Anda di halaman 1dari 13

LOG SHEET OF DIVERSIFIED TRAINING FOR ARCHITECTS LICENSURE EXAMINATION

SUMMARY
MINIMUM
FIELD OF PRACTICE % (MAX)
CREDIT HOURS TOTAL NO. OF HOURS balance/excess
ACCOMPLISHED

ARCHITECTURAL DESIGNING/DRAFTING, STRUCTURAL CONCEPTUALIZATION,


PLANNING & THE LIKE 30% 1152 1252 A
100
PREPARATION OF CONTRACT DOCUMENTS, SPECIFICATION WRITING, BILL OF
MATERIALS, COST ESTIMATES, GENERAL CONDITIONS, BIDDING
DOCUMENTS, CLERK OF WORKS AND THE LIKE
25% 960 976 B
16
FIELD SUPERINTEDENCE, PROJECT MANAGEMENT ADMINISTRATION & THE
LIKE 15% 576 836 C 260
TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITY STUDIES, PROJECT
PROMOTIONAL, PRE-DESIGN & THE LIKES 10% 384 400 D 16
ARCHITECTURAL LAY-OUTING OF MECHANICAL ELECTRICAL, ELECTRONIC,
SANITARY, PLUMBING, COMMUNICATIONS AND OTHER UTILITY SYSTEMS,
EQUIPMENT AND FIXTURES ARCH'L LIGTHING, ACOUSTICS AND ALLIED FIELD 10% 384 528 E
OF PRACTICE
144
ARCHITECTURAL INTERIORS/SPACE PLANNING, RESTORATION/PRESERVATION
AND OTHER ANCILLARY SERVICES 10% 384 460 F 76
TOTAL 3840 4452

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
Project title: Ms. XX Residence
Location: Porac Pampanga
Conducted ar. Programming and feasibility 8 11 10 21 1 11 188
Schematic Design preparation 24 1 11 7 2 11 44
Consultation and presentation to client 8 2 11 18 2 11 36
Preparation of drawings for building permit 21 2 11 25 2 11 100
Architectural Interior space planning 28 2 11 25 3 11
Preparation of estimates, specifications and materials 28 3 11 2 5 11 92
Meeting with client and project approval 6 5 11 13 5 11 24
Application for building permit 16 5 11 23 5 11 24
Site Supervision 24 5 11 29 11 11 380
Preparation of Architectural shop drawings 1 12 11 29 12 11 48
Consultation meeting with client 4 1 12 13 1 12 32
Application for occupancy 16 1 12 31 1 12 48
Architectural Interior detailing 1 2 12 29 2 12
Final cost analysis of the project 1 3 12 23 3 12 68

TOTAL NO OF HOURS
192 232 380 280 0
PERIOD COVERED Corresponding Number of hours of Described
PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
Project title: Dr. XYZ Residence
Location: Villa Teresa, Brgy. Sto Rosario, Angeles City
Site Inspection, data gathering and analysis 2 5 12 11 5 12 64
Conducted ar. Programming and feasibility 14 5 12 25 5 12 80
Schematic Design preparation and rendering 28 5 12 15 6 12 112
Consultation and presentation to client 18 6 12 22 6 12 40
Preparation of drawings for building permit 25 6 12 17 8 12 304
Preparation of estimates, specifications and materials 20 8 12 21 9 12 184
Preparation of Bid documents and contracts 24 9 12 28 9 12 80
Architectural Interior Planning 1 10 12 12 10 12
Application for building permit 15 10 12 22 10 12 48
Site Supervision 23 10 12 27 3 13 352
Layouting of Electrical, mechanical, Sanitary, plumbing 2 2 13 27 3 13 480
Architectural show drawings 1 4 13 10 5 13 228
Preparation of Asbuilt plans 14 5 13 12 7 13 336
Architectural Interior Detailing 15 7 13 31 7 13
Application for Occupancy 1 8 13 23 8 13 96

TOTAL NO OF HOURS
980 408 416 120 480

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
Project title: ABC Medical Arts building Renovation
Location: Rizal St. Balibago Angeles City
Site Inspection, data gathering and analysis 26 8 13 30 8 13 40
Asbuilt drawing of plans 2 9 13 6 9 13 40
Schematic Design preparation and rendering 16 9 13 20 9 13 40
Layouting of Electrical, mechanical, Sanitary, plumbing 23 9 13 30 9 13 48
Preparation of estimates, specifications and materials 1 10 13 15 11 13 256
Preparation of Bid documents and contracts 18 11 13 29 11 13 80
Architectural Interior detailing and planning 2 12 13 20 12 13
TOTAL NO OF HOURS
80 336 40 0 48
Prepared by:

Ar. Jan Philippe N. Cortes


Hope it will help! Cheers and good luck!
balance/excess

100

16

260

16

144

76

hours of Described Total No. of


OP) hours
F

212
44
36 n 18
100 d 20
80 80 ja 15
92
24
24
380 53
48
32
48
76 76
68

156 1264
hours of Described Total No. of
OP) hours
F

64
80
112
40 jan 21
304 feb 20
184 mar 19
80
80 80
48 60
352
480 Site Supervision 23 10 12 28 12 12
228 Layouting of Electrical, mechanical, Sanitary, plumbing 2 2 13 27 3 13
336
104 104
96

184 2588

hours of Described Total No. of


OP) hours
F

40
40
40
48
256
80
120 120
120 624
352 760
480 480 480
LOG SHEET OF DIVERSIFIED TRAINING FOR ARCHITECTS LICENSURE EXAMINATION

SUMMARY
MINIMUM
FIELD OF PRACTICE % (MAX)
CREDIT HOURS TOTAL NO. OF HOURS balance/excess
ACCOMPLISHED

ARCHITECTURAL DESIGNING/DRAFTING, STRUCTURAL CONCEPTUALIZATION,


PLANNING & THE LIKE 30% 1152 1161 A
9
PREPARATION OF CONTRACT DOCUMENTS, SPECIFICATION WRITING, BILL OF
MATERIALS, COST ESTIMATES, GENERAL CONDITIONS, BIDDING
DOCUMENTS, CLERK OF WORKS AND THE LIKE
25% 960 976 B
16
FIELD SUPERINTEDENCE, PROJECT MANAGEMENT ADMINISTRATION & THE
LIKE 15% 576 584 C 8
TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITY STUDIES, PROJECT
PROMOTIONAL, PRE-DESIGN & THE LIKES 10% 384 386 D 2
ARCHITECTURAL LAY-OUTING OF MECHANICAL ELECTRICAL, ELECTRONIC,
SANITARY, PLUMBING, COMMUNICATIONS AND OTHER UTILITY SYSTEMS,
EQUIPMENT AND FIXTURES ARCH'L LIGTHING, ACOUSTICS AND ALLIED FIELD 10% 384 628 E
OF PRACTICE
244
ARCHITECTURAL INTERIORS/SPACE PLANNING, RESTORATION/PRESERVATION
AND OTHER ANCILLARY SERVICES 10% 384 473 F 89
TOTAL 3840 4208

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
Project title: Two storey Residential
Location: Westwood Subd. Lot. 24 Blk. 27 Brgy. Dungon Ilo-ilo City
Conducted ar. Programming and feasibility 8 4 15 26 5 15 170
Schematic Design preparation 27 5 15 8 6 15 45
Preparation of drawings for building permit 9 6 15 7 7 15 100
Architectural Interior space planning 8 7 15 20 7 15
Preparation of estimates, specifications and materials 21 7 15 22 9 15 200
Site Visitation/Supervision 23 9 15 27 10 15 120
Layouting of Electrical, mechanical, Sanitary, plumbing 28 10 15 25 11 15 100
Preparation of Architectural shop drawings 26 11 15 21 12 15 80
Architectural Interior detailing 22 12 15 29 12 15

TOTAL NO OF HOURS
225 200 120 170 100

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
Project title: Four Storey Commercial Building & Printing Press
Location: P. Burgos St. Tacloban City
Site Inspection, data gathering and analysis 4 4 16 12 4 16 56
Conducted ar. Programming and feasibility 13 4 16 11 5 16 160
Schematic Design preparation 12 5 16 20 5 16 56
Preparation of drawings for building permit 23 5 16 1 7 16 240
Preparation of estimates, specifications and materials 4 7 16 23 8 16 288
Preparation of documents and contracts 24 8 16 6 9 16 72
Architectural Interior Planning 7 9 16 23 9 16
Application for building permit 26 9 16 5 10 16 48
Site Supervision 6 10 16 13 12 16 368
Layouting of Electrical, mechanical, Sanitary, plumbing 14 12 16 6 3 17 464
Architectural shop drawing detail 7 3 17 21 4 17 256
Preparation of Asbuilt plans 24 4 17 23 6 17 344
Architectural Interior Detailing 27 6 17 14 7 17

TOTAL NO OF HOURS
896 408 424 160 464

PERIOD COVERED Corresponding Number of hours of Described


PROJECT TITLE/DESCRIPTION & LOCATION FROM TO Training (FOP)
Day Mo. Yr. Day Mo. Yr. A B C D E
Project title: Two Storey w/ Roofdeck
Location:Lot 1 Blk. 18 Phase 5, Citty Grande, Iba. Iyam, L.C.
Site Inspection, data gathering and analysis 17 7 17 21 7 17 40
Conducted ar. Programming and feasibility 24 7 17 1 8 17 56
Schematic Design preparation and rendering 2 8 17 8 8 17 40
Layouting of Electrical, mechanical, Sanitary, plumbing 9 8 17 18 8 17 64
Preparation of estimates, specifications and materials 22 8 17 27 9 17 272
Preparation of Bid documents and contracts 28 9 17 13 10 17 96
Architectural Interior detailing and planning 17 9 17 24 11 17

TOTAL NO OF HOURS
40 368 40 56 64
Prepared by:
TOTAL NO OF H
Ar. Jan Philippe N. Cortes
Hope it will help! Cheers and good luck!
TION

balance/excess

16

244

89

of hours of Described Total No. of


g (FOP) hours
E F

170
45
100 d 20
40 40 ja 15
200
120
100 100 Site Supervision 23 10 12 28
80
25 25

100 65 880

of hours of Described Total No. of


g (FOP) hours Location: Westwood Subd. Lot. 24 Blk. 27 Brgy. Dungon, Ilo-ilo City
E F

56
160 56
56
240 104 feb 20
288 mar 19
72
96 96
48 39
368
464 464 Site Supervision 23 10 12 28
256 Layouting of Electrical, mechanical, Sanitary, plumbing 2 2 13 27
344
112 112

464 208 2560

of hours of Described Total No. of


g (FOP) hours
E F

40
56
40
64 64 2
272 2
96 2
200 200 2

64 200 768 704

TOTAL NO OF HOURS
4208
12 12 352 760

ungon, Ilo-ilo City


12 12 352 760
3 13 480 480 480

Anda mungkin juga menyukai