RECOMMENDATIONS REGARDING IMPLEMENTATION OF

AVAILABILITY BASED TARIFF (A.B.T.) IN INTRA-STATE SYSTEMS

1. Availability Based Tariff (ABT), with a unique Unscheduled Interchange


(UI) component, was recommended for Central Sector generation and
private generation by M/s ECC, USA after a nation-wide, World
Bank/ADB-sponsored study in 1993-94. Govt. of India then agreed to
its early implementation, as a covenant of World Bank/ADB loans to
Power Grid Corporation of India. After constitution of the Central
Electricity Regulatory Commission (CERC) in 1998, the matter came
under the purview of CERC, which after due process in 1999 has
issued its orders and regulations on this subject starting from January
2000. ABT has since been implemented at inter-State level (i.e. for
Central generating stations), region-by-region during 2002 and 2003.

2. Following improvements have been brought about in operation of


regional grids by ABT:

(i) Grid frequency has dramatically improved from 48-52 Hz range


to 49.0-50.5Hz range for most of the time.
(ii) A higher consumer demand is being met, due to built-in
incentives to maximise generation in peak-load hours.
(iii) Generating stations are being operated according to real merit-
order, on region-wide basis, through decentralized scheduling.
(iv) Hydro-electric generation is being harnessed more optimally
than done previously.
(v) States share in Central generating stations have acquired a
new meaning and grid discipline is encouraged.
(vi) Open access, wheeling of captive generation and power trading
have been enabled by placing in position the mechanism (UI) for
handling deviations/mismatches.

1
(vii) States meet their occasional excess demand by over-drawing
from the regional grid and paying applicable UI charges to the
under-drawing States.

3. The intra-State generating stations are not yet on ABT, due to which
opportunities for further optimisation are being lost. For example, the
intra-State stations (other than those owned by the still-bundled SEB)
have no incentive presently to maximise their generation in peak-load
hours and to back down during off-peak hours. They are also not
induced to respond to grid contingencies. Scheduling disputes between
generating stations and State LDCs could arise, particularly in case of
IPPs. With the present focus on commercial aspects, it is very
desirable that ABT is applied to all intra-State stations (except those
embedded in vertically bundled licensees systems) as well, whether
SEB-owned or otherwise, for optimised utilisation of intra-State
resources.

4. Optimum utilisation of pumped storage capacity is another area of


concern. The 4x100 MW Kadamparai scheme belonging to TNEB has
been fully utilised since introduction of ABT in Southern Region. Water
is pumped up in off-peak hours when UI rate is low, and power is
generated during peak-load hours when UI rate is high. On the other
hand, in the absence of intra-State ABT/UI in Maharashtra, a similar
commercial signal is not available to Tata Power, and their 150 MW
Bhira pumped storage scheme is still not being utilised optimally.
Srisailam pumped storage scheme in Andhra Pradesh too has not
received due priority, as APGenco has no UI.

5. The foregoing has been duly appreciated by the Central Government


and the following has been stipulated in the National Electricity Policy
notified on 12.2.2005:

5.7.1(b) The ABT regime introduced by CERC at the national level


has had a positive impact. It has also enabled a credible settlement

2
mechanism for intra-day power transfers from licensees with surpluses
to licensees experiencing deficits. SERCs are advised to introduce the
ABT regime at the State level within one year.

6. As and when an SEB is unbundled and the States distribution system


is divided into zones, it would be essential that each zone has a
schedule for power that it is to receive through the State grid. The intra-
State system would then look very much like the present regional
system : a number of generating stations supplying power through a
transmission grid to a number of beneficiaries, with scheduling,
metering and energy accounting carried out by a load dispatch centre.
It would only be logical to replicate the regional system (of
shares/allocations, scheduling, metering, UI, etc), which is already tried
and proven.

7. The UI liability of a State, after unbundling, would depend on judicious


scheduling for the intra-State entities and their dynamic response. This
can all be centralised at the State LDC adopting a disciplinarian
approach, but it has the risk of being resisted and flouted. Highly
reliable communication, SCADA, AGC etc would also be required, with
associated cost and complications. A more pragmatic approach,
therefore, would be to delegate the responsibilities to the intra-State
entities for decentralised action, with UI mechanism providing the
required frame work for keeping all entities on track. In other words, it
would be desirable to apply UI on all intra-State entities which are
supposed to have a schedule.

8. While for a total compatibility with the system presently operating at the
inter-State (regional) level, it would be desirable to adopt the same
system in-toto for intra-State entities, it is recognized that there could
be valid reasons, State-specific, to deviate from the regional
mechanism. It is recommended that the concerned SERCs examine
the following issues in detail, in association with the respective
SEB/STU and pragmatically decide their approach.

3
9. Structure and components of ABT

The present ABT for Central generating stations comprises of three (3)
components : capacity charge, energy charge and UI. This structure is
rational and appropriate for the conditions prevailing in India, and
should straight-away be adopted for all intra-State generating stations.
However, incentive may be linked to plant availability, instead of linking
to PLF (as is presently done for Central Stations). Linking of incentive
to PLF effectively converts the incentive into a supplementary energy
charge, and distorts the merit order. Most Central stations being pit-
head (and, therefore, not being required to back down during off-peak
hours), do not face a major problem on this account. On the other
hand, many intra-State generating stations would be at load-centres
and/or will be liquid fuel-based. They would have a high variable cost,
would often be scheduled to back down during off-peak hours, and
would, therefore, have a lower PLF. Linking of incentive to PLF in their
case would be counter-productive and it would only be logical to link
the incentive to plant availability. Para 144 and 145 of CERC order
dated 29.3.2004 in petition no. 67/2003 may also be seen in this
connection (copy enclosed).

Certain issues have come up recently in ABT for Hydro stations,


particularly in NER. It is suggested that SERCs may exercise caution
while extending ABT to intra-State Hydro stations, or wait for resolution
of these issues by CERC (for Central stations).

10 Norms and parameters for tariff:

Various norms and parameters in the present ABT for Central


generating stations have been fixed by CERC primarily considering the
past performance of NTPC and NHPC plants. It is possible that the
performance level of the intra-State power plants, due to a variety of

4
factors, may not match those of NTPC and NHPC. In such cases, it
would be appropriate to adopt different norms and parameters, atleast
for a transition period. CEA have also prescribed certain norms
recently, and these too may be considered by SERCs.

11. Treatment of secondary oil consumption

It has been a practice so far in India to treat secondary oil consumption


as a component of energy charge. However, secondary oil is
consumed only when a coal/lignite-fired unit has to back down below
about 60% or has to be started up/shut down. During normal operation,
secondary oil should not have to be fired at all. In other words, during
normal operation (above 70% load), the variable cost of a generating
unit would comprise of only the coal cost. In order to get the energy
charge to reflect the units correct variable cost (and thereby to give the
unit a better merit-order position), it would be desirable to treat
secondary oil consumption as a component of plants fixed cost, and
recover it through capacity charge instead of energy charge. This is
particularly important for load-centre stations which would be required
to back-down during off-peak hours due to their comparatively higher
variable cost, and may be considered by SERCs at an appropriate
stage.

12. Relationship between capacity charge and plant availability

It has been suggested in para 9 above that the incentive may be linked
to plant availability. Once this is done, incentive can as well be merged
with capacity charge. The relationship between capacity charge
payment for the year and average plant availability can then have three
possible shapes, as shown in figure-I. It is our majority view that shape
(c) is more equitable than the others.

5
13. Time block for UI

In the inter-State ABT, UI is determined for each 15-minute time block.


This inherently requires 15-minute wise energy metering on all
interchange points of each regional constituent. Similar special energy
meters shall be required for all intra-State constituents if the same 15-
minute time block is to be applied intra-State. As some States already
have meters for 30-minute time-block, a question has been raised as to
whether the intra-State time block can be of 30 minutes.

The primary idea of UI is to price the deviations from schedules


according to prevailing (i.e., real time) system conditions. The time
block should, therefore, be as small as practicable, and a 5-minute time
block would be still better, theoretically. 15-minute has been a
satisfactory compromise, as regional grid operation over the last 2-3
years has shown. As such, we recommend that all States adopt a time
block of 15 minutes only, which would also enable direct back-to-back
accounting with regional UI. However, implementation of intra-State UI
should not get delayed on this account alone. It is, therefore,
suggested that following procedure may be adopted as an interim
arrangement for determination of UI charges for those intra-State
entities who are having 30 - minute meters on their periphery.

Energy actually drawn in a 30 - minute block = A


Scheduled energy for that block = B
UI energy for the 30 - minute block = (A-B)
Average frequency (regional) for first 15 minutes = C
Average frequency (regional) for second 15 minutes = D
UI rate corresponding to C = E
UI rate corresponding to D = F
UI charge for the intra-State entity, for the 30 - minutes block =(A-B)x (E+F)/2.

6
14. Maximum and minimum UI rates

The minimum UI rate at regional level is zero, corresponding to the


variable cost of overflowing hydro-electric stations. The same should
be adopted for intra-State system as well, whether a State has intra-
State hydro stations or not. (A detailed explanation of interplay
between UI rate and system marginal cost is given in ABC of ABT - a
Primer on Availability Tariff written by Shri Bhanu Bhushan).

Similarly, the maximum intra-State UI rate should basically be same as


the ceiling regional UI rate, to enable back-to-back operation of
regional and State UI pool accounts. For example, suppose a DISCOM
overdraws by 10 MW from State grid, due to which the State overdraws
10 MW from the regional grid, while frequency is 49.0 Hz. The State
shall have to pay to regional UI pool account for the overdrawal at the
ceiling rate, which is Rs. 5.70 per kWh presently. This amount should
in turn be paid by the defaulting DISCOM into the State UI pool
account. UI rate for the DISCOM should also, therefore, be Rs. 5.70
per kWh.

The present regional ceiling UI rate was specified by CERC when


diesel price was about Rs. 22 per litre. Now that the diesel price is
around Rs. 32 per litre, it may be necessary to increase the ceiling UI
rate. This matter is, however, in CERC's jurisdiction, and it is being
mentioned here only to apprise SERCs about the possibility of such an
increase so that necessary provision is kept in the concerned intra-
State regulations.

15. Threshold frequencies for UI rate

In the present relationship between frequency and regional UI rate


specified by CERC, the minimum UI rate (zero) is reached at 50.5Hz
and the maximum (ceiling) UI rate is reached at 49.0Hz. The
experience with such frequency thresholds has generally been

7
satisfactory. In any case, the intra-State UI has to necessarily have the
same frequency threshold as regional UI, for back-to-back operation of
regional and State UI pool accounts.

16. Adjustment for intra-State transmission losses

In para 14 above, it is assumed that transmission losses in intra-State


grid are not affected by the deviations from schedules (UI) of the intra-
State entities. While this simplifying assumption could be adopted to
begin with, the impact of intra-State UI on transmission losses would
have to be taken into account when one starts getting into the details.
For example, 10 MW overdrawal by a DISCOM may cause (depending
on topology and power flow scenario) an increase in intra-State
transmission loss by 0.3 MW. Consequently, the resulting overdrawal
of the State from regional grid would be 10.3 MW, and the full coverage
of States UI liability would require that the UI rate applied to the
DISCOM be 3% higher than the regional UI rate.

The incremental transmission loss would, however, change with power


flow pattern, requiring detailed studies/computations and may still be
very subjective. It is, therefore, recommended that this particular
aspect be deferred for some time, and for the present, intra-State UI
rate relationship with frequency be kept same as that at the regional
level.

17. Entities to be covered in ABT

In the first instance, intra-State ABT should be implemented for


i) all SEB/STU-owned generating stations above 10 MW
ii) all State Government-owned/State generating company- owned
generating stations above 10 MW
iii) all IPPs, i.e. private/JV-owned and any other power stations
above 10 MW, which are contracted to supply power to
SEB/STU/State Govt/DISCOMs

8
iv) all DISCOMs, as and when SEBs are unbundled, and entities
like NDMC, BEST.
v) distribution licensees who are supplied power from identified
generating stations as per an allocation.

18. UI (not the full ABT) could be implemented for


i) all entities availing Open Access
ii) all parties availing wheeling of captive generation
iii) all generating stations below 10 MW, (as a general guideline),
which are connected to the State/DISCOM grid, including non-
conventional
iv) Merchant power plants, pumped-storage plants,
v) all entities/consumers with captive/co-generation, particularly
those with a possibility of feeding power back into the grid
vi) licensees with own generation, e.g. TPC, BSES, AEC, CESC.

It is not desirable to implement ABT separately for the power plants of


licensees, as long as the concerned licensee (such as TPC and BSES
in Mumbai) continues as a vertically integrated utility. Covering the
licensee under the UI mechanism (operating on its periphery) would
suffice for inducing merit-order operation of embedded generation.

19. For implementation of ABT and UI mechanism within a State, the


activity on the critical path would be installation of special energy meters
on the periphery of all entities which are to be covered by ABT and UI.
It is recommended that the meters already field-proven, and fully
conforming to the specification used in case of Gujarat be ordered by
the respective SEB/STU on priority. Other preparatory action can
follow.

20. In conformity with section 166(4) of the Electricity Act, 2003, the SERCs
may request the respective State Governments to constitute a
Coordination Forum at the State level, which may also oversee the
implementation of intra-State A.B.T., if so decided.

9
21. Implications of not implementing A.B.T. for Intra-State Stations
As mentioned earlier, the A.B.T. as implemented for Central generating
stations comprises of three components : (a) Capacity charge, (b)
Energy charge, and (c) UI. Payment of capacity charge for
reimbursement of the annual fixed cost is linked to average plant
availability achieved over the year, which induces the plant owner to
maximise its availability, without encouraging over-generation during
off-peak hours. A power plant not on A.B.T. would either have a
single-part tariff (i.e. a constant paise/kWh rate), or a two-part tariff
(e.g. K.P. Rao formula). In case of single-part tariff, with a composite
paise/kWh rate combining fixed and variable costs, the plant owner
would have a perpetual incentive to maximise the generation, even
during off-peak hours when his plant should in fact be backing down
depending on its position in variable cost-based merit order. He
would resist if the SLDC gives him a schedule with backing down in
off-peak hours, and three possibilities would arise, as follows:
(a) SLDC issues a schedule with backing down by this station
during off-peak hours, and the station generates energy
according to the given schedule: The Station owner would suffer
a revenue loss on account of energy not generated.
(b) SLDC issues a schedule with backing down by this station
during off-peak hours, but the station does not back down: The
station will earn extra profit, while the State would under-draw
from the regional grid, and in the process suffer a loss (paying a
higher rate to the station for the extra energy, and getting paid a
lower rate for the same energy quantum from regional UI
account).
(c) SLDC is forced by the station owner to give full schedule for the
station (ignoring merit-order), and consequently requisitions only
a part of States entitlement in Central stations during off-peak
hours; The State would again suffer a loss, and SLDC could be
blamed for scheduling costlier energy while forgoing cheaper
energy from Central stations.

10
The result of the above would be a perpetual tussle between the SLDC
and the generating station, and the ultimate result would be a loss for
the State as a whole, one way or the other. The situation would
somewhat improve in case the station is on K.P. Rao tariff (in which full
fixed charges are paid even in case of backing down). However, the
experience between 1992 and 2002 clearly shows that K.P. Rao tariff
did not address all the problems and indisciplined behaviour by utilities
could not be curbed. In particular, there was nothing to discourage
SEBs from overdrawing during peak-load hours and underdrawing
during off-peak hours. There were perpetual commercial disputes as
well. While most of the problems at the inter-State level have been
addressed by implementation of A.B.T. for Central stations, similar
problems would arise between intra-State entities if sufficient care is
not taken while unbundling the SEBs. Specifically, the intra-State
mechanism must have features which (a) encourage generation
maximisation during peak-load hours, (b) encourage backing down of
generation as per merit order during off-peak hours, (c) discourage
DISCOMs from over-drawing during peak-load hours.
A.B.T. would directly provide all these. If an SERC proposes to adopt
a variant, it would have to see how the above features are incorporated
in the proposed mechanism.

22. Implications of Adopting a Balancing Mechanism different from


Regional UI
Some States are contemplating balancing mechanisms differing from
the concept of frequency-linked U.I. rate. The implications are
explained below through an example.
Suppose two States A and B have a thermal station each, both having
a variable cost of 150 paise/kWh. Suppose both have been scheduled
to generate at 90% of their available capability during off-peak hours on
a certain day. Also suppose that State-A has adopted UI mechanism
totally identical to the regional UI mechanism, but State-B has adopted
a different balancing mechanism concept in which the price of

11
balancing power, instead of being a function of frequency, is calculated
by the SLDC from time to time. Suppose it is 210 paise/kWh at a
certain time, while frequency is 49.9 Hz and corresponding regional UI
rate is 180 p/kWh. In State-A, the thermal station would see the
frequency and ramp up its generation from 90% to 100% of available
capability (say 500 MW), at an incremental expenditure of 150
paise/kWh. The 50 MW over-generation would result in 50 MW of
underdrawal by State-A, for which it would receive UI charges @ 180
paise/kWh from regional UI pool account, which would get passed on
to the thermal station. There would thus be a saving of 30 paise/kWh
on 50 MW for the thermal station of State-A, which would work out to
Rs.15000 per hour. Other utilities in State-A would not have any
financial impact on the above account.

The situation in State-B would be more complex. The thermal station


may want to increase its generation, since it would get 210 paise/kWh
against an incremental fuel expenditure of 150 paise/kWh. But this
would result in a loss for State-B DISCOMs; they would pay 210
paise/kWh to the thermal station for its extra generation, but would
receive only 180 paise/kWh from regional UI pool account for the
resulting underdrawal. Due to this anomaly, the SLDC of State-B may
not permit the thermal station to increase its generation beyond the
given schedule (90%), and the State as a whole would miss an
opportunity for some financial gain. In other words, generally speaking,
State-B may not gain anything by adopting a balancing mechanism
differing from regional UI.
There would be another issue to resolve. If a DISCOM in State-B
overdraws, it would pay 210 paise/kWh into the State UI pool account
for the energy overdrawn. The State would have to pay only 180
paise/kWh to the regional UI pool account for the consequent
overdrawal from regional grid. What is to be done with the 30
paise/kWh differential ? And it could be negative as well ! These
complications also can be avoided by extending the regional

12
frequency-linked UI rate to all intra-State entities on back-to-back
basis.

23. Revenue Balancing between DISCOMs

Because of differing consumer mix, different DISCOMs in a State may


have differing daily load curve, differing average consumer tariff and
differing realisation percentage. If power is supplied to all DISCOMs at
identical rates (as would normally be the case immediately after SEB
unbundling), it could mean widely differing amounts for meeting their
own expense. Some DISCOMs may have much bigger gaps than
others (it being unlikely that any DISCOM would be able to meet all its
obligations on its own). This situation may be further aggravated if
DISCOMs have to as well pay UI charges on back-to-back basis, as
has been recommended.

However, it needs being appreciated that revenue balancing between


DISCOMs is necessary, whether UI charges apply on them or not. The
prudent approach would be to treat all DISCOMs similarly, in respect of
generation allocation, power supply tariff, UI charges, etc., to ensure
that similar incentives apply for all. In particular, UI mechanism should
not be distorted in any manner. Only then would each DISCOM be
properly incentivised to take due care in its load forecasting, daily
requisitioning, load management planning and load curtailment if grid
situation so requires. All revenue balancing between DISCOMs may
be achieved through diversion of Government subsidy to the DISCOMs
which are relatively more negative.
Allocation of intra-State generating station capacity between
DISCOMs, as also allocation of the States entitlement in Central
stations between DISCOMs, have to be done very judiciously. These
should be on 24-hour basis only. In case it is found that a DISCOM
has a surplus in peak-load hours as well, some of its allocation should
be diverted to the needy DISCOMs, but only on a permanent, 24-hour
basis, and by the authority which is responsible for original allocation.

13
However, no restrictions should be imposed on DISCOMs regarding
trading of any off-peak or occasional surplus, either on bilaterally
contracted basis or as UI. Only in case of an allegation of sale of
power by a DISCOM to earn money while its own consumers are being
load-shed, should be SERC/ State Government look into the matter. At
times of low frequency, a DISCOM may be justified in not supplying
power to non-paying consumers, either to curtail its overdrawal (and UI
liability) or to improve its finances (by earning some UI). SERCs could
specify frequency thresholds for different consumer categories, above
which they should not be shed.

24. Captive/Co-generation and non-conventional sources


A.B.T. is basically meant for large power plants whose capacity is
assigned to one or more beneficiaries on a 24 - hour, long-term basis.
It presumes that the plant operator is able to declare the plant
availability on day-ahead basis, and is then able to supply power as per
the schedule advised by his beneficiaries. As such, A.B.T. is not an
appropriate/practicable mechanism for captive/co-generation, or for
non-conventional sources of energy (wind, solar, biomass, mini-hydel,
etc.), which are mostly unpredictable regarding their power supply
capability. For example, payment of capacity charge in A.B.T. is
dependent on MW availability declaration. If a figure cannot be
committed for the whole of the next day, capacity charge itself cannot
be determined. Further, the actual generation could vary widely, from
the given schedule (e.g. due to changes in wind speed), and a plant
could run up huge UI liability.

A.B.T. should therefore not be applied for such plants. They may
continue on the single-part tariffs as presently specified by SERCs, or
the entire power supplied by them into the grid may be treated as UI
(and paid for by the concerned DISCOM at the frequency-linked UI
rate). The logic for the latter is fairly simple. If a DISCOM receives one
MW from a captive plant or wind farm, its drawal from the State grid
would reduce by one MW. If it goes in underdrawal mode, it would

14
receive UI payment for one MW, which it can pass on to the captive
plant/wind farm, and remain financially immune.

25. UI for Open Access


Open access, as contemplated in the Electricity Act, 2003, means
supply of power by entity-A to entity-B through the electricity grid.
Power injection by A may not be constant, and may differ from
contracted amount, by a varying degree from time to time. Similarly,
power drawal by B may also vary and differ from the contracted
amount. For example, the contract between the two parties may
stipulate that A has to inject 10 MW, and B has to draw 9.5 MW (after
accounting for transmission loss in the electricity grid). The actual
injection and drawal may however be 9.0 and 10.0 MW respectively.
Commercial treatment of such a situation, which is dynamic, could be
very complex. The matter, however, becomes fairly simple if it is
stipulated that B has still to pay to A for 10 MW at contracted rate, A
has to pay at the UI rate to UI pool account for one MW of under-
supply, and B has to pay at the UI rate for 0.5 MW of over-drawal to the
UI pool account. This has already been specified by CERC for inter-
State open access, and the same approach should be stipulated by the
SERCs for intra-State open access. This necessarily requires
installation of special energy meters for all open access customers, for
recording energy 15-minutes block wise.

26. A.B.T. is generally not suitable for end-consumers of SEBs/ DISCOMs.


As and when they are allowed open access, they would have to pay
charges for contracted energy as per tariff bilaterally agreed with their
supplier, and the UI charges for deviations from contracted schedule.
This has to be duly taken care of while extending open access to end-
consumers.

*********