16 Desember 2017
A-10
Oleh :
Kelompok 10
MUHAMMAD IQBAL GHIFARI 153060015
ARTIKA RAHMA DIANA 153060016
LUTHFI SULTHANTIO 153060020
ANNISA FIRDAUS 153060047
SELMA NABILA ABROR 153060074
SARAH NUR SHOFINA 153060088
FAKULTAS TEKNIK
UNIVERSITAS PASUNDAN
BANDUNG
2017
1
DIKETAHUI:
Tipe:
Penunjang:
BCR = 60%
1:2:4
I. Kavling (1:2:4)
𝟏
a. 81.000 m2 x = 11.572 m2
𝟕
𝟐
b. 81.000 m2 x 𝟕 = 23.143m2
𝟒
c. 81.000 m2 x = 46.285m2
𝟕
II. Jumlah Kavling
72⁄
150 → 11.572 : 150 m = 77 kavling
2
54⁄
120→23.143 : 120 m = 193 kavling
2
2
III. Sarana dan Prasarana
Ruko + halaman (parkir)→ 2(5 x 10) = 100 m2 x 10 = 1.000 m2
Toserba + halaman (parkir)→ (10x8) + (5x8) = 120 m2 x 1 =
120 m2
Masjid → (12 x12) = 144 m2 x 1 = 144 m2
Lapangan volley → (24x15) = 360 m2 x 2 = 720 m2
Arena bermain → (20x10) = 200 m2 x 2 = 400 m2
Total → 1000 m2 + 120 m2 + 144 m2 + 720 m2 + 400 m2 =
2.384 m2
RTH + jalan → 54.000 m2 – 2.384 m = 51.616 m2