Anda di halaman 1dari 6

Siva Kumar

Title: Consultant
Location: Hyderabad, India
Languages: Telugu (native), English (fluent)

Experience Summary

Having 5+ years of experience in SAP Plant Maintenance (PM) with Implementation, Support,
Roll Out projects.
Configuration of PM Organizational Structure.
Expertise in understanding business process and mapping in SAP as per client requirement.
Good logical skills suitable for Business process design, development & implementation.
Configuration of Master data settings and Maintenance Process Settings for SAP PM.
Preparation of Functional Specs for new developments to reach the client requirements for
reports which are not in standard SAP.
Good communication and interpersonal skills.
Strong team orientation, hard working and enthusiastic.

KEY SKILLS:

Functional: SAP Plant Maintenance (PM)

Experience
01 Type of Industry: Manufacturing
Project ITT
Description: ITT is a leading manufacturer of highly engineered, customized solutions
for the energy, transportation and industrial markets. Legacy of
innovation is reflected in trusted products and brands including Goulds
and Bornemann pumps, KONI shock absorbers, Cannon connectors and
Enidine energy absorption devices.
Role: SAP PM Consultant

Project Duration: April 2016 to May 2017


Responsibilities: Responsible for configuration, testing of SAP Plant Maintenance.
Business process Document, Configuration document, Scenario
overview for Business process Flow
Configured order types (Corrective Maintenance, preventive
Maintenance, Calibration & Capital Order).

Resume | Copyright 2016 Capgemini. All rights reserved. Page 1 / 6


Created master data & manual configurations as per the
business requirement in testing systems for unit testing, FIT 1 to
FIT 4 & UAT.
Prepared the test scripts & uploaded in HP-ALM tool & executed
the business scenarios.
Collected all the dependency data from other team filled the
data sheet templates to execute the Integration test scenario.
Changes in configuration based on requirements of client with
change in Business Processes if required.

02 Type of Industry: Innovative


Project Solution Center
Description: Capgeminis SAP CERTIFIED Solutions:

Energy Path, Manufacturing Path, Distribution Path, Life


Sciences Path, Retail Path etc., these paths are all built on
industry leading practices and business processes
All contain Capgemini industry improvements tested,
reviewed and certified by SAP
All include industry reference models, solution templates,
layouts, reports, test scenarios and scripts
All are designed to bring quick results and ROI
All are highly scalable and will grow with the customer

Role: SAP PM Consultant

Project Duration: Dec 2014 to Dec 2015


Responsibilities: Mapping the Building Blocks for the Business process.
Configuring ZBC Sets and preparing variant files for eCATTs
(Master Data) to map Building Blocks.
Responsible for configuration, testing of SAP Plant Maintenance.
Boot camp has to be given to the clients to overview of solution
paths.
Business Process Integration testing, Configuration and Master
data Bug Fix.
Business process Document, Configuration document, Scenario
overview for Business process Flow
Integration Test Script (SAP + Cap processes), Functional
Specification, Technical specification
Modified the existing Locations, Equipment, Task list,
Maintenance Plan etc.,
Configured order types (Corrective Maintenance, preventive
Maintenance & Refurbishment Maintenance).
Collected all the dependency data from other team filled the
data sheet templates to execute the Integration test scenario.

Resume | Copyright 2016 Capgemini. All rights reserved. Page 2 / 6


Created PPTs for KT Purpose.

03 Type of Industry: Tobacco


Project BAT (British-American Tobacco)
Description:
BAT, with products sold in over 180 countries, holds leadership in more
than 50 markets and has more than 250 tobacco brands in its portfolio.
BAT undertook a major business transformation across all functions in
order to improve and support its strategic agenda. Tao program
underpins the Target Operating Model by designing and implementing a
single, standard SAP Template which will be rolled in across the
organisation.
In this assignment, the aim was to build fianc and marketing
application as transition from global system for Western Europe market.

SAP PM Consultant
Role:
Duration: April 2014 to Oct 2014
Responsibilities: Collected master Data with the business and did the
configuration.
Configured order types (Break down, preventive and
refurbishment).
Identified the maintenance items and configured strategies,
maintenance plans (Time and condition based) and scheduling
parameters.
Configuration for Master Data of technical objects, Maintenance
order planning, Maintenance order Processing.
Created master data as per the business requirement in testing
system for unit testing ITC & prepared the test scripts &
uploaded in HPQC tool executed the business scenarios.
Collected all the dependency data from other team filled the
data sheet templates to execute the ITC business scenario.
Involved in manual Build process.

04 Type of Industry: Oil & Gas


Project Shell Oil
Description:
Shell is a global group of energy and petrochemicals companies with
around 92,000 employees in more than 70 countries and territories.
Shell use advanced technologies and take an innovative approach to
help build a sustainable energy future.

Resume | Copyright 2016 Capgemini. All rights reserved. Page 3 / 6


SAP PM Consultant
Role:
Duration: July 2013 to March 2014
Responsibilities: Collected the KDS (Key Data Structure) with the business and did
the configuration as per KDS & created configuration Document
as per KDS for each config nodes.
Created master data as per the business requirement in testing
system for unit testing ITC & prepared the test scripts &
uploaded in HPQC tool executed the business scenarios.
Configured order types (Break down, preventive and
refurbishment).
Collected all the dependency data from other team (MM, FICO
etc...) filled the data sheet templates to execute the ITC business
scenario.
For ITC1 & ITC2 (Integration Testing) Prepared the test scripts &
uploaded in HPQC and executed the business scenarios.
CAT (Confirmation from business Acceptance Testing)
coordinated and guided the business local deploy team in
execution of business scenarios.
TC1, TC2, TC3 (Trial Conversion) Activities: Data cleansing and
master data upload strategy cutover Activities:-Create the
cutover plan and set the date for all task and according these
task we do all the activities.
Take the Triangle Call Every Week: In this call, I will take care of
local deploy Business and understand their difficulty in SAP and
give suggestion and solved their problems and Upload it into
GLL Links.
Given Training to new Employee from business local deploy
team.
Changes in configuration based on requirements of client with
change in Business Processes if required.

05 Type of Industry: Energy Ventures


Project KSK Energy Ventures Limited
Description: KSK is a power project development company in India, with experience
in developing and operating multiple power plants across India. They
operate in the power generation business and have long-term fuel
access to various power plants. They power projects are in various
phases of operation and development, including operational power
projects, a power project under construction and power projects in the
planning phases. We were established in 2001 to capitalize on the
emerging opportunities in the Indian power sector and focus on
developing, operating and maintaining power projects. They supply
power through a combination of long-term, medium-term and short-
term PPAs to a combination of industrial consumers and state-owned
entities in India.

Resume | Copyright 2016 Capgemini. All rights reserved. Page 4 / 6


Associate Consultant
Role:
Duration: April 2012 to June 2013
Responsibilities: Responsible for SAP Plant Maintenance Implementation, support
& training.
To analyze business requirements, to map with respect to SAP
functionalities, develop`; solution alternatives, validate, Prepared
and reviewed the business blue print for approval.
Configuration of organizational structure, units, notification.
Orders etc...
Creation of PM Master Data & managing the Technical Objects
Equipment master, Functional locations, Work center, Task list,
Maintenance plans, Bill of Material, Class, Catalog, Measuring
points.
Creation of Maintenance Task Lists, Maintenance Strategy,
Creation of Maintenance Plans for Single Cycle plans, and
Strategy controlled plans as per client requirement.
Maintaining Organization Unit & master Data in Plant
Maintenance.
Collected all the dependency data from other team filled the
data sheet templates to execute the ITC business scenario
Maintenance processing Support for End User in creation of
Notification & maintenance Order based on requirement.
Given Training to new Employee from business local deploy
team.

06 Type of Industry: Manufacturing


Project Uttam Value Steels Ltd
Description:
Uttam has expanded and diversified into core business areas, ensuring
synergy amongst its business ventures spreading over 4 plants, at 3
pivotal locations in India. The focus in manufacturing is, Steel & related
products, including upstream (Coal Based DRI) & Downstream (like
Pipes, Tubes, Engineering Products). Uttam plants/divisions are equipped
with the state of art technology, equipments and excellent infrastructure
like water, power, rail link, and townships.
Associate Consultant
Role:
Duration: June 2011 to March 2012
Responsibilities: Responsible for SAP Plant Maintenance Functional & Technical
Support.
Understanding the complete business process of PM Cycle.
Master data collection & management.
Collected master Data with the business and did the

Resume | Copyright 2016 Capgemini. All rights reserved. Page 5 / 6


configuration.
Configuration for Master Data of technical objects, Maintenance
order planning, Maintenance order Processing.
Collected all the dependency data from other team filled the
data sheet templates to execute the ITC business scenario.
Coordinated the Integration Testing and Data loading activities
through LSMW.
Preventive Maintenance & Services: Managing Task List, Single
cycle Maintenance planning, Maintenance planning with
Strategy: Time & Performance Based, Maintenance planning with
cycle of different dimensions and Condition Based Maintenance.
Generating Reports & Data Analysis on regular basis through SAP
Information System.
Responsible for Solving End user issue from Maintenance plant.

Higher Education
Bachelor of Engineering in ECE from S.K.D Engg College (JNT University)

VISA
Stamped for H1B VISA till August 2019.

Resume | Copyright 2016 Capgemini. All rights reserved. Page 6 / 6

Anda mungkin juga menyukai