Anda di halaman 1dari 7
ADVANCED MUST) CONTENT ‘A. Multi meter case for MSB connection / Multi meter case for LV panel 4 B. Service Cabinet / Electric room connection / Single meter case for MSB / Single meter case 5 for LV panel connection Page 03 of 08 Advanced Metering Infrastructure Code (AMI) Amendment to the Regulations for the Installation of Electrical wiring to accommodate the Advanced Metering Infrastructure (AMI) components “Additional Field Requirements for AMI” In addition to Kahramaa Installations regulations, the below shall be considered for Advanced Metering Infrastructure system (AMI); additional Drawing named “Advanced Metering Infrastructure Layout" shall become a part of the Building Permit document submission for Kahramaa approval A. Multi meter case for MSB connection / Multi meter case for LV panel 1) In each / typical floors, provide Two embedded 32 mm PVC conduit (2 nos. x 32 mm) between each group Electricity meters of (max 12 meters) and the corresponding group of Water meters (Between both groups) with pulling rope and the following embedded junction boxes (provide access panels on false ceiling, i required). a, In electricity metering room near to the Main Distribution Board, install 2 Nos. 150mm x 160mm x 100mm size end junction box to connect with the 2 No.s 32 mm PVC conduits. b. Inwater metering room near corresponding Water meter cabinet, install 2 Nos. 150mm x150mm x 100mm size end junction box to connect with the 2 No.s 32 mm PVG conduits . Install 32 mm conduit to connect the above 2 Nos. end Junction Boxes at water metering room {in item above) to corresponding water meters cabinets Up to 3 cabinets maximum, each of the 2 nos. end junction boxes should be connected to each water meter cabinet (when cabinet does not exist stop at group of meters with 150x150x100 mm end Junction box) and all conduits should have a pulling rope {every cabinet suppose to have 4 meters only). 4. For every conduit; Install pulling junction boxes in every 10-15mtr distance / corner portions. 2) Provide 1 x 32 mm embedded heavy-duty PVC conduit with 5c. 2.5mm? cables (R, Y, B, N & E) for ‘interconnecting power supply’ between the main water meter chamber and nearest ground floor electrical room / LV room and Provide another 1 x 32 mm embedded heavy-duty PVC conduit between the main water meter chamber and The MDF with pulling rope with the following embedded junction boxes: (Proper waterproofing is required for the conduits in main water meter chamber and building retaining wall) ‘a. Install IP65, 150mm x 150mm x 100mm size end junction box neer to the Main Distribution Board 7 LV panel in ground floor electrical room with a 32 mm PVG conduit connecting with pulling rope ‘at Main LV panel and Install IP65, 150mm x 150mm x 100mm size end junction box near to the "MDF" b. Inmain water meter chamber, install 2 nos. IP65, 100mm x 100mm x 50mm size end junction box ‘0n high level and ensure the connection to the 2 nos. 32 mm heavy duty conduits mentioned in point 2 above. ¢, Install pulling chamber / junction box in every 20-25mtr distance / corner portions. 3) In main LV room a 500mm (Height) x 500mm (Width) provision required on the wall with 100mm x 400mm x 50mm size surface mount type junction box for each data concentrator (AMI Device). Following adcitional requirements are to be incorporated. a. Install embedded conduit with Sc. 2.5mm? cables (R, Y, B, N & &) from the LV panel-metering ‘compartment to the data concentrator junction box on the wall. Each data concentrator requires a 3ph+N supply from the respective main LV panels, each LV panel will have a Data Concentrator. b. Distance between the data concentrator junction boxes shall be minimum 300mm, if two or more main LV panels are in the main LV room, Paga 04 of cs cA 4) Provide embedded 38mm PVC conduit for between the MDF panel and main LV rooms with pulling rope and the following embedded junction boxes (provide access panels on false ceiling, if required). a. Install 150mm x 10mm x 100mm size end junction box 30 cm from MDF, b. Install 150mm x 150mm x 100mm size end junction box in main LV room, near to data concentrator. ¢, In case of more than one concentrator in main LY room (More than one Main LV panel), install 100mm x 100mm x 50mm size Junction box near to each data concentrator and install and connect 25 mm conduit between these 100mm x 100mm x 50mm size Junction boxes and the 400mm x 100mm x 50mm size end junction box in main LV room. 4. Install embedded pulling junction boxes in every 10-15mtr distance / corner portions. B. Service Cabinet / Electric room connection / Single meter case for MSB / Single meter case for LV panel connection 41) Provide 2 Nos. embedded 25mm PVC conduit between the electrical and water metering cabinets and fix at allocated opening in both cabinets of respective premises (use pipe/cable entrance only in case of 1no allocated opening) with pulling rope and install IP65, 100mm x 100mm x 50mm size embedded pulling Junction boxes in every 20mtr distance / comer portions. 2} Provide 1 Nos. embedded 25mm PVC conduit between Landiord water meter and Landlord Electric meter locations with pulling rope and install IP65, 100mm x 100mm x 50mm size embedded pulling junction boxes in every 20mtr distance / comer portions. Note: In all cases; Distant from relevant eclectic meter should not exceeds 90 meters. Page 05 of 08 Field Requirements for AMI (Item A-1) AN APPS a _ynpuce pappaque wal 2EN8 uaa am 0 6r019 Sea = 109} 902 saws Sa So f= Ta _npuce pappaquie ww ze 9nd aued (7 10) 2889 J2}2UU RINW / UORIAUUOD BSW 10) a$09 18}2UL HNN -Uon2=UUOD jo PoUTeW BUIMO}IO4 10 Field Requirements for AMI (Item A-2, 3& 4) anpuco unt ge 00: wewy/voos ups 201 puna 2.66, Be oe awe soquiey> serene oued (7104 ase s9}0U NIN / YORDEUUO> ASW 10) 2$89 19}9U IMWY ‘UoRD9UUO> Jo po\paW BuIMO|!o} 10} BuIpliNg ye WOUIE,INbO: WY Field Requirements for AMI( Item B) @ 369 Uayy 12}94 2079p PLO|PUET 5H UByM TSU JSTEM PIOIPURT ouIgeD 2oyn5 s9yaw j>HI921g purges so1A195J9}9U 9H uogo@uuco jeued 7 10} 8se0 19}9u1 e/Buls | UORDeUUOS BSW 40} eSE9 J8}OUL e/BUIS / UOHDEUUCD woos o1OBIa RELIED SONOS suoRosuu0s Jo pouyeyy Buymo|jo} 40) Bulpling ye uewesinbe Wy Pago 08 ot oe

Anda mungkin juga menyukai