Anda di halaman 1dari 2

Cmo modelar tuberas laterales (desde

el lavabo hasta el pozo de inspeccin)?


(20283 "Base" "Conduit" "415" "lk-1" (N / A) "Inclinacin (en la parte superior del
conducto) 2.806 pies / pie, V: H) es mayor que (1.000 pies / pie, V: H). Comprobar si
los Invertidos de Inicio y de Parada son correctos.
Hay una manera de superar este problema ??
Another common use case is that of a catch basin where less that all of the flow is
captured by the inlet. Given the flow in the illustration below and the assumption that
the downstream conduit is not backing up and overflowing the catch basin, the
following flows are defined:

The values that appear in the property grid for the catch basin are

Flow (Total in) = 37 (conduit in+capture+sanitary)


Flow (Local surface) = 18 (catchment+gutter+inflow collection)
Flow (Total out) = 37 (sum - gutter out))
Flow (Local in) = 17 (capture + sanitary)
Flow (Local from inflow collection) = 3 (inflow)
Flow (Captured) = 0.667 (5+3+10) (flow to inlet times capture fraction)
Flow (Overflow) = 0