PUMP HOUSE
ISSUED: 14.03.2016
No. 27-3, Fengsheng Road, Jiulongpo District,
Chongqing, PR China
17
PUMP HOUSE
DRAWING LIST
Designed by:
Drawn by:
MICHAEL CHEOK
MEP DRAWINGS
ELECTRICAL SYSTEM
ISSUED: 14.03.2016
MAIN ENTRANCE
10F
H= 49.9M
1F
H= 3.6M
4
3
3
ENTRANCE
2
1
1
EXIT
4
3
3
2
2
1
1
No. 27-3, Fengsheng Road, Jiulongpo District,
Chongqing, PR China
KEY PLAN
EXIT
07 SH - CONVENTIONAL COMBINE DETECTORS ( HEAT & SMOKE) 07 PABX - PRIVATE AUTOMATIC BRANCH EXCHANGE 7. - ENSURE THAT ALL PENETRATIONS THROUGH THE ROOF OR WALLS ARE PROPERLY
SEALED AGAINST RAIN WATER LEAKAGE DURING AND AFTER CONSTRUCTION.
08 SH - ADDRESSABLE COMBINE DETECTORS ( HEAT & SMOKE) 08 UPS - UNINTERRUPTIBLE POWER SUPPLY
17
12 FIRE PHONE
HANDSET JACK - EMERGENCY TELEPHONE JACK 12 MV - MEDIUM VOLTAGE
PUMP HOUSE
18 TM - ADDRESSABLE INPUT MODULE (TELEPHONE) 18 FR - FIRE RATED (FIRE RATED CABLE) Cad File No.:
01.China Factory Project \Output\Working Files\
MICHAEL CHEOK
21 B - ADDRESSABLE BEAM DETECTOR (TO TRANSMIT)
CONNECTION TO FACP-SLAVE 02
B AT BUILDING N0.02
CM
SH B
PUMP HOUSE
MICHAEL CHEOK