1. Benoi Shaf
Building : Ventilation building of 2 floors and 1 basement
Existing Cable : 12 Circuits
Future Cable : 2 Circuits
2. Shipyard Shaf
Building : Equipment building of 4 floors and 1 basement
Existing Cable : 9 Circuits
Future Cable : 2 Circuits
3. WJI Shaf
Building : Equipment building of 3 floors and 2 basement
Existing Cable : 12 Circuits
Future Cable : 4 Circuits
Job Description