10/15/2017
10/22/2017
10/29/2017
11/12/2017
11/19/2017
11/26/2017
12/10/2017
12/17/2017
12/24/2017
12/31/2017
AYARA Bobot Bobot
1/16/2017
1/22/2017
1/29/2017
2/12/2017
2/19/2017
2/26/2017
3/12/2017
3/19/2017
3/26/2017
4/16/2017
4/23/2017
4/30/2017
5/14/2017
5/21/2017
5/28/2017
6/11/2017
6/18/2017
6/25/2017
7/16/2017
7/23/2017
7/30/2017
8/13/2017
8/20/2017
8/27/2017
9/10/2017
9/17/2017
9/24/2017
10/1/2017
10/8/2017
11/5/2017
12/3/2017
2/5/2017
3/5/2017
4/2/2017
4/9/2017
5/7/2017
6/4/2017
7/2/2017
7/9/2017
8/6/2017
9/3/2017
SAT. VOL. SAT. VOL.
N (%) (%)
Minggu ke 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
- ###DIVISI 1. UMUM
1.2 ###Mobilisasi LS 1.00 2.021 LS 1.00 2.021 0.510 0.505 0.505 0.500
100
1.8.(1)
1.17
###Manajemen dan Keselamatan Lalu Lintas
###Pengamanan Lingkungan Hidup
LS
LS
1.00
1.00
0.329
0.154
LS
LS
1.00
1.00
0.329
0.154
0.005
0.000
0.005
0.005
0.013
0.007
0.022
0.006
0.013
0.006
0.013
0.006
0.013
0.006
0.013
0.006
0.013
0.006
0.013
0.006
0.013
0.006
0.013
0.006
0.013
0.006
0.013
0.006
0.005
0.006
0.005
0.006
0.001
0.006
0.084
0.006
0.010
0.006
0.010
0.006
0.010
0.001
0.010
0.018
0.010
0.012 L 0.008
0.006
I
1.19(2) ###Sistem Manajemen K-3 Konstruksi LS 1.00 0.542 LS 1.00 0.542 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021
1.21 ###Manajemen Mutu LS 1.00 0.303 LS 1.00 0.303 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
###
2.1.(1)
- ###DIVISI 2. DRAINASE
###Galian untuk Selokan Drainase dan Saluran Air M3 7,950.00
2,770.56
1.212
12.149
M3
M3
5,722.20
2,736.98
0.872
12.001
0.010 0.020
0.100
0.030
0.120
0.040
0.200
0.045
0.200
0.060
0.350
0.222
0.450
0.222
0.500
0.222
0.600 1.354 1.354 1.354 1.354 1.354 1.354 1.354
B 90
U
2.2.(1) ###Pasangan Batu dengan Mortar M3
2.3.(4) ###Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - M1 50.00 0.819 M1 38.00 0.622 0.207 0.207 0.207
105 cm
3.1.(7)
- ###DIVISI 3. PEKERJAAN TANAH
###Galian Perkerasan Beraspal tanpa Cold Milling Machine
3.2.(1a) ###Timbunan Biasa dari Sumber Galian
M3
M3
2.25
3,279.38
0.004
1.759
M3
M3
4.50
2,215.00
0.008
1.188
0.001
0.066
0.001
0.066
0.005
0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066
R 80
3.2.(2a) ###Timbunan Pilihan dari Sumber Galian M3 450.51 0.545 M3 2,640.00 3.194 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188
Catatan : 0.5
*25 Desember 2017 libur Natal 0.26 ###
20190359651.32 2.73
Kasatker PJN Wilayah I 2.47 Pejabat Pembuat Komitmen 07 Konsultan Penyedia
Provinsi Sumatera Utara (Balige, cs) PT. Marlo Karya Mandiri PT. Lian Surya
1/16/2017
1/22/2017
1/29/2017
2/12/2017
2/19/2017
2/26/2017
3/12/2017
3/19/2017
3/26/2017
4/16/2017
4/23/2017
4/30/2017
5/14/2017
5/21/2017
5/28/2017
6/11/2017
6/18/2017
6/25/2017
7/14/2017
SAT. VOL. Bobot (%) SAT. VOL. Bobot (%)
2/5/2017
3/5/2017
4/2/2017
4/9/2017
5/7/2017
6/4/2017
7/2/2017
7/9/2017
RAN
Minggu ke 1 2 3 4 5 6 7 8 9 10 11 12 12 14 15 16 17 18 19 20 21 22 23 24 25 26 27 ###
DIVISI 1. UMUM L
1.2 Mobilisasi LS 1.00 2.537 LS 1.00 2.537 0.53 0.63 0.73 0.634 100###
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 0.414 LS 1.00 0.414 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 ###
1.17 Pengamanan Lingkungan Hidup LS 1.00 0.194 LS 1.00 0.194 0.0081 0.0081 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 I 0.008 ###
1.19(2) Sistem Manajemen K-3 Konstruksi LS 1.00 0.680 LS 1.00 0.680 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 ###
1.21 Manajemen Mutu LS 1.00 0.380 LS 1.00 0.380 0.0152 0.0152 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 ###
90 ###
DIVISI 2. DRAINASE
B ###
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 7,950.00 1.521 M3 5,722.20 1.095 0.010 0.020 0.030 0.040 0.045 0.060 0.297 0.297 0.297 ###
2.2.(1)
2.3.(4)
Pasangan Batu dengan Mortar
Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm
M3
M1
2,770.56
50.00
15.249
1.028
M3
M1
2,736.98
38.00
15.065
0.781
0.100 0.120 0.200 0.200 0.350
0.260
0.450
0.260
0.500
0.260
0.600 1.354 1.354 1.967 1.967 1.967 1.967 1.967
U ###
###
80 ###
3.1.(7)
DIVISI 3. PEKERJAAN TANAH
Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 2.25 0.005 M3 4.50 0.010 0.002 0.002 0.007 R ###
###
3.2.(1a) Timbunan Biasa dari Sumber Galian M3 3,279.38 2.207 M3 2,215.00 1.491 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.104 0.104 0.104 0.104 0.104 0.104 0.104 0.104 ###
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 450.51 0.684 M3 4.009 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.188 0.278 0.278 0.278 0.278 0.278 0.278 0.278 0.278 0.278 ###
2,640.00
L 70 ###
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN ###
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 1,878.19 6.923 M3 1,800.00 6.635 0.481 0.481 0.481 0.481 0.481 0.481 0.750 0.750 0.750 0.750 0.750 ###
E ###
DIVISI 5. PERKERASAN BERBUTIR ###
5.1.(1) Lapis Pondasi Agregat Kelas A M3 4,695.47 18.579 M3 4,500.00 17.805 0.350 0.350 0.350 0.350 1.278 1.278 1.278 1.278 1.382 1.382 2.003 2.106 2.106 2.313 60 ###
6.3(6a) Laston Lapis Antara (AC-BC) Ton 3,357.13 25.891 Ton 3,340.80 25.765 1.718 1.718 1.718 1.718 1.718 1.718 1.718 1.718 1.718 1.718 1.718 1.718 1.718 1.718 1.718 ###
6.3.(8) Bahan anti pengelupasan Kg 896.35 0.537 Kg 837.37 0.501 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033 0.033
R ###
###
DIVISI 7. STRUKTUR ###
10.00 0.163 M3 0.375 0.075 0.075 0.075 0.075 0.075 40 ###
A
7.1 (7) a Beton mutu sedang fc= 20 MPa M3 23.00
7.1 (10) Beton mutu rendah fc= 10 Mpa M3 3.00 0.027 M3 3.80 0.035 0.007 0.007 0.007 0.007 0.007 ###
7.3 (1) Baja Tulangan U 24 Polos Kg 1,250.00 0.206 Kg 2,875.00 0.474 0.095 0.095 0.095 0.095 0.095 ###
7.9.(1) Pasangan Batu M3 686.14 3.956 M3 487.49 2.811 0.281 0.281 0.281 0.281 0.281 0.281 0.281 0.281 0.281 0.281 ###
N 30 ###
###
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.3.(3) Pohon Jenis . Buah 160.00 0.0952 Buah 220.00 0.1309 0.065 0.065 ###
8.4.(1) Marka Jalan Termoplastik M2 1,054.50 1.067 M2 1.154
KURVA S (KONTRAK AWAL) 0.385 0.385 0.385 ###
1,140.50
8.4.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade Buah 37.00 0.244 Buah 37.00 0.244 KURVA S (KONTRAK ADDENDUM) 0.122 0.122 ###
8.4.(5) Patok Pengarah Buah 120.00 0.234 Buah 120.00 0.234 0.117 0.117 ###
8.4.(6a) Patok Kilometer Buah 4.00 0.020 Buah 0.020 0.010 0.010
20 ###
4.00
8.4.(7) Rel Pengaman M1 300.00 2.080 M1 300.00 2.080 1.040 1.040 ###
REKONSTRUKSI JALAN
JADWAL PELAKSANAAN PEKERJAAN PEMELIHARAAN RUTIN KONDISI
34
BULAN
KONTRAK AWAL ADDENDUM 1
Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
NO. MATA
PEMBAYARA URAIAN PEKERJAAN
14/May/17
21/May/17
28/May/17
12/Mar/17
19/Mar/17
26/Mar/17
12/Nov/17
19/Nov/17
26/Nov/17
13/Aug/17
20/Aug/17
27/Aug/17
10/Sep/17
17/Sep/17
24/Sep/17
10/Dec/17
17/Dec/17
24/Dec/17
31/Dec/17
12/Feb/17
19/Feb/17
26/Feb/17
Ket.
16/Apr/17
23/Apr/17
30/Apr/17
15/Oct/17
22/Oct/17
29/Oct/17
11/Jun/17
18/Jun/17
25/Jun/17
22/Jan/17
29/Jan/17
7/May/17
5/Mar/17
16/Jul/17
23/Jul/17
30/Jul/17
6/Aug/17
5/Nov/17
3/Sep/17
3/Dec/17
5/Feb/17
2/Apr/17
9/Apr/17
1/Oct/17
8/Oct/17
4/Jun/17
2/Jul/17
9/Jul/17
N
SAT. VOL. Bobot (%) SAT. VOL. Bobot (%)
Minggu Ke 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 ###
- ### - - - 90
###
-### - - -
U ###
- ### - - - R ###
- ### - - - ###
- ###DIVISI 7. STRUKTUR - -
E 60
###
- ### - - -
B ###
SKh-1.10.a(10) Campuran Aspal Panas 69.935 1,083.601 96.068 0.0050 0.8000 0.8600 0.4000 0.5000 1.0000 0.5000 0.6500 0.7500 0.5000 0.2000 0.5000 0.8000 0.5000 0.6000 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 2.8768 0.5000 0.5000 0.1000 0.1000 ###
M3 965.33 M3
SKh-1.10.a(17) Pengendalian Tanaman -
LS -
SKh-1.10.2(5) Pembersihan jembatan
M2 -
- 10
SKh-1.10.2(5) Pengecatan sederhana - ###
M2 -
SKh-1.10.2(5) Pasangan Batu - ###
M3 -
00
-
JUMLAH TOTAL 100.00 100.00
RENCANA PROGRESS MINGGUAN (AWAL) 0.015 0.816 0.880 0.516 0.660 1.180 0.700 1.320 1.420 1.170 0.870 1.170 1.470 1.170 1.270 1.670 2.670 3.370 2.061 2.870 2.000 2.699 - 2.300 1.960 2.359 1.600 2.759 2.940 3.126 3.237 3.039 3.128 3.127 2.926 3.217 3.116 3.425 3.346 3.437 2.917 2.824 2.905 2.670 2.670 2.670 1.166 0.919 0.120 0.120
AKUMULASI RENCANA PROGRESS MINGGUAN (AWAL) 0.02 0.83 1.71 2.23 2.89 4.07 4.77 6.09 7.51 8.68 9.55 10.72 12.19 13.36 14.63 16.30 18.97 22.34 24.40 27.27 29.27 31.97 31.97 34.27 36.23 38.59 40.19 42.95 45.89 49.02 52.25 55.29 58.42 61.55 64.47 67.69 70.81 74.23 77.58 81.02 83.93 86.76 89.66 92.33 95.00 97.67 98.84 99.76 99.88 100.00
RENCANA PROGRESS MINGGUAN (ADD-1) 0.02 0.82 0.88 0.42 0.53 1.04 0.55 0.71 0.81 0.56 0.26 0.56 0.86 0.56 0.66 2.94 2.94 2.94 2.94 2.94 2.94 2.94 0.00 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 2.94 3.24 3.24 0.87 0.92 0.12 0.12
AKUMULASI RENCANA PROGRESS MINGGUAN (ADD-1) - 0.02 0.83 1.71 2.14 2.66 3.70 4.25 4.96 5.77 6.33 6.60 7.16 8.02 8.58 9.24 12.17 15.11 18.05 20.99 23.92 26.86 29.80 29.80 32.74 35.67 38.61 41.55 44.49 47.42 50.36 53.30 56.24 59.17 62.11 65.05 67.98 70.92 73.86 76.80 79.73 82.67 85.61 88.55 91.48 94.73 97.97 98.84 99.76 99.88 100.00
DEVIASI -
3.190619481 2.699045755 2.511225413 10.96241705 10.07 12.59 13.00829491 13.00829491 12.5886725 13.27176974 5.74
0.364714286 0.377142857 3.555333766 6.254379521 8.765604934 19.72802198 29.80 42.38763248 55.39592739 68.40422231 80.9928948 94.26466454 100.00
Catatan : 0.30351
* 25 Desember 2017 libur Natal - 2.015
20190359651.32 -
Kasatker PJN Wilayah I - Pejabat Pembuat Komitmen 07 Konsultan Penyedia
Provinsi Sumatera Utara 0.708 (Balige, cs) PT. Marlo Karya Mandiri PT. Lian Surya
0.22668
2.36
BULAN
NO. MATA
PEMBAYARA URAIAN PEKERJAAN SAT. VOL. Bobot (%) Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember Ket.
N
14/May/17
21/May/17
28/May/17
12/Mar/17
19/Mar/17
26/Mar/17
12/Nov/17
19/Nov/17
26/Nov/17
13/Aug/17
20/Aug/17
27/Aug/17
10/Dec/17
17/Dec/17
24/Dec/17
31/Dec/17
12/Feb/17
19/Feb/17
26/Feb/17
10/Sep/17
17/Sep/17
24/Sep/17
15/Oct/17
22/Oct/17
29/Oct/17
16/Apr/17
23/Apr/17
30/Apr/17
11/Jun/17
18/Jun/17
25/Jun/17
22/Jan/17
29/Jan/17
7/May/17
5/Mar/17
5/Nov/17
16/Jul/17
23/Jul/17
30/Jul/17
6/Aug/17
3/Dec/17
5/Feb/17
3/Sep/17
1/Oct/17
8/Oct/17
2/Apr/17
9/Apr/17
4/Jun/17
2/Jul/17
9/Jul/17
Minggu ke 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
- ###DIVISI 1. UMUM -
L
100
- ### - - -
- ###DIVISI 2. DRAINASE - -
I
90
B
- ### - - -
###
- - - -
U
- ###DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN - - 80
- ### - - -
R
###
- DIVISI 5. PERKERASAN BERBUTIR - -
- ### - - -
L 70
- ###DIVISI 6. PERKERASAN ASPAL - -
- ### - - - E
- ###DIVISI 7. STRUKTUR - - 60
- ### - - - B
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR -
- A 50
DIVISI 9. PEKERJAAN HARIAN -
- R
40
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN -
SKh-1.10.a(2) Timbunan Pilhan untuk Lereng Tepi saluran 3.403 0.068 0.050 0.040 0.040 0.050 0.070 0.050 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.090 0.068 0.238 ### 0.100 0.005 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.148 0.068 0.068 0.068 0.068 0.068 0.068 0.068 0.140 0.001 0.000
19.443 0.389 0.100 0.200 0.250 0.200 0.390 0.390 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.500 0.520 0.800 0.800 ###
N 0.500 0.500 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.389 0.500 0.500 0.500 0.500 0.630 0.001 0.001
30
M3 173.14
SKh-1.10.a(17) Pengendalian Tanaman 13.660 0.100 0.100 0.100 0.100 0.100 0.270 0.270 0.273 0.273 0.273 0.273 0.273 0.273 0.273 0.273 0.273 0.273 0.273 0.523 0.523 0.323 ### 0.250 0.200 0.273 0.273 0.273 0.273 0.273 0.273 0.273 0.273 0.273 0.273 0.273 0.273 0.273 0.273 0.273 0.273 0.273 0.273 0.300 0.400 0.300 0.600
LS 1.00
00
BULAN
14/May/17
21/May/17
28/May/17
12/Mar/17
19/Mar/17
26/Mar/17
12/Nov/17
19/Nov/17
26/Nov/17
13/Aug/17
20/Aug/17
27/Aug/17
10/Dec/17
17/Dec/17
24/Dec/17
31/Dec/17
12/Feb/17
19/Feb/17
26/Feb/17
10/Sep/17
17/Sep/17
24/Sep/17
16/Apr/17
23/Apr/17
30/Apr/17
15/Oct/17
22/Oct/17
29/Oct/17
22/Jan/17
29/Jan/17
11/Jun/17
18/Jun/17
25/Jun/17
7/May/17
5/Mar/17
5/Nov/17
16/Jul/17
23/Jul/17
30/Jul/17
6/Aug/17
3/Dec/17
5/Feb/17
3/Sep/17
2/Apr/17
9/Apr/17
1/Oct/17
8/Oct/17
4/Jun/17
2/Jul/17
9/Jul/17
Minggu ke e 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
-
A
DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN - 40
SKh-1.10.a(1) Galian Tanah untuk saluran air dan lereng M3 - - R
SKh-1.10.a(2) Timbunan Pilhan untuk Lereng Tepi saluran M3 - -
SKh-1.10.2(5) Pembersihan jembatan 49.235 0.40 0.30 0.20 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.20 1.20 1.20 1.20 2.20 2.50 2.00 2.00 2.00 2.00 1.00 1.00 1.50 2.00 2.50 2.50 2.50 2.50 2.00 2.13 1.30 1.00 1.00 1.00 1.20 0.20 0.20 0.20 0.20 0.20 0.10 0.10 0.00 0.00 0.00 0.00 0.00
M2 2,012.05 10
SKh-1.10.2(5) Pengecatan sederhana M2 715.00 41.545 0.50 0.25 0.20 0.25 0.50 0.30 0.40 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 1.00 2.00 1.00 1.02 1.66 0.83 0.83 0.94 1.00 1.00 0.50 0.50 1.00 1.20 1.20 1.20 1.75 1.20 1.12 1.12 1.40 1.50 1.70 0.00 0.00 0.00 0.00
SKh-1.10.2(5) Pasangan Batu M3 10.00 9.220 0.01 0.01 0.01 0.01 0.02 0.10 0.10 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.51 0.01 0.05 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.40 0.40 0.29 0.50 0.50 0.30 0.50 0.50 0.44 0.03 0.10 0.00 0.00 0.00 0.00
-
00
JUMLAH TOTAL 100.00
RENCANA PROGRESS MINGGUAN 0.91 0.56 0.41 0.76 1.02 0.90 1.00 1.52 1.52 1.52 1.52 1.52 2.22 2.22 2.22 2.22 3.22 3.52 3.02 3.02 3.02 3.02 0.00 2.51 3.01 2.55 3.20 4.35 3.52 3.52 3.62 3.18 3.31 1.98 1.68 2.40 2.60 2.69 1.90 2.45 1.70 1.82 1.82 1.94 1.63 1.80 0.00 0.00 0.00 0.00
AKUMULASI RENCANA PROGRESS MINGGUAN - 0.91 1.47 1.88 2.64 3.66 4.56 5.56 7.07 8.59 10.10 11.62 13.13 15.35 17.56 19.78 21.99 25.21 28.72 31.74 34.75 37.77 40.78 40.78 43.29 46.30 48.85 52.06 56.40 59.92 63.43 67.06 70.24 73.56 75.54 77.23 79.63 82.23 84.92 86.82 89.27 90.97 92.79 94.61 96.55 98.18 99.98 99.98 99.98 99.99 100.00
RELISASI PROGRESS MINGGUAN
AKUMULASI REALISASI PROGRESS MINGGUAN -
DEVIASI -
3.2764286 5.4580111 8.3106314 12.251302 10.34 12.52 16.03 10.664465 10.00 7.9485714 2.05
1.15 0.5428571 4.4264286 9.8844396 18.195071 30.446373 40.78 53.300476 69.333848 79.998313 89.996456 97.945027 100.00
Catatan : 2.42
* 25 Desember 2017 libur Natal -
20190359651.32 1.64
Kasatker PJN Wilayah I 1.64 Pejabat Pembuat Komitmen 07 Konsultan Penyedia
Provinsi Sumatera Utara ### 0.4371 (Balige, cs) PT. Marlo Karya Mandiri PT. Lian Surya
3.07
10/15/2017
10/22/2017
10/29/2017
11/12/2017
11/19/2017
11/26/2017
12/10/2017
12/17/2017
12/24/2017
12/31/2017
Bobot
1/16/2017
1/22/2017
1/29/2017
2/12/2017
2/19/2017
2/26/2017
3/12/2017
3/19/2017
3/26/2017
4/16/2017
4/23/2017
4/30/2017
5/14/2017
5/21/2017
5/28/2017
6/11/2017
6/18/2017
6/25/2017
7/16/2017
7/23/2017
7/30/2017
8/13/2017
8/20/2017
8/27/2017
9/10/2017
9/17/2017
9/24/2017
10/1/2017
10/8/2017
11/5/2017
12/3/2017
2/5/2017
3/5/2017
4/2/2017
4/9/2017
5/7/2017
6/4/2017
7/2/2017
7/9/2017
8/6/2017
9/3/2017
ARAN SAT. VOL.
(%)
Minggu ke 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51
- ###DIVISI 1. UMUM
1.2 ###Mobilisasi LS 1.00 2.021 0.510 0.505 0.505 0.500
100
1.8.(1)
1.17
###Manajemen dan Keselamatan Lalu Lintas
###Pengamanan Lingkungan Hidup
LS
LS
1.00
1.00
0.329
0.154
0.005
0.000
0.005
0.005
0.013
0.007
0.022
0.006
0.013
0.006
0.013
0.006
0.013
0.006
0.013
0.006
0.013
0.006
0.013
0.006
0.013
0.006
0.013
0.006
0.013
0.006
0.013
0.006
0.005
0.006
0.005
0.006
0.001
0.006
0.084
0.006
0.010
0.006
0.010
0.006
0.010
0.001
0.010
0.018
0.010
0.012 L 0.008
0.006
I
1.19(2) ###Sistem Manajemen K-3 Konstruksi LS 1.00 0.542 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021 0.021
1.21 ###Manajemen Mutu LS 1.00 0.303 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012
###
2.1.(1)
- ###DIVISI 2. DRAINASE
###Galian untuk Selokan Drainase dan Saluran Air M3 7,950.00 1.212 0.010 0.020 0.030 0.040 0.045 0.060 0.336 0.336 0.336 B 90
U
2.2.(1) ###Pasangan Batu dengan Mortar M3 2,770.56 12.149 0.100 0.120 0.200 0.200 0.350 0.450 0.500 0.600 1.376 1.376 1.376 1.376 1.376 1.376 1.376
2.3.(4) ###Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - M1 50.00 0.819 0.273 0.273 0.273
105 cm
3.1.(7)
3.2.(1a)
- ###DIVISI 3. PEKERJAAN TANAH
###Galian Perkerasan Beraspal tanpa Cold Milling Machine
###Timbunan Biasa dari Sumber Galian
M3
M3
2.25
3,279.38
0.004
1.759
0.001
0.098
0.001
0.098
0.001
0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098 0.098
R 80
3.2.(2a) ###Timbunan Pilihan dari Sumber Galian M3 450.51 0.545 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032 0.032
4.2.(2b)
- ###DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
###Lapis Pondasi Agregat Kelas S M3 1,878.19 5.515 0.501 0.501 0.501 0.501 0.501 0.501 0.501 0.501 0.501 L 0.501 0.501
70
5.1.(1)
-### DIVISI 5. PERKERASAN BERBUTIR
###Lapis Pondasi Agregat Kelas A M3 4,695.47 14.801 0.350 0.350 0.350 0.350 1.340 1.340 1.340 1.340 1.340 1.340 1.340 1.340 1.340 1.340
E
- ###DIVISI 6. PERKERASAN ASPAL B
A
6.1 (1)(a) ###Lapis Resap Pengikat - Aspal Cair Liter 18,066.38 0.988
6.1 (2)(a) ###Lapis Perekat - Aspal Cair Liter 2,709.96 0.153
0.062 0.062 0.062
0.011
0.062
0.011
0.062
0.011
0.062
0.011
0.062
0.011
0.062
0.011
0.062
0.011
0.062
0.011
0.062
0.011
0.062
0.011
0.062
0.011
0.062
0.011
0.062
0.011
0.062
0.011
60
6.3(5a) ###Laston Lapis Aus (AC-WC) Ton 1,678.56 10.656 0.761 0.761 0.761 0.761 0.761 0.761 0.761 0.761 0.761 0.761 0.761 0.761 0.761 0.761
6.3(6a)
6.3.(8)
###Laston Lapis Antara (AC-BC)
###Bahan anti pengelupasan
Ton
Kg
3,357.13
896.35
20.626
0.428
1.375
0.029
1.375
0.029
1.375
0.029
1.375
0.029
1.375
0.029
1.375
0.029
1.375
0.029
1.375
0.029
1.375
0.029
1.375
0.029
1.375
0.029
1.375
0.029
1.375
0.029
1.375
0.029
1.375
0.029 R
7.1 (7) a
- ###DIVISI 7. STRUKTUR
###Beton mutu sedang fc= 20 MPa M3 10.00 0.130 0.026 0.026 0.026 0.026 0.026
A 50
7.1 (10)
7.3 (1)
7.9.(1)
###Beton mutu rendah fc= 10 Mpa
###Baja Tulangan U 24 Polos
###Pasangan Batu
M3
Kg
M3
3.00
1,250.00
686.14
0.022
0.164
3.152 0.315 0.315 0.315
0.004
0.033
0.315
0.004
0.033
0.315
0.004
0.033
0.315
0.004
0.033
0.315
0.004
0.033
0.315 0.315 0.315
N
8.3.(3)
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
Pohon Jenis . Buah 160.00 0.0758
40
0.038 0.038
8.4.(1) Marka Jalan Termoplastik M2 1,054.50 0.850 0.283 0.283 0.283
8.4.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Buah 37.00 0.195 0.097 0.097
Grade
8.4.(5) Patok Pengarah Buah 120.00 0.186 0.093 0.093
8.4.(6a) Patok Kilometer Buah 4.00 0.016 0.008 0.008
8.4.(7) Rel Pengaman M1 300.00 1.657 0.829 0.829 30
DIVISI 9. PEKERJAAN HARIAN
9.1.(1) Mandor Jam 21.00 0.0016 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001 0.0001
9.1.(2) Pekerja Biasa Jam 63.00 0.0039 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002
9.1.(4) a Dump Truck, kapasitas 3 - 4 m Jam 21.00 0.029 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013 0.0013
9.1.(8) Motor Grader min 100 PK Jam 21.00 0.067 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 0.0029 20
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 21.00 0.053 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023 0.0023
9.1.(11) Alat Penggali (Excavator) 80 - 140 PK Jam 21.00 0.060 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026 0.0026
Catatan : 0.52
*25 Desember 2017 libur Natal 0.26 ###
20190359651.32 2.73
Kasatker PJN Wilayah I 2.47 Pejabat Pembuat Komitmen 07 Konsultan Penyedia
Provinsi Sumatera Utara (Balige, cs) PT. Marlo Karya Mandiri PT. Lian Surya
1/16/2017
1/22/2017
1/29/2017
2/12/2017
2/19/2017
2/26/2017
3/12/2017
3/19/2017
3/26/2017
4/16/2017
4/23/2017
4/30/2017
5/14/2017
5/21/2017
5/28/2017
6/11/2017
6/18/2017
6/25/2017
7/14/2017
SAT. VOL. Bobot (%)
2/5/2017
3/5/2017
4/2/2017
4/9/2017
5/7/2017
6/4/2017
7/2/2017
7/9/2017
RAN
Minggu ke 1 2 3 4 5 6 7 8 9 10 11 12 12 14 15 16 17 18 19 20 21 22 23 24 25 26 27 ###
DIVISI 1. UMUM L
1.2 Mobilisasi LS 1.00 2.537 0.53 0.63 0.73 0.634 100###
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 0.414 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 ###
1.17 Pengamanan Lingkungan Hidup LS 1.00 0.194 0.0081 0.0081 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 0.008 I 0.008 ###
1.19(2) Sistem Manajemen K-3 Konstruksi LS 1.00 0.680 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 0.027 ###
1.21 Manajemen Mutu LS 1.00 0.380 0.0152 0.0152 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 0.015 ###
90 ###
DIVISI 2. DRAINASE
B ###
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 7,950.00 1.521 0.010 0.020 0.030 0.040 0.045 0.060 0.439 0.439 0.439 ###
2.2.(1)
2.3.(4)
Pasangan Batu dengan Mortar
Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm
M3
M1
2,770.56
50.00
15.249
1.028
0.100 0.120 0.200 0.200 0.350
0.343
0.450
0.343
0.500
0.343
0.600 1.354 1.354 2.004 2.004 2.004 2.004 2.004
U ###
###
80 ###
3.1.(7)
DIVISI 3. PEKERJAAN TANAH
Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 2.25 0.005 0.002 0.002 0.002 R ###
###
3.2.(1a) Timbunan Biasa dari Sumber Galian M3 3,279.38 2.207 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.066 0.193 0.193 0.193 0.193 0.193 0.193 0.193 0.193 ###
3.2.(2a) Timbunan Pilihan dari Sumber Galian M3 450.51 0.684 0.040 0.040 0.040 0.040 0.040 0.040 0.040 0.040 0.040 0.040 0.040 0.040 0.040 0.040 0.040 0.040 0.040 ###
L 70 ###
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN ###
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 1,878.19 6.923 0.481 0.481 0.481 0.481 0.481 0.481 0.750 0.750 0.750 0.894 0.894 ###
E ###
DIVISI 5. PERKERASAN BERBUTIR ###
5.1.(1) Lapis Pondasi Agregat Kelas A M3 4,695.47 18.579 0.350 0.350 0.350 0.350 1.278 1.278 1.278 1.278 1.382 1.382 2.325 2.325 2.325 2.325 60 ###
6.3(6a) Laston Lapis Antara (AC-BC) Ton 3,357.13 25.891 1.726 1.726 1.726 1.726 1.726 1.726 1.726 1.726 1.726 1.726 1.726 1.726 1.726 1.726 1.726 ###
6.3.(8) Bahan anti pengelupasan Kg 896.35 0.537 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036 0.036
R ###
###
DIVISI 7. STRUKTUR ###
7.1 (7) a Beton mutu sedang fc= 20 MPa M3 10.00 0.163 0.033 0.033 0.033 0.033 0.033 40 ###
7.1 (10) Beton mutu rendah fc= 10 Mpa M3 3.00 0.027 0.005 0.005 0.005 0.005 0.005 A ###
7.3 (1) Baja Tulangan U 24 Polos Kg 1,250.00 0.206 0.041 0.041 0.041 0.041 0.041 ###
7.9.(1) Pasangan Batu M3 686.14 3.956 0.396 0.396 0.396 0.396 0.396 0.396 0.396 0.396 0.396 0.396 ###
N 30 ###
###
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.3.(3) Pohon Jenis . Buah 160.00 0.0952 0.048 0.048 ###
8.4.(1) Marka Jalan Termoplastik M2 1,054.50 1.067 0.356 0.356 0.356 ###
8.4.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade Buah 37.00 0.244 0.122 0.122 ###
8.4.(5) Patok Pengarah Buah 120.00 0.234 0.117 0.117 ###
8.4.(6a) Patok Kilometer Buah 4.00 0.020 0.010 0.010
20 ###
8.4.(7) Rel Pengaman M1 300.00 2.080 1.040 1.040 ###
REKONSTRUKSI JALAN
JADWAL PELAKSANAAN PEKERJAAN PEMELIHARAAN RUTIN KONDISI
34
BULAN
NO. MATA Januari Februari Maret April Mei Juni Juli Agustus September Oktober November Desember
PEMBAYARA URAIAN PEKERJAAN SAT. VOL. Bobot (%) Ket.
N
14/May/17
21/May/17
28/May/17
12/Mar/17
19/Mar/17
26/Mar/17
12/Nov/17
19/Nov/17
26/Nov/17
13/Aug/17
20/Aug/17
27/Aug/17
10/Dec/17
17/Dec/17
24/Dec/17
31/Dec/17
10/Sep/17
17/Sep/17
24/Sep/17
12/Feb/17
19/Feb/17
26/Feb/17
16/Apr/17
23/Apr/17
30/Apr/17
15/Oct/17
22/Oct/17
29/Oct/17
11/Jun/17
18/Jun/17
25/Jun/17
22/Jan/17
29/Jan/17
7/May/17
5/Mar/17
5/Nov/17
16/Jul/17
23/Jul/17
30/Jul/17
6/Aug/17
3/Dec/17
5/Feb/17
3/Sep/17
2/Apr/17
9/Apr/17
1/Oct/17
8/Oct/17
4/Jun/17
2/Jul/17
9/Jul/17
Minggu Ke 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Chart26 Title 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 ###
- ### - - - 90
###
-### - - -
U ###
- ### - - - R ###
- ### - - - ###
- ###DIVISI 7. STRUKTUR - -
E 60
###
- ### - - -
B ###
SKh-1.10.a(10) Campuran Aspal Panas 69.935 0.0050 0.8000 0.8600 0.4000 0.5000 1.0000 0.5000 0.6500 0.7500 0.5000 0.2000 0.5000 0.8000 0.5000 0.6000 1.0000 2.0000 2.5000 1.1909 2.0000 2.0000 1.3987 1.5000 1.0000 1.5000 1.0000 2.0000 2.2340 2.4560 2.5670 2.3686 2.4577 2.4570 2.1254 2.3466 2.2456 2.2546 2.4703 2.4670 2.2467 2.1540 2.2300 2.0000 2.0000 2.0000 0.5000 0.5000 0.1000 0.1000 ###
M3 965.33
SKh-1.10.a(17) Pengendalian Tanaman -
LS -
SKh-1.10.2(5) Pembersihan jembatan
M2 -
- 10
SKh-1.10.2(5) Pengecatan sederhana - ###
M2 -
SKh-1.10.2(5) Pasangan Batu - ###
M3 -
00
-
JUMLAH TOTAL 100.00
RENCANA PROGRESS MINGGUAN 0.02 0.82 0.88 0.52 0.66 1.18 0.70 1.32 1.42 1.17 0.87 1.17 1.47 1.17 1.27 1.67 2.67 3.37 2.06 2.87 2.00 2.70 0.00 2.30 1.96 2.36 1.60 2.76 2.94 3.13 3.24 3.04 3.13 3.13 2.93 3.22 3.12 3.43 3.35 3.44 2.92 2.82 2.90 2.67 2.67 2.67 1.17 0.92 0.12 0.12
AKUMULASI RENCANA PROGRESS MINGGUAN 0.02 0.83 1.71 2.23 2.89 4.07 4.77 6.09 7.51 8.68 9.55 10.72 12.19 13.36 14.63 16.30 18.97 22.34 24.40 27.27 29.27 31.97 31.97 34.27 36.23 38.59 40.19 42.95 45.89 49.02 52.25 55.29 58.42 61.55 64.47 67.69 70.81 74.23 77.58 81.02 83.93 86.76 89.66 92.33 95.00 97.67 98.84 99.76 99.88 100.00
DEVIASI
3.533714286 4.612757475 5.212059801 9.796793355 8.45 9.01 13.44502027 13.71194694 14.12962193 12.35571694 5.38
0.364714286 0.377142857 3.898428571 8.511186047 13.72324585 23.5200392 31.97 40.98012307 54.42514333 68.13709028 82.2667122 94.62242915 100.00
Catatan : 0.36857
* 25 Desember 2017 libur Natal - 2.080
20190359651.32 -
Kasatker PJN Wilayah I - Pejabat Pembuat Komitmen 07 Konsultan Penyedia
Provinsi Sumatera Utara 0.708 (Balige, cs) PT. Marlo Karya Mandiri PT. Lian Surya
0.28286
2.51