DAILY CHECK LIST


PROJECT NAME: LOUVRE ABU DHABI PROJECT CODE: P028 DATE: _______________

Building - Area:-
Date:-
Description To Corrective Date
Standard Measures
YES NO
PPE (Helmet, Safety Shoes, Jacket) available & utilized in building

Full Body Safety Harness used where required/ Body harness inspections completed.
Scaftag System Implemented and scaffolding safe for use including working towers platforms
Proper Signage PPE/ block works in progress etc.
Hot Work Permit in Place/Being monitored (Daily close-outs)
Fire Extinguishers in Place checked for serviceability
Emergency Evacuation (known to all workforce)signage showing access /egress in place
First Aid Box/site clinic contact details
Any Hazardous Materials in use proper PPE in use(masks glasses gloves) Environmental
considerations
Crane Load Certificate/Operators Competency Certificate in place area barricaded
Waste Disposal skips emptied/covered waste management in place
Hand Power Tools electrical connection adequate. Distribution panels in place
Excavation Edge/Fall Protection/solid
Safe Access & Egress to all working area including signage
Appropriate Use of Tools PPE etc.
Plant & Equipment (Crane, Lifting Equipment) checklists completed
Adequate lighting/serviceable
Safe Manual Handling techniques
Flammable Liquids/paints/glues (Proper Storing & Stacking) spill kits
Welfare Arrangements (Drinking Water, Shaded Rest Area toilets)
House Keeping up to date
Signages
Risk assessments completed and signed
Edge protection complete Solid barricading & covers (openings & edges)
The above list does not exclude or waive any other checklist or legal requirement
List tasks for the day:
Concrete Pouring at steel erection at scaffold erection at Installation of ribbon for

List specific hazards related to the tasks:

List safety precautions:

Note: If tasks change, this list and the risk assessment must be revised before proceeding with new/changed task. A signed attendance register
must be attached to this list. I hereby certify that the above items were checked, and all workers under my supervision received a safe task
instruction:
Items listed in the no column are to have a corrective action plan raised
Safety Officer/Engineer Print Date

Foreman/Supervisor/Engineer Print Date

HSE Manager Print Date

CC Project Manager and Construction Manager

ASO_08004 - Rev0 - Date May 18, 2013


ASOLOUVREJV
DAILY CHECK LIST
PROJECT NAME: LOUVRE ABU DHABI PROJECT CODE: P028 DATE: _______________

ASO_08004 - Rev0 - Date May 18, 2013

Anda mungkin juga menyukai