NOMBRE DEL PROYECTO: AMPLIACION Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO

CASCAS
Departamento LA LIBERTAD
Provincia GRAN CHIMU
Distrito CASCAS
Localidad: CASCAS
UA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE
HOJA DE METRADOS - PTAR 01
PROYECTO:
AMPLIACION Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE CASCAS
Departamento: LA LIBERTAD
Provincia: GRAN CHIMU
Distrito: CASCAS
Localidad: CASCAS

MEDIDAS
ITEM DESCRIPCION UND N VEC. CANT. SUB TOTAL TOTAL
LARGO/AREA ANCHO ALTO

PARTIDAS - RED COLECTORA

01.00.00 TRABAJOS PRELIMINARES


01.01.00 Campamento Provisional UND 1.00
1.00 1.00 1.00
01.01.00 Cartel De Obra De 3.60 X 2.40M GLB 1.00
1.00 1.00 1.00 1.00
01.02.00 Movilizacion y Desmovilizacin de maquinaria GLB 1.00
1.00 1.00 1.00 1.00

02.00.00 OBRAS PROVISIONALES


02.01 .00 Trazo Y Replanteo Inicial De Obra ML 12,033.74
1.00 1.00 12,033.74 12,033.74

02.02.00 Trazo Y Replanteo Final De Obra ML 12,033.74


1.00 1.00 12,033.74 12,033.74

03.00.00 MOVIMIENTO DE TIERRAS


03.01.00 Excav. MANUAL P/Buzones
03.01.01 Excav.manual En T/Boloneria P/Buzones De 1.00M-1.50M M3 406.89
163.00 2.50 Ver. Planilla de Vol. De Excv. De BZs 406.89
03.01.02 Excav.manual En T/BoloneriaP/Buzones De 1,50M-2,00M M3 53.01
16.00 3.31 Ver. Planilla de Vol. De Excv. De BZs 53.01
03.01.03 Excav.manual En T/Boloneria P/Buzones De 2,00M-3,00M M3 28.89
6.00 4.82 Ver. Planilla de Vol. De Excv. De BZs 28.89
03.01.04 Excav.manual En T/Boloneria P/Buzones De 3,01M-4,00M M3 5.92
2.00 2.96 Ver. Planilla de Vol. De Excv. De BZs 5.92

03.02.00 Excav. C/MAQUINARIA para Zanja


Excv.C/ MAQ de zanja para Tub. DN=160mm - 250mm H=1.20 a
03.02.01 ML 5,472.87
1,50m T/Boloneria
1.00 1.00 5,472.87 Ver metrado de Red de Alc, 5,472.87
Excv.C/ MAQ de zanja para Tub. DN=160mm - 250mm H=1.51 a
03.02.02 ML 475.04
2,00m T/Boloneria
1.00 1.00 475.04 Ver metrado de Red de Alc, 475.04
Excv.C/ MAQ de zanja para Tub. DN=160mm - 250mm H=2,01 a
03.02.03 ML 135.68
2,50m T/Boloneria
1.00 1.00 135.68 Ver metrado de Red de Alc, 135.68
Excv.C/ MAQ de zanja para Tub. DN=160mm - 250mm H=3,01 a
03.02.04 ML 38.72
3,50m T/Boloneria
1.00 1.00 38.72 Ver metrado de Red de Alc, 38.72
03.03.00 Excav. MANUAL para Zanja
Excv. MANUAL de zanja para Tub. DN=160mm - 250mm H=1.20 a
03.03.01 ML 4,997.50
1.50m T/Normal
1.00 1.00 4,997.50 Ver metrado de Red de Alc, 4,997.50
Excv. MANUAL de zanja para Tub. DN=160mm - 250mm H=1.51 a
03.03.02 ML 352.29
2.00m T/Normal
1.00 1.00 352.29 Ver metrado de Red de Alc, 352.29
Excv. MANUAL de zanja para Tub. DN=160mm - 250mm H=2.01 a
03.03.03 ML 169.59
3.00m T/Normal
1.00 1.00 169.59 Ver metrado de Red de Alc, 169.59
Excv. MANUAL de zanja para Tub. DN=160mm - 250mm H=3.01 a
03.03.04 ML 56.05
4.00m T/Normal
1.00 1.00 56.05 Ver metrado de Red de Alc, 56.05
03.04.00 Refine, Nivel. y Fondos P/Tub. Pvc,
Refine, Nivel. y Fondos P/Tub Pvc l Ancho 0.70M T/CON
03.04.01 ML 12,033.74
BOLONERIA
1.00 1.00 12,033.74 Ver metrado de Red de Alc, 12,033.74

03.05.00 Prep.Cama De Apoyo P/Fondos Tub.Pvc H=0.10M

03.05.01 Prep. Cama Apoyo P/Fondos Tub.Pvc. H=0.10M T. ML 12,033.74


1.00 1 12,033.74 Ver metrado de Red de Alc, 12,033.74

03.06.00 Relleno de Zanja


PRIMER RELLENO
03.06.01 Primer Relleno H=0.30M Material Seleccionado A=0.70M ML 11,697.74
1.00 1.00 11,697.74 Ver metrado de Red de Alc, 11,697.74
SEGUNDO RELLENO
Segundo Relleno Material propio A=0.70M @ 0.30 M. zanja de
03.06.02 ML 11,697.74
1.20m - 1.50m
1.00 1.00 10,470.37 Ver metrado de Red de Alc, 10,470.37
Segundo Relleno Material propio A=0.70M @ 0.30 M. zanja de
03.06.03 ML
1.51m - 2.00m
1.00 1.00 827.33 Ver metrado de Red de Alc, 827.33
Segundo Relleno Material propio A=0.70M @ 0.30 M. zanja de
03.06.04 ML
2.01m - 3.00m
1.00 1.00 305.27 Ver metrado de Red de Alc, 305.27
Segundo Relleno Material propio A=0.70M @ 0.30 M. zanja de
03.06.06 ML
3.01m - 4.00m
1.00 1.00 94.77 Ver metrado de Red de Alc, 94.77
03.07.00 Rotura de pavimentos y veredas
03.07.01 Rotura de pavimento ML 1.00 4,727.86

3
HOJA DE METRADOS - PTAR 01
PROYECTO:
AMPLIACION Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE CASCAS
Departamento: LA LIBERTAD
Provincia: GRAN CHIMU
Distrito: CASCAS
Localidad: CASCAS

MEDIDAS
ITEM DESCRIPCION UND N VEC. CANT. SUB TOTAL TOTAL
LARGO/AREA ANCHO ALTO
*en zanjas 1.00 1.00 4,727.86 4,727.86

03.07.02 Reposicin de pavimento ML 1.00 4,727.86


*en zanjas 1.00 1.00 4,727.86 4,727.86

03.08.00 Demoliciones
03.08.01 Demolicion de buzones UND 1.00 109.00 109.00 109.00

03.09.00 Eliminacion De Material Excedente


Eliminacion De Material Excedente, Dist. Prom. 3Km, Carguio
03.09.01 M3 1.30 6,962.60 9,051.38
C/Maq
*en buzones 1.00 494.71 494.71
*pavimento 1.00 1.00 4,727.86 0.70 0.10 330.95
*boloneria 1.00 1.00 7,305.88 0.70 1.20 6,136.94

04.00.00 TUBERIAS
Sumin.E Inst. De TUB. PVC-UF ISO 4435 DN 200Mm S-25 Para
04.01.00 M 10,543.57
Desague
1.00 1.00 10,543.57 10,543.57
Sumin.E Inst. De TUB. PVC-UF ISO 4435 DN 250Mm S-25 Para
04.02.00 M 1,221.37
Desague
1.00 1.00 1,221.37 1,221.37

04.03.00 Alineamiento Y Ajuste De Tuberia Pvc ISO 4435 M 11,764.94


1.00 1.00 11,764.94 11,764.94
05.00.00 PRUEBA HIDRAULICA
05.01.00 Prueba Hidraulica De Tuberia Pvc Iso4435 Dn 200Mm M 11,764.94
1.00 1.00 11,764.94 11,764.94

06.00.00 CONSTRUCCION DE BUZONES


06.01.00 Solado 4" p/Buzones (Mezcla 1:12 C:H) M2 1.00 187.00 A= 1.77 330.99 330.99

Const. De Buzon Estandar Tipo I FC=210Kg/Cm2, H=1.20M -


06.02.00 UND 187.00
1.50M
1.00 163.00 163.00

Const. De Buzon Estandar Tipo I FC=210Kg/Cm2, H=1.51M -


06.03.00 UND
2.00M
1.00 16.00 16.00

Const. De Buzon Estandar Tipo I FC=210Kg/Cm2, H=2.01M -


06.04.00 UND
3.00M
1.00 6.00 6.00
Const. De Buzon Estandar Tipo I FC=210Kg/Cm2, H=3.01M -
06.05.00 UND
4.00M
1.00 2.00 2.00
06.07.00 Dados de concreto de f'c=140Kg./cm2 M3 23.94
2.00 187.00 0.40 0.40 0.40 23.94

07.00.00 CONEXIONES DOMICILIARIAS


07.01.00 Rotura de pavimentos M 1.00 1,125.00 4.80 5,400.00 5,400.00

07.02.00 Reposicin de pavimentos M 1.00 1,125.00 4.80 5,400.00 5,400.00

07.03.00 Rotura de veredas M 1.00 1,125.00 1.20 1,350.00 1,350.00

07.04.00 Reposicin de veredas M 1.00 1,125.00 1.20 1,350.00 1,350.00

07.05.00 Excav. De Conex. Domiciliaria C/MAQ. en Terreno C/Boloneria M 1.00 1,125.00 6.00 6,750.00 6,750.00

07.06.00 Conex. Domiciliaria Dn 160MM ISO 4435, L=6.00M UND 1.00 1,125.00 1.00 1,125.00 1,125.00

07.07.00 Relleno y compactado c/mat propio en zanjas M3 1.00 1,125.00 6.00 0.70 0.70 3,307.50 3,307.50

08.00.00 VARIOS

08.01.00 PRUEBA DE CALIDAD DE CONCRETO - COMPRESION UND 1.00 21.00 21.00 21.00

08.02.00 PRUEBA DENSIDAD DE CAMPO UND 1.00 45.00 45.00 45.00

08.03.00 DISEO DE MEZCLA DE CONCRETO UND 1.00 5.00 5.00 5.00

4
METRADO DE VOLUMEN DE EXCAVACION DE BUZONES

PROYECTO: AMPLIACION Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE


CASCAS

Departamento: LA LIBERTAD
Provincia: GRAN CHIMU

Distrito: CASCAS

Localidad: CASCAS

1.0 EXCAVACION DE BUZON ESTANDAR TIPO I Di = 1.20 m., H=1.00m - 1.50m.T/CON BOLONERIA
Area(m2) Volumen Excavacion MANUAL Excavacion MAQUINARIA
BUZONES H(m) T. Normal T. Semi UND
T. Normal T. Normal Roca S. Roca F.
(m3) c/boloneria rocoso
BP-01 1.2 1.77 2.47 2.47 1
BP-02 1.2 1.77 2.47 2.47 1
BD-11 1.2 1.77 2.47 2.47 1
BP-03 1.2 1.77 2.47 2.47 1
BD-31 1.2 1.77 2.47 2.47 1
BD-30 1.2 1.77 2.47 2.47 1
BD-12 1.2 1.77 2.47 2.47 1
BD-29 1.2 1.77 2.47 2.47 1
BD-32 1.4 1.77 2.83 2.83 1
BD-13 1.2 1.77 2.47 2.47 1
BD-14 1.2 1.77 2.47 2.47 1
BD-28 1.2 1.77 2.47 2.47 1
BD-27 1.2 1.77 2.47 2.47 1
BD-33 1.2 1.77 2.47 2.47 1
BD-51 1.2 1.77 2.47 2.47 1
BD-49 1.2 1.77 2.47 2.47 1
BD-52 1.2 1.77 2.47 2.47 1
BD-48 1.2 1.77 2.47 2.47 1
BD-53 1.2 1.77 2.47 2.47 1
BP-07 1.2 1.77 2.47 2.47 1
BP-06 1.2 1.77 2.47 2.47 1
BP-05 1.2 1.77 2.47 2.47 1
BD-79 1.2 1.77 2.47 2.47 1
BD-78 1.2 1.77 2.47 2.47 1
BD-77 1.2 1.77 2.47 2.47 1
BP-09 1.2 1.77 2.47 2.47 1
BD-10 1.2 1.77 2.47 2.47 1
BD-15 1.2 1.77 2.47 2.47 1
BP-12 1.2 1.77 2.47 2.47 1
BD-17 1.2 1.77 2.47 2.47 1
BD-16 1.2 1.77 2.47 2.47 1
BD-26 1.4 1.77 2.83 2.83 1
BD-34 1.2 1.77 2.47 2.47 1
BD-35 1.2 1.77 2.47 2.47 1
BD-47 1.2 1.77 2.47 2.47 1
BD-54 1.2 1.77 2.47 2.47 1
BD-55 1.2 1.77 2.47 2.47 1
BD-76 1.2 1.77 2.47 2.47 1
BD-56 1.3 1.77 2.65 2.65 1
BP-08 1.2 1.77 2.47 2.47 1
BD-75 1.2 1.77 2.47 2.47 1
BD-74 1.2 1.77 2.47 2.47 1
BD-104 1.2 1.77 2.47 2.47 1
BD-80 1.2 1.77 2.47 2.47 1
BD-36 1.2 1.77 2.47 2.47 1
BP-10 1.2 1.77 2.47 2.47 1
BD-37 1.2 1.77 2.47 2.47 1
BP-09 1.2 1.77 2.47 2.47 1
BD-45 1.2 1.77 2.47 2.47 1
BD-18 1.2 1.77 2.47 2.47 1
BD-24 1.2 1.77 2.47 2.47 1
BD-25 1.4 1.77 2.83 2.83 1
BP-11 1.2 1.77 2.47 2.47 1
BD-07 1.2 1.77 2.47 2.47 1
BD-08 1.2 1.77 2.47 2.47 1
BD-01 1.2 1.77 2.47 2.47 1
BD-02 1.2 1.77 2.47 2.47 1
BD-03 1.2 1.77 2.47 2.47 1
METRADO DE VOLUMEN DE EXCAVACION DE BUZONES

PROYECTO: AMPLIACION Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE


CASCAS

Departamento: LA LIBERTAD
Provincia: GRAN CHIMU

Distrito: CASCAS

Localidad: CASCAS
BP-13 1.2 1.77 2.47 2.47 1
BP-14 1.2 1.77 2.47 2.47 1
BD-04 1.2 1.77 2.47 2.47 1
BD-05 1.2 1.77 2.47 2.47 1
BD-19 1.2 1.77 2.47 2.47 1
BD-23 1.2 1.77 2.47 2.47 1
BD-22 1.2 1.77 2.47 2.47 1
BD-39 1.2 1.77 2.47 2.47 1
BD-38 1.2 1.77 2.47 2.47 1
BD-40 1.2 1.77 2.47 2.47 1
BD-43 1.2 1.77 2.47 2.47 1
BD-44 1.2 1.77 2.47 2.47 1
BD-57 1.2 1.77 2.47 2.47 1
BD-58 1.2 1.77 2.47 2.47 1
BD-59 1.2 1.77 2.47 2.47 1
BD-73 1.45 1.77 2.92 2.92 1
BD-81 1.2 1.77 2.47 2.47 1
BD-72 1.3 1.77 2.65 2.65 1
BD-71 1.4 1.77 2.83 2.83 1
BP-15 1.2 1.77 2.47 2.47 1
BD-84 1.2 1.77 2.47 2.47 1
BD-85 1.2 1.77 2.47 2.47 1
BD-21 1.2 1.77 2.47 2.47 1
BD-62 1.2 1.77 2.47 2.47 1
BD-42 1.2 1.77 2.47 2.47 1
BP-16 1.2 1.77 2.47 2.47 1
BP-17 1.2 1.77 2.47 2.47 1
BP-18 1.2 1.77 2.47 2.47 1
BP-19 1.2 1.77 2.47 2.47 1
BP-20 1.2 1.77 2.47 2.47 1
BP-22 1.2 1.77 2.47 2.47 1
BP-23 1.2 1.77 2.47 2.47 1
BD-63 1.2 1.77 2.47 2.47 1
BP-21 1.2 1.77 2.47 2.47 1
BP-24 1.2 1.77 2.47 2.47 1
BP-25 1.2 1.77 2.47 2.47 1
BD-64 1.2 1.77 2.47 2.47 1
BD-61 1.2 1.77 2.47 2.47 1
BD-66 1.2 1.77 2.47 2.47 1
BP-26 1.2 1.77 2.47 2.47 1
BP-29 1.2 1.77 2.47 2.47 1
BD-32A 1.25 1.77 2.56 2.56 1
BD-67 1.35 1.77 2.74 2.74 1
BD-68 1.2 1.77 2.47 2.47 1
BD-70 1.2 1.77 2.47 2.47 1
BD-86 1.2 1.77 2.47 2.47 1
BD-87 1.2 1.77 2.47 2.47 1
BP-27 1.2 1.77 2.47 2.47 1
BP-28 1.2 1.77 2.47 2.47 1
BP-30 1.2 1.77 2.47 2.47 1
BP-32 1.2 1.77 2.47 2.47 1
BP-33 1.2 1.77 2.47 2.47 1
BP-34 1.2 1.77 2.47 2.47 1
BP-35 1.2 1.77 2.47 2.47 1
BP-37 1.2 1.77 2.47 2.47 1
BP-38 1.2 1.77 2.47 2.47 1
BP-39 1.2 1.77 2.47 2.47 1
BP-43 1.2 1.77 2.47 2.47 1
BP-44 1.4 1.77 2.83 2.83 1
BP-40 1.2 1.77 2.47 2.47 1
BP-41 1.2 1.77 2.47 2.47 1
BP-42 1.2 1.77 2.47 2.47 1
BD-88 1.2 1.77 2.47 2.47 1
BD-89 1.2 1.77 2.47 2.47 1
BD-90 1.2 1.77 2.47 2.47 1
METRADO DE VOLUMEN DE EXCAVACION DE BUZONES

PROYECTO: AMPLIACION Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE


CASCAS

Departamento: LA LIBERTAD
Provincia: GRAN CHIMU

Distrito: CASCAS

Localidad: CASCAS
BD-91 1.2 1.77 2.47 2.47 1
BP-50 1.2 1.77 2.47 2.47 1
BD-92 1.2 1.77 2.47 2.47 1
BD-93 1.2 1.77 2.47 2.47 1
BP-49 1.2 1.77 2.47 2.47 1
BP-45 1.2 1.77 2.47 2.47 1
BP-46 1.2 1.77 2.47 2.47 1
BP-47 1.2 1.77 2.47 2.47 1
BP-54 1.2 1.77 2.47 2.47 1
BD-94 1.2 1.77 2.47 2.47 1
BP-48 1.2 1.77 2.47 2.47 1
BP-51 1.2 1.77 2.47 2.47 1
BP-52 1.2 1.77 2.47 2.47 1
BP-53 1.2 1.77 2.47 2.47 1
BP-55 1.2 1.77 2.47 2.47 1
BP-58 1.2 1.77 2.47 2.47 1
BP-56 1.2 1.77 2.47 2.47 1
BD-95 1.2 1.77 2.47 2.47 1
BD-96 1.2 1.77 2.47 2.47 1
BD-97 1.2 1.77 2.47 2.47 1
BD-98 1.2 1.77 2.47 2.47 1
BD-99 1.2 1.77 2.47 2.47 1
BD-100 1.2 1.77 2.47 2.47 1
BD-101 1.2 1.77 2.47 2.47 1
BP-60 1.2 1.77 2.47 2.47 1
BP-61 1.2 1.77 2.47 2.47 1
BP-62 1.2 1.77 2.47 2.47 1
BP-63 1.25 1.77 2.56 2.56 1
BP-64 1.45 1.77 2.92 2.92 1
BP-65 1.2 1.77 2.47 2.47 1
BP-66 1.2 1.77 2.47 2.47 1
BP-67 1.2 1.77 2.47 2.47 1
BP-68 1.2 1.77 2.47 2.47 1
BP-72 1.3 1.77 2.65 2.65 1
BP-73 1.2 1.77 2.47 2.47 1
BP-74 1.2 1.77 2.47 2.47 1
BP-75 1.2 1.77 2.47 2.47 1
BP-76 1.2 1.77 2.47 2.47 1
BP-77 1.2 1.77 2.47 2.47 1
BP-78 1.2 1.77 2.47 2.47 1
TOTAL 406.89 406.89 163.00
METROS CUBICOS POR BUZON PROM= 2.50

2.0 EXCAVACION DE BUZON ESTANDAR TIPO I Di = 1.20 m., H=1.51m - 2.00m. T/CON BOLONERIA
Volumen Excavacion MANUAL Excavacion Maquinaria
BUZONES H(m) Area(m2) T. Normal T. Semi UND
T. Normal T. Normal Roca S. Roca F.
(m3) c/boloneria rocoso
BD-46 1.8 1.77 3.53 3.53 1
BD-13A 1.55 1.77 3.09 3.09 1
BD-06 1.55 1.77 3.09 3.09 1
BD-20 1.75 1.77 3.45 3.45 1
BD-82 1.75 1.77 3.45 3.45 1
BD-83 1.9 1.77 3.71 3.71 1
BD-41 1.55 1.77 3.09 3.09 1
BD-60 1.55 1.77 3.09 3.09 1
BD-65 1.55 1.77 3.09 3.09 1
BD-69 1.55 1.77 3.09 3.09 1
BD-35A 1.65 1.77 3.27 3.27 1
BP-36 1.7 1.77 3.36 3.36 1
BP-57 1.75 1.77 3.45 3.45 1
BP-59 1.95 1.77 3.80 3.80 1
BD-103 1.55 1.77 3.09 3.09 1
BP-69 1.7 1.77 3.36 3.36 1
TOTAL 53.014 53.014 16.000
METROS CUBICOS POR BUZON PROM= 3.31
METRADO DE VOLUMEN DE EXCAVACION DE BUZONES

PROYECTO: AMPLIACION Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE


CASCAS

Departamento: LA LIBERTAD
Provincia: GRAN CHIMU

Distrito: CASCAS

Localidad: CASCAS

3.0 EXCAVACION DE BUZON ESTANDAR TIPO I Di = 1.20 m., H=2.01m - 3.00m. T/CON BOLONERIA
Volumen
Excavacion MANUAL Excavacion Maquinaria
BUZONES H(m) Area(m2) Unidades
T. Normal T. Semi
T. Normal T. Normal Roca S. Roca F.
(m3) c/boloneria rocoso
BD-50 3 1.77 5.65 5.65 1
BP-04 2.9 1.77 5.48 5.48 1
BP-31 2.1 1.77 4.06 4.06 1
BD-67A 2.4 1.77 4.59 4.59 1
BD-102 2.4 1.77 4.59 4.59 1
BP-70 2.35 1.77 4.51 4.51 1
TOTAL #REF! 28.893 6.000
METROS CUBICOS POR BUZON PROM= 4.82

4.0 EXCAVACION DE BUZON ESTANDAR TIPO I Di = 1.20 m., H=3.01m - 4.00m. T/CON BOLONERIA
Volumen Excavacion MANUAL Excavacion Maquinaria
BUZONES H(m) Area(m2) T. Normal T. Semi Unidades
T. Normal T. Normal Roca S. Roca F.
(m3) c/boloneria rocoso
BD-66A 3.15 1.77 5.92 5.92 1
BP-71 4.70 1.77 8.66 8.66 1
TOTAL 5.920 5.920 2.000
METROS CUBICOS POR BUZON PROM= 2.96
METRADO DE RED DE ALCANTARILLADO

PROYECTO: AMPLIACION Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE CASCAS

Departamento: LA LIBERTAD
Provincia: GRAN CHIMU
Distrito: CASCAS
Localidad: CASCAS

EXCAVACION CON MAQUINARIA EXCAVACION MANUAL

Terreno CON BOLONERIA Terreno CON BOLONERIA TUBERIAS S-25

zanj. zanj. zanj. zanj. zanj. zanj. zanj.


Buzon de Inicio Buzon de Llegada zanj. prom. zanj. prom. zanj. prom. zanj. prom. zanj. prom. DIAM DIAM DIAM
prom. prom. prom. prom. prom. prom. prom.
Dimetro
Tipo Longitud del Metrado de Zanja Tipo de Altura Promedio Metrado de Tubera Metrado de Zanja
Item Colector (*)
Jiron/Calle/Avenida DADOS
Tramo (m) (m)
Nominal
material (m) (m) OBS (m)
Cota Terreno Cota de Fondo Altura Cota de Terreno Cota de Fondo Altura (mm) 3.51 -
Buzon N Buzon N 120 - 1.50 1.51 - 2.00 2.01 - 2.50 2.51 - 3.00 3.01 - 3.50 120 - 1.50 1.51 - 2.00 2.01 - 2.50 2.51 - 3.00 3.01 - 3.50 3.51 - 4.00 160 mm 200 mm 250 mm
(msnm) (msnm) (m) (msnm) (msnm) (m) 4.00

TP 200
1.00 1 CA. BOLIVAR 1 BD-11 1340.459 1339.259 1.20 BP-03 1332.940 1331.740 1.20 59.43 57.93 200 PVC-UF 1.20 58.23 TUB. A REEMP. T/BOLONERIA 57.93 0.00 0.00 0.00 0.00 0.00 57.93 0.00 0.00 0.00 0.00 0.00 0.00 58.23 0.00
2.00 1 CA. BOLIVAR 1 BP-03 1332.940 1331.740 1.20 BD-12 1325.269 1324.069 1.20 63.73 62.23 200 PVC-UF 1.20 62.53 TUB. A REEMP. T/BOLONERIA 62.23 0.00 0.00 0.00 0.00 0.00 62.23 0.00 0.00 0.00 0.00 0.00 0.00 62.53 0.00
3.00 1 CA. BOLIVAR 1 BD-12 1325.269 1324.069 1.20 BD-13 1318.014 1316.814 1.20 71.04 69.54 200 PVC-UF 1.20 69.84 TUB. A REEMP. T/BOLONERIA 69.54 0.00 0.00 0.00 0.00 0.00 69.54 0.00 0.00 0.00 0.00 0.00 0.00 69.84 0.00
4.00 3 CA. BOLIVAR 1 BD-13 1318.014 1316.814 1.20 BD-14 1316.269 1315.069 1.20 24.53 23.03 200 PVC-UF 1.20 23.33 TUB. A REEMP. T/BOLONERIA 23.03 23.03 0.00 0.00 0.00 0.00 0.00 0.00 23.33 0.00
5.00 3 CA. BOLIVAR 1 BD-14 1316.269 1315.069 1.20 BD-15 1307.954 1306.754 1.20 71.09 69.59 200 PVC-UF 1.20 69.89 TUB. A REEMP. T/BOLONERIA 69.59 69.59 0.00 0.00 0.00 0.00 0.00 0.00 69.89 0.00
6.00 3 CA. BOLIVAR 1 BD-15 1307.954 1306.754 1.20 BD-16 1301.668 1300.468 1.20 61.08 59.58 200 PVC-UF 1.20 59.88 TUB. A REEMP. T/BOLONERIA 59.58 59.58 0.00 0.00 0.00 0.00 0.00 0.00 59.88 0.00
7.00 4 CA. JORGE CHAVEZ 1 BD-09 1303.940 1302.740 1.20 BD-10 1303.203 1302.003 1.20 29.57 28.07 200 PVC-UF 1.20 28.37 TUB. A REEMP. PAV. EN MAL ESTADO 28.07 28.07 0.00 0.00 0.00 0.00 0.00 0.00 28.37 0.00
8.00 4 CA. JORGE CHAVEZ 1 BD-10 1303.203 1302.003 1.20 BD-16 1301.668 1300.468 1.20 46.09 44.59 200 PVC-UF 1.20 44.89 TUB. A REEMP. PAV. EN MAL ESTADO 44.59 44.59 0.00 0.00 0.00 0.00 0.00 0.00 44.89 0.00
9.00 5 CA. BOLIVAR 1 BD-16 1301.668 1300.468 1.20 BD-17 1298.050 1296.850 1.20 40.67 39.17 200 PVC-UF 1.20 39.47 TUB. A REEMP. T/BOLONERIA 39.17 0.00 39.17 0.00 0.00 0.00 0.00 0.00 0.00 39.47 0.00
10.00 5 CA. BOLIVAR 1 BD-17 1298.050 1296.850 1.20 BD-18 1293.820 1292.620 1.20 44.22 42.72 200 PVC-UF 1.20 43.02 TUB. A REEMP. T/BOLONERIA 42.72 0.00 42.72 0.00 0.00 0.00 0.00 0.00 0.00 43.02 0.00
11.00 7 CA. BOLIVAR 1 BD-19 1283.315 1282.115 1.20 BD-20 1277.417 1275.667 1.75 69.52 68.02 200 PVC-UF 1.48 68.32 TUB. A REEMP. T/BOLONERIA 68.02 0.00 68.02 0.00 0.00 0.00 0.00 0.00 0.00 68.32 0.00
12.00 8 CA. 28 DE JULIO 1 BD-05 1277.692 1276.492 1.20 BD-20 1277.417 1275.667 1.75 68.84 67.34 200 PVC-UF 1.48 67.64 TUB. A REEMP. PAV. EN MAL ESTADO 67.34 67.34 0.00 0.00 0.00 0.00 0.00 0.00 67.64 0.00
13.00 9a CA. 28 DE JULIO 1 BD-22 1277.431 1276.231 1.20 BD-20 1277.417 1275.667 1.75 68.17 66.67 200 PVC-UF 1.48 66.97 TUB. A REEMP. PAV. EN MAL ESTADO 66.67 66.67 0.00 0.00 0.00 0.00 0.00 0.00 66.97 0.00
14.00 10 CA. RICARDO PALMA 1 BD-09 1303.940 1302.740 1.20 BP-12 1300.555 1299.355 1.20 41.38 39.88 200 PVC-UF 1.20 40.18 TUB. A REEMP. T/BOLONERIA 39.88 39.88 0.00 0.00 0.00 0.00 0.00 0.00 40.18 0.00
15.00 10 CA. RICARDO PALMA 1 BP-12 1300.555 1299.355 1.20 BD-08 1295.349 1294.149 1.20 42.95 41.45 200 PVC-UF 1.20 41.75 TUB. A REEMP. T/BOLONERIA 41.45 41.45 0.00 0.00 0.00 0.00 0.00 0.00 41.75 0.00
16.00 10 CA. RICARDO PALMA 1 BD-08 1295.349 1294.149 1.20 BD-07 1288.069 1286.869 1.20 70.94 69.44 200 PVC-UF 1.20 69.74 TUB. A REEMP. T/BOLONERIA 69.44 69.44 0.00 0.00 0.00 0.00 0.00 0.00 69.74 0.00
17.00 10 CA. RICARDO PALMA 1 BD-07 1288.069 1286.869 1.20 BD-06 1282.743 1280.793 1.95 64.19 62.69 200 PVC-UF 1.58 62.99 TUB. A REEMP. T/BOLONERIA 62.69 0.00 62.69 0.00 0.00 0.00 0.00 0.00 62.99 0.00
18.00 11 CA. SAN GABRIEL 1 BD-01 1286.000 1284.800 1.20 BD-02 1284.541 1283.341 1.20 30.34 28.84 200 PVC-UF 1.20 29.14 TUB. A REEMP. PAV. EN MAL ESTADO 28.84 28.84 0.00 0.00 0.00 0.00 0.00 0.00 29.14 0.00
19.00 11 CA. SAN GABRIEL 1 BD-02 1284.541 1283.341 1.20 BD-03 1282.447 1281.247 1.20 43.55 42.05 200 PVC-UF 1.20 42.35 TUB. A REEMP. PAV. EN MAL ESTADO 42.05 42.05 0.00 0.00 0.00 0.00 0.00 0.00 42.35 0.00
20.00 11 CA. SAN GABRIEL 1 BD-03 1282.447 1281.247 1.20 BD-06 1282.743 1280.793 1.95 52.07 50.57 200 PVC-UF 1.58 50.87 TUB. A REEMP. PAV. EN MAL ESTADO 50.57 0.00 50.57 0.00 0.00 0.00 0.00 0.00 50.87 0.00
21.00 12 CA. SAN GABRIEL 1 BD-19 1283.315 1282.115 1.20 BD-06 1282.743 1280.793 1.95 65.79 64.29 200 PVC-UF 1.58 64.59 TUB. A REEMP. PAV. EN MAL ESTADO 64.29 0.00 64.29 0.00 0.00 0.00 0.00 0.00 64.59 0.00
22.00 14 CA. 28 DE JULIO 1 BD-02 1284.541 1283.341 1.20 BP-13 1284.174 1282.974 1.20 19.64 18.14 200 PVC-UF 1.20 18.44 TUB. PROYECTADA 18.14 18.14 0.00 0.00 0.00 0.00 0.00 0.00 18.44 0.00
23.00 14 CA. 28 DE JULIO 1 BP-13 1284.174 1282.974 1.20 BP-14 1281.052 1279.852 1.20 42.07 40.57 200 PVC-UF 1.20 40.87 TUB. PROYECTADA 40.57 40.57 0.00 0.00 0.00 0.00 0.00 0.00 40.87 0.00
24.00 14 CA. 28 DE JULIO 1 BP-14 1281.052 1279.852 1.20 BE-16 1278.740 1277.540 1.20 51.57 50.07 200 PVC-UF 1.20 50.37 TUB. PROYECTADA 50.07 50.07 0.00 0.00 0.00 0.00 0.00 0.00 50.37 0.00
25.00 15 CA. RICARDO PALMA 1 BD-05 1277.692 1276.492 1.20 BD-04 1273.506 1272.306 1.20 66.46 64.96 200 PVC-UF 1.20 65.26 TUB. A REEMP. PAV. EN MAL ESTADO 64.96 64.96 0.00 0.00 0.00 0.00 0.00 0.00 65.26 0.00
26.00 16 AV. CAJAMARCA 1 BP-01 1363.085 1361.885 1.20 BP-02 1361.970 1360.770 1.20 66.96 65.46 200 PVC-UF 1.20 65.76 TUB. PROYECTADA 65.46 65.46 0.00 0.00 0.00 0.00 0.00 0.00 65.76 0.00
27.00 16 AV. CAJAMARCA 1 BP-02 1361.970 1360.770 1.20 BE-01 1357.338 1356.138 1.20 66.74 65.24 200 PVC-UF 1.20 65.54 TUB. PROYECTADA 65.24 65.24 0.00 0.00 0.00 0.00 0.00 0.00 65.54 0.00
28.00 16 CA. PROGRESO 1 BD-31 1340.679 1339.479 1.20 BD-30 1333.308 1332.108 1.20 50.03 48.53 200 PVC-UF 1.20 48.83 TUB. A REEMP. PAV. EN MAL ESTADO 48.53 48.53 0.00 0.00 0.00 0.00 0.00 0.00 48.83 0.00
29.00 16 CA. PROGRESO 1 BD-30 1333.308 1332.108 1.20 BD-29 1326.746 1325.546 1.20 57.41 55.91 200 PVC-UF 1.20 56.21 TUB. A REEMP. PAV. EN MAL ESTADO 55.91 55.91 0.00 0.00 0.00 0.00 0.00 0.00 56.21 0.00
30.00 16 CA. PROGRESO 1 BD-29 1326.746 1325.546 1.20 BD-28 1319.948 1318.748 1.20 69.81 68.31 200 PVC-UF 1.20 68.61 TUB. A REEMP. PAV. EN MAL ESTADO 68.31 68.31 0.00 0.00 0.00 0.00 0.00 0.00 68.61 0.00
31.00 16 CA. PROGRESO 1 BD-28 1319.948 1318.748 1.20 BD-27 1316.443 1315.243 1.20 38.00 36.50 200 PVC-UF 1.20 36.80 TUB. A REEMP. PAV. EN MAL ESTADO 36.50 36.50 0.00 0.00 0.00 0.00 0.00 0.00 36.80 0.00
32.00 16 CA. PROGRESO 1 BD-27 1316.443 1315.243 1.20 BD-26 1307.749 1306.349 1.40 65.41 63.91 200 PVC-UF 1.30 64.21 TUB. A REEMP. PAV. EN MAL ESTADO 63.91 63.91 0.00 0.00 0.00 0.00 0.00 0.00 64.21 0.00
33.00 17 CAMINO DE VIG. 11 1 BD-15 1307.954 1306.754 1.20 BD-26 1307.749 1306.349 1.40 44.58 43.08 200 PVC-UF 1.30 43.38 TUB. A REEMP. T/BOLONERIA 43.08 0.00 43.08 0.00 0.00 0.00 0.00 0.00 0.00 43.38 0.00
34.00 18 CA. PROGRESO 1 BD-26 1307.749 1306.349 1.40 BD-25 1300.846 1299.646 1.20 57.06 55.56 200 PVC-UF 1.30 55.86 TUB. A REEMP. PAV. EN MAL ESTADO 55.56 55.56 0.00 0.00 0.00 0.00 0.00 0.00 55.86 0.00
35.00 19 CA. JORGE CHAVEZ 1 BD-16 1301.668 1300.468 1.20 BD-25 1300.846 1299.646 1.20 50.21 48.71 200 PVC-UF 1.20 49.01 TUB. A REEMP. PAV. EN MAL ESTADO 48.71 48.71 0.00 0.00 0.00 0.00 0.00 0.00 49.01 0.00
36.00 20 CA. PROGRESO 1 BD-25 1300.846 1299.646 1.20 BP-11 1295.960 1294.760 1.20 42.20 40.70 200 PVC-UF 1.20 41.00 TUB. A REEMP. PAV. EN MAL ESTADO 40.70 40.70 0.00 0.00 0.00 0.00 0.00 0.00 41.00 0.00
37.00 20 CA. PROGRESO 1 BP-11 1295.960 1294.760 1.20 BD-24 1291.414 1290.214 1.20 42.28 40.78 200 PVC-UF 1.20 41.08 TUB. A REEMP. PAV. EN MAL ESTADO 40.78 40.78 0.00 0.00 0.00 0.00 0.00 0.00 41.08 0.00
38.00 23 CA. SAN GABRIEL 1 BD-19 1283.315 1281.965 1.35 BD-23 1282.523 1281.323 1.20 72.88 71.38 200 PVC-UF 1.28 71.68 TUB. A REEMP. PAV. EN MAL ESTADO 71.38 71.38 0.00 0.00 0.00 0.00 0.00 0.00 71.68 0.00
39.00 24 CA. SAN GABRIEL 1 BD-38 1284.846 1283.646 1.20 BD-23 1282.523 1281.323 1.20 65.33 63.83 200 PVC-UF 1.20 64.13 TUB. A REEMP. PAV. EN MAL ESTADO 63.83 63.83 0.00 0.00 0.00 0.00 0.00 0.00 64.13 0.00
40.00 25 CA. PROGRESO 1 BD-23 1282.523 1281.323 1.20 BD-22 1277.431 1276.231 1.20 67.24 65.74 200 PVC-UF 1.20 66.04 TUB. A REEMP. PAV. EN MAL ESTADO 65.74 65.74 0.00 0.00 0.00 0.00 0.00 0.00 66.04 0.00
41.00 25 CA. PROGRESO 1 BD-22 1277.431 1276.231 1.20 BD-21 1271.482 1269.882 1.60 65.13 63.63 200 PVC-UF 1.40 63.93 TUB. A REEMP. PAV. EN MAL ESTADO 63.63 63.63 0.00 0.00 0.00 0.00 0.00 0.00 63.93 0.00
42.00 28 CA. INCA 1 BP-07 1354.860 1353.660 1.20 BP-06 1351.465 1350.265 1.20 64.29 62.79 200 PVC-UF 1.20 63.09 TUB. PROYECTADA 62.79 62.79 0.00 0.00 0.00 0.00 0.00 0.00 63.09 0.00
43.00 28 CA. INCA 1 BP-06 1351.465 1350.265 1.20 BP-05 1351.100 1349.900 1.20 45.40 43.90 200 PVC-UF 1.20 44.20 TUB. PROYECTADA 43.90 43.90 0.00 0.00 0.00 0.00 0.00 0.00 44.20 0.00
44.00 28 CA. INCA 1 BP-05 1351.100 1349.900 1.20 BP-04 1352.416 1349.516 2.90 43.80 42.30 200 PVC-UF 2.05 42.60 TUB. PROYECTADA 42.30 0.00 0.00 42.30 0.00 0.00 0.00 0.00 42.60 0.00
45.00 28 CA. INCA 1 BP-04 1352.416 1349.516 2.90 BD-50 1352.033 1349.033 3.00 57.55 56.05 200 PVC-UF 2.95 56.35 TUB. PROYECTADA 56.05 0.00 0.00 0.00 56.05 0.00 0.00 0.00 56.35 0.00
46.00 29 CA. JORGE CHAVEZ 1 BD-29 1326.746 1325.546 1.20 BD-32 1325.438 1324.038 1.40 55.15 53.65 200 PVC-UF 1.30 53.95 TUB. A REEMP. T/BOLONERIA 53.65 53.65 0.00 0.00 0.00 0.00 0.00 0.00 53.95 0.00
47.00 30 CA. JORGE CHAVEZ 1 BD-52 1326.182 1324.982 1.20 BD-49 1325.823 1324.623 1.20 35.26 33.76 200 PVC-UF 1.20 34.06 TUB. A REEMP. T/BOLONERIA 33.76 33.76 0.00 0.00 0.00 0.00 0.00 0.00 34.06 0.00
48.00 30 CA. JORGE CHAVEZ 1 BD-49 1325.823 1324.623 1.20 BD-32 1325.438 1324.038 1.40 71.50 70.00 200 PVC-UF 1.30 70.30 TUB. A REEMP. T/BOLONERIA 70.00 70.00 0.00 0.00 0.00 0.00 0.00 0.00 70.30 0.00
49.00 31 CA. SAN MARTIN 1 BD-32 1325.438 1324.038 1.40 BD-33 1318.667 1317.467 1.20 50.87 49.37 200 PVC-UF 1.30 49.67 TUB. A REEMP. T/BOLONERIA 49.37 49.37 0.00 0.00 0.00 0.00 0.00 0.00 49.67 0.00
50.00 33 CA. SAN MARTIN 1 BD-33 1318.667 1317.467 1.20 BD-34 1312.474 1311.274 1.20 50.47 48.97 200 PVC-UF 1.20 49.27 TUB. A REEMP. PAV. EN MAL ESTADO 48.97 48.97 0.00 0.00 0.00 0.00 0.00 0.00 49.27 0.00
51.00 33 CA. SAN MARTIN 1 BD-34 1312.474 1311.274 1.20 BD-35 1306.241 1305.041 1.20 56.08 54.58 200 PVC-UF 1.20 54.88 TUB. A REEMP. PAV. EN MAL ESTADO 54.58 54.58 0.00 0.00 0.00 0.00 0.00 0.00 54.88 0.00
52.00 34 CA. COLON 1 BD-26 1307.749 1306.549 1.20 BD-35 1306.241 1305.041 1.20 80.71 79.21 200 PVC-UF 1.20 79.51 TUB. A REEMP. PAV. EN BUEN ESTADO 79.21 79.21 0.00 0.00 0.00 0.00 0.00 0.00 79.51 0.00
53.00 35 CA. SAN MARTIN 1 BD-35 1306.241 1305.041 1.20 BD-36 1297.510 1296.310 1.20 67.35 65.85 200 PVC-UF 1.20 66.15 TUB. A REEMP. PAV. EN MAL ESTADO 65.85 65.85 0.00 0.00 0.00 0.00 0.00 0.00 66.15 0.00
54.00 36 CA. JORGE CHAVEZ 1 BD-25 1300.846 1299.646 1.20 BD-36 1297.510 1296.310 1.20 78.26 76.76 200 PVC-UF 1.20 77.06 TUB. A REEMP. PAV. EN MAL ESTADO 76.76 76.76 0.00 0.00 0.00 0.00 0.00 0.00 77.06 0.00
55.00 36a CA. JORGE CHAVEZ 1 BD-45 1298.702 1297.502 1.20 BD-36 1297.510 1296.310 1.20 65.72 64.22 200 PVC-UF 1.20 64.52 TUB. A REEMP. PAV. EN MAL ESTADO 64.22 64.22 0.00 0.00 0.00 0.00 0.00 0.00 64.52 0.00
56.00 37 CA. SAN MARTIN 1 BD-36 1297.510 1296.310 1.20 BP-10 1292.191 1290.991 1.20 41.75 40.25 200 PVC-UF 1.20 40.55 TUB. A REEMP. PAV. EN MAL ESTADO 40.25 40.25 0.00 0.00 0.00 0.00 0.00 0.00 40.55 0.00
57.00 37 CA. SAN MARTIN 1 BP-10 1292.191 1290.991 1.20 BD-37 1290.412 1289.212 1.20 41.75 40.25 200 PVC-UF 1.20 40.55 TUB. A REEMP. PAV. EN MAL ESTADO 40.25 40.25 0.00 0.00 0.00 0.00 0.00 0.00 40.55 0.00
58.00 38 CA. UNION 1 BD-24 1291.414 1290.214 1.20 BD-37 1290.412 1289.212 1.20 73.57 72.07 200 PVC-UF 1.20 72.37 TUB. A REEMP. PAV. EN MAL ESTADO 72.07 72.07 0.00 0.00 0.00 0.00 0.00 0.00 72.37 0.00
59.00 39 CA. SAN MARTIN 1 BD-13A 1290.325 1288.775 1.55 BD-38 1284.846 1283.646 1.20 37.14 35.64 200 PVC-UF 1.38 35.94 TUB. PROY. EN PAV. EN BUEN ESTADO 35.64 35.64 0.00 0.00 0.00 0.00 0.00 0.00 35.94 0.00
60.00 39 CA. SAN MARTIN 1 BD-38 1284.846 1283.646 1.20 BD-39 1279.249 1278.049 1.20 24.25 22.75 200 PVC-UF 1.20 23.05 TUB. A REEMP. PAV. EN MAL ESTADO 22.75 22.75 0.00 0.00 0.00 0.00 0.00 0.00 23.05 0.00
61.00 39 CA. SAN MARTIN 1 BD-39 1279.249 1278.049 1.20 BD-40 1275.716 1274.516 1.20 39.88 38.38 200 PVC-UF 1.20 38.68 TUB. A REEMP. PAV. EN MAL ESTADO 38.38 38.38 0.00 0.00 0.00 0.00 0.00 0.00 38.68 0.00
62.00 40 CA. 28 DE JULIO 1 BD-22 1277.431 1276.231 1.20 BD-40 1275.716 1274.516 1.20 66.27 64.77 200 PVC-UF 1.20 65.07 TUB. A REEMP. PAV. EN MAL ESTADO 64.77 64.77 0.00 0.00 0.00 0.00 0.00 0.00 65.07 0.00
63.00 41 CA. SAN MARTIN 1 BD-40 1275.716 1274.516 1.20 BE-27 1269.094 1266.944 2.15 65.75 64.25 200 PVC-UF 1.68 64.55 TUB. A REEMP. PAV. EN MAL ESTADO 64.25 0.00 64.25 0.00 0.00 0.00 0.00 0.00 64.55 0.00
64.00 42 CA. FRANCISCO BOLOGNESI 1 BD-49 1325.823 1324.623 1.20 BD-48 1319.377 1318.177 1.20 51.08 49.58 200 PVC-UF 1.20 49.88 TUB. A REEMP. PAV. EN MAL ESTADO 49.58 49.58 0.00 0.00 0.00 0.00 0.00 0.00 49.88 0.00
65.00 43 CA. FRANCISCO BOLOGNESI 1 BD-48 1319.377 1318.177 1.20 BD-47 1312.508 1311.308 1.20 57.18 55.68 200 PVC-UF 1.20 55.98 TUB. A REEMP. PAV. EN MAL ESTADO 55.68 55.68 0.00 0.00 0.00 0.00 0.00 0.00 55.98 0.00
66.00 43 CA. FRANCISCO BOLOGNESI 1 BD-47 1312.508 1311.308 1.20 BD-46 1306.019 1304.219 1.80 56.14 54.64 200 PVC-UF 1.50 54.94 TUB. A REEMP. PAV. EN MAL ESTADO 54.64 54.64 0.00 0.00 0.00 0.00 0.00 0.00 54.94 0.00
67.00 44 CA. COLON 1 BD-35 1306.241 1305.041 1.20 BD-46 1306.019 1304.219 1.80 69.88 68.38 200 PVC-UF 1.50 68.68 TUB. A REEMP. PAV. EN MAL ESTADO 68.38 68.38 0.00 0.00 0.00 0.00 0.00 0.00 68.68 0.00
68.00 43a CA. COLON 1 BD-55 1306.053 1304.653 1.40 BD-46 1306.019 1304.219 1.80 51.83 50.33 200 PVC-UF 1.60 50.63 TUB. A REEMP. PAV. EN MAL ESTADO 50.33 0.00 50.33 0.00 0.00 0.00 0.00 0.00 50.63 0.00
69.00 45 CA. FRANCISCO BOLOGNESI 1 BD-46 1306.019 1304.219 1.80 BD-45 1298.702 1297.502 1.20 63.31 61.81 200 PVC-UF 1.50 62.11 TUB. A REEMP. PAV. EN MAL ESTADO 61.81 61.81 0.00 0.00 0.00 0.00 0.00 0.00 62.11 0.00
70.00 47 CA. FRANCISCO BOLOGNESI 1 BD-45 1298.702 1297.502 1.20 BP-09 1293.647 1292.447 1.20 44.42 42.92 200 PVC-UF 1.20 43.22 TUB. A REEMP. PAV. EN MAL ESTADO 42.92 42.92 0.00 0.00 0.00 0.00 0.00 0.00 43.22 0.00
71.00 47 CA. FRANCISCO BOLOGNESI 1 BP-09 1293.647 1292.447 1.20 BD-44 1288.889 1287.689 1.20 44.42 42.92 200 PVC-UF 1.20 43.22 TUB. A REEMP. PAV. EN MAL ESTADO 42.92 42.92 0.00 0.00 0.00 0.00 0.00 0.00 43.22 0.00
72.00 48 CA. UNION 1 BD-37 1290.412 1289.212 1.20 BD-44 1288.889 1287.689 1.20 59.86 58.36 200 PVC-UF 1.20 58.66 TUB. A REEMP. PAV. EN MAL ESTADO 58.36 58.36 0.00 0.00 0.00 0.00 0.00 0.00 58.66 0.00
73.00 49 CA. FRANCISCO BOLOGNESI 1 BD-44 1288.889 1287.689 1.20 BD-43 1282.233 1281.033 1.20 70.77 69.27 200 PVC-UF 1.20 69.57 TUB. A REEMP. PAV. EN MAL ESTADO 69.27 69.27 0.00 0.00 0.00 0.00 0.00 0.00 69.57 0.00
74.00 50 CA. SAN GABRIEL 1 BD-38 1284.846 1283.646 1.20 BD-43 1282.233 1281.033 1.20 63.49 61.99 200 PVC-UF 1.20 62.29 TUB. A REEMP. PAV. EN MAL ESTADO 61.99 61.99 0.00 0.00 0.00 0.00 0.00 0.00 62.29 0.00
75.00 51 CA. FRANCISCO BOLOGNESI 1 BD-43 1282.233 1281.033 1.20 BD-42 1274.992 1273.792 1.20 65.71 64.21 200 PVC-UF 1.20 64.51 TUB. A REEMP. PAV. EN MAL ESTADO 64.21 64.21 0.00 0.00 0.00 0.00 0.00 0.00 64.51 0.00
76.00 52 CA. 28 DE JULIO 1 BD-40 1275.716 1274.516 1.20 BD-42 1274.992 1273.792 1.20 67.30 65.80 200 PVC-UF 1.20 66.10 TUB. A REEMP. PAV. EN MAL ESTADO 65.80 65.80 0.00 0.00 0.00 0.00 0.00 0.00 66.10 0.00
77.00 53 CA. FRANCISCO BOLOGNESI 1 BD-42 1274.992 1273.792 1.20 BD-41 1268.430 1266.880 1.55 66.37 64.87 200 PVC-UF 1.38 65.17 TUB. A REEMP. PAV. EN MAL ESTADO 64.87 64.87 0.00 0.00 0.00 0.00 0.00 0.00 65.17 0.00
78.00 53a CA. LIMA 1 BE-27 1269.094 1267.894 1.20 BD-41 1268.430 1266.880 1.55 65.85 64.35 200 PVC-UF 1.38 64.65 TUB. A REEMP. PAV. EN BUEN ESTADO 64.35 64.35 0.00 0.00 0.00 0.00 0.00 0.00 64.65 0.00
79.00 54 CA. MIGUEL GRAU 1 BD-50 1352.033 1350.833 1.20 BD-51 1335.344 1334.144 1.20 62.22 60.72 200 PVC-UF 1.20 61.02 TUB. A REEMP. PAV. EN BUEN ESTADO 60.72 60.72 0.00 0.00 0.00 0.00 0.00 0.00 61.02 0.00
80.00 54 CA. MIGUEL GRAU 1 BD-51 1335.344 1334.144 1.20 BD-52 1326.182 1324.982 1.20 59.61 58.11 200 PVC-UF 1.20 58.41 TUB. A REEMP. T/BOLONERIA 58.11 58.11 0.00 0.00 0.00 0.00 0.00 0.00 58.41 0.00
81.00 54 CA. MIGUEL GRAU 1 BD-52 1326.182 1324.982 1.20 BD-53 1318.874 1317.674 1.20 53.99 52.49 200 PVC-UF 1.20 52.79 TUB. A REEMP. T/BOLONERIA 52.49 52.49 0.00 0.00 0.00 0.00 0.00 0.00 52.79 0.00
82.00 55 CA. RAMON CASTILLA 1 BD-48 1319.377 1318.177 1.20 BD-53 1318.874 1317.674 1.20 40.86 39.36 200 PVC-UF 1.20 39.66 TUB. A REEMP. PAV. EN MAL ESTADO 39.36 39.36 0.00 0.00 0.00 0.00 0.00 0.00 39.66 0.00
83.00 57 CA. MIGUEL GRAU 1 BD-54 1312.425 1311.225 1.20 BD-55 1306.053 1304.653 1.40 56.79 55.29 200 PVC-UF 1.30 55.59 TUB. A REEMP. PAV. EN MAL ESTADO 55.29 55.29 0.00 0.00 0.00 0.00 0.00 0.00 55.59 0.00
84.00 59 CA. COLON 1 BD-78 1308.806 1307.606 1.20 BD-76 1306.312 1305.112 1.20 72.65 71.15 200 PVC-UF 1.20 71.45 TUB. A REEMP. PAV. EN MAL ESTADO 71.15 71.15 0.00 0.00 0.00 0.00 0.00 0.00 71.45 0.00
85.00 59 CA. COLON 1 BD-76 1306.312 1305.112 1.20 BD-55 1306.053 1304.653 1.40 51.30 49.80 200 PVC-UF 1.30 50.10 TUB. A REEMP. T/BOLONERIA 49.80 49.80 0.00 0.00 0.00 0.00 0.00 0.00 50.10 0.00
86.00 60 CA. MIGUEL GRAU 1 BD-55 1306.053 1304.653 1.40 BD-56 1298.304 1297.004 1.30 63.70 62.20 200 PVC-UF 1.35 62.50 TUB. A REEMP. T/BOLONERIA 62.20 62.20 0.00 0.00 0.00 0.00 0.00 0.00 62.50 0.00
87.00 61 CA. JORGE CHAVEZ 1 BD-45 1298.702 1297.502 1.20 BD-56 1298.304 1297.004 1.30 56.64 55.14 200 PVC-UF 1.25 55.44 TUB. A REEMP. PAV. EN MAL ESTADO 55.14 55.14 0.00 0.00 0.00 0.00 0.00 0.00 55.44 0.00

9
METRADO DE RED DE ALCANTARILLADO

PROYECTO: AMPLIACION Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE CASCAS

Departamento: LA LIBERTAD
Provincia: GRAN CHIMU
Distrito: CASCAS
Localidad: CASCAS

EXCAVACION CON MAQUINARIA EXCAVACION MANUAL

Terreno CON BOLONERIA Terreno CON BOLONERIA TUBERIAS S-25

zanj. zanj. zanj. zanj. zanj. zanj. zanj.


Buzon de Inicio Buzon de Llegada zanj. prom. zanj. prom. zanj. prom. zanj. prom. zanj. prom. DIAM DIAM DIAM
prom. prom. prom. prom. prom. prom. prom.
Dimetro
Tipo Longitud del Metrado de Zanja Tipo de Altura Promedio Metrado de Tubera Metrado de Zanja
Item Colector (*)
Jiron/Calle/Avenida DADOS
Tramo (m) (m)
Nominal
material (m) (m) OBS (m)
Cota Terreno Cota de Fondo Altura Cota de Terreno Cota de Fondo Altura (mm) 3.51 -
Buzon N Buzon N 120 - 1.50 1.51 - 2.00 2.01 - 2.50 2.51 - 3.00 3.01 - 3.50 120 - 1.50 1.51 - 2.00 2.01 - 2.50 2.51 - 3.00 3.01 - 3.50 3.51 - 4.00 160 mm 200 mm 250 mm
(msnm) (msnm) (m) (msnm) (msnm) (m) 4.00

TP 200
88.00 62 CA. MIGUEL GRAU 1 BD-56 1298.304 1297.004 1.30 BP-08 1293.276 1292.076 1.20 44.86 43.36 200 PVC-UF 1.25 43.66 TUB. A REEMP. PAV. EN MAL ESTADO 43.36 43.36 0.00 0.00 0.00 0.00 0.00 0.00 43.66 0.00
89.00 62 CA. MIGUEL GRAU 1 BP-08 1293.276 1292.076 1.20 BD-57 1287.640 1286.440 1.20 44.86 43.36 200 PVC-UF 1.20 43.66 TUB. A REEMP. PAV. EN MAL ESTADO 43.36 43.36 0.00 0.00 0.00 0.00 0.00 0.00 43.66 0.00
90.00 63 CA. COLON 1 BD-44 1288.889 1287.689 1.20 BD-57 1287.640 1286.440 1.20 63.40 61.90 200 PVC-UF 1.20 62.20 TUB. A REEMP. PAV. EN MAL ESTADO 61.90 61.90 0.00 0.00 0.00 0.00 0.00 0.00 62.20 0.00
91.00 64 CA. MIGUEL GRAU 1 BD-57 1287.640 1286.440 1.20 BD-58 1281.436 1280.236 1.20 53.04 51.54 200 PVC-UF 1.20 51.84 TUB. A REEMP. PAV. EN MAL ESTADO 51.54 51.54 0.00 0.00 0.00 0.00 0.00 0.00 51.84 0.00###
92.00 65 CA. SAN GABRIEL 1 BD-43 1282.233 1281.033 1.20 BD-58 1281.436 1280.236 1.20 66.74 65.24 200 PVC-UF 1.20 65.54 TUB. A REEMP. PAV. EN MAL ESTADO 65.24 65.24 0.00 0.00 0.00 0.00 0.00 0.00 65.54 0.00###
93.00 66 CA. MIGUEL GRAU 1 BD-58 1281.436 1280.236 1.20 BD-59 1274.508 1273.308 1.20 67.97 66.47 200 PVC-UF 1.20 66.77 TUB. A REEMP. PAV. EN MAL ESTADO 66.47 66.47 0.00 0.00 0.00 0.00 0.00 0.00 66.77 0.00
94.00 67 CA. 28 DE JULIO 1 BD-42 1274.992 1273.792 1.20 BD-59 1274.508 1273.308 1.20 67.17 65.67 200 PVC-UF 1.20 65.97 TUB. A REEMP. PAV. EN MAL ESTADO 65.67 65.67 0.00 0.00 0.00 0.00 0.00 0.00 65.97 0.00
95.00 68 CA. MIGUEL GRAU 1 BD-59 1274.508 1273.308 1.20 BD-60 1268.666 1267.466 1.20 67.66 66.16 200 PVC-UF 1.20 66.46 TUB. A REEMP. PAV. EN MAL ESTADO 66.16 66.16 0.00 0.00 0.00 0.00 0.00 0.00 66.46 0.00
96.00 68 CA. MIGUEL GRAU 1 BD-60 1268.666 1267.466 1.20 BD-71 1265.133 1263.733 1.40 79.62 78.12 200 PVC-UF 1.30 78.42 TUB. A REEMP. PAV. EN MAL ESTADO 78.12 78.12 0.00 0.00 0.00 0.00 0.00 0.00 78.42 0.00
97.00 70 AV. LIBERTAD 1 BE-09 1330.246 1329.046 1.20 BD-77 1312.252 1311.052 1.20 68.18 66.68 200 PVC-UF 1.20 66.98 TUB. PROYECTADA 66.68 66.68 0.00 0.00 0.00 0.00 0.00 0.00 66.98 0.00
98.00 72 AV. LIBERTAD 1 BD-77 1312.252 1311.052 1.20 BD-78 1308.806 1307.606 1.20 13.99 12.49 200 PVC-UF 1.20 12.79 TUB. PROYECTADA 12.49 12.49 0.00 0.00 0.00 0.00 0.00 0.00 12.79 0.00
99.00 72 AV. LIBERTAD 1 BD-78 1308.806 1307.606 1.20 BD-79 1302.716 1301.516 1.20 38.11 36.61 200 PVC-UF 1.20 36.91 TUB. A REEMP. T/BOLONERIA 36.61 36.61 0.00 0.00 0.00 0.00 0.00 0.00 36.91 0.00
100.00 72 AV. LIBERTAD 1 BD-79 1302.716 1301.516 1.20 BD-80 1296.274 1295.074 1.20 46.21 44.71 200 PVC-UF 1.20 45.01 TUB. A REEMP. T/BOLONERIA 44.71 44.71 0.00 0.00 0.00 0.00 0.00 0.00 45.01 0.00
101.00 73 CAMINO DE VIG. 9 1 BD-75 1299.775 1298.575 1.20 BD-74 1296.745 1295.545 1.20 25.72 24.22 200 PVC-UF 1.20 24.52 TUB. A REEMP. T/BOLONERIA 24.22 24.22 0.00 0.00 0.00 0.00 0.00 0.00 24.52 0.00
102.00 74 CA. JORGE CHAVEZ 1 BD-56 1298.304 1297.004 1.30 BD-74 1296.745 1295.545 1.20 45.79 44.29 200 PVC-UF 1.25 44.59 TUB. A REEMP. T/BOLONERIA 44.29 44.29 0.00 0.00 0.00 0.00 0.00 0.00 44.59 0.00
103.00 75 CA. JORGE CHAVEZ 1 BD-74 1296.745 1295.545 1.20 BD-104 1296.727 1295.427 1.30 13.81 12.31 200 PVC-UF 1.25 12.61 TUB. A REEMP. T/BOLONERIA 12.31 12.31 0.00 0.00 0.00 0.00 0.00 0.00 12.61 0.00
104.00 75 CA. JORGE CHAVEZ 1 BD-104 1296.727 1295.427 1.30 BD-80 1296.274 1294.974 1.30 52.20 50.70 200 PVC-UF 1.30 51.00 TUB. A REEMP. T/BOLONERIA 50.70 50.70 0.00 0.00 0.00 0.00 0.00 0.00 51.00 0.00
105.00 76 AV. LIBERTAD 1 BD-80 1296.274 1294.974 1.30 BD-81 1291.483 1290.283 1.20 36.05 34.55 200 PVC-UF 1.25 34.85 TUB. A REEMP. T/BOLONERIA 34.55 34.55 0.00 0.00 0.00 0.00 0.00 0.00 34.85 0.00
106.00 76 AV. LIBERTAD 1 BD-81 1291.483 1290.283 1.20 BD-82 1286.327 1284.577 1.75 38.60 37.10 200 PVC-UF 1.48 37.40 TUB. A REEMP. T/BOLONERIA 37.10 37.10 0.00 0.00 0.00 0.00 0.00 0.00 37.40 0.00
107.00 78 AV. LIBERTAD 1 BD-82 1286.327 1284.577 1.75 BD-83 1281.169 1279.269 1.90 37.41 35.91 200 PVC-UF 1.83 36.21 TUB. A REEMP. T/BOLONERIA 35.91 0.00 35.91 0.00 0.00 0.00 0.00 0.00 36.21 0.00
108.00 79 CA. SAN GABRIEL 1 BD-58 1281.436 1280.236 1.20 BD-73 1281.208 1279.758 1.45 55.46 53.96 200 PVC-UF 1.33 54.26 TUB. A REEMP. PAV. EN MAL ESTADO 53.96 53.96 0.00 0.00 0.00 0.00 0.00 0.00 54.26 0.00
109.00 79 CA. SAN GABRIEL 1 BD-73 1281.208 1279.758 1.45 BD-83 1281.169 1279.269 1.90 60.39 58.89 200 PVC-UF 1.68 59.19 TUB. A REEMP. PAV. EN MAL ESTADO 58.89 0.00 58.89 0.00 0.00 0.00 0.00 0.00 59.19 0.00
110.00 81 CA. 28 DE JULIO 1 BD-59 1274.508 1273.308 1.20 BD-72 1274.000 1272.700 1.30 71.32 69.82 200 PVC-UF 1.25 70.12 TUB. A REEMP. PAV. EN MAL ESTADO 69.82 69.82 0.00 0.00 0.00 0.00 0.00 0.00 70.12 0.00
111.00 81 CA. 28 DE JULIO 1 BD-72 1274.000 1272.700 1.30 BD-84 1272.608 1271.408 1.20 78.14 76.64 200 PVC-UF 1.25 76.94 TUB. A REEMP. PAV. EN MAL ESTADO 76.64 76.64 0.00 0.00 0.00 0.00 0.00 0.00 76.94 0.00
112.00 82 AV. LIBERTAD 1 BE-42 1258.425 1257.225 1.20 BD-88 1251.430 1250.230 1.20 61.89 60.39 200 PVC-UF 1.20 60.69 TUB. A REEMP. PAV. EN BUEN ESTADO 60.39 60.39 0.00 0.00 0.00 0.00 0.00 0.00 60.69 0.00
113.00 82 AV. LIBERTAD 1 BD-88 1251.430 1250.230 1.20 BD-89 1246.250 1245.050 1.20 43.11 41.61 200 PVC-UF 1.20 41.91 TUB. A REEMP. PAV. EN MAL ESTADO 41.61 41.61 0.00 0.00 0.00 0.00 0.00 0.00 41.91 0.00
114.00 82 AV. LIBERTAD 1 BD-89 1246.250 1245.050 1.20 BD-90 1241.101 1239.901 1.20 43.11 41.61 200 PVC-UF 1.20 41.91 TUB. A REEMP. PAV. EN MAL ESTADO 41.61 41.61 0.00 0.00 0.00 0.00 0.00 0.00 41.91 0.00
115.00 82 AV. LIBERTAD 1 BD-90 1241.101 1239.901 1.20 BD-91 1234.933 1233.733 1.20 52.81 51.31 200 PVC-UF 1.20 51.61 TUB. A REEMP. PAV. EN MAL ESTADO 51.31 51.31 0.00 0.00 0.00 0.00 0.00 0.00 51.61 0.00
116.00 82 AV. LIBERTAD 1 BD-91 1234.933 1233.733 1.20 BD-92 1228.849 1227.649 1.20 52.81 51.31 200 PVC-UF 1.20 51.61 TUB. A REEMP. PAV. EN MAL ESTADO 51.31 51.31 0.00 0.00 0.00 0.00 0.00 0.00 51.61 0.00
117.00 82 AV. LIBERTAD 1 BD-92 1228.849 1227.649 1.20 BD-93 1221.561 1220.361 1.20 58.38 56.88 200 PVC-UF 1.20 57.18 TUB. A REEMP. PAV. EN MAL ESTADO 56.88 56.88 0.00 0.00 0.00 0.00 0.00 0.00 57.18 0.00
118.00 82 AV. LIBERTAD 1 BD-93 1221.561 1220.361 1.20 BD-94 1215.716 1214.516 1.20 57.05 55.55 200 PVC-UF 1.20 55.85 TUB. A REEMP. PAV. EN MAL ESTADO 55.55 55.55 0.00 0.00 0.00 0.00 0.00 0.00 55.85 0.00
119.00 83 CA. LIMA 1 BD-85 1267.014 1265.814 1.20 BP-15 1265.273 1264.073 1.20 62.56 61.06 200 PVC-UF 1.20 61.36 TUB. A REEMP. T/BOLONERIA 61.06 61.06 0.00 0.00 0.00 0.00 0.00 0.00 61.36 0.00
120.00 83 CA. LIMA 1 BP-15 1265.273 1264.073 1.20 BD-71 1265.133 1263.733 1.40 40.36 38.86 200 PVC-UF 1.30 39.16 TUB. A REEMP. T/BOLONERIA 38.86 38.86 0.00 0.00 0.00 0.00 0.00 0.00 39.16 0.00
121.00 85 AV. 28 DE OCTUBRE 1 BD-88 1251.430 1250.230 1.20 BD-87 1249.781 1248.581 1.20 80.37 78.87 200 PVC-UF 1.20 79.17 TUB. A REEMP. PAV. EN BUEN ESTADO 78.87 78.87 0.00 0.00 0.00 0.00 0.00 0.00 79.17 0.00
122.00 85 AV. 28 DE OCTUBRE 1 BD-87 1249.781 1248.581 1.20 BD-86 1247.362 1246.162 1.20 56.90 55.40 200 PVC-UF 1.20 55.70 TUB. A REEMP. PAV. EN BUEN ESTADO 55.40 55.40 0.00 0.00 0.00 0.00 0.00 0.00 55.70 0.00
123.00 86 AV. 28 DE OCTUBRE 1 BE-24 1256.682 1255.482 1.20 BD-63 1254.468 1253.268 1.20 60.40 58.90 200 PVC-UF 1.20 59.20 TUB. A REEMP. T/BOLONERIA 58.90 58.90 0.00 0.00 0.00 0.00 0.00 0.00 59.20 0.00
124.00 88 AV. 28 DE OCTUBRE 1 BD-63 1254.468 1253.268 1.20 BD-64 1253.113 1251.913 1.20 78.92 77.42 200 PVC-UF 1.20 77.72 TUB. A REEMP. T/BOLONERIA 77.42 77.42 0.00 0.00 0.00 0.00 0.00 0.00 77.72 0.00
125.00 89 CA. FRANCISCO BOLOGNESI 1 BD-41 1268.430 1267.230 1.20 BD-62 1261.623 1260.423 1.20 76.92 75.42 200 PVC-UF 1.20 75.72 TUB. A REEMP. PAV. EN BUEN ESTADO 75.42 75.42 0.00 0.00 0.00 0.00 0.00 0.00 75.72 0.00
126.00 89 CA. FRANCISCO BOLOGNESI 1 BD-62 1261.623 1260.423 1.20 BD-64 1253.113 1251.913 1.20 61.83 60.33 200 PVC-UF 1.20 60.63 TUB. A REEMP. PAV. EN BUEN ESTADO 60.33 60.33 0.00 0.00 0.00 0.00 0.00 0.00 60.63 0.00
127.00 90 AV. 28 DE OCTUBRE 1 BD-64 1253.113 1251.913 1.20 BD-65 1253.130 1251.580 1.55 40.94 39.44 200 PVC-UF 1.38 39.74 TUB. A REEMP. T/BOLONERIA 39.44 39.44 0.00 0.00 0.00 0.00 0.00 0.00 39.74 0.00
128.00 90 AV. 28 DE OCTUBRE 1 BD-65 1253.130 1251.580 1.55 BD-68 1252.150 1250.950 1.20 52.25 50.75 200 PVC-UF 1.38 51.05 TUB. A REEMP. T/BOLONERIA 50.75 50.75 0.00 0.00 0.00 0.00 0.00 0.00 51.05 0.00
129.00 91 CA. MIGUEL GRAU 1 BD-60 1268.666 1267.466 1.20 BD-61 1259.814 1258.614 1.20 72.46 70.96 200 PVC-UF 1.20 71.26 TUB. A REEMP. PAV. EN MAL ESTADO 70.96 70.96 0.00 0.00 0.00 0.00 0.00 0.00 71.26 0.00
130.00 91 CA. MIGUEL GRAU 1 BD-61 1259.814 1258.614 1.20 BD-68 1252.150 1250.950 1.20 71.45 69.95 200 PVC-UF 1.20 70.25 TUB. A REEMP. T/BOLONERIA 69.95 69.95 0.00 0.00 0.00 0.00 0.00 0.00 70.25 0.00
131.00 92 AV. 28 DE OCTUBRE 1 BD-68 1252.150 1250.950 1.20 BD-70 1248.755 1247.555 1.20 69.88 68.38 200 PVC-UF 1.20 68.68 TUB. A REEMP. T/BOLONERIA 68.38 68.38 0.00 0.00 0.00 0.00 0.00 0.00 68.68 0.00
132.00 92 AV. 28 DE OCTUBRE 1 BD-70 1248.755 1247.555 1.20 BD-86 1247.362 1246.162 1.20 40.21 38.71 200 PVC-UF 1.20 39.01 TUB. A REEMP. T/BOLONERIA 38.71 38.71 0.00 0.00 0.00 0.00 0.00 0.00 39.01 0.00
133.00 93 CA. PRIMAVERA 1 BE-45 1230.097 1228.897 1.20 BP-41 1221.951 1220.751 1.20 62.34 60.84 200 PVC-UF 1.20 61.14 TUB. PROYECTADA 60.84 60.84 0.00 0.00 0.00 0.00 0.00 0.00 61.14 0.00
134.00 93 CA. PRIMAVERA 1 BP-41 1221.951 1220.751 1.20 BP-40 1218.044 1216.844 1.20 29.70 28.20 200 PVC-UF 1.20 28.50 TUB. PROYECTADA 28.20 28.20 0.00 0.00 0.00 0.00 0.00 0.00 28.50 0.00
135.00 93 CA. PRIMAVERA 1 BP-40 1218.044 1216.844 1.20 BE-37 1212.368 1209.568 2.80 52.42 50.92 200 PVC-UF 2.00 51.22 TUB. PROYECTADA 50.92 0.00 50.92 0.00 0.00 0.00 0.00 0.00 51.22 0.00
136.00 94 CA. RICARDO PALMA 1 BD-04 1273.506 1270.706 2.80 BP-16 1270.683 1269.283 1.40 53.22 51.72 200 PVC-UF 2.10 52.02 TUB. PROYECTADA 51.72 0.00 0.00 51.72 0.00 0.00 0.00 0.00 52.02 0.00
137.00 94 CA. RICARDO PALMA 1 BP-16 1270.683 1269.283 1.40 BP-17 1267.398 1266.198 1.20 52.96 51.46 200 PVC-UF 1.30 51.76 TUB. PROYECTADA 51.46 51.46 0.00 0.00 0.00 0.00 0.00 0.00 51.76 0.00
138.00 94 CA. RICARDO PALMA 1 BP-17 1267.398 1266.198 1.20 BP-18 1265.104 1263.904 1.20 18.49 16.99 200 PVC-UF 1.20 17.29 TUB. PROYECTADA 16.99 16.99 0.00 0.00 0.00 0.00 0.00 0.00 17.29 0.00
139.00 94 CA. RICARDO PALMA 1 BP-18 1265.104 1263.904 1.20 BP-19 1260.336 1259.136 1.20 18.51 17.01 200 PVC-UF 1.20 17.31 TUB. PROYECTADA 17.01 17.01 0.00 0.00 0.00 0.00 0.00 0.00 17.31 0.00
140.00 94 CA. RICARDO PALMA 1 BP-19 1260.336 1259.136 1.20 BP-20 1254.673 1253.473 1.20 40.76 39.26 200 PVC-UF 1.20 39.56 TUB. PROYECTADA 39.26 39.26 0.00 0.00 0.00 0.00 0.00 0.00 39.56 0.00
141.00 94 CA. RICARDO PALMA 1 BP-20 1254.673 1253.473 1.20 BP-21 1248.065 1246.865 1.20 53.79 52.29 200 PVC-UF 1.20 52.59 TUB. PROYECTADA 52.29 52.29 0.00 0.00 0.00 0.00 0.00 0.00 52.59 0.00
142.00 96 CA. PROGRESO 1 BD-21 1271.482 1270.282 1.20 BE-25 1263.896 1262.696 1.20 69.81 68.31 200 PVC-UF 1.20 68.61 TUB. A REEMP. T/BOLONERIA 68.31 68.31 0.00 0.00 0.00 0.00 0.00 0.00 68.61 0.00
143.00 96 CA. PROGRESO 1 BE-25 1263.896 1262.696 1.20 BE-24 1256.682 1255.482 1.20 64.33 62.83 200 PVC-UF 1.20 63.13 TUB. A REEMP. T/BOLONERIA 62.83 62.83 0.00 0.00 0.00 0.00 0.00 0.00 63.13 0.00
144.00 96 CA. PROGRESO 1 BE-24 1256.682 1255.482 1.20 BE-23 1254.896 1253.696 1.20 21.98 20.48 200 PVC-UF 1.20 20.78 TUB. PROYECTADA 20.48 20.48 0.00 0.00 0.00 0.00 0.00 0.00 20.78 0.00
145.00 97 CA. PROGRESO 1 BE-23 1254.896 1253.696 1.20 BP-22 1251.532 1250.332 1.20 40.75 39.25 200 PVC-UF 1.20 39.55 TUB. PROYECTADA 39.25 39.25 0.00 0.00 0.00 0.00 0.00 0.00 39.55 0.00
146.00 97 CA. PROGRESO 1 BP-22 1251.532 1250.332 1.20 BP-21 1248.065 1246.865 1.20 54.01 52.51 200 PVC-UF 1.20 52.81 TUB. PROYECTADA 52.51 52.51 0.00 0.00 0.00 0.00 0.00 0.00 52.81 0.00
147.00 98 CA. RICARDO PALMA 1 BP-21 1248.065 1246.865 1.20 BP-24 1244.838 1243.638 1.20 54.71 53.21 200 PVC-UF 1.20 53.51 TUB. PROYECTADA 53.21 53.21 0.00 0.00 0.00 0.00 0.00 0.00 53.51 0.00
148.00 99 CA. BOLIVAR 1 BP-23 1251.243 1250.043 1.20 BP-24 1244.838 1243.638 1.20 51.75 50.25 200 PVC-UF 1.20 50.55 TUB. PROYECTADA 50.25 50.25 0.00 0.00 0.00 0.00 0.00 0.00 50.55 0.00
149.00 100 CA. RICARDO PALMA 1 BP-24 1244.838 1243.638 1.20 BE-28 1239.380 1238.180 1.20 72.82 71.32 200 PVC-UF 1.20 71.62 TUB. PROYECTADA 71.32 71.32 0.00 0.00 0.00 0.00 0.00 0.00 71.62 0.00
150.00 101 CA. SAN MARTIN 1 BD-63 1254.468 1253.268 1.20 BP-25 1247.312 1246.112 1.20 59.07 57.57 200 PVC-UF 1.20 57.87 TUB. PROYECTADA 57.57 57.57 0.00 0.00 0.00 0.00 0.00 0.00 57.87 0.00
151.00 101 CA. SAN MARTIN 1 BP-25 1247.312 1246.112 1.20 BE-28 1239.380 1238.180 1.20 67.66 66.16 200 PVC-UF 1.20 66.46 TUB. PROYECTADA 66.16 66.16 0.00 0.00 0.00 0.00 0.00 0.00 66.46 0.00
152.00 102 CA. SAN MARTIN 1 BE-28 1239.380 1238.180 1.20 BP-27 1231.806 1230.606 1.20 57.15 55.65 200 PVC-UF 1.20 55.95 TUB. PROYECTADA 55.65 55.65 0.00 0.00 0.00 0.00 0.00 0.00 55.95 0.00
153.00 102 CA. SAN MARTIN BP-27 1231.806 1230.606 1.20 BP-28 1225.864 1224.664 1.20 52.07 50.57 200 PVC-UF 1.20 50.87 TUB. PROYECTADA 50.57 50.57 0.00 0.00 0.00 0.00 0.00 0.00 50.87 0.00
154.00 102 CA. SAN MARTIN BP-28 1225.864 1224.664 1.20 BP-32 1221.787 1220.587 1.20 59.05 57.55 200 PVC-UF 1.20 57.85 TUB. PROYECTADA 57.55 57.55 0.00 0.00 0.00 0.00 0.00 0.00 57.85 0.00
155.00 102 CA. SAN MARTIN BP-32 1221.787 1220.587 1.20 BP-33 1221.132 1219.932 1.20 7.73 6.23 200 PVC-UF 1.20 6.53 TUB. PROYECTADA 6.23 6.23 0.00 0.00 0.00 0.00 0.00 0.00 6.53 0.00
156.00 102 CA. SAN MARTIN BP-33 1221.132 1219.932 1.20 BP-31 1221.608 1219.508 2.10 51.66 50.16 200 PVC-UF 1.65 50.46 TUB. PROYECTADA 50.16 0.00 50.16 0.00 0.00 0.00 0.00 0.00 50.46 0.00
157.00 103 CA. FRANCISCO BOLOGNESI BE-30 1237.671 1236.471 1.20 BP-29 1232.278 1231.078 1.20 47.45 45.95 200 PVC-UF 1.20 46.25 TUB. PROYECTADA 45.95 45.95 0.00 0.00 0.00 0.00 0.00 0.00 46.25 0.00
158.00 103 CA. FRANCISCO BOLOGNESI BP-29 1232.278 1231.078 1.20 BP-30 1228.220 1227.020 1.20 44.76 43.26 200 PVC-UF 1.20 43.56 TUB. PROYECTADA 43.26 43.26 0.00 0.00 0.00 0.00 0.00 0.00 43.56 0.00
159.00 103 CA. FRANCISCO BOLOGNESI BP-30 1228.220 1227.020 1.20 BP-31 1221.608 1219.508 2.10 51.37 49.87 200 PVC-UF 1.65 50.17 TUB. PROYECTADA 49.87 0.00 49.87 0.00 0.00 0.00 0.00 0.00 50.17 0.00
160.00 104 CAMINO DE VIG. 3 BP-31 1221.608 1219.508 2.10 BP-34 1218.722 1217.522 1.20 47.71 46.21 200 PVC-UF 1.65 46.51 TUB. PROYECTADA 46.21 0.00 46.21 0.00 0.00 0.00 0.00 0.00 46.51 0.00
161.00 104 CAMINO DE VIG. 4 BP-34 1218.722 1217.522 1.20 BP-35 1215.716 1214.516 1.20 59.19 57.69 200 PVC-UF 1.20 57.99 TUB. PROYECTADA 57.69 57.69 0.00 0.00 0.00 0.00 0.00 0.00 57.99 0.00
162.00 104 CAMINO DE VIG. 5 BP-35 1215.716 1214.516 1.20 BP-36 1215.683 1213.983 1.70 63.48 61.98 200 PVC-UF 1.45 62.28 TUB. PROYECTADA 61.98 61.98 0.00 0.00 0.00 0.00 0.00 0.00 62.28 0.00
163.00 104 CAMINO DE VIG. 6 BP-36 1215.683 1213.983 1.70 BP-37 1214.479 1213.279 1.20 76.11 74.61 200 PVC-UF 1.45 74.91 TUB. PROYECTADA 74.61 74.61 0.00 0.00 0.00 0.00 0.00 0.00 74.91 0.00
164.00 104 CAMINO DE VIG. 7 BP-37 1214.479 1213.279 1.20 BP-45 1213.327 1212.127 1.20 42.34 40.84 200 PVC-UF 1.20 41.14 TUB. PROYECTADA 40.84 40.84 0.00 0.00 0.00 0.00 0.00 0.00 41.14 0.00
165.00 104 CAMINO DE VIG. 8 BP-45 1213.327 1212.127 1.20 BP-44 1213.143 1211.743 1.40 46.32 44.82 200 PVC-UF 1.30 45.12 TUB. PROYECTADA 44.82 44.82 0.00 0.00 0.00 0.00 0.00 0.00 45.12 0.00
166.00 104 CAMINO DE VIG. 9 BP-44 1213.143 1211.743 1.40 BP-43 1212.767 1211.367 1.40 46.61 45.11 200 PVC-UF 1.40 45.41 TUB. PROYECTADA 45.11 45.11 0.00 0.00 0.00 0.00 0.00 0.00 45.41 0.00
167.00 105 CA. FRANCISCO BOLOGNESI BD-64 1253.113 1251.913 1.20 BD-66 1246.171 1244.971 1.20 65.88 64.38 200 PVC-UF 1.20 64.68 TUB. A REEMP. T/BOLONERIA 64.38 64.38 0.00 0.00 0.00 0.00 0.00 0.00 64.68 0.00
168.00 112 CA. LAS PALMERAS BD-66 1246.171 1244.971 1.20 BD-67 1245.815 1244.465 1.35 57.57 56.07 200 PVC-UF 1.28 56.37 TUB. A REEMP. T/BOLONERIA 56.07 56.07 0.00 0.00 0.00 0.00 0.00 0.00 56.37 0.00
169.00 113 CA. LOS CIPRESES BD-65 1253.130 1251.930 1.20 BD-67 1245.815 1244.465 1.35 65.12 63.62 200 PVC-UF 1.28 63.92 TUB. A REEMP. T/BOLONERIA 63.62 63.62 0.00 0.00 0.00 0.00 0.00 0.00 63.92 0.00
170.00 113 CA. LOS CIPRESES BD-67 1245.815 1244.465 1.35 BD-69 1245.546 1243.996 1.55 56.77 55.27 200 PVC-UF 1.45 55.57 TUB. A REEMP. T/BOLONERIA 55.27 55.27 0.00 0.00 0.00 0.00 0.00 0.00 55.57 0.00
171.00 114 CA. MIGUEL GRAU BD-68 1252.150 1250.950 1.20 BD-69 1245.546 1243.996 1.55 64.54 63.04 200 PVC-UF 1.38 63.34 TUB. A REEMP. T/BOLONERIA 63.04 63.04 0.00 0.00 0.00 0.00 0.00 0.00 63.34 0.00
172.00 116 CA. MIGUEL GRAU BE-36 1227.379 1226.179 1.20 BP-38 1220.618 1219.418 1.20 62.79 61.29 200 PVC-UF 1.20 61.59 TUB. PROYECTADA 61.29 61.29 0.00 0.00 0.00 0.00 0.00 0.00 61.59 0.00
173.00 116 CA. MIGUEL GRAU BP-38 1220.618 1219.418 1.20 BP-39 1218.132 1216.932 1.20 29.69 28.19 200 PVC-UF 1.20 28.49 TUB. PROYECTADA 28.19 28.19 0.00 0.00 0.00 0.00 0.00 0.00 28.49 0.00
174.00 116 CA. MIGUEL GRAU BP-39 1218.132 1216.932 1.20 BP-43 1212.767 1211.567 1.20 30.12 28.62 200 PVC-UF 1.20 28.92 TUB. PROYECTADA 28.62 28.62 0.00 0.00 0.00 0.00 0.00 0.00 28.92 0.00

10
METRADO DE RED DE ALCANTARILLADO

PROYECTO: AMPLIACION Y MEJORAMIENTO DE LOS SISTEMAS DE AGUA POTABLE Y ALCANTARILLADO DE LA LOCALIDAD DE CASCAS

Departamento: LA LIBERTAD
Provincia: GRAN CHIMU
Distrito: CASCAS
Localidad: CASCAS

EXCAVACION CON MAQUINARIA EXCAVACION MANUAL

Terreno CON BOLONERIA Terreno CON BOLONERIA TUBERIAS S-25

zanj. zanj. zanj. zanj. zanj. zanj. zanj.


Buzon de Inicio Buzon de Llegada zanj. prom. zanj. prom. zanj. prom. zanj. prom. zanj. prom. DIAM DIAM DIAM
prom. prom. prom. prom. prom. prom. prom.
Dimetro
Tipo Longitud del Metrado de Zanja Tipo de Altura Promedio Metrado de Tubera Metrado de Zanja
Item Colector (*)
Jiron/Calle/Avenida DADOS
Tramo (m) (m)
Nominal
material (m) (m) OBS (m)
Cota Terreno Cota de Fondo Altura Cota de Terreno Cota de Fondo Altura (mm) 3.51 -
Buzon N Buzon N 120 - 1.50 1.51 - 2.00 2.01 - 2.50 2.51 - 3.00 3.01 - 3.50 120 - 1.50 1.51 - 2.00 2.01 - 2.50 2.51 - 3.00 3.01 - 3.50 3.51 - 4.00 160 mm 200 mm 250 mm
(msnm) (msnm) (m) (msnm) (msnm) (m) 4.00

TP 200
175.00 117 CA. FELIX DIAZ BP-43 1212.767 1211.567 1.20 BE-37 1212.368 1211.168 1.20 12.62 11.12 200 PVC-UF 1.20 11.42 TUB. PROYECTADA 11.12 11.12 0.00 0.00 0.00 0.00 0.00 0.00 11.42 0.00
176.00 119 CA. LOS GERANIOS BD-90 1241.101 1239.201 1.90 BE-47 1239.255 1237.355 1.90 58.03 56.53 200 PVC-UF 1.90 56.83 TUB. PROYECTADA 56.53 0.00 56.53 0.00 0.00 0.00 0.00 0.00 56.83 0.00
177.00 125 PASAJE 4 BP-42 1220.211 1219.011 1.20 BE-38 1219.060 1217.860 1.20 38.03 36.53 200 PVC-UF 1.20 36.83 TUB. PROYECTADA 36.53 36.53 0.00 0.00 0.00 0.00 0.00 0.00 36.83 0.00
178.00 128 CALLE F BE-54 1220.166 1218.966 1.20 BP-49 1217.831 1216.631 1.20 60.01 58.51 200 PVC-UF 1.20 58.81 TUB. PROYECTADA 58.51 58.51 0.00 0.00 0.00 0.00 0.00 0.00 58.81 0.00
179.00 129 CALLE J BP-50 1224.255 1223.055 1.20 BP-49 1217.831 1216.631 1.20 55.75 54.25 200 PVC-UF 1.20 54.55 TUB. PROYECTADA 54.25 54.25 0.00 0.00 0.00 0.00 0.00 0.00 54.55 0.00
180.00 130 CALLE F BP-49 1217.831 1216.631 1.20 BP-48 1215.356 1214.156 1.20 56.94 55.44 200 PVC-UF 1.20 55.74 TUB. PROYECTADA 55.44 55.44 0.00 0.00 0.00 0.00 0.00 0.00 55.74 0.00
181.00 130 CALLE F BP-48 1215.356 1214.156 1.20 BP-47 1211.983 1210.783 1.20 58.50 57.00 200 PVC-UF 1.20 57.30 TUB. PROYECTADA 57.00 57.00 0.00 0.00 0.00 0.00 0.00 0.00 57.30 0.00
182.00 131 CALLE I BE-38 1219.060 1217.860 1.20 BP-47 1211.983 1210.783 1.20 69.28 67.78 200 PVC-UF 1.20 68.08 TUB. PROYECTADA 67.78 67.78 0.00 0.00 0.00 0.00 0.00 0.00 68.08 0.00
183.00 132 CALLE F BP-47 1211.983 1210.783 1.20 BE-58 1208.659 1207.459 1.20 48.06 46.56 200 PVC-UF 1.20 46.86 TUB. PROYECTADA 46.56 46.56 0.00 0.00 0.00 0.00 0.00 0.00 46.86 0.00
184.00 134 CALLE G BE-55 1213.068 1211.868 1.20 BP-54 1211.599 1210.399 1.20 44.08 42.58 200 PVC-UF 1.20 42.88 TUB. PROYECTADA 42.58 42.58 0.00 0.00 0.00 0.00 0.00 0.00 42.88 0.00
185.00 135 CALLE J BP-49 1217.831 1216.631 1.20 BP-54 1211.599 1210.399 1.20 57.03 55.53 200 PVC-UF 1.20 55.83 TUB. PROYECTADA 55.53 55.53 0.00 0.00 0.00 0.00 0.00 0.00 55.83 0.00
186.00 136 CALLE G BP-54 1211.599 1210.399 1.20 BP-53 1208.335 1207.135 1.20 60.16 58.66 200 PVC-UF 1.20 58.96 TUB. PROYECTADA 58.66 58.66 0.00 0.00 0.00 0.00 0.00 0.00 58.96 0.00
187.00 136 CALLE G BP-53 1208.335 1207.135 1.20 BP-52 1204.484 1203.284 1.20 76.65 75.15 200 PVC-UF 1.20 75.45 TUB. PROYECTADA 75.15 75.15 0.00 0.00 0.00 0.00 0.00 0.00 75.45 0.00
188.00 137 CALLE I BP-47 1211.983 1210.783 1.20 BP-51 1208.448 1207.248 1.20 45.60 44.10 200 PVC-UF 1.20 44.40 TUB. PROYECTADA 44.10 44.10 0.00 0.00 0.00 0.00 0.00 0.00 44.40 0.00
189.00 137 CALLE I BP-51 1208.448 1207.248 1.20 BP-52 1204.484 1203.284 1.20 45.60 44.10 200 PVC-UF 1.20 44.40 TUB. PROYECTADA 44.10 44.10 0.00 0.00 0.00 0.00 0.00 0.00 44.40 0.00
190.00 138 CALLE G BP-52 1204.484 1203.284 1.20 BE-60 1199.910 1198.710 1.20 36.59 35.09 200 PVC-UF 1.20 35.39 TUB. PROYECTADA 35.09 35.09 0.00 0.00 0.00 0.00 0.00 0.00 35.39 0.00
191.00 141 CALLE G BD-94 1215.716 1214.516 1.20 BE-55 1213.068 1211.868 1.20 75.09 73.59 200 PVC-UF 1.20 73.89 TUB. PROYECTADA 73.59 73.59 0.00 0.00 0.00 0.00 0.00 0.00 73.89 0.00
192.00 143 CALLE H BD-96 1202.301 1201.101 1.20 BP-56 1201.390 1200.190 1.20 54.35 52.85 200 PVC-UF 1.20 53.15 TUB. PROYECTADA 52.85 52.85 0.00 0.00 0.00 0.00 0.00 0.00 53.15 0.00
193.00 143 CALLE H BP-56 1201.390 1200.190 1.20 BE-57 1200.442 1199.242 1.20 48.32 46.82 200 PVC-UF 1.20 47.12 TUB. PROYECTADA 46.82 46.82 0.00 0.00 0.00 0.00 0.00 0.00 47.12 0.00
194.00 145 CALLE J BP-54 1211.599 1210.399 1.20 BP-55 1205.819 1204.619 1.20 57.70 56.20 200 PVC-UF 1.20 56.50 TUB. PROYECTADA 56.20 56.20 0.00 0.00 0.00 0.00 0.00 0.00 56.50 0.00
195.00 145 CALLE J BP-55 1205.819 1204.619 1.20 BE-64 1200.095 1198.895 1.20 57.70 56.20 200 PVC-UF 1.20 56.50 TUB. PROYECTADA 56.20 56.20 0.00 0.00 0.00 0.00 0.00 0.00 56.50 0.00
196.00 149 CALLE E BE-61 1195.565 1194.365 1.20 BP-58 1193.192 1191.992 1.20 56.98 55.48 200 PVC-UF 1.20 55.78 TUB. PROYECTADA 55.48 55.48 0.00 0.00 0.00 0.00 0.00 0.00 55.78 0.00
197.00 149 CALLE E BP-58 1193.192 1191.992 1.20 BP-57 1193.086 1191.336 1.75 76.82 75.32 200 PVC-UF 1.48 75.62 TUB. PROYECTADA 75.32 75.32 0.00 0.00 0.00 0.00 0.00 0.00 75.62 0.00
198.00 149 CALLE E BP-57 1193.086 1191.336 1.75 BD-66A 1193.839 1190.689 3.15 77.07 75.57 200 PVC-UF 2.45 75.87 TUB. PROYECTADA 75.57 0.00 0.00 75.57 0.00 0.00 0.00 0.00 75.87 0.00
199.00 152 EMISOR BD-97 1193.541 1189.891 3.65 BD-98 1184.424 1183.224 1.20 80.07 78.57 250 PVC-UF 2.43 78.87 EMISOR A REEMPLAZAR 78.57 0.00 0.00 78.57 0.00 0.00 0.00 0.00 0.00 78.87
200.00 152 EMISOR BD-98 1184.424 1183.224 1.20 BD-99 1177.009 1175.809 1.20 66.75 65.25 250 PVC-UF 1.20 65.55 EMISOR A REEMPLAZAR 65.25 65.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65.55
201.00 152 EMISOR BD-99 1177.009 1175.809 1.20 BD-100 1169.585 1168.385 1.20 66.75 65.25 250 PVC-UF 1.20 65.55 EMISOR A REEMPLAZAR 65.25 65.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65.55
202.00 152 EMISOR BD-100 1169.585 1168.385 1.20 BD-101 1168.800 1167.600 1.20 53.41 51.91 250 PVC-UF 1.20 52.21 EMISOR A REEMPLAZAR 51.91 51.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 52.21
203.00 152 EMISOR BD-101 1168.800 1167.600 1.20 BD-102 1169.628 1167.228 2.40 44.38 42.88 250 PVC-UF 1.80 43.18 EMISOR A REEMPLAZAR 42.88 0.00 42.88 0.00 0.00 0.00 0.00 0.00 0.00 43.18
204.00 152 EMISOR BD-102 1169.628 1167.228 2.40 BD-103 1168.404 1166.854 1.55 44.38 42.88 250 PVC-UF 1.98 43.18 EMISOR A REEMPLAZAR 42.88 0.00 42.88 0.00 0.00 0.00 0.00 0.00 0.00 43.18
205.00 152 EMISOR BD-103 1168.404 1166.854 1.55 BP-59 1168.318 1166.368 1.95 56.73 55.23 250 PVC-UF 1.75 55.53 EMISOR PROYECTADO 55.23 0.00 55.23 0.00 0.00 0.00 0.00 0.00 0.00 55.53
206.00 152 EMISOR BP-59 1168.318 1166.368 1.95 BP-60 1166.798 1165.598 1.20 47.22 45.72 250 PVC-UF 1.58 46.02 EMISOR PROYECTADO 45.72 0.00 45.72 0.00 0.00 0.00 0.00 0.00 0.00 46.02
207.00 152 EMISOR BP-60 1166.798 1165.598 1.20 BP-61 1165.625 1164.425 1.20 13.81 12.31 250 PVC-UF 1.20 12.61 EMISOR PROYECTADO 12.31 12.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.61
208.00 152 EMISOR BP-61 1165.625 1164.425 1.20 BP-62 1163.952 1162.752 1.20 51.23 49.73 250 PVC-UF 1.20 50.03 EMISOR PROYECTADO 49.73 49.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.03
209.00 152 EMISOR BP-62 1163.952 1162.752 1.20 BP-63 1163.807 1162.557 1.25 24.14 22.64 250 PVC-UF 1.23 22.94 EMISOR PROYECTADO 22.64 22.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.94
210.00 152 EMISOR BP-63 1163.807 1162.557 1.25 BP-64 1163.609 1162.159 1.45 44.93 43.43 250 PVC-UF 1.35 43.73 EMISOR PROYECTADO 43.43 43.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 43.73
211.00 152 EMISOR BP-64 1163.609 1162.159 1.45 BP-65 1162.906 1161.706 1.20 44.93 43.43 250 PVC-UF 1.33 43.73 EMISOR PROYECTADO 43.43 43.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 43.73
212.00 152 EMISOR BP-65 1162.906 1161.706 1.20 BP-66 1162.000 1160.800 1.20 18.17 16.67 250 PVC-UF 1.20 16.97 EMISOR PROYECTADO 16.67 16.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.97
213.00 152 EMISOR BP-66 1162.000 1160.800 1.20 BP-67 1160.393 1159.193 1.20 31.52 30.02 250 PVC-UF 1.20 30.32 EMISOR PROYECTADO 30.02 30.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 30.32
214.00 152 EMISOR BP-67 1160.393 1159.193 1.20 BP-68 1160.210 1159.010 1.20 20.70 19.20 250 PVC-UF 1.20 19.50 EMISOR PROYECTADO 19.20 19.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.50
215.00 152 EMISOR BP-68 1160.210 1159.010 1.20 BP-69 1160.230 1158.530 1.70 55.57 54.07 250 PVC-UF 1.45 54.37 EMISOR PROYECTADO 54.07 54.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54.37
216.00 152 EMISOR BP-69 1160.230 1158.530 1.70 BP-70 1160.496 1158.146 2.35 43.98 42.48 250 PVC-UF 2.03 42.78 EMISOR PROYECTADO 42.48 0.00 0.00 42.48 0.00 0.00 0.00 0.00 0.00 42.78
217.00 152 EMISOR BP-70 1160.496 1158.146 2.35 BP-71 1161.364 1157.814 3.55 40.22 38.72 250 PVC-UF 2.95 39.02 EMISOR PROYECTADO 38.72 0.00 0.00 0.00 38.72 0.00 0.00 0.00 0.00 39.02
218.00 152 EMISOR BP-71 1161.364 1157.814 3.55 BP-72 1158.965 1157.665 1.30 16.13 14.63 250 PVC-UF 2.43 14.93 EMISOR PROYECTADO 14.63 0.00 0.00 14.63 0.00 0.00 0.00 0.00 0.00 14.93
219.00 152 EMISOR BP-72 1158.965 1157.665 1.30 BP-73 1156.900 1155.700 1.20 60.33 58.83 250 PVC-UF 1.25 59.13 EMISOR PROYECTADO 58.83 58.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 59.13
220.00 152 EMISOR BP-73 1156.900 1155.700 1.20 BP-74 1156.199 1154.999 1.20 60.25 58.75 250 PVC-UF 1.20 59.05 EMISOR PROYECTADO 58.75 58.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 59.05
221.00 152 EMISOR BP-74 1156.199 1154.999 1.20 BP-75 1155.534 1154.334 1.20 80.00 78.50 250 PVC-UF 1.20 78.80 EMISOR PROYECTADO 78.50 78.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 78.80
222.00 152 EMISOR BP-75 1155.534 1154.334 1.20 BP-76 1155.321 1153.671 1.65 80.00 78.50 250 PVC-UF 1.43 78.80 EMISOR PROYECTADO 78.50 78.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 78.80
223.00 152 EMISOR BP-76 1155.219 1154.019 1.20 BP-77 1154.965 1153.765 1.20 61.00 59.50 250 PVC-UF 1.20 59.80 EMISOR PROYECTADO 59.50 59.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 59.80
224.00 152 EMISOR BP-77 1154.965 1153.765 1.20 BP-78 1154.782 1153.582 1.20 45.97 44.47 250 PVC-UF 1.20 44.77 EMISOR PROYECTADO 44.47 44.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.77
0.00 0.00 0.00 0.00 0.00 0.00 0.00 ###
TOTALES= 12033.74 11697.74 11764.94 11697.74 5472.87 475.04 135.68 38.72 0.00 0.00 4997.50 352.29 169.59 56.05 0.00 0.00 0.00 10543.57 1221.37
6122.31 5575.43 11764.94