A -1.877478097
B -0.8145804597
C -0.1870744085
D -0.0145228667
E -0.0010148518
Flv 1.1351879518
log(Flv) 0.0550677731
-1.9229049591
Kdrum 0.1461816929 Usual 0.1 0.35
uperm 4.576501671 ft/s 1.395 m/s
Altura
htotal /D 3 a 5
Vsurge Vol de Deposito 4.51 m3
tr Minutos de retencion 1.35 min
hL Altura pileta liquida 1.44 m 0.4826 0.4572
hf Dif de Altura 0.750 m 1.0922 1.2192
hv Altura de expansion 1.500 m 14"
dnozzle Diametro entrada 0.356 m
htotal /D Relacion de Geometria 1.84
htotal Altura Final Adoptada 3.687 m
Si htotal /D > 5
Se usa tanque horizontal
Separation Process Engineering: Includes Mass Transfer Analysis (4th Edition) 4th Edition
by Phillip C. Wankat pg45
Referencias
38.06.01 Flujograma Primer Etapa rev0