: CONST/PK/HSE/FRM-
22
JOB SAFETY ANALYSIS Rev.: 01
Date: July 1st, 2016
Page: 1 of 2
Project: NRL CDU Revamp Project Project#: 1166 Area: Fin Fan General Comments: Proper PPE, TBT should be conducted before start the job,
Coolers Tie in Points Access control authority would be DEL Site Manager/Site Engineer
Date: 06-02-2017 Supervisor: Ramzan/Adnan
This document is the intellectual property of Descon Engineering Limited. Any unauthorized use, including modification and reproduction of the content is strictly prohibited.
Copyrights Ordinance 2002, All Rights Reserved
JSA MEETING PRIOR TO START OF JOB
Severity Rating : (1) First Aid / Minor Property Damage (2) Recordable Accident / Property Damage
(3) Lost Time Accident / Major Property Loss (4) Catastrophic Accident
Are you aware of, and do you have the correct PPE? What are the risks? How do controlled risks?
_______________________________ __________________________
AREA ENGINEER / SUPERVISOR HSE REPRESENTATIVE
This document is the intellectual property of Descon Engineering Limited. Any unauthorized use, including modification and reproduction of the content is strictly prohibited.
Copyrights Ordinance 2002, All Rights Reserved
This document is the intellectual property of Descon Engineering Limited. Any unauthorized use, including modification and reproduction of the content is strictly prohibited.
Copyrights Ordinance 2002, All Rights Reserved