Anda di halaman 1dari 9

RISK ASSESSMENT AND CONTROL MEASURES IN A CONSTRUCTION INDUSTRY

Project submitted to the

IIPHS FIRE & SAFETY MANAGEMENT COLLEGE

Approved collaborative college of

ALAGAPPA UNIVERSITY

(A State University Accredited with A Grade by NAAC)

In partial fulfillment of the requirements

For the award of the degree in

BACHELOR OF SCIENCE (F&ISM)

BY

VIVEKANANDAN.P

Enrollment No: 129100050

Under guidance of and of supervision of

Mr. P.ARUL B.Sc., DIS., OSHA

Lecturer in safety inspection and audit

IIPHS FIRE & SAFETY MANAGEMENT COLLEGE

Approved Collaborative College of ALAGAPPA UNIVERSITY

(A State University Accredited with A Grade by NAAC)

S.Melur, Trichy Airport Road, Pudukkottai Dist. T.N. India 622 501.

2014-2015
Mr.P.Arul B.Sc., DIS., OSHA.
Lecturer in safety inspection and audit,
IIPHS Fire & Safety Management College,
S.Melur,
Pudukkottai-622 501

CERTIFICATE

This is to certify that the project entitled RISK ASSESSMENT AND CONTROL MEASURES
IN A CONSTRUCTION INDUSTRY is the bonafide project carried out by
Mr.VIVEKANANDAN.P the academic year 2014-2015 submitted to the IIPHS Fire & Safety
management college, collaborative college of Alagappa university in partial fulfillment of the
requirements for the award of degree of Bachelor of Science (F&ISM) and that project, has not
previously formed the basis for the award to the project represent independent and original work
on the part of the candidate under my guidance and supervision.

Place: Signature

Date: (P.Arul)
IIPHS FIRE & SAFETY MANAGEMENT COLLEGE
Approved collaborative college of ALAGAPPA UNIVERSITY
(A State University Accredited with A Grade by NAAC)
S. Melur, Trichy Airport Road, Pudukkottai Dist.
Tamil Nadu. India Pin-622 501.

Enrollment No: 129100013


CERTIFICATE

Certified that this project report RISK ASSESSMENT AND CONTROL MEASURES IN
A CONSTRUCTION INDUSTRY is the bonafide work of Mr. VIVEKANANDAN.P
Carried out the project under my supervision for the final year B.Sc., Fire and
Industrial Safety Management in the academic year 2014-2015.

Signature of the Guide Signature of the Principal

Submitted for the University Examination on _________

Internal Examiner External Examiner


VIVEKANANDAN.P
B.Sc (F&ISM)., STUDENT,
IIPHS Fire & Safety Management College,
S.Melur,
Pudukkottai-622 501.

DECLARATION

We hereby declare that the work entitled RISK ASSESSMENT AND CONTROL
MEASURES IN A CONSTRUCTION INDUSTRY submitted for the degree, Bachelor of
Science (F&ISM), is my original work and the project work has not formed the basis for the award
of any degree, diploma , associate ship, fellow ship or any other similar title.

Place: Signature of the students,

Date: VIVEKANANDAN.P

ERUTHAYARAJ.J

SANTHOSH BABU.C

VETRI ARASU.M

RAVI.P
ACKNOWLEDGEMENT

First, my heartfelt thanks to GOD ALMIGHTY for making this efforts fruitful.

At the foremost I thank my PARENTS without whom nothing would have been possible.
The satisfaction and euphoria that accompanies the successful completion of any task would be
incomplete without the mention of the people who made it possible.

First of all, I thank our respectable Joint director Mr.G.MURUGANANDAM, M.A.,M.Phil., and
Mrs.E.SHANTHI,DECE.,M.A.,M.Phil.,(Correspondent) and Mr. MOHAMMED RIZWAN
(CEO) for providing Golden opportunity.

I express our sincere thanks to my guide Mr.P.ARUL B.Sc., DIS., OSHA. For his support,
valuable guidance, encouragement and unreserved co-operation extended at each stage for doing
this project work.

My special thanks to

Mr. ELANGOVAN.P B.Sc.,

Mr. RAJASEKAR.G DECE., B.Sc (F&ISM)

Mr. DEVKUMAR.V.N BE. MBA.,DFSE.,NEBOSH.

Mr. RAVI.S BE.,

Mr. SAJU KUMAR.V B.Sc., DFSE.

Mr. SIVAGURU ASAIPILLAI.A BE,

Mr. EESWARAN.C BE,

I wish to thank all our staff members and friends and all others who have directly or indirectly
helped us to bring out this project successfully.
Abstract

The project describes, on the basis of a risk assessment and control measures in construction
industry activities the construction industry's perception of risk associated with its activities
and the extent to which the industry uses risk assessment techniques. It concludes that risk
assessment is essential to construction activities in minimizing losses and enhancing
profitability. Construction activities risk is generally perceived as events that influence
project objectives of cost, time and quality. Risk assessment and control measures in
construction depend mainly on intuition, judgement and experience. This risk assessments
are prepared in the following construction industry activities of Excavation for Effluent
treatment plant(ETP), Scaffold erection for outer plastering in a G + 14 MSB, Explosive
blasting, Crane operation to position a Truss work of 100 MT weight in an Air port and
suggest the suitable control measures is based upon the ALARA/ALARP region.

Risk assessment involves identifying risks, assessing them and then developing control strategies
to manage them. Risks can be assessed qualitatively and quantitatively. The project
emphasizes the identification and assessment of various risks in case of construction
industry projects. The evaluation of risks can help in prioritizing risks for effective risk
assessment and successful completion of a project.
Content
S.NO TITLE PAGE.NO REMARKS

1.
Excavation for effluent treatment
plant(ETP)

1.0.Planning

2.0.Scope

3.0.Referrences

4.0. Definition

5.0. Excavation hazards

6.0. Requirements for protective system

7.0. Blasting

8.0.work permit system

9.0.Risk assessment
2.
Scaffold erection for outer plastering
work G+14
1.0.Planning

2.0.Scope

3.0.References

4.0.Definition

5.0.Types of scaffold

6.0. Scaffolding components

7.0.Classifications of scaffold

8.0. scaffold tag system

9.0. permit system

10.0. Risk assessment


3.
Explosive blasting

1.0.Planning

2.0.Scope

3.0.References

4.0. Definition

5.0.Types of Explosives

6.0. Exploder system

7.0. General terms of explosive blasting

8.0.Permit system

9.0.Risk assessment
4. Crane operation to position a trusses an
airport

1.0.Planning

2.0.Scope

3.0.References

4.0.General terms of crane

5.0.Crane specifications

6.0.Lifting gears

7.0. Hand signals

8.0.Lifting documents

9.0.Risk assessment