G+2 SEISMIC LOAD CALCULATION

Weigth & Centroid of Foundation Column


FCL No. L(m) D(width),m H(thickness),m Weigth(Wi)(kN) Distance, Xi(m)
1 2.5 0.35 0.35 7.35 0
2 2.5 0.35 0.35 7.35 0
3 2.5 0.35 0.35 7.35 0
4 2.5 0.35 0.35 7.35 0
5 2.5 0.35 0.35 7.35 6
6 2.5 0.35 0.35 7.35 6
7 2.5 0.35 0.35 7.35 6
8 2.5 0.35 0.35 7.35 6
9 2.5 0.35 0.35 7.35 9.6
10 2.5 0.35 0.35 7.35 9.6
11 2.5 0.35 0.35 7.35 9.6
12 2.5 0.35 0.35 7.35 9.6
13 2.5 0.35 0.35 7.35 12.35
14 2.5 0.35 0.35 7.35 14.75
15 2.5 0.35 0.35 7.35 14.75
16 2.5 0.35 0.35 7.35 14.75
17 2.5 0.35 0.35 7.35 14.75
18 2.5 0.35 0.35 7.35 20.75
19 2.5 0.35 0.35 7.35 20.75
20 2.5 0.35 0.35 7.35 20.75
21 2.5 0.35 0.35 7.35 20.75

Total Weigth(KN) 154.35


SUM Wi*Xi 1593.1125
SUM Wi*Yi 1203.93
Mass Center X(m) 10.3214285714
Y(m) 7.8

Weight & Centroid of Ground Floor


Description L(m) D(width),m H(thickness),m Weigth(Wi)(kN) Distance, Xi(m)
CL. No Columns
1 3.2 0.35 0.3 8.064 0
2 3.2 0.35 0.3 8.064 0
3 3.2 0.35 0.3 8.064 0
4 3.2 0.35 0.3 8.064 0
5 3.2 0.35 0.3 8.064 6
6 3.2 0.35 0.3 8.064 6
7 3.2 0.35 0.3 8.064 6
8 3.2 0.35 0.3 8.064 6
9 3.2 0.35 0.3 8.064 9.6
10 3.2 0.35 0.3 8.064 9.6
11 3.2 0.35 0.3 8.064 9.6
12 3.2 0.35 0.3 8.064 9.6
13 3.2 0.35 0.3 8.064 12.35
14 3.2 0.35 0.3 8.064 14.75
15 3.2 0.35 0.3 8.064 14.75
16 3.2 0.35 0.3 8.064 14.75
17 3.2 0.35 0.3 8.064 14.75
18 3.2 0.35 0.3 8.064 20.75
19 3.2 0.35 0.3 8.064 20.75
20 3.2 0.35 0.3 8.064 20.75
21 3.2 0.35 0.3 8.064 20.75
Grade Beams
GB-1 20.75 0.4 0.3 59.76 10.375
GB-2 20.75 0.4 0.3 59.76 10.375
GB-3 20.75 0.4 0.3 59.76 10.375
GB-4 20.75 0.4 0.3 59.76 10.375
GB-A 15.8 0.4 0.3 45.504 0
GB-B 15.8 0.4 0.3 45.504 6
GB-C 15.8 0.4 0.3 45.504 9.6
GB-D 15.8 0.4 0.3 45.504 14.75
GB-E 15.8 0.4 0.3 45.504 20.75
Ground Floor Panels
Panel AB 6 15.8 0.4 509.076 3
panel BC 3 15.8 0.4 254.538 7.5
panel CD 5.15 15.8 0.4 436.9569 12.175
panel DE 6 15.8 0.4 509.076 17.75
Ground Floor Partition walls
Partition-1 6.5 3.2 0.2 79.04 1.75
partition 1-1 5 3.2 0.2 60.8 7.5
Partition-2 4.24 3.2 0.2 51.5584 0.62
partition 2-1 5 3.2 0.15 45.6 7.5
Partition-2' 2.45 3.2 0.1 14.896 1.225
Partition-3 5 3.2 0.15 45.6 2.5
Partition-5 10 3.2 0.004 3.2 5
Partition-A-1 7 3.2 0.004 2.24 0
Partition-A-2' 2.1 3.2 0.2 25.536 -1.5
Partition-A-2 2.9 3.2 0.004 0.928 0
Partition-A-3 2.9 3.2 0.2 35.264 2.34
Partition-B 6.3 3.2 0.2 76.608 5
Partition-C-1 9.9 3.2 0.004 3.168 10
Partition-C-2 3.4 3.2 0.2 41.344 10
Total Weigth(KN) 2831.3333
SUM Wi*Xi 26334.3862255
SUM Wi*Yi 23542.35707
Mass Center X(m) 9.3010548159
Y(m) 8.3149366661

Weight & Centroid of FIRST & SECOND FLOOR Floor


Description L(m) D(width),m H(thickness),m Weigth(Wi)(kN) Distance, Xi(m)
1 3 0.35 0.3 7.56 0
2 3 0.35 0.3 7.56 0
3 3 0.35 0.3 7.56 0
4 3 0.35 0.3 7.56 0
5 3 0.35 0.3 7.56 6

Calculate t
6 3 0.35 0.3 7.56 6
7 3 0.35 0.3 7.56 6
8 3 0.35 0.3 7.56 6
9 3 0.35 0.3 7.56 9.6
10 3 0.35 0.3 7.56 9.6
11 3 0.35 0.3 7.56 9.6
12 3 0.35 0.3 7.56 9.6
13 3 0.35 0.3 7.56 12.35
14 3 0.35 0.3 7.56 14.75
15 3 0.35 0.3 7.56 14.75
16 3 0.35 0.3 7.56 14.75
17 3 0.35 0.3 7.56 14.75
18 3 0.35 0.3 7.56 20.75
19 3 0.35 0.3 7.56 20.75
20 3 0.35 0.3 7.56 20.75
21 3 0.35 0.3 7.56 20.75

FBM-1 12.8 0.35 0.25 26.88 4.9


FBM-2 12.8 0.35 0.25 26.88 4.9
FBM-3 12.8 0.35 0.25 26.88 4.9
FBM-4 11.3 0.35 0.25 23.73 5.65
FBM-5 10 0.35 0.25 21 5
FBM-A 11.2 0.35 0.25 23.52 0
FBM-B 13.3 0.35 0.25 27.93 5
FBM-C 14.6 0.35 0.25 30.66 10

Panel AB-1 5 9.9 0.35 177.6456 2.5


panel AB-2 3.65 1.3 0.35 17.74825 1.825
panel AB-3 3 1.5 0.35 16.782 -0.75
panel AB-4 2.9 1.5 0.35 15.8145 -0.75
Panel BC-1 5 13.3 0.35 238.6552 7.5
Panel BC-2 3.63 1.3 0.35 17.68039 8.185
Panel BC-3 3 1.3 0.35 14.5444 10.65
Panel BC-4 5.19 1.3 0.35 23.97187 10.65
Panel BC-5 3.4 1.3 0.35 15.9016 10.65
partition wall
Partition-1 6.5 3.06 0.2 75.582 1.75
partition 1-1 5 3.06 0.2 58.14 7.5
Partition-2 5.33 3.06 0.2 61.97724 1.165
partition 2-1 5 3.06 0.15 43.605 7.5
Partition-2' 5 3.06 0.15 43.605 7.5
Partition-3-1 3.83 3.06 0.15 33.40143 1.915
Partition-3-1' 3.83 3.06 0.15 33.40143 1.915
Partition-3-2 5 3.06 0.15 43.605 7.5
Partition 4-1 3.83 3.06 0.15 33.40143 1.915
Partition 4-2 5 3.06 0.15 43.605 7.5
Partition-5 10 3.06 0.2 116.28 5
Partition-A-1 9.9 3.06 0.2 115.1172 0
Partition-A-2' 2.1 3.06 0.2 24.4188 -1.5
Partition-A-2 9.9 3.06 0.15 86.3379 3.83
Partition-A-3 2.9 3.06 0.15 25.2909 2.34
Partition-B 10.86 3.06 0.15 94.71006 5
Partition-B' 2.19 3.06 0.15 19.09899 5.9
Partition-C-1 13.3 3.06 0.2 154.6524 10
wall for balcony
Fblcny 1-1 1.3 0.8 0.1 1.976 0
Fblcny 1-2 3.65 0.8 0.1 5.548 1.825
Fblcny 1-3 1.3 0.8 0.1 1.976 3.65
Fblcny 2-1 1.3 0.8 0.1 1.976 6.37
Fblcny 2-2 3.63 0.8 0.1 5.5176 8.185
Fblcny 2-3 1.3 0.8 0.1 1.976 10
Lblcny1-1 1.5 0.8 0.1 2.28 -0.75
Lblcny1-2 3 0.8 0.1 4.56 -1.5
Lblcny1-3 1.5 0.8 0.1 2.28 -0.75
Lblcny 2-1 1.5 0.8 0.1 2.28 -0.75
Lblcny 2-2 2.9 0.8 0.1 4.408 -1.5
Lblcny 2-3 1.5 0.8 0.1 2.28 -0.75
Rblcny1-1 1.3 0.8 0.1 1.976 10.65
Rblcny1-2 3 0.8 0.1 4.56 11.3
Rblcny1-3 1.3 0.8 0.1 1.976 10.65
Rblcny2-1 1.3 0.8 0.1 1.976 10.65
Rblcny2-2 5.19 0.8 0.1 7.8888 11.3
Rblcny2-3 1.3 0.8 0.1 1.976 10.65
Rblcny3-1 1.3 0.8 0.1 1.976 10.65
Rblcny3-2 3.4 0.8 0.1 5.168 11.3
Rblcny3-3 1.3 0.8 0.1 1.976 10.65
Total Weigth(KN) 1918.98399
SUM Wi*Xi 9654.53460885
SUM Wi*Yi 11977.5115009
Mass Center X(m) 5.0310657406
Y(m) 6.241590114

Weight and Centroid Roofing and Top Tie Beam


Description L(m) D(width),m H(thickness),m Weigth(Wi)(kN) Distance, Xi(m)
TTBM 1 10 0.3 0.25 18 5
TTBM 2 10 0.3 0.25 18 5
TTBM 3 10 0.3 0.25 18 5
TTBM 4 10 0.3 0.25 18 5
TTBM 5 10 0.3 0.25 18 5
TTBM A 12 0.3 0.25 21.6 0
TTBM B 12 0.3 0.25 21.6 5
TTBM C 12 0.3 0.25 21.6 10
Distance, Yi(m) W*Xi(kNm) W*Yi(kNm)
0 0 0
5.8 0 42.63
10 0 73.5
15.8 0 116.13
0 44.1 0
5.8 44.1 42.63
10 44.1 73.5
15.8 44.1 116.13
0 70.56 0
5.8 70.56 42.63
10 70.56 73.5
15.8 70.56 116.13
5.8 90.7725 42.63
0 108.4125 0
5.8 108.4125 42.63
10 108.4125 73.5
15.8 108.4125 116.13
0 152.5125 0
5.8 152.5125 42.63
10 152.5125 73.5
15.8 152.5125 116.13

Distance, Yi(m) W*Xi(kNm) W*Yi(kNm)

0 0 0
5.8 0 46.7712
10 0 80.64
15.8 0 127.4112
0 48.384 0
5.8 48.384 46.7712
10 48.384 80.64
15.8 48.384 127.4112
0 77.4144 0
5.8 77.4144 46.7712
10 77.4144 80.64
15.8 77.4144 127.4112
5.8 99.5904 46.7712
0 118.944 0
5.8 118.944 46.7712
10 118.944 80.64
15.8 118.944 127.4112
0 167.328 0
5.8 167.328 46.7712
10 167.328 80.64
15.8 167.328 127.4112

0 620.01 0
5.8 620.01 346.608
10 620.01 597.6
15.8 620.01 944.208
7.9 0 359.4816
7.9 273.024 359.4816
7.9 436.8384 359.4816
7.9 671.184 359.4816
7.9 944.208 359.4816

7.9 1527.228 4021.7004


7.9 1909.035 2010.8502
7.9 5319.950258 3451.95951
7.9 9036.099 4021.7004

12 138.32 948.48
13.3 456 808.64
9.9 31.966208 510.42816
9.9 342 451.44
8.4 18.2476 125.1264
7 114 319.2
0 16 0
3.5 0 7.84
10.95 -38.304 279.6192
8.45 0 7.8416
8.45 82.51776 297.9808
10.15 383.04 777.5712
4.95 31.68 15.6816
11.6 413.44 479.5904
FLOOR Floor
Distance, Yi(m) W*Xi(kNm) W*Yi(kNm)
0 0 0
5.8 0 43.848
10 0 75.6
15.8 0 119.448
0 45.36 0

lculate the Rest by Yourself


5.8 45.36 43.848
10 45.36 75.6
15.8 45.36 119.448
0 72.576 0
5.8 72.576 43.848
10 72.576 75.6
15.8 72.576 119.448
5.8 93.366 43.848
0 111.51 0
5.8 111.51 43.848
10 111.51 75.6
15.8 111.51 119.448
0 156.87 0
5.8 156.87 43.848
10 156.87 75.6
15.8 156.87 119.448

12 131.712 322.56
9.9 131.712 266.112
7 131.712 188.16
4 134.0745 94.92
0 105 0
4.3 0 101.136
6.65 139.65 185.7345
6 306.6 183.96

4.95 444.114 879.34572


-0.65 32.39055625 -11.536363
1.9 -12.5865 31.8858
8.45 -11.860875 133.632525
6.65 1789.914 1587.05708
-0.65 144.7139922 -11.492254
1.9 154.89786 27.63436
6.595 255.3004155 158.094483
11.6 169.35204 184.45856
12 132.2685 906.984
13.3 436.05 773.262
9.9 72.2034846 613.574676
10.3 327.0375 449.1315
9.1 327.0375 396.8055
7 63.96373845 233.81001
5.7 63.96373845 190.388151
6.2 327.0375 270.351
4 63.96373845 133.60572
3.24 327.0375 141.2802
0 581.4 0 Fblcny Front balcony
4.95 0 569.83014 Lblcny left"
10.95 -36.6282 267.38586 R right
4.95 330.674157 427.372605
8.45 59.180706 213.708105
7.87 473.5503 745.368172
1.095 112.684041 20.9133941
6.65 1546.524 1028.43846

-0.65 0 -1.2844
-1.3 10.1251 -7.2124
-0.65 7.2124 -1.2844
-0.65 12.58712 -1.2844
-1.3 45.161556 -7.17288
-0.65 19.76 -1.2844
0.4 -1.71 0.912
1.9 -6.84 8.664
3.4 -1.71 7.752
7 -1.71 15.96
8.45 -6.612 37.2476
9.9 -1.71 22.572
0.4 21.0444 0.7904
1.9 51.528 8.664
3.4 21.0444 6.7184
4 21.0444 7.904
6.595 89.14344 52.026636
9.19 21.0444 18.15944
9.9 21.0444 19.5624
11.6 58.3984 59.9488
13.3 21.0444 26.2808
Distance, Yi(m) W*Xi(kNm) W*Yi(kNm)
12 90 216
9.9 90 178.2
7 90 126
4 90 72
0 90 0 Floor Weight(kN x
6 0 129.6 Ground column 132.3 5
6 108 129.6 Ground Floor 1560.87 4.565775
6 216 129.6 First Floor 2018.128 5.02954
Second Floor 2018.128 5.02954
Third Floor 2056.352 5.03831
Roofing 450 5.4
ourself!!!
y
6.58
7.980462
6.258215
6.258215
6.559044
6.65
EARTH QUAKE ANALBASED ON EBCS-8,1995
PROJECT MUB
CLIENT
LOCATION Adama
FOOTING GROUND
DEAD LOAD(KN) 181.125 4698.125

zone 4 (EBCS 8-1995 TABLE 1.3)


o= 0.1 Bed rock acceleration. Zone 4
I= 1.2 Importance factor (EBCS 8-1995 TABLE 2.4)

=o*I= 0.12 Parameter (calculated value)


Soil type= B
S= 1.2 Site coefficient from sub soil condition, CLASS (EBCS 8-1995 TABLE 1.2)
H= 15.24 Height of the building.

C1= 0.075 for RC moment resisting frames (EBCS 8-1995 ARTICLE 2.


2.5
T1=C1*H^.75 = T1 0.5784955 Fundamental period of building ,in sec
=1.2S/T^.66 = 2.07447593 Design response factor
=< 2.07447593
Used value of = 2.07447593 Design response factor
o= 0.2 Basic value of behavior factor-frame system
KD= 1.5 DC"M" mdium ductility Ductility class
KR= 1 Regularity in elevation -for regular
KW= 1 Prevailing failure mode-for frame

=o*KD*KR*KW= 0.3 Behaviour factors <=0.7 (calculated value)

=<0.7= 0.3 Behaviour factors (calculated value)

Sd(T1)= = 0.07468113 Design spectrum (calculated value)


W= 9235.779 Dead load of the building
Fb=Sd(T1)W = 689.73841 Seismic base shear force EBCS 8-1995 Article 2.3.3
Ft=.07*T1*Fb = 27.9307399 Concenterated force at top EBCS 8-1995 Article 2.3.3
Base shear distiributed over the height of the building accordingly

Fi=(Fb-Ft)Wihi/Wj*hj =

mass center

STORY Height(hi) Dead load(Wi) xi yi Wihi


average height roof floo 15.24 450.00 5.40 6.65 6858.00
3rd floor 12.18 1901.55 5.04 6.58 23160.91
2nd floor 9.12 2018.13 5.03 6.26 18405.33
1st floor 6.06 2018.13 5.03 6.26 12229.86
ground flo 3 1560.87 4.57 7.98 4682.61
foundatio 0 132.30 5.00 6.58 0.00
8080.98 65336.70

mass center
Floor Weight(kN x y
Ground c 132.3 5.0 6.6
Ground Fl 1560.87 4.6 8.0
First Floor 2018.13 5.0 6.3
Second Fl 2018.13 5.0 6.3
Third Floo 1901.55 5.0 6.6
Roofing & 450 5.4 6.7
Floor Weight(kN) x y
Ground c 132.3 5 6.58
Ground Fl1560.8704 4.56577 7.98046
1ST FLOOR2ND FLOORTTB &ROOF First Floor 2018.128 5.02954 6.25822
3793.525 4061.275 422.5 Second Fl 2018.128 5.02954 6.25822
SUM W(KN) 13156.55 Third Floo2056.3522 5.03831 6.55904
Roofing 1450 5.4 6.65
9235.77855
(EBCS 8-1995 TABLE 1.1) LATERAL LOAD ANALYSIS
(EBCS 8-1995 TABLE 2.4) USING EBCS-8 1995 Static approach
BASE SHEAR CALCULATION
(calculated value) C1 0.075 constant for reinforced concrete moment resisting
H 15 Height of building above the base in m
(EBCS 8-1995 TABLE 1.2) (ARTICLE 1.3.2) T1 #VALUE! Fundamental period of building in seconds-for bui
(Given) W(kN) 9235.77855 Seismic dead load

(EBCS 8-1995 ARTICLE 2.3.3.2.2) Sd(T1) Ordinate of design spectrum at period T1

(calculated value) Fb 0 Seismic base shear force for each main direction
(calculated value) Ft #VALUE! Concentrated force at the top
Distributing the base shear over the height of the structure
(calculated value) hi Height of the building at each level
(EBCS 8-1995 TABLE 3.2) Wi Seismic dead load at each level
(EBCS 8-1995 ARTICLE 3.3.2.1.4) Fi
(EBCS 8-1995 ARTICLE 3.3.2.1.6) level 1 2 3 4
(EBCS 8-1995 ARTICLE 3.3.2.1.7) wi
hi
(calculated value) wi*hi
Fi
(calculated value)

Importan
ce Seismic
Category I Zone 4 3
(calculated value) I 1.4 o 0.1 0.07
(calculated value) II 1.2
(calculated value) III 1
(calculated value) IV 0.8
Table 1.2(ARTICLE 1.3.2)

S
(site
coefficien
Soil Class t)
rocks A 1
medium
dense
soils B 1.2
loose soils C 1.5

=1.2*S/(T )
2/3

Fi
97.40
234.60
186.43
123.88
47.43
0.00

234.60
xi yi
40 8
41 8.566941
34.7 6.2
34.7 6.2
28.3 5.9
28.3 5.9
8.034783 8.804348
Static approach

ed concrete moment resisting frame and eccentrically braced steel frames


bove the base in m
of building in seconds-for buildings upto 80m

pectrum at period T1 Sd(T1)=


=o*I I= importance factor
orce for each main direction Fb=Sd(T1)*W

of the structure
ng at each level

2 1
0.05 0.03