At
Khasra No. 89/1/1, 89/1/2, 90/1, 91/3, 97/2, 91/2, 89/1/3,
92/2/1 Village Chitawad & Plot No. 2, ring Road, Yojna No. 94,
Sector-1, Tehsil Indore, District Indore, M.P.
Registered address
Vishesh Diagnostics Pvt. Ltd.
A.B. Road, Geeta Bhavan Chouraha,
Indore (MP)-452 001
0
List of Contents
1. INTRODUCTION .................................................................................................................. 02
2. SITE LOCATION AND SURROUNDING ................................................................................. 02
3. CONNECTIVITY .................................................................................................................... 02
4. AREA STATEMENT............................................................................................................... 02
5. POPULATION DENSITY ........................................................................................................ 03
6. WATER REQUIREMENT ....................................................................................................... 03
7. SEWAGE TREATMENT TECHNOLOGY ................................................................................. 04
8. RAIN WATER HARVESTING ................................................................................................. 07
9. VEHICLE PARKING FACILITIES ............................................................................................. 10
10. POWER REQUIREMENT.................................................................................................... 10
11. SOLID WASTE GENERATION ............................................................................................. 11
12. GREEN AREA ..................................................................................................................... 12
List of Tables
Table 1: Area Statement ............................................................................................................ 02
Table 2: Population Break up ..................................................................................................... 02
Table 3: Calculations for Daily Water Demand .......................................................................... 03
Table 4: Waste Water Calculations ............................................................................................ 03
Table 5: Calculation of Solid Waste Generation ...................................................................... 03
1
CONCEPTUAL PLAN
1.0 INTRODUCTION
The Vishesh Diagnostics Pvt. Is going to establish a 200 beds hospital in the Indore city, or which
the Land has been procured and all approvals has been obtained. Totall area for the project is
18070.09 sqm, and total builtt-up area will be 42207.76 sqm. The constructed area is more then
mes under the preview of EIA Notification 14thh Sept. 2006 in category
20,000 sqm therefore its com
8 (a).
3.0 CONNECTIVITY
The project site has good conne
connectivity. Nearest Railway Station Indore is 7.0 km in NE direction
from the project site. Nearest airport is Indore Airport, at 20 km (SW) from the project site.
During the project operational stage, the total water demand of the Hospital and nursing home
will be around 140 kld.
It may be seen that total waste water generation will be 126 KLD and treated water will be
available as 114 KLD per day (after 10% process loss) . The utilization of treated waste water is
given below :
3
Total Treated water = 114 KLD
Recycled water requirement
Flushing = 25 KLD
HAVC system = 35 KLD
Horticulture = 66 KLD
Total = 126 KLD
Hence we haveve not proposed the discharge of treated water from the campus. It is submitted
that we are having enough land measuring with open area of 8681.54,, therefore we have not
proposed any discharge out side of the premises.
Wastewater:
During the operationall stage, wastewater generation from Hospital and Nursing home project
will be approx. 126 kld.
The treated wastewater generated will be reused for flushing, and horticulture purposes.
4
sewerage systems.
Sludge generated from the Sewage Treatment Plant shall be rich in organic content and
used as manure for horticultural purposes.
Wastewater Details
Treatment Technology
The technology is based on attached growth aerobic treatment followed by clarification by a
tube settler. Lime will be dosed in for suppression of foaming tendencies. The clarified water will
be filtered in a pressure sand filter after dosing of coagulant (alum) for removal of unsettled
suspended impurities. This water will be passed through an activated carbon filter for removal of
organics. The filtered water from ACF is then chlorinated & stored in the flushing tank.
The attached growth fluidized aerobic bed reactor (FAB) process combines the biological
processes of attached & suspended growth. It combines submerged fixed film with extended
aeration for treatment of the waste water.
5
The waste water after screening is collected in an equalization tank. The equalization tank is
required for preventing surges in flow & facilitating equalization of characteristics over the entire
quantity of effluent in a given time. A provision for pre-aeration is made in the equalization tank
in order to ensure mixing & to prevent the sewage from going septic.
The equalized sewage is then pumped into the FAB reactor for biological processing. The water
enters the bottom of the reactor & flows up through the fixed film media which grossly enhances
the hydraulic retention time & provides a large surface area for growth of biological micro
organisms. The FAB reactor is aerated by fine pore sub surface diffusers which provide the
oxygen for organic removal. The synthetic media floats on the water & the air agitation ensures
good water to micro-organism contact.
The FAB treatment is an attached growth type biological treatment process where in, the
majority of biological activity takes place on the surface of the PVC media. Continuous aeration
ensures aerobic activity on the surface of the media. Micro organisms attach themselves on the
media & grow into dense films of a viscous jelly like nature.
Waste water passes over this film with dissolved organics passing into the bio-film due to
concentration gradients within the film. Suspended particles & colloid may get retained on this
sticky surface where they are decomposed into soluble products. Oxygen from the aeration
process in the waste water provides oxygen for the aerobic reactions at the bio-film surface.
Waste products from the metabolic processes diffuse outward & get carried away by the waste
water or air currents through the voids of the media.
6
Figure 3: Schematic Diagram of STP
Keeping in mind the importance of water and it scarcity it is proposed to conserve rainwater by
harvesting which will improve the subsoil water condition / moisture content maintained /
improved to a great extent.
It is proposed to collect
ect rainwater from roof area, Ground surface area and harvest the same for
charging the under Ground water table. For this, all rain water pipes from ducts are connected to
the storm water drain at ground level. The collected rainwater with battery / netwo
network of catch
basin is finally connected to rainwater harvest pit located at various points.
The rain water harvesting pits will contain circular RCC retention tanks of 2.5 m radius. It will be
fitted with RCC lids and will be provided with separate inlet and outlets (Overflow) pipes. The
base of the retention tank will be fitted with course sand of 1.5 2 mm dia, gravel of 5 10 mm
dia and finally by boulder of 5 15 mm dia laid one layer on another. This provides a natural
filtration to the incoming rain
in water. A 153 dia PVC pipe with1.55mm slots at the bottom is
provided for percolation. The total retention capacity of the tank and pipe is about 80 m3
7
It has been estimated that the annual rain water harvesting capacity of the entire complex is
around 58664 m3. Considering a maximum intensity of 50 mm rainfall per hour, and run of
coefficient from rooftop, paved road/ parking area and open area to be 0.7, 0.85 and 0.2
respectively the rain water available for harvesting shall be as shown in the table below:
(m/hr) in
(Q)
mm
8
9
9.0 VEHICLE PARKING FACILITIES
For the project, ample parking space has been provided. During operational phase, parking space
of 8540 sqm will be provided.
Energy consumption per sqft of builtup is assumed as apprx. 3.12 watt/sqft for th
proposed medical institute complex.
Power Consumption during operation phase for facility
3 security lightening 05
4 bore wells 12
5 electrically operated 60
equipment
6 welding m/cs 12
7 Misc. load 15
10
Details of D.G Sets
To serve as a back-up power supply, 1500 and 1250 KVA of power is to be supplied through DG
set, having a 02 stack, with estimated operation duration of 2 hours per day. As a worst-case
scenario, emissions were predicted assuming an operation time of 24 hours. These generators
would be located in the Services area of the site.
1 No of DG sets 2
2 No of Stacks 2
The excavated material such as topsoil and stones will be stacked for reuse during later
stages of construction
Excavated top soil will be stored in temporary constructed soil bank and will be reused
for landscaping of the project.
11
Remaining soil shall be utilized for refilling / road work / rising of site level at locations/
selling to local vendor.
Solid Waste
Construction Waste
12
0