PEKERJAAN PEMBANGUNAN GARDU INDUK 150 KV PARINGIN DAN INCOMER
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp.) Periode Tahun 2017 Periode Tahun 2018
Okt Nov Des Jan Feb Mar Apr Mei Jun Jul August Sep Okt
I PEKERJAAN PRASARANA 6,117,205,777 6,117,205,777.3500
II PEKERJAAN SWITCH YARD 6,302,950,344 3,151,475,172.07 3,151,475,172.07 III PEKERJAAN GEDUNG KONTROL 150 kV 3,262,712,780 3,262,712,779.58 IV PEKERJAAN POS JAGA 103,048,032 103,048,032.15 V PEKERJAAN GUDANG LIMBAH B3 135,338,953 135,338,952.6563 VI PEKERJAAN TRANSMISI TAPPING A. PEKERJAAN SIPIL 2,768,337,161 276,833,716.05 2,491,503,444.48 B. PEKERJAAN E/M 1,218,391,032 121,839,103.15 365,517,309.46 - 731,034,618.92 - VII PENGADAAN MATERIAL A. PERALATAN ELEKTROMEKANIK 2 LINE BAY 13,496,951,839 1,349,695,183.89 4,049,085,551.68 8,098,171,103.36 B. PERALATAN AUTOMATION + TRAINING 2,233,816,019 1,116,908,009.44 1,116,908,009.44 C. PERALATAN ELEKTROMEKANIK 1 TRAFO BAY FOR TRAFO 60 MVA 8,208,188,648 820,818,864.77 7,387,369,782.92 VIII PEMASANGAN MATERIAL DAN KOMISIONING A. PERALATAN ELEKTROMEKANIK 2 LINE BAY 799,989,110 79,998,911 719,990,199.30 B. PERALATAN AUTOMATION 1,181,032,543 118,103,254 1,062,929,288.25 C. PERALATAN ELEKTROMEKANIK 1 TRAFO BAY FOR TRAFO 60 MVA 1,064,830,069 106,483,007 958,347,061.98 TOTAL - - 6,239,044,880.5035 5,813,108,576.4405 11,039,701,217.1060 7,200,560,723.7517 731,034,618.9210 11,706,582,557.2770 1,116,908,009.4375 - 304,585,172.1698 2,741,266,549.5278 - JUMLAH I s/d VII 46,892,792,305.13 6,239,044,880.50 12,052,153,456.94 23,091,854,674.05 30,292,415,397.80 31,023,450,016.72 42,730,032,574.00 43,846,940,583.44 43,846,940,583.44 44,151,525,755.61 46,892,792,305.13