Volume Pengatapan
Volume Pengatapan
Deviasi : -19.40
Asnadi Chenchen
VOL BOBOT PERIODE LALU PERIODE INI S/D PERIODE INI
NO JENIS PEKERJAAN SPESIFIKASI UNIT
PAMA (%) PRESTASI BOBOT (%) PRESTASI BOBOT (%) PRESTASI BOBOT (%)
2 Kabel leeder 300 x 100 c/w fitting, Tree Star mtr 100.00 0.66 15.00 0.10 - 15.00 0.10
support and accessories - - - - -
3 Armature Lucolite
HPIT LED 150 W Phillips nos 4.00 0.14 10.00 0.01 - 10.00 0.01
Lampu HPIBU LED 150 watt Phillips nos 18.00 2.34 10.00 0.23 - 10.00 0.23
TL LED 2 x 18 Watt TKO V-Shape Phillips nos 24.00 0.26 10.00 0.03 - 10.00 0.03
Stop kontak 50 A/ 3 phase TYPE 56C550RP+56P550 Clipsal nos 3.00 0.14 10.00 0.01 - 10.00 0.01
Stop kontak 32 A/ 3 phase TYPE 56C432+56P432 Clipsal nos 3.00 0.09 10.00 0.01 - 10.00 0.01
Stop Kontak 16 A/ 1 Phase Clipsal nos 3.00 0.01 10.00 0.00 - 10.00 0.00
4 Instalation
Dari LVMDP ke SDP Workshop Kabel NYFGBY 4C - 185mm2 Supreme mtr 100.00 3.17 - - - - -
Dari SDP ke PP Workshop Kabel NYFGBY 4C-70mm2 Supreme mtr 15.00 0.17 - - - - -
Dari SDP ke PP Ofc. Worksop Kabel NYFGBY 4C-16mm2 Supreme mtr 15.00 0.08 - - - - -
Dari SDP ke PP UPS Kabel NYFGBY 4C-10mm2 Supreme mtr 15.00 0.06 - - - - -
Installation lampu HPIT 400 Watt NYM 3 x 2,5mm + Conduit Supreme titik 4.00 0.06 - - - - -
Installation lampu HPIBU LED 200 Watt NYM 3 x 2,5mm + Conduit Supreme titik 18.00 0.25 - - - - -
Installation lampu TL LED 2x18 Watt TKO V-Shape Supreme titik 24.00 0.17 - - - - -
Installation Stop kontak 16 A/1 p NYM 3 x 2,5mm + Conduit Supreme titik 3.00 0.02 - - - - -
Installation Stop kontak 63 A/3 p NYY 4 x 16mm + G Supreme titik 3.00 0.14 - - - - -
Installation Stop kontak 32 A/3 p NYY 4 x 6mm + G Supreme titik 3.00 0.08 - - - - -
Instalation
7 NYM 3 x 2,5 mm2 + conduit to Installation TL LED 2 x 18 Watt Supreme Point
8 NYM 3 x 2,5 mm2 + conduit to Installation DL 1 x 18 Watt Supreme Point
9 NYM 3 x 2,5 mm2 + conduit to Installation Exhaust fan Supreme Point
10 NYM 3 x 2,5 mm2 + conduit to Installation Receptacle 1 Ph/16 A 1 Gang' Supreme Point 8.00 0.06 - - - - -
11 NYM 3 x 2,5 mm2 + Conduit to General Receptacle 1 Ph/16 A 2 Gang ( UPS ) Supreme Point 8.00 0.06 - - - - -
12 Support of Material Lot 1.00 0.07 - - - - -
13 Grounding Bangunan Keliling Lot 8.00 0.89 - - - - -
14 Telephone ( Outlet + Instalation ) Lot
B MECHANICAL WORKS
1 Packed Booster Pump ( 2 Pompa ) unit 1.00 1.33 - - - - -
Merk Grounfos / Ebara
Type
Kap. 100 Liter / Menit
Total Head 40 m
Power
Presure Tank ( include )
Model membran
Cap. 200 lt/m
Automatic Panel Water Pump
Cable Power Pump NYY 4x6 mm2 ( 50 m' )
Include fitting, support and accessories
2 Air Conditioning
AC Split Wall type 1 PK - 9000 BTU / H Panasonic Unit
AC Split Wall type 2 PK 18000 BTU / H Panasonic Unit 2.00 0.43 - - - - -
AC Split Wall type 1,5 PK - 12,100 BTU / H Panasonic Unit
Exhaust fan type industrial Panasonic UNIT
Installation AC + Cable Power + Cable Control Panasonic Lot
Installation Exhaust + Cable Power + Cable Control Panasonic Lot
Support of Material Lot
6 Fire Protection
Apar 3,5 Kg Appron / Yamato bh 4.00 0.30 - - - - -
1 PEKERJAAN STRUKTUR
a. Pekerjaan Tanah 0.19 0.03 0.01 0.03
1 Galian tanah m3 31.70 0.09 10.00 0.01 5.00 0.00 15.00 0.01
2 Urugan tanah kembali m3 12.00 0.01 25.00 0.00 5.00 0.00 30.00 0.00
3 Urugan tanah peninggian lantai (tanah dari lokasi project) m3 - - 5.00
4 Pemadatan tanah m2 249.60 0.09 15.00 0.01 - 15.00 0.01
2 PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 3.36 0.59 0.12 0.71
1 Pasangan dinding batako C 1:4 Area Luar + Kamar mandi Lokal m2 323.72 1.19 50.00 0.59 10.00 0.12 60.00 0.71
2 Pasangan dinding GRC h:2,4 m ( Area Kantin) 2 sisi m2 62.40 0.35 - - - - -
3 Plesteran & Acian C 1:4 m2 647.44 1.42 - - - - -
4 Pas Dinding keramik KM 20/25 Asia Tile / Mulia m2 15.90 0.08 - - - - -
5 Pas . Dinding Keramik Area Dapur Masak m2 3.90 0.02 - - - - -
6 Dinding Waremash area Gas m2 20.00 0.30 - - - - -
b Instalasi Pipa Air Kotor, Air Bekas, Dan Pipa Venting Lengkap Dengan Fitting
Pipa air kotor, bekas dan venting dari pipa PVC Class AW lengkap
dengan sambungan, gantungan / penyangga, material
bantu, sesuai dengan gambar dan spesifikasi teknik
Air kotor, Air Bekas dan Venting
1 Pipa 100 Wavin AW m 25.00 0.05 20.00 0.01 5.00 0.00 25.00 0.01
2 Pipa 65 m 10.00 0.01 20.00 0.00 5.00 0.00 25.00 0.00
3 Pipa 50 m 21.00 0.03 20.00 0.01 5.00 0.00 25.00 0.01
4 Pipa 32 m 4.00 0.00 20.00 0.00 5.00 0.00 25.00 0.00
5 Floor Clean Out 100 mm Lokal buah 4.00 0.02 20.00 0.00 5.00 0.00 25.00 0.00
6 Vent Cap 100 mm Lokal buah 1.00 0.01 20.00 0.00 5.00 0.00 25.00 0.00
7 Portable Grease Trap kapasitas 10 liter terbuat dari stainless steel Lokal buah 1.00 0.09 20.00 0.02 5.00 0.00 25.00 0.02
lengkap dengan saringan
8 Fitting Rucika ls 1.00 0.09 20.00 0.02 - 20.00 0.02
9 Material Bantu Ls 1.00 0.07 20.00 0.01 - 20.00 0.01
10 Biotect BT Series BT 6 ( Cap 4,8 m3) buah 1.00 0.59 20.00 0.12 - 20.00 0.12
B PEKERJAAN TELPON
Outlet & Instalasi
1 Pengadaan dan pemsangan Outlet telpon dan instalasi Telpon pipa Is - - - - -
konduit sesuai gambar dan spesifikasi teknik
Kabel telpon 2x2x0,6 mm didalam pipa Pvc high Impact
IV PEKERJAAN PENGATAPAN
1. KONTAINER PARING LAHUNG 3.77 1.43 - 1.43
1 Rangka atap baja ringan ( upah pasang ) m 290.40 0.27 100.00 0.27 - 100.00 0.27
2 Atap Galvalume ex. Fumira type G680, t = 0,5 mm m 290.40 1.29 30.00 0.39 - 30.00 0.39
3 Listplank GRC 25 cm t : 12mm m 102.40 0.80 - - - - -
4 Cladding Galvalum ex Fumira t : 0,45 mm m 20.00 0.09 30.00 0.03 - 30.00 0.03
5 Cor Lantai t : 10 cm wiremesh single M8 Sitemix K250 m3 12.00 1.07 70.00 0.75 - 70.00 0.75
6 Dinding Kawat Harmonika m2 21.00 0.16 - - - - -
7 Pintu double Kawat Harmonika Rangka Pipa dia 2 inch bh 1.00 0.10 - - - - -
3 Armature Lucolite
HPIT LED 250 W Phillips nos
Lampu HPIBU LED 250 watt Phillips nos
TL LED 2 x 18 Watt TKO V-Shape Phillips nos 36 0.38 - - - - -
Stop kontak 50 A/ 3 phase TYPE 56C550RP+56P550 Clipsal nos
Stop kontak 32 A/ 3 phase TYPE 56C432+56P432 Clipsal nos
Stop Kontak 16 A/ 1 Phase Clipsal nos
4 Instalation
Dari LVMDP ke SDP Workshop Kabel NYFGBY 4C - 185mm2 Supreme mtr
Dari SDP ke PP Workshop Kabel NYFGBY 4C-70mm2 Supreme mtr 225 2.48 - - - - -
Dari SDP ke PP Ofc. Worksop Kabel NYFGBY 4C-16mm2 Supreme mtr
Dari SDP ke PP UPS Kabel NYFGBY 4C-10mm2 Supreme mtr
Installation lampu HPIT 250 Watt NYM 3 x 2,5mm + Conduit Supreme titik
Installation lampu HPIBU LED 250 Watt NYM 3 x 2,5mm + Conduit Supreme titik
Installation lampu TL LED 2x18 Watt TKO V-Shape Supreme titik 36 0.25 - - - - -
Installation Stop kontak 16 A/1 p NYM 3 x 2,5mm + Conduit Supreme titik
Installation Stop kontak 63 A/3 p NYY 4 x 16mm + G Supreme titik
Installation Stop kontak 32 A/3 p NYY 4 x 6mm + G Supreme titik
Instalation
7 NYM 3 x 2,5 mm2 + conduit to Installation TL LED 2 x 18 Watt Supreme Point
8 NYM 3 x 2,5 mm2 + conduit to Installation DL 1 x 18 Watt Supreme Point
9 NYM 3 x 2,5 mm2 + conduit to Installation Exhaust fan Supreme Point
10 NYM 3 x 2,5 mm2 + conduit to Installation Receptacle 1 Ph/16 A 1 Gang' Supreme Point
11 NYM 3 x 2,5 mm2 + Conduit to General Receptacle 1 Ph/16 A 2 Gang ( UPS ) Supreme Point
12 Support of Material Lot
13 Grounding Bangunan Keliling Lot
14 Telephone ( Outlet + Instalation ) Lot
6 Fire Protection
Apar 6 Kg Appron / Yamato bh 6 0.45 - - - - -
TOTAL 100.00 26.30 0.47 26.77
PROJECT MANAGEMENT PROGRESS PERIODE
I. PROGRESS PEKERJAAN
2017
APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER
No Item Bobot (%) Note Ket
4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
4 01Apr-09Apr 10Apr-16Apr 17Apr-23Apr 24Apr-30Apr 01Mei-07Mei 08Mei-14Mei 15Mei-21Mei 22Mei-28Mei 29Mei-04Jun 05Jun-11Jun 12Jun-18Jun 19Jun-25Jun 26Jun-02Jul 03Jul-09Jul 10Jul-16Jul 17Jul-23Jul 24Jul-30Jul 31Jul-06Agus 07Agus-13Agus 14Agus-20Agus 21Agus-27Agus 28Agus-03Sep 04Sep-10Sep 11Sep-17Sep 18Sep-24Sep 25Sep-01Okt 02Okt-08Okt 09Okt-15Okt
Aktual 0.01 0.01 0.01 0.02 0.01 0.01 0.00 0.14 0.04 0.06 0.07
I.2 PEKERJAAN STRUKTUR DASAR 9.65 Rencana 1.38 1.38 1.38 1.38 1.38 1.38 1.38
I.3 PEKERJAAN STRUKTUR BAJA 6.03 Rencana 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75
I.4 PEKERJAAN PASANGAN ATAP & CLADDING 2.42 Rencana 0.00 0.40 0.40 0.40 0.40 0.40 0.40
Aktual 0.24
I.5 PEKERJAAN DINDING & LANTAI 2.83 Rencana 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24
Aktual 0.39
I.6 PEKERJAAN PLAFOND & CAT 0.65 Rencana 0.13 0.13 0.13 0.13 0.13
Aktual
I.7 PEKERJAAN KUSEN DAN PINTU 1.81 Rencana 0.30 0.30 0.30 0.30 0.30 0.30
Aktual
I.8 PEKERJAAN SARANA LUAR 2.42 Rencana 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22
Aktual 0.73
I.9 PEKERJAAN MEKANIKAL / ELEKTRIKAL TYRESHOP 15.31 Rencana 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81 0.81
C. PEKERJAAN DAPUR
II.1 Pekerjaan Tanah 0.19 Rencana 0.05 0.05 0.05 0.05
II.2 Pekerjaan Beton 4.52 Rencana 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56
II.3 Pekerjaan Rangka & Penutup Atap 3.62 Rencana 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 50%
Aktual 0.72
II.4 Pekerjaan Dinding 3.36 Rencana 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42
II.5 Pekerjaan Kusen Pintu & Jendela 2.02 Rencana 0.34 0.34 0.34 0.34 0.34 0.34
Aktual
II.6 Pekerjaan lantai 3.77 Rencana 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47
II.7 Pekerjaan Plafond 1.16 Rencana 0.19 0.19 0.19 0.19 0.19 0.19
Aktual
II.8 Pekerjaan Sanitair 1.05 Rencana 0.18 0.18 0.18 0.18 0.18 0.18
Aktual 0.01
II.9 Pekerjaan Pengecatan 0.70 Rencana 0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09
Aktual
II.10 PEKERJAAN MEKANIKAL 4.37 Rencana 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29 0.29
II.11 PEKERJAAN ELEKTRIKAL 1.12 Rencana 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07 0.07
D. PEKERJAAN PENGATAPAN
III.1 KONTAINER PARING LAHUNG 3.77 Rencana 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34
III.2 KONTAINER TELUK TIMBAU 3.66 Rencana 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
Aktual
III.3 YARD TELUK TIMBAU 4.05 Rencana 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37 0.37
Aktual
III.4 PEKERJAAN MEP AREA PARING LAHUNG 5.96 Rencana 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
Aktual
0.00%
TOTAL 100
Progess 1.76 1.76 1.76 2.32 3.65 3.65 3.57 4.37 4.82 5.58 5.58 - - 3.35 3.77 4.41 4.41 5.10 4.65 3.90 4.29 4.22 4.17 4.30 4.30 3.83 3.52 2.95
Komulatif Progress - 1.76 3.52 5.28 7.60 11.26 14.91 18.47 22.85 27.67 33.25 38.82 38.82 38.82 42.18 45.95 50.36 54.78 59.88 64.53 68.43 72.72 76.94 81.10 85.40 89.70 93.52 97.05 100.00
Progess 1.91 1.40 0.84 0.87 1.05 1.33 1.13 3.70 5.13 6.28 6.31 - - - 0.48 0.47 - - - - - - - - - - - -
Komulatif Progress - 1.91 3.31 4.16 5.02 6.08 7.40 8.53 12.23 17.36 23.64 30.02 30.02 30.50 30.97
Deviation 0.15 (0.20) (1.12) (2.58) (5.18) (7.50) (9.94) (10.61) (10.31) (9.61) (9.04) (9.04) (15.45) (19.40)
I MAN
- Pekerja sudah ada dilokasi - menunggu shopdrawing Target tgl. 10 mei 2017 shop drawing sdh selesai Asnadi
-
-
II MATERIAL
- Material alam sudah ready di lapangan - menunggu shopdrawing Target tgl. 10 mei 2017 shop drawing sdh selesai Asnadi
- Material Pancang 25x25 sudah sampai di lapangan - menunggu izin kerja Target tgl. 24 mei 2017 pemancangan selesai
- Material baja sudah ready di lapangan - Proses fabrikasi baja sedang berlangsung
- Tanah untuk urugan kantin belum dikirim pihak PAMA - Mohon segera dikirim Target tgl. 03 juni 2017 tanah urugan selesai
III METHODE
- Shop Drawing belum di Approval - Mohon segera di Approval shopdrawing Target tgl. 10 mei 2017 shop drawing sdh selesai Asnadi
-
-
IV K3 LH
-
-
-
PROJECT MANAGEMENT PROGRESS
PT. PAMAPERSADA NUSANTARA Project : PEMBANGUNAN WORKSHOP & MESS FACILITY
Jl. Rawagelam I No. 9, Kawasan Industri Pulogadung
Phone : (021) 4602015 Fax: (021) 4601916 Paket Pekerjaa : EXTEND WORKSHOP A2B
Kontraktor : PT. GUNUNGGAYA PERSADA
Deviasi : -13.13
Asnadi Chenchen
VOL BOBOT PERIODE LALU PERIODE INI S/D PERIODE INI
NO JENIS PEKERJAAN SPESIFIKASI UNIT
PAMA (%) PRESTASI BOBOT (%) PRESTASI BOBOT (%) PRESTASI
2 Kabel leeder 300 x 100 c/w fitting, Tree Star mtr 100.00 1.37 30.00 0.41 - 30.00
support and accessories - - - -
3 Armature Lucolite
HPIT LED 150 W Phillips nos 4.00 0.29 25.00 0.07 - 25.00
Lampu HPIBU LED 150 watt Phillips nos 18.00 4.84 25.00 1.21 - 25.00
TL LED 2 x 18 Watt TKO V-Shape Phillips nos 24.00 0.53 25.00 0.13 - 25.00
Stop kontak 50 A/ 3 phase TYPE 56C550RP+56P550 Clipsal nos 3.00 0.29 25.00 0.07 - 25.00
Stop kontak 32 A/ 3 phase TYPE 56C432+56P432 Clipsal nos 3.00 0.18 25.00 0.04 - 25.00
Stop Kontak 16 A/ 1 Phase Clipsal nos 3.00 0.01 25.00 0.00 - 25.00
4 Instalation
Dari LVMDP ke SDP Workshop Kabel NYFGBY 4C - 185mm2 Supreme mtr 100.00 6.54 - - - -
Dari SDP ke PP Workshop Kabel NYFGBY 4C-70mm2 Supreme mtr 15.00 0.34 - - - -
Dari SDP ke PP Ofc. Worksop Kabel NYFGBY 4C-16mm2 Supreme mtr 15.00 0.16 - - - -
Dari SDP ke PP UPS Kabel NYFGBY 4C-10mm2 Supreme mtr 15.00 0.12 - - - -
Installation lampu HPIT 400 Watt NYM 3 x 2,5mm + Conduit Supreme titik 4.00 0.11 - - - -
Installation lampu HPIBU LED 200 Watt NYM 3 x 2,5mm + Conduit Supreme titik 18.00 0.52 - - - -
Installation lampu TL LED 2x18 Watt TKO V-Shape Supreme titik 24.00 0.35 - - - -
Installation Stop kontak 16 A/1 p NYM 3 x 2,5mm + Conduit Supreme titik 3.00 0.05 - - - -
Installation Stop kontak 63 A/3 p NYY 4 x 16mm + G Supreme titik 3.00 0.30 - - - -
Installation Stop kontak 32 A/3 p NYY 4 x 6mm + G Supreme titik 3.00 0.16 - - - -
Instalation
7 NYM 3 x 2,5 mm2 + conduit to Installation TL LED 2 x 18 Watt Supreme Point
8 NYM 3 x 2,5 mm2 + conduit to Installation DL 1 x 18 Watt Supreme Point
9 NYM 3 x 2,5 mm2 + conduit to Installation Exhaust fan Supreme Point
10 NYM 3 x 2,5 mm2 + conduit to Installation Receptacle 1 Ph/16 A 1 Gang' Supreme Point 8.00 0.13 20.00 0.03 - 20.00
11 NYM 3 x 2,5 mm2 + Conduit to General Receptacle 1 Ph/16 A 2 Gang ( UPS ) Supreme Point 8.00 0.13 20.00 0.03 - 20.00
12 Support of Material Lot 1.00 0.14 20.00 0.03 - 20.00
13 Grounding Bangunan Keliling Lot 8.00 1.83 20.00 0.37 - 20.00
14 Telephone ( Outlet + Instalation ) Lot
B MECHANICAL WORKS
1 Packed Booster Pump ( 2 Pompa ) unit 1.00 2.76 - - - -
Merk Grounfos / Ebara
Type
Kap. 100 Liter / Menit
Total Head 40 m
Power
Presure Tank ( include )
Model membran
Cap. 200 lt/m
Automatic Panel Water Pump
Cable Power Pump NYY 4x6 mm2 ( 50 m' )
Include fitting, support and accessories
2 Air Conditioning
AC Split Wall type 1 PK - 9000 BTU / H Panasonic Unit
AC Split Wall type 2 PK 18000 BTU / H Panasonic Unit 2.00 0.90 - - - -
AC Split Wall type 1,5 PK - 12,100 BTU / H Panasonic Unit
Exhaust fan type industrial Panasonic UNIT
Installation AC + Cable Power + Cable Control Panasonic Lot
Installation Exhaust + Cable Power + Cable Control Panasonic Lot
Support of Material Lot
6 Fire Protection
Apar 3,5 Kg Appron / Yamato bh 4.00 0.62 - - - -
PT PAMAPERSADA NUSANTARA
Project Manager
9.97
0.12
0.37
-
0.38
0.56
0.09
0.31
0.55
3.19
4.41
0.93
0.23
0.05
0.16
0.28
0.20
0.01
12.14
1.25
0.17
0.55
0.11
2.10
5.34
-
2.22
0.31
0.04
0.05
8.19
1.59
0.16
0.78
0.07
0.69
0.11
0.80
0.47
1.10
0.28
0.31
0.26
0.29
0.15
0.10
0.06
0.98
-
1.49
0.89
0.13
0.03
0.10
0.29
0.06
0.81
0.58
0.23
-
-
-
-
-
-
-
-
-
-
-
-
1.50
0.98
0.52
4.49
0.60
0.39
0.29
0.37
0.18
0.27
0.41
-
0.07
1.21
0.13
0.07
0.04
0.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
0.03
0.03
0.03
0.37
-
-
-
-
-
-
-
-
-
-
-
-
39.53
PROJECT MANAGEMENT PROGRESS PERIODE
I. PROGRESS PEKERJAAN
A. PROGRESS KOMULATIF
Progress Rencana :
49.31
Progress Aktual :
36.18
Deviasi (+ / -) :
(13.13)
2017
APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER
No Item Bobot (%) Note
4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
4 01Apr-09Apr 10Apr-16Apr 17Apr-23Apr 24Apr-30Apr 01Mei-07Mei 08Mei-14Mei 15Mei-21Mei 22Mei-28Mei 29Mei-04Jun 05Jun-11Jun 12Jun-18Jun 19Jun-25Jun 26Jun-02Jul 03Jul-09Jul 10Jul-16Jul 17Jul-23Jul 24Jul-30Jul 31Jul-06Agus 07Agus-13Agus 14Agus-20Agus 21Agus-27Agus 28Agus-03Sep 04Sep-10Sep 11Sep-17Sep 18Sep-24Sep 25Sep-01Okt 02Okt-08Okt 09Okt-15Okt
Aktual 1.75 1.27 0.73 0.74 0.78 0.71 0.70 0.65 0.68 1.33 0.63
Aktual 0.02 0.02 0.02 0.05 0.02 0.02 0.09 0.30 0.09 0.13 0.15
I.2 PEKERJAAN STRUKTUR DASAR 19.93 Rencana 2.85 2.85 2.85 2.85 2.85 2.85 2.85
I.3 PEKERJAAN STRUKTUR BAJA 12.45 Rencana 1.56 1.56 1.56 1.56 1.56 1.56 1.56 1.56
I.4 PEKERJAAN PASANGAN ATAP & CLADDING 5.01 Rencana 0.83 0.83 0.83 0.83 0.83 0.83
I.5 PEKERJAAN DINDING & LANTAI 5.84 Rencana 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49 0.49
Aktual 0.81
I.6 PEKERJAAN PLAFOND & CAT 1.34 Rencana 0.27 0.27 0.27 0.27 0.27
Aktual
I.7 PEKERJAAN KUSEN DAN PINTU 3.74 Rencana 0.62 0.62 0.62 0.62 0.62 0.62
Aktual
I.8 PEKERJAAN SARANA LUAR 5.00 Rencana 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45
Aktual 1.50
I.9 PEKERJAAN MEKANIKAL / ELEKTRIKAL TYRESHOP 31.62 Rencana 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66 1.66
Aktual 1.14
TOTAL 100
Progess 0.72 0.72 0.72 0.72 3.57 3.57 3.39 5.05 5.05 6.61 6.61 - - 3.76 3.76 5.08 5.08 5.53 5.53 3.98 4.60 3.77 3.77 4.03 4.03 4.03 3.41 2.92
Komulatif Progress - 0.72 1.44 2.16 2.88 6.45 10.01 13.40 18.45 23.50 30.11 36.71 36.71 36.71 40.47 44.23 49.31 54.39 59.92 65.46 69.44 74.04 77.80 81.57 85.60 89.63 93.67 97.08 100.00
Progess 1.78 1.29 0.76 0.78 1.17 1.85 1.56 6.85 6.11 4.65 8.79 - - - - 0.58 - - - - - - - - - - - -
Komulatif Progress - 1.78 3.07 3.83 4.61 5.78 7.63 9.19 16.04 22.15 26.80 35.60 35.60 35.60 36.18
Deviation 1.06 1.63 1.67 1.73 (0.66) (2.39) (4.21) (2.41) (1.35) (3.30) (1.12) (1.12) (8.63) (13.13)
PERIODE
Ket
100%
0.00%
PROJECT MANAGEMENT PROGRESS
PT. PAMAPERSADA NUSANTARA Project : PEMBANGUNAN WORKSHOP & MESS FACILITY
Jl. Rawagelam I No. 9, Kawasan Industri Pulogadung
Phone : (021) 4602015 Fax: (021) 4601916 Paket Pekerjaa : DAPUR + KANTIN
Kontraktor : PT. GUNUNGGAYA PERSADA
Deviasi : -8.28
Asnadi Chenchen
VOL BOBOT PERIODE LALU PERIODE INI S/D PERIODE INI
NO JENIS PEKERJAAN SPESIFIKASI UNIT
PAMA (%) PRESTASI BOBOT (%) PRESTASI BOBOT (%) PRESTASI
1 PEKERJAAN STRUKTUR
a. Pekerjaan Tanah 0.63 0.53 0.02
1 Galian tanah m3 31.70 0.28 95.00 0.27 - 95.00
2 Urugan tanah kembali m3 12.00 0.05 80.00 0.04 5.00 0.00 85.00
3 Urugan tanah peninggian lantai (tanah dari lokasi project) m3 - - 70.00 - 5.00 - 75.00
4 Pemadatan tanah m2 249.60 0.30 75.00 0.22 5.00 0.01 80.00
2 PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 10.78 1.72 0.38
1 Pasangan dinding batako C 1:4 Area Luar + Kamar mandi Lokal m2 323.72 3.82 45.00 1.72 10.00 0.38 55.00
2 Pasangan dinding GRC h:2,4 m ( Area Kantin) 2 sisi m2 62.40 1.13 - - - -
3 Plesteran & Acian C 1:4 m2 647.44 4.55 - - - -
4 Pas Dinding keramik KM 20/25 Asia Tile / Mulia m2 15.90 0.25 - - - -
5 Pas . Dinding Keramik Area Dapur Masak m2 3.90 0.06 - - - -
6 Dinding Waremash area Gas m2 20.00 0.97 - - - -
b Instalasi Pipa Air Kotor, Air Bekas, Dan Pipa Venting Lengkap Dengan Fitting
Pipa air kotor, bekas dan venting dari pipa PVC Class AW lengkap
dengan sambungan, gantungan / penyangga, material
bantu, sesuai dengan gambar dan spesifikasi teknik
Air kotor, Air Bekas dan Venting
1 Pipa 100 Wavin AW m 25.00 0.16 20.00 0.03 5.00 0.01 25.00
2 Pipa 65 m 10.00 0.04 20.00 0.01 5.00 0.00 25.00
3 Pipa 50 m 21.00 0.08 20.00 0.02 5.00 0.00 25.00
4 Pipa 32 m 4.00 0.01 20.00 0.00 5.00 0.00 25.00
5 Floor Clean Out 100 mm Lokal buah 4.00 0.06 20.00 0.01 5.00 0.00 25.00
6 Vent Cap 100 mm Lokal buah 1.00 0.04 20.00 0.01 5.00 0.00 25.00
7 Portable Grease Trap kapasitas 10 liter terbuat dari stainless steel Lokal buah 1.00 0.29 20.00 0.06 5.00 0.01 25.00
lengkap dengan saringan
8 Fitting Rucika ls 1.00 0.30 20.00 0.06 - 20.00
9 Material Bantu Ls 1.00 0.22 20.00 0.04 - 20.00
10 Biotect BT Series BT 6 ( Cap 4,8 m3) buah 1.00 1.89 20.00 0.38 - 20.00
B PEKERJAAN TELPON
Outlet & Instalasi
1 Pengadaan dan pemsangan Outlet telpon dan instalasi Telpon pipa Is - - - -
konduit sesuai gambar dan spesifikasi teknik
Kabel telpon 2x2x0,6 mm didalam pipa Pvc high Impact
PT PAMAPERSADA NUSANTARA
Project Manager
9.33
0.14
0.43
-
0.33
0.54
0.10
0.34
-
2.89
4.57
0.55
0.27
0.04
-
0.24
12.88
6.61
1.71
2.49
1.84
0.22
-
3.49
1.92
1.05
0.14
0.02
0.35
2.10
2.10
-
-
-
-
-
0.00
-
-
-
-
-
-
3.56
1.73
0.35
0.10
0.77
0.59
0.02
0.00
-
-
-
0.09
-
-
0.03
-
-
0.06
-
-
-
0.00
-
-
-
0.91
0.01
0.01
0.01
0.01
0.01
0.16
-
-
0.04
-
0.04
0.01
0.02
0.00
0.01
0.01
0.07
0.06
0.04
0.38
-
-
-
-
-
-
-
-
-
-
-
-
0.75
0.53
0.13
0.02
0.01
0.01
0.02
0.03
0.01
-
-
-
-
-
-
-
33.65
PROJECT MANAGEMENT PROGRESS PERIODE
I. PROGRESS PEKERJAAN
A. PROGRESS KOMULATIF
Progress Rencana :
39.18
Progress Aktual :
30.89
Deviasi (+ / -) :
(8.28)
2017
APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER
No Item Bobot (%) Note
4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
4 01Apr-09Apr 10Apr-16Apr 17Apr-23Apr 24Apr-30Apr 01Mei-07Mei 08Mei-14Mei 15Mei-21Mei 22Mei-28Mei 29Mei-04Jun 05Jun-11Jun 12Jun-18Jun 19Jun-25Jun 26Jun-02Jul 03Jul-09Jul 10Jul-16Jul 17Jul-23Jul 24Jul-30Jul 31Jul-06Agus 07Agus-13Agus 14Agus-20Agus 21Agus-27Agus 28Agus-03Sep 04Sep-10Sep 11Sep-17Sep 18Sep-24Sep 25Sep-01Okt 02Okt-08Okt 09Okt-15Okt
Aktual 0.00 0.00 0.00 0.00 0.00 0.00 1.83 0.88 4.31 0.86 1.45
C. PEKERJAAN DAPUR
II.1 Pekerjaan Tanah 0.63 Rencana 0.16 0.16 0.16 0.16
II.2 Pekerjaan Beton 14.50 Rencana 1.81 1.81 1.81 1.81 1.81 1.81 1.81 1.81
II.3 Pekerjaan Rangka & Penutup Atap 11.64 Rencana 1.45 1.45 1.45 1.45 1.45 1.45 1.45 1.45
Aktual 2.33
II.4 Pekerjaan Dinding 10.78 Rencana 1.35 1.35 1.35 1.35 1.35 1.35 1.35 1.35
II.5 Pekerjaan Kusen Pintu & Jendela 6.50 Rencana 1.08 1.08 1.08 1.08 1.08 1.08
Aktual
II.6 Pekerjaan lantai 12.10 Rencana 1.51 1.51 1.51 1.51 1.51 1.51 1.51 1.51
II.7 Pekerjaan Plafond 3.71 Rencana 0.62 0.62 0.62 0.62 0.62 0.62
Aktual
II.8 Pekerjaan Sanitair 3.38 Rencana 0.56 0.56 0.56 0.56 0.56 0.56
Aktual 0.02
II.9 Pekerjaan Pengecatan 2.24 Rencana 0.28 0.28 0.28 0.28 0.28 0.28 0.28 0.28
Aktual
II.10 PEKERJAAN MEKANIKAL 14.03 Rencana 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
II.11 PEKERJAAN ELEKTRIKAL 3.59 Rencana 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24
Aktual 0.37
TOTAL 100
Progess 0.81 0.81 0.81 2.62 2.46 2.46 2.46 2.46 3.92 3.92 3.92 - - 3.28 4.63 4.63 4.63 6.14 4.69 4.69 4.96 6.05 5.88 5.88 5.88 4.37 4.37 3.29
Komulatif Progress - 0.81 1.61 2.42 5.04 7.50 9.97 12.43 14.89 18.81 22.73 26.64 26.64 26.64 29.92 34.55 39.18 43.80 49.94 54.63 59.31 64.28 70.33 76.21 82.09 87.97 92.34 96.71 100.00
Progess - - - - - - 4.01 5.65 7.94 7.24 5.25 - - - 0.21 0.60 - - - - - - - - - - - -
Komulatif Progress - - - - - - - 4.01 9.65 17.59 24.83 30.08 30.08 30.29 30.89
Deviation (0.81) (1.61) (2.42) (5.04) (7.50) (9.97) (8.42) (5.24) (1.22) 2.11 3.44 3.44 (4.26) (8.28)
PERIODE
Ket
100%
50%
0.00%
2. KONTAINER TELUK TIMBAU 17.88
1 Rangka atap baja ringan ( upah pasang ) m 246.40 305.60 1.11
2 Atap Galvalume ex. Fumira type G680, t = 0,5 mm m 246.40 305.60 5.35
3 Listplank GRC 25 cm t : 12mm m 102.40 111.00 3.90
4 Cladding Galvalum ex Fumira t : 0,45 mm m 102.40 111.00 2.31
5 Cor Lantai t : 10 cm wiremesh single M8 Sitemix K250 m 12.00 14.40 5.22
I. PROGRESS PEKERJAAN
A. PROGRESS KOMULATIF
Progress Rencana :
69.89
Progress Aktual :
-
Deviasi (+ / -) :
(69.89)
2017
APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER
No Item Bobot (%) Note Ket
4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
4 01Apr-09Apr 10Apr-16Apr 17Apr-23Apr 24Apr-30Apr 01Mei-07Mei 08Mei-14Mei 15Mei-21Mei 22Mei-28Mei 29Mei-04Jun 05Jun-11Jun 12Jun-18Jun 19Jun-25Jun 26Jun-02Jul 03Jul-09Jul 10Jul-16Jul 17Jul-23Jul 24Jul-30Jul 31Jul-06Agus 07Agus-13Agus 14Agus-20Agus 21Agus-27Agus 28Agus-03Sep 04Sep-10Sep 11Sep-17Sep 18Sep-24Sep 25Sep-01Okt 02Okt-08Okt 09Okt-15Okt
D. PEKERJAAN PENGATAPAN
III.1 KONTAINER PARING LAHUNG 18.44 Rencana 1.68 1.68 1.68 1.68 1.68 1.68 1.68 1.68 1.68 1.68 1.68
Aktual 0.07 0.13 0.20 0.26 0.13 0.07 0.65 1.17 1.37 2.42
III.2 KONTAINER TELUK TIMBAU 17.88 Rencana 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63 1.63
Aktual
III.3 YARD TELUK TIMBAU 19.82 Rencana 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80 1.80
Aktual
III.4 PEKERJAAN MEP AREA PARING LAHUNG 29.15 Rencana 1.94 1.94 1.94 1.94 1.94 1.94 1.94 1.94 1.94 1.94 1.94 1.94 1.94 1.94 1.94
Aktual
0.00%
TOTAL 100
Progess 5.67 5.67 5.67 5.67 5.67 5.67 5.67 5.67 5.67 5.67 5.67 - - 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51
Komulatif Progress - 5.67 11.34 17.01 22.68 28.35 34.02 39.69 45.36 51.03 56.70 62.37 62.37 62.37 64.88 67.38 69.89 72.40 74.91 77.42 79.93 82.44 84.95 87.46 89.96 92.47 94.98 97.49 100.00
Progess 1.15 1.23 0.75 0.81 0.68 0.76 1.57 1.94 2.75 0.71 3.12 - - - - - - - - - - - - - - - - -
Komulatif Progress - 1.15 2.37 3.12 3.93 4.61 5.37 6.94 8.88 11.63 12.33 15.46 15.46 15.46
Deviation (4.52) (8.97) (13.89) (18.75) (23.74) (28.65) (32.75) (36.48) (39.40) (44.36) (46.91) (46.91) (51.93)
DOKUMENTASI PELAKSANAAN
PEKERJAAN PENGECORAN TIANG KANTIN & DAPUR PEKERJAAN PEMASANGAN DINDING BATAKO AREA KANTIN &
DAPUR
PEKERJAAN FABRIKASI BAJA AREA WORKSHOP PEKERJAAN FABRIKASI BAJA AREA WORKSHOP