The number of operating loader hours required per year was calculated by dividing the total tonnes
These were then divided by the number of days per year and the number of estimated operating hou
The estimate for the number of loaders operating included an allowance of 0.3 loaders for stockp
operating to 2.3. To estimate the number of loaders required in the fleet, mechanical availability and us
Haul Trucks
To determine the number of haul trucks required, the proposed haulage routes for the various mater
then used to determine travel times for the various materials (i.e. ore, waste, weathered rock, etc). Tr
presented in Table 5-18. These estimates were obtained from the rim-pull and retarding curves found
33, a mine speed limit of 50 km/h, and an estimated 3% rolling resistance. The trucks have been quo
The total cycle times included estimated travel time plus loading and spotting and dumping. Loading
dump time was estimated at 1.5 minutes for this study. A minimum total cycle time of 10 minutes for an
Theoretical haul truck productivity rates were calculated using the cycle times described above. Thes
type. These were calculated as shown in the following example:
Theoretical Production = (Minutes per Operating Hour Minutes per Cycle) x Truck Capacity
Theoretical Production = (45 Minutes per Hour 11.42 Minutes per Cycle) x 140 Tonnes
Theoretical Production = 551 tonnes per operating hour (example)
The number of trucks was estimated by determining the number of operating hours required to mov
essentially done by bench and material type and then totalled for a particular year or quarter. An examp
The number of trucks operating was then calculated by dividing the truck hours by the operating days p
Number of Trucks = Total Truck Hours (Days/Year) Op. Hrs per Day
Number of Trucks = (44,962 350) 20
Number of Trucks = 6.4 Trucks (Operating)
To estimate the number of trucks required in the fleet mechanical availability and use of availability wer
1,780
ding the total tonnes moved in a given year by the estimated productivity.
timated operating hours per day. An example calculation for the number of
2.04
0.3 loaders for stockpile re-handle thus increasing the number of loaders
2.95
for the various material types were estimated for each bench. These were
eathered rock, etc). Travel times were based on the travel speed estimates
rucks have been quoted suitably equipped with turbochargers for operation
and dumping. Loading and spotting time was estimated at 3.8 minutes and
e of 10 minutes for any individual haul was assumed.
described above. These were calculated by year, by bench and by material
ck Capacity
551
hours required to move the tonnes of material for a given period. This was
44,962
y the operating days per year and the operating hours per day.
6.4
El nmero horas operativas de carguo requerido por ao fue calculado dividiendo el total de tonnes
entonces por el numero de dias del ao y el nmero de horas operativas al da. Un ejemplo de c
presenta a continuacin.
Toneladas totales rock 9,000,000.00
Nmero de cargadores = (Tonnes totales de material/Productividad) 20 horas
Nmero de cargadores = (25,384,000 tonnes/1,780 tonnes por hora) 20 horas
Nmero de cargadores = (713 Loader days required)
(350 Das al ao)
Nmero de cargadores = 2.04 (operando) se aproxima a 2
operativos aumenta a 2.3. Para estimar la flota de cargadores, se aplican los ndices de disponibilidad
Camiones
Para determinar el nmero de camiones requerido se estimaron las rutas de transporte para los disti
para cada material (por ej. mineral, estril, roca meteorizada, etc). Los tiempos de transporte se ba
obtuvieron considerando datos del CATERPILLAR Performance Handbook Edition 33, un lmite de vel
camiones equipados con turbocompresores (turbochargers) los cuales permiten operar a grandes
El tiempo total de ciclo incluye tiempo estimado de viaje ms tiempo de espera, tiempo de carga y
tiempo de descarga en 1.5 minutos, para efectos de este estudio. Para cada transporte se asumi un
los tiempos de ciclo descritos anteriormente. Estos fueron calculados por ao, por banco, y por tipo de
Hora Operativa 45 min/hr
Minutos por ciclo 11.42 min
Produccin Terica = (Minutos por Hora Operativa Minutos por Ciclo) x Capacidad Camin
Produccin Terica = (45 Minutos por Hora 11.42 Minutos por Ciclo) x 140 Tonnes
Produccin Terica = 551 tonnes por hora operativa (ejemplo)
El nmero de camiones fue estimado determinando el nmero de horas operativas necesarias para m
por tipo de material, y luego totalizado para un ao en particular. A continuacin se presenta un ejem
programa minero.
Se calcula el nmero de camiones operativos dividiendo las horas requeridas por los das al ao y las
Nmero de Camiones = Horas Requeridas Camiones (Das por ao) Horas operativas por da
Nmero de Camiones = (44,962 350) 20
Nmero de Camiones = 6.4 Camiones (Operativos)
Para estimar el nmero de camiones requeridos en la flota, se aplican los ndices de Disponibilidad Fs
lado dividiendo el total de tonnes movilizadas en un ao dado por la productividad estimada. El resultado es dividido
erativas al da. Un ejemplo de clculo del nmero de cargadores trabajando al cuarto ao del programa minero se
aproxima a 2 0.91
luye posteriormente un margen de 0.3 cargadores para remanejo de stocks, por lo que el nmero de cargadores
Los tiempos de transporte se basaron en las velocidades estimadas presentadas en la tabla 5-18. Estas ltimas se
dbook Edition 33, un lmite de velocidad de 50 km/h, y una resistencia a la rodadura estimada de 3%. Se consideraron
ales permiten operar a grandes altitudes, por lo que no se consider una reduccin en la eficiencia del motor por
as Camin
-10% pendiente +10% pendiente
23 10
43 24
po de espera, tiempo de carga y tiempo de descarga. El tiempo de espera y carga fue estimado en 3.8 minutos y el
ara cada transporte se asumi un tiempo de ciclo mnimo de 10 minutos. La productividad terica fue calculada usando
s por ao, por banco, y por tipo de material. Estos fueron calculados como se muestra en el siguiente ejemplo.
o) x Capacidad Camin
) x 140 Tonnes 236
oras operativas necesarias para movilizar el tonelaje de material para un perodo dado. Esto fue realizado por banco y
continuacin se presenta un ejemplo de clculo del nmero de horas operativas de camiones en el cuarto ao de un
uctividad Camin
38,136
El resultado es dividido
el programa minero se
nmero de cargadores
el tiempo de transporte
de 3%. Se consideraron