DESENCF. EN MODULO E Z-4 4.00 5.10 0.50 10.20
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


ENC.Y DESENCF. EN MODULO E Z-5 4.00 5.60 0.50 11.20
ENC.Y DESENCF. EN MODULO F Z-5 28.00 5.60 0.50 78.40
ENC.Y DESENCF. EN MODULO G Z-2 21.00 4.60 0.50 48.30
ENC.Y DESENCF. EN MODULO G Z-3 4.00 4.00 0.50 7.99
ENC.Y DESENCF. EN MODULO H Z-1 9.00 4.80 0.50 21.60
ENC.Y DESENCF. EN MODULO H Z-3 4.00 4.00 0.50 7.99
ENC.Y DESENCF. EN MODULO I Z-1 14.00 4.80 0.50 33.60
ENC.Y DESENCF. EN MODULO I Z-1 1.00 4.50 0.50 2.25
ENC.Y DESENCF. EN MODULO J Z-1 12.00 4.80 0.50 28.80
ENC.Y DESENCF. EN MODULO K Z-1 12.00 4.80 0.50 28.80
ENC.Y DESENCF. EN MODULO L Z-1 4.00 4.80 0.50 9.60
ENC.Y DESENCF. EN MODULO L Z-1 2.00 3.90 0.50 3.90

ZAPATAS - ACERO DE REFUERZO Fy=4200 kg/cm2 6829.87

PLACAS
PLACAS - CONCRETO PREMEZCLADO f'c = 280 kg/cm2. 61.00
CONCRETO EN PLACAS EN MODULO A 1.00 11.70 0.15 5.65 9.92
CONCRETO EN PLACAS EN MODULO G 1.00 9.54 0.15 5.65 8.09
CONCRETO EN PLACAS EN MODULO G 1.00 2.99 0.25 5.65 4.22
CONCRETO EN PLACAS EN MODULO H 1.00 10.88 0.15 5.65 9.22
CONCRETO EN PLACAS EN MODULO J 1.00 9.56 0.15 5.65 8.10
CONCRETO EN PLACAS EN MODULO K 1.00 9.48 0.15 5.65 8.03
CONCRETO EN ASCENSOR 1.00 9.50 0.25 5.65 13.42

PLACAS - ENCOFRADO Y DESENCOFRADO 719.25


ENC.Y DESENC. PLACAS EN MODULO A 2.00 11.70 5.65 132.21
ENC.Y DESENC. PLACAS EN MODULO G 2.00 9.54 5.65 107.80
ENC.Y DESENC. PLACAS EN MODULO G 2.00 2.99 5.65 33.79
ENC.Y DESENC. PLACAS EN MODULO H 2.00 10.88 5.65 122.94
ENC.Y DESENC. PLACAS EN MODULO J 2.00 9.56 5.65 108.03
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


ENC.Y DESENC. PLACAS EN MODULO K 2.00 9.48 5.65 107.12
ENC.Y DESENC. ASCENSOR 2.00 9.50 5.65 107.35

PLACAS - ACERO DE REFUERZO Fy=4200 kg/cm2 36230.47

COLUMNAS
COLUMNAS - CONCRETO PREMEZCLADO f'c = 210 kg/cm2. 155.28
CONCRETO COLUMNA EN ING. VEHI. C-2 17.00 0.25 0.25 5.65 6.00
CONCRETO COLUMNA EN MODULO A C-1 10.00 0.30 0.30 5.65 5.09
CONCRETO COLUMNA EN MODULO B C-1 2.00 0.30 0.30 5.65 1.02
CONCRETO COLUMNA EN MODULO B C-4 14.00 0.50 0.30 5.65 11.87
CONCRETO COLUMNA EN MODULO C C-3 36.00 0.50 0.25 5.65 25.43
CONCRETO COLUMNA EN MODULO D C-4 10.00 0.50 0.30 5.65 8.48
CONCRETO COLUMNA EN MODULO D C-1 15.00 0.30 0.30 5.65 7.63
CONCRETO COLUMNA EN MODULO E C-4 4.00 0.50 0.30 5.65 3.39
CONCRETO COLUMNA EN MODULO E C-3 16.00 0.50 0.25 5.65 11.30
CONCRETO COLUMNA EN MODULO E C-1 20.00 0.30 0.30 5.65 10.17
CONCRETO COLUMNA EN MODULO E C-2 5.00 0.30 0.30 5.65 2.54
CONCRETO COLUMNA EN MODULO F C-4 28.00 0.50 0.30 5.65 23.73
CONCRETO COLUMNA EN MODULO G C-2 21.00 0.30 0.30 5.65 10.68
CONCRETO COLUMNA EN MODULO H C-1 9.00 0.30 0.30 5.65 4.58
CONCRETO COLUMNA EN MODULO I C-1 16.00 0.30 0.30 5.65 8.14
CONCRETO COLUMNA EN MODULO J C-1 12.00 0.30 0.30 5.65 6.10
CONCRETO COLUMNA EN MODULO K C-1 12.00 0.30 0.30 5.65 6.10
CONCRETO COLUMNA EN MODULO L C-1 6.00 0.30 0.30 5.65 3.05

COLUMNAS - ENCOFRADO Y DESENCOFRADO 1846.57


ENC. Y DESEN. COLUMNA EN ING. VEHI. C-2 17.00 1.00 5.46 92.82
ENC. Y DESEN. COLUMNA EN MODULO A C-1 10.00 1.20 5.46 65.52
ENC. Y DESEN. COLUMNA EN MODULO B C-1 2.00 1.20 5.46 13.10
ENC. Y DESEN. COLUMNA EN MODULO B C-4 14.00 1.60 5.46 122.30
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


ENC. Y DESEN. COLUMNA EN MODULO C C-3 36.00 1.50 5.46 294.84
ENC. Y DESEN. COLUMNA EN MODULO D C-4 10.00 1.60 5.46 87.36
ENC. Y DESEN. COLUMNA EN MODULO D C-1 15.00 1.20 5.46 98.28
ENC. Y DESEN. COLUMNA EN MODULO E C-4 4.00 1.60 5.46 34.94
ENC. Y DESEN. COLUMNA EN MODULO E C-3 16.00 1.50 5.46 131.04
ENC. Y DESEN. COLUMNA EN MODULO E C-1 20.00 1.20 5.46 131.04
ENC. Y DESEN. COLUMNA EN MODULO E C-2 5.00 1.20 5.46 32.76
ENC. Y DESEN. COLUMNA EN MODULO F C-4 28.00 1.60 5.46 244.61
ENC. Y DESEN.COLUMNA EN MODULO G C-2 21.00 1.20 5.46 137.59
ENC. Y DESEN. COLUMNA EN MODULO H C-1 9.00 1.20 5.46 58.97
ENC. Y DESEN. COLUMNA EN MODULO I C-1 16.00 1.20 5.46 104.83
ENC. Y DESEN. COLUMNA EN MODULO J C-1 12.00 1.20 5.46 78.62
ENC. Y DESEN. COLUMNA EN MODULO K C-1 12.00 1.20 5.46 78.62
ENC. Y DESEN. COLUMNA EN MODULO L C-1 6.00 1.20 5.46 39.31

COLUMNAS - ACERO DE REFUERZO Fy=4200 kg/cm2 18218.91

VIGAS
VIGAS - CONCRETO PREMEZCLADO f'c = 210 kg/cm2.
CONCRETO VIGA EN INGRESO 214.96
CONCRETO VIGA EN MODULO A VA-103 1.00 2.90 0.30 0.35 0.30
CONCRETO VIGA EN MODULO A VA-104 1.00 2.90 0.30 0.35 0.30
CONCRETO VIGA EN MODULO A VA-105 1.00 2.90 0.30 0.35 0.30
CONCRETO VIGA EN MODULO A VA-106 1.00 15.35 0.30 0.35 1.61
CONCRETO VIGA EN MODULO A VA-107 1.00 15.35 0.30 0.35 1.61
CONCRETO VIGA EN MODULO B VB.101 1.00 14.37 0.30 0.55 2.37
CONCRETO VIGA EN MODULO B VB.102 1.00 14.37 0.30 0.55 2.37
CONCRETO VIGA EN MODULO B VB.103 1.00 13.50 0.30 0.55 2.23
CONCRETO VIGA EN MODULO B VB.104 1.00 13.50 0.30 0.55 2.23
CONCRETO VIGA EN MODULO B VB.105 1.00 13.50 0.30 0.55 2.23
CONCRETO VIGA EN MODULO B VB.106 1.00 15.65 0.30 0.35 1.64
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


CONCRETO VIGA EN MODULO B VB.107 1.00 15.65 0.30 0.35 1.64
CONCRETO VIGA EN MODULO B VB.108 1.00 3.51 0.30 0.35 0.37
CONCRETO VIGA EN MODULO B VB.109 1.00 15.65 0.30 0.35 1.64
CONCRETO VIGA EN MODULO B VCH 1.00 31.30 0.30 0.25 2.35
CONCRETO VIGA EN MODULO C VC-101 1.00 18.51 0.25 0.50 2.31
CONCRETO VIGA EN MODULO C VC-102 1.00 18.51 0.25 0.50 2.31
CONCRETO VIGA EN MODULO C VC-103 1.00 18.51 0.25 0.50 2.31
CONCRETO VIGA EN MODULO C VC-104 1.00 13.00 0.25 0.50 1.63
CONCRETO VIGA EN MODULO C VC-105 1.00 13.00 0.25 0.50 1.63
CONCRETO VIGA EN MODULO C VC-106 1.00 18.51 0.25 0.50 2.31
CONCRETO VIGA EN MODULO C VC-107 1.00 19.00 0.25 0.50 2.38
CONCRETO VIGA EN MODULO C VC-108 1.00 19.00 0.25 0.50 2.38
CONCRETO VIGA EN MODULO C VC-109 1.00 19.00 0.25 0.50 2.38
CONCRETO VIGA EN MODULO C VC-110 1.00 28.91 0.25 0.40 2.89
CONCRETO VIGA EN MODULO C VC-111 1.00 28.91 0.25 0.40 2.89
CONCRETO VIGA EN MODULO C VC-112 1.00 28.91 0.25 0.40 2.89
CONCRETO VIGA EN MODULO C VC-113 1.00 28.91 0.25 0.40 2.89
CONCRETO VIGA EN MODULO C VCH 1.00 6.88 0.25 0.25 0.43
CONCRETO VIGA EN MODULO D VD-101 1.00 14.50 0.30 0.35 1.52
CONCRETO VIGA EN MODULO D VD-102 1.00 14.50 0.30 0.35 1.52
CONCRETO VIGA EN MODULO D VD-103 1.00 14.50 0.30 0.35 1.52
CONCRETO VIGA EN MODULO D VD-104 1.00 14.50 0.30 0.35 1.52
CONCRETO VIGA EN MODULO D VD-105 1.00 14.50 0.30 0.35 1.52
CONCRETO VIGA EN MODULO D VD-106 1.00 23.25 0.30 0.50 3.49
CONCRETO VIGA EN MODULO D VD-107 1.00 23.25 0.30 0.50 3.49
CONCRETO VIGA EN MODULO D VD-108 1.00 23.25 0.30 0.50 3.49
CONCRETO VIGA EN MODULO D VD-109 1.00 23.25 0.30 0.50 3.49
CONCRETO VIGA EN MODULO D VD-110 1.00 23.25 0.30 0.50 3.49
CONCRETO VIGA EN MODULO E VE-101 1.00 17.45 0.25 0.50 2.18
CONCRETO VIGA EN MODULO E VE-102 1.00 17.45 0.25 0.50 2.18
CONCRETO VIGA EN MODULO E VE-103 1.00 17.45 0.25 0.50 2.18
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


CONCRETO VIGA EN MODULO E VE-104 1.00 17.45 0.25 0.50 2.18
CONCRETO VIGA EN MODULO E VE-105 1.00 14.50 0.30 0.50 2.18
CONCRETO VIGA EN MODULO E VE-106 1.00 14.50 0.30 0.50 2.18
CONCRETO VIGA EN MODULO E VE-107 1.00 14.50 0.30 0.50 2.18
CONCRETO VIGA EN MODULO E VE-108 1.00 14.50 0.30 0.50 2.18
CONCRETO VIGA EN MODULO E VE-109 1.00 28.91 0.30 0.50 4.34
CONCRETO VIGA EN MODULO E VE-110 1.00 28.91 0.30 0.50 4.34
CONCRETO VIGA EN MODULO E VE-111 1.00 28.91 0.30 0.50 4.34
CONCRETO VIGA EN MODULO E VE-112 1.00 28.91 0.30 0.50 4.34
CONCRETO VIGA EN MODULO E VE-113 1.00 28.91 0.30 0.50 4.34
CONCRETO VIGA EN MODULO F VF-101 1.00 32.00 0.30 0.50 4.80
CONCRETO VIGA EN MODULO F VF-102 1.00 32.00 0.30 0.50 4.80
CONCRETO VIGA EN MODULO F VF-103 1.00 32.00 0.30 0.50 4.80
CONCRETO VIGA EN MODULO F VF-104 1.00 32.00 0.30 0.50 4.80
CONCRETO VIGA EN MODULO F VF-105 1.00 16.45 0.30 0.50 2.47
CONCRETO VIGA EN MODULO F VF-106 1.00 16.45 0.30 0.50 2.47
CONCRETO VIGA EN MODULO F VF-107 1.00 16.45 0.30 0.50 2.47
CONCRETO VIGA EN MODULO F VF-108 1.00 16.45 0.30 0.50 2.47
CONCRETO VIGA EN MODULO F VF-109 1.00 16.45 0.30 0.50 2.47
CONCRETO VIGA EN MODULO F VF-110 1.00 16.45 0.30 0.50 2.47
CONCRETO VIGA EN MODULO F VF-111 1.00 16.45 0.30 0.50 2.47
CONCRETO VIGA EN MODULO F VF-112 1.00 16.45 0.30 0.50 2.47
CONCRETO VIGA EN MODULO G VG-101 1.00 18.00 0.25 0.40 1.80
CONCRETO VIGA EN MODULO G VG-102 1.00 18.00 0.25 0.40 1.80
CONCRETO VIGA EN MODULO G VG-103 1.00 18.00 0.25 0.40 1.80
CONCRETO VIGA EN MODULO G VG-104 1.00 18.00 0.25 0.40 1.80
CONCRETO VIGA EN MODULO G VG-105 1.00 18.00 0.25 0.40 1.80
CONCRETO VIGA EN MODULO G VG-106 1.00 13.45 0.25 0.40 1.35
CONCRETO VIGA EN MODULO G VG-107 1.00 13.45 0.25 0.40 1.35
CONCRETO VIGA EN MODULO G VG-108 1.00 13.45 0.25 0.40 1.35
CONCRETO VIGA EN MODULO G VG-109 1.00 3.68 0.25 0.40 0.37
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


CONCRETO VIGA EN MODULO G VG-110 1.00 7.26 0.25 0.40 0.73
CONCRETO VIGA EN MODULO G VG-111 1.00 13.45 0.25 0.40 1.35
CONCRETO VIGA EN MODULO G VCH 1.00 6.02 0.25 0.40 0.60
CONCRETO VIGA EN MODULO H VH-101 1.00 8.02 0.30 0.40 0.96
CONCRETO VIGA EN MODULO H VH-102 1.00 8.02 0.30 0.40 0.96
CONCRETO VIGA EN MODULO H VH-103 1.00 8.02 0.30 0.40 0.96
CONCRETO VIGA EN MODULO H VH-104 1.00 8.23 0.30 0.40 0.99
CONCRETO VIGA EN MODULO H VH-105 1.00 8.23 0.30 0.40 0.99
CONCRETO VIGA EN MODULO H VH-106 1.00 8.23 0.30 0.40 0.99
CONCRETO VIGA EN MODULO I VI-101 1.00 19.55 0.30 0.45 2.64
CONCRETO VIGA EN MODULO I VI-102 1.00 19.55 0.30 0.45 2.64
CONCRETO VIGA EN MODULO I VI-103 1.00 4.95 0.30 0.45 0.67
CONCRETO VIGA EN MODULO I VI-104 1.00 4.95 0.30 0.45 0.67
CONCRETO VIGA EN MODULO I VI-105 1.00 4.95 0.30 0.45 0.67
CONCRETO VIGA EN MODULO I VI-106 1.00 4.95 0.30 0.45 0.67
CONCRETO VIGA EN MODULO I VI-107 1.00 4.95 0.30 0.45 0.67
CONCRETO VIGA EN MODULO I VI-108 1.00 4.95 0.30 0.45 0.67
CONCRETO VIGA EN MODULO J VJ-101 1.00 5.63 0.30 0.45 0.76
CONCRETO VIGA EN MODULO J VJ-102 1.00 5.63 0.30 0.45 0.76
CONCRETO VIGA EN MODULO J VJ-103 1.00 5.63 0.30 0.45 0.76
CONCRETO VIGA EN MODULO J VJ-104 1.00 9.01 0.30 0.50 1.35
CONCRETO VIGA EN MODULO J VJ-105 1.00 9.01 0.30 0.50 1.35
CONCRETO VIGA EN MODULO J VJ-106 1.00 16.94 0.30 0.45 2.29
CONCRETO VIGA EN MODULO J VJ-107 1.00 10.28 0.30 0.45 1.39
CONCRETO VIGA EN MODULO J VJ-108 1.00 4.18 0.30 0.45 0.56
CONCRETO VIGA EN MODULO J VJ-109 1.00 4.18 0.30 0.45 0.56
CONCRETO VIGA EN MODULO J V-CH 1.00 6.96 0.30 0.25 0.52
CONCRETO VIGA EN MODULO K VK-101 1.00 18.85 0.30 0.40 2.26
CONCRETO VIGA EN MODULO K VK-102 1.00 18.85 0.30 0.40 2.26
CONCRETO VIGA EN MODULO K VK-103 1.00 4.00 0.30 0.40 0.48
CONCRETO VIGA EN MODULO K VK-104 1.00 4.00 0.30 0.40 0.48
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


CONCRETO VIGA EN MODULO K VK-105 1.00 4.00 0.30 0.40 0.48
CONCRETO VIGA EN MODULO K VK-106 1.00 4.00 0.30 0.40 0.48
CONCRETO VIGA EN MODULO K VK-107 1.00 4.00 0.30 0.40 0.48
CONCRETO VIGA EN MODULO K VK-108 1.00 4.00 0.30 0.40 0.48
CONCRETO VIGA EN MODULO L VL-101 1.00 5.36 0.30 0.45 0.72
CONCRETO VIGA EN MODULO L VL-102 1.00 5.36 0.30 0.45 0.72
CONCRETO VIGA EN MODULO L VL-103 1.00 5.36 0.30 0.45 0.72
CONCRETO VIGA EN MODULO L V-CH 1.00 11.34 0.30 0.25 0.85
CONCRETO VIGA EN MODULO LL VL-101 1.00 7.20 0.30 0.50 1.08
CONCRETO VIGA EN MODULO LL VL-102 1.00 7.20 0.30 0.50 1.08
CONCRETO VIGA EN MODULO LL V-CH 1.00 7.88 0.30 0.25 0.59
CONCRETO VIGA EN MODULO M VM-101 1.00 5.02 0.30 0.40 0.60
CONCRETO VIGA EN MODULO M VM-102 1.00 5.02 0.30 0.40 0.60
CONCRETO VIGA EN MODULO M VM-103 1.00 4.69 0.30 0.40 0.56
CONCRETO VIGA EN MODULO M VM-104 1.00 4.69 0.30 0.40 0.56

VIGAS - ENCOFRADO Y DESENCOFRADO


ENC. DESENCOF. EN VIGA EN INGRESO 1985.95
ENC. DESENCOF. EN MODULO A VA-103 1.00 2.90 0.30 0.35 2.90
ENC. DESENCOF. EN MODULO A VA-104 1.00 2.90 0.30 0.35 2.90
ENC. DESENCOF. EN MODULO A VA-105 1.00 2.90 0.30 0.35 2.90
ENC. DESENCOF. EN MODULO A VA-106 1.00 15.35 0.30 0.35 15.35
ENC. DESENCOF. EN MODULO A VA-107 1.00 15.35 0.30 0.35 15.35
ENC. DESENCOF. EN MODULO B VB.101 1.00 14.37 0.30 0.55 20.12
ENC. DESENCOF. EN MODULO B VB.102 1.00 14.37 0.30 0.55 20.12
ENC. DESENCOF. EN MODULO B VB.103 1.00 13.50 0.30 0.55 18.90
ENC. DESENCOF. EN MODULO B VB.104 1.00 13.50 0.30 0.55 18.90
ENC. DESENCOF. EN MODULO B VB.105 1.00 13.50 0.30 0.55 18.90
ENC. DESENCOF.EN MODULO B VB.106 1.00 15.65 0.30 0.35 15.65
ENC. DESENCOF. EN MODULO B VB.107 1.00 15.65 0.30 0.35 15.65
ENC. DESENCOF. EN MODULO B VB.108 1.00 3.51 0.30 0.35 3.51
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


ENC. DESENCOF. EN MODULO B VB.109 1.00 15.65 0.30 0.35 15.65
ENC. DESENCOF. EN MODULO B VCH 1.00 31.30 0.30 0.25 25.04
ENC. DESENCOF. EN MODULO C VC-101 1.00 18.51 0.25 0.50 23.14
ENC. DESENCOF. EN MODULO C VC-102 1.00 18.51 0.25 0.50 23.14
ENC. DESENCOF. EN MODULO C VC-103 1.00 18.51 0.25 0.50 23.14
ENC. DESENCOF. EN MODULO C VC-104 1.00 13.00 0.25 0.50 16.25
ENC. DESENCOF. EN MODULO C VC-105 1.00 13.00 0.25 0.50 16.25
ENC. DESENCOF. EN MODULO C VC-106 1.00 18.51 0.25 0.50 23.14
ENC. DESENCOF. EN MODULO C VC-107 1.00 19.00 0.25 0.50 23.75
ENC. DESENCOF.EN MODULO C VC-108 1.00 19.00 0.25 0.50 23.75
ENC. DESENCOF.EN MODULO C VC-109 1.00 19.00 0.25 0.50 23.75
ENC. DESENCOF. EN MODULO C VC-110 1.00 28.91 0.25 0.40 30.36
ENC. DESENCOF. EN MODULO C VC-111 1.00 28.91 0.25 0.40 30.36
ENC. DESENCOF. EN MODULO C VC-112 1.00 28.91 0.25 0.40 30.36
ENC. DESENCOF. EN MODULO C VC-113 1.00 28.91 0.25 0.40 30.36
ENC. DESENCOF. EN MODULO C VCH 1.00 6.88 0.25 0.25 5.16
ENC. DESENCOF. EN MODULO D VD-101 1.00 14.50 0.30 0.35 14.50
ENC. DESENCOF. EN MODULO D VD-102 1.00 14.50 0.30 0.35 14.50
ENC. DESENCOF. EN MODULO D VD-103 1.00 14.50 0.30 0.35 14.50
ENC. DESENCOF. EN MODULO D VD-104 1.00 14.50 0.30 0.35 14.50
ENC. DESENCOF. EN MODULO D VD-105 1.00 14.50 0.30 0.35 14.50
ENC. DESENCOF. EN MODULO D VD-106 1.00 23.25 0.30 0.50 30.23
ENC. DESENCOF. EN MODULO D VD-107 1.00 23.25 0.30 0.50 30.23
ENC. DESENCOF. EN MODULO D VD-108 1.00 23.25 0.30 0.50 30.23
ENC. DESENCOF. EN MODULO D VD-109 1.00 23.25 0.30 0.50 30.23
ENC. DESENCOF. EN MODULO D VD-110 1.00 23.25 0.30 0.50 30.23
ENC. DESENCOF. EN MODULO E VE-101 1.00 17.45 0.25 0.50 21.81
ENC. DESENCOF. EN MODULO E VE-102 1.00 17.45 0.25 0.50 21.81
ENC. DESENCOF. EN MODULO E VE-103 1.00 17.45 0.25 0.50 21.81
ENC. DESENCOF. EN MODULO E VE-104 1.00 17.45 0.25 0.50 21.81
ENC. DESENCOF. EN MODULO E VE-105 1.00 14.50 0.30 0.50 18.85
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


ENC. DESENCOF. EN MODULO E VE-106 1.00 14.50 0.30 0.50 18.85
ENC. DESENCOF. EN MODULO E VE-107 1.00 14.50 0.30 0.50 18.85
ENC. DESENCOF. EN MODULO E VE-108 1.00 14.50 0.30 0.50 18.85
ENC. DESENCOF. EN MODULO E VE-109 1.00 28.91 0.30 0.50 37.58
ENC. DESENCOF. EN MODULO E VE-110 1.00 28.91 0.30 0.50 37.58
ENC. DESENCOF. EN MODULO E VE-111 1.00 28.91 0.30 0.50 37.58
ENC. DESENCOF. EN MODULO E VE-112 1.00 28.91 0.30 0.50 37.58
ENC. DESENCOF. EN MODULO E VE-113 1.00 28.91 0.30 0.50 37.58
ENC. DESENCOF. EN MODULO F VF-101 1.00 32.00 0.30 0.50 41.60
ENC. DESENCOF. EN MODULO F VF-102 1.00 32.00 0.30 0.50 41.60
ENC. DESENCOF. EN MODULO F VF-103 1.00 32.00 0.30 0.50 41.60
ENC. DESENCOF. EN MODULO F VF-104 1.00 32.00 0.30 0.50 41.60
ENC. DESENCOF. EN MODULO F VF-105 1.00 16.45 0.30 0.50 21.39
ENC. DESENCOF. EN MODULO F VF-106 1.00 16.45 0.30 0.50 21.39
ENC. DESENCOF. EN MODULO F VF-107 1.00 16.45 0.30 0.50 21.39
ENC. DESENCOF. EN MODULO F VF-108 1.00 16.45 0.30 0.50 21.39
ENC. DESENCOF. EN MODULO F VF-109 1.00 16.45 0.30 0.50 21.39
ENC. DESENCOF. EN MODULO F VF-110 1.00 16.45 0.30 0.50 21.39
ENC. DESENCOF. EN MODULO F VF-111 1.00 16.45 0.30 0.50 21.39
ENC. DESENCOF. EN MODULO F VF-112 1.00 16.45 0.30 0.50 21.39
ENC. DESENCOF. EN MODULO G VG-101 1.00 18.00 0.25 0.40 18.90
ENC. DESENCOF. EN MODULO G VG-102 1.00 18.00 0.25 0.40 18.90
ENC. DESENCOF. EN MODULO G VG-103 1.00 18.00 0.25 0.40 18.90
ENC. DESENCOF. EN MODULO G VG-104 1.00 18.00 0.25 0.40 18.90
ENC. DESENCOF. EN MODULO G VG-105 1.00 18.00 0.25 0.40 18.90
ENC. DESENCOF. EN MODULO G VG-106 1.00 13.45 0.25 0.40 14.12
ENC. DESENCOF. EN MODULO G VG-107 1.00 13.45 0.25 0.40 14.12
ENC. DESENCOF. EN MODULO G VG-108 1.00 13.45 0.25 0.40 14.12
ENC. DESENCOF. EN MODULO G VG-109 1.00 3.68 0.25 0.40 3.86
ENC. DESENCOF. EN MODULO G VG-110 1.00 7.26 0.25 0.40 7.62
ENC. DESENCOF. EN MODULO G VG-111 1.00 13.45 0.25 0.40 14.12
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


ENC. DESENCOF. EN MODULO G VCH 1.00 6.02 0.25 0.40 6.32
ENC. DESENCOF. EN MODULO H VH-101 1.00 8.02 0.30 0.40 8.82
ENC. DESENCOF. EN MODULO H VH-102 1.00 8.02 0.30 0.40 8.82
ENC. DESENCOF.EN MODULO H VH-103 1.00 8.02 0.30 0.40 8.82
ENC. DESENCOF. EN MODULO H VH-104 1.00 8.23 0.30 0.40 9.05
ENC. DESENCOF. EN MODULO H VH-105 1.00 8.23 0.30 0.40 9.05
ENC. DESENCOF. EN MODULO H VH-106 1.00 8.23 0.30 0.40 9.05
ENC. DESENCOF. EN MODULO I VI-101 1.00 19.55 0.30 0.45 23.46
ENC. DESENCOF. EN MODULO I VI-102 1.00 19.55 0.30 0.45 23.46
ENC. DESENCOF. EN MODULO I VI-103 1.00 4.95 0.30 0.45 5.94
ENC. DESENCOF. EN MODULO I VI-104 1.00 4.95 0.30 0.45 5.94
ENC. DESENCOF. EN MODULO I VI-105 1.00 4.95 0.30 0.45 5.94
ENC. DESENCOF. EN MODULO I VI-106 1.00 4.95 0.30 0.45 5.94
ENC. DESENCOF. EN MODULO I VI-107 1.00 4.95 0.30 0.45 5.94
ENC. DESENCOF. EN MODULO I VI-108 1.00 4.95 0.30 0.45 5.94
ENC. DESENCOF. EN MODULO J VJ-101 1.00 5.63 0.30 0.45 6.76
ENC. DESENCOF. EN MODULO J VJ-102 1.00 5.63 0.30 0.45 6.76
ENC. DESENCOF. EN MODULO J VJ-103 1.00 5.63 0.30 0.45 6.76
ENC. DESENCOF. EN MODULO J VJ-104 1.00 9.01 0.30 0.50 11.71
ENC. DESENCOF. EN MODULO J VJ-105 1.00 9.01 0.30 0.50 11.71
ENC. DESENCOF. EN MODULO J VJ-106 1.00 16.94 0.30 0.45 20.33
ENC. DESENCOF. EN MODULO J VJ-107 1.00 10.28 0.30 0.45 12.34
ENC. DESENCOF. EN MODULO J VJ-108 1.00 4.18 0.30 0.45 5.02
ENC. DESENCOF. EN MODULO J VJ-109 1.00 4.18 0.30 0.45 5.02
ENC. DESENCOF. EN MODULO J V-CH 1.00 6.96 0.30 0.25 5.57
ENC. DESENCOF. EN MODULO K VK-101 1.00 18.85 0.30 0.40 20.74
ENC. DESENCOF. EN MODULO K VK-102 1.00 18.85 0.30 0.40 20.74
ENC. DESENCOF. EN MODULO K VK-103 1.00 4.00 0.30 0.40 4.40
ENC. DESENCOF. EN MODULO K VK-104 1.00 4.00 0.30 0.40 4.40
ENC. DESENCOF. EN MODULO K VK-105 1.00 4.00 0.30 0.40 4.40
ENC. DESENCOF. EN MODULO K VK-106 1.00 4.00 0.30 0.40 4.40
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


ENC. DESENCOF. EN MODULO K VK-107 1.00 4.00 0.30 0.40 4.40
ENC. DESENCOF. EN MODULO K VK-108 1.00 4.00 0.30 0.40 4.40
ENC. DESENCOF. EN MODULO L VL-101 1.00 5.36 0.30 0.45 6.43
ENC. DESENCOF. EN MODULO L VL-102 1.00 5.36 0.30 0.45 6.43
ENC. DESENCOF. EN MODULO L VL-103 1.00 5.36 0.30 0.45 6.43
ENC. DESENCOF. EN MODULO L V-CH 1.00 11.34 0.30 0.25 9.07
ENC. DESENCOF. EN MODULO LL VL-101 1.00 7.20 0.30 0.50 9.36
ENC. DESENCOF. EN MODULO LL VL-102 1.00 7.20 0.30 0.50 9.36
ENC. DESENCOF. EN MODULO LL V-CH 1.00 7.88 0.30 0.25 6.30
ENC. DESENCOF.EN MODULO M VM-101 1.00 5.02 0.30 0.40 5.52
ENC. DESENCOF. EN MODULO M VM-102 1.00 5.02 0.30 0.40 5.52
ENC. DESENCOF.EN MODULO M VM-103 1.00 4.69 0.30 0.40 5.16
ENC. DESENCOF. EN MODULO M VM-104 1.00 4.69 0.30 0.40 5.16

VIGAS - ACERO DE REFUERZO Fy=4200 kg/cm2 18596.34

LOSA ALIGERADA EN UN SENTIDO


LOSAS ALIGERADA- CONCRETO PREMEZCLADO f'c = 210 kg/cm2. 122.93
CONCRETO EN MODULO A FACT= 0.09 AREA= 55.18 4.83
CONCRETO EN MODULO C FACT= 0.09 AREA= 417.10 36.51
CONCRETO EN MODULO D FACT= 0.09 AREA= 282.68 24.75
CONCRETO EN MODULO E FACT= 0.09 AREA= 27.43 2.40
CONCRETO EN MODULO F FACT= 0.09 AREA= 84.36 7.39
CONCRETO EN MODULO G FACT= 0.09 AREA= 204.18 17.87
CONCRETO EN MODULO H FACT= 0.09 AREA= 52.22 4.57
CONCRETO EN MODULO I FACT= 0.09 AREA= 77.20 6.76
CONCRETO EN MODULO J FACT= 0.09 AREA= 82.05 7.18
CONCRETO EN MODULO K FACT= 0.09 AREA= 57.99 5.08
CONCRETO EN MODULO L FACT= 0.09 AREA= 22.71 1.99
CONCRETO EN MODULO LL FACT= 0.09 AREA= 23.03 2.02
CONCRETO EN MODULO M FACT= 0.09 AREA= 18.11 1.59
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL

LOSAS ALIGERADA- ACERO DE REFUERZO Fy=4200 Kg/cm2

LOSAS ALIGERADA- ENCOFRADO Y DESENCOFRADO 1404.23


ENCOFRADO Y DESENCOFRADO EN MODULO A AREA= 55.18
ENCOFRADO Y DESENCOFRADO EN MODULO C AREA= 417.10
ENCOFRADO Y DESENCOFRADO EN MODULO D AREA= 282.68
ENCOFRADO Y DESENCOFRADO EN MODULO E AREA= 27.43
ENCOFRADO Y DESENCOFRADO EN MODULO F AREA= 84.36
ENCOFRADO Y DESENCOFRADO EN MODULO G AREA= 204.18
ENCOFRADO Y DESENCOFRADO EN MODULO H AREA= 52.22
ENCOFRADO Y DESENCOFRADO EN MODULO I AREA= 77.20
ENCOFRADO Y DESENCOFRADOEN MODULO J AREA= 82.05
ENCOFRADO Y DESENCOFRADO EN MODULO K AREA= 57.99
ENCOFRADO Y DESENCOFRADO EN MODULO L AREA= 22.71
ENCOFRADO Y DESENCOFRADO EN MODULO LL AREA= 23.03
ENCOFRADO Y DESENCOFRADO EN MODULO M AREA= 18.11

LOSAS ALIGERADA- LADRILLO HUECO 20x30x30 11655.00


LADRILLO EN MODULO A FACT= 8.30 AREA= 55.18 458.02
LADRILLO EN MODULO C FACT= 8.30 AREA= 417.10 3461.92
LADRILLO EN MODULO D FACT= 8.30 AREA= 282.68 2346.25
LADRILLO EN MODULO E FACT= 8.30 AREA= 27.43 227.63
LADRILLO EN MODULO F FACT= 8.30 AREA= 84.36 700.19
LADRILLO EN MODULO G FACT= 8.30 AREA= 204.18 1694.67
LADRILLO EN MODULO H FACT= 8.30 AREA= 52.22 433.42
LADRILLO EN MODULO I FACT= 8.30 AREA= 77.20 640.78
LADRILLO EN MODULO J FACT= 8.30 AREA= 82.05 681.05
LADRILLO EN MODULO K FACT= 8.30 AREA= 57.99 481.28
LADRILLO EN MODULO L FACT= 8.30 AREA= 22.71 188.49
LADRILLO EN MODULO LL FACT= 8.30 AREA= 23.03 191.15
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


LADRILLO EN MODULO M FACT= 8.30 AREA= 18.11 150.28

LOSA ALIGERADA EN DOS SENTIDOS


LOSAS ALIGERADA- CONCRETO PREMEZCLADO f'c = 210 kg/cm2. 98.66
CONCRETO EN MODULO B FACT= 0.12 AREA= 171.40 20.57
CONCRETO EN MODULO E FACT= 0.12 AREA= 327.97 39.36
CONCRETO EN MODULO F FACT= 0.12 AREA= 322.78 38.73

LOSAS ALIGERADA- ENCOFRADO Y DESENCOFRADO 822.15


ENCOFRADO Y DESENCOFRADO EN MODULO B AREA= 171.40
ENCOFRADO Y DESENCOFRADO EN MODULO E AREA= 327.97
ENCOFRADO Y DESENCOFRADO EN MODULO F AREA= 322.78

LOSAS ALIGERADA- ACERO DE REFUERZO Fy=4200 Kg/cm2 43654.92

LOSAS ALIGERADA- LADRILLO HUECO 20x30x30 3964.00


LADRILLO EN MODULO B FACT= 5.25 AREA= 55.18 289.71
LADRILLO EN MODULO E FACT= 5.25 AREA= 417.10 2189.77
LADRILLO EN MODULO F FACT= 5.25 AREA= 282.68 1484.08

DINTELES
DINTELES - CONCRETO f'c=210kg/CM2
PUERTAS 6.62
DINTELE EN MODULO A 3.00 2.30 0.15 0.20 0.21
DINTELE EN MODULO A 1.00 1.50 0.15 0.20 0.05
DINTELE EN MODULO B 5.00 1.10 0.15 0.20 0.17
DINTELE EN MODULO B 6.00 1.30 0.15 0.20 0.23
DINTELE EN MODULO B 2.00 1.00 0.15 0.20 0.06
DINTELE EN MODULO C 17.00 1.30 0.15 0.20 0.66
DINTELE EN MODULO C 2.00 1.00 0.15 0.20 0.06
DINTELE EN MODULO C 2.00 1.10 0.15 0.20 0.07
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


DINTELE EN MODULO D 11.00 1.30 0.15 0.20 0.43
DINTELE EN MODULO D 2.00 1.10 0.15 0.20 0.07
DINTELE EN MODULO E 9.00 1.10 0.15 0.20 0.30
DINTELE EN MODULO E 10.00 1.30 0.15 0.20 0.39
DINTELE EN MODULO E 5.00 1.00 0.15 0.20 0.15
DINTELE EN MODULO E 1.00 2.70 0.15 0.20 0.08
DINTELE EN MODULO E 1.00 2.80 0.15 0.20 0.08
DINTELE EN MODULO E 1.00 1.35 0.15 0.20 0.04
DINTELE EN MODULO E 1.00 1.20 0.15 0.20 0.04
DINTELE EN MODULO E 2.00 1.50 0.15 0.20 0.09
DINTELE EN MODULO F 1.00 3.30 0.15 0.20 0.10
DINTELE EN MODULO F 1.00 2.65 0.15 0.20 0.08
DINTELE EN MODULO F 8.00 1.10 0.15 0.20 0.26
DINTELE EN MODULO F 5.00 1.00 0.15 0.20 0.15
DINTELE EN MODULO F 3.00 1.20 0.15 0.20 0.11
DINTELE EN MODULO F 5.00 1.30 0.15 0.20 0.20
DINTELE EN MODULO F 4.00 2.10 0.15 0.20 0.25
DINTELE EN MODULO G 4.00 1.20 0.15 0.20 0.14
DINTELE EN MODULO G 11.00 1.30 0.15 0.20 0.43
DINTELE EN MODULO G 6.00 1.00 0.15 0.20 0.18
DINTELE EN MODULO G 2.00 1.10 0.15 0.20 0.07
DINTELE EN MODULO G 1.00 1.50 0.15 0.20 0.05
DINTELE EN MODULO G 1.00 2.10 0.15 0.20 0.06
DINTELE EN MODULO H 2.00 1.50 0.15 0.20 0.09
DINTELE EN MODULO H 2.00 1.30 0.15 0.20 0.08
DINTELE EN MODULO I 3.00 1.00 0.15 0.20 0.09
DINTELE EN MODULO I 5.00 1.50 0.15 0.20 0.23
DINTELE EN MODULO I 2.00 1.30 0.15 0.20 0.08
DINTELE EN MODULO J 8.00 1.00 0.15 0.20 0.24
DINTELE EN MODULO J 1.00 1.10 0.15 0.20 0.03
DINTELE EN MODULO J 2.00 1.30 0.15 0.20 0.08
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


DINTELE EN MODULO K 2.00 1.10 0.15 0.20 0.07
DINTELE EN MODULO K 5.00 1.30 0.15 0.20 0.20
DINTELE EN MODULO K 4.00 1.00 0.15 0.20 0.12
DINTELE EN MODULO L 2.00 1.50 0.15 0.20 0.09

DINTELES - ENCOFRADO Y DESENCOFRADO 121.39


PUERTAS
DINTELE EN MODULO A 3.00 2.30 0.15 0.20 3.80
DINTELE EN MODULO A 1.00 1.50 0.15 0.20 0.83
DINTELE EN MODULO B 5.00 1.10 0.15 0.20 3.03
DINTELE EN MODULO B 6.00 1.30 0.15 0.20 4.29
DINTELE EN MODULO B 2.00 1.00 0.15 0.20 1.10
DINTELE EN MODULO C 17.00 1.30 0.15 0.20 12.16
DINTELE EN MODULO C 2.00 1.00 0.15 0.20 1.10
DINTELE EN MODULO C 2.00 1.10 0.15 0.20 1.21
DINTELE EN MODULO D 11.00 1.30 0.15 0.20 7.87
DINTELE EN MODULO D 2.00 1.10 0.15 0.20 1.21
DINTELE EN MODULO E 9.00 1.10 0.15 0.20 5.45
DINTELE EN MODULO E 10.00 1.30 0.15 0.20 7.15
DINTELE EN MODULO E 5.00 1.00 0.15 0.20 2.75
DINTELE EN MODULO E 1.00 2.70 0.15 0.20 1.49
DINTELE EN MODULO E 1.00 2.80 0.15 0.20 1.54
DINTELE EN MODULO E 1.00 1.35 0.15 0.20 0.74
DINTELE EN MODULO E 1.00 1.20 0.15 0.20 0.66
DINTELE EN MODULO E 2.00 1.50 0.15 0.20 1.65
DINTELE EN MODULO F 1.00 3.30 0.15 0.20 1.82
DINTELE EN MODULO F 1.00 2.65 0.15 0.20 1.46
DINTELE EN MODULO F 8.00 1.10 0.15 0.20 4.84
DINTELE EN MODULO F 5.00 1.00 0.15 0.20 2.75
DINTELE EN MODULO F 3.00 1.20 0.15 0.20 1.98
DINTELE EN MODULO F 5.00 1.30 0.15 0.20 3.58
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


DINTELE EN MODULO F 4.00 2.10 0.15 0.20 4.62
DINTELE EN MODULO G 4.00 1.20 0.15 0.20 2.64
DINTELE EN MODULO G 11.00 1.30 0.15 0.20 7.87
DINTELE EN MODULO G 6.00 1.00 0.15 0.20 3.30
DINTELE EN MODULO G 2.00 1.10 0.15 0.20 1.21
DINTELE EN MODULO G 1.00 1.50 0.15 0.20 0.83
DINTELE EN MODULO G 1.00 2.10 0.15 0.20 1.16
DINTELE EN MODULO H 2.00 1.50 0.15 0.20 1.65
DINTELE EN MODULO H 2.00 1.30 0.15 0.20 1.43
DINTELE EN MODULO I 3.00 1.00 0.15 0.20 1.65
DINTELE EN MODULO I 5.00 1.50 0.15 0.20 4.13
DINTELE EN MODULO I 2.00 1.30 0.15 0.20 1.43
DINTELE EN MODULO J 8.00 1.00 0.15 0.20 4.40
DINTELE EN MODULO J 1.00 1.10 0.15 0.20 0.61
DINTELE EN MODULO J 2.00 1.30 0.15 0.20 1.43
DINTELE EN MODULO K 2.00 1.10 0.15 0.20 1.21
DINTELE EN MODULO K 5.00 1.30 0.15 0.20 3.58
DINTELE EN MODULO K 4.00 1.00 0.15 0.20 2.20
DINTELE EN MODULO L 2.00 1.50 0.15 0.20 1.65

DINTELES- ACERO DE REFUERZO Fy=4200 Kg/cm2 295.06

ESCALERAS
ESCALERAS- CONCRETO PREMEZCLADO f'c = 210 kg/cm2. 5.25
CIMIENTO 4.00 1.20 0.50 0.98 2.35
PASOS Y CONTRAPASO
PASOS Y CONTRAPASO 4.00 1.20 0.25 0.09 0.11
PASOS Y CONTRAPASO 4.00 1.20 0.44 0.09 0.19
PASOS Y CONTRAPASO 4.00 1.20 0.44 0.09 0.19
PASOS Y CONTRAPASO 4.00 1.20 0.44 0.09 0.19
PASOS Y CONTRAPASO 4.00 1.20 0.44 0.09 0.19
PLANILLA DE METRADOS
PROYECTO : HOSPITAL DE HUAURA
UBICACIN : HUAURA-HUAURA-LIMA
FECHA : 43040

CODIGO DESCRIPCIN UND. CANT. LARGO ANCHO ALTURASUB TOTAL TOTAL


TRAMO INCLINADO 4.00 1.20 0.90 0.27 1.17
LOSA 4.00 1.20 0.90 0.20 0.86

ESCALERAS- ENCOFRADO Y DESENCOFRADO 32.64


TRAMO INCLINADO 4.00 4.00 1.20 19.20
CONTRAPASOS 64.00 1.20 0.18 13.44

ESCALERAS - ACERO DE REFUERZO Fy=4200 kg/cm2 466.85

TANQUE CISTERNA
TANQUE CISTERNA- CONCRETO PREMEZCLADO f'c = 210 kg/cm2. 8.03
PAREDES 3.00 8.06 0.15 1.70 6.17
PAREDES 3.00 1.60 0.10 0.20 0.10
PAREDES 3.00 0.94 0.10 0.20 0.06
FONDO 3.00 3.26 1.07 0.15 1.57
FONDO 3.00 0.34 0.42 0.15 0.06
LOSA 3.00 0.50 0.50 0.10 0.08
TANQUE CISTERNA- ENCFRADO Y DESENCOFRADO 15.08
PAREDES 3.00 7.84 1.90 14.90
PAREDES 3.00 0.75 0.25 0.19

TANQUE CISTERNA- ACERO DE REFUERZO Fy=4200 Kg/cm2


PLANILLA DE METRADOS DE ACEROS
PROYECTO : CONSTRUCCION EN SITIO PROPIO DE UNA VIVIENDA UNIFAMILIAR
UBICACIN : AV. CHIMUCAPAC - SUPE PUEBLO - BARRANCA - LIMA
FECHA : 3/5/2015

DENOMINACION VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1
ELEMENTO DISEO DE ACERO CANTIDAD LONGITUD SEGN DIMETRO

DENOMINACION DIMENSIONES VECES LONGITUD DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1
PARTIDA 01.05.01.03 ACERO EN ZAPATAS
ZAPATA Z-1 1.20 1.20 75.00 5/8 1.13 7.00 593.25
ZAPATA Z-2 1.15 1.15 21.00 5/8 1.08 7.00 158.76
ZAPATA Z-3 1.60 1.60 4.00 5/8 1.53 9.00 55.08
ZAPATA Z-4 1.15 1.40 36.00 5/8 1.08 8.00 311.04
ZAPATA Z-5 1.30 1.50 44.00 5/8 1.23 9.00 487.08
ZAPATA Z-6 1.30 1.30 22.00 5/8 1.23 8.00 216.48
ZAPATA Z-7 1.25 1.50 12.00 LONGITUD 5/8 1.18 9.00 127.44
ZAPATA Z-8 1.25 1.25 5.00 5/8 1.18 7.00 41.30
ZAPATA Z-9 1.20 1.40 10.00 5/8 1.13 8.00 90.40
ZAPATA Z-10 0.80 1.50 3.00 5/8 0.73 9.00 19.71
ZAPATA Z-11 0.80 1.30 2.00 5/8 0.73 8.00 11.68
ZAPATA Z-12 1.15 1.50 7.00 5/8 1.08 9.00 68.04

ZAPATA Z-1 1.20 1.20 75.00 5/8 1.13 7.00 593.25


ZAPATA Z-2 1.15 1.15 21.00 5/8 1.08 7.00 158.76
ZAPATA Z-3 1.60 1.60 4.00 5/8 1.53 9.00 55.08
ZAPATA Z-4 1.15 1.40 36.00 5/8 1.33 7.00 335.16
ZAPATA Z-5 1.30 1.50 44.00 5/8 1.43 8.00 503.36
ZAPATA Z-6 1.30 1.30 22.00 5/8 1.23 8.00 216.48
ZAPATA Z-7 1.25 1.50 12.00 LONGITUD 5/8 1.43 7.00 120.12
ZAPATA Z-8 1.25 1.25 5.00 5/8 1.18 7.00 41.30
ZAPATA Z-9 1.20 1.40 10.00 5/8 1.33 7.00 93.10
ZAPATA Z-10 0.80 1.50 3.00 5/8 1.43 5.00 21.45
ZAPATA Z-11 0.80 1.30 2.00 5/8 1.23 5.00 12.30
ZAPATA Z-12 1.15 1.50 7.00 5/8 1.43 7.00 70.07
LONGITUD TOTAL (ML) 0.00 0.00 0.00 4400.69 0.00 0.00
PESO UNITARIO (KG/ML) 0.25 0.56 0.99 1.55 2.24 0.00
PESO PARCIAL (KG) 0.00 0.00 0.00 6829.87 0.00 0.00
PESO TOTAL (KG) 6829.87

ELEMENTO DISEO DE ACERO CANTIDAD LONGITUD SEGN DIMETRO

DENOMINACION DIMENSIONES VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1
PARTIDA 01.05.02.03 ACERO EN COLUMNAS

COLUMNA C-1 0.30 0.30 102.00 1/2 5.98 8.00 4879.68


COLUMNA C-2 0.25 0.25 43.00 1/2 5.98 8.00 2057.12
COLUMNA C-3 0.25 0.50 52.00 1/2 5.98 10.00 3109.6
COLUMNA C-4 0.30 0.50 56.00 6 1/2 5.98 10.00 3348.8
PLANILLA DE METRADOS DE ACEROS
PROYECTO : CONSTRUCCION EN SITIO PROPIO DE UNA VIVIENDA UNIFAMILIAR
UBICACIN : AV. CHIMUCAPAC - SUPE PUEBLO - BARRANCA - LIMA
FECHA : 3/5/2015

DENOMINACION VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1
LONGITUD TOTAL (ML) 0.00 0.00 13395.20 0.00 0.00 0.00
PESO UNITARIO (KG/ML) 0.25 0.56 0.99 1.55 2.24 0.00
PESO PARCIAL (KG) 0.00 0.00 13314.83 0.00 0.00 0.00
13314.83

ELEMENTO DISEO DE ACERO CANTIDAD LONGITUD SEGN DIMETRO

DENOMINACION DIMENSIONES VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1

COLUMNA C-1 0.30 0.30 102.00 3/8 1.12 28.00 3198.72


COLUMNA C-2 0.25 0.25 43.00 3/8 0.92 28.00 1107.68
COLUMNA C-3 0.25 0.50 52.00 3/8 1.42 28.00 2067.52
COLUMNA C-4 0.30 0.50 56.00 3/8 1.52 28.00 2383.36

LONGITUD TOTAL (ML) 0.00 8757.28 0.00 0.00 0.00 0.00


PESO UNITARIO (KG/ML) 0.25 0.56 0.99 1.55 2.24 0.00
PESO PARCIAL (KG) 0.00 4904.08 0.00 0.00 0.00 0.00
4904.08
PESO TOTAL ACERO EN COLUMNAS (KG) 18218.91

ELEMENTO DISEO DE ACERO CANTIDAD LONGITUD SEGN DIMETRO

DENOMINACION DIMENSIONES VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1
PARTIDA 01.05.03.03 ACERO EN VIGAS
VA-103 0.30 0.35 1.00 2.90 1/2 3.250 6.00 19.5
VA-104 0.30 0.35 1.00 2.90 1/2 3.250 6.00 19.5
VA-105 0.30 0.35 1.00 2.90 1/2 3.250 6.00 19.5
VA-106 0.30 0.35 1.00 15.35 1/2 16.200 6.00 97.2
VA-107 0.30 0.35 1.00 15.35 1/2 16.200 6.00 97.2
VB.101 0.30 0.55 1.00 14.37 1/2 15.220 6.00 91.32
VB.102 0.30 0.55 1.00 14.37 1/2 15.220 6.00 91.32
VB.103 0.30 0.55 1.00 13.50 1/2 14.350 6.00 86.1
VB.104 0.30 0.55 1.00 13.50 1/2 14.350 6.00 86.1
VB.105 0.30 0.55 1.00 13.50 1/2 14.350 6.00 86.1
VB.106 0.30 0.35 1.00 15.65 1/2 16.500 6.00 99
VB.107 0.30 0.35 1.00 15.65 1/2 16.500 6.00 99
VB.108 0.30 0.35 1.00 3.51 1/2 3.860 6.00 23.16
VB.109 0.30 0.35 1.00 15.65 1/2 16.500 6.00 99
VCH 0.30 0.25 1.00 31.30 1/2 32.150 6.00 192.9
VC-101 0.25 0.50 1.00 18.51 1/2 19.360 6.00 116.16
VC-102 0.25 0.50 1.00 18.51 1/2 19.360 6.00 116.16
VC-103 0.25 0.50 1.00 18.51 1/2 19.360 6.00 116.16
VC-104 0.25 0.50 1.00 13.00 1/2 13.850 6.00 83.1
VC-105 0.25 0.50 1.00 13.00 1/2 13.850 6.00 83.1
VC-106 0.25 0.50 1.00 18.51 1/2 19.360 6.00 116.16
PLANILLA DE METRADOS DE ACEROS
PROYECTO : CONSTRUCCION EN SITIO PROPIO DE UNA VIVIENDA UNIFAMILIAR
UBICACIN : AV. CHIMUCAPAC - SUPE PUEBLO - BARRANCA - LIMA
FECHA : 3/5/2015

DENOMINACION VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1
VC-107 0.25 0.50 1.00 19.00 1/2 19.850 6.00 119.1
VC-108 0.25 0.50 1.00 19.00 1/2 19.850 6.00 119.1
VC-109 0.25 0.50 1.00 19.00 1/2 19.850 6.00 119.1
VC-110 0.25 0.40 1.00 28.91 1/2 29.760 6.00 178.56
VC-111 0.25 0.40 1.00 28.91 1/2 29.760 6.00 178.56
VC-112 0.25 0.40 1.00 28.91 1/2 29.760 6.00 178.56
VC-113 0.25 0.40 1.00 28.91 1/2 29.760 6.00 178.56
VCH 0.25 0.25 1.00 6.88 1/2 7.230 6.00 43.38
VD-101 0.30 0.35 1.00 14.50 1/2 15.350 6.00 92.1
VD-102 0.30 0.35 1.00 14.50 1/2 15.350 6.00 92.1
VD-103 0.30 0.35 1.00 14.50 1/2 15.350 6.00 92.1
VD-104 0.30 0.35 1.00 14.50 1/2 15.350 6.00 92.1
VD-105 0.30 0.35 1.00 14.50 1/2 15.350 6.00 92.1
VD-106 0.30 0.50 1.00 23.25 1/2 24.100 6.00 144.6
VD-107 0.30 0.50 1.00 23.25 1/2 24.100 6.00 144.6
VD-108 0.30 0.50 1.00 23.25 1/2 24.100 6.00 144.6
VD-109 0.30 0.50 1.00 23.25 1/2 24.100 6.00 144.6
VD-110 0.30 0.50 1.00 23.25 1/2 24.100 6.00 144.6
VE-101 0.25 0.50 1.00 17.45 1/2 18.300 6.00 109.8
VE-102 0.25 0.50 1.00 17.45 1/2 18.300 6.00 109.8
VE-103 0.25 0.50 1.00 17.45 1/2 18.300 6.00 109.8
VE-104 0.25 0.50 1.00 17.45 1/2 18.300 6.00 109.8
VE-105 0.30 0.50 1.00 14.50 1/2 15.350 6.00 92.1
VE-106 0.30 0.50 1.00 14.50 1/2 15.350 6.00 92.1
VE-107 0.30 0.50 1.00 14.50 1/2 15.350 6.00 92.1
VE-108 0.30 0.50 1.00 14.50 1/2 15.350 6.00 92.1
VE-109 0.30 0.50 1.00 28.91 1/2 29.760 6.00 178.56
VE-110 0.30 0.50 1.00 28.91 1/2 29.760 6.00 178.56
VE-111 0.30 0.50 1.00 28.91 1/2 29.760 6.00 178.56
VE-112 0.30 0.50 1.00 28.91 1/2 29.760 6.00 178.56
VE-113 0.30 0.50 1.00 28.91 1/2 29.760 6.00 178.56
VF-101 0.30 0.50 1.00 32.00 1/2 32.850 6.00 197.1
VF-102 0.30 0.50 1.00 32.00 1/2 32.850 6.00 197.1
VF-103 0.30 0.50 1.00 32.00 1/2 32.850 6.00 197.1
VF-104 0.30 0.50 1.00 32.00 1/2 32.850 6.00 197.1
VF-105 0.30 0.50 1.00 16.45 1/2 17.300 6.00 103.8
VF-106 0.30 0.50 1.00 16.45 1/2 17.300 6.00 103.8
VF-107 0.30 0.50 1.00 16.45 1/2 17.300 6.00 103.8
VF-108 0.30 0.50 1.00 16.45 1/2 17.300 6.00 103.8
VF-109 0.30 0.50 1.00 16.45 1/2 17.300 6.00 103.8
VF-110 0.30 0.50 1.00 16.45 1/2 17.300 6.00 103.8
VF-111 0.30 0.50 1.00 16.45 1/2 17.300 6.00 103.8
VF-112 0.30 0.50 1.00 16.45 1/2 17.300 6.00 103.8
VG-101 0.25 0.40 1.00 18.00 1/2 18.850 6.00 113.1
VG-102 0.25 0.40 1.00 18.00 1/2 18.850 6.00 113.1
VG-103 0.25 0.40 1.00 18.00 1/2 18.850 6.00 113.1
VG-104 0.25 0.40 1.00 18.00 1/2 18.850 6.00 113.1
VG-105 0.25 0.40 1.00 18.00 1/2 18.850 6.00 113.1
VG-106 0.25 0.40 1.00 13.45 1/2 14.300 6.00 85.8
VG-107 0.25 0.40 1.00 13.45 1/2 14.300 6.00 85.8
PLANILLA DE METRADOS DE ACEROS
PROYECTO : CONSTRUCCION EN SITIO PROPIO DE UNA VIVIENDA UNIFAMILIAR
UBICACIN : AV. CHIMUCAPAC - SUPE PUEBLO - BARRANCA - LIMA
FECHA : 3/5/2015

DENOMINACION VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1
VG-108 0.25 0.40 1.00 13.45 1/2 14.300 6.00 85.8
VG-109 0.25 0.40 1.00 3.68 1/2 4.030 6.00 24.18
VG-110 0.25 0.40 1.00 7.26 1/2 7.610 6.00 45.66
VG-111 0.25 0.40 1.00 13.45 1/2 14.300 6.00 85.8
VCH 0.25 0.40 1.00 6.02 1/2 6.370 6.00 38.22
VH-101 0.30 0.40 1.00 8.02 1/2 8.370 6.00 50.22
VH-102 0.30 0.40 1.00 8.02 1/2 8.370 6.00 50.22
VH-103 0.30 0.40 1.00 8.02 1/2 8.370 6.00 50.22
VH-104 0.30 0.40 1.00 8.23 1/2 8.580 6.00 51.48
VH-105 0.30 0.40 1.00 8.23 1/2 8.580 6.00 51.48
VH-106 0.30 0.40 1.00 8.23 1/2 8.580 6.00 51.48
VI-101 0.30 0.45 1.00 19.55 1/2 20.400 6.00 122.4
VI-102 0.30 0.45 1.00 19.55 1/2 20.400 6.00 122.4
VI-103 0.30 0.45 1.00 4.95 1/2 5.300 6.00 31.8
VI-104 0.30 0.45 1.00 4.95 1/2 5.300 6.00 31.8
VI-105 0.30 0.45 1.00 4.95 1/2 5.300 6.00 31.8
VI-106 0.30 0.45 1.00 4.95 1/2 5.300 6.00 31.8
VI-107 0.30 0.45 1.00 4.95 1/2 5.300 6.00 31.8
VI-108 0.30 0.45 1.00 4.95 1/2 5.300 6.00 31.8
VJ-101 0.30 0.45 1.00 5.63 1/2 5.980 6.00 35.88
VJ-102 0.30 0.45 1.00 5.63 1/2 5.980 6.00 35.88
VJ-103 0.30 0.45 1.00 5.63 1/2 5.980 6.00 35.88
VJ-104 0.30 0.50 1.00 9.01 1/2 9.860 6.00 59.16
VJ-105 0.30 0.50 1.00 9.01 1/2 9.860 6.00 59.16
VJ-106 0.30 0.45 1.00 16.94 1/2 17.790 6.00 106.74
VJ-107 0.30 0.45 1.00 10.28 1/2 11.130 6.00 66.78
VJ-108 0.30 0.45 1.00 4.18 1/2 4.530 6.00 27.18
VJ-109 0.30 0.45 1.00 4.18 1/2 4.530 6.00 27.18
V-CH 0.30 0.25 1.00 6.96 1/2 7.310 6.00 43.86
VK-101 0.30 0.40 1.00 18.85 1/2 19.700 6.00 118.2
VK-102 0.30 0.40 1.00 18.85 1/2 19.700 6.00 118.2
VK-103 0.30 0.40 1.00 4.00 1/2 4.350 6.00 26.1
VK-104 0.30 0.40 1.00 4.00 1/2 4.350 6.00 26.1
VK-105 0.30 0.40 1.00 4.00 1/2 4.350 6.00 26.1
VK-106 0.30 0.40 1.00 4.00 1/2 4.350 6.00 26.1
VK-107 0.30 0.40 1.00 4.00 1/2 4.350 6.00 26.1
VK-108 0.30 0.40 1.00 4.00 1/2 4.350 6.00 26.1
VL-101 0.30 0.45 1.00 5.36 1/2 5.710 6.00 34.26
VL-102 0.30 0.45 1.00 5.36 1/2 5.710 6.00 34.26
VL-103 0.30 0.45 1.00 5.36 1/2 5.710 6.00 34.26
V-CH 0.30 0.25 1.00 11.34 1/2 12.190 6.00 73.14
VL-101 0.30 0.50 1.00 7.20 1/2 7.550 6.00 45.3
VL-102 0.30 0.50 1.00 7.20 1/2 7.550 6.00 45.3
V-CH 0.30 0.25 1.00 7.88 1/2 8.230 6.00 49.38
VM-101 0.30 0.40 1.00 5.02 1/2 5.370 6.00 32.22
VM-102 0.30 0.40 1.00 5.02 1/2 5.370 6.00 32.22
VM-103 0.30 0.40 1.00 4.69 1/2 5.040 6.00 30.24
VM-104 0.30 0.40 1.00 4.69 1/2 5.040 6.00 30.24
LONGITUD TOTAL (ML) 0.00 0.00 10544.34 0.00 0.00 0.00
PESO UNITARIO (KG/ML) 0.25 0.56 0.99 1.55 2.24 0.00
PLANILLA DE METRADOS DE ACEROS
PROYECTO : CONSTRUCCION EN SITIO PROPIO DE UNA VIVIENDA UNIFAMILIAR
UBICACIN : AV. CHIMUCAPAC - SUPE PUEBLO - BARRANCA - LIMA
FECHA : 3/5/2015

DENOMINACION VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1
PESO PARCIAL (KG) 0.00 0.00 10481.07 0.00 0.00 0.00
10481.07
PLANILLA DE METRADOS DE ACEROS
PROYECTO : CONSTRUCCION EN SITIO PROPIO DE UNA VIVIENDA UNIFAMILIAR
UBICACIN : AV. CHIMUCAPAC - SUPE PUEBLO - BARRANCA - LIMA
FECHA : 3/5/2015

DENOMINACION VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1
ELEMENTO DISEO DE ACERO CANTIDAD LONGITUD SEGN DIMETRO

DENOMINACION DIMENSIONES VECES LONGITUD DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1
PARTIDA 01.05.03.03 ACERO EN VIGAS
PLACAS EN MODULO A 2.00 11.70 1/2 11.950 30.00 717
PLACAS EN MODULO G 2.00 9.54 1/2 9.790 30.00 587.4
PLACAS EN MODULO G 2.00 2.99 1/2 3.240 30.00 194.4
TRANSVERSALES
PLACAS EN MODULO H 2.00 10.88 1/2 11.130 30.00 667.8
PLACAS EN MODULO J 2.00 9.56 1/2 9.810 30.00 588.6
ASCENSOR 2.00 9.48 1/2 9.730 30.00 583.8
PLACAS EN MODULO A 2.00 5.98 1/2 6.230 59.00 735.14
PLACAS EN MODULO G 2.00 5.98 1/2 6.230 48.00 598.08
PLACAS EN MODULO G 2.00 5.98 1/2 6.230 15.00 186.9
HORIZONTALES
PLACAS EN MODULO H 2.00 5.98 1/2 6.230 54.00 672.84
PLACAS EN MODULO J 2.00 5.98 1/2 6.230 48.00 598.08
ASCENSOR 2.00 5.98 1/2 6.230 47.00 585.62
LONGITUD TOTAL (ML) 0.00 0.00 36449.17 0.00 0.00 0.00
PESO UNITARIO (KG/ML) 0.25 0.56 0.99 1.55 2.24 0.00
PESO PARCIAL (KG) 0.00 0.00 36230.47 0.00 0.00 0.00
36230.47

ELEMENTO DISEO DE ACERO CANTIDAD LONGITUD SEGN DIMETRO

DENOMINACION DIMENSIONES VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1
VA-103 0.30 0.35 1.00 2.90 3/8 1.22 32.00 39.04
VA-104 0.30 0.35 1.00 2.90 3/8 1.22 32.00 39.04
VA-105 0.30 0.35 1.00 2.90 3/8 1.22 32.00 39.04
VA-106 0.30 0.35 1.00 15.35 3/8 1.22 94.00 114.68
VA-107 0.30 0.35 1.00 15.35 3/8 1.22 94.00 114.68
VB.101 0.30 0.55 1.00 14.37 3/8 1.62 89.00 144.18
VB.102 0.30 0.55 1.00 14.37 3/8 1.62 89.00 144.18
VB.103 0.30 0.55 1.00 13.50 3/8 1.62 85.00 137.7
VB.104 0.30 0.55 1.00 13.50 3/8 1.62 85.00 137.7
VB.105 0.30 0.55 1.00 13.50 3/8 1.62 85.00 137.7
VB.106 0.30 0.35 1.00 15.65 3/8 1.22 96.00 117.12
VB.107 0.30 0.35 1.00 15.65 3/8 1.22 96.00 117.12
VB.108 0.30 0.35 1.00 3.51 3/8 1.22 35.00 42.7
VB.109 0.30 0.35 1.00 15.65 3/8 1.22 96.00 117.12
VCH 0.30 0.25 1.00 31.30 3/8 1.02 174.00 177.48
VC-101 0.25 0.50 1.00 18.51 3/8 1.42 110.00 156.2
VC-102 0.25 0.50 1.00 18.51 3/8 1.42 110.00 156.2
VC-103 0.25 0.50 1.00 18.51 3/8 1.42 110.00 156.2
VC-104 0.25 0.50 1.00 13.00 3/8 1.42 82.00 116.44
VC-105 0.25 0.50 1.00 13.00 3/8 1.42 82.00 116.44
VC-106 0.25 0.50 1.00 18.51 3/8 1.42 110.00 156.2
VC-107 0.25 0.50 1.00 19.00 3/8 1.42 112.00 159.04
VC-108 0.25 0.50 1.00 19.00 3/8 1.42 112.00 159.04
VC-109 0.25 0.50 1.00 19.00 3/8 1.42 112.00 159.04
VC-110 0.25 0.40 1.00 28.91 3/8 1.22 162.00 197.64
PLANILLA DE METRADOS DE ACEROS
PROYECTO : CONSTRUCCION EN SITIO PROPIO DE UNA VIVIENDA UNIFAMILIAR
UBICACIN : AV. CHIMUCAPAC - SUPE PUEBLO - BARRANCA - LIMA
FECHA : 3/5/2015

DENOMINACION VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1
VC-111 0.25 0.40 1.00 28.91 3/8 1.22 162.00 197.64
VC-112 0.25 0.40 1.00 28.91 3/8 1.22 162.00 197.64
VC-113 0.25 0.40 1.00 28.91 3/8 1.22 162.00 197.64
VCH 0.25 0.25 1.00 6.88 3/8 0.92 52.00 47.84
VD-101 0.30 0.35 1.00 14.50 3/8 1.22 90.00 109.8
VD-102 0.30 0.35 1.00 14.50 3/8 1.22 90.00 109.8
VD-103 0.30 0.35 1.00 14.50 3/8 1.22 90.00 109.8
VD-104 0.30 0.35 1.00 14.50 3/8 1.22 90.00 109.8
VD-105 0.30 0.35 1.00 14.50 3/8 1.22 90.00 109.8
VD-106 0.30 0.50 1.00 23.25 3/8 1.52 134.00 203.68
VD-107 0.30 0.50 1.00 23.25 3/8 1.52 134.00 203.68
VD-108 0.30 0.50 1.00 23.25 3/8 1.52 134.00 203.68
VD-109 0.30 0.50 1.00 23.25 3/8 1.52 134.00 203.68
VD-110 0.30 0.50 1.00 23.25 3/8 1.52 134.00 203.68
VE-101 0.25 0.50 1.00 17.45 3/8 1.42 105.00 149.1
VE-102 0.25 0.50 1.00 17.45 3/8 1.42 105.00 149.1
VE-103 0.25 0.50 1.00 17.45 3/8 1.42 105.00 149.1
VE-104 0.25 0.50 1.00 17.45 3/8 1.42 105.00 149.1
VE-105 0.30 0.50 1.00 14.50 3/8 1.52 90.00 136.8
VE-106 0.30 0.50 1.00 14.50 3/8 1.52 90.00 136.8
VE-107 0.30 0.50 1.00 14.50 3/8 1.52 90.00 136.8
VE-108 0.30 0.50 1.00 14.50 3/8 1.52 90.00 136.8
VE-109 0.30 0.50 1.00 28.91 3/8 1.52 162.00 246.24
VE-110 0.30 0.50 1.00 28.91 3/8 1.52 162.00 246.24
VE-111 0.30 0.50 1.00 28.91 3/8 1.52 162.00 246.24
VE-112 0.30 0.50 1.00 28.91 3/8 1.52 162.00 246.24
VE-113 0.30 0.50 1.00 28.91 3/8 1.52 162.00 246.24
VF-101 0.30 0.50 1.00 32.00 3/8 1.52 177.00 269.04
VF-102 0.30 0.50 1.00 32.00 3/8 1.52 177.00 269.04
VF-103 0.30 0.50 1.00 32.00 3/8 1.52 177.00 269.04
VF-104 0.30 0.50 1.00 32.00 3/8 1.52 177.00 269.04
VF-105 0.30 0.50 1.00 16.45 3/8 1.52 100.00 152
VF-106 0.30 0.50 1.00 16.45 3/8 1.52 100.00 152
VF-107 0.30 0.50 1.00 16.45 3/8 1.52 100.00 152
VF-108 0.30 0.50 1.00 16.45 3/8 1.52 100.00 152
VF-109 0.30 0.50 1.00 16.45 3/8 1.52 100.00 152
VF-110 0.30 0.50 1.00 16.45 3/8 1.52 100.00 152
VF-111 0.30 0.50 1.00 16.45 3/8 1.52 100.00 152
VF-112 0.30 0.50 1.00 16.45 3/8 1.52 100.00 152
VG-101 0.25 0.40 1.00 18.00 3/8 1.22 107.00 130.54
VG-102 0.25 0.40 1.00 18.00 3/8 1.22 107.00 130.54
VG-103 0.25 0.40 1.00 18.00 3/8 1.22 107.00 130.54
VG-104 0.25 0.40 1.00 18.00 3/8 1.22 107.00 130.54
VG-105 0.25 0.40 1.00 18.00 3/8 1.22 107.00 130.54
VG-106 0.25 0.40 1.00 13.45 3/8 1.22 85.00 103.7
VG-107 0.25 0.40 1.00 13.45 3/8 1.22 85.00 103.7
VG-108 0.25 0.40 1.00 13.45 3/8 1.22 85.00 103.7
VG-109 0.25 0.40 1.00 3.68 3/8 1.22 36.00 43.92
VG-110 0.25 0.40 1.00 7.26 3/8 1.22 54.00 65.88
VG-111 0.25 0.40 1.00 13.45 3/8 1.22 85.00 103.7
PLANILLA DE METRADOS DE ACEROS
PROYECTO : CONSTRUCCION EN SITIO PROPIO DE UNA VIVIENDA UNIFAMILIAR
UBICACIN : AV. CHIMUCAPAC - SUPE PUEBLO - BARRANCA - LIMA
FECHA : 3/5/2015

DENOMINACION VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1
VCH 0.25 0.40 1.00 6.02 3/8 1.22 48.00 58.56
VH-101 0.30 0.40 1.00 8.02 3/8 1.32 58.00 76.56
VH-102 0.30 0.40 1.00 8.02 3/8 1.32 58.00 76.56
VH-103 0.30 0.40 1.00 8.02 3/8 1.32 58.00 76.56
VH-104 0.30 0.40 1.00 8.23 3/8 1.32 59.00 77.88
VH-105 0.30 0.40 1.00 8.23 3/8 1.32 59.00 77.88
VH-106 0.30 0.40 1.00 8.23 3/8 1.32 59.00 77.88
VI-101 0.30 0.45 1.00 19.55 3/8 1.42 115.00 163.3
VI-102 0.30 0.45 1.00 19.55 3/8 1.42 115.00 163.3
VI-103 0.30 0.45 1.00 4.95 3/8 1.42 42.00 59.64
VI-104 0.30 0.45 1.00 4.95 3/8 1.42 42.00 59.64
VI-105 0.30 0.45 1.00 4.95 3/8 1.42 42.00 59.64
VI-106 0.30 0.45 1.00 4.95 3/8 1.42 42.00 59.64
VI-107 0.30 0.45 1.00 4.95 3/8 1.42 42.00 59.64
VI-108 0.30 0.45 1.00 4.95 3/8 1.42 42.00 59.64
VJ-101 0.30 0.45 1.00 5.63 3/8 1.42 46.00 65.32
VJ-102 0.30 0.45 1.00 5.63 3/8 1.42 46.00 65.32
VJ-103 0.30 0.45 1.00 5.63 3/8 1.42 46.00 65.32
VJ-104 0.30 0.50 1.00 9.01 3/8 1.52 62.00 94.24
VJ-105 0.30 0.50 1.00 9.01 3/8 1.52 62.00 94.24
VJ-106 0.30 0.45 1.00 16.94 3/8 1.42 102.00 144.84
VJ-107 0.30 0.45 1.00 10.28 3/8 1.42 69.00 97.98
VJ-108 0.30 0.45 1.00 4.18 3/8 1.42 38.00 53.96
VJ-109 0.30 0.45 1.00 4.18 3/8 1.42 38.00 53.96
V-CH 0.30 0.25 1.00 6.96 3/8 1.02 52.00 53.04
VK-101 0.30 0.40 1.00 18.85 3/8 1.32 112.00 147.84
VK-102 0.30 0.40 1.00 18.85 3/8 1.32 112.00 147.84
VK-103 0.30 0.40 1.00 4.00 3/8 1.32 37.00 48.84
VK-104 0.30 0.40 1.00 4.00 3/8 1.32 37.00 48.84
VK-105 0.30 0.40 1.00 4.00 3/8 1.32 37.00 48.84
VK-106 0.30 0.40 1.00 4.00 3/8 1.32 37.00 48.84
VK-107 0.30 0.40 1.00 4.00 3/8 1.32 37.00 48.84
VK-108 0.30 0.40 1.00 4.00 3/8 1.32 37.00 48.84
VL-101 0.30 0.45 1.00 5.36 3/8 1.42 44.00 62.48
VL-102 0.30 0.45 1.00 5.36 3/8 1.42 44.00 62.48
VL-103 0.30 0.45 1.00 5.36 3/8 1.42 44.00 62.48
V-CH 0.30 0.25 1.00 11.34 3/8 1.02 74.00 75.48
VL-101 0.30 0.50 1.00 7.20 3/8 1.52 53.00 80.56
VL-102 0.30 0.50 1.00 7.20 3/8 1.52 53.00 80.56
V-CH 0.30 0.25 1.00 7.88 3/8 1.02 57.00 58.14
VM-101 0.30 0.40 1.00 5.02 3/8 1.32 43.00 56.76
VM-102 0.30 0.40 1.00 5.02 3/8 1.32 43.00 56.76
VM-103 0.30 0.40 1.00 4.69 3/8 1.32 41.00 54.12
VM-104 0.30 0.40 1.00 4.69 3/8 1.32 41.00 54.12
PLANILLA DE METRADOS DE ACEROS
PROYECTO : CONSTRUCCION EN SITIO PROPIO DE UNA VIVIENDA UNIFAMILIAR
UBICACIN : AV. CHIMUCAPAC - SUPE PUEBLO - BARRANCA - LIMA
FECHA : 3/5/2015

DENOMINACION VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1
LONGITUD TOTAL (ML) 0.00 14491.54 0.00 0.00 0.00 0.00
PESO UNITARIO (KG/ML) 0.25 0.56 0.99 1.55 2.24 0.00
PESO PARCIAL (KG) 0.00 8115.26 0.00 0.00 0.00 0.00
PESO TOTAL (KG) 8115.26
PESO TOTAL DE ACERO EN VIGAS (KG) 18596.34

ELEMENTO DISEO DE ACERO CANTIDAD LONGITUD SEGN DIMETRO

DENOMINACION DIMENSIONES VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1
PARTIDA 01.05.04.03 ACERO EN LOSA ALIGERADA

16.00 15.00 240


1.00 1/2

MODULO A 15.65 4.5


1.00 1/2 2.60 15.00 39

1.00 1/2 8.40 15.00 126

1.00 1/2 16.00 48.00 768

MODULO B 15.65 14.37


1.00 1/2 2.45 48.00 117.6

1.00 1/2 23.10 48.00 1108.8

1.00 1/2 14.72 52.00 765.44

MODULO B 15.65 14.37


PLANILLA DE METRADOS DE ACEROS
PROYECTO : CONSTRUCCION EN SITIO PROPIO DE UNA VIVIENDA UNIFAMILIAR
UBICACIN : AV. CHIMUCAPAC - SUPE PUEBLO - BARRANCA - LIMA
FECHA : 3/5/2015

DENOMINACION VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1
MODULO B 15.65 14.37
1.00 1/2 3.00 52.00 156

1.00 1/2 18.70 52.00 972.4

1.00 1/2 29.25 62.00 1813.5

MODULO C 28.9 18.5


1.00 1/2 2.45 62.00 151.9

1.00 1/2 23.10 62.00 1432.2

1.00 1/2 18.85 95.00 1790.75

MODULO C 28.5 18.5


1.00 1/2 3.00 95.00 285

1.00 1/2 18.70 95.00 1776.5

1.00 1/2 23.60 48.00 1132.8

MODULO D 23.25 14.5


1.00 1/2 2.45 48.00 117.6
PLANILLA DE METRADOS DE ACEROS
PROYECTO : CONSTRUCCION EN SITIO PROPIO DE UNA VIVIENDA UNIFAMILIAR
UBICACIN : AV. CHIMUCAPAC - SUPE PUEBLO - BARRANCA - LIMA
FECHA : 3/5/2015
MODULO D 23.25 14.5

DENOMINACION VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1

1.00 1/2 23.10 48.00 1108.8

1.00 1/2 29.25 58.00 1696.5

MODULO E 28.9 17.45


1.00 1/2 2.45 58.00 142.1

1.00 1/2 23.10 58.00 1339.8

1.00 1/2 17.80 96.00 1708.8

MODULO E 28.9 17.45


1.00 1/2 3.00 96.00 288

1.00 1/2 18.70 96.00 1795.2

2.00 1/2 32.35 55.00 3558.5

MODULO F 32 16.45
2.00 1/2 2.45 55.00 269.5
PLANILLA DE METRADOS DE ACEROS
PROYECTO : CONSTRUCCION EN SITIO PROPIO DE UNA VIVIENDA UNIFAMILIAR
MODULO F 32 16.45
UBICACIN : AV. CHIMUCAPAC - SUPE PUEBLO - BARRANCA - LIMA
FECHA : 3/5/2015

DENOMINACION VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1

2.00 1/2 23.10 55.00 2541

2.00 1/2 16.80 107.00 3595.2

MODULO F 32 16.45
2.00 1/2 3.00 107.00 642

2.00 1/2 18.70 107.00 4001.8

2.00 1/2 18.35 45.00 1651.5

MODULO G 13.45 18
2.00 1/2 3.00 45.00 270

2.00 1/2 18.70 45.00 1683

1.00 1/2 8.37 27.00 225.99

MODULO H 8.23 8.02


1.00 1/2 3.00 27.00 81

1.00 1/2 18.70 27.00 504.9


MODULO H 8.23 8.02
PLANILLA DE METRADOS DE ACEROS
PROYECTO : CONSTRUCCION EN SITIO PROPIO DE UNA VIVIENDA UNIFAMILIAR
UBICACIN : AV. CHIMUCAPAC - SUPE PUEBLO - BARRANCA - LIMA
FECHA : 3/5/2015

DENOMINACION VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1

1.00 1/2 19.90 17.00 338.3

MODULO I 4.95 19.55


1.00 1/2 3.00 17.00 51

1.00 1/2 18.70 17.00 317.9

1.00 1/2 9.35 57.00 532.95

MODULO J 16.95 9.00


1.00 1/2 3.00 57.00 171

1.00 1/2 18.70 57.00 1065.9

1.00 1/2 19.20 13.00 249.6

MODULO K 4 18.85
1.00 1/2 3.00 13.00 39

1.00 1/2 18.70 13.00 243.1


PLANILLA DE METRADOS DE ACEROS
PROYECTO : CONSTRUCCION EN SITIO PROPIO DE UNA VIVIENDA UNIFAMILIAR
UBICACIN : AV. CHIMUCAPAC - SUPE PUEBLO - BARRANCA - LIMA
FECHA : 3/5/2015

DENOMINACION VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1

1.00 1/2 6.00 18.00 108

MODULO L 5.35 5.65


1.00 1/2 3.00 18.00 54

1.00 1/2 18.70 18.00 336.6

7.55 13.00 98.15


1.00 1/2

MODULO LL 7.2 3.95


1.00 1/2 2.60 13.00 33.8

1.00 1/2 8.40 13.00 109.2

5.05 17.00 85.85


1.00 1/2

MODULO M 4.7 5.05


1.00 1/2 2.60 17.00 44.2

1.00 1/2 8.40 17.00 142.8

LONGITUD TOTAL (ML) 0.00 0.00 43918.43 0.00 0.00 0.00


PESO UNITARIO (KG/ML) 0.25 0.56 0.99 1.55 2.24 0.00
PLANILLA DE METRADOS DE ACEROS
PROYECTO : CONSTRUCCION EN SITIO PROPIO DE UNA VIVIENDA UNIFAMILIAR
UBICACIN : AV. CHIMUCAPAC - SUPE PUEBLO - BARRANCA - LIMA
FECHA : 3/5/2015

DENOMINACION VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1
PESO PARCIAL (KG) 0.00 0.00 43654.92 0.00 0.00 0.00
TOTAL ACERO LOSA ALIGERADA (KG) 43654.92

ELEMENTO DISEO DE ACERO CANTIDAD LONGITUD SEGN DIMETRO

DENOMINACION DIMENSIONES VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1
PARTIDA 01.05.04.03 ACERO EN DINTELES

0.15 0.20 3.00 2.30 3/8 2.55 2 15.30


0.15 0.20 1.00 1.50 3/8 1.75 2 3.50
0.15 0.20 5.00 1.10 3/8 1.35 2 13.50
0.15 0.20 6.00 1.30 3/8 1.55 2 18.60
0.15 0.20 2.00 1.00 3/8 1.25 2 5.00
0.15 0.20 17.00 1.30 3/8 1.55 2 52.70
0.15 0.20 2.00 1.00 3/8 1.25 2 5.00
0.15 0.20 2.00 1.10 3/8 1.35 2 5.40
0.15 0.20 11.00 1.30 3/8 1.55 2 34.10
0.15 0.20 2.00 1.10 3/8 1.35 2 5.40
0.15 0.20 9.00 1.10 3/8 1.35 2 24.30
0.15 0.20 10.00 1.30 3/8 1.55 2 31.00
0.15 0.20 5.00 1.00 3/8 1.25 2 12.50
0.15 0.20 1.00 2.70 3/8 2.95 2 5.90
0.15 0.20 1.00 2.80 3/8 3.05 2 6.10
0.15 0.20 1.00 1.35 3/8 1.60 2 3.20
0.15 0.20 1.00 1.20 3/8 1.45 2 2.90
0.15 0.20 2.00 1.50 3/8 1.75 2 7.00
0.15 0.20 1.00 3.30 3/8 3.55 2 7.10
0.15 0.20 1.00 2.65 3/8 2.90 2 5.80
DINTELES
0.15 0.20 8.00 1.10 3/8 1.35 2 21.60
0.15 0.20 5.00 1.00 3/8 1.25 2 12.50
0.15 0.20 3.00 1.20 3/8 1.45 2 8.70
0.15 0.20 5.00 1.30 3/8 1.55 2 15.50
0.15 0.20 4.00 2.10 3/8 2.35 2 18.80
0.15 0.20 4.00 1.20 3/8 1.45 2 11.60
0.15 0.20 11.00 1.30 3/8 1.55 2 34.10
0.15 0.20 6.00 1.00 3/8 1.25 2 15.00
0.15 0.20 2.00 1.10 3/8 1.35 2 5.40
0.15 0.20 1.00 1.50 3/8 1.75 2 3.50
0.15 0.20 1.00 2.10 3/8 2.35 2 4.70
0.15 0.20 2.00 1.50 3/8 1.75 2 7.00
0.15 0.20 2.00 1.30 3/8 1.55 2 6.20
0.15 0.20 3.00 1.00 3/8 1.25 2 7.50
0.15 0.20 5.00 1.50 3/8 1.75 2 17.50
0.15 0.20 2.00 1.30 3/8 1.55 2 6.20
0.15 0.20 8.00 1.00 3/8 1.25 2 20.00
0.15 0.20 1.00 1.10 3/8 1.35 2 2.70
0.15 0.20 2.00 1.30 3/8 1.55 2 6.20
0.15 0.20 2.00 1.10 3/8 1.35 2 5.40
PLANILLA DE METRADOS DE ACEROS
PROYECTO : CONSTRUCCION EN SITIO PROPIO DE UNA VIVIENDA UNIFAMILIAR
UBICACIN : AV. CHIMUCAPAC - SUPE PUEBLO - BARRANCA - LIMA
FECHA : 3/5/2015

DENOMINACION VECES DETALLE DIAM. LONGITUD PARCIAL TOTAL 1/4 3/8 1/2 5/8 3/4 1
0.15 0.20 5.00 1.30 3/8 1.55 2 15.50
0.15 0.20 4.00 1.00 3/8 1.25 2 10.00
0.15 0.20 2.00 1.50 3/8 1.75 2 7.00
LONGITUD TOTAL (ML) 0.00 526.90 0.00 0.00 0.00 0.00
PESO UNITARIO (KG/ML) 0.25 0.56 0.99 1.55 2.24 0.00
PESO PARCIAL (KG) 0.00 295.06 0.00 0.00 0.00 0.00
TOTAL ACERO LOSA ALIGERADA (KG) 295.06

PARTIDA 05.06.03 ACERO EN ESCALERA

6.68 6 6 40.08
1/2"
1

5.8 6 6 34.8
1/2"
1

1.8 6 6 10.8
REFUERZO DEL 1 PISO AL 2do 1/2"
1

1.74 6 6 10.44
1/2"
1

0.84 45 45 37.8
1 3/8"

LONGITUD TOTAL (ML) 0.00 37.80 96.12 0.00 0.00 0.00


PESO UNITARIO (KG/ML) 0.25 0.56 0.99 1.55 2.24 0.00
PESO PARCIAL (KG) 0.00 21.17 95.54 0.00 0.00 0.00
PESO TOTAL DE ACERO EN ESCALERA (KG) 466.85