Back Up Data - 6
Back Up Data - 6
JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp)
Terbilang : #REF!
Page 2 of 73
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
(Rp) (Rp)
1 2 3 4 5 6=4x5
Page 3 of 73
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN SAT VOLUME
(Rp) (Rp)
1 2 3 4 5 6=4x5
Page 4 of 73
ANALISA HARGA SATUAN
1 PEKERJAAN PEMBONGKARAN
Page 5 of 73
2 PEKERJAAN TANAH
Page 6 of 73
2.2 1 M3 GALIAN TANAH DALAM
0.526 OH Pekerja @ Rp. 55,000.00 = Rp 28,930.00
0.052 OH Mandor @ Rp. 65,000.00 = Rp 3,380.00
JUMLAH Rp 32,310.00
3 PEKERJAAN PONDASI
Page 7 of 73
4 PEKERJAAN BETON
Page 8 of 73
4.3 1 M3 MEMBUAT SLOEF BETON BERTULANG (150 Kg BESI + BEKISTING)
0.270 M3 Papan Mal Klas III @ Rp. 1,500,000.00 = Rp 405,000.00
2.000 Kg Paku Biasa @ Rp. 20,000.00 = Rp 40,000.00
0.600 Ltr Minyak Bekisting @ Rp. 19,800.00 = Rp 11,880.00
150.000 Kg Besi Beton @ Rp. 17,000.00 = Rp 2,550,000.00
3.000 Kg Kawat Beton @ Rp. 25,000.00 = Rp 75,000.00
323.000 Kg Semen Portland @ Rp. 1,600.00 = Rp 516,800.00
0.520 M3 Pasir Beton @ Rp. 110,000.00 = Rp 57,200.00
0.780 M 3
Kerikil Beton @ Rp. 132,000.00 = Rp 102,960.00
4.850 OH Pekerja @ Rp. 55,000.00 = Rp 266,750.00
0.350 OH Tukang Batu @ Rp. 65,000.00 = Rp 22,750.00
1.560 OH Tukang Kayu @ Rp. 65,000.00 = Rp 101,400.00
1.400 OH Tukang Besi @ Rp. 65,000.00 = Rp 91,000.00
0.331 OH Kepala Tukang @ Rp. 75,000.00 = Rp 24,825.00
0.170 OH Mandor @ Rp. 70,000.00 = Rp 11,900.00
JUMLAH Rp 4,277,465.00
Page 9 of 73
4.5 1 M3 MEMBUAT KOLOM BETON BERTULANG (160 Kg BESI + BEKISTING)
0.400 M3 Papan Mal Klas III @ Rp. 1,500,000.00 = Rp 600,000.00
4.000 Kg Paku Biasa @ Rp. 20,000.00 = Rp 80,000.00
2.000 Ltr Minyak Bekisting @ Rp. 19,800.00 = Rp 39,600.00
160.000 Kg Besi Beton @ Rp. 17,000.00 = Rp 2,720,000.00
4.500 Kg Kawat Beton @ Rp. 25,000.00 = Rp 112,500.00
323.000 Kg Semen Portland @ Rp. 1,600.00 = Rp 516,800.00
0.520 M3 Pasir Beton @ Rp. 110,000.00 = Rp 57,200.00
0.780 M 3
Kerikil Beton @ Rp. 132,000.00 = Rp 102,960.00
0.150 M 3
Kayu Klas III, Jenis Balok @ Rp. 1,952,000.00 = Rp 292,800.00
3.500 Lbr Tripleks @ Rp. 49,500.00 = Rp 173,250.00
7.300 OH Pekerja @ Rp. 55,000.00 = Rp 401,500.00
0.350 OH Tukang Batu @ Rp. 65,000.00 = Rp 22,750.00
3.300 OH Tukang Kayu @ Rp. 65,000.00 = Rp 214,500.00
2.100 OH Tukang Besi @ Rp. 65,000.00 = Rp 136,500.00
0.570 OH Kepala Tukang @ Rp. 75,000.00 = Rp 42,750.00
0.250 OH Mandor @ Rp. 70,000.00 = Rp 17,500.00
JUMLAH Rp 5,530,610.00
Page 10 of 73
4.8 1 M' MEMBUAT KOLOM PRAKTIS BETON BERTULANG + BEKISTING
0.002 M3 Papan Mal Klas III @ Rp. 1,500,000.00 = Rp 3,000.00
0.010 Kg Paku Biasa @ Rp. 20,000.00 = Rp 200.00
3.000 Kg Besi Beton Polos @ Rp. 17,000.00 = Rp 51,000.00
0.450 Kg Kawat Beton @ Rp. 25,000.00 = Rp 11,250.00
4.000 Kg Semen Portland @ Rp. 1,600.00 = Rp 6,400.00
0.006 M 3
Pasir Beton @ Rp. 110,000.00 = Rp 660.00
0.009 M 3
Koral Beton @ Rp. 132,000.00 = Rp 1,188.00
0.060 OH Pekerja @ Rp. 55,000.00 = Rp 3,300.00
0.020 OH Tukang Batu @ Rp. 65,000.00 = Rp 1,300.00
0.020 OH Tukang Kayu @ Rp. 65,000.00 = Rp 1,300.00
0.020 OH Tukang Besi @ Rp. 65,000.00 = Rp 1,300.00
0.006 OH Kepala Tukang @ Rp. 75,000.00 = Rp 450.00
0.003 OH Mandor @ Rp. 70,000.00 = Rp 210.00
JUMLAH Rp 81,558.00
Page 11 of 73
4.9 1 M3 MEMBUAT BALOK BETON BERTULANG (180 Kg BESI + BEKISTING)
0.320 M3 Papan Mal Klas III @ Rp. 1,500,000.00 = Rp 480,000.00
3.200 Kg Paku Biasa @ Rp. 20,000.00 = Rp 64,000.00
1.600 Ltr Minyak Bekisting @ Rp. 19,800.00 = Rp 31,680.00
180.000 Kg Besi Beton @ Rp. 17,000.00 = Rp 3,060,000.00
2.250 Kg Kawat Beton @ Rp. 25,000.00 = Rp 56,250.00
323.000 Kg Semen Portland @ Rp. 1,600.00 = Rp 516,800.00
0.520 M 3
Pasir Beton @ Rp. 110,000.00 = Rp 57,200.00
0.780 M3 Kerikil Beton @ Rp. 132,000.00 = Rp 102,960.00
0.120 M3 Kayu Klas III, Jenis Balok @ Rp. 1,952,000.00 = Rp 234,240.00
2.800 Lbr Tripleks @ Rp. 49,500.00 = Rp 138,600.00
5.800 OH Pekerja @ Rp. 55,000.00 = Rp 319,000.00
0.350 OH Tukang Batu @ Rp. 65,000.00 = Rp 22,750.00
2.800 OH Tukang Kayu @ Rp. 65,000.00 = Rp 182,000.00
1.050 OH Tukang Besi @ Rp. 65,000.00 = Rp 68,250.00
0.420 OH Kepala Tukang @ Rp. 75,000.00 = Rp 31,500.00
0.185 OH Mandor @ Rp. 70,000.00 = Rp 12,950.00
JUMLAH Rp 5,378,180.00
Page 12 of 73
0.320 M3 Papan Mal Klas III @ Rp. 1,500,000.00 = Rp 480,000.00
3.200 Kg Paku Biasa @ Rp. 20,000.00 = Rp 64,000.00
1.600 Ltr Minyak Bekisting @ Rp. 19,800.00 = Rp 31,680.00
150.000 Kg Besi Beton @ Rp. 17,000.00 = Rp 2,550,000.00
2.250 Kg Kawat Beton @ Rp. 25,000.00 = Rp 56,250.00
323.000 Kg Semen Portland @ Rp. 1,600.00 = Rp 516,800.00
0.520 M3 Pasir Beton @ Rp. 110,000.00 = Rp 57,200.00
0.780 M 3
Kerikil Beton @ Rp. 132,000.00 = Rp 102,960.00
0.120 M3 Kayu Klas III, Jenis Balok @ Rp. 1,952,000.00 = Rp 234,240.00
5.800 OH Pekerja @ Rp. 55,000.00 = Rp 319,000.00
0.350 OH Tukang Batu @ Rp. 65,000.00 = Rp 22,750.00
2.800 OH Tukang Kayu @ Rp. 65,000.00 = Rp 182,000.00
1.050 OH Tukang Besi @ Rp. 65,000.00 = Rp 68,250.00
0.420 OH Kepala Tukang @ Rp. 75,000.00 = Rp 31,500.00
0.185 OH Mandor @ Rp. 70,000.00 = Rp 12,950.00
JUMLAH Rp 4,729,580.00
Page 13 of 73
4.13 1 M3 MEMBUAT PLAT BETON BERTULANG (125 Kg BESI + BEKISTING)
0.240 M3 Papan Mal Klas III @ Rp. 1,500,000.00 Rp 360,000.00
3.200 Kg Paku Biasa @ Rp. 20,000.00 Rp 64,000.00
1.600 Ltr Minyak Bekisting @ Rp. 19,800.00 Rp 31,680.00
125.000 Kg Besi Beton Polos @ Rp. 17,000.00 = Rp 2,125,000.00
2.250 Kg Kawat Beton @ Rp. 25,000.00 = Rp 56,250.00
323.000 Kg Semen Portland @ Rp. 1,600.00 = Rp 516,800.00
0.520 M3 Pasir Beton @ Rp. 110,000.00 = Rp 57,200.00
0.780 M 3
Kerikil Beton @ Rp. 132,000.00 = Rp 102,960.00
0.160 M 3
Kayu Klas III, Jenis Balok @ Rp. 1,952,000.00 = Rp 312,320.00
2.800 Lbr Tripleks @ Rp. 49,500.00 = Rp 138,600.00
5.600 OH Pekerja @ Rp. 55,000.00 = Rp 308,000.00
0.350 OH Tukang Batu @ Rp. 65,000.00 = Rp 22,750.00
2.640 OH Tukang Kayu @ Rp. 65,000.00 Rp 171,600.00
1.050 OH Tukang Besi @ Rp. 65,000.00 Rp 68,250.00
0.400 OH Kepala Tukang @ Rp. 75,000.00 = Rp 30,000.00
0.193 OH Mandor @ Rp. 70,000.00 = Rp 13,510.00
JUMLAH Rp 4,378,920.00
Page 14 of 73
5 PEKERJAAN DINDING DAN PLESTERAN
Page 15 of 73
6 PEKERJAAN LANTAI
Page 16 of 73
6.2 1 M2 PASANG LANTAI KERAMIK UKURAN 40 x 40 cm
6.250 Bh Keramik 40 x 40 cm @ Rp. 10,633.00 = Rp 66,456.25
11.380 Kg Semen Portland @ Rp. 1,600.00 = Rp 18,208.00
0.042 M 3
Pasir Pasang @ Rp. 110,000.00 = Rp 4,620.00
1.500 Kg Semen Warna @ Rp. 10,000.00 = Rp 15,000.00
0.620 OH Pekerja @ Rp. 55,000.00 = Rp 34,100.00
0.350 OH Tukang Batu @ Rp. 65,000.00 = Rp 22,750.00
0.035 OH Kepala Tukang @ Rp. 75,000.00 = Rp 2,625.00
0.030 OH Mandor @ Rp. 70,000.00 = Rp 2,100.00
JUMLAH Rp 165,859.25
BAHAN
26.500 Bh Ubin Warna 20 x 20 cm @ Rp. 1,700.00 = Rp 45,050.00
8.760 Kg Semen Portland @ Rp. 1600.00 = Rp 14,016.00
0.023 M 3
Pasir Pasang @ Rp. 110,000.00 = Rp 2,530.00
0.900 Kg Semen Warna @ Rp. 10,000.00 = Rp 9,000.00
Rp 70,596.00
TENAGA
0.270 OH Pekerja @ Rp. 55,000.00 = Rp 14,850.00
0.130 OH Tukang Batu @ Rp. 65,000.00 = Rp 8,450.00
0.013 OH Kepala Tukang @ Rp. 75,000.00 = Rp 975.00
0.0135 OH Mandor @ Rp. 70,000.00 = Rp 945.00
Rp 25,220.00
JUMLAH Rp 95,816.00
BAHAN
10.000 Bh Ubin Keramik 33 x 33 cm @ Rp. = Rp -
11.380 Kg Semen Portland @ Rp. = Rp -
0.042 M 3
Pasir Pasang @ Rp. = Rp -
1.500 Kg Semen Warna @ Rp. = Rp -
Rp -
TENAGA
0.620 OH Pekerja @ Rp. 55,000.00 = Rp 34,100.00
Page 17 of 73
0.350 OH Tukang Batu @ Rp. 65,000.00 = Rp 22,750.00
0.035 OH Kepala Tukang @ Rp. 75,000.00 = Rp 2,625.00
0.030 OH Mandor @ Rp. 70,000.00 = Rp 2,100.00
Rp 61,575.00
JUMLAH Rp 61,575.00
BAHAN
5.300 Bh Plint Ubin Pc Warna 10 x 20 cm @ Rp. = Rp -
1.200 Kg Semen Portland @ Rp. = Rp -
0.0030 M3 Pasir Pasang @ Rp. = Rp -
0.190 Kg Semen Warna @ Rp. = Rp -
Rp -
TENAGA
0.060 OH Pekerja @ Rp. 55,000.00 = Rp 3,300.00
0.030 OH Tukang Batu @ Rp. 65,000.00 = Rp 1,950.00
0.003 OH Kepala Tukang @ Rp. 75,000.00 = Rp 225.00
0.003 OH Mandor @ Rp. 70,000.00 = Rp 210.00
Rp 5,685.00
JUMLAH Rp 5,685.00
6.4 1 M' PASANG PLINT KERAMIK UKURAN 20 x 40 cm
2.500 Bh Plint Keramik 20 x 40 cm @ Rp. 5,316.50 = Rp 13,291.25
1.650 Kg Semen Portland @ Rp. 1,600.00 = Rp 2,640.00
0.0032 M3 Pasir Pasang @ Rp. 110,000.00 = Rp 352.00
0.100 Kg Semen Warna @ Rp. 10,000.00 = Rp 1,000.00
0.060 OH Pekerja @ Rp. 55,000.00 = Rp 3,300.00
0.030 OH Tukang Batu @ Rp. 65,000.00 = Rp 1,950.00
0.003 OH Kepala Tukang @ Rp. 75,000.00 = Rp 225.00
0.003 OH Mandor @ Rp. 70,000.00 = Rp 210.00
JUMLAH Rp 22,968.25
Page 18 of 73
6.7 1 M2 PASANG DINDING PARTISI TRIPLEKS
0.0195 M3 Kayu Klas III, Balok @ Rp. 1,400,000.00 = Rp 27,300.00
0.400 Lbr Tripleks 3 mm @ Rp. 50,000.00 = Rp 20,000.00
0.100 Kg Paku Campur @ Rp. 20,000.00 = Rp 2,000.00
0.050 Kg Paku Tripleks @ Rp. 20,000.00 = Rp 1,000.00
0.150 OH Pekerja @ Rp. 55,000.00 = Rp 8,250.00
0.450 OH Tukang Batu @ Rp. 65,000.00 = Rp 29,250.00
0.045 OH Kepala Tukang @ Rp. 75,000.00 = Rp 3,375.00
0.075 OH Mandor @ Rp. 70,000.00 = Rp 5,250.00
JUMLAH Rp 96,425.00
7.1 1 M3 PASANG KUSEN PINTU, JENDELA DAN VENTILASI KAYU KLAS II (SEJENISNYA)
1.200 M3 Kayu Klas II (Sejenisnya), Balok @ Rp. 2,887,000.00 = Rp 3,464,400.00
6.000 OH Pekerja @ Rp. 55,000.00 = Rp 330,000.00
18.000 OH Tukang Kayu @ Rp. 65,000.00 = Rp 1,170,000.00
2.000 OH Kepala Tukang @ Rp. 75,000.00 = Rp 150,000.00
0.300 OH Mandor @ Rp. 70,000.00 = Rp 21,000.00
JUMLAH Rp 5,135,400.00
Page 19 of 73
7.2 1 M2 PASANG PINTU PANIL KAYU KLAS II (SEJENISNYA)
0.040 M3 Kayu Klas II (Sejenisnya), Papan @ Rp. 2,887,000.00 = Rp 115,480.00
1.000 OH Pekerja @ Rp. 55,000.00 = Rp 55,000.00
2.500 OH Tukang Kayu @ Rp. 65,000.00 = Rp 162,500.00
0.250 OH Kepala Tukang @ Rp. 75,000.00 = Rp 18,750.00
0.050 OH Mandor @ Rp. 70,000.00 = Rp 3,500.00
JUMLAH Rp 355,230.00
7.5 1 M' PASANG LISTPLANK UKURAN 2 X (2 X 20) Cm, KAYU KLAS II (SEJENISNYA)
0.0088 M3 Kayu Klas II (Sejenisnya), Papan @ Rp. 2,887,000.00 = Rp 25,405.60
0.060 Kg Paku Campur @ Rp. 20,000.00 = Rp 1,200.00
0.100 OH Pekerja @ Rp. 55,000.00 = Rp 5,500.00
0.100 OH Tukang Kayu @ Rp. 65,000.00 = Rp 6,500.00
0.010 OH Kepala Tukang @ Rp. 75,000.00 = Rp 750.00
0.050 OH Mandor @ Rp. 70,000.00 = Rp 3,500.00
JUMLAH Rp 42,855.60
Page 20 of 73
7.6 1 M2 PASANG RANGKA PLAFOND KAYU KLAS II (SEJENISNYA)
0.012 M3 Kayu Klas II /Sejenisnya (Balok 5/7) @ Rp. 2,887,000.00 = Rp 34,644.00
0.100 Kg Paku Campur @ Rp. 20,000.00 = Rp 2,000.00
0.150 OH Pekerja @ Rp. 55,000.00 = Rp 8,250.00
0.250 OH Tukang Kayu @ Rp. 65,000.00 = Rp 16,250.00
0.025 OH Kepala Tukang @ Rp. 75,000.00 = Rp 1,875.00
0.075 OH Mandor @ Rp. 70,000.00 = Rp 5,250.00
JUMLAH Rp 68,269.00
Page 21 of 73
8 PEKERJAAN PENGGANTUNG/PENGUNCI
Page 22 of 73
8.5 1 BUAH GRENDEL PINTU
1.0000 Bh Grendel Pintu @ Rp. 27,500.00 = Rp 27,500.00
0.0100 OH Pekerja @ Rp. 55,000.00 = Rp 550.00
0.5000 OH Tukang Kayu @ Rp. 65,000.00 = Rp 32,500.00
0.0100 OH Kepala Tukang @ Rp. 75,000.00 = Rp 750.00
0.0050 OH Mandor @ Rp. 70,000.00 = Rp 350.00
JUMLAH Rp 61,650.00
Page 23 of 73
9 PEKERJAAN PLUMBING
Page 24 of 73
JUMLAH Rp 984,000.00
Page 25 of 73
9.6 MEMASANG 1 M' PIPA PVC DIA. 1/2"
1.200 M' Pipa PVC Dia. 1/2" @ Rp. 4,500.00 = Rp 5,400.00
1.000 Bh Lem Pipa @ Rp. 15,000.00 = Rp 15,000.00
0.036 OH Pekerja @ Rp. 55,000.00 = Rp 1,980.00
0.060 OH Tukang Batu @ Rp. 65,000.00 = Rp 3,900.00
0.006 OH Kepala Tukang @ Rp. 75,000.00 = Rp 450.00
0.0018 OH Mandor @ Rp. 70,000.00 = Rp 126.00
JUMLAH Rp 26,856.00
10 PEKERJAAN ELEKTRIKAL
11 PEKERJAAN FINISHING
Page 26 of 73
2
DAFTAR HARGA SATUAN BAHAN DAN UPAH
HARGA SATUAN
NO. URAIAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
1 Mandor OH 70,000.00
2 Kepala Tukang OH 75,000.00
3 Tukang OH 65,000.00
4 Pekerja OH 55,000.00
1 2 3 4 5
1 2 3 4 5
1 2 3 4 5
1 2 3 4
### #REF!
1.2. ###
- Panjang = 12.00 M'
- Lebar = 20.00 M'
Volume Pek. Pengukuran & Pas. Bouplank = 72.00 M'
### #REF!
2.1 Pek. Galian Tanah Pondasi
a. Galian Pondasi Poer Kolom ( Kedalaman 1 M
- Tinggi Galian = 1.50 M
- Lebar Galian = 1.20 M
- Panjang Galian = 1.20 M
- Jumlah Poer = 35.00 Bh
Volume Galian Pondasi Poer = 75.60 M
2.2 ###
a. Pondasi Poer :
* Luas bidang = 0.46 M
* Panjang bidang 1 = 2.40 M
Panjang bidang 2 = 0.70 M
* Jumlah Poer = 35.00 Bh
Volume Galian Pondasi Poer = 12.47 M
b. Pondasi Garis/Menerus :
Volume Pondasi Garis/Menerus = 12.16 M
b. Area Km/Wc :
- Luas = 12.69 M
- Tinggi Timbunan = 0.35 M
Volume Timbunan Area Km/Wc = 4.44 M
b. Pondasi Garis :
- Tinggi Urugan = 0.05 M
- Panjang = 177.00 M
- Lebar Urugan = 0.70 M
Volume Urugan Pasir Alas Pondasi Garis = 6.20 M
c. Pondasi Tangga :
- Tinggi Urugan = 0.05 M
- Panjang = 0.60 M
- Lebar Urugan = 1.40 M
Volume Urugan Pasir Alas Pondasi Garis = 0.04 M
- Bordes
- Luas Bordes= 4.06 M2
- Tebal Borde = 0.10 M cek lagi tebal
- Jumlah Bor = 1.00 Bh
Volume = 0.41 M3
- Balok Bordes
- Panjang Bal = 9.50 M balok
- Luas Balok = 0.03 M2 15/20
Volume = 0.29 M3
Volume Tangga = 2.42 M3
- Lantai 02
- Pias Depan = 130.15 M2
- Pias Samping= 38.95 M2
- Pias Sampin= 38.95 M2
- Pias Belaka = 90.25 M2
- Pias Dalam = 379.23 M2
- Luas Pasan = 677.53 M2
- Luas Kusen= 84.24 M2
- Luas Kolom= 4.62 M2 bs d cek lg
Luas Pas. Bata Lantai 02 = 588.67 M2
- Lantai 02
- Panjang = 4.00 M
- Tinggi = 3.00 M
= 12.00 M2
Volume Total = 96.00 M2
6 PEKERJAAN PLESTERAN + ACIAN 6.1 Plesteran Beton
Lantai 01
- Kolom 30/30 (1 sisi) = 16.38 M2
- Kolom 30/30 (2 sisi) = 30.42 M2
- Kolom 30/30 (4 sisi) = 4.68 M2 loket
- Kolom 30/30 (4 sisi) = 12.48 M2 teras
- Kolom 30/30 (4 sisi) = 14.88 M2 parkir
78.84 M2
Lantai 02
- Kolom 25/25 (1 sisi) = 6.83 M2
- Kolom 25/25 (2 sisi) = 7.80 M2
- Balok 20/35 (total) = 73.84 M2 cek lg
- Balok 20/35 (sisi luar) = 25.76 M2 cek lg
114.23 M2
Dak Beton
pada teras
- Panjang = 26.30 M'
- Tinggi = 0.50 M'
- Jumlah sisi = 2.00 sisi
26.30 M2
Lantai 02
- Luas bangunan (Lt 02) = 120.98 M2
- Luas KM/WC = 4.50 M2
- Luas void (tangga) = 12.00 M2
Luas Keramik 40 x 40 cm = 104.48 M2
Jendela 2 (1 Mata)
- Jumlah Jendela = 2.00 Bh
- Panjang List Bingkai = 13.44 M
Volume = 26.88 M'
Jendela Loket
- Jumlah Jendela = 1.00 Bh
- Panjang List Bingkai = 5.20 M
Volume = 5.20 M'
Jendela Loket
- Jumlah = 1.00 Bh
- Luas Pas. Kaca = 0.64 M2
Volume = 0.64 M2
- Plafond Selasar
- Lantai 01 = - M2
- Lantai 02 = - M2
- M2
- Engsel Jendela
- Engsel Jend= 140.00 Bh
= 140.00 Bh
11.3 Grendel
- Grendel Pintu
- Grendel Pin = 20.00 Bh
- Grendel Pin = 31.00 Bh
- Grendel Pin = 4.00 Bh
= 55.00 Bh
12.2 Lampu
- TL Ganda Philips 40 Watt
- Lantai 01 = 9.00 Psg
- Lantai 02 = 8.00 Psg
= 17.00 Psg
- TL Philips 18 Watt
- Lantai 01 = 20.00 Bh
- Lantai 02 = 13.00 Bh
= 33.00 Bh
- TL Philips 10 Watt
- Lantai 01 = 2.00 Bh
- Lantai 02 = 3.00 Bh
= 5.00 Bh
12.3 Saklar
- Saklar Tunggal
- Lantai 01 = 19.00 Bh
- Lantai 02 = 14.00 Bh
= 33.00 Bh
- Saklar Ganda
- Lantai 01 = 2.00 Bh
- Lantai 02 = - Bh
= 2.00 Bh
12.4 Kabel
- Lantai 01 = 17.00 M'
- Lantai 02 = 50.00 M'
= 67.00 M'
13.2 Kloset
- Kloset Duduk = 4.00 Bh
- Kusen P2
- Kayu Menempel
- Kayu Jadi = 0.25 M
- Panjang = 5.00 M
Volume = 1.25 M2
Jumlah Kusen = 31.00 Bh
Volume = 38.75 M2
- Kusen P3
- Kayu Menempel
- Kayu Jadi = 0.25 M
- Panjang = 4.50 M
Volume = 1.13 M2
Jumlah Kusen = 4.00 Bh
Volume = 4.50 M2
Sub Volume 1 = 50.50 M2
Kusen Jendela J1 (1 Mata)
- Kayu Menempel
- Kayu Jadi = 0.25 M
- Panjang = 3.96 M
Volume = 0.99 M2
Jumlah Kusen = 70.00 Bh
Volume = 69.30 M2
RISMAN RAMLI, ST
Direktur Direktur/Direktris
BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
SATUAN KERJA :
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
1 2 3 4
I. PEKERJAAN PERSIAPAN
1.3. Pek. Pengukuran dan Pasangan Bowplank
- Panjang = 6.00 M'
- Lebar = 29.00 M'
Volume Pek. Pengukuran & Pas. Bouplank = 78.00 M'
BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
SATUAN KERJA :
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
1 2 3 4
II. PEKERJAAN TANAH DAN PASIR
2.1. Pek. Galian Tanah, T = 1 M
a. Galian Pondasi Poer Plate
- Tinggi Galian = 0.50 M
- Lebar Galian = 0.70 M
- Panjang Galian = 0.50 M
- Jumlah Poer = 14.00 Bh
Volume Galian Pondasi Poer Plate = 2.45 M
d. Area Saluran :
- Tinggi Urugan = 0.03 M
- Panjang Urugan = 34.95 M
- Lebar Urugan = 0.25 M
Volume Urugan Pasir Alas Pondasi Tangga = 0.26 M
1 2 3 4
III. PEKERJAAN PONDASI
3.1. Pek. Pas. Batu Kosong
- Tinggi Pasangan = 0.15 M
- Lebar Pasangan = 0.55 M From urugan pasir alas
- Panjang Pasangan = 18.30 M pondasi.
Volume Pek. Pas. Batu Kosong = 1.51 M ok
1 2 3 4
IV. PEKERJAAN BETON
4.1. Pek. Floor Bawah Pondasi Poer Plate
- Tebal Floor = 0.10 M
- Luas Floor = 0.35 M
- Jumlah Pondasi Poer Plate = 14.00 Bh
Volume Pek. Rabat Beton Bawah Pondasi Poer Plate = 0.49 M ok
B. Beton Tumbuk
* Type 1 :
Jumlah = 7.00 Bh
Luas = 0.39 M
Tebal = 0.20 M'
= 0.55 M
* Type 2 :
a. Luas = 0.08 M
b. Panjang = 19.90 M'
= 1.59 M
1 2 3 4
### #REF!
### ###
A. Lantai 01
- Luas Pias 1 (dibawah balok type B1) :
* Tinggi dinding = 3.38 M
* Panjang pas. batu merah = 119.45 M'
= 403.74 M
- Luas Pias 2 (Km/Wc) :
* Tinggi dinding = 3.88 M
* Panjang pas. bata merah = 18.90 M'
= 73.33 M
- Luas Kusen/Lubang Lt. 01 = 57.89 M
Volume Pas. Bata Merah Lt. 01 = 419.18 M
B. Lantai 02
- Luas Pias 1 :
* Tinggi dinding = 3.85 M
* Panjang pas. batu merah = 134.78 M'
= 518.90 M
- Luas Pias 2 (railing teras) :
* Tinggi dinding = 0.68 M
* Panjang pas. batu merah = 15.40 M'
= 10.47 M
- Luas Pias 3 (railing dekat tempat tower) :
* Tinggi dinding = 0.80 M
* Panjang pas. batu merah = 5.00 M'
= 4.00 M
- Luas Pias 4 (diatas balok type B.3) :
* Tinggi dinding = 0.57 M
* Panjang pas. batu merah = 15.40 M'
= 8.78 M
- Luas Pias 5 (kuda-kuda batu) :
* Luas KB 1 = 13.92 M
* Luas KB 2 = 12.40 M
= 26.32 M
- Luas Kusen/Lubang Lt. 02 = 64.85 M
### ###
- Lebar Pasangan = 2.20 M
- Tinggi Pasangan = 8.00 M
- Jumlah Kolom Pasangan = 6.00 Bh
Volume Pek. Pas. Batu Alam = 105.60 M
BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
SATUAN KERJA :
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
1 2 3 4
### #REF!
### ###
A. Lantai 01
- Luas Pias 1 (dibawah balok type B1) :
* Tinggi dinding = 3.38 M
* Panjang pas. batu merah = 121.25 M'
= 819.65 M
- Luas Pias 2 (Km/Wc) :
* Tinggi dinding = 3.88 M
* Panjang pas. bata merah = 21.00 M'
= 162.96 M
- Kolom K1, 35/35 (1 sisi) :
* Tinggi kolom = 2.40 M
* Panjang kolom = 1.40 M
* Jml. Kolom = #REF! Bh
= #REF! M
- Balok B1, 25/50 (1 sisi) :
* Lebar = 1.25 M
* Panjang = #REF! M
= #REF! M
- Balok B2, 20/30 (1 sisi) :
* Luas 1 = 1.65 M
* Luas 2 = 9.00 M
= 15.13 M
- Plat & Tangga :
* Luas 1 (lantai 2) = 8.76 M
* Luas 2 (area tangga) = 1.29 M
= 10.05 M
- Luas Kusen/Lubang Lt. 01 = 57.89 M
Volume Plesteran, Lt. 01 = #REF! M
B. Lantai 02
- Luas Pias 1 (dinding utama) :
* Tinggi dinding = 4.00 M
* Panjang pas. batu merah dinding utama = 117.85 M'
* Panjang pas. batu merah km/wc = 21.00 M'
= 1,110.80 M
- Luas Pias 2 (railing teras) :
* Tinggi dinding = 0.68 M
* Panjang pas. batu merah = 15.40 M'
= 20.94 M
- Luas Pias 3 (railing dekat tempat tower) :
* Tinggi dinding = 0.80 M
* Panjang pas. batu merah = 5.00 M'
= 8.00 M
- Luas Pias 4 (diatas balok type B.3) :
* Tinggi dinding = 0.57 M
* Panjang pas. batu merah = 15.40 M'
= 17.56 M
- Luas Pias 5 (kuda-kuda batu) :
* Luas KB 1 = 13.92 M
* Luas KB 2 = 12.40 M
= 26.32 M
- Kolom K1, 35/35 (1 sisi) :
* Tinggi kolom = 4.00 M
* Panjang kolom = 1.40 M
* Jml. Kolom = #REF! Bh
= #REF! M
- Balok B3 + Over stek Plate Beton (1 sisi) :
* Lebar = 1.45 M
* Panjang = 17.45 M
= 25.30 M
- Luas Kusen/Lubang Lt. 02 = 64.85 M
Volume Plesteran, Lt. 02 = #REF! M
### ###
- Luas Profil Tiang = 15.60 M'
- Panjang Profil Atas Reling teras lt.2 = 52.56 M'
Volume Pek. Plesteran Profil = 68.16 M'
### ###
- Luas Plesteran Pondasi Garis = 39.94 M
Volume Pek. Acian = 39.94 M
BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
SATUAN KERJA :
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
1 2 3 4
### #REF!
### ###
- Kayu Jadi = 0.01 M
- Jumlah Kusen = 14.00 Bh
- Panjang = 1.06 M
- Jumlah Panjang = 1.00 Bh
- Tegak = 2.05 M
- Jumlah Tegak = 2.00 Bh
Volume Pek. Kusen P1 = 0.54 M
### ###
Volume Pek. Kusen P2 = 14.00 Unit
### ###
* Kusen Type J1
- Kayu Jadi = 0.01 M
- Jumlah Kusen = 28.00 Bh
- Panjang = 0.61 M
- Jumlah Panjang = 2.00 Bh
- Tegak = 1.65 M
- Jumlah Tegak = 2.00 Bh
Volume = 0.95 M
* Kusen Type J2
- Kayu Jadi = 0.01 M
- Jumlah Kusen = 2.00 Bh
- Panjang = 2.12 M
- Tegak = 2.40 M
- Jumlah Tegak = 2.00 Bh
Volume = 0.10 M
* Kusen Type J3
- Kayu Jadi = 0.01 M
- Jumlah Kusen = 1.00 Bh
- Panjang = 2.72 M
- Tegak = 3.38 M
- Jumlah Tegak = 2.00 Bh
Volume = 0.07 M
### ###
* Kusen Type V
- Kayu Jadi = 0.01 M
- Jumlah Kusen = 14.00 Bh
- Panjang = 0.76 M
- Jumlah Panjang = 2.00 Bh
- Tegak = 0.50 M
- Jumlah Tegak = 2.00 Bh
Volume = 0.26 M
* Kusen Type BL
- Kayu Jadi = 0.01 M
- Jumlah Kusen = 98.00 Bh
- Panjang = 0.41 M
- Jumlah Panjang = 2.00 Bh
- Tegak = 0.55 M
- Jumlah Tegak = 2.00 Bh
Volume = 1.41 M
### ###
* Jendela Type J1 (1 Mata)
- Lebar Bingkai = 0.07 M
- Panjang Bingkai = 3.88 M
- Jumlah Jendela = 28.00 Bh
Volume = 7.60 M
### ###
* Jendela Type J1 (1 Lubang)
- Jumlah Jendela = 28.00 Bh
- Luas Pas. Kaca = 0.36 M
Volume = 10.15 M
### ###
* Jendela Type J1 (1 Lubang)
- Jumlah Jendela = 28.00 Bh
- Panjang List = 3.32 M'
Volume = 92.96 M'
1 2 3 4
### #REF!
### ###
- Jumlah Pintu Panel, Type P1 = 14.00 Bh
Volume Pas. Kunci Tanam Biasa 2 Slag = 14.00 Bh
### ###
- Jumlah Pintu Panel, Type P1 = 14.00 Bh
Volume Pas. Engsel Pintu Kupu-kupu = 42.00 Bh
### ###
- Jumlah Bingkai Jendela, Type J1 (1 Lubang) = 28.00 Bh
Volume Pas. Engsel Jendela = 56.00 Bh
### ###
- Jumlah Pintu Panel, Type P1 = 14.00 Bh
Volume Pas. Grendel Pintu = 14.00 Bh
### ###
- Jumlah Bingkai Jendela, Type J1 (1 Lubang) = 28.00 Bh
Volume Pas. Grendel Jendela = 28.00 Bh
### ###
- Jumlah Bingkai Jendela, Type J1 (1 Lubang) = 28.00 Bh
Volume Pas. Kait Angin = 56.00 Bh
BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
SATUAN KERJA :
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
1 2 3 4
### #REF!
### ###
- Luas Bidang 1 = 38.74 M
- Luas Bidang 2 = 18.61 M
- Luas Bidang 3 = 32.84 M
- Luas Bidang 4 = 50.13 M
Volume Pek. Ranka + Atap = 140.31 M
### ###
* Nok Atap :
* Jurai Atap :
* Talam Atap :
Total Volume Pek. Nok, Jurai & Talam Atap = 36.43 M'
### ###
- Panjang Depan = 22.51 M'
- Panjang Belakang = 20.85 M'
- Panjang Samping Kanan = 9.85 M'
- Panjang Samping Kiri = 13.82 M'
Volume Pek. Lisplank = 67.03 M'
BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
SATUAN KERJA :
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
1 2 3 4
### #REF!
### ###
Lantai 01 :
- Luas bangunan = 109.72 M
- Luas Teras = 30.58 M
- Luas Teras Dekat Tangga = 15.69 M
- Luas Tangga Utama = 18.41 M
- Luas Tangga Teras = 2.06 M
- Luas Meja Beton = 3.57 M
Volume = 180.03 M
Lantai 02
- Luas bangunan = 109.72 M
- Luas Teras = 31.91 M
- Luas Meja Beton = 3.57 M
Volume = 145.20 M
### ###
- Plint Ruangan Lantai 01 = 157.50 M'
- Teras Lantai 01 = 31.00 M'
- Lebar Lubang Pintu Lantai 01 = 11.90 M'
= 176.60 M'
- Plint Ruangan Lantai 02 = 157.50 M'
- Teras Lantai 02 = 52.32 M'
- Lebar Lubang Pintu Lantai 02 = 11.90 M'
= 197.92 M'
### ###
- Lantai 01 = 37.80 M
- Lantai 02 = 37.80 M
- Tinggi = 1.50 M
- Lebar Pintu Lantai 01 & 02 = 16.80 M'
Volume Pas. Dinding Keramik 20 x 25 = 96.60 M
BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
SATUAN KERJA :
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
1 2 3 4
### #REF!
### ###
- Rangka Plafond Ruangan :
Lantai 01 = 120.98 M
Lantai 02 = 120.98 M
Volume = 241.96 M
### ###
- Plafond Ruangan :
Lantai 01 = 120.98 M
Lantai 02 = 120.98 M
Volume = 241.96 M
- Plafond Selasar :
Lantai 01 = 27.50
Lantai 02 = 42.78
Volume = 70.28 M
- Plafond Tritisan :
Depan = 19.82 M
Belakang = 15.64 M
Samping Kiri/Kanan = 12.53 M
Volume = 47.99 M
### ###
- Rangka Plafond Ruangan :
Lantai 01 = 195.30 M'
Lantai 02 = 195.30 M'
Volume = 390.60 M'
1 2 3 4
### #REF!
### ###
- Lantai 01 = 36.00 Ttk
- Lantai 02 = 37.00 Ttk
Volume Pas. Titik Instalasi Listrik = 73.00 Ttk
### ###
- Lantai 01 = 15.00 Bh
- Lantai 02 = 16.00 Bh
Volume Pas. Lampu 15 Watt = 31.00 Bh
### ###
- Lantai 01 = 7.00 Bh
- Lantai 02 = 7.00 Bh
Volume Pas. Lampu 10 Watt = 14.00 Bh
### ###
- Lantai 01 = 14.00 Bh
- Lantai 02 = 14.00 Bh
Volume Pas. Lampu 8 Watt = 28.00 Bh
### ###
- Lantai 01 = 8.00 Bh
- Lantai 02 = 7.00 Bh
Volume Pas. Saklar Tunggal = 15.00 Bh
### ###
- Lantai 01 = 14.00 Bh
- Lantai 02 = 15.00 Bh
Volume Pas. Saklar Ganda = 29.00 Bh
### ###
- Lantai 01 = 7.00 Bh
- Lantai 02 = 7.00 Bh
Volume Pas. Stop Kontak = 14.00 Bh
### ###
- Lantai 01 = 60.90 M'
- Lantai 02 = 60.90 M'
Volume Pas. Pipa Conduit = 121.80 M'
### #REF!
### ###
- Lantai 01 = 7.00 Bh
- Lantai 02 = 7.00 Bh
Volume Pas. Kloset = 14.00 Bh
### ###
- Lantai 01 = 7.00 Bh
- Lantai 02 = 7.00 Bh
Volume Pas. Tempat Sabun = 14.00 Bh
### ###
- Lantai 01 = 7.00 Bh
- Lantai 02 = 7.00 Bh
Volume Pas. Sower Mandi = 14.00 Bh
### ###
- Lantai 01 = 7.00 Bh
- Lantai 02 = 7.00 Bh
Volume Pas. Floor Drain = 14.00 Bh
### ###
- Lantai 01 = 7.00 Bh
- Lantai 02 = 7.00 Bh
Volume Pas. Selang Kran Kloset = 14.00 Bh
### ###
- Lantai 01 = 7.00 Bh
- Lantai 02 = 7.00 Bh
Volume Pas. Kran Air 1/2" = 14.00 Bh
BACK UP DATA
PERHITUNGAN VOLUME PEKERJAAN
SATUAN KERJA :
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
NO. JENIS PEKERJAAN URAIAN PERHITUNGAN VOLUME KETERANGAN
1 2 3 4
### #REF!
#REF! #REF! ###
- Tinggi Galian = 0.15 M
- Lebar Galian = 0.10 M
- Panjang Galian = 3.60 M
- Jumlah Vas Bunga = 5.00 Bh
Volume Pek. Galian Tanah = 0.27 M
###
- Tinggi Urugan = 0.55 M
- Luas Urugan = 0.39 M
- Jumlah Vas Bunga = 5.00 Bh
Volume Pek. Urugan Tanah = 1.07 M
###
- Tinggi = 0.75 M
- Panjang = 3.60 M
- Jumlah Vas Bunga = 5.00 Bh
Volume Pek. Pas. Batu Merah = 13.50 M
###
- Tinggi = 0.60 M
- Panjang Plesteran Luar = 4.00 M
- Panjang Plesteran Dalam = 3.20 M
- Jumlah Vas Bunga = 5.00 Bh
Volume Pek. Plasteran = 21.60 M
###
- Tinggi 01 = 0.20 M
- Panjang Plesteran 01 = 2.38 M
Volume = 0.48 M
- Tinggi 02 = 0.08 M
- Panjang Plesteran 02 = 2.50 M
Volume = 0.20 M
- Jumlah Vas Bunga = 5.00 Bh
Volume Pek. Plasteran Bertekstur = 3.38 M
### #REF!
### ###
- Luas Dinding Lt. 01 = #REF! M
- Luas Dinding Lt. 02 = #REF! M
- Luas Dinding Vas Bunga = 21.60 M
Volume Pek. Pengecetan Tembok = #REF! M
### ###
- L. Plafond Ruangan = 241.96 M
- L. Plafond Selasar = 70.28 M
- L. Plafond Tritisan = 47.99 M
Volume Pek. Pengecetan Tembok = 360.22 M
### ###
Kusen Pintu :
- ###
- Kayu Jadi = 0.25 M
- Jumlah Kusen = 14.00 Bh
- Panjang = 1.06 M
- Jumlah Panjang = 1.00 Bh
- Tegak = 2.05 M
- Jumlah Tegak = 2.00 Bh
Volume = 18.06 M
Kusen Jendela J1
- Kayu Jadi = 0.25 M
- Jumlah Kusen = 28.00 Bh
- Panjang = 0.61 M
- Jumlah Panjang = 2.00 Bh
- Tegak = 1.65 M
- Jumlah Tegak = 2.00 Bh
Volume = 31.64 M
Kusen Jendela J2
- Kayu Jadi = 0.25 M
- Jumlah Kusen = 2.00 Bh
- Panjang = 2.12 M
- Tegak = 2.40 M
- Jumlah Tegak = 2.00 Bh
Volume = 3.46 M
Kusen Jendela J3
- Kayu Jadi = 0.25 M
- Jumlah Kusen = 1.00 Bh
- Panjang = 2.72 M
- Tegak = 3.38 M
- Jumlah Tegak = 2.00 Bh
Volume = 2.37 M
Kusen Ventilasi V
- Kayu Jadi = 0.25 M
- Jumlah Kusen = 14.00 Bh
- Panjang = 0.76 M
- Jumlah Panjang = 2.00 Bh
- Tegak = 0.50 M
- Jumlah Tegak = 2.00 Bh
Volume = 8.82 M
Kusen Ventilasi BL
- Kayu Jadi = 0.25 M
- Jumlah Kusen = 98.00 Bh
- Panjang = 0.41 M
- Jumlah Panjang = 2.00 Bh
- Tegak = 0.55 M
- Jumlah Tegak = 2.00 Bh
Volume = 47.04 M
### ###
- Panjang Listplank = 67.03 M'
- Lebar Listplank = 0.25 M
Volume Pek. Kilap Listplank = 16.76 M
### ###
- Luas Total Daun Pintu = 24.11 M
- Jumlah Sisi Yang dicat = 2.00
Volume Pek. Kilap Daun Pintu = 48.22 M
DAFTAR HARGA SATUAN BAHAN DAN UPAH
HARGA SATUAN
NO. URAIAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
1 Mandor OH 50,000.00
2 Kepala Tukang OH 60,000.00
3 Tukang OH 55,000.00
4 Pekerja OH 45,000.00
1 2 3 4 5
41 Wastafel Bh 750,000.00
42 Kran Air Bh 40,000.00
43 Kran Air Leher Angsa Bh 50,000.00
44 Floor Drain Bh 25,000.00
45 Sambungan Pipa Bh 5,000.00
46 Pipa PVC 3/4" M' 8,500.00
47 Pipa PVC 1 1/2" M' 10,500.00
48 Pipa PVC 4" M' 25,000.00
49 Pipa Galvaniz 2" M' 60,000.00
50 Pipa Galvaniz 1" M' 45,000.00
51 Lem Pipa Bh 12,000.00
52 Bak Fibreglass Bh 250,000.00
53 Sumbat Bak Bh 7,500.00
54 Seal Tape Bh 5,000.00
55 Saklar Ganda Bh 35,000.00
56 Saklar Tunggal Bh 25,000.00
57 Stop Kontak Bh 25,000.00
58 Pipa Clipsal 1/2" M' 2,500.00