Core problem
Causes
Inadequate complementary
infrastructure.
Solution IMPROVEMENT OF THE LEVEL OF SOCIOCULTURAL DEVELOPMENT OF THE DISTRICT OF
AYACUCHO - HUAMANGA - AYACUCHO
Tree
Satisfaction of parents High School Performance. Under percentage of
Ends desertion School and
dismissed
Goal
Means
Adequate complementary
infrastructure.
" Installation line of transmission 66 kv Combapata -
Llusco and extension S.E Combapata - Region
Cusco "
Problem Socioeconomic, commercial and industrial delay of the area of the project
tree
Core problem
Causes
Insufficient aptitude of
Service with Increase of
electrical infrastructure to
restriction of load voltage drops
attend to the new loads
Insufficient
Inadequate Electrical
capacity of Distribution substations
configuration of system needs
transmission overloaded
the electrical reconfiguration
existing system
Solution There is no socioeconomic, commercial and industrial delay of the area of the project
Tree
High commercial and Decrease of economic
industrial capacity in the losses for the company
Ends
zone of the project
Goal
Means
Sufficient aptitude of
Service without Decrease of
electrical infrastructure to
restriction of load voltage drops
attend to the new loads
Electrical
Adequate Sufficient capacity
system doesnt Substations of not
configuration of of transmission
needs overloaded distribution
the electrical
reconfiguration
existing system
Extension of the capacity of attention hospitable
flexible before emergencies and disasters in
Metropolitan Lima
Problem High rate of morbidity and mortality in Metropolitan Lima population Disaster
Tree
High morbidity and mortality High morbidity and mortality in the
in the population generates population vulnerable
Effect
Core problem
Causes
Deficient offer of Inadequate
services of health processes before a
before a disaster disaster
Tree
Low morbidity and mortality Low morbidity and mortality in the
in the population generates population vulnerable
Ends
Goal
Means
Efficient provision
Appropriate
of health services
processes Disaster
to disaster
Tree
Limited supply service and on
Increased migration centres
Low quality of life health and education
Urban
Effect
Assignment small
Ignorance of existing
There is no generation of technology for
technologies to improve
the new labor markets. development
quality of life
Health and education
Core problem
134 rural localities of the district of San Ignacio disjointed and unrelated to
the Basic Electric Service
Causes
Not taking advantage of High cost for
energy potential and domiciliary generation
existing electrical systems of energy
Nonexistence of infrastructure
Lack of modern systems to
for renewable energy use or
generate electrical domiciliary
conventional
energy
Solution Socioeconomic and Cultural development of the district of San Ignacio
Tree
Decrease of the emigration
Limited supply service and on
to the congested urban
Low quality of life health and education
zones
Ends
Appropriate technology
Knowledge of existing
New generation of labor assignment for
technologies to improve
markets development of
quality Life
Health and education
Goal
134 rural localities of the district San Ignacio linked to Basic Service Electric
Power
Means
Utilization of the energetic Under cost for
potentials and electrical generation of
existing systems domiciliary energy
Availability of infrastructure to
take advantage of energy Availability of modern systems to
Renewables or conventional generate electricity domiciliaria
"Creating the paleontological park in Villa El
Salvador, province of Lima - Lima".
Problem Decrease of the cultural activity in metropolitan Lima
Tree
Decrease of the preference of the
population of being present at
cultural centers
Effect
Core problem
Causes
Decrease of
infrastructure for Insufficient
Insufficient Insufficient Insufficient promotion
the development infrastructure of
equipment qualified and diffusion
and thematic of complementary
and furniture personnel
cultural activities services
Improvement of the
Increase of the participation
access of the
of the population in cultural
population to the
activities
cultural services
Goal
Means
Increase of Sufficient
infrastructure for Sufficient Sufficient Sufficient
infrastructure of qualified promotion and
the development equipment and
and thematic of
complementary furniture personnel diffusion
cultural activities services
Causes Inadequate use of the space where the intervention will be executed
Low concentration of
Adequate conditioning suspended particles in Adequate space for
of tourist areas summer to damage the recreation
health and welfare
Goal
Means Adequate use of the space where the intervention will be executed
Effect
Core problem
Causes
Limitadas
Carencia de Limitadas capacidades
capacidades
Infraestructura tcnicas y de gestin de
tcnicas y de
Urbana Basica y Eq la Poblacin
gestin del GL