PERHITUNGAN VOLUME PEKERJAAN

LOKASI Sungai Ampodoap - Kec. Beo


NAMA BANGUNAN Intake

NO URAIAN VOLUME KET

PEKERJAAN INTAKE

A. PEMBERSIHAN LAHAN

Luas ( m2)
24.320 x 15.97 388.39 m2

B. PEMASANGAN KISTDAM 390.00 buah

5.00 x 58.00 x 1.00 290.00 buah Badan


5.00 x 10.00 x 2.00 100.00 buah Sayap Kanan dan Kiri
PERHITUNGAN VOLUME PEKERJAAN
LOKASI Sungai Ampodoap - Kec. Beo
NAMA BANGUNAN Intake

NO URAIAN VOLUME KET

1.00
+38.66

+37.7
0
+37.20
+37.0
0
2.00
+36.30
+36.00
2.40
+35.40 +35.7
0 0.90
+34.8
0 0.60
0.60
4.23 1.00 3.50 1.00 1.00 4.00 1.60
A B C

C. GALIAN DAN URUGAN

GALIAN TANAH KERAS 214.21 m3


A 1.80 x 4.23 x 8.50 x 0.50 32.34
B 1.80 x 1.60 x 8.50 24.48
C 2.40 x 3.50 x 8.50 71.40
D 2.40 x 2.00 x 8.50 40.80
E 1.00 x 4.00 x 8.50 34.00
F 1.30 x 0.60 x 8.50 6.63
G 0.67 x 1.60 x 8.50 x 0.50 4.56

1.00
+38.66

+37.70
+37.20
V
+37.00
IV
+36.30 VI VII
2.00

+36.00
2.40 I
II
+35.40 +35.70
III 0.90
+34.80
0.60
0.60
4.23 1.00 3.50 1.00 1.00 4.00 1.60
6m
2.4

VIII

0.60 0.60
+38.66
+38.4
6

D. PASANGAN DAN PLESTERAN

PLESTERAN 1:3 211.73 m2


+36.00
14.96 x +36.00
8.00 1.00 119.68 m2 lantai bendung
3.80 x +35.50 12.00 - 5.45 40.15 m2 dinding bendung sisi kanan
3.80 x 12.00 - 4.00 41.60 m3 dinding bendung sisi kiri
+36.76
2.06 x 0.60 1.50
1.90
2.00 0.60
1.00
1.00
6.18 m2 dinding1.00
1.5 tangkapan air
1.00
2.06 x 1.00 2.00 4.12 m2 dinding 1 tangkapan air
PERHITUNGAN VOLUME PEKERJAAN
LOKASI Sungai Ampodoap - Kec. Beo
NAMA BANGUNAN Intake

NO URAIAN VOLUME KET

PASANGAN BATU 132.58 m3


I 0.90 x 0.60 x 8.00 4.32
II 6.50 x 0.60 x 8.00 31.20
III 6.50 x 0.60 x 8.00 31.20
IV 2.66 x 1.00 x 8.00 0.50 10.64
V 2.66 x 1.00 x 8.00 21.28
VI 3.40 x 1.00 x 8.00 27.20
VII 1.00 x 0.60 x 8.00 4.80 m3
VIII a. 1.00 1.00 1.50 1.50
VIII b. 0.20 1.46 1.50 2.00 0.44
PERHITUN
LOKASI : BEO KAB. KEPULAUAN TALAUD
NAMA BANGUNAN : RESERVOIR 600 M3

NO SKET BANGUNAN

P 1A - P 2
NO SKET BANGUNAN
P 2 - P 2A

NO SKET BANGUNAN
P 2A - P 3
NO SKET BANGUNAN
P3-P4
NO SKET BANGUNAN
P4-P5
NO SKET BANGUNAN
P 5 - P6
NO SKET BANGUNAN
P6 - P7
NO SKET BANGUNAN
P7 - P8
NO SKET BANGUNAN
P8 - P9
NO SKET BANGUNAN
P9 - P10
NO SKET BANGUNAN
P10 - P11
NO SKET BANGUNAN
P11 - P12
NO SKET BANGUNAN
P12 - P13
NO SKET BANGUNAN
P12 - P13
NO SKET BANGUNAN
P13 - P14
NO SKET BANGUNAN
P14 - P15

NO SKET BANGUNAN
P15 - P16
NO SKET BANGUNAN
P16 - P17
NO SKET BANGUNAN
P17 - P18
NO SKET BANGUNAN
P18 - P19
NO SKET BANGUNAN
P19 - P20
NO SKET BANGUNAN
P20 - P21
NO SKET BANGUNAN
P21 - P22
NO SKET BANGUNAN
P22 - P23
NO SKET BANGUNAN
P23 - P24
NO SKET BANGUNAN
P24-P25
NO SKET BANGUNAN
P25-P26
NO SKET BANGUNAN
P26-P27
NO SKET BANGUNAN
P27-P28
NO SKET BANGUNAN
P28-P29

NO SKET BANGUNAN
P29-P30
NO SKET BANGUNAN
P30-P31
NO SKET BANGUNAN
P31-P33
NO SKET BANGUNAN
P31-P33
PERHITUNGAN VOLUME PEKERJAAN
DIHITUNG :
DIPERIKSA :

FAKTOR URAIAN

PEKERJAAN PIPA P1 - P2

A. GALIAN
P1

Jarak P1-P2 : 27.77 m


Luas Galian P1 : 0.223 x 0.5 x 0.5
Luas Galian P2 : 0.025 x 0.5 x 0.5
Luas Galian Rata -Rata : P1 + P2
2
Volume Galian : Galian Rata-rata x Jarak

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 9.26 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 27.77 m
Titik Penyambungan : Panjang Pipa = 4.628
6.00
FAKTOR URAIAN

PEKERJAAN PIPA P2 - P2A

A. GALIAN
P2 P2A

Jarak P2-P2A : 36.71 m


Luas Galian P2 : 0.025 x 0.5 x 0.5
Luas Galian P2A : 0.02 x 0.5 x 0.5
Luas Galian Rata -Rata : P1 + P2
2
Volume Galian : Galian Rata-rata x Jarak
0.05 x 36.71

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 12.24 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 36.71 m
Titik Penyambungan : Panjang Pipa = 6.118
6.00

FAKTOR URAIAN
PEKERJAAN PIPA P2A - P3

A. GALIAN
P2A P3

Jarak P2A-P3 : 58.07 m


Luas Galian P2A : 0.02 x 0.5 x 0.5
Luas Galian P3 : 0.034 x 0.5 x 0.5
Luas Galian Rata -Rata : P2A + P3
2
Volume Galian : Galian Rata-rata x Jarak
0.05 x 58.07

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 19.36 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 58.07 m
Titik Penyambungan : Panjang Pipa = 9.678
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P3 - P4

A. GALIAN
P3 P4

Jarak P3-P4 : 59.66 m


Luas Galian P3 : 0.034 x 0.5 x 0.5
Luas Galian P4 : 0.046 x 0.5 x 0.5
Luas Galian Rata -Rata : P3 + P4
2
Volume Galian : Galian Rata-rata x Jarak
0.06 x 59.66

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 19.89 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 59.66 m
Titik Penyambungan : Panjang Pipa = 9.943
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P4 - P5

A. GALIAN
P4 P5
Jarak P4-P5 : 42.48 m
Luas Galian P4 : 0.046 x 0.5 x 0.5
Luas Galian P5 : 0.030 x 0.5 x 0.5
Luas Galian Rata -Rata : P4 + P5
2
Volume Galian : Galian Rata-rata x Jarak
0.06 x 42.48

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 14.16 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 42.48 m
Titik Penyambungan : Panjang Pipa = 7.08
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P5 - P6

A. GALIAN
P5 P6
Jarak P5-P6 : 59.95 m
Luas Galian P5 : 0.030 x 0.5 x 0.5
Luas Galian P6 : 0.015 x 0.5 x 0.5
Luas Galian Rata -Rata : P5 + P6
2
Volume Galian : Galian Rata-rata x Jarak
0.06 x 59.95

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 19.98 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 59.95 m
Titik Penyambungan : Panjang Pipa = 9.992
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P6 - P7

A. GALIAN
P6 P7
Jarak P6-P7 : 42.27 m
Luas Galian P6 : 0.015 x 0.5 x 0.5
Luas Galian P7 : 0.020 x 0.5 x 0.5
Luas Galian Rata -Rata : P6 + P7
2
Volume Galian : Galian Rata-rata x Jarak
0.05 x 42.27

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 14.09 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 42.27 m
Titik Penyambungan : Panjang Pipa = 7.045
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P7 - P8

A. GALIAN
P7 P8

Jarak P7-P8 : 44.59 m


Luas Galian P7 : 0.020 x 0.5 x 0.5
Luas Galian P8 : 0.024 x 0.5 x 0.5
Luas Galian Rata -Rata : P7 + P8
2
Volume Galian : Galian Rata-rata x Jarak
0.06 x 44.59

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 14.86 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 44.59 m
Titik Penyambungan : Panjang Pipa = 7.432
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P8 - P9

A. GALIAN
P8 P9

Jarak P8-P9 : 64.90 m


Luas Galian P8 : 0.024 x 0.5 x 0.5
Luas Galian P9 : 0.089 x 0.5 x 0.5
Luas Galian Rata -Rata : P8 + P9
2
Volume Galian : Galian Rata-rata x Jarak
0.06 x 64.90
B. KUBUS TUMPUAN BETON K175
Jumlah Kubus : Jarak Pipa = 21.63 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 64.90 m
Titik Penyambungan : Panjang Pipa = 10.82
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P9 - P10

A. GALIAN
P9 P10

Jarak P9-P10 : 62.49 m


Luas Galian P9 : 0.089 x 0.5 x 0.5
Luas Galian P10 : 0.070 x 0.5 x 0.5
Luas Galian Rata -Rata : P9 + P10
2
Volume Galian : Galian Rata-rata x Jarak
0.07 x 62.49

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 20.83 buah
3
Luas Kubus : 0.50 x 0.5 - 3.14
Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 62.49 m
Titik Penyambungan : Panjang Pipa = 10.42
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P10 - P11

A. GALIAN
P10 P11

Jarak P10-P11 : 50.05 m


Luas Galian P10 : 0.070 x 0.5 x 0.5
Luas Galian P11 : 0.000 x 0x 0
Luas Galian Rata -Rata : P10 + P11
2
Volume Galian : Galian Rata-rata x Jarak
0.06 x 50.05

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 16.68 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 50.05 m
Titik Penyambungan : Panjang Pipa = 8.342
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P11 - P12

A. GALIAN
P11 P12

Jarak P11-P12 : 47.72 m


Luas Galian P11 : 0.000 x 0x 0
Luas Galian P12 : 0.020 x 0.5 x 0.5
Luas Galian Rata -Rata : P11 + P12
2
Volume Galian : Galian Rata-rata x Jarak
0.05 x 47.72

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 15.91 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 47.72 m
Titik Penyambungan : Panjang Pipa = 7.953
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P12 - P13

A. GALIAN
P12 P13

Jarak P12-P13 : 52.75 m


Luas Galian P12 : 0.020 x 0.5 x 0.5
Luas Galian P13 : 0.060 x 0.5 x 0.5
Luas Galian Rata -Rata : P12 + P13
2
Volume Galian : Galian Rata-rata x Jarak
0.05 x 52.75

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 17.58 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 52.75 m
Titik Penyambungan : Panjang Pipa = 8.792
6.00
FAKTOR URAIAN

PEKERJAAN PIPA P12 - P13

A. GALIAN
P12 P13

Jarak P12-P13 : 52.75 m


Luas Galian P12 : 0.020 x 0.5 x 0.5
Luas Galian P13 : 0.060 x 0.5 x 0.5
Luas Galian Rata -Rata : P12 + P13
2
Volume Galian : Galian Rata-rata x Jarak
0.05 x 52.75

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 17.58 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 52.75 m
Titik Penyambungan : Panjang Pipa = 8.792
6.00
FAKTOR URAIAN

PEKERJAAN PIPA P13 - P14

A. GALIAN
P13 P14

Jarak P13-P14 : 46.18 m


Luas Galian P13 : 0.060 x 0.5 x 0.5
Luas Galian P14 : 0.170 x 0.5 x 0.5
Luas Galian Rata -Rata : P13 + P14
2
Volume Galian : Galian Rata-rata x Jarak
0.06 x 46.18

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 15.39 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 46.18 m
Titik Penyambungan : Panjang Pipa = 7.697
6.00
FAKTOR URAIAN

PEKERJAAN PIPA P14 - P15

A. GALIAN
P14 P15

Jarak P14-P15 : 54.61 m


Luas Galian P14 : 0.170 x 0.5 x 0.5
Luas Galian P15 : 0.120 x 0.5 x 0.5
Luas Galian Rata -Rata : P14 + P15
2
Volume Galian : Galian Rata-rata x Jarak
0.09 x 54.61

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 18.20 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 54.61 m
Titik Penyambungan : Panjang Pipa = 9.102
6.00

FAKTOR URAIAN
PEKERJAAN PIPA P15 - P16

A. GALIAN
P15 P16

Jarak P15-P16 : 59.57 m


Luas Galian P15 : 0.120 x 0.5 x 0.5
Luas Galian P16 : 0.020 x 0.5 x 0.5
Luas Galian Rata -Rata : P15 + P16
2
Volume Galian : Galian Rata-rata x Jarak
0.06 x 59.57

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 19.86 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 59.57 m
Titik Penyambungan : Panjang Pipa = 9.928
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P16 - P17

A. GALIAN
P16 P17

Jarak P16-P17 : 57.88 m


Luas Galian P16 : 0.020 x 0.5 x 0.5
Luas Galian P17 : 0.040 x 0.5 x 0.5
Luas Galian Rata -Rata : P16 + P17
2
Volume Galian : Galian Rata-rata x Jarak
0.05 x 57.88

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 19.29 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 57.88 m
Titik Penyambungan : Panjang Pipa = 9.647
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P17 - P18

A. GALIAN
P17 P18
Jarak P17-P18 : 46.57 m
Luas Galian P17 : 0.040 x 0.5 x 0.5
Luas Galian P18 : 0.030 x 0.5 x 0.5
Luas Galian Rata -Rata : P17 + P18
2
Volume Galian : Galian Rata-rata x Jarak
0.06 x 46.57

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 15.52 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 46.57 m
Titik Penyambungan : Panjang Pipa = 7.762
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P18 - P19

A. GALIAN
P18 P19
Jarak P18-P19 : 45.28 m
Luas Galian P18 : 0.030 x 0.5 x 0.5
Luas Galian P19 : 0.015 x 0.5 x 0.5
Luas Galian Rata -Rata : P18 + P19
2
Volume Galian : Galian Rata-rata x Jarak
0.06 x 45.28

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 15.09 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 45.28 m
Titik Penyambungan : Panjang Pipa = 7.547
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P19 - P20

A. GALIAN
P19 P20
Jarak P19-P20 : 48.68 m
Luas Galian P19 : 0.015 x 0.5 x 0.5
Luas Galian P20 : 0.030 x 0.5 x 0.5
Luas Galian Rata -Rata : P19 + P20
2
Volume Galian : Galian Rata-rata x Jarak
0.05 x 48.68

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 16.23 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 48.68 m
Titik Penyambungan : Panjang Pipa = 8.113
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P20 - P21

A. GALIAN
P20 P21

Jarak P20-P21 : 40.83 m


Luas Galian P20 : 0.030 x 0.5 x 0.5
Luas Galian P21 : 0.030 x 0.5 x 0.5
Luas Galian Rata -Rata : P20 + P21
2
Volume Galian : Galian Rata-rata x Jarak
0.04 x 40.83

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 13.61 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 40.83 m
Titik Penyambungan : Panjang Pipa = 6.805
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P21 - P22

A. GALIAN
P21 P22

Jarak P21-P22 : 38.81 m


Luas Galian P21 : 0.030 x 0.5 x 0.5
Luas Galian P22 : 0.100 x 0.5 x 0.5
Luas Galian Rata -Rata : P21 + P22
2
Volume Galian : Galian Rata-rata x Jarak
0.06 x 38.81
B. KUBUS TUMPUAN BETON K175
Jumlah Kubus : Jarak Pipa = 12.94 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 38.81 m
Titik Penyambungan : Panjang Pipa = 6.468
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P22 - P23

A. GALIAN
P22 P23

Jarak P22-P23 : 58.44 m


Luas Galian P22 : 0.100 x 0.5 x 0.5
Luas Galian P23 : 0.015 x 0.5 x 0.5
Luas Galian Rata -Rata : P22 + P23
2
Volume Galian : Galian Rata-rata x Jarak
0.06 x 58.44

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 19.48 buah
3
Luas Kubus : 0.50 x 0.5 - 3.14
Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 58.44 m
Titik Penyambungan : Panjang Pipa = 9.74
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P23 - P24

A. GALIAN
P23 P24

Jarak P23-P24 : 53.27 m


Luas Galian P23 : 0.015 x 0.5 x 0.5
Luas Galian P24 : 0.015 x 0.5 x 0.5
Luas Galian Rata -Rata : P23 + P24
2
Volume Galian : Galian Rata-rata x Jarak
0.05 x 53.27

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 17.76 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 53.27 m
Titik Penyambungan : Panjang Pipa = 8.878
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P24 - P25

A. GALIAN
P24 P25

Jarak P24-P25 : 30.27 m


Luas Galian P24 : 0.015 x 0.5 x 0.5
Luas Galian P25 : 0.060 x 0.5 x 0.5
Luas Galian Rata -Rata : P24 + P25
2
Volume Galian : Galian Rata-rata x Jarak
0.04 x 30.27

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 10.09 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 30.27 m
Titik Penyambungan : Panjang Pipa = 5.045
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P25 - P26

A. GALIAN
P25 P26

Jarak P25-P26 : 36.22 m


Luas Galian P25 : 0.060 x 0.5 x 0.5
Luas Galian P26 : 0.010 x 0.5 x 0.5
Luas Galian Rata -Rata : P25 + P26
2
Volume Galian : Galian Rata-rata x Jarak
0.04 x 36.22

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 12.07 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 36.22 m
Titik Penyambungan : Panjang Pipa = 6.037
6.00
FAKTOR URAIAN

PEKERJAAN PIPA P26 - P27

A. GALIAN
P26 P27

Jarak P26-P27 : 50.68 m


Luas Galian P26 : 0.010 x 0.5 x 0.5
Luas Galian P27 : 0.110 x 0.5 x 0.5
Luas Galian Rata -Rata : P26 + P27
2
Volume Galian : Galian Rata-rata x Jarak
0.06 x 50.68

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 16.89 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 50.68 m
Titik Penyambungan : Panjang Pipa = 8.447
6.00
FAKTOR URAIAN

PEKERJAAN PIPA P27 - P28

A. GALIAN
P27 P28

Jarak P27-P28 : 59.90 m


Luas Galian P27 : 0.110 x 0.5 x 0.5
Luas Galian P28 : 0.020 x 0.5 x 0.5
Luas Galian Rata -Rata : P27 + P28
2
Volume Galian : Galian Rata-rata x Jarak
0.06 x 59.90

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 19.97 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 59.90 m
Titik Penyambungan : Panjang Pipa = 9.983
6.00
FAKTOR URAIAN

PEKERJAAN PIPA P28 - P29

A. GALIAN
P28 P29

Jarak P28-P29 : 36.31 m


Luas Galian P28 : 0.020 x 0.5 x 0.5
Luas Galian P29 : 0.020 x 0.5 x 0.5
Luas Galian Rata -Rata : P28 + P29
2
Volume Galian : Galian Rata-rata x Jarak
0.05 x 36.31

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 12.10 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 36.31 m
Titik Penyambungan : Panjang Pipa = 6.052
6.00

FAKTOR URAIAN
PEKERJAAN PIPA P29 - P30

A. GALIAN
P29 P30

Jarak P29-P30 : 47.95 m


Luas Galian P29 : 0.020 x 0.5 x 0.5
Luas Galian P30 : 0.000 x 0x 0
Luas Galian Rata -Rata : P29 + P30
2
Volume Galian : Galian Rata-rata x Jarak
0.05 x 47.95

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 15.98 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 47.95 m
Titik Penyambungan : Panjang Pipa = 7.992
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P30 - P31

A. GALIAN
P30 P31

Jarak P30-P31 : 51.32 m


Luas Galian P30 : 0.000 x 0 x 0
Luas Galian P30 : 0.500 x 3.14 x 0.2
Luas Galian Rata -Rata : P30 + P31
2
Volume Galian : Galian Rata-rata x Jarak
0.03 x 51.32

B. KUBUS TUMPUAN BETON K175


Jumlah Kubus : Jarak Pipa = 17.11 buah
3

Luas Kubus : 0.50 x 0.5 - 3.14


Volume 1 Kubus : Luas Kubus x 0.5
Volume Kubus : Volume 1 kubus x Jumlah Kubus

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 51.32 m
Titik Penyambungan : Panjang Pipa = 8.553
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P31 - P33

A. GALIAN
P31 P33
Jarak P31-P33 : 98.00 m
Luas Galian P31 : 0.500 x 3.14 x 0.2
Luas Galian P33 : 0.500 x 3.14 x 0.2
Luas Galian Rata -Rata : P31 + P33
2
Volume Galian : Galian Rata-rata x Jarak
0.02 x 98.00

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 98.00 m
Titik Penyambungan : Panjang Pipa = 16.33
6.00

FAKTOR URAIAN

PEKERJAAN PIPA P31 - P33

A. GALIAN
P31 P33
Jarak P31-P33 : 98.00 m
Luas Galian P31 : 0.500 x 3.14 x 0.2
Luas Galian P33 : 0.500 x 3.14 x 0.2
Luas Galian Rata -Rata : P31 + P33
2
Volume Galian : Galian Rata-rata x Jarak
0.02 x 98.00

C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 98.00 m
Titik Penyambungan : Panjang Pipa = 16.33
6.00
DIHITUNG :
DIPERIKSA :

VOLUME KET

P2

Pipa Galvanis Dia 8'

+ 0.1 x 0.50 0.106 m2


+ 0.1 x 0.50 0.056 m2
0.081 m2

2.249 m3

9 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 0.560 m3

27.770 m
5 Titik
VOLUME KET

P2A
Pipa Galvanis Dia 8'

+ 0.1 x 0.50 0.056 m2


+ 0.08 x 0.50 0.045 m2
0.051 m2

1.858 m3

12 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 0.746 m3

36.710 m
6 Titik

VOLUME KET
Pipa Galvanis Dia 8'

+ 0.08 x 0.50 0.045 m2


+ 0.10 x 0.50 0.059 m2
0.052 m2

3.005 m3

19 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 1.182 m3

58.070 m
10 Titik

VOLUME KET
Pipa Galvanis Dia 8'

+ 0.10 x 0.50 0.059 m2


+ 0.10 x 0.50 0.062 m2
0.060 m2

3.580 m3

20 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 1.244 m3

59.660 m
10 Titik

VOLUME KET

Pipa Galvanis Dia 8'


+ 0.10 x 0.50 0.062 m2
+ 0.10 x 0.50 0.058 m2
0.060 m2

2.528 m3

14 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 0.871 m3

42.480 m
7 Titik

VOLUME KET

Pipa Galvanis Dia 8'


+ 0.10 x 0.50 0.058 m2
+ 0.10 x 0.50 0.054 m2
0.056 m2

3.335 m3

20 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 1.244 m3

59.950 m
10 Titik

VOLUME KET

Pipa Galvanis Dia 8'


+ 0.10 x 0.50 0.054 m2
+ 0.10 x 0.50 0.055 m2
0.054 m2

2.298 m3

14 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 0.871 m3

42.270 m
7 Titik

VOLUME KET

Pipa Galvanis Dia 8'

+ 0.10 x 0.50 0.055 m2


+ 0.10 x 0.50 0.056 m2
0.056 m2

2.475 m3

15 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 0.933 m3

44.590 m
7 Titik

VOLUME KET

Pipa Galvanis Dia 8'

+ 0.10 x 0.50 0.056 m2


+ 0.10 x 0.50 0.072 m2
0.064 m2

4.162 m3
22 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 1.368 m3

64.900 m
11 Titik

VOLUME KET

Pipa Galvanis Dia 8'

+ 0.10 x 0.50 0.072 m2


+ 0.10 x 0.50 0.068 m2
0.070 m2

4.366 m3

21 buah
x 0.2 x 0.20 0.124 m2
0.062 m3
Jumlah Kubus 1.306 m3

62.490 m
11 Titik

VOLUME KET

Pipa Galvanis Dia 8'

+ 0.10 x 0.50 0.068 m2


+ 0.10 x 0.50 0.050 m2
0.059 m2

2.940 m3

17 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 1.057 m3

50.050 m
9 Titik

VOLUME KET

Pipa Galvanis Dia 8'

+ 0.10 x 0.50 0.050 m2


+ 0.10 x 0.50 0.055 m2
0.053 m2

2.505 m3

16 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 0.995 m3

47.720 m
8 Titik

VOLUME KET

Pipa Galvanis Dia 8'

+ 0.10 x 0.50 0.055 m2


+ 0.04 x 0.50 0.035 m2
0.045 m2

2.374 m3

18 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 1.120 m3

52.750 m
9 Titik
VOLUME KET

Pipa Galvanis Dia 8'

+ 0.10 x 0.50 0.055 m2


+ 0.04 x 0.50 0.035 m2
0.045 m2

2.374 m3

18 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 1.120 m3

52.750 m
9 Titik
VOLUME KET

Pipa Galvanis Dia 8'

+ 0.04 x 0.50 0.035 m2


+ 0.10 x 0.50 0.093 m2
0.064 m2

2.944 m3

15 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 0.933 m3

46.180 m
8 Titik
VOLUME KET

Pipa Galvanis Dia 8'

+ 0.10 x 0.50 0.093 m2


+ 0.10 x 0.50 0.080 m2
0.086 m2

4.710 m3

18 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 1.120 m3

54.610 m
9 Titik

VOLUME KET
Pipa Galvanis Dia 8'

+ 0.10 x 0.50 0.080 m2


+ 0.08 x 0.50 0.045 m2
0.063 m2

3.723 m3

20 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 1.244 m3

59.570 m
10 Titik

VOLUME KET
Pipa Galvanis Dia 8'

+ 0.08 x 0.50 0.045 m2


+ 0.10 x 0.50 0.060 m2
0.053 m2

3.039 m3

19 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 1.182 m3

57.880 m
10 Titik

VOLUME KET

Pipa Galvanis Dia 8'


+ 0.10 x 0.50 0.060 m2
+ 0.10 x 0.50 0.058 m2
0.059 m2

2.736 m3

15 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 0.933 m3

46.570 m
8 Titik

VOLUME KET

Pipa Galvanis Dia 8'


+ 0.10 x 0.50 0.058 m2
+ 0.10 x 0.50 0.054 m2
0.056 m2

2.519 m3

15 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 0.933 m3

45.280 m
8 Titik

VOLUME KET

Pipa Galvanis Dia 8'


+ 0.10 x 0.50 0.054 m2
+ 0.07 x 0.50 0.043 m2
0.048 m2

2.343 m3

16 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 0.995 m3

48.680 m
8 Titik

VOLUME KET

Pipa Galvanis Dia 8'

+ 0.07 x 0.50 0.043 m2


+ 0.07 x 0.50 0.043 m2
0.043 m2

1.735 m3

14 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 0.871 m3

40.830 m
7 Titik

VOLUME KET

Pipa Galvanis Dia 8'

+ 0.07 x 0.50 0.043 m2


+ 0.10 x 0.50 0.075 m2
0.059 m2

2.280 m3
13 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 0.809 m3

38.810 m
6 Titik

VOLUME KET

Pipa Galvanis Dia 8'

+ 0.10 x 0.50 0.075 m2


+ 0.085 x 0.50 0.046 m2
0.061 m2

3.543 m3

19 buah
x 0.2 x 0.20 0.124 m2
0.062 m3
Jumlah Kubus 1.182 m3

58.440 m
10 Titik

VOLUME KET

Pipa Galvanis Dia 8'

+ 0.085 x 0.50 0.046 m2


+ 0.100 x 0.50 0.054 m2
0.050 m2

2.664 m3

18 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 1.120 m3

53.270 m
9 Titik

VOLUME KET

Pipa Galvanis Dia 8'

+ 0.100 x 0.50 0.054 m2


+ 0.040 x 0.50 0.035 m2
0.044 m2

1.343 m3

10 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 0.622 m3

30.270 m
5 Titik

VOLUME KET

Pipa Galvanis Dia 8'

+ 0.040 x 0.50 0.035 m2


+ 0.090 x 0.50 0.048 m2
0.041 m2

1.494 m3

12 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 0.746 m3

36.220 m
6 Titik
VOLUME KET

Pipa Galvanis Dia 8'

+ 0.090 x 0.50 0.048 m2


+ 0.100 x 0.50 0.078 m2
0.063 m2

3.168 m3

17 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 1.057 m3

50.680 m
8 Titik
VOLUME KET

Pipa Galvanis Dia 8'

+ 0.100 x 0.50 0.078 m2


+ 0.080 x 0.50 0.045 m2
0.061 m2

3.669 m3

20 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 1.244 m3

59.900 m
10 Titik
VOLUME KET

Pipa Galvanis Dia 8'

+ 0.080 x 0.50 0.045 m2


+ 0.080 x 0.50 0.045 m2
0.045 m2

1.634 m3

12 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 0.746 m3

36.310 m
6 Titik

VOLUME KET
Pipa Galvanis Dia 8'

+ 0.080 x 0.50 0.045 m2


+ 0.100 x 0.50 0.050 m2
0.048 m2

2.278 m3

16 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 0.995 m3

47.950 m
8 Titik

VOLUME KET
Pipa Galvanis Dia 8'

+ 0.100 x 0.50 0.050 m2


x 0.200 x 0.25 0.016 m2
0.033 m2

1.686 m3

17 buah

x 0.2 x 0.20 0.124 m2


0.062 m3
Jumlah Kubus 1.057 m3

51.320 m
9 Titik

VOLUME KET

Pipa Galvanis Dia 8'


x 0.200 x 0.25 0.016 m2
x 0.200 x 0.25 0.016 m2
0.016 m2

1.539 m3

98.000 m
9 Titik

VOLUME KET

Pipa Galvanis Dia 8'


x 0.200 x 0.25 0.016 m2
x 0.200 x 0.25 0.016 m2
0.016 m2

1.539 m3

98.000 m
9 Titik

90.633
31.846
Batu Kali Siar Plester Beton 1:4 Siaran Plest Pintu

POT. A-A POT. B-B


POT. B-B
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 34

PATOK P35
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 34
Galian
Area 1
Jarak Antara P34 - P35 =

Point X (Dist) Y (El)

1 3421.012 -36.345
2 3421.063 -37.044
3 3421.463 -37.044
4 3421.514 -36.343
5 3421.012 -36.345

TOTAL
Luas ( m2)

P 34
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P35
Galian
Point X (Dist) Y (El)

1 3456.760 -36.992
2 3456.813 -37.717
3 3457.213 -37.717
4 3457.264 -37.021
5 3456.760 -36.992

TOTAL
Luas ( m2)

P35
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P34-P35


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

45.17 m

Xn *Yn +1 Xn *Yn -1

- -
(126,727.969) (124,338.535)
(126,729.858) (126,744.675)
(124,346.230) (126,746.565)
(124,354.926) (124,329.839)

(502,158.98) (502,159.61)
0.316
Total m2 0.32

0.316
p. r2 0.032
0.283
Total m2 0.28

Xn *Yn +1 Xn *Yn -1

- -
(130,378.617) (127,874.426)
(130,380.616) (130,395.703)
(127,989.482) (130,397.626)
(127,891.110) (127,972.712)

(516,639.83) (516,640.47)
0.321
Total m2 0.32

0.321
p. r2 0.032
0.289
Total m2 0.29
mbunan P34-P35
Luas (m2) Volume (m3)
0.32 14.38
0.29 12.92
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 35

PATOK P36
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 35
Galian
Area 1
Jarak Antara P35 - P36 =

Point X (Dist) Y (El)

1 3456.760 -36.992
2 3456.813 -37.717
3 3457.213 -37.717
4 3457.264 -37.021
5 3456.760 -36.992

TOTAL
Luas ( m2)

P 35
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P36
Galian
Point X (Dist) Y (El)

1 3413.958 -54.743
2 3414.069 -56.261
3 3414.469 -56.261
4 3414.521 -55.554
5 3413.958 -54.743

TOTAL
Luas ( m2)

P36
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P35-P36


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

52.67 m

Xn *Yn +1 Xn *Yn -1

- -
(130,378.617) (127,874.426)
(130,380.616) (130,395.703)
(127,989.482) (130,397.626)
(127,891.110) (127,972.712)

(516,639.83) (516,640.47)
0.321
Total m2 0.32

0.321
p. r2 0.032
0.289
Total m2 0.29

Xn *Yn +1 Xn *Yn -1

- -
(192,072.691) (186,896.379)
(192,078.936) (192,101.440)
(189,687.411) (192,104.366)
(186,921.123) (189,659.023)

(760,760.16) (760,761.21)
0.524
Total m2 0.52

0.524
p. r2 0.032
0.491
Total m2 0.49
mbunan P35-P36
Luas (m2) Volume (m3)
0.42 22.25
0.39 20.54
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 36

PATOK P37
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 36
Galian
Area 1
Jarak Antara P36 - P37 =

Point X (Dist) Y (El)

1 3456.760 -36.992
2 3456.813 -37.717
3 3457.213 -37.717
4 3457.264 -37.021
5 3456.760 -36.992

TOTAL
Luas ( m2)

P 36
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P37
Galian
Point X (Dist) Y (El)

1 3463.702 -53.664
2 3463.754 -54.385
3 3464.154 -54.385
4 3464.201 -53.751
5 3463.702 -53.664

TOTAL
Luas ( m2)

P37
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P36-P37


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

51.20 m

Xn *Yn +1 Xn *Yn -1

- -
(130,378.617) (127,874.426)
(130,380.616) (130,395.703)
(127,989.482) (130,397.626)
(127,891.110) (127,972.712)

(516,639.83) (516,640.47)
0.321
Total m2 0.32

0.321
p. r2 0.032
0.289
Total m2 0.29

Xn *Yn +1 Xn *Yn -1

- -
(188,373.433) (185,878.895)
(188,376.261) (188,398.015)
(186,201.742) (188,400.571)
(185,902.882) (186,177.446)

(748,854.32) (748,854.93)
0.304
Total m2 0.30

0.304
p. r2 0.032
0.272
Total m2 0.27
mbunan P36-P37
Luas (m2) Volume (m3)
0.31 16.01
0.28 14.36
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 37

PATOK P38
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 37
Galian
Area 1
Jarak Antara P37 - P38 =

Point X (Dist) Y (El)

1 3463.702 -53.664
2 3463.754 -54.385
3 3464.154 -54.385
4 3464.201 -53.751
5 3463.702 -53.664

TOTAL
Luas ( m2)

P 37
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P38
Galian
Point X (Dist) Y (El)

1 3522.259 -20.758
2 3522.314 -21.515
3 3522.714 -21.515
4 3522.765 -20.821
5 3522.259 -20.758

TOTAL
Luas ( m2)

P38
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P37-P38


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

50.88 m

Xn *Yn +1 Xn *Yn -1

- -
(188,373.433) (185,878.895)
(188,376.261) (188,398.015)
(186,201.742) (188,400.571)
(185,902.882) (186,177.446)

(748,854.32) (748,854.93)
0.304
Total m2 0.30

0.304
p. r2 0.032
0.272
Total m2 0.27

Xn *Yn +1 Xn *Yn -1

- -
(75,781.402) (73,116.194)
(75,782.586) (75,791.192)
(73,346.428) (75,792.289)
(73,125.556) (73,336.955)

(298,035.97) (298,036.63)
0.329
Total m2 0.33

0.329
p. r2 0.032
0.296
Total m2 0.30
mbunan P37-P38
Luas (m2) Volume (m3)
0.32 16.10
0.28 14.46
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 38

PATOK P39
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 38
Galian
Area 1
Jarak Antara P38 - P39 =

Point X (Dist) Y (El)

1 3522.259 -20.758
2 3522.314 -21.515
3 3522.714 -21.515
4 3522.765 -20.821
5 3522.259 -20.758

TOTAL
Luas ( m2)

P 38
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P39
Galian
Point X (Dist) Y (El)

1 3557.538 -22.174
2 3557.595 -22.962
3 3557.996 -22.962
4 3558.047 -22.262
5 3557.538 -22.174

TOTAL
Luas ( m2)

P39
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P38-P39


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

46.26 m

Xn *Yn +1 Xn *Yn -1

- -
(75,781.402) (73,116.194)
(75,782.586) (75,791.192)
(73,346.428) (75,792.289)
(73,125.556) (73,336.955)

(298,035.97) (298,036.63)
0.329
Total m2 0.33

0.329
p. r2 0.032
0.296
Total m2 0.30

Xn *Yn +1 Xn *Yn -1

- -
(81,688.188) (78,886.112)
(81,689.496) (81,698.704)
(79,208.107) (81,699.875)
(78,896.134) (79,197.911)

(321,481.93) (321,482.60)
0.338
Total m2 0.34

0.338
p. r2 0.032
0.306
Total m2 0.31
mbunan P38-P39
Luas (m2) Volume (m3)
0.33 15.43
0.30 13.93
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 39

PATOK P40
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 39
Galian
Area 1
Jarak Antara P39 - P40 =

Point X (Dist) Y (El)

1 3557.538 -22.174
2 3557.595 -22.962
3 3557.996 -22.962
4 3558.047 -22.262
5 3557.538 -22.174

TOTAL
Luas ( m2)

P 39
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P40
Galian
Point X (Dist) Y (El)

1 3518.223 -37.988
2 3518.274 -38.684
3 3518.674 -38.684
4 3518.725 -37.988
5 3518.223 -37.988

TOTAL
Luas ( m2)

P40
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P39-P40


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

50.44 m

Xn *Yn +1 Xn *Yn -1

- -
(81,688.188) (78,886.112)
(81,689.496) (81,698.704)
(79,208.107) (81,699.875)
(78,896.134) (79,197.911)

(321,481.93) (321,482.60)
0.338
Total m2 0.34

0.338
p. r2 0.032
0.306
Total m2 0.31

Xn *Yn +1 Xn *Yn -1

- -
(136,098.939) (133,652.193)
(136,100.911) (136,116.385)
(133,667.388) (136,118.358)
(133,669.325) (133,650.255)

(539,536.56) (539,537.19)
0.314
Total m2 0.31

0.314
p. r2 0.032
0.282
Total m2 0.28
mbunan P39-P40
Luas (m2) Volume (m3)
0.33 16.45
0.29 14.82
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 40

PATOK P41
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 40
Galian
Area 1
Jarak Antara P40 - P41 =

Point X (Dist) Y (El)

1 3456.760 -36.992
2 3456.813 -37.717
3 3457.213 -37.717
4 3457.264 -37.021
5 3456.760 -36.992

TOTAL
Luas ( m2)

P 40
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P41
Galian
Point X (Dist) Y (El)

1 3559.833 -38.526
2 3559.884 -39.231
3 3560.285 -39.231
4 3560.335 -38.535
5 3559.833 -38.526

TOTAL
Luas ( m2)

P41
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P40-P41


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

47.04 m

Xn *Yn +1 Xn *Yn -1

- -
(130,378.617) (127,874.426)
(130,380.616) (130,395.703)
(127,989.482) (130,397.626)
(127,891.110) (127,972.712)

(516,639.83) (516,640.47)
0.321
Total m2 0.32

0.321
p. r2 0.032
0.289
Total m2 0.29

Xn *Yn +1 Xn *Yn -1

- -
(139,655.808) (137,148.091)
(139,657.809) (139,673.541)
(137,195.582) (139,675.502)
(137,165.466) (137,178.165)

(553,674.67) (553,675.30)
0.316
Total m2 0.32

0.316
p. r2 0.032
0.284
Total m2 0.28
mbunan P40-P41
Luas (m2) Volume (m3)
0.32 14.99
0.29 13.47
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 41

PATOK P42
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 41
Galian
Area 1
Jarak Antara P41 - P42 =

Point X (Dist) Y (El)

1 3559.833 -38.526
2 3559.884 -39.231
3 3560.285 -39.231
4 3560.335 -38.535
5 3559.833 -38.526

TOTAL
Luas ( m2)

P 41
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P42
Galian
Point X (Dist) Y (El)

1 3517.230 -53.908
2 3517.286 -54.680
3 3517.687 -54.680
4 3517.737 -53.983
5 3517.230 -53.908

TOTAL
Luas ( m2)

P42
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P41-P42


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

41.15 m

Xn *Yn +1 Xn *Yn -1

- -
(139,655.808) (137,148.091)
(139,657.809) (139,673.541)
(137,195.582) (139,675.502)
(137,165.466) (137,178.165)

(553,674.67) (553,675.30)
0.316
Total m2 0.32

0.316
p. r2 0.032
0.284
Total m2 0.28

Xn *Yn +1 Xn *Yn -1

- -
(192,322.136) (189,609.854)
(192,325.198) (192,347.125)
(189,895.297) (192,349.859)
(189,634.166) (189,870.627)

(764,176.80) (764,177.47)
0.333
Total m2 0.33

0.333
p. r2 0.032
0.301
Total m2 0.30
mbunan P41-P42
Luas (m2) Volume (m3)
0.32 13.37
0.29 12.03
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 42

PATOK P43
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 42
Galian
Area 1
Jarak Antara P42 - P43 =

Point X (Dist) Y (El)

1 3517.230 -53.908
2 3517.286 -54.680
3 3517.687 -54.680
4 3517.737 -53.983
5 3517.230 -53.908

TOTAL
Luas ( m2)

P 42
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P43
Galian
Point X (Dist) Y (El)

1 3555.945 -54.257
2 3555.999 -54.994
3 3556.399 -54.994
4 3556.450 -54.297
5 3555.945 -54.257

TOTAL
Luas ( m2)

P43
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P42-P43


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

54.41 m

Xn *Yn +1 Xn *Yn -1

- -
(192,322.136) (189,609.854)
(192,325.198) (192,347.125)
(189,895.297) (192,349.859)
(189,634.166) (189,870.627)

(764,176.80) (764,177.47)
0.333
Total m2 0.33

0.333
p. r2 0.032
0.301
Total m2 0.30

Xn *Yn +1 Xn *Yn -1

- -
(195,555.639) (192,937.838)
(195,558.609) (195,580.607)
(193,101.797) (195,583.411)
(192,962.308) (193,077.146)

(777,178.35) (777,179.00)
0.324
Total m2 0.32

0.324
p. r2 0.032
0.292
Total m2 0.29
mbunan P42-P43
Luas (m2) Volume (m3)
0.33 17.89
0.30 16.13
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 43

PATOK P44
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 43
Galian
Area 1
Jarak Antara P43 - P44 =

Point X (Dist) Y (El)

1 3555.945 -54.257
2 3555.999 -54.994
3 3556.399 -54.994
4 3556.450 -54.297
5 3555.945 -54.257

TOTAL
Luas ( m2)

P 43
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P44
Galian
Point X (Dist) Y (El)

1 3618.179 -21.891
2 3618.227 -22.553
3 3618.627 -22.553
4 3618.675 -21.893
5 3618.179 -21.891

TOTAL
Luas ( m2)

P44
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P43-P44


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

33.58 m

Xn *Yn +1 Xn *Yn -1

- -
(195,555.639) (192,937.838)
(195,558.609) (195,580.607)
(193,101.797) (195,583.411)
(192,962.308) (193,077.146)

(777,178.35) (777,179.00)
0.324
Total m2 0.32

0.324
p. r2 0.032
0.292
Total m2 0.29

Xn *Yn +1 Xn *Yn -1

- -
(81,600.791) (79,206.607)
(81,601.874) (81,610.895)
(79,222.601) (81,611.977)
(79,216.414) (79,212.793)

(321,641.68) (321,642.27)
0.296
Total m2 0.30

0.296
p. r2 0.032
0.264
Total m2 0.26
mbunan P43-P44
Luas (m2) Volume (m3)
0.31 10.42
0.28 9.33
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 44

PATOK P45
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 44
Galian
Area 1
Jarak Antara P44 - P45 =

Point X (Dist) Y (El)

1 3618.179 -21.891
2 3618.227 -22.553
3 3618.627 -22.553
4 3618.675 -21.893
5 3618.179 -21.891

TOTAL
Luas ( m2)

P 44
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P45
Galian
Point X (Dist) Y (El)

1 3655.281 -22.101
2 3655.335 -22.852
3 3655.736 -22.852
4 3655.786 -22.156
5 3655.281 -22.101

TOTAL
Luas ( m2)

P45
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P44-P45


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

56.24 m

Xn *Yn +1 Xn *Yn -1

- -
(81,600.791) (79,206.607)
(81,601.874) (81,610.895)
(79,222.601) (81,611.977)
(79,216.414) (79,212.793)

(321,641.68) (321,642.27)
0.296
Total m2 0.30

0.296
p. r2 0.032
0.264
Total m2 0.26

Xn *Yn +1 Xn *Yn -1

- -
(83,530.481) (80,786.559)
(83,531.715) (83,540.879)
(80,996.487) (83,542.022)
(80,796.526) (80,986.406)

(328,855.21) (328,855.87)
0.328
Total m2 0.33

0.328
p. r2 0.032
0.295
Total m2 0.30
mbunan P44-P45
Luas (m2) Volume (m3)
0.31 17.54
0.28 15.72
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 45

PATOK P46
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 45
Galian
Area 1
Jarak Antara P45 - P46 =

Point X (Dist) Y (El)

1 3655.281 -22.101
2 3655.335 -22.852
3 3655.736 -22.852
4 3655.786 -22.156
5 3655.281 -22.101

TOTAL
Luas ( m2)

P 45
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P46
Galian
Point X (Dist) Y (El)

1 3618.787 -39.065
2 3618.838 -39.772
3 3619.239 -39.772
4 3619.289 -39.076
5 3618.787 -39.065

TOTAL
Luas ( m2)

P46
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P45-P46


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

51.00 m

Xn *Yn +1 Xn *Yn -1

- -
(83,530.481) (80,786.559)
(83,531.715) (83,540.879)
(80,996.487) (83,542.022)
(80,796.526) (80,986.406)

(328,855.21) (328,855.87)
0.328
Total m2 0.33

0.328
p. r2 0.032
0.295
Total m2 0.30

Xn *Yn +1 Xn *Yn -1

- -
(143,926.397) (141,369.906)
(143,928.425) (143,944.374)
(141,425.383) (143,946.362)
(141,387.525) (141,407.721)

(570,667.73) (570,668.36)
0.317
Total m2 0.32

0.317
p. r2 0.032
0.284
Total m2 0.28
mbunan P45-P46
Luas (m2) Volume (m3)
0.32 16.43
0.29 14.78
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 46

PATOK P47
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 46
Galian
Area 1
Jarak Antara P46 - P47 =

Point X (Dist) Y (El)

1 3618.787 -39.065
2 3618.838 -39.772
3 3619.239 -39.772
4 3619.289 -39.076
5 3618.787 -39.065

TOTAL
Luas ( m2)

P 46
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P47
Galian
Point X (Dist) Y (El)

1 3661.137 -38.882
2 3661.193 -39.653
3 3661.593 -39.653
4 3661.640 -38.999
5 3661.137 -38.882

TOTAL
Luas ( m2)

P47
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P46-P47


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

46.42 m

Xn *Yn +1 Xn *Yn -1

- -
(143,926.397) (141,369.906)
(143,928.425) (143,944.374)
(141,425.383) (143,946.362)
(141,387.525) (141,407.721)

(570,667.73) (570,668.36)
0.317
Total m2 0.32

0.317
p. r2 0.032
0.284
Total m2 0.28

Xn *Yn +1 Xn *Yn -1

- -
(145,175.065) (142,354.506)
(145,177.286) (145,193.147)
(142,798.465) (145,195.011)
(142,371.886) (142,780.682)

(575,522.70) (575,523.35)
0.321
Total m2 0.32

0.321
p. r2 0.032
0.289
Total m2 0.29
mbunan P46-P47
Luas (m2) Volume (m3)
0.32 14.81
0.29 13.31
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 47

PATOK P48
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 47
Galian
Area 1
Jarak Antara P47 - P48 =

Point X (Dist) Y (El)

1 3661.137 -38.882
2 3661.193 -39.653
3 3661.593 -39.653
4 3661.640 -38.999
5 3661.137 -38.882

TOTAL
Luas ( m2)

P 47
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P48
Galian
Point X (Dist) Y (El)

1 3618.968 -54.230
2 3619.021 -54.961
3 3619.422 -54.961
4 3619.468 -54.320
5 3618.968 -54.230

TOTAL
Luas ( m2)

P48
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P47-P48


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

53.78 m

Xn *Yn +1 Xn *Yn -1

- -
(145,175.065) (142,354.506)
(145,177.286) (145,193.147)
(142,798.465) (145,195.011)
(142,371.886) (142,780.682)

(575,522.70) (575,523.35)
0.321
Total m2 0.32

0.321
p. r2 0.032
0.289
Total m2 0.29

Xn *Yn +1 Xn *Yn -1

- -
(198,902.100) (196,259.509)
(198,905.013) (198,927.053)
(196,607.003) (198,929.581)
(196,283.750) (196,582.342)

(790,697.87) (790,698.48)
0.309
Total m2 0.31

0.309
p. r2 0.032
0.277
Total m2 0.28
mbunan P47-P48
Luas (m2) Volume (m3)
0.32 16.95
0.28 15.21
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 48

PATOK P49
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 48
Galian
Area 1
Jarak Antara P48 - P49 =

Point X (Dist) Y (El)

1 3618.968 -54.230
2 3619.021 -54.961
3 3619.422 -54.961
4 3619.468 -54.320
5 3618.968 -54.230

TOTAL
Luas ( m2)

P 48
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P 49
Galian
Point X (Dist) Y (El)

1 3658.857 -53.433
2 3658.927 -54.396
3 3659.327 -54.396
4 3659.377 -53.710
5 3658.857 -53.433

TOTAL
Luas ( m2)

P 49
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P48-P49


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

51.09 m

Xn *Yn +1 Xn *Yn -1

- -
(198,902.100) (196,259.509)
(198,905.013) (198,927.053)
(196,607.003) (198,929.581)
(196,283.750) (196,582.342)

(790,697.87) (790,698.48)
0.309
Total m2 0.31

0.309
p. r2 0.032
0.277
Total m2 0.28

Xn *Yn +1 Xn *Yn -1

- -
(199,027.185) (195,507.446)
(199,030.993) (199,052.751)
(196,542.453) (199,055.471)
(195,531.491) (196,517.209)

(790,132.12) (790,132.88)
0.378
Total m2 0.38

0.378
p. r2 0.032
0.346
Total m2 0.35
mbunan P48-P49
Luas (m2) Volume (m3)
0.34 17.54
0.31 15.89
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 49

PATOK P50
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 49
Galian
Area 1
Jarak Antara P49 - P50 =

Point X (Dist) Y (El)

1 3658.857 -53.433
2 3658.927 -54.396
3 3659.327 -54.396
4 3659.377 -53.710
5 3658.857 -53.433

TOTAL
Luas ( m2)

P 49
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P 50
Galian
Point X (Dist) Y (El)

1 3714.617 -23.373
2 3714.670 -24.101
3 3715.070 -24.101
4 3715.121 -23.406
5 3714.617 -23.373

TOTAL
Luas ( m2)

P 50
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P49-P50


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

45.14 m

Xn *Yn +1 Xn *Yn -1

- -
(199,027.185) (195,507.446)
(199,030.993) (199,052.751)
(196,542.453) (199,055.471)
(195,531.491) (196,517.209)

(790,132.12) (790,132.88)
0.378
Total m2 0.38

0.378
p. r2 0.032
0.346
Total m2 0.35

Xn *Yn +1 Xn *Yn -1

- -
(89,525.984) (86,822.982)
(89,527.262) (89,536.902)
(86,954.928) (89,538.131)
(86,833.523) (86,944.326)

(352,841.70) (352,842.34)
0.322
Total m2 0.32

0.322
p. r2 0.032
0.289
Total m2 0.29
mbunan P49-P50
Luas (m2) Volume (m3)
0.35 15.79
0.32 14.33
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 50

PATOK P51
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 50
Galian
Area 1
Jarak Antara P50 - P51 =

Point X (Dist) Y (El)

1 3714.617 -23.373
2 3714.670 -24.101
3 3715.070 -24.101
4 3715.121 -23.406
5 3714.617 -23.373

TOTAL
Luas ( m2)

P 50
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P51
Galian
Point X (Dist) Y (El)

1 3757.009 -21.885
2 3757.064 -22.641
3 3757.464 -22.641
4 3757.515 -21.945
5 3757.009 -21.885

TOTAL
Luas ( m2)

P51
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P50-P51


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

49.21 m

Xn *Yn +1 Xn *Yn -1

- -
(89,525.984) (86,822.982)
(89,527.262) (89,536.902)
(86,954.928) (89,538.131)
(86,833.523) (86,944.326)

(352,841.70) (352,842.34)
0.322
Total m2 0.32

0.322
p. r2 0.032
0.289
Total m2 0.29

Xn *Yn +1 Xn *Yn -1

- -
(85,062.441) (82,223.346)
(85,063.686) (85,072.742)
(82,457.547) (85,073.897)
(82,233.216) (82,447.563)

(334,816.89) (334,817.55)
0.329
Total m2 0.33

0.329
p. r2 0.032
0.296
Total m2 0.30
mbunan P50-P51
Luas (m2) Volume (m3)
0.33 16.00
0.29 14.41
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 51

PATOK P 52
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 51
Galian
Area 1
Jarak Antara P51 - P52 =

Point X (Dist) Y (El)

1 3757.009 -21.885
2 3757.064 -22.641
3 3757.464 -22.641
4 3757.515 -21.945
5 3757.009 -21.885

TOTAL
Luas ( m2)

P 51
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P52
Galian
Point X (Dist) Y (El)

1 3716.954 -38.225
2 3717.004 -38.919
3 3717.405 -38.919
4 3717.457 -38.198
5 3716.954 -38.225

TOTAL
Luas ( m2)

P52
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P51-P52


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

52.78 m

Xn *Yn +1 Xn *Yn -1

- -
(85,062.441) (82,223.346)
(85,063.686) (85,072.742)
(82,457.547) (85,073.897)
(82,233.216) (82,447.563)

(334,816.89) (334,817.55)
0.329
Total m2 0.33

0.329
p. r2 0.032
0.296
Total m2 0.30

Xn *Yn +1 Xn *Yn -1

- -
(144,660.133) (142,082.478)
(144,662.079) (144,677.685)
(141,997.436) (144,679.709)
(142,099.794) (141,980.209)

(573,419.44) (573,420.08)
0.320
Total m2 0.32

0.320
p. r2 0.032
0.287
Total m2 0.29
mbunan P51-P52
Luas (m2) Volume (m3)
0.32 17.12
0.29 15.41
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 52

PATOK P 53
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 52
Galian
Area 1
Jarak Antara P52 - P53=

Point X (Dist) Y (El)

1 3716.954 -38.225
2 3717.004 -38.919
3 3717.405 -38.919
4 3717.457 -38.198
5 3716.954 -38.225

TOTAL
Luas ( m2)

P 52
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P53
Galian
Point X (Dist) Y (El)

1 3757.874 -38.858
2 3757.930 -39.617
3 3758.330 -39.617
4 3758.388 -38.825
5 3757.874 -38.858

TOTAL
Luas ( m2)

P53
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P52-P53


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

45.89 m

Xn *Yn +1 Xn *Yn -1

- -
(144,660.133) (142,082.478)
(144,662.079) (144,677.685)
(141,997.436) (144,679.709)
(142,099.794) (141,980.209)

(573,419.44) (573,420.08)
0.320
Total m2 0.32

0.320
p. r2 0.032
0.287
Total m2 0.29

Xn *Yn +1 Xn *Yn -1

- -
(148,875.694) (146,025.644)
(148,877.913) (148,893.760)
(145,917.162) (148,896.057)
(146,043.441) (145,899.458)

(589,714.21) (589,714.92)
0.354
Total m2 0.35

0.354
p. r2 0.032
0.322
Total m2 0.32
mbunan P52-P53
Luas (m2) Volume (m3)
0.34 15.47
0.30 13.98
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 53

PATOK P54
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 53
Galian
Area 1
Jarak Antara P53 - P54 =

Point X (Dist) Y (El)

1 3757.874 -38.858
2 3757.930 -39.617
3 3758.330 -39.617
4 3758.388 -38.825
5 3757.874 -38.858

TOTAL
Luas ( m2)

P 53
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P54
Galian
Point X (Dist) Y (El)

1 3718.928 -54.953
2 3718.995 -55.877
3 3719.396 -55.877
4 3719.446 -55.178
5 3718.928 -54.953

TOTAL
Luas ( m2)

P54
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P53-P54


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

50.69 m

Xn *Yn +1 Xn *Yn -1

- -
(148,875.694) (146,025.644)
(148,877.913) (148,893.760)
(145,917.162) (148,896.057)
(146,043.441) (145,899.458)

(589,714.21) (589,714.92)
0.354
Total m2 0.35

0.354
p. r2 0.032
0.322
Total m2 0.32

Xn *Yn +1 Xn *Yn -1

- -
(207,802.540) (204,369.932)
(207,806.284) (207,828.690)
(205,228.832) (207,831.484)
(204,394.716) (205,203.009)

(825,232.37) (825,233.12)
0.372
Total m2 0.37

0.372
p. r2 0.032
0.340
Total m2 0.34
mbunan P53-P54
Luas (m2) Volume (m3)
0.36 18.41
0.33 16.77
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 54

PATOK P 55
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 54
Galian
Area 1
Jarak Antara P54 - P55 =

Point X (Dist) Y (El)

1 3718.928 -54.953
2 3718.995 -55.877
3 3719.396 -55.877
4 3719.446 -55.178
5 3718.928 -54.953

TOTAL
Luas ( m2)

P 54
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P55
Galian
Point X (Dist) Y (El)

1 3752.607 -54.774
2 3752.735 -55.564
3 3753.120 -55.564
4 3753.231 -54.811
5 3752.607 -54.774

TOTAL
Luas ( m2)

P55
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P54-P55


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

51.09 m

Xn *Yn +1 Xn *Yn -1

- -
(207,802.540) (204,369.932)
(207,806.284) (207,828.690)
(205,228.832) (207,831.484)
(204,394.716) (205,203.009)

(825,232.37) (825,233.12)
0.372
Total m2 0.37

0.372
p. r2 0.032
0.340
Total m2 0.34

Xn *Yn +1 Xn *Yn -1

- -
(208,509.855) (205,552.307)
(208,516.968) (208,538.360)
(205,712.260) (208,544.527)
(205,579.475) (205,684.142)

(828,318.56) (828,319.34)
0.389
Total m2 0.39

0.389
p. r2 0.032
0.357
Total m2 0.36
mbunan P54-P55
Luas (m2) Volume (m3)
0.38 19.44
0.35 17.79
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P55

PATOK P56
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P55
Galian
Area 1
Jarak Antara P55 - P56 =

Point X (Dist) Y (El)

1 3752.607 -54.774
2 3752.735 -55.564
3 3753.120 -55.564
4 3753.231 -54.811
5 3752.607 -54.774

TOTAL
Luas ( m2)

P55
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P56
Galian
Point X (Dist) Y (El)

1 3818.028 -23.248
2 3818.094 -24.156
3 3818.494 -24.156
4 3818.545 -23.456
5 3818.028 -23.248

TOTAL
Luas ( m2)

P56
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P55-P56


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

36.66 m

Xn *Yn +1 Xn *Yn -1

- -
(208,509.855) (205,552.307)
(208,516.968) (208,538.360)
(205,712.260) (208,544.527)
(205,579.475) (205,684.142)

(828,318.56) (828,319.34)
0.389
Total m2 0.39

0.389
p. r2 0.032
0.357
Total m2 0.36

Xn *Yn +1 Xn *Yn -1

- -
(92,228.284) (88,763.049)
(92,229.879) (92,239.541)
(89,566.595) (92,240.773)
(88,773.534) (89,555.665)

(362,798.29) (362,799.03)
0.368
Total m2 0.37

0.368
p. r2 0.032
0.336
Total m2 0.34
mbunan P55-P56
Luas (m2) Volume (m3)
0.38 13.87
0.35 12.69
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 56

PATOK P57
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 56
Galian
Area 1
Jarak Antara P56 - P57 =

Point X (Dist) Y (El)

1 3818.028 -23.248
2 3818.094 -24.156
3 3818.494 -24.156
4 3818.545 -23.456
5 3818.028 -23.248

TOTAL
Luas ( m2)

P 56
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P57
Galian
Point X (Dist) Y (El)

1 3854.964 -21.880
2 3855.014 -22.565
3 3855.415 -22.565
4 3855.465 -21.871
5 3854.964 -21.880

TOTAL
Luas ( m2)

P57
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P56-P57


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

60.49 m

Xn *Yn +1 Xn *Yn -1

- -
(92,228.284) (88,763.049)
(92,229.879) (92,239.541)
(89,566.595) (92,240.773)
(88,773.534) (89,555.665)

(362,798.29) (362,799.03)
0.368
Total m2 0.37

0.368
p. r2 0.032
0.336
Total m2 0.34

Xn *Yn +1 Xn *Yn -1

- -
(86,987.263) (84,347.706)
(86,988.391) (86,997.439)
(84,321.781) (86,998.568)
(84,357.574) (84,311.918)

(342,655.01) (342,655.63)
0.311
Total m2 0.31

0.311
p. r2 0.032
0.279
Total m2 0.28
mbunan P56-P57
Luas (m2) Volume (m3)
0.34 20.53
0.31 18.57
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 57

PATOK P58
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 57
Galian
Area 1
Jarak Antara P57 - P58 =

Point X (Dist) Y (El)

1 3854.964 -21.880
2 3855.014 -22.565
3 3855.415 -22.565
4 3855.465 -21.871
5 3854.964 -21.880

TOTAL
Luas ( m2)

P 57
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P58
Galian
Point X (Dist) Y (El)

1 3817.292 -39.762
2 3817.346 -40.504
3 3817.746 -40.504
4 3817.797 -39.806
5 3817.292 -39.762

TOTAL
Luas ( m2)

P58
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P57-P58


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

49.78 m

Xn *Yn +1 Xn *Yn -1

- -
(86,987.263) (84,347.706)
(86,988.391) (86,997.439)
(84,321.781) (86,998.568)
(84,357.574) (84,311.918)

(342,655.01) (342,655.63)
0.311
Total m2 0.31

0.311
p. r2 0.032
0.279
Total m2 0.28

Xn *Yn +1 Xn *Yn -1

- -
(154,615.595) (151,785.312)
(154,617.782) (154,633.984)
(151,969.197) (154,636.050)
(151,803.244) (151,951.125)

(613,005.82) (613,006.47)
0.326
Total m2 0.33

0.326
p. r2 0.032
0.293
Total m2 0.29
mbunan P57-P58
Luas (m2) Volume (m3)
0.32 15.85
0.29 14.24
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 58

PATOK P59
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 58
Galian
Area 1
Jarak Antara P58 - P59 =

Point X (Dist) Y (El)

1 3817.292 -39.762
2 3817.346 -40.504
3 3817.746 -40.504
4 3817.797 -39.806
5 3817.292 -39.762

TOTAL
Luas ( m2)

P 58
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P59
Galian
Point X (Dist) Y (El)

1 3857.821 -33.474
2 3857.865 -34.079
3 3858.265 -34.079
4 3858.316 -33.384
5 3857.821 -33.474

TOTAL
Luas ( m2)

P59
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P58-P59


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

51.12 m

Xn *Yn +1 Xn *Yn -1

- -
(154,615.595) (151,785.312)
(154,617.782) (154,633.984)
(151,969.197) (154,636.050)
(151,803.244) (151,951.125)

(613,005.82) (613,006.47)
0.326
Total m2 0.33

0.326
p. r2 0.032
0.293
Total m2 0.29

Xn *Yn +1 Xn *Yn -1

- -
(131,470.682) (129,138.173)
(131,472.181) (131,485.813)
(128,804.319) (131,487.551)
(129,153.270) (128,789.496)

(520,900.45) (520,901.03)
0.291
Total m2 0.29

0.291
p. r2 0.032
0.258
Total m2 0.26
mbunan P58-P59
Luas (m2) Volume (m3)
0.31 15.76
0.28 14.10
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016

JENIS PEKERJAAN GALIAN DAN TIMBUNAN


SKETSA

PATOK P 59

PATOK P60
BACK UP DATA

AIR BAKU KABUPATEN KEPULAUAN TALAUD

PERHITUNGAN

II, P 59
Galian
Area 1
Jarak Antara P59 - P60 =

Point X (Dist) Y (El)

1 3857.821 -33.474
2 3857.865 -34.079
3 3858.265 -34.079
4 3858.316 -33.384
5 3857.821 -33.474

TOTAL
Luas ( m2)

P 59
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

P60
Galian
Point X (Dist) Y (El)

1 3824.304 -53.409
2 3824.356 -54.123
3 3824.756 -54.123
4 3824.807 -53.425
5 3824.304 -53.409

TOTAL
Luas ( m2)

P60
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)

Rata-Rata Glian & Timbunan P59-P60


Nama Pekerjaan
Luas Galian ( m2)
Luas Timbunan (m2)
PERHITUNGAN SAT TOTAL

20.01 m

Xn *Yn +1 Xn *Yn -1

- -
(131,470.682) (129,138.173)
(131,472.181) (131,485.813)
(128,804.319) (131,487.551)
(129,153.270) (128,789.496)

(520,900.45) (520,901.03)
0.291
Total m2 0.29

0.291
p. r2 0.032
0.258
Total m2 0.26

Xn *Yn +1 Xn *Yn -1

- -
(206,982.805) (204,255.030)
(206,985.620) (207,007.269)
(204,337.589) (207,010.029)
(204,279.117) (204,313.441)

(822,585.13) (822,585.77)
0.319
Total m2 0.32

0.319
p. r2 0.032
0.286
Total m2 0.29
mbunan P59-P60
Luas (m2) Volume (m3)
0.30 6.10
0.27 5.45
PERHITUNGAN VOLUME PEKER
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir

NO URAIAN

PEKERJAAN RESERVOIR 600 M3

A. PEMBERSIHAN AREAL TANDON


18.69 x 24.670
PERHITUNGAN VOLUME PEKER
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir

NO URAIAN

B. GALIAN DAN URUGAN

GALIAN TANAH
1.60 x 13.50 x 13.50

URUGAN PASIR
0.30 x 13.50 x 13.50

C. PLESTERAN

PLESTERAN DAN ACIAN


13.50 x 3.40 x 12.00
13.50 x 13.50 x 1.00
13.50 x 13.50 x 1.00

D. PEK. BETON DAN PEMBESIAN

BETON TUMBUK/LANTAI KERKA 1:3:5


13.50 x 13.50 x 0.10

BETON BERTULANG K-225


13.50 x 3.40 x 0.20 x 8.00
13.60 x 13.60 x 0.20
13.60 x 13.60 x 0.15
0.60 x 0.60 x 4.80 x 25.00
0.60 x 0.60 x 13.60 x 10.00
PERHITUNGAN VOLUME PEKER
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir

NO URAIAN

PENULANGAN PLAT LANTAI


Sketch Dia Panjang bh Jumlah Panjang Berat J
No mm m m

1 7.4 m 12.00 7.55 363 2738.13


(13.6/0.15*4)
0.15
1.80 12.00 1.9 544 1033.60
2 (13.6/0.15*6)
0.05

1
3 12.00 1.58 363 573.01
0.48 0.05 (13.6/0.15*4)
0.05
Total Tulangan Plat Lantai

PENULANGAN PLAT ATAP


Sketch Dia Panjang bh Jumlah Panjang Berat J
No mm m m

1 7.4 m 12.00 7.55 363 2738.13


(13.6/0.15*4)
0.15
PERHITUNGAN VOLUME PEKER
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir

NO URAIAN
1.80 12.00 1.9 544 1033.60
2 (13.6/0.15*6)
0.05

1
3 12.00 1.58 363 573.01
0.48 0.05 (13.6/0.15*4)
0.05
Total Tulangan Plat Atap
PERHITUNGAN VOLUME PEKER
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir

NO URAIAN

2 1
3 4

PENULANGAN PLAT DINDING


Sketch Dia Panjang bh Jumlah Panjang Berat J
No mm m m

1 10.8 12.00 11.8 37 434.24


(4.6/1*8)
1

3.9
2 12.00 4.9 37 180.32
1 (4.6/1*8)

3.8
3 12.00 4.1 37 150.88
0.3 0.30 (4.6/1*8)

4 0.3 12.00 11.03 37 405.90


(4.6/1*8)
10.73

0.95
5 12.00 2.2 204 449.78
0.3 (4.6/0.45*20)

3.96
6 12.00 4.22 427 1800.53
0.26 (13.6/0.51*2*8)
PERHITUNGAN VOLUME PEKER
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir

NO 0.26 URAIAN

1.56
7 12.00 2.06 427 878.93
0.50 (13.6/0.51*2*8)

Total Tulangan Plat Dinding


PERHITUNGAN VOLUME PEKER
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir

NO URAIAN

PENULANGAN SLOOP
Sketch Dia Panjang bh Jumlah Panjang Berat J
No mm M

0.92 1.85 1.22 19.00 14.51 20 290.2


(2x10)
0.28

13.6
19.00 13.8 80 1104
0.1 0.1
(8x10)

0.36
0.05
0.05 8.00 1.54 907 1396.27
0.36 (13.6/0.15x10)
PERHITUNGAN VOLUME PEKER
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir

NO URAIAN

Total Tulangan Balok

PENULANGAN KOLOM
Sketch Dia Panjang bh Jumlah Panjang Berat J
No mm M

4.6
0.1 19.00 4.8 300 1440
0.1
(12x25)

0.36
0.05
0.05
8.00 1.54 767 1180.67
0.36 (4.6/0.15x25)

Total Tulangan Balok


PERHITUNGAN VOLUME PEKER
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir

NO URAIAN
PENULANGAN BALOK
Sketch Dia Panjang bh Jumlah Panjang Berat J
No mm M

0.92 1.85 1.22 19.00 14.51 20 290.2


(2x10)
0.28 (8x10)

13.6
19.00 13.8 40 552
0.1 0.1
(4x10)

0.36
0.05
0.05
8.00 1.54 907 1396.27
0.36 (13.6/0.15x10)

Total Tulangan Balok

TOTAL VOLUME PENULANGAN


PERHITUNGAN VOLUME PEKER
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir

NO URAIAN

BEKISTING
13.60 x 13.60 x 1.00
13.60 x 0.20 x 4.00 + 13.60 x 0.15 x
3.40 x 4.25 x 2.00 x 29.00
0.60 x 0.60 x 4.25 x 25.00
0.60 x 0.60 x 3.40 x 40.00

E. PEK. Pipa
3.20 3.00
1.00
8.00
VOLUME PEKERJAAN

VOLUME KET

461.08 m2
461.08 m2
VOLUME PEKERJAAN

VOLUME KET

291.60 m3
291.60

54.68 m3
54.68 m3

915.30 m2
550.80 m2 dinding
182.25 m2 lantai
182.25 m2 atap

18.23 m3
18.23 m3

230.34 m3
73.44 m3 dinding
36.99 m3 lantai
27.74 m3 atap
43.20 m3 kolom
48.96 m3 balok
VOLUME PEKERJAAN

VOLUME KET

Berat Jenis Jumlah Berat


Kg/m Kg

0.89 2,431.46

0.89 917.84

0.89 508.84

ngan Plat Lantai 3,858.14

Berat Jenis Jumlah Berat


Kg/m Kg

0.89 2,431.46
VOLUME PEKERJAAN

VOLUME KET
0.89 917.84

0.89 508.84

angan Plat Atap 3,858.14


VOLUME PEKERJAAN

VOLUME KET

Berat Jenis Jumlah Berat


Kg/m Kg

0.89 385.61

0.89 160.12

0.89 133.98

0.89 360.44

0.89 399.40

0.89 1,598.87
VOLUME PEKERJAAN

VOLUME KET

0.89 782.25

ngan Plat Dinding 3,820.68


VOLUME PEKERJAAN

VOLUME KET

Berat Jenis Jumlah Berat

2.23 645.99

2.23 2,457.50

0.40 551.53
VOLUME PEKERJAAN

VOLUME KET

ulangan Balok 3,655.01

Berat Jenis Jumlah Berat

2.23 3,205.44

0.40 466.36

ulangan Balok 3,671.80


VOLUME PEKERJAAN

VOLUME KET

Berat Jenis Jumlah Berat

2.23 645.99

2.23 1,228.75

0.40 551.53

ulangan Balok 2,426.26

21,290.03
VOLUME PEKERJAAN

VOLUME KET

1,129.31 m2
184.96 m2 b. dasar plat atap
4.00 19.04 b. samping plat
838.10 m2 b. dinding
38.25 m2 b. kolom
48.96 m2 b. balok

Pelimpas &
9.60 m Penguras
3.00 unit Gate Valve
8.00 unit Elbow
Tabel 9.5 Volume Pekerjaan SID Air Baku
(Lokasi 1. Sungai Ampodoap - Kec. Beo)

No. Uraian Pekerjaan Satuan Volume

(1) (2) (3) (4)


A. Pekerjaan Persiapan
1 Mobilisasi dan demobilisasi Ls
- Bahan & Pekerja 1.00
- Alat-alat 1.00
2 Pengukuran Ls 1.00
3 As Built Drawing Ls 1.00
4 Dokumentasi pelaksanaan Ls 1.00

B. Pekerjaan Intake

I. Pekerjaan pembersihan
1 Pembersihan di rencana bangunan m2 388.39

II. Pekerjaan coffering dan dewatering


1 Kistdam pasir/tanah dibungkus karung plastik uk 43x65 cm buah 390.00
2 Dewatering hari 15.00

III. Pekerjaan tanah


1 Galian tanah keras m3 214.21
2 Pembuangan sisa galian tanah m3 214.21
3 Perapihan m2 60.27

IV. Pekerjaan beton dan pasangan


1 Pas. Batu Kali / Batu Belah 1:3 m³ 132.58
2 Pek. Plesteran sp 1:3 tebal 1.0 cm m2 211.73

IV. Pengangkatan Material


1 Semen Sak Err:509
2 Batu Kali m³ Err:509
No. Uraian Pekerjaan Satuan Volume

(1) (2) (3) (4)


C. Pekerjaan Pipa

I. Pekerjaan tanah
1 Galian tanah penempatan pipa m3 505.54
2 Timbunan tanah m 3
374.66
3 Pemadatan Tanah m 3
374.66

II. Pekerjaan pipa


A Dari Broncap Peling ke Reservoar PDAM
1 Pemasangan & Pengadaan Pipa HDPE dia 8" inch (panjang 6 m 1,291.00
2 Pemasangan & Pengadaan Pipa Galvanis 8" m 1,631.00
3 Penyambungan pipa HDPE titik 215.17
Penyambungan las Pipa Galvanis 8'' titik 271.83
4 Pengetesan pipa HDPE dia 8 inch m 1,291.00
5 Pemasangan & Pengadaan Elbow HDPE Bend. 45o dia 6 inch bh 10.00
6 Pemasangan & Pengadaan Elbow HDPE Bend. 90o dia 6 inch bh 20.00

III. Pekerjaan Kubus Perletakan Pipa


Beton K 175 m3 31.85
D. Pekerjaan Pipa

I. Pekerjaan pembersihan
1 Pembersihan di rencana bangunan m2 461.08

II. Pekerjaaan Bangunan Reservoar


1 Galian Tanah Fondasi m3 291.60
2 Urugan Pasir m3 54.68
3 Lantai Kerja m3 18.23
4 Pek. Beton K225 m3 230.34
5 Pek. Plesteran sp 1:3 tebal 1.0 cm m2 915.30
6 Pembesian Kg
7 Pemasangan Bekisting m2 1,129.31
8 Pipa GIP ∅8" m 9.60
9 Elbow 90o pcs 8.00
10 Valve penguras ∅6" pcs 3.00
No. Uraian Pekerjaan Satuan Volume

(1) (2) (3) (4)


E. Pekerjaan K3
1 a Penyiapan RK3K terdiri atas: Pembuatan Manual, Prosedur, Instruksi Set 1
Kerja, Ijin Kerja Dan
b Pembuatan Kartu Identitas Pekerja Lb 20
(KIP);
2 a Sosialisasi dan Promosi K3 terdiri atas: Org 20
Induksi K3 (Safety Induction );
b Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk Org 20
dan/atau Tool Box Meeting) ;
c Pelatihan K3; Org 1
d Simulasi K3; Org 20
e Spanduk (banner) ; Lb 1
f Poster; Lb 1
g Papan Informasi K3. Bh 1
3 a Alat Pelindung Kerja terdiri atas: Ls 1
Jaring Pengaman (Safety Net);
b Tali Keselamatan (Life Line); Ls 1
c Penahan Jatuh (Safety Deck); Ls 1
d Pagar Pengaman (Guard Railling); Ls 1
e Pembatas Area (Restricted Area ). Ls 1

4 Alat Pelindung Diri terdiri atas:


a Topi Pelindung (Safety Helmet) ; Bh 20
b Pelindung Mata (Goggles, Spectacles); Psg 20
c Tameng Muka (Face Shield); Bh 5
d Masker Selam (Breathing Apparatus); Bh
e Pelindung Telinga (Ear Plug, Ear Muff); Psg 5
f Pelindung Pernafasan Dan Mulut (Masker); Bh 20
g Sarung Tangan (Safety Gloves); Psg 20
h Sepatu Keselamatan (Safety Shoes); Psg 20
i Penunjang Seluruh Tubuh (Full Body Harness); Bh 5
j Jaket Pelampung (Life Vest); Bh 5
k Rompi Keselamatan (Safety Vest); Bh 20
l Celemek (Apron/Coveralls); Bh 2
m Pelindung Jatuh (Fall Arrester); Bh 10
5 a Asuransi Dan Perijinan terdiri atas : Ls 1

BPJS Ketenagakerjaan Dan Kesehatan


Kerja;
b Surat Ijin Kelaikan Alat; Alat/Kend 3
c Surat Ijin Operator; Lb/Alat 3
d Surat Ijin Pengesahan Panitia Pembina Ls 1
Keselamatan Dan Kesehatan Kerja

6 a Personil K3 terdiri atas : OB 1


Ahli K3
b Petugas K3 OB
c Petugas Tanggap Darurat; OB 1
d Petugas P3K; OB 1
e Petugas Pengatur Lalu Lintas OB 1
(Flagman );
f Petugas Medis. OB 1
No. Uraian Pekerjaan Satuan Volume

(1) (2) (3) (4)


7 a Fasilitas sarana kesehatan; Peralatan P3K (Kotak P3K, Tandu, Tabung Ls 1
Oksigen, Obat Luka, Perban,
b Ruang P3K (Tempat Tidur Pasien, Ls 1
Stetoskop, Timbangan Berat Badan,
c Peralatan Pengasapan (Fogging) ; Bh 1
d Obat Pengasapan. Ls 1
8 a Rambu- Rambu terdiri atas : Bh 10
Rambu Petunjuk;
b Rambu Larangan; Bh 5
c Rambu Peringatan; Bh 10
d Rambu Kewajiban; Bh 5
e Rambu Informasi; Bh 5
f Rambu Pekerjaan Sementara; Bh 10
g Tongkat Pengatur Lalu Lintas (Warning Bh 2
Lights Stick) ;
j Kerucut Lalu Lintas (Traffic Cone) ; Bh 10
i Lampu Putar (Rotary Lamp ); Bh 2
j Lampu Selang Lalu Lintas. Ls 1
9 a Lain- Lain Terkait Pengendalian Bh 4
Risiko K3
Alat Pemadam Api Ringan (APAR);
b Sirine; Bh 2
c Bendera K3; Bh 2
d Jalur Evakuasi (Escape Route ); Ls 1
e Lampu Darurat (Emergency Lamp ); Bh 4
f Program Inspeksi Dan Audit Internal; Ls 1
g Pelaporan dan Penyelidikan Insiden. Ls 1
Tabel 9.5 Rencana Anggaran Biaya Pekerjaan Persiapa
(Lokasi 1. Sungai Ampodoap - Kec. Beo)

No. Uraian Pekerjaan Satuan

(1) (2) (3)

1 Mobilisasi dan demobilisasi Ls


- Bahan & Pekerja
- Alat-alat
2 Pengukuran Ls
3 As Built Drawing Ls
4 Dokumentasi pelaksanaan Ls

Sumber : hasil perhitungan


ekerjaan Persiapan
doap - Kec. Beo)

Harga Biaya
Volume Satuan
( Rp. ) ( Rp. )
(4) (5) (6)

1.00 5,000,000.00 5,000,000.00


1.00 15,000,000.00 15,000,000.00
1.00 12,000,000.00 12,000,000.00
1.00 5,000,000.00 5,000,000.00
1.00 500,000.00 500,000.00

Jumlah 37,500,000.00
Bangunan Bendung

Harga Biaya
No. Uraian Pekerjaan Satuan Volume Satuan
( Rp. ) ( Rp. )
(1) (2) (3) (4) (5) (6)

I. Pekerjaan pembersihan 3,796,516.16


1 Pembersihan di rencana bangunan m2 388.39 9,775.00 3,796,516.16

II. Pekerjaan coffering dan dewatering 24,699,792.00


1 Kistdam pasir/tanah dibungkus karung plastik uk 43x65 cm buah 390 46,439.30 18,111,327.00
2 Dewatering hari 15.00 439,231.00 6,588,465.00

III. Pekerjaan tanah 59,443,998.54


1 Galian tanah keras m3 214.21 222,414.60 47,643,475.95
2 Pembuangan sisa galian tanah m3 214.21 51,441.80 11,019,358.27
3 Perapihan m2 60.27 12,960.50 781,164.33

IV. Pekerjaan beton dan pasangan 423,264,488.80


1 Pas. Batu Kali / Batu Belah 1:3 m³ 132.58 2,995,073.25 397,080,821.07
2 Pek. Plesteran sp 1:3 tebal 1.0 cm m2 211.73 123,665.37 26,183,667.73

Jumlah 511,204,795.51
Sumber : Hasil perhitungan
Pekerjaan Pipa Transmisi
(Lokasi 1. Sungai Ampodoap - Kec. Beo)
Harga Biaya
No. Uraian Pekerjaan Satuan Volume Satuan
( Rp. ) ( Rp. )
(1) (2) (3) (4) (5) (6)

I. Pekerjaan tanah 119,817,912.86


1 Galian tanah penempatan pipa m3 505.54 174,008.80 87,968,753.10
2 Timbunan tanah m3 374.66 42,504.00 15,924,579.88
3 Pemadatan Tanah m3 374.66 42,504.00 15,924,579.88

II. Pekerjaan pipa 2,671,669,692.06


A Dari Broncap Peling ke Reservoar PDAM
1 Pemasangan & Pengadaan Pipa HDPE dia 8" inch (panj m 1,291.00 763,654.63 985,878,120.88
2 Pemasangan & Pengadaan Pipa Galvanis 8" m 1,631.00 763,717.88 1,245,623,854.13
3 Penyambungan pipa HDPE titik 215 360,000.00 77,460,000.00
Penyambungan las Pipa Galvanis 8'' titik 272 1,200,000.00 326,200,000.00
4 Pengetesan pipa HDPE dia 8 inch m 1,291.00 5,698.45 7,356,700.56
5 Pemasangan & Pengadaan Elbow HDPE Bend. 45o dia bh 10.00 965,260.55 9,652,605.50
6 Pemasangan & Pengadaan Elbow HDPE Bend. 90o dia bh 20.00 974,920.55 19,498,411.00

III. Pekerjaan Kubus Perletakan Pipa


Beton K 175 m3 31.8464 1,773,543.79 56,480,985.05

Jumlah 2,671,669,692.06

Sumber : Hasil perhitungan


Bangunan Reservoar
(Lokasi 1. Sungai Ampodoap - Kec. Beo)
Harga Biaya
No. Uraian Pekerjaan Satuan Volume Satuan
( Rp. ) ( Rp. )
(1) (2) (3) (4) (5) (6)

I. Pekerjaan pembersihan 4,247,259.61


1 Pembersihan di rencana bangunan m2 461.08 9,211.50 4,247,259.61

II. Pekerjaaan Bangunan Reservoar 1,762,942,551.79


1 Galian Tanah Fondasi m3 291.60 212,520.00 61,970,832.00
2 Urugan Pasir m3 54.68 500,000.00 27,337,500.00
3 Lantai Kerja m3 18.23 1,557,912.99 28,392,964.29
4 Pek. Beton K225 m3 230.34 1,897,074.00 436,964,436.93
5 Pek. Plesteran sp 1:3 tebal 1.0 cm m2 915.30 94,772.71 86,745,459.17 beo salibabu juml
6 Pembesian Kg 38,009.16 21,216.35 806,415,705.13 38,009.16 52035.75444 90,044.92
7 Pemasangan Bekisting m 2
1,129.31 219,542.19 247,931,187.77
8 Pipa GIP ∅8" m 9.60 4,125,333.33 39,603,200.00
9 Elbow 90 o
pcs 8.00 1,537,941.00 12,303,528.00
10 Valve penguras ∅6" pcs 3.00 5,092,579.50 15,277,738.50

Jumlah 1,767,189,811.40
Jumlah 1 buah 1,767,189,811.40
Sumber : Hasil perhitungan
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir

DAFTAR PEMBESIAN KOLOM 30X30 (POT.IV,V,VI)


DENAH PEMBESIAN

DIA PANJANG JML.PANJANG BERAT


NO SKETSA
Ø M' PANJANG KG/M'
P Bh

a 19 4.24 x 12 50.88 2.226

b 19 1.3 x 12 15.60 2.226

C 8 1.04 x 27 28.43 0.395

Total 1 Kolom
Jumlah ( x 23 )
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN BALOK LANTAI DAN ATAP MELINTANG
DENAH PEMBESIAN

DENAH

DIA PANJANG JML.PANJANG BERAT


NO SKETSA
Ø M' PANJANG KG/M'
LANTAI 40X30 (POT. I - I ) P Bh

1 19 12 x 8 96.00 2.226

1' 19 2.95 x 8 23.60 2.226

2 19 12 x 2 24.00 2.226

2' 19 3.91 x 2 7.82 2.226

3 8 1.48 x 80 118.40 0.395

Total 1 Balok
Jumlah ( x 5 )
ATAP 30X30 (POT.VI I -VI I )
a 19 12 x 4 48.00 2.226

a' 19 2.95 x 4 11.80 2.226


PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir

b 19 12 x 2 24.00 2.226

19 4.58 x 2 9.16 2.226


b'

c 8 1.04 x 80 83.20 0.395

Total 1 Balok
Jumlah ( x 5 )
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN BALOK LANTAI DAN ATAP
DENAH PEMBESIAN

DENAH

DIA PANJANG JML.PANJANG BERAT


NO SKETSA
Ø M' PANJANG KG/M'
LANTAI 40X30 (POT. I - I ) P Bh

1 19 12 x 8 96.00 2.226

1' 19 2.95 x 8 23.60 2.226

2 19 12 x 2 24.00 2.226

2' 19 3.91 x 2 7.82 2.226

3 8 1.48 x 80 118.40 0.395

Total 1 Balok
Jumlah ( x 3 )
ATAP 30X30 (POT.VI I -VI I )
a 19 12 x 4 48.00 2.226

a' 19 2.95 x 4 11.80 2.226

b 19 12 x 2 24.00 2.226
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir

19 4.58 x 2 9.16 2.226


b'

c 8 1.04 x 80 83.20 0.395

Total 1 Balok
Jumlah ( x 3 )
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN LANTAI
DENAH PEMBESIAN

DIA PANJANG JML.PANJANG BERAT


NO SKETSA
Ø M' PANJANG KG/M'
Lantai Pot.Melintang P Bh

1 12 12 x 86 1032.00 0.888

1' 12 9.32 x 86 801.52 0.888

3 12 1.92 x 63 120.96 0.888

b 12 2.07 86 178.02 0.888

12 1.45 86 124.70 0.888

Total 1 Balok
Jumlah ( x 2 )
Lantai Pot.Memanjang

a 12 12 x 42 504.00 0.888
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
a' 12 2.34 x 42 98.28 0.888

3 12 1.92 x 21 40.32 0.888

b 12 2.07 42 86.94 0.888

b' 12 1.45 42 60.90 0.888

Total
Jumlah ( x 4 )
Total 1 Lantai
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN ATAP
DENAH PEMBESIAN

DIA PANJANG JML.PANJANG BERAT


NO SKETSA
Ø M' PANJANG KG/M'
Lantai Pot.Memanjang

a 12 12 x 141 1696.00 0.888

a' 12 2.34 x 141 330.72 0.888

b 12 2.07 84 173.88 0.888

b' 12 1.45 84 121.80 0.888

c 12 4.82 x 27 128.53 0.888

d 12 2.87 x 27 76.53 0.888

e 12 1.92 x 57 110.08 0.888

Total
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
Jumlah ( x 0 )
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN ATAP
DENAH PEMBESIAN

DIA PANJANG JML.PANJANG BERAT


NO SKETSA
Ø M' PANJANG KG/M'
Lantai Pot.Melintang P Bh

1 12 12 x 144 1728.00 0.888

1' 12 9.32 x 144 1342.08 0.888

2 12 1.92 x 258 495.36 0.888

3 12 7.12 28 199.36 0.888

3'

4 12 2.4 56 81.20 0.888

5 12 2.07 172 356.04 -

5' 12 1.45 172 249.40 -

Total
Total Pembesian Atap
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN DINDING BAGIAN LUAR KELILING +AS
DENAH PEMBESIAN

DIA PANJANG JML.PANJANG BERAT


NO SKETSA
Ø M' PANJANG KG/M'
P Bh

1 12 12 x 252 3024.00 0.888

1' 12 12 x 252 3024.00 0.888

2 12 4.74 x 168 796.32 0.888

12 4.54 x 168 762.72 0.888

3 12 4.34 168 729.12 0.888


PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir

3' 12 3.82 168 641.76 0.888

4 12 2.12 168 356.16 0.888

4' 12 1.72 168 288.96 0.888

a 12 4.96 1458 7231.68 0.888

Total
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN DINDING DALAM
DENAH PEMBESIAN

DIA PANJANG JML.PANJANG BERAT


NO SKETSA
Ø M' PANJANG KG/M'
P Bh

1 12 5.62 x 84 472.08 0.888

a 12 4.66 x 98 456.68 0.888

Total
Jumlah ( x 2 )
DAFTAR PEMBESIAN DINDING DALAM
DENAH PEMBESIAN

DIA PANJANG JML.PANJANG BERAT


NO SKETSA
Ø M' PANJANG KG/M'
P Bh

1 12 10.32 x 84 866.88 0.888

a 12 4.66 x 186 866.76 0.888


PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
Total
Jumlah ( x 0 )
Total Pembesian Dinding
JML.BERAT OVERLAP
KG M

113.26 0.75

34.73 0.75

11.23

159.21
3,661.90
TANG

JML.BERAT OVERLAP
KG M

213.70 0.75

52.53 0.75

53.42 0.75

17.41 0.75

46.77 0.75

383.83
1,919.14

106.85 0.75

26.27 0.75
53.42 0.75

20.39 0.75

32.86 0.75

239.79
1,198.96
JML.BERAT OVERLAP
KG M

213.70 0.75

52.53 0.75

53.42 0.75

17.41 0.75

46.77 0.75

383.83
1,151.49

106.85 0.75

26.27 0.75

53.42 0.75
20.39 0.75

32.86 0.75

239.79
719.38
JML.BERAT OVERLAP
KG M

916.42 0.5

711.75 0.5

107.41

158.08

110.73

2004.39
4,008.79

447.55 0.5
87.27 0.5

35.80

77.20

54.08

701.91
2,807.64
6,816.43
JML.BERAT OVERLAP
KG M

1506.05 0.5

293.68 0.5

154.41

108.16

114.14

67.96

97.75

2,342.14
-
JML.BERAT OVERLAP
KG M

1534.46 0.5

1191.77 0.5

439.88

177.03 0.5

72.11

0.00

0.00

3415.25
5,757.39
G +AS

JML.BERAT OVERLAP
KG M

2685.31 0.5

2685.31 0.5

707.13 0.5

677.30 0.5

647.46 0.5
569.88 0.5

316.27

256.60

6421.73

14,966.99
JML.BERAT OVERLAP
KG M

419.21

405.53

824.74
1,649.48

JML.BERAT OVERLAP
KG M

769.79

769.68
1,539.47
-
14,966.99
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir

DAFTAR PEMBESIAN KOLOM 30X30 (POT.IV,V,VI)


DENAH PEMBESIAN

DIA PANJANG JML.PANJANG BERAT


NO SKETSA
Ø M' PANJANG KG/M'
P Bh

a 19 4.24 x 12 50.88 2.226

b 19 1.3 x 12 15.60 2.226

C 8 1.04 x 27 28.43 0.395

Total 1 Kolom
Jumlah ( x 33 Bh)
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN BALOK LANTAI DAN ATAP MELINTANG
DENAH PEMBESIAN

DENAH

DIA PANJANG JML.PANJANG BERAT


NO SKETSA
Ø M' PANJANG KG/M'
LANTAI 40X30 (POT. I - I ) P Bh

1 19 12 x 8 96.00 2.226

1' 19 2.95 x 8 23.60 2.226

2 19 12 x 2 24.00 2.226

2' 19 3.91 x 2 7.82 2.226

3 8 1.48 x 80 118.40 0.395

Total 1 Balok
Jumlah ( x 7 Bh)
ATAP 30X30 (POT.VI I -VI I )
a 19 12 x 4 48.00 2.226

a' 19 2.95 x 4 11.80 2.226


PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir

b 19 12 x 2 24.00 2.226

19 4.58 x 2 9.16 2.226


b'

c 8 1.04 x 80 83.20 0.395

Total 1 Balok
Jumlah ( x 7 )
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN BALOK LANTAI DAN ATAP
DENAH PEMBESIAN

DENAH

DIA PANJANG JML.PANJANG BERAT


NO SKETSA
Ø M' PANJANG KG/M'
BALOK LANTAI 40X30 (POT. I - I ) P Bh

1 19 12 x 8 96.00 2.226

1' 19 2.95 x 8 23.60 2.226

2 19 12 x 2 24.00 2.226

2' 19 10.95 x 2 21.90 2.226

3 8 1.48 x 120 177.60 0.395

Total 1 Balok
Jumla (x 3 Bh )
BALOK ATAP 30X30 (POT.VI I -VI I )
a 19 12 x 4 48.00 2.226

a' 19 2.95 x 4 11.80 2.226


PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir
b 19 12 x 2 24.00 2.226

19 10.95 x 2 21.90 2.226


b'

c 8 1.04 x 120 124.80 0.395

Total 1 Balok
Jumla (x 3 Bh )
Jumlah Penulangan Kolom
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN LANTAI
DENAH PEMBESIAN

DIA PANJANG JML.PANJANG BERAT


NO SKETSA
Ø M' PANJANG KG/M'
Lantai Pot.Melintang P Bh

1 12 12 x 86 1032.00 0.888

1' 12 9.32 x 86 801.52 0.888

3 12 1.92 x 105 201.60 0.888

b 12 2.07 86 178.02 0.888

12 1.45 86 124.70 0.888

Total 1 Balok
Jumla (x 2 Bh )
Lantai Pot.Memanjang

a 12 12 x 42 504.00 0.888
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir
a' 12 2.34 x 42 98.28 0.888

3 12 1.92 x 21 40.32 0.888

b 12 2.07 42 86.94 0.888

b' 12 1.45 42 60.90 0.888

Total
Jumla (x 6 Blok )
Total 1 Lantai
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN ATAP
DENAH PEMBESIAN

DIA PANJANG JML.PANJANG BERAT


NO SKETSA
Ø M' PANJANG KG/M'
Lantai Pot.Memanjang

a 12 12 x 225 2704.00 0.888

a' 12 2.34 x 225 527.28 0.888

b 12 2.07 252 521.64 0.888

b' 12 1.45 252 365.40 0.888

c 12 4.82 x 27 128.53 0.888

d 12 2.87 x 27 76.53 0.888


PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir

e 12 1.92 x 99 190.72 0.888

Total
Jumlah ( x 0 )
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN ATAP
DENAH PEMBESIAN

DIA PANJANG JML.PANJANG BERAT


NO SKETSA
Ø M' PANJANG KG/M'
Lantai Pot.Melintang P Bh

1 12 12 x 144 1728.00 0.888

1' 12 9.32 x 144 1342.08 0.888

2 12 1.92 x 402 771.84 0.888

3 12 12 28 336.00 0.888

3' 12 2.52 28 70.56 0.888

4 12 2.36 56 132.16 0.888

5 12 2.07 172 356.04 0.888


PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir

5' 12 1.45 172 249.40 0.888

Total
Total Pembesian Atap
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN DINDING BAGIAN LUAR KELILING +AS
DENAH PEMBESIAN

DIA PANJANG JML.PANJANG BERAT


NO SKETSA
Ø M' PANJANG KG/M'
P Bh

1 12 12 x 252 3024.00 0.888

1' 12 12 x 252 3024.00 0.888

2 12 11.24 x 126 1416.24 0.888

2' 12 10.72 126 1350.72 0.888

3 12 4.34 84 364.56 0.888


PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir

3' 12 3.82 84 320.88 0.888

4 12 2.12 168 356.16 0.888

4' 12 1.72 168 288.96 0.888

a 12 4.96 1830 9076.80 0.888

Total
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN DINDING DALAM
DENAH PEMBESIAN

DIA PANJANG JML.PANJANG BERAT


NO SKETSA
Ø M' PANJANG KG/M'
P Bh

1 12 5.62 x 84 472.08 0.888

a 12 4.66 x 98 456.68 0.888

Total
Jumlah ( x 4 )
DAFTAR PEMBESIAN DINDING DALAM
DENAH PEMBESIAN

DIA PANJANG JML.PANJANG BERAT


NO SKETSA
Ø M' PANJANG KG/M'
P Bh

1 12 10.32 x 84 866.88 0.888

a 12 4.66 x 186 866.76 0.888


PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir
Total
Jumlah ( x 2 )
Total Pembesian Dinding
JML.BERAT OVERLAP
KG M

113.26 0.75

34.73 0.75

11.23

159.21
5,254.03
TANG

JML.BERAT OVERLAP
KG M

213.70 0.75

52.53 0.75

53.42 0.75

17.41 0.75

46.77 0.75

383.83
2,686.80

106.85 0.75

26.27 0.75
53.42 0.75

20.39 0.75

32.86 0.75

239.79
1,678.55
JML.BERAT OVERLAP
KG M

213.70 0.75

52.53 0.75

53.42 0.75

48.75 0.75

70.15 0.75

438.56
1,315.67

106.85 0.75

26.27 0.75
53.42 0.75

48.75 0.75

49.30 0.75

284.58
853.75
2,169.42
JML.BERAT OVERLAP
KG M

916.42 0.5

711.75 0.5

179.02

158.08

110.73

2076.00
4,152.00

447.55 0.5
87.27 0.5

35.80

77.20

54.08

701.91
4,211.46
8,363.47
JML.BERAT OVERLAP
KG M

2401.15 0.5

468.22 0.5

463.22

324.48

114.14

67.96
169.36

4,008.53
-
JML.BERAT OVERLAP
KG M

1534.46 0.5

1191.77 0.5

685.39

298.37 0.5

62.66 0.5

117.36

316.16
221.47

4427.64
8,436.17
G +AS

JML.BERAT OVERLAP
KG M

2685.31 0.5

2685.31 0.5

1257.62 0.5

1199.44 0.5

323.73 0.5
284.94 0.5

316.27

256.60

8060.20

17,069.42
JML.BERAT OVERLAP
KG M

419.21

405.53

824.74
3,298.96

JML.BERAT OVERLAP
KG M

769.79

769.68
1,539.47
3,078.94
20,148.36
0.8 PEKERJAAN K3 (KESELAMATAN & KESEHATAN KERJA)
(Lokasi 1. Sungai Ampodoap - Kec. Beo)

NO URAIAN SAT VOL

1 a Penyiapan RK3K terdiri atas: Pembuatan Manual, Set 1


Prosedur, Instruksi Kerja, Ijin Kerja Dan
b Pembuatan Kartu Identitas Pekerja Lb 20
(KIP);
2 a Sosialisasi dan Promosi K3 terdiri atas: Org 20
Induksi K3 (Safety Induction );
b Pengarahan K3 (safety briefing) : Pertemuan Org 20
Keselamatan (Safety Talk dan/atau Tool Box Meeting) ;

c Pelatihan K3; Org 1


d Simulasi K3; Org 20
e Spanduk (banner) ; Lb 1
f Poster; Lb 1
g Papan Informasi K3. Bh 1
3 a Alat Pelindung Kerja terdiri atas: Ls 1
Jaring Pengaman (Safety Net);
b Tali Keselamatan (Life Line); Ls 1
c Penahan Jatuh (Safety Deck); Ls 1
d Pagar Pengaman (Guard Railling); Ls 1
e Pembatas Area (Restricted Area ). Ls 1

4 Alat Pelindung Diri terdiri atas:


a Topi Pelindung (Safety Helmet) ; Bh 20
b Pelindung Mata (Goggles, Spectacles); Psg 20
c Tameng Muka (Face Shield); Bh 5
d Masker Selam (Breathing Apparatus); Bh
e Pelindung Telinga (Ear Plug, Ear Muff); Psg 5
f Pelindung Pernafasan Dan Mulut (Masker); Bh 20
g Sarung Tangan (Safety Gloves); Psg 20
h Sepatu Keselamatan (Safety Shoes); Psg 20
i Penunjang Seluruh Tubuh (Full Body Harness); Bh 5
j Jaket Pelampung (Life Vest); Bh 5
k Rompi Keselamatan (Safety Vest); Bh 20
l Celemek (Apron/Coveralls); Bh 2
m Pelindung Jatuh (Fall Arrester); Bh 10
5 a Asuransi Dan Perijinan terdiri atas : Ls 1

BPJS Ketenagakerjaan Dan Kesehatan


Kerja;
b Surat Ijin Kelaikan Alat; Alat/Kend 3
c Surat Ijin Operator; Lb/Alat 3
d Surat Ijin Pengesahan Panitia Pembina Ls 1
Keselamatan Dan Kesehatan Kerja

6 a Personil K3 terdiri atas : OB 1


Ahli K3
b Petugas K3 OB
c Petugas Tanggap Darurat; OB 1
d Petugas P3K; OB 1
e Petugas Pengatur Lalu Lintas OB 1
(Flagman );
f Petugas Medis. OB 1
7 a Fasilitas sarana kesehatan; Peralatan P3K (Kotak Ls 1
P3K, Tandu, Tabung Oksigen, Obat Luka, Perban,
b Ruang P3K (Tempat Tidur Pasien, Ls 1
Stetoskop, Timbangan Berat Badan,
c Peralatan Pengasapan (Fogging) ; Bh 1
d Obat Pengasapan. Ls 1
8 a Rambu- Rambu terdiri atas : Bh 10
Rambu Petunjuk;
b Rambu Larangan; Bh 5
c Rambu Peringatan; Bh 10
d Rambu Kewajiban; Bh 5
e Rambu Informasi; Bh 5
f Rambu Pekerjaan Sementara; Bh 10
g Tongkat Pengatur Lalu Lintas (Warning Bh 2
Lights Stick) ;
j Kerucut Lalu Lintas (Traffic Cone) ; Bh 10
i Lampu Putar (Rotary Lamp ); Bh 2
j Lampu Selang Lalu Lintas. Ls 1
9 a Lain- Lain Terkait Pengendalian Bh 4
Risiko K3
Alat Pemadam Api Ringan (APAR);
b Sirine; Bh 2
c Bendera K3; Bh 2
d Jalur Evakuasi (Escape Route ); Ls 1
e Lampu Darurat (Emergency Lamp ); Bh 4
f Program Inspeksi Dan Audit Internal; Ls 1
g Pelaporan dan Penyelidikan Insiden. Ls 1

Sumber : Hasil perhitungan


& KESEHATAN KERJA)
ap - Kec. Beo)

HARGA SATUAN TOTAL HARGA

400,000.00 400,000.00

4,000.00 80,000.00

0.00 0.00

8,000.00 160,000.00

1,200,000.00 1,200,000.00
20,000.00 400,000.00
280,000.00 280,000.00
120,000.00 120,000.00
1,200,000.00 1,200,000.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00
1,200,000.00 1,200,000.00
0.00 0.00
0.00 0.00
52,000.00 1,040,000.00
120,000.00 2,400,000.00
0.00 0.00
0.00 0.00
0.00 0.00
1,600.00 32,000.00
4,000.00 80,000.00
240,000.00 4,800,000.00
480,000.00 2,400,000.00
0.00 0.00
40,000.00 800,000.00
0.00 0.00
0.00 0.00
8,000,000.00 8,000,000.00

0.00 0.00
0.00 0.00
0.00 0.00

0.00 0.00
5,600,000.00 5,600,000.00

0.00 0.00
2,400,000.00 2,400,000.00
2,400,000.00 2,400,000.00
2,400,000.00 2,400,000.00

2,400,000.00 2,400,000.00
2,400,000.00 2,400,000.00

4,000,000.00 4,000,000.00

0.00 0.00
0.00 0.00
80,000.00 800,000.00

80,000.00 400,000.00
80,000.00 800,000.00
80,000.00 400,000.00
80,000.00 400,000.00
80,000.00 800,000.00
120,000.00 240,000.00

80,000.00 800,000.00
0.00 0.00
800,000.00 800,000.00
0.00 0.00

0.00 0.00
40,000.00 80,000.00
400,000.00 400,000.00
56,000.00 224,000.00
1,600,000.00 1,600,000.00
400,000.00 400,000.00
54,336,000.00
Rencana Anggaran Biaya SID Penyediaan Air Baku Kab. Kepulauan Talaud
(Lokasi 1. Sungai Ampodoap - Kec. Beo)

Biaya Total
No. Uraian Pekerjaan
( Rp. )
(1) (2) (3)

I. BIAYA LANGSUNG KONSTRUKSI

A. Pekerjaan Persiapan 37,500,000.00

B. Pekerjaan Intake 511,204,795.51

C. Pekerjaan Jaringan Pipa Transmisi 2,671,669,692.06

D Pekerjaan Reservoar 1,767,189,811.40

E. Pekerjaan K3 54,336,000.00

Sub Total I 5,041,900,298.97

II. PAJAK PERTAMBAHAN NILAI (10 % BIAYA KONSTRUKSI) 504,190,029.90

TOTAL 5,546,090,328.87
DIBULATKAN 5,546,090,000.00

Terbilang : Lima Miliar Seratus Lima Puluh Lima JutaDelapan Ratus Sembilan Puluh Sembilan Ribu Rupiah

Sumber : hasil perhitungan