Deputy Director
(Development and Construction)
To supervise the Development & Construction
Division of the Housing Department; and
European Union
Finland Russia
United Kingdom
Korea
United States
Dubai
China
Singapore
4
02. Global BIM Development
European Union
Finland Russia
4 th Government BIM Symposium was held in Beijing in Oct 2016
United Kingdom
Korea
United States
Dubai
China
Singapore
5
02. Global BIM Development
Source: BCA of Singapore
Building and Construction Authority (BCA)European Union
Regulatory Approval (BIM Requirements)
Finland Russia
Engineering Submission for all
Voluntary Submission in Native Format
new building project > 20000m2 United Kingdom
Korea
July 2013 United States July 2015 Oct 2017
Dubai
July 2014 Oct 2016
China
Architecture Submission for all Architecture & Engineering Submission Mandatory Submission in Native Format
new building project > 20000m2 for all new building project > 5,000m2
Singapore
6
02. Global BIM Development
European Union
Finland Russia
United Kingdom
Korea
United States
(MOHURD, Dubai
PRC)
China
2020
BIM
Singapore
2020
BIM90%
1.
2.
Source: MOHURD of PRC official website
http://www.mohurd.gov.cn/wjfb/201507/t20150701_222741.html
7
02. Global BIM Development
European Union
Finland Russia
EUBIM Task Group
United Kingdom
The European Commission recently awarded the EU BIM Task Group funding for two years (2016-
Korea
2017) to deliver a common European network aimed at aligning the use of Building Information
United
Modelling in public works. The States
group will be communicating its ambition at conferences around
Dubai
Europe and holding a launch event in Brussels to grow its public sector membership and engage with
industry.
China
Singapore
8
02. Global BIM Development
European Union
Finland Russia
United Kingdom
Korea
United States
Dubai for the implementation of
The U.K. mandate
Level 2 BIM on all government infrastructure
projects by 2016 China
Level 2 BIM requirements include: -
9
02. Global BIM Development
European Union
Finland Russia
United Kingdom
Korea
United States
Dubai
China
Dubai to make BIM Software mandatory for
major projects in 2015
Mandatory use of BIM extended to their
construction projects for: Singapore
a) buildings that are above 20 floors;
b) buildings and facilities and compounds with
areas larger than 200,000 sq. ft.;
c) buildings and special facilities like hospitals
and universities and all that is similar to
that;
d) all governmental projects;
e) all buildings and projects that are
requested from a foreign office.
Sources: http://www.constructionweekonline.com/article-34893-revealed-dubai-
10
municipalitys-updated-bim-mandate/
02. Global BIM Development
European Union
Finland Russia
United Kingdom
Korea
United States
Dubai
2007:
European Union
Requires IFC/BIM in its
projects and intends to have
Finland integrated
Russiamodel-based
operation in future
United Kingdom
Korea
United States
DubaiPublic Procurement Service,
U.S. GSA the Prime Ministers Office,
U.S. Army Corp of Korea
Engineers China
2016:
2008 : Using BIM compulsory for all
Mandatory BIM projects >S$50M and for all
Submission for public sector projects
Singapore
major federal
government
building projects
12
02. Global BIM Development
European Union
Finland Russia
United Kingdom
Korea
United States
Dubai
China
Singapore
13
03. BIM in Hong Kong
Project Clients
Development Bureau
CIC
(Anchor)
15
03. BIM in Hong Kong
BIM Implementation in Various Sectors
Professionals / Specialists Academia
Development Bureau
CIC
Development Bureau (Anchor)
16
03. BIM in Hong Kong
BIM Implementation in Various Sectors
Professionals / Specialists Academia
Buildings Department (Government Department)
(New PNAP ADV-34 on BIM Submission released on 9 Sep 2016)
PNAP ADV-34
On 9 th September 2016,
Buildings Department issued
a PNAPProject Clients
ADV-34 on BIM
submissions as Reference
Material for building
Development Bureau
proposals submitted to BD.
CIC
(Anchor)
17
03. BIM in Hong Kong
BIM Implementation in Various Sectors
Professionals / Specialists
Drainage Services Department Academia
(Government Department)
(BIM for Asset Management)
Project Clients
Development Bureau
CIC
(Anchor)
18
03. BIM in Hong Kong
BIM Implementation in Various Sectors
Professionals / Specialists Academia
Water Supplies Department
(Government Department)
(BIM for Utilities Design)
Project Clients
Development Bureau
CIC
(Anchor)
19
03. BIM in Hong Kong
BIM Implementation in Various Sectors
Professionals / Specialists Academia
(Government Department)
Architectural Services Department
(BIM for Statutory Submissions)
Project Clients
Development Bureau
CIC
(Anchor)
20
03. BIM in Hong Kong
BIM Implementation in Various Sectors
Professionals / Specialists Academia (Government Department)
Electrical and Mechanical Services Department
(BIM for Asset Management)
Project Clients
Development Bureau
CIC
(Anchor)
21
03. BIM in Hong Kong
BIM Implementation in Various Sectors
Professionals / Specialists Academia
CLP Power Hong Kong Limited (Public Utilities Company)
(BIM for Safety Management)
Project Clients
Development Bureau
CIC
(Anchor)
22
03. BIM in Hong Kong
BIM Implementation in Various Sectors
Professionals / Specialists Academia
Contractors
Chun Wo
Gammon
Construction Ltd. Yau Lee Group
Project Clients
Construction &
Engineering Co., Ltd.
Development Bureau
China States Construction
Hip Hing Construction Co. Ltd.
Engineering Corporation Ltd.
CIC
(Anchor)
and more...
23
03. BIM in Hong Kong
We are at a very important stage for BIM Development in HK
Photo 01
24
03. BIM in Hong Kong
What CIC has done to lead for BIM development in Hong Kong?
25
03. BIM in Hong Kong
What CIC has done to lead for BIM development in Hong Kong?
4 Major Chapters
a) Project Execution Plan
b) Modeling Methodology
c) Level of Development
d) Presentation Style & Data Organization
26
03. BIM in Hong Kong
What CIC has done to lead for BIM development in Hong Kong?
27
03. BIM in Hong Kong
What CIC has done to lead for BIM development in Hong Kong?
Aim
With local practice, to provide a quick third party method in quality checking of drawings using BIM technology before
General Building Plan (GBP) submission to statutory authorities & concerned Government Departments.
Benefits
Reduce time in manual checking
Avoid errors and rejections
Deliverables
Set of specifications, steps and
Methods to achieve a semi-automatic computational
solution
Scopes
Fundamental standards as per current Practice Notes issued
by statutory authorities and concerned Government
Gross Floor Area
Means of Escape Fire Compartment
Sanitary Fitment Provision Fire Resisting Construction
28
03. BIM in Hong Kong
What CIC has done to lead for BIM development in Hong Kong?
Aim
To establish a set of industrial specifications & common practice to
facilitate Mechanical, Electrical and Plumbing (MEP) professional
on the use of BIM in construction projects.
29
03. BIM in Hong Kong
What CIC has done to lead for BIM development in Hong Kong?
30
03. BIM in Hong Kong
What CIC has done to lead for BIM development in Hong Kong?
31
03. BIM in Hong Kong
What CIC has done to lead for BIM development in Hong Kong?
Committee on BIM
To formulate strategies for market transformation, promote the use and facilitate the application of
BIM, digital construction, and its related technologies in construction industry
To develop CIC as a Centre of Excellence for BIM in the form of a central hub and of the open
sharing platform of BIM with specific focus
To identify areas which require further investigation, promote research & development for BIM.
32
04. BIM in Housing Authority
Hong Kong Housing Authority (HKHA) implements one of the
worlds largest public housing programme
Enhance environmental
Enhance social interaction awareness
Social
Enhance health & exercise
Strengthen community
awareness for all ages
Identity
Encourage outdoor family
activities
1992
HA/HD Website 2009
MISIS GIS
1984 (Geographic
2012
Integrated System of
2001 Information DrgMS
Housing Management
COMIS System) (Drawing
(EMMS)
Management
1980 HRMS RSMS System)
2017
Structural Engineering, Statistical (Remote Site 2014 SAFD
Analysis, and financial accounting Monitoring SLIS (Semi-
applications on PC Platforms System) (Specification Automated
Library Foundation
Design)
System)
BIM & GIS Integration Lighting Daylight Statutory Thermal Value Facility
Simulation Analysis Submissions Calculation Management
(RTTV)
Value Management Automated Foundation Construction & Safety BIM & RFID 5D BIM (QTO)
Design (SAFD) Planning Integration
Ease of assembly
of site specific
blocks
Value Management
Environmental Analysis
Optimize Lighting Design for Development of more energy efficient lighting
Energy Saving operation mode (Two-level lighting design)
BIM 2D DRAWINGS
3D .dwf Files CHECKING
(REVIT)
(For Reference)
3D VIEW FOR
REFERENCE
ONLY
Walls
Typical Floor
Windows
Better understanding
of project cash flow.
RFID Tag
The contractor
documented all the detail
underground utilities and
structure in the BIM model
at construction stage.
Government Departments
BIM Institutes
Utilities Company
Academia
Photo 03
Hardware Suppliers
52
05. What is your contribution ?
BIM development areas which you can contribute on
Photo 04
Families
Construction Planning
Daylight Analysis
Photo 07 53
What is your contribution?
BIM in HK
Photo 08
54
Please contact CIC or myself:
Thank you
Referenced Photos:
http://www.plananddesign.co.uk/planning-
Photo 04
permission-application-submission
http://www.greenbim-eng.com/services/computational-
Photo 05
fluid-dynamics-cfd/
Slide 53
http://www.escoladominio.com.br/produto/curso-de-
Photo 06
design-grafico/
Photo 07 http://www.123gite.com/asset-management/