PEKERJAAN INTAKE
A. PEMBERSIHAN LAHAN
Luas ( m2)
24.320 x 15.97 388.39 m2
1.00
+38.66
+37.7
0
+37.20
+37.0
0
2.00
+36.30
+36.00
2.40
+35.40 +35.7
0 0.90
+34.8
0 0.60
0.60
4.23 1.00 3.50 1.00 1.00 4.00 1.60
A B C
1.00
+38.66
+37.70
+37.20
V
+37.00
IV
+36.30 VI VII
2.00
+36.00
2.40 I
II
+35.40 +35.70
III 0.90
+34.80
0.60
0.60
4.23 1.00 3.50 1.00 1.00 4.00 1.60
6m
2.4
VIII
0.60 0.60
+38.66
+38.4
6
NO SKET BANGUNAN
P 1A - P 2
NO SKET BANGUNAN
P 2 - P 2A
NO SKET BANGUNAN
P 2A - P 3
NO SKET BANGUNAN
P3-P4
NO SKET BANGUNAN
P4-P5
NO SKET BANGUNAN
P 5 - P6
NO SKET BANGUNAN
P6 - P7
NO SKET BANGUNAN
P7 - P8
NO SKET BANGUNAN
P8 - P9
NO SKET BANGUNAN
P9 - P10
NO SKET BANGUNAN
P10 - P11
NO SKET BANGUNAN
P11 - P12
NO SKET BANGUNAN
P12 - P13
NO SKET BANGUNAN
P12 - P13
NO SKET BANGUNAN
P13 - P14
NO SKET BANGUNAN
P14 - P15
NO SKET BANGUNAN
P15 - P16
NO SKET BANGUNAN
P16 - P17
NO SKET BANGUNAN
P17 - P18
NO SKET BANGUNAN
P18 - P19
NO SKET BANGUNAN
P19 - P20
NO SKET BANGUNAN
P20 - P21
NO SKET BANGUNAN
P21 - P22
NO SKET BANGUNAN
P22 - P23
NO SKET BANGUNAN
P23 - P24
NO SKET BANGUNAN
P24-P25
NO SKET BANGUNAN
P25-P26
NO SKET BANGUNAN
P26-P27
NO SKET BANGUNAN
P27-P28
NO SKET BANGUNAN
P28-P29
NO SKET BANGUNAN
P29-P30
NO SKET BANGUNAN
P30-P31
NO SKET BANGUNAN
P31-P33
NO SKET BANGUNAN
P31-P33
PERHITUNGAN VOLUME PEKERJAAN
DIHITUNG :
DIPERIKSA :
FAKTOR URAIAN
PEKERJAAN PIPA P1 - P2
A. GALIAN
P1
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 27.77 m
Titik Penyambungan : Panjang Pipa = 4.628
6.00
FAKTOR URAIAN
A. GALIAN
P2 P2A
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 36.71 m
Titik Penyambungan : Panjang Pipa = 6.118
6.00
FAKTOR URAIAN
PEKERJAAN PIPA P2A - P3
A. GALIAN
P2A P3
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 58.07 m
Titik Penyambungan : Panjang Pipa = 9.678
6.00
FAKTOR URAIAN
PEKERJAAN PIPA P3 - P4
A. GALIAN
P3 P4
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 59.66 m
Titik Penyambungan : Panjang Pipa = 9.943
6.00
FAKTOR URAIAN
PEKERJAAN PIPA P4 - P5
A. GALIAN
P4 P5
Jarak P4-P5 : 42.48 m
Luas Galian P4 : 0.046 x 0.5 x 0.5
Luas Galian P5 : 0.030 x 0.5 x 0.5
Luas Galian Rata -Rata : P4 + P5
2
Volume Galian : Galian Rata-rata x Jarak
0.06 x 42.48
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 42.48 m
Titik Penyambungan : Panjang Pipa = 7.08
6.00
FAKTOR URAIAN
PEKERJAAN PIPA P5 - P6
A. GALIAN
P5 P6
Jarak P5-P6 : 59.95 m
Luas Galian P5 : 0.030 x 0.5 x 0.5
Luas Galian P6 : 0.015 x 0.5 x 0.5
Luas Galian Rata -Rata : P5 + P6
2
Volume Galian : Galian Rata-rata x Jarak
0.06 x 59.95
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 59.95 m
Titik Penyambungan : Panjang Pipa = 9.992
6.00
FAKTOR URAIAN
PEKERJAAN PIPA P6 - P7
A. GALIAN
P6 P7
Jarak P6-P7 : 42.27 m
Luas Galian P6 : 0.015 x 0.5 x 0.5
Luas Galian P7 : 0.020 x 0.5 x 0.5
Luas Galian Rata -Rata : P6 + P7
2
Volume Galian : Galian Rata-rata x Jarak
0.05 x 42.27
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 42.27 m
Titik Penyambungan : Panjang Pipa = 7.045
6.00
FAKTOR URAIAN
PEKERJAAN PIPA P7 - P8
A. GALIAN
P7 P8
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 44.59 m
Titik Penyambungan : Panjang Pipa = 7.432
6.00
FAKTOR URAIAN
PEKERJAAN PIPA P8 - P9
A. GALIAN
P8 P9
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 64.90 m
Titik Penyambungan : Panjang Pipa = 10.82
6.00
FAKTOR URAIAN
A. GALIAN
P9 P10
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 62.49 m
Titik Penyambungan : Panjang Pipa = 10.42
6.00
FAKTOR URAIAN
A. GALIAN
P10 P11
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 50.05 m
Titik Penyambungan : Panjang Pipa = 8.342
6.00
FAKTOR URAIAN
A. GALIAN
P11 P12
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 47.72 m
Titik Penyambungan : Panjang Pipa = 7.953
6.00
FAKTOR URAIAN
A. GALIAN
P12 P13
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 52.75 m
Titik Penyambungan : Panjang Pipa = 8.792
6.00
FAKTOR URAIAN
A. GALIAN
P12 P13
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 52.75 m
Titik Penyambungan : Panjang Pipa = 8.792
6.00
FAKTOR URAIAN
A. GALIAN
P13 P14
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 46.18 m
Titik Penyambungan : Panjang Pipa = 7.697
6.00
FAKTOR URAIAN
A. GALIAN
P14 P15
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 54.61 m
Titik Penyambungan : Panjang Pipa = 9.102
6.00
FAKTOR URAIAN
PEKERJAAN PIPA P15 - P16
A. GALIAN
P15 P16
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 59.57 m
Titik Penyambungan : Panjang Pipa = 9.928
6.00
FAKTOR URAIAN
A. GALIAN
P16 P17
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 57.88 m
Titik Penyambungan : Panjang Pipa = 9.647
6.00
FAKTOR URAIAN
A. GALIAN
P17 P18
Jarak P17-P18 : 46.57 m
Luas Galian P17 : 0.040 x 0.5 x 0.5
Luas Galian P18 : 0.030 x 0.5 x 0.5
Luas Galian Rata -Rata : P17 + P18
2
Volume Galian : Galian Rata-rata x Jarak
0.06 x 46.57
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 46.57 m
Titik Penyambungan : Panjang Pipa = 7.762
6.00
FAKTOR URAIAN
A. GALIAN
P18 P19
Jarak P18-P19 : 45.28 m
Luas Galian P18 : 0.030 x 0.5 x 0.5
Luas Galian P19 : 0.015 x 0.5 x 0.5
Luas Galian Rata -Rata : P18 + P19
2
Volume Galian : Galian Rata-rata x Jarak
0.06 x 45.28
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 45.28 m
Titik Penyambungan : Panjang Pipa = 7.547
6.00
FAKTOR URAIAN
A. GALIAN
P19 P20
Jarak P19-P20 : 48.68 m
Luas Galian P19 : 0.015 x 0.5 x 0.5
Luas Galian P20 : 0.030 x 0.5 x 0.5
Luas Galian Rata -Rata : P19 + P20
2
Volume Galian : Galian Rata-rata x Jarak
0.05 x 48.68
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 48.68 m
Titik Penyambungan : Panjang Pipa = 8.113
6.00
FAKTOR URAIAN
A. GALIAN
P20 P21
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 40.83 m
Titik Penyambungan : Panjang Pipa = 6.805
6.00
FAKTOR URAIAN
A. GALIAN
P21 P22
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 38.81 m
Titik Penyambungan : Panjang Pipa = 6.468
6.00
FAKTOR URAIAN
A. GALIAN
P22 P23
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 58.44 m
Titik Penyambungan : Panjang Pipa = 9.74
6.00
FAKTOR URAIAN
A. GALIAN
P23 P24
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 53.27 m
Titik Penyambungan : Panjang Pipa = 8.878
6.00
FAKTOR URAIAN
A. GALIAN
P24 P25
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 30.27 m
Titik Penyambungan : Panjang Pipa = 5.045
6.00
FAKTOR URAIAN
A. GALIAN
P25 P26
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 36.22 m
Titik Penyambungan : Panjang Pipa = 6.037
6.00
FAKTOR URAIAN
A. GALIAN
P26 P27
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 50.68 m
Titik Penyambungan : Panjang Pipa = 8.447
6.00
FAKTOR URAIAN
A. GALIAN
P27 P28
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 59.90 m
Titik Penyambungan : Panjang Pipa = 9.983
6.00
FAKTOR URAIAN
A. GALIAN
P28 P29
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 36.31 m
Titik Penyambungan : Panjang Pipa = 6.052
6.00
FAKTOR URAIAN
PEKERJAAN PIPA P29 - P30
A. GALIAN
P29 P30
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 47.95 m
Titik Penyambungan : Panjang Pipa = 7.992
6.00
FAKTOR URAIAN
A. GALIAN
P30 P31
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 51.32 m
Titik Penyambungan : Panjang Pipa = 8.553
6.00
FAKTOR URAIAN
A. GALIAN
P31 P33
Jarak P31-P33 : 98.00 m
Luas Galian P31 : 0.500 x 3.14 x 0.2
Luas Galian P33 : 0.500 x 3.14 x 0.2
Luas Galian Rata -Rata : P31 + P33
2
Volume Galian : Galian Rata-rata x Jarak
0.02 x 98.00
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 98.00 m
Titik Penyambungan : Panjang Pipa = 16.33
6.00
FAKTOR URAIAN
A. GALIAN
P31 P33
Jarak P31-P33 : 98.00 m
Luas Galian P31 : 0.500 x 3.14 x 0.2
Luas Galian P33 : 0.500 x 3.14 x 0.2
Luas Galian Rata -Rata : P31 + P33
2
Volume Galian : Galian Rata-rata x Jarak
0.02 x 98.00
C. PEMASANGAN PIPA
Panjang Pipa Galvanis : 98.00 m
Titik Penyambungan : Panjang Pipa = 16.33
6.00
DIHITUNG :
DIPERIKSA :
VOLUME KET
P2
2.249 m3
9 buah
27.770 m
5 Titik
VOLUME KET
P2A
Pipa Galvanis Dia 8'
1.858 m3
12 buah
36.710 m
6 Titik
VOLUME KET
Pipa Galvanis Dia 8'
3.005 m3
19 buah
58.070 m
10 Titik
VOLUME KET
Pipa Galvanis Dia 8'
3.580 m3
20 buah
59.660 m
10 Titik
VOLUME KET
2.528 m3
14 buah
42.480 m
7 Titik
VOLUME KET
3.335 m3
20 buah
59.950 m
10 Titik
VOLUME KET
2.298 m3
14 buah
42.270 m
7 Titik
VOLUME KET
2.475 m3
15 buah
44.590 m
7 Titik
VOLUME KET
4.162 m3
22 buah
64.900 m
11 Titik
VOLUME KET
4.366 m3
21 buah
x 0.2 x 0.20 0.124 m2
0.062 m3
Jumlah Kubus 1.306 m3
62.490 m
11 Titik
VOLUME KET
2.940 m3
17 buah
50.050 m
9 Titik
VOLUME KET
2.505 m3
16 buah
47.720 m
8 Titik
VOLUME KET
2.374 m3
18 buah
52.750 m
9 Titik
VOLUME KET
2.374 m3
18 buah
52.750 m
9 Titik
VOLUME KET
2.944 m3
15 buah
46.180 m
8 Titik
VOLUME KET
4.710 m3
18 buah
54.610 m
9 Titik
VOLUME KET
Pipa Galvanis Dia 8'
3.723 m3
20 buah
59.570 m
10 Titik
VOLUME KET
Pipa Galvanis Dia 8'
3.039 m3
19 buah
57.880 m
10 Titik
VOLUME KET
2.736 m3
15 buah
46.570 m
8 Titik
VOLUME KET
2.519 m3
15 buah
45.280 m
8 Titik
VOLUME KET
2.343 m3
16 buah
48.680 m
8 Titik
VOLUME KET
1.735 m3
14 buah
40.830 m
7 Titik
VOLUME KET
2.280 m3
13 buah
38.810 m
6 Titik
VOLUME KET
3.543 m3
19 buah
x 0.2 x 0.20 0.124 m2
0.062 m3
Jumlah Kubus 1.182 m3
58.440 m
10 Titik
VOLUME KET
2.664 m3
18 buah
53.270 m
9 Titik
VOLUME KET
1.343 m3
10 buah
30.270 m
5 Titik
VOLUME KET
1.494 m3
12 buah
36.220 m
6 Titik
VOLUME KET
3.168 m3
17 buah
50.680 m
8 Titik
VOLUME KET
3.669 m3
20 buah
59.900 m
10 Titik
VOLUME KET
1.634 m3
12 buah
36.310 m
6 Titik
VOLUME KET
Pipa Galvanis Dia 8'
2.278 m3
16 buah
47.950 m
8 Titik
VOLUME KET
Pipa Galvanis Dia 8'
1.686 m3
17 buah
51.320 m
9 Titik
VOLUME KET
1.539 m3
98.000 m
9 Titik
VOLUME KET
1.539 m3
98.000 m
9 Titik
90.633
31.846
Batu Kali Siar Plester Beton 1:4 Siaran Plest Pintu
PATOK P 34
PATOK P35
BACK UP DATA
PERHITUNGAN
II, P 34
Galian
Area 1
Jarak Antara P34 - P35 =
1 3421.012 -36.345
2 3421.063 -37.044
3 3421.463 -37.044
4 3421.514 -36.343
5 3421.012 -36.345
TOTAL
Luas ( m2)
P 34
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P35
Galian
Point X (Dist) Y (El)
1 3456.760 -36.992
2 3456.813 -37.717
3 3457.213 -37.717
4 3457.264 -37.021
5 3456.760 -36.992
TOTAL
Luas ( m2)
P35
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
45.17 m
Xn *Yn +1 Xn *Yn -1
- -
(126,727.969) (124,338.535)
(126,729.858) (126,744.675)
(124,346.230) (126,746.565)
(124,354.926) (124,329.839)
(502,158.98) (502,159.61)
0.316
Total m2 0.32
0.316
p. r2 0.032
0.283
Total m2 0.28
Xn *Yn +1 Xn *Yn -1
- -
(130,378.617) (127,874.426)
(130,380.616) (130,395.703)
(127,989.482) (130,397.626)
(127,891.110) (127,972.712)
(516,639.83) (516,640.47)
0.321
Total m2 0.32
0.321
p. r2 0.032
0.289
Total m2 0.29
mbunan P34-P35
Luas (m2) Volume (m3)
0.32 14.38
0.29 12.92
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 35
PATOK P36
BACK UP DATA
PERHITUNGAN
II, P 35
Galian
Area 1
Jarak Antara P35 - P36 =
1 3456.760 -36.992
2 3456.813 -37.717
3 3457.213 -37.717
4 3457.264 -37.021
5 3456.760 -36.992
TOTAL
Luas ( m2)
P 35
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P36
Galian
Point X (Dist) Y (El)
1 3413.958 -54.743
2 3414.069 -56.261
3 3414.469 -56.261
4 3414.521 -55.554
5 3413.958 -54.743
TOTAL
Luas ( m2)
P36
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
52.67 m
Xn *Yn +1 Xn *Yn -1
- -
(130,378.617) (127,874.426)
(130,380.616) (130,395.703)
(127,989.482) (130,397.626)
(127,891.110) (127,972.712)
(516,639.83) (516,640.47)
0.321
Total m2 0.32
0.321
p. r2 0.032
0.289
Total m2 0.29
Xn *Yn +1 Xn *Yn -1
- -
(192,072.691) (186,896.379)
(192,078.936) (192,101.440)
(189,687.411) (192,104.366)
(186,921.123) (189,659.023)
(760,760.16) (760,761.21)
0.524
Total m2 0.52
0.524
p. r2 0.032
0.491
Total m2 0.49
mbunan P35-P36
Luas (m2) Volume (m3)
0.42 22.25
0.39 20.54
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 36
PATOK P37
BACK UP DATA
PERHITUNGAN
II, P 36
Galian
Area 1
Jarak Antara P36 - P37 =
1 3456.760 -36.992
2 3456.813 -37.717
3 3457.213 -37.717
4 3457.264 -37.021
5 3456.760 -36.992
TOTAL
Luas ( m2)
P 36
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P37
Galian
Point X (Dist) Y (El)
1 3463.702 -53.664
2 3463.754 -54.385
3 3464.154 -54.385
4 3464.201 -53.751
5 3463.702 -53.664
TOTAL
Luas ( m2)
P37
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
51.20 m
Xn *Yn +1 Xn *Yn -1
- -
(130,378.617) (127,874.426)
(130,380.616) (130,395.703)
(127,989.482) (130,397.626)
(127,891.110) (127,972.712)
(516,639.83) (516,640.47)
0.321
Total m2 0.32
0.321
p. r2 0.032
0.289
Total m2 0.29
Xn *Yn +1 Xn *Yn -1
- -
(188,373.433) (185,878.895)
(188,376.261) (188,398.015)
(186,201.742) (188,400.571)
(185,902.882) (186,177.446)
(748,854.32) (748,854.93)
0.304
Total m2 0.30
0.304
p. r2 0.032
0.272
Total m2 0.27
mbunan P36-P37
Luas (m2) Volume (m3)
0.31 16.01
0.28 14.36
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 37
PATOK P38
BACK UP DATA
PERHITUNGAN
II, P 37
Galian
Area 1
Jarak Antara P37 - P38 =
1 3463.702 -53.664
2 3463.754 -54.385
3 3464.154 -54.385
4 3464.201 -53.751
5 3463.702 -53.664
TOTAL
Luas ( m2)
P 37
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P38
Galian
Point X (Dist) Y (El)
1 3522.259 -20.758
2 3522.314 -21.515
3 3522.714 -21.515
4 3522.765 -20.821
5 3522.259 -20.758
TOTAL
Luas ( m2)
P38
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
50.88 m
Xn *Yn +1 Xn *Yn -1
- -
(188,373.433) (185,878.895)
(188,376.261) (188,398.015)
(186,201.742) (188,400.571)
(185,902.882) (186,177.446)
(748,854.32) (748,854.93)
0.304
Total m2 0.30
0.304
p. r2 0.032
0.272
Total m2 0.27
Xn *Yn +1 Xn *Yn -1
- -
(75,781.402) (73,116.194)
(75,782.586) (75,791.192)
(73,346.428) (75,792.289)
(73,125.556) (73,336.955)
(298,035.97) (298,036.63)
0.329
Total m2 0.33
0.329
p. r2 0.032
0.296
Total m2 0.30
mbunan P37-P38
Luas (m2) Volume (m3)
0.32 16.10
0.28 14.46
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 38
PATOK P39
BACK UP DATA
PERHITUNGAN
II, P 38
Galian
Area 1
Jarak Antara P38 - P39 =
1 3522.259 -20.758
2 3522.314 -21.515
3 3522.714 -21.515
4 3522.765 -20.821
5 3522.259 -20.758
TOTAL
Luas ( m2)
P 38
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P39
Galian
Point X (Dist) Y (El)
1 3557.538 -22.174
2 3557.595 -22.962
3 3557.996 -22.962
4 3558.047 -22.262
5 3557.538 -22.174
TOTAL
Luas ( m2)
P39
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
46.26 m
Xn *Yn +1 Xn *Yn -1
- -
(75,781.402) (73,116.194)
(75,782.586) (75,791.192)
(73,346.428) (75,792.289)
(73,125.556) (73,336.955)
(298,035.97) (298,036.63)
0.329
Total m2 0.33
0.329
p. r2 0.032
0.296
Total m2 0.30
Xn *Yn +1 Xn *Yn -1
- -
(81,688.188) (78,886.112)
(81,689.496) (81,698.704)
(79,208.107) (81,699.875)
(78,896.134) (79,197.911)
(321,481.93) (321,482.60)
0.338
Total m2 0.34
0.338
p. r2 0.032
0.306
Total m2 0.31
mbunan P38-P39
Luas (m2) Volume (m3)
0.33 15.43
0.30 13.93
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 39
PATOK P40
BACK UP DATA
PERHITUNGAN
II, P 39
Galian
Area 1
Jarak Antara P39 - P40 =
1 3557.538 -22.174
2 3557.595 -22.962
3 3557.996 -22.962
4 3558.047 -22.262
5 3557.538 -22.174
TOTAL
Luas ( m2)
P 39
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P40
Galian
Point X (Dist) Y (El)
1 3518.223 -37.988
2 3518.274 -38.684
3 3518.674 -38.684
4 3518.725 -37.988
5 3518.223 -37.988
TOTAL
Luas ( m2)
P40
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
50.44 m
Xn *Yn +1 Xn *Yn -1
- -
(81,688.188) (78,886.112)
(81,689.496) (81,698.704)
(79,208.107) (81,699.875)
(78,896.134) (79,197.911)
(321,481.93) (321,482.60)
0.338
Total m2 0.34
0.338
p. r2 0.032
0.306
Total m2 0.31
Xn *Yn +1 Xn *Yn -1
- -
(136,098.939) (133,652.193)
(136,100.911) (136,116.385)
(133,667.388) (136,118.358)
(133,669.325) (133,650.255)
(539,536.56) (539,537.19)
0.314
Total m2 0.31
0.314
p. r2 0.032
0.282
Total m2 0.28
mbunan P39-P40
Luas (m2) Volume (m3)
0.33 16.45
0.29 14.82
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 40
PATOK P41
BACK UP DATA
PERHITUNGAN
II, P 40
Galian
Area 1
Jarak Antara P40 - P41 =
1 3456.760 -36.992
2 3456.813 -37.717
3 3457.213 -37.717
4 3457.264 -37.021
5 3456.760 -36.992
TOTAL
Luas ( m2)
P 40
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P41
Galian
Point X (Dist) Y (El)
1 3559.833 -38.526
2 3559.884 -39.231
3 3560.285 -39.231
4 3560.335 -38.535
5 3559.833 -38.526
TOTAL
Luas ( m2)
P41
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
47.04 m
Xn *Yn +1 Xn *Yn -1
- -
(130,378.617) (127,874.426)
(130,380.616) (130,395.703)
(127,989.482) (130,397.626)
(127,891.110) (127,972.712)
(516,639.83) (516,640.47)
0.321
Total m2 0.32
0.321
p. r2 0.032
0.289
Total m2 0.29
Xn *Yn +1 Xn *Yn -1
- -
(139,655.808) (137,148.091)
(139,657.809) (139,673.541)
(137,195.582) (139,675.502)
(137,165.466) (137,178.165)
(553,674.67) (553,675.30)
0.316
Total m2 0.32
0.316
p. r2 0.032
0.284
Total m2 0.28
mbunan P40-P41
Luas (m2) Volume (m3)
0.32 14.99
0.29 13.47
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 41
PATOK P42
BACK UP DATA
PERHITUNGAN
II, P 41
Galian
Area 1
Jarak Antara P41 - P42 =
1 3559.833 -38.526
2 3559.884 -39.231
3 3560.285 -39.231
4 3560.335 -38.535
5 3559.833 -38.526
TOTAL
Luas ( m2)
P 41
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P42
Galian
Point X (Dist) Y (El)
1 3517.230 -53.908
2 3517.286 -54.680
3 3517.687 -54.680
4 3517.737 -53.983
5 3517.230 -53.908
TOTAL
Luas ( m2)
P42
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
41.15 m
Xn *Yn +1 Xn *Yn -1
- -
(139,655.808) (137,148.091)
(139,657.809) (139,673.541)
(137,195.582) (139,675.502)
(137,165.466) (137,178.165)
(553,674.67) (553,675.30)
0.316
Total m2 0.32
0.316
p. r2 0.032
0.284
Total m2 0.28
Xn *Yn +1 Xn *Yn -1
- -
(192,322.136) (189,609.854)
(192,325.198) (192,347.125)
(189,895.297) (192,349.859)
(189,634.166) (189,870.627)
(764,176.80) (764,177.47)
0.333
Total m2 0.33
0.333
p. r2 0.032
0.301
Total m2 0.30
mbunan P41-P42
Luas (m2) Volume (m3)
0.32 13.37
0.29 12.03
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 42
PATOK P43
BACK UP DATA
PERHITUNGAN
II, P 42
Galian
Area 1
Jarak Antara P42 - P43 =
1 3517.230 -53.908
2 3517.286 -54.680
3 3517.687 -54.680
4 3517.737 -53.983
5 3517.230 -53.908
TOTAL
Luas ( m2)
P 42
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P43
Galian
Point X (Dist) Y (El)
1 3555.945 -54.257
2 3555.999 -54.994
3 3556.399 -54.994
4 3556.450 -54.297
5 3555.945 -54.257
TOTAL
Luas ( m2)
P43
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
54.41 m
Xn *Yn +1 Xn *Yn -1
- -
(192,322.136) (189,609.854)
(192,325.198) (192,347.125)
(189,895.297) (192,349.859)
(189,634.166) (189,870.627)
(764,176.80) (764,177.47)
0.333
Total m2 0.33
0.333
p. r2 0.032
0.301
Total m2 0.30
Xn *Yn +1 Xn *Yn -1
- -
(195,555.639) (192,937.838)
(195,558.609) (195,580.607)
(193,101.797) (195,583.411)
(192,962.308) (193,077.146)
(777,178.35) (777,179.00)
0.324
Total m2 0.32
0.324
p. r2 0.032
0.292
Total m2 0.29
mbunan P42-P43
Luas (m2) Volume (m3)
0.33 17.89
0.30 16.13
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 43
PATOK P44
BACK UP DATA
PERHITUNGAN
II, P 43
Galian
Area 1
Jarak Antara P43 - P44 =
1 3555.945 -54.257
2 3555.999 -54.994
3 3556.399 -54.994
4 3556.450 -54.297
5 3555.945 -54.257
TOTAL
Luas ( m2)
P 43
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P44
Galian
Point X (Dist) Y (El)
1 3618.179 -21.891
2 3618.227 -22.553
3 3618.627 -22.553
4 3618.675 -21.893
5 3618.179 -21.891
TOTAL
Luas ( m2)
P44
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
33.58 m
Xn *Yn +1 Xn *Yn -1
- -
(195,555.639) (192,937.838)
(195,558.609) (195,580.607)
(193,101.797) (195,583.411)
(192,962.308) (193,077.146)
(777,178.35) (777,179.00)
0.324
Total m2 0.32
0.324
p. r2 0.032
0.292
Total m2 0.29
Xn *Yn +1 Xn *Yn -1
- -
(81,600.791) (79,206.607)
(81,601.874) (81,610.895)
(79,222.601) (81,611.977)
(79,216.414) (79,212.793)
(321,641.68) (321,642.27)
0.296
Total m2 0.30
0.296
p. r2 0.032
0.264
Total m2 0.26
mbunan P43-P44
Luas (m2) Volume (m3)
0.31 10.42
0.28 9.33
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 44
PATOK P45
BACK UP DATA
PERHITUNGAN
II, P 44
Galian
Area 1
Jarak Antara P44 - P45 =
1 3618.179 -21.891
2 3618.227 -22.553
3 3618.627 -22.553
4 3618.675 -21.893
5 3618.179 -21.891
TOTAL
Luas ( m2)
P 44
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P45
Galian
Point X (Dist) Y (El)
1 3655.281 -22.101
2 3655.335 -22.852
3 3655.736 -22.852
4 3655.786 -22.156
5 3655.281 -22.101
TOTAL
Luas ( m2)
P45
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
56.24 m
Xn *Yn +1 Xn *Yn -1
- -
(81,600.791) (79,206.607)
(81,601.874) (81,610.895)
(79,222.601) (81,611.977)
(79,216.414) (79,212.793)
(321,641.68) (321,642.27)
0.296
Total m2 0.30
0.296
p. r2 0.032
0.264
Total m2 0.26
Xn *Yn +1 Xn *Yn -1
- -
(83,530.481) (80,786.559)
(83,531.715) (83,540.879)
(80,996.487) (83,542.022)
(80,796.526) (80,986.406)
(328,855.21) (328,855.87)
0.328
Total m2 0.33
0.328
p. r2 0.032
0.295
Total m2 0.30
mbunan P44-P45
Luas (m2) Volume (m3)
0.31 17.54
0.28 15.72
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 45
PATOK P46
BACK UP DATA
PERHITUNGAN
II, P 45
Galian
Area 1
Jarak Antara P45 - P46 =
1 3655.281 -22.101
2 3655.335 -22.852
3 3655.736 -22.852
4 3655.786 -22.156
5 3655.281 -22.101
TOTAL
Luas ( m2)
P 45
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P46
Galian
Point X (Dist) Y (El)
1 3618.787 -39.065
2 3618.838 -39.772
3 3619.239 -39.772
4 3619.289 -39.076
5 3618.787 -39.065
TOTAL
Luas ( m2)
P46
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
51.00 m
Xn *Yn +1 Xn *Yn -1
- -
(83,530.481) (80,786.559)
(83,531.715) (83,540.879)
(80,996.487) (83,542.022)
(80,796.526) (80,986.406)
(328,855.21) (328,855.87)
0.328
Total m2 0.33
0.328
p. r2 0.032
0.295
Total m2 0.30
Xn *Yn +1 Xn *Yn -1
- -
(143,926.397) (141,369.906)
(143,928.425) (143,944.374)
(141,425.383) (143,946.362)
(141,387.525) (141,407.721)
(570,667.73) (570,668.36)
0.317
Total m2 0.32
0.317
p. r2 0.032
0.284
Total m2 0.28
mbunan P45-P46
Luas (m2) Volume (m3)
0.32 16.43
0.29 14.78
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 46
PATOK P47
BACK UP DATA
PERHITUNGAN
II, P 46
Galian
Area 1
Jarak Antara P46 - P47 =
1 3618.787 -39.065
2 3618.838 -39.772
3 3619.239 -39.772
4 3619.289 -39.076
5 3618.787 -39.065
TOTAL
Luas ( m2)
P 46
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P47
Galian
Point X (Dist) Y (El)
1 3661.137 -38.882
2 3661.193 -39.653
3 3661.593 -39.653
4 3661.640 -38.999
5 3661.137 -38.882
TOTAL
Luas ( m2)
P47
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
46.42 m
Xn *Yn +1 Xn *Yn -1
- -
(143,926.397) (141,369.906)
(143,928.425) (143,944.374)
(141,425.383) (143,946.362)
(141,387.525) (141,407.721)
(570,667.73) (570,668.36)
0.317
Total m2 0.32
0.317
p. r2 0.032
0.284
Total m2 0.28
Xn *Yn +1 Xn *Yn -1
- -
(145,175.065) (142,354.506)
(145,177.286) (145,193.147)
(142,798.465) (145,195.011)
(142,371.886) (142,780.682)
(575,522.70) (575,523.35)
0.321
Total m2 0.32
0.321
p. r2 0.032
0.289
Total m2 0.29
mbunan P46-P47
Luas (m2) Volume (m3)
0.32 14.81
0.29 13.31
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 47
PATOK P48
BACK UP DATA
PERHITUNGAN
II, P 47
Galian
Area 1
Jarak Antara P47 - P48 =
1 3661.137 -38.882
2 3661.193 -39.653
3 3661.593 -39.653
4 3661.640 -38.999
5 3661.137 -38.882
TOTAL
Luas ( m2)
P 47
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P48
Galian
Point X (Dist) Y (El)
1 3618.968 -54.230
2 3619.021 -54.961
3 3619.422 -54.961
4 3619.468 -54.320
5 3618.968 -54.230
TOTAL
Luas ( m2)
P48
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
53.78 m
Xn *Yn +1 Xn *Yn -1
- -
(145,175.065) (142,354.506)
(145,177.286) (145,193.147)
(142,798.465) (145,195.011)
(142,371.886) (142,780.682)
(575,522.70) (575,523.35)
0.321
Total m2 0.32
0.321
p. r2 0.032
0.289
Total m2 0.29
Xn *Yn +1 Xn *Yn -1
- -
(198,902.100) (196,259.509)
(198,905.013) (198,927.053)
(196,607.003) (198,929.581)
(196,283.750) (196,582.342)
(790,697.87) (790,698.48)
0.309
Total m2 0.31
0.309
p. r2 0.032
0.277
Total m2 0.28
mbunan P47-P48
Luas (m2) Volume (m3)
0.32 16.95
0.28 15.21
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 48
PATOK P49
BACK UP DATA
PERHITUNGAN
II, P 48
Galian
Area 1
Jarak Antara P48 - P49 =
1 3618.968 -54.230
2 3619.021 -54.961
3 3619.422 -54.961
4 3619.468 -54.320
5 3618.968 -54.230
TOTAL
Luas ( m2)
P 48
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P 49
Galian
Point X (Dist) Y (El)
1 3658.857 -53.433
2 3658.927 -54.396
3 3659.327 -54.396
4 3659.377 -53.710
5 3658.857 -53.433
TOTAL
Luas ( m2)
P 49
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
51.09 m
Xn *Yn +1 Xn *Yn -1
- -
(198,902.100) (196,259.509)
(198,905.013) (198,927.053)
(196,607.003) (198,929.581)
(196,283.750) (196,582.342)
(790,697.87) (790,698.48)
0.309
Total m2 0.31
0.309
p. r2 0.032
0.277
Total m2 0.28
Xn *Yn +1 Xn *Yn -1
- -
(199,027.185) (195,507.446)
(199,030.993) (199,052.751)
(196,542.453) (199,055.471)
(195,531.491) (196,517.209)
(790,132.12) (790,132.88)
0.378
Total m2 0.38
0.378
p. r2 0.032
0.346
Total m2 0.35
mbunan P48-P49
Luas (m2) Volume (m3)
0.34 17.54
0.31 15.89
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 49
PATOK P50
BACK UP DATA
PERHITUNGAN
II, P 49
Galian
Area 1
Jarak Antara P49 - P50 =
1 3658.857 -53.433
2 3658.927 -54.396
3 3659.327 -54.396
4 3659.377 -53.710
5 3658.857 -53.433
TOTAL
Luas ( m2)
P 49
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P 50
Galian
Point X (Dist) Y (El)
1 3714.617 -23.373
2 3714.670 -24.101
3 3715.070 -24.101
4 3715.121 -23.406
5 3714.617 -23.373
TOTAL
Luas ( m2)
P 50
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
45.14 m
Xn *Yn +1 Xn *Yn -1
- -
(199,027.185) (195,507.446)
(199,030.993) (199,052.751)
(196,542.453) (199,055.471)
(195,531.491) (196,517.209)
(790,132.12) (790,132.88)
0.378
Total m2 0.38
0.378
p. r2 0.032
0.346
Total m2 0.35
Xn *Yn +1 Xn *Yn -1
- -
(89,525.984) (86,822.982)
(89,527.262) (89,536.902)
(86,954.928) (89,538.131)
(86,833.523) (86,944.326)
(352,841.70) (352,842.34)
0.322
Total m2 0.32
0.322
p. r2 0.032
0.289
Total m2 0.29
mbunan P49-P50
Luas (m2) Volume (m3)
0.35 15.79
0.32 14.33
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 50
PATOK P51
BACK UP DATA
PERHITUNGAN
II, P 50
Galian
Area 1
Jarak Antara P50 - P51 =
1 3714.617 -23.373
2 3714.670 -24.101
3 3715.070 -24.101
4 3715.121 -23.406
5 3714.617 -23.373
TOTAL
Luas ( m2)
P 50
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P51
Galian
Point X (Dist) Y (El)
1 3757.009 -21.885
2 3757.064 -22.641
3 3757.464 -22.641
4 3757.515 -21.945
5 3757.009 -21.885
TOTAL
Luas ( m2)
P51
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
49.21 m
Xn *Yn +1 Xn *Yn -1
- -
(89,525.984) (86,822.982)
(89,527.262) (89,536.902)
(86,954.928) (89,538.131)
(86,833.523) (86,944.326)
(352,841.70) (352,842.34)
0.322
Total m2 0.32
0.322
p. r2 0.032
0.289
Total m2 0.29
Xn *Yn +1 Xn *Yn -1
- -
(85,062.441) (82,223.346)
(85,063.686) (85,072.742)
(82,457.547) (85,073.897)
(82,233.216) (82,447.563)
(334,816.89) (334,817.55)
0.329
Total m2 0.33
0.329
p. r2 0.032
0.296
Total m2 0.30
mbunan P50-P51
Luas (m2) Volume (m3)
0.33 16.00
0.29 14.41
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 51
PATOK P 52
BACK UP DATA
PERHITUNGAN
II, P 51
Galian
Area 1
Jarak Antara P51 - P52 =
1 3757.009 -21.885
2 3757.064 -22.641
3 3757.464 -22.641
4 3757.515 -21.945
5 3757.009 -21.885
TOTAL
Luas ( m2)
P 51
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P52
Galian
Point X (Dist) Y (El)
1 3716.954 -38.225
2 3717.004 -38.919
3 3717.405 -38.919
4 3717.457 -38.198
5 3716.954 -38.225
TOTAL
Luas ( m2)
P52
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
52.78 m
Xn *Yn +1 Xn *Yn -1
- -
(85,062.441) (82,223.346)
(85,063.686) (85,072.742)
(82,457.547) (85,073.897)
(82,233.216) (82,447.563)
(334,816.89) (334,817.55)
0.329
Total m2 0.33
0.329
p. r2 0.032
0.296
Total m2 0.30
Xn *Yn +1 Xn *Yn -1
- -
(144,660.133) (142,082.478)
(144,662.079) (144,677.685)
(141,997.436) (144,679.709)
(142,099.794) (141,980.209)
(573,419.44) (573,420.08)
0.320
Total m2 0.32
0.320
p. r2 0.032
0.287
Total m2 0.29
mbunan P51-P52
Luas (m2) Volume (m3)
0.32 17.12
0.29 15.41
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 52
PATOK P 53
BACK UP DATA
PERHITUNGAN
II, P 52
Galian
Area 1
Jarak Antara P52 - P53=
1 3716.954 -38.225
2 3717.004 -38.919
3 3717.405 -38.919
4 3717.457 -38.198
5 3716.954 -38.225
TOTAL
Luas ( m2)
P 52
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P53
Galian
Point X (Dist) Y (El)
1 3757.874 -38.858
2 3757.930 -39.617
3 3758.330 -39.617
4 3758.388 -38.825
5 3757.874 -38.858
TOTAL
Luas ( m2)
P53
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
45.89 m
Xn *Yn +1 Xn *Yn -1
- -
(144,660.133) (142,082.478)
(144,662.079) (144,677.685)
(141,997.436) (144,679.709)
(142,099.794) (141,980.209)
(573,419.44) (573,420.08)
0.320
Total m2 0.32
0.320
p. r2 0.032
0.287
Total m2 0.29
Xn *Yn +1 Xn *Yn -1
- -
(148,875.694) (146,025.644)
(148,877.913) (148,893.760)
(145,917.162) (148,896.057)
(146,043.441) (145,899.458)
(589,714.21) (589,714.92)
0.354
Total m2 0.35
0.354
p. r2 0.032
0.322
Total m2 0.32
mbunan P52-P53
Luas (m2) Volume (m3)
0.34 15.47
0.30 13.98
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 53
PATOK P54
BACK UP DATA
PERHITUNGAN
II, P 53
Galian
Area 1
Jarak Antara P53 - P54 =
1 3757.874 -38.858
2 3757.930 -39.617
3 3758.330 -39.617
4 3758.388 -38.825
5 3757.874 -38.858
TOTAL
Luas ( m2)
P 53
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P54
Galian
Point X (Dist) Y (El)
1 3718.928 -54.953
2 3718.995 -55.877
3 3719.396 -55.877
4 3719.446 -55.178
5 3718.928 -54.953
TOTAL
Luas ( m2)
P54
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
50.69 m
Xn *Yn +1 Xn *Yn -1
- -
(148,875.694) (146,025.644)
(148,877.913) (148,893.760)
(145,917.162) (148,896.057)
(146,043.441) (145,899.458)
(589,714.21) (589,714.92)
0.354
Total m2 0.35
0.354
p. r2 0.032
0.322
Total m2 0.32
Xn *Yn +1 Xn *Yn -1
- -
(207,802.540) (204,369.932)
(207,806.284) (207,828.690)
(205,228.832) (207,831.484)
(204,394.716) (205,203.009)
(825,232.37) (825,233.12)
0.372
Total m2 0.37
0.372
p. r2 0.032
0.340
Total m2 0.34
mbunan P53-P54
Luas (m2) Volume (m3)
0.36 18.41
0.33 16.77
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 54
PATOK P 55
BACK UP DATA
PERHITUNGAN
II, P 54
Galian
Area 1
Jarak Antara P54 - P55 =
1 3718.928 -54.953
2 3718.995 -55.877
3 3719.396 -55.877
4 3719.446 -55.178
5 3718.928 -54.953
TOTAL
Luas ( m2)
P 54
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P55
Galian
Point X (Dist) Y (El)
1 3752.607 -54.774
2 3752.735 -55.564
3 3753.120 -55.564
4 3753.231 -54.811
5 3752.607 -54.774
TOTAL
Luas ( m2)
P55
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
51.09 m
Xn *Yn +1 Xn *Yn -1
- -
(207,802.540) (204,369.932)
(207,806.284) (207,828.690)
(205,228.832) (207,831.484)
(204,394.716) (205,203.009)
(825,232.37) (825,233.12)
0.372
Total m2 0.37
0.372
p. r2 0.032
0.340
Total m2 0.34
Xn *Yn +1 Xn *Yn -1
- -
(208,509.855) (205,552.307)
(208,516.968) (208,538.360)
(205,712.260) (208,544.527)
(205,579.475) (205,684.142)
(828,318.56) (828,319.34)
0.389
Total m2 0.39
0.389
p. r2 0.032
0.357
Total m2 0.36
mbunan P54-P55
Luas (m2) Volume (m3)
0.38 19.44
0.35 17.79
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P55
PATOK P56
BACK UP DATA
PERHITUNGAN
II, P55
Galian
Area 1
Jarak Antara P55 - P56 =
1 3752.607 -54.774
2 3752.735 -55.564
3 3753.120 -55.564
4 3753.231 -54.811
5 3752.607 -54.774
TOTAL
Luas ( m2)
P55
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P56
Galian
Point X (Dist) Y (El)
1 3818.028 -23.248
2 3818.094 -24.156
3 3818.494 -24.156
4 3818.545 -23.456
5 3818.028 -23.248
TOTAL
Luas ( m2)
P56
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
36.66 m
Xn *Yn +1 Xn *Yn -1
- -
(208,509.855) (205,552.307)
(208,516.968) (208,538.360)
(205,712.260) (208,544.527)
(205,579.475) (205,684.142)
(828,318.56) (828,319.34)
0.389
Total m2 0.39
0.389
p. r2 0.032
0.357
Total m2 0.36
Xn *Yn +1 Xn *Yn -1
- -
(92,228.284) (88,763.049)
(92,229.879) (92,239.541)
(89,566.595) (92,240.773)
(88,773.534) (89,555.665)
(362,798.29) (362,799.03)
0.368
Total m2 0.37
0.368
p. r2 0.032
0.336
Total m2 0.34
mbunan P55-P56
Luas (m2) Volume (m3)
0.38 13.87
0.35 12.69
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 56
PATOK P57
BACK UP DATA
PERHITUNGAN
II, P 56
Galian
Area 1
Jarak Antara P56 - P57 =
1 3818.028 -23.248
2 3818.094 -24.156
3 3818.494 -24.156
4 3818.545 -23.456
5 3818.028 -23.248
TOTAL
Luas ( m2)
P 56
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P57
Galian
Point X (Dist) Y (El)
1 3854.964 -21.880
2 3855.014 -22.565
3 3855.415 -22.565
4 3855.465 -21.871
5 3854.964 -21.880
TOTAL
Luas ( m2)
P57
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
60.49 m
Xn *Yn +1 Xn *Yn -1
- -
(92,228.284) (88,763.049)
(92,229.879) (92,239.541)
(89,566.595) (92,240.773)
(88,773.534) (89,555.665)
(362,798.29) (362,799.03)
0.368
Total m2 0.37
0.368
p. r2 0.032
0.336
Total m2 0.34
Xn *Yn +1 Xn *Yn -1
- -
(86,987.263) (84,347.706)
(86,988.391) (86,997.439)
(84,321.781) (86,998.568)
(84,357.574) (84,311.918)
(342,655.01) (342,655.63)
0.311
Total m2 0.31
0.311
p. r2 0.032
0.279
Total m2 0.28
mbunan P56-P57
Luas (m2) Volume (m3)
0.34 20.53
0.31 18.57
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 57
PATOK P58
BACK UP DATA
PERHITUNGAN
II, P 57
Galian
Area 1
Jarak Antara P57 - P58 =
1 3854.964 -21.880
2 3855.014 -22.565
3 3855.415 -22.565
4 3855.465 -21.871
5 3854.964 -21.880
TOTAL
Luas ( m2)
P 57
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P58
Galian
Point X (Dist) Y (El)
1 3817.292 -39.762
2 3817.346 -40.504
3 3817.746 -40.504
4 3817.797 -39.806
5 3817.292 -39.762
TOTAL
Luas ( m2)
P58
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
49.78 m
Xn *Yn +1 Xn *Yn -1
- -
(86,987.263) (84,347.706)
(86,988.391) (86,997.439)
(84,321.781) (86,998.568)
(84,357.574) (84,311.918)
(342,655.01) (342,655.63)
0.311
Total m2 0.31
0.311
p. r2 0.032
0.279
Total m2 0.28
Xn *Yn +1 Xn *Yn -1
- -
(154,615.595) (151,785.312)
(154,617.782) (154,633.984)
(151,969.197) (154,636.050)
(151,803.244) (151,951.125)
(613,005.82) (613,006.47)
0.326
Total m2 0.33
0.326
p. r2 0.032
0.293
Total m2 0.29
mbunan P57-P58
Luas (m2) Volume (m3)
0.32 15.85
0.29 14.24
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 58
PATOK P59
BACK UP DATA
PERHITUNGAN
II, P 58
Galian
Area 1
Jarak Antara P58 - P59 =
1 3817.292 -39.762
2 3817.346 -40.504
3 3817.746 -40.504
4 3817.797 -39.806
5 3817.292 -39.762
TOTAL
Luas ( m2)
P 58
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P59
Galian
Point X (Dist) Y (El)
1 3857.821 -33.474
2 3857.865 -34.079
3 3858.265 -34.079
4 3858.316 -33.384
5 3857.821 -33.474
TOTAL
Luas ( m2)
P59
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
51.12 m
Xn *Yn +1 Xn *Yn -1
- -
(154,615.595) (151,785.312)
(154,617.782) (154,633.984)
(151,969.197) (154,636.050)
(151,803.244) (151,951.125)
(613,005.82) (613,006.47)
0.326
Total m2 0.33
0.326
p. r2 0.032
0.293
Total m2 0.29
Xn *Yn +1 Xn *Yn -1
- -
(131,470.682) (129,138.173)
(131,472.181) (131,485.813)
(128,804.319) (131,487.551)
(129,153.270) (128,789.496)
(520,900.45) (520,901.03)
0.291
Total m2 0.29
0.291
p. r2 0.032
0.258
Total m2 0.26
mbunan P58-P59
Luas (m2) Volume (m3)
0.31 15.76
0.28 14.10
PEKERJAAN : SID PENYEDIAAN AIR BAKU KABUPATEN
LOKASI : KECAMATAN ESSANG
TAHUN ANGGARAN : 2016
PATOK P 59
PATOK P60
BACK UP DATA
PERHITUNGAN
II, P 59
Galian
Area 1
Jarak Antara P59 - P60 =
1 3857.821 -33.474
2 3857.865 -34.079
3 3858.265 -34.079
4 3858.316 -33.384
5 3857.821 -33.474
TOTAL
Luas ( m2)
P 59
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
P60
Galian
Point X (Dist) Y (El)
1 3824.304 -53.409
2 3824.356 -54.123
3 3824.756 -54.123
4 3824.807 -53.425
5 3824.304 -53.409
TOTAL
Luas ( m2)
P60
Timbunan
Luas Galian ( m2)
Luas Pipa 8" ( m2)
Luas Timbunan (m2)
20.01 m
Xn *Yn +1 Xn *Yn -1
- -
(131,470.682) (129,138.173)
(131,472.181) (131,485.813)
(128,804.319) (131,487.551)
(129,153.270) (128,789.496)
(520,900.45) (520,901.03)
0.291
Total m2 0.29
0.291
p. r2 0.032
0.258
Total m2 0.26
Xn *Yn +1 Xn *Yn -1
- -
(206,982.805) (204,255.030)
(206,985.620) (207,007.269)
(204,337.589) (207,010.029)
(204,279.117) (204,313.441)
(822,585.13) (822,585.77)
0.319
Total m2 0.32
0.319
p. r2 0.032
0.286
Total m2 0.29
mbunan P59-P60
Luas (m2) Volume (m3)
0.30 6.10
0.27 5.45
PERHITUNGAN VOLUME PEKER
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
NO URAIAN
NO URAIAN
GALIAN TANAH
1.60 x 13.50 x 13.50
URUGAN PASIR
0.30 x 13.50 x 13.50
C. PLESTERAN
NO URAIAN
1
3 12.00 1.58 363 573.01
0.48 0.05 (13.6/0.15*4)
0.05
Total Tulangan Plat Lantai
NO URAIAN
1.80 12.00 1.9 544 1033.60
2 (13.6/0.15*6)
0.05
1
3 12.00 1.58 363 573.01
0.48 0.05 (13.6/0.15*4)
0.05
Total Tulangan Plat Atap
PERHITUNGAN VOLUME PEKER
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
NO URAIAN
2 1
3 4
3.9
2 12.00 4.9 37 180.32
1 (4.6/1*8)
3.8
3 12.00 4.1 37 150.88
0.3 0.30 (4.6/1*8)
0.95
5 12.00 2.2 204 449.78
0.3 (4.6/0.45*20)
3.96
6 12.00 4.22 427 1800.53
0.26 (13.6/0.51*2*8)
PERHITUNGAN VOLUME PEKER
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
NO 0.26 URAIAN
1.56
7 12.00 2.06 427 878.93
0.50 (13.6/0.51*2*8)
NO URAIAN
PENULANGAN SLOOP
Sketch Dia Panjang bh Jumlah Panjang Berat J
No mm M
13.6
19.00 13.8 80 1104
0.1 0.1
(8x10)
0.36
0.05
0.05 8.00 1.54 907 1396.27
0.36 (13.6/0.15x10)
PERHITUNGAN VOLUME PEKER
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
NO URAIAN
PENULANGAN KOLOM
Sketch Dia Panjang bh Jumlah Panjang Berat J
No mm M
4.6
0.1 19.00 4.8 300 1440
0.1
(12x25)
0.36
0.05
0.05
8.00 1.54 767 1180.67
0.36 (4.6/0.15x25)
NO URAIAN
PENULANGAN BALOK
Sketch Dia Panjang bh Jumlah Panjang Berat J
No mm M
13.6
19.00 13.8 40 552
0.1 0.1
(4x10)
0.36
0.05
0.05
8.00 1.54 907 1396.27
0.36 (13.6/0.15x10)
NO URAIAN
BEKISTING
13.60 x 13.60 x 1.00
13.60 x 0.20 x 4.00 + 13.60 x 0.15 x
3.40 x 4.25 x 2.00 x 29.00
0.60 x 0.60 x 4.25 x 25.00
0.60 x 0.60 x 3.40 x 40.00
E. PEK. Pipa
3.20 3.00
1.00
8.00
VOLUME PEKERJAAN
VOLUME KET
461.08 m2
461.08 m2
VOLUME PEKERJAAN
VOLUME KET
291.60 m3
291.60
54.68 m3
54.68 m3
915.30 m2
550.80 m2 dinding
182.25 m2 lantai
182.25 m2 atap
18.23 m3
18.23 m3
230.34 m3
73.44 m3 dinding
36.99 m3 lantai
27.74 m3 atap
43.20 m3 kolom
48.96 m3 balok
VOLUME PEKERJAAN
VOLUME KET
0.89 2,431.46
0.89 917.84
0.89 508.84
0.89 2,431.46
VOLUME PEKERJAAN
VOLUME KET
0.89 917.84
0.89 508.84
VOLUME KET
0.89 385.61
0.89 160.12
0.89 133.98
0.89 360.44
0.89 399.40
0.89 1,598.87
VOLUME PEKERJAAN
VOLUME KET
0.89 782.25
VOLUME KET
2.23 645.99
2.23 2,457.50
0.40 551.53
VOLUME PEKERJAAN
VOLUME KET
2.23 3,205.44
0.40 466.36
VOLUME KET
2.23 645.99
2.23 1,228.75
0.40 551.53
21,290.03
VOLUME PEKERJAAN
VOLUME KET
1,129.31 m2
184.96 m2 b. dasar plat atap
4.00 19.04 b. samping plat
838.10 m2 b. dinding
38.25 m2 b. kolom
48.96 m2 b. balok
Pelimpas &
9.60 m Penguras
3.00 unit Gate Valve
8.00 unit Elbow
Tabel 9.5 Volume Pekerjaan SID Air Baku
(Lokasi 1. Sungai Ampodoap - Kec. Beo)
B. Pekerjaan Intake
I. Pekerjaan pembersihan
1 Pembersihan di rencana bangunan m2 388.39
I. Pekerjaan tanah
1 Galian tanah penempatan pipa m3 505.54
2 Timbunan tanah m 3
374.66
3 Pemadatan Tanah m 3
374.66
I. Pekerjaan pembersihan
1 Pembersihan di rencana bangunan m2 461.08
Harga Biaya
Volume Satuan
( Rp. ) ( Rp. )
(4) (5) (6)
Jumlah 37,500,000.00
Bangunan Bendung
Harga Biaya
No. Uraian Pekerjaan Satuan Volume Satuan
( Rp. ) ( Rp. )
(1) (2) (3) (4) (5) (6)
Jumlah 511,204,795.51
Sumber : Hasil perhitungan
Pekerjaan Pipa Transmisi
(Lokasi 1. Sungai Ampodoap - Kec. Beo)
Harga Biaya
No. Uraian Pekerjaan Satuan Volume Satuan
( Rp. ) ( Rp. )
(1) (2) (3) (4) (5) (6)
Jumlah 2,671,669,692.06
Jumlah 1,767,189,811.40
Jumlah 1 buah 1,767,189,811.40
Sumber : Hasil perhitungan
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
Total 1 Kolom
Jumlah ( x 23 )
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN BALOK LANTAI DAN ATAP MELINTANG
DENAH PEMBESIAN
DENAH
1 19 12 x 8 96.00 2.226
2 19 12 x 2 24.00 2.226
Total 1 Balok
Jumlah ( x 5 )
ATAP 30X30 (POT.VI I -VI I )
a 19 12 x 4 48.00 2.226
b 19 12 x 2 24.00 2.226
Total 1 Balok
Jumlah ( x 5 )
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN BALOK LANTAI DAN ATAP
DENAH PEMBESIAN
DENAH
1 19 12 x 8 96.00 2.226
2 19 12 x 2 24.00 2.226
Total 1 Balok
Jumlah ( x 3 )
ATAP 30X30 (POT.VI I -VI I )
a 19 12 x 4 48.00 2.226
b 19 12 x 2 24.00 2.226
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
Total 1 Balok
Jumlah ( x 3 )
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN LANTAI
DENAH PEMBESIAN
1 12 12 x 86 1032.00 0.888
Total 1 Balok
Jumlah ( x 2 )
Lantai Pot.Memanjang
a 12 12 x 42 504.00 0.888
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
a' 12 2.34 x 42 98.28 0.888
Total
Jumlah ( x 4 )
Total 1 Lantai
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN ATAP
DENAH PEMBESIAN
Total
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
Jumlah ( x 0 )
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN ATAP
DENAH PEMBESIAN
3'
Total
Total Pembesian Atap
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN DINDING BAGIAN LUAR KELILING +AS
DENAH PEMBESIAN
Total
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Beo - S. Ampodoap
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN DINDING DALAM
DENAH PEMBESIAN
Total
Jumlah ( x 2 )
DAFTAR PEMBESIAN DINDING DALAM
DENAH PEMBESIAN
113.26 0.75
34.73 0.75
11.23
159.21
3,661.90
TANG
JML.BERAT OVERLAP
KG M
213.70 0.75
52.53 0.75
53.42 0.75
17.41 0.75
46.77 0.75
383.83
1,919.14
106.85 0.75
26.27 0.75
53.42 0.75
20.39 0.75
32.86 0.75
239.79
1,198.96
JML.BERAT OVERLAP
KG M
213.70 0.75
52.53 0.75
53.42 0.75
17.41 0.75
46.77 0.75
383.83
1,151.49
106.85 0.75
26.27 0.75
53.42 0.75
20.39 0.75
32.86 0.75
239.79
719.38
JML.BERAT OVERLAP
KG M
916.42 0.5
711.75 0.5
107.41
158.08
110.73
2004.39
4,008.79
447.55 0.5
87.27 0.5
35.80
77.20
54.08
701.91
2,807.64
6,816.43
JML.BERAT OVERLAP
KG M
1506.05 0.5
293.68 0.5
154.41
108.16
114.14
67.96
97.75
2,342.14
-
JML.BERAT OVERLAP
KG M
1534.46 0.5
1191.77 0.5
439.88
177.03 0.5
72.11
0.00
0.00
3415.25
5,757.39
G +AS
JML.BERAT OVERLAP
KG M
2685.31 0.5
2685.31 0.5
707.13 0.5
677.30 0.5
647.46 0.5
569.88 0.5
316.27
256.60
6421.73
14,966.99
JML.BERAT OVERLAP
KG M
419.21
405.53
824.74
1,649.48
JML.BERAT OVERLAP
KG M
769.79
769.68
1,539.47
-
14,966.99
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir
Total 1 Kolom
Jumlah ( x 33 Bh)
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN BALOK LANTAI DAN ATAP MELINTANG
DENAH PEMBESIAN
DENAH
1 19 12 x 8 96.00 2.226
2 19 12 x 2 24.00 2.226
Total 1 Balok
Jumlah ( x 7 Bh)
ATAP 30X30 (POT.VI I -VI I )
a 19 12 x 4 48.00 2.226
b 19 12 x 2 24.00 2.226
Total 1 Balok
Jumlah ( x 7 )
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN BALOK LANTAI DAN ATAP
DENAH PEMBESIAN
DENAH
1 19 12 x 8 96.00 2.226
2 19 12 x 2 24.00 2.226
Total 1 Balok
Jumla (x 3 Bh )
BALOK ATAP 30X30 (POT.VI I -VI I )
a 19 12 x 4 48.00 2.226
Total 1 Balok
Jumla (x 3 Bh )
Jumlah Penulangan Kolom
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN LANTAI
DENAH PEMBESIAN
1 12 12 x 86 1032.00 0.888
Total 1 Balok
Jumla (x 2 Bh )
Lantai Pot.Memanjang
a 12 12 x 42 504.00 0.888
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir
a' 12 2.34 x 42 98.28 0.888
Total
Jumla (x 6 Blok )
Total 1 Lantai
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN ATAP
DENAH PEMBESIAN
Total
Jumlah ( x 0 )
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN ATAP
DENAH PEMBESIAN
3 12 12 28 336.00 0.888
Total
Total Pembesian Atap
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN DINDING BAGIAN LUAR KELILING +AS
DENAH PEMBESIAN
Total
PERHITUNGAN VOLUME PEKERJAAN
LOKASI : Kec Salibabu - S.
NAMA BANGUNAN : Resevoir
DAFTAR PEMBESIAN DINDING DALAM
DENAH PEMBESIAN
Total
Jumlah ( x 4 )
DAFTAR PEMBESIAN DINDING DALAM
DENAH PEMBESIAN
113.26 0.75
34.73 0.75
11.23
159.21
5,254.03
TANG
JML.BERAT OVERLAP
KG M
213.70 0.75
52.53 0.75
53.42 0.75
17.41 0.75
46.77 0.75
383.83
2,686.80
106.85 0.75
26.27 0.75
53.42 0.75
20.39 0.75
32.86 0.75
239.79
1,678.55
JML.BERAT OVERLAP
KG M
213.70 0.75
52.53 0.75
53.42 0.75
48.75 0.75
70.15 0.75
438.56
1,315.67
106.85 0.75
26.27 0.75
53.42 0.75
48.75 0.75
49.30 0.75
284.58
853.75
2,169.42
JML.BERAT OVERLAP
KG M
916.42 0.5
711.75 0.5
179.02
158.08
110.73
2076.00
4,152.00
447.55 0.5
87.27 0.5
35.80
77.20
54.08
701.91
4,211.46
8,363.47
JML.BERAT OVERLAP
KG M
2401.15 0.5
468.22 0.5
463.22
324.48
114.14
67.96
169.36
4,008.53
-
JML.BERAT OVERLAP
KG M
1534.46 0.5
1191.77 0.5
685.39
298.37 0.5
62.66 0.5
117.36
316.16
221.47
4427.64
8,436.17
G +AS
JML.BERAT OVERLAP
KG M
2685.31 0.5
2685.31 0.5
1257.62 0.5
1199.44 0.5
323.73 0.5
284.94 0.5
316.27
256.60
8060.20
17,069.42
JML.BERAT OVERLAP
KG M
419.21
405.53
824.74
3,298.96
JML.BERAT OVERLAP
KG M
769.79
769.68
1,539.47
3,078.94
20,148.36
0.8 PEKERJAAN K3 (KESELAMATAN & KESEHATAN KERJA)
(Lokasi 1. Sungai Ampodoap - Kec. Beo)
400,000.00 400,000.00
4,000.00 80,000.00
0.00 0.00
8,000.00 160,000.00
1,200,000.00 1,200,000.00
20,000.00 400,000.00
280,000.00 280,000.00
120,000.00 120,000.00
1,200,000.00 1,200,000.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
1,200,000.00 1,200,000.00
0.00 0.00
0.00 0.00
52,000.00 1,040,000.00
120,000.00 2,400,000.00
0.00 0.00
0.00 0.00
0.00 0.00
1,600.00 32,000.00
4,000.00 80,000.00
240,000.00 4,800,000.00
480,000.00 2,400,000.00
0.00 0.00
40,000.00 800,000.00
0.00 0.00
0.00 0.00
8,000,000.00 8,000,000.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
5,600,000.00 5,600,000.00
0.00 0.00
2,400,000.00 2,400,000.00
2,400,000.00 2,400,000.00
2,400,000.00 2,400,000.00
2,400,000.00 2,400,000.00
2,400,000.00 2,400,000.00
4,000,000.00 4,000,000.00
0.00 0.00
0.00 0.00
80,000.00 800,000.00
80,000.00 400,000.00
80,000.00 800,000.00
80,000.00 400,000.00
80,000.00 400,000.00
80,000.00 800,000.00
120,000.00 240,000.00
80,000.00 800,000.00
0.00 0.00
800,000.00 800,000.00
0.00 0.00
0.00 0.00
40,000.00 80,000.00
400,000.00 400,000.00
56,000.00 224,000.00
1,600,000.00 1,600,000.00
400,000.00 400,000.00
54,336,000.00
Rencana Anggaran Biaya SID Penyediaan Air Baku Kab. Kepulauan Talaud
(Lokasi 1. Sungai Ampodoap - Kec. Beo)
Biaya Total
No. Uraian Pekerjaan
( Rp. )
(1) (2) (3)
E. Pekerjaan K3 54,336,000.00
TOTAL 5,546,090,328.87
DIBULATKAN 5,546,090,000.00
Terbilang : Lima Miliar Seratus Lima Puluh Lima JutaDelapan Ratus Sembilan Puluh Sembilan Ribu Rupiah