1. BASIC INFORMATION
TITLE OF THE PROJECT
Bridges
Form No.: TSU-URO-SF-01 Revision No.: 01 Effectivity Date: September 12, 2017 Page: 1 of 10
(The following is to be filled in by the
University Research Office)
Form No.: TSU-URO-SF-01
Filing Date:
Date of Receipt:
Form No.: TSU-URO-SF-01 Revision No.: 01 Effectivity Date: September 12, 2017 Page: 2 of 10
(The following is to be filled in by the
University Research Office)
Form No.: TSU-URO-SF-01
Filing Date:
Date of Receipt:
OBJECTIVES (State general and specific objectives, purpose of the Evaluators Input:
Study including problems intended to be solved, hypotheses to be tested, etc.)
General Objective:
To promote awareness to the public, especially private contractors and the government, the
importance of having durable and strategically located bridges.
Specific Objectives:
1. To identify the characteristics of bridges based on the materials used, location, durability.
2. To know the status of bridges in Tarlac .
3. To discuss the laws or rules and factors involved in the construction of bridges
4. To uncover how bridges are monitored and maintained
Form No.: TSU-URO-SF-01 Revision No.: 01 Effectivity Date: September 12, 2017 Page: 3 of 10
(The following is to be filled in by the
University Research Office)
Form No.: TSU-URO-SF-01
Filing Date:
Date of Receipt:
https://science.howstuffworks.com/engineering/structural/10-reasons-why-bridges-collapse.htm
Form No.: TSU-URO-SF-01 Revision No.: 01 Effectivity Date: September 12, 2017 Page: 4 of 10
(The following is to be filled in by the
University Research Office)
Form No.: TSU-URO-SF-01
Filing Date:
Date of Receipt:
Form No.: TSU-URO-SF-01 Revision No.: 01 Effectivity Date: September 12, 2017 Page: 5 of 10
(The following is to be filled in by the
University Research Office)
Form No.: TSU-URO-SF-01
Filing Date:
Date of Receipt:
A. Communication cost
Item description/ Specification Unit (pcs, pax, kilo, etc) Quantity Unit cost Total cost
B. TRANSPORTATION COST
Item description/ Specification Unit (pcs, pax, kilo, etc) Quantity Unit cost Total cost
C. HARDWARE/EQUIPMENT COST
Item description/ Specification Unit (pcs, pax, kilo, etc) Quantity Unit cost Total cost
D. PERSONNEL SERVICES
Personnel in-need No. of personnel Total hours to Rate/hour Total cost
Form No.: TSU-URO-SF-01 Revision No.: 01 Effectivity Date: September 12, 2017 Page: 6 of 10
(The following is to be filled in by the
University Research Office)
Form No.: TSU-URO-SF-01
Filing Date:
Date of Receipt:
render
TIMELINE OF ACTIVITIES
Form No.: TSU-URO-SF-01 Revision No.: 01 Effectivity Date: September 12, 2017 Page: 7 of 10
(The following is to be filled in by the
University Research Office)
Form No.: TSU-URO-SF-01
Filing Date:
Date of Receipt:
___________________________________ ______________
Signature over Printed Name of the Lead Researcher Date
___________________________________ ______________
Signature over Printed Name of the Co-Researcher Date
___________________________________ ______________
Signature over Printed Name of the Co-Researcher Date
________ ________
Date Date
Form No.: TSU-URO-SF-01 Revision No.: 01 Effectivity Date: September 12, 2017 Page: 8 of 10
(The following is to be filled in by the
University Research Office)
Form No.: TSU-URO-SF-01
Filing Date:
Date of Receipt:
Form No.: TSU-URO-SF-01 Revision No.: 01 Effectivity Date: September 12, 2017 Page: 9 of 10
(The following is to be filled in by the
University Research Office)
Form No.: TSU-URO-SF-01
Filing Date:
Date of Receipt:
1. How to know the safest way to protec your driveway from this bridge failure?
2. How many times do they monitor/check the maintenance of the bridges?
3. Are there particular rules in building, maintaining and ensuring the safety of bridges?
4. How important for designer and engineer to plan all aspect of bridge construction?
Form No.: TSU-URO-SF-01 Revision No.: 01 Effectivity Date: September 12, 2017 Page: 10 of 10