Anda di halaman 1dari 176

T H E C H R O N I C L E

13 While the develop- 10 Hospitality ventures 06 In preparation for 02 Focusing on real 98 All infrastructure 94 Comprehensive
ment strategy fo- come to complement the development estate develop- works in the Tradi- urban planning
cuses on revenue- and support real of the Waterfront ments that attract tional City Center stresses the topog-
generating and added- estate development District – the reclaimed tenants and residents to are complete including raphy of Beirut city center
value ventures to com- and enhance property expansion of the tradi- the city center, and fol- the expansion of the and ensures a connection
plete the Traditional City value. Hotels, cafes, tional city center – Beirut lowing the positive Ring Road and the cre- between the project and
Center, the future devel- and restaurants blossom is promoted as an inter- response to Saifi Village, ation of primary east– its surrounding areas,
opment frontier is the alongside office and res- national corporate busi- the impetus to invest in west and north–south accommodating a broad,
Waterfront District, with idential neighborhoods, ness center. Further other residential devel- avenues, which organize sustainable, flexible
gateway projects set to promoting the city cen- detailed urban and traffic opments increases. This accessibility and con- land-use mix.
bridge the transition from ter as a welcoming and studies are carried out, trend also underlines the serve air and view corri-
historic to new. friendly, mixed-use space. resulting in amendments importance of full-time dors. 91 Beirut’s postwar
to the Master Plan. property maintenance urban recovery is to
12 After Saifi, Wadi 09 Beirut Souks, a flag- and operations services, 97 Restoration is car- be directed through
Abou Jamil is taking ship retail project, 05 The seafront Beirut which begin to be offered ried out based on concerted private sector
shape as a new opens its doors. Marina is fully oper- to third-party developers. clear urban design, investment into a care-
calm, urban, residential This signature shopping, ational, berthing a technical guidelines, and fully constructed institu-
neighborhood, while the hospitality, entertain- large number of vessels 01 As businesses, architectural briefs, pre- tional framework,
construction of several ment, and cultural meet- on annual and seasonal commercial outlets, serving facades and regulated by government
high-rise and large-scale ing point boosts the bases. The planning and and landscaped adapting interiors to the decree. It is set to become
developments are economic vitality and construction of several open spaces multiply, needs of contemporary one of the largest inner-
launched in the Hotel social vibrancy of the city real estate projects rush a number of vacant lots life and business. Mean- city and waterfront
District, Serail Corridor, center. The expansive site forward, especially in provide temporary park- while, following a fast- renewal projects in the
and Saifi, all evolving to is a prime example of Wadi Abou Jamil, the ing spaces to accommo- track approach, the first world.
complete the Traditional how layers of the city can Hotel District, and the date the mobility of the major new development
City Center cityscape. be incorporated into a Serail Corridor. growing number of ten- reaches completion.
contemporary design. ants and visitors, in
11 Zaitunay Bay inau- 04 An international anticiplation of the 96 Beirut city center
gurates its quayside 08 With the Conserva- urban design com- completion of under- becomes a large
restaurant strip and tion Area’s urban petition solicits new ground parking facilities archeological site,
welcomes more than fabric almost com- visions for Martyrs’ Square prescribed in the city cen- with excavations uncov-
3,000 visitors per day in plete and the remaining and its surroundings. ter’s Master Plan. ering major discoveries
the first six months. At parts of the Traditional The objective is to open dating back to several
the other end of town, City Center more than the axis toward the sea 00 With archeological past civilizations. These
the newly landscaped halfway developed, a cul- with respect to the urban documentation and excavations are carried
Uruguay Street vitalizes tural strategy is imple- grid and reposition the evaluation in full out following a UNESCO
nightlife activity in the mented to promote square as a national swing, and following protocol specifically
Conservation Area, where culture, arts, and heritage meeting point. extensive findings related devised for the area in
selected buildings are il- as tremendous resources to the Cardo Maximus, a coordination with a
luminated in the for the local and interna- 03 In establishing large site between several number of agencies and
nightscape through an tional communities. the city center as a places of worship is dedi- teams of experts from
image projection system. culture and leisure cated to be a landscaped several different countries.
07 With the completion destination, a strategic public space as the
of land reclamation approach is taken to Hadiqat As-Samah (Gar- 95 Informed by natu-
and the visible integrate archeological den of Forgiveness). ral boundaries and
demarcation of the new finds within the urban landforms, street
Waterfront District, along fabric. Meanwhile, a 99 The city center is patterns, visual corri-
with a continuous rise in Quartier des Arts evolves pulsing with life. dors, past neighborhood
developers’ and investors’ against the backdrop Landmark buildings structures, and preserved
interest in real estate of reconstructed and are being restored and fabrics, the city center is
development, requests restored traditional cafes and restaurants are envisioned as a cluster of
come in to emulate the buildings in Saifi Village. multiplying. Businesses sectors, each with its own
success of Beirut city and institutions relocating detailed master plan.
center’s regeneration to the area are drawn by
enterprise in other parts the amenities and serv-
of the world. ices such as the state-of-
the-art communication
network, security, and
maintenance.

Solidere Annual Report 2012:


an account of facts and events in the reconstruction
and development of beirut city center
12
An account of facts and events in the reconstruction and
development of Beirut city center

The Chronicle presents a linear sequence of facts and events


spanning eighteen years of reconstruction and development
in Beirut city center. Like a timeline, it moves chronologi-
cally, without analysis or interpretation. Through the unique
method of the chronicle, historiography extends through
generations.
Nasser Chammaa Dear Shareholders,

a word from the chairman The Lebanese economy has endured the devastating consequences
of geopolitical upheaval and domestic tension. The uncertainty, com-
pounded by ongoing regional turmoil, has exacted a marked and
heavy toll on the real estate, tourism, and hospitality sectors.

Our Company was not spared, and the number of transacted sale
deals in 2012 was drastically low as a result of the growing fallout.
The downturn in economic activity at the national level with its
pronounced effects on the commercial and hospitality sectors has
afflicted the Company’s related businesses, too. Net operating rev-
enues dropped sharply by 68 percent, and net income fell 90 percent
year over year.

Still, Solidere’s fundamentals remain strong: our valuable assets


include a land bank estimated at around US$8 billion, a real estate
portfolio valued at US$1.3 billion, and a balance in cash and receiv-
ables of about US$717 million.

We reevaluated and adapted our strategies to ensure the sustainabil-


ity of resources. As we weather this tumultuous climate, we have
streamlined operations and continue to decrease overhead expenses.
Real estate activity proceeds, though at a much reduced pace.
Certain real estate development projects have been postponed while
the progress of others has slowed. These shifts will ensure cautious
application of Company resources, and they will enable Solidere to
maintain the track record of superior quality that the brand represents.

We will inaugurate the Souks’ Cinema and Entertainment Complex


by end 2013 and will complete the Souks’ Department Store in 2015.
Both projects generate revenue and will strengthen the vibrancy and
value of the area, and more broadly of Beirut city center. In addition,
other projects such as the Serviced Apartments and Wellness Center,
due for delivery by end 2016, will increase the critical mass of the
Souks area.

Land on the Waterfront District is ready for construction. The Eastern


Marina and 80,000 sq m waterfront city park, now scheduled for a
! — 03

later delivery date, will complement the other real estate projects in
the area and serve as additional magnets.
02

Further afield, Solidere International, of which Solidere owns 39


percent, remains financially solid with high liquidity and zero debt.
Solidere International pursues the relentless effort to increase business
in the region through investments in exclusive and high-value land
and real estate development projects with the potential to deliver
attractive return on investment. Moving forward, the objective is to
capitalize decisively on market trends in the region, primarily in
Saudi Arabia and the United Arab Emirates.

In 2012, Solidere International distributed a dividend of US$1.50 per


share from 2011 profits. We trust that Solidere International’s progress
will further catalyze potential value and revenue growth for Solidere
and its shareholders.

Despite the dire circumstances, the Company stands fast as a market


leader in the real estate and land development field. Indeed, Solidere
is well positioned to meet its objectives by capitalizing on strong fun-
damentals and core competencies.

We remain unflinching in our commitment to uphold and pursue


Solidere’s interest. Our focus is on implementing strategies that
sustain value creation and result in better returns for the Company’s
stakeholders. At the same time, we will remain vigilant. A flexible
Nasser Chammaa approach to business planning is the key to insulating the Company
Chairman and General Manager to the greatest extent possible from the negative consequences of
July 2013 local and regional instability.
In establishing the Focusing on real As businesses, With archeological The city center is All infrastructure Restoration is Beirut city center
THE CHRONICLE While the develop-
ment strategy
focuses on revenue-
After Saifi, Wadi
Abou Jamil is tak-
ing shape as a new
Zaitunay Bay inau-
gurates its quayside
restaurant strip and
Hospitality ven-
tures come to com-
plement and
Beirut Souks, a
flagship retail proj-
ect, opens its doors.
With the Conserva-
tion Area’s urban
fabric almost com-
With the comple-
tion of land recla-
mation and the
In preparation for
the development
of the Waterfront
The seafront Beirut
Marina is fully
operational,
An international
urban design com-
petition solicits new
city center as a cul-
ture and leisure
estate develop-
ments that attract
commercial outlets,
and landscaped
documentation and
evaluation in full
pulsing with life.
Landmark build-
works in the Tradi-
tional City Center
carried out based
on clear urban
becomes a large
archeological site,
Informed by natural
boundaries and
landforms, street
Comprehensive
urban planning
stresses the topog-
Beirut’s postwar
urban recovery is to
be directed through
generating and calm, urban, resi- welcomes more support real estate This signature plete and the re- visible demarcation District – the re- berthing a large visions for Martyrs’ destination, a tenants and resi- open spaces multi- swing, and follow- ings are being re- are complete in- design, technical with excavations patterns, visual cor- raphy of Beirut city concerted private
added-value ven- dential neighbor- than 3,000 visitors development and shopping, hospital- maining parts of of the new Water- claimed expansion number of vessels Square and its sur- strategic approach dents to the city ply, a number of ing extensive find- stored and cafes cluding the expan- guidelines, and uncovering major ridors, past neigh- center and ensures sector investment
tures to complete hood, while the per day in the first enhance property ity, entertainment, the Traditional City front District, along of the traditional on annual and sea- roundings. The ob- is taken to integrate center, and follow- vacant lots provide ings related to the and restaurants are sion of the Ring architectural briefs, discoveries dating borhood structures, a connection be- into a carefully con-
the Traditional City construction of sev- six months. At the value. Hotels, cafes, and cultural meet- Center more than with a continuous city center – Beirut sonal bases. The jective is to open archeological finds ing the positive temporary parking Cardo Maximus, a multiplying. Busi- Road and the cre- preserving facades back to several past and preserved fab- tween the project structed institu-
Center, the future eral high-rise and other end of town, and restaurants ing point boosts the halfway developed, rise in developers’ is promoted as an planning and con- the axis toward the within the urban response to Saifi spaces to accom- large site between nesses and institu- ation of primary and adapting inte- civilizations. These rics, the city center and its surrounding tional framework,
development fron- large-scale devel- the newly land- blossom alongside economic vitality a cultural strategy and investors’ inter- international cor- struction of several sea with respect to fabric. Meanwhile, Village, the impetus modate the mobil- several places of tions relocating to east–west and riors to the needs excavations are car- is envisioned as a areas, accommo- regulated by gov-
tier is the Water- opments are scaped Uruguay office and residen- and social vibrancy is implemented to est in real estate porate business real estate projects the urban grid and a Quartier des Arts to invest in other ity of the growing worship is dedicated the area are drawn north–south av- of contemporary ried out following a cluster of sectors, dating a broad, sus- ernment decree.
front District, with launched in the Street vitalizes tial neighborhoods, of the city center. promote culture, development, re- center. Further rush forward, espe- reposition the evolves against the residential develop- number of tenants to be a landscaped by the amenities enues, which or- life and business. UNESCO protocol each with its own tainable, flexible It is set to become
gateway projects set Hotel District, nightlife activity in promoting the city The expansive site arts, and heritage as quests come in to detailed urban and cially in Wadi Abou square as a national backdrop of recon- ments increases. and visitors, in an- public space as and services such as ganize accessibility Meanwhile, follow- specifically devised detailed master land-use mix. one of the largest
to bridge the transi- Serail Corridor, and the Conservation center as a welcom- is a prime example tremendous re- emulate the success traffic studies are Jamil, the Hotel meeting point. structed and re- This trend also un- ticiplation of the the Hadiqat As- the state-of-the-art and conserve air ing a fast-track for the area in coor- plan. inner-city and wa-
tion from historic Saifi, all evolving to Area, where selected ing and friendly, of how layers of the sources for the local of Beirut city cen- carried out, result- District, and the stored traditional derlines the impor- completion of un- Samah (Garden communication and view corridors. approach, the first dination with a terfront renewal
to new. complete the Tradi- buildings are illu- mixed-use space. city can be incorpo- and international ter’s regeneration ing in amendments Serail Corridor. buildings in Saifi tance of full-time derground parking of Forgiveness). network, security, major new devel- number of agencies 94 projects in the
tional City Center minated in the rated into a con- communities. enterprise in other to the Master Plan.
04 Village. property mainte- facilities prescribed and maintenance. opment reaches and teams of ex- 95 world.
cityscape. nightscape through temporary design. parts of the world. nance and opera- in the city center’s
98 completion. perts from several
13 an image projection
10 05 tions services, Master Plan.
00 different countries.
system. 08 06 03 which begin to be
99 91
12 09 07 offered to third-
97
party developers.
01 96
11
02
an account of facts and events in the reconstruction
and development of Beirut city center
Solidere Annual Report 2012:

24 — 25 40 — 41 64 — 65
Rania Sassine Oussama Kabbani Ghaleb Mahmassani
on Building the Solidere Brand on Planning the Urban Regeneration on Structuring the Legal
and Learning across Generations of Beirut City Center Framework of Solidere

STRATEGY DEVELOPMENT VITALITY HOSPITALITY RETAIL CULTURE ENTERPRISE EXPANSION SEAFRONT URBAN GRID RESTORATION MAINTENANCE MOBILITY PUBLIC SPACE COMMUNICATION INFRASTRUCTURE ARCHITECTURE ARCHEOLOGY PLANNING SUSTANABILITY FRAMEWORK

New real estate proj- As a result of detailed From the onset, tem- Hospitality venues A shopping destina- Archeological sites, With its convenient The new Waterfront Beirut Marina and its Most of the existing Buildings of heritage Facility management In addition to requir- The public domain Beirut city center is a The most important A rich variety of ar- Referred to by the in- A comprehensive The Beirut Central A group of strategic
ects achieve a bal- urban planning for a porary activities were from hotels to restau- tion that builds on a art exhibits, and location, design flexi- District is an expan- surrounding board- street grids that radi- and architectural and its related opera- ing developers to in- will consist of no less 24-hour IT zone, pro- part of reconstruct- chitectural expres- ternational media as urban master plan, District Master Plan’s thinkers, urban de-
anced mix of land number of distinct set up on vacant lots rants carry on the centuries-old legacy music festivals re- bility, efficient avail- sion of a landfill that walk and quayside ate from the historic value are accurately tions and mainte- corporate parking than 60 parks, gar- viding an array of ing and developing sions are present the largest archeolog- developed out of ex- mixed-use policies signers, planners, en-
use according to de- residential neighbor- in the city center to Lebanese tradition of trade and com- main dynamic and able technology, and housed a dumpsite restaurant strip have core are preserved. restored with no al- nance in Beirut city spaces into building dens, squares, pedes- multimedia and the city center is the throughout the city, ical site in the world, tensive studies and are defined through gineers, architects,
tailed sector plans. hoods and mixed-use attract the country’s of refined living as merce, Beirut Souks integral elements of modern services, for 16 years – an become a hub of out- View and air corri- terations or additions center are an essen- plots and provide ad- trian areas, and broadband commu- installation of high- such as French Man- Beirut’s finds and public debate, sector regulations, al- craftspeople, legal
To control the pace, areas, diverse groups population, bringing part of the social and maintain the struc- everyday life in the Beirut city center is environmental scar door activities. A dors to the sea and while other retained tial component of equate parking to seafront prome- nication services. quality infrastruc- date, Venetian- and treasures suggest stresses the topogra- lowing land use to re- minds, and financial
components, and of people now live life to an area that economic process ture of the pre-war city center. Further- a prime location for on the city center soon-to-open yacht mountains are main- buildings are allowed conserving property serve the uses of each nades, the most im- Tenants can surf the ture, both under and Genovese-inspired that the city became a phy of Beirut city main as flexible as specialists is en-
quality of each proj- and work in the city was otherwise bar- that has renewed the grid while integrating more, one newly business and retail. seashore. Following club and a planned tained through wide some level of flexibil- and land value in project, the Master portant of which will internet at speeds un- above ground, in ac- triple arch windows, significant urban center, its surviving possible in order to trusted with the task
ect, Development center, benefiting ren. Over the years, city center for quality open spaces and developed and 18 his- The new Waterfront extensive land treat- Eastern Marina will streets, major public ity, including limited the market and ulti- Plan includes a num- be the waterfront city available elsewhere cordance with inter- Ottoman arcades and center in the third buildings, townscape meet evolving devel- of rebuilding the
Briefs provide stan- from the many con- new destinations living. archeological finds torical spaces of wor- District will also offer ment and reclama- further concretize the spaces, and low-rise facade alterations mately attracting ber of underground park. All of these in Lebanon and enjoy nationally approved cornices, Islamic millennium BC; views, neighborhood oper and end-user heart of Lebanon’s
dardized documenta- veniences the area draw people to the into a contemporary ship around the city a wide range of com- tion, the Waterfront city’s historic link to building zones. and potential addi- tenants. public parking lots. contribute in creating an enhanced televi- standards to best friezes and inscrip- since then it has fabric, and the many needs. The renewal capital city into a re-
tion of technical has to offer. city center and en- design adapted to center attest to the mercial and retail District is envisioned the Mediterranean tions. This approach The standards as- a pleasant and dis- sion experience. serve the interests of tions, and 1920s and been home to a large layers of historical of the city center has gional economic, so-
guidelines and calcu- hance the restoration modern life. ongoing spiritual di- space in addition to as a natural exten- Sea. affirms that historical sume a gradual intro- tinctive urban real estate develop- 1930s neo-Oriental number of civiliza- memory that form come to exemplify a cial, and cultural
lation of floor space. of its social fabric. versity and richness a special business sion of the city cen- structures can sur- duction of effective character. ment, public areas, designs, comple- tions. Archeological the city’s heritage. It sustainable model of destination.
of the place. district. ter, with extensive vive and create value public transportation and city center ten- mented by contem- remains are uncov- conceives of the city inner-city regenera-
green areas and dis- when adapted to the within the city. ants and visitors. porary new ered, preserved, and center as a cluster of tion.
tinctive architecture. needs of contempo- developments. integrated into recon- city quarters, each
rary life. struction efforts. with its own identity
and character, to be
developed over a pe-
riod of time.
The Chronicle
Solidere Annual Report 2012

An account of facts and events in the


reconstruction and development of
Beirut city center
Mosbah Assi During the Lebanese civil war, I was a photojournalist portraying the Once infrastructure works began and excavations started uncovering As reconstruction progressed, the Master Plan limits became less
horrors and destruction of war in the hope of stopping it. I witnessed archeological remains, we photographed everything for our own visible from land and sea, so we started taking aerial pictures at six-
on Photo-Documenting the how it damaged the country and its people. records and for the Directorate General of Antiquities (DGA). One month intervals to keep track of which land area was being developed
Reconstruction and Development example is the cemetery between Murr Tower and the Phoenicia and which wasn’t. Those were taken not only from airplanes but also
of Beirut City Center I started working for the would-be founders of Solidere in May 1993. Hotel, a burial for the rich in pre-Ottoman times. The graves were from the multitude of cranes at construction sites around town.
I had to take a 180-degree turn, wear a new hat, to show how what filled with gold jewelry that have been transferred to the National
Once a photojournalist covering the devastation is destroyed can be rebuilt, how there was still beauty around us, Museum. VI
of the Lebanese civil war, Mosbah Assi has spent how a city can revive from its ashes. It was not an easy task at first,
the past twenty years documenting the reconstruc- but I had faith in the project, and it drove me to want to capture the III The mere fact that we were recording everything on film meant that
tion and development of Beirut city center on a reconstruction and development efforts. an archive was being kept. All our photographs are recorded by date,
daily basis. The Normandy dumpsite was a dangerous area. It was like a jungle, place, and event. We never printed them all. Bear in mind that before
I filled not with trees but with long grass growing out of the garbage. 2004 they were not digital. We archived them all, and some were
There were bubbling gases and horrible smells. Water that was once used in corporate publications and in the media. At the end of the
In 1993, there were no visible roads in what we call the city center part of the city center’s shoreline was barely visible, and it would day, images are more truthful than words, or rather an image is a
today, no visible landmarks. I knew the city center well before the war, bubble as if boiling in some areas. There were unexploded bombs, credible support of words and efforts.
but when I first came back, I had trouble pinpointing my whereabouts, carcasses, garbage, anything and everything you can and cannot
and I kept on losing my bearings. Shrubs, even trees, were growing imagine. We had to be very careful moving around. When the deci- Twenty years down the line, I have the exact same faith and same
out of nearly every wall left standing and in the middle of what used sion was taken to treat the area and reclaim land, we documented drive in the project but probably less energy. I can honestly say that
to be streets. There were still many land mines in the area, and the the works. Everything was separated into recyclable or non-recyclable the city center looks better than my expectations were back then.
Lebanese army was organizing special tours for photographers. material. The rubble and debris from the city center’s destruction When I saw the extent of destruction, I could not imagine something
were moved to the landfill area, separated into usable and non-usable this beautiful could be constructed. The photographs gathered over
We started by photographing squatters, the people who were living material, treated, and then used in the landfill. the years show the effort, depict the reconstruction, and document
in the destroyed buildings. They knew how to move about, how to the result.
avoid land mines, because they moved from building to building IV
through the gaping holes, remnants of the war .
Once infrastructure works were on their way and salvageable buildings
The areas that were the worst off were Allenby and Weygand streets, marked, I started getting direction on what needed to be photographed
Martyrs’ Square, Bab Idriss, Wadi Abou Jamil, and the old Souks. In from the urban planning management; which sites, views, and angles
somewhat of a contrast, Maarad and Foch streets, Lazarieh Center, to capture. At first, I did not understand why I had to photograph a
and the Riad El Solh Square area were better off. Actually, in 1993, large expanse of empty space or a straight line from the inner city cen-
there were small ill-kempt cafés and even a men’s salon, open for ter toward the sea. It took me a while to realize that they were looking
business near Riad El Solh Square. at the city center through its Master Plan. Once I understood, it all
made sense. I felt I was in sync, that the way I was approaching my
II photography was in line with how the planners envisioned the city
center. I could finally capture the plan through my lens.
By the end of 1994, all the land mines were cleared, roads or rather
paths were opened, and rubble was removed. We needed to docu- V
ment everything that was going on in the city center, particularly the
condition of every street and building. We had to capture details, In the beginning, after having taken every single angle shot from
! — 11

document every single streetscape, doorway, balcony, stonemasonry, within the city center, we were asked to take some from the sea.
and window – in case it would be needed later on in the reconstruc- We would go out with fishermen and look back toward a cityscape
10

tion stage. The goal was to have a photographic record of the condi- that meant nothing, that showed nothing beyond a mountain made
tion of the city center as a whole so that we could compare it to our of garbage, a few derelict hotels and buildings, Murr Tower still in
reconstruction and development efforts in the future. cement, and Starco Center. Nothing else.
Corporate Development Landscape

After having recorded a number The construction of a new project The Department Store (photo Peter Marino (US) is the winner The concept incorporates a large The building’s schematic design The first phase of development Located on the northern part of
of land sale transactions in the begins on one of the few remain- next page), the final development of the design competition for the podium as a contemporary inter- is under review while current on the western lot comprises a the Foch-Allenby Conservation
Waterfront District and finalized ing lots in the Conservation to round off the singular leisure mixed-use project on Hoyek pretation of the Middle Eastern market demand is assessed prior number of buildings at podium Area, Harbor Square, designed
its infrastructure, the target is to Area, at the intersection of the experience of Beirut Souks is now Street in the Serail Corridor. The souk, with its porous urbanism, to launching the Construction height composed of residential, by Gustafson Porter (US/UK), is
push forward with its develop- historic core and the new Water- under design by Zaha Hadid concept for the Furnished and unique character, and sheltered Document phase. office, and retail components. completed by Target. Covering
ment. Supported by strong front District. Allenby Gate resi- Architects (UK). It will open its Serviced Apartments, Spa, passageways. In response to the The podiums include an active part of Beirut’s ancient harbor,
fundamentals and proper man- dential building, designed by doors to a three-story retail de- and Wellness Center presents a global trend toward multiuse, The Zaitunay Bay yacht club, ground floor designed to be per- the design repositions part of the
agement of resources, the district Nabil Gholam Architects, will velopment covering 26,370 sq m successful massing response to loosely defined working environ- with 14,000 sq m of floor space, meable and accessible to the old harbor wall within the square
will rise to complete the devel- reinterpret the scale and propor- of mixed-use space. the local context, comprising two ments, a series of linked green takes shape, emerging naturally public; they also feature several and treats it as a sculpture.
opment of an integrated and tions of the contiguous historical structures with a central court- spaces runs through the tower. out of the land and transcending multiuse levels and suspended Fountains and pavements shape
sustainable urban environment, streetscape and strike a harmony Designed by Nabil Gholam Ar- yard. Marino teams up with Referred to as elements of verti- the boundary between city and rooftop gardens. the square’s reinterpretation as a
accommodating financial, com- with the new, modern, reclaimed chitects, the 178 Saifi develop- IdepConsult–Mounir Saroufim cal urbanism, they connect the sea. It is set to accommodate a harbor. Also completed is the
mercial, residential, cultural, and land area. ment is envisioned as a natural for the detailed design phase. work spaces to the surrounding club for up to 400 members with The retail frontages are adorned Bassel Fuleihan Memorial on
tourist facilities. extension to the popular Saifi city and sea. a swimming pool, restaurant, with light, transparent canopies. the Corniche Road between
The Cinema and Entertain- Village and comprises a cluster One building houses the serviced, bar, e-library, game room, and Trees play an essential role as Beirut Marina and the Phoenicia
ment Complex (photo below) of one office and four residential furnished apartment wing, with With a double-skin facade, the spa center at ground level, along unifying elements that help unite Hotel, designed by Imad
opens in the northern part of buildings. A courtyard landscaped a tranquil entrance from the building concept has been opti- with 53 serviced and furnished the traditional part of the city Gemayel Architects and con-
Beirut Souks. Envisioned as a by Vladimir Djurovic Landscape southwest corner and a rooftop mized for Beirut’s mild winters state-of-the-art apartments on and the new district throughout structed by Araco.
mega entertainment destination, Architecture runs through the garden and sun terrace with and hot summers. The outer the upper levels. The project re- the Pinwheel Project. The pres-
the main building comprises 14 five units and serves as a relax- spectacular views and access to skin consists of a ceramic frit in vives the richness of the urban ence of water, another unifying Having realized more than half
movie theaters including two VIP ation space for tenants. The the second structure. The second translucent and transparent shoreline. element, evokes the sea pene- of the gardens, squares, and
halls with a private lounge area, courtyard design also integrates building houses the wellness glaze, which protects against trating into the city and provides outdoor spaces envisioned in
as well as concession areas, a archeological finds unearthed center, which features top design, wind and solar radiation but As a transition zone between the a cooling effect in summer. the Beirut Central District Master
food court, and a special chil- during the excavation works. state-of-the-art equipment, and still allows diffuse light to filter Traditional City Center and the Plan, Solidere has several more
dren’s area. The volume of its professionals to cater to its clien- through. The inner skin is fully Waterfront District, Renzo Piano The suspended rooftop gardens, sites in the works. Others, includ-
outer skin is composed of four The residential buildings are tele. Both components will be glazed and includes slits that Building Workshop’s (Italy/France) accessed via panoramic elevators, ing the 80,000 sq m waterfront
metal ribbons that wrap around townhouse-like units character- operated by a well-known allow fresh air to reach the inte- proposal for the Pinwheel Project include both native and non- city park, will take shape further
the four large theaters in a ized by space, light, calm, and international firm with experi- rior. Since the building is located creates a sense of continuity and native Mediterranean plants, down the road.
north–south direction, generat- comfort. They incorporate a wide ence in this field. Residents and in a district mainly composed of urban unity. It establishes strong with a mixture of deciduous and
ing a dynamic sculptural form. range of living options, including visitors enjoy easy access to an residences and hotels, a number pedestrian land use and build- evergreen species to maintain a Khan Antoun Bey Square is
At Allenby street level, high-end large lofts, mini lofts with a com- inner courtyard, where independ- of amenities are offered on-site ing-scale links between the his- green cover throughout seasonal progressing according to PROAP’s
boutiques form a continuation of bined living-working space, ent retail outlets, restaurants, to fulfill tenants’ daily needs. toric core and the waterfront, changes. Also at the rooftop level, (Portugal) design, adjacent to the
the existing retail offerings. ground-floor maisonettes with and cafes maintain privacy and These include a canteen, rooftop accommodating retail, hotel, light constructions made of steel, newly inaugurated Entertainment
private gardens, central hall intimacy. restaurant, convenience store, residential, and cultural use. It is glass, and fabric are used as cafes and Cinema Complex of Beirut
An adjacent L-shaped building apartments, and a variety of and several other facilities that a key development that balances and restaurants. Light structural Souks. All Saints Square, an-
to the north of the complex hosts penthouses with generous ter- Fumihiko Maki and Associates will make the building a one- four central dualistic concepts: walkways connect the different other Shoreline Walk open space
several restaurants while an races. The office building offers (Japan) wins the design compe- stop destination. unity and diversity, permeability plots together to create a contin- designed by Gustafson Porter, is
! — 13

annex facing Ajami Square local- serviced offices and distin- tition for the Triple-A Office and privacy, transparency and uous promenade. also in development. In Beirut
izes the entertainment facilities. guishes itself from the living Building in the Hotel District, opacity, and construction and Souks, Martha Schwartz Partners
12

spaces through its outer appear- which is drawing the interest of vegetation. In the Waterfront District, (UK) is redesigning Imam Ouzai
The movie theaters’ branding is ance: an inner Corten facade high-profile potential tenants. several plots of land have been Square and Marc Aurel Studio
finalized to reflect two identities: covered in triangular fin louvers The proposal highlights the flex- sold to third parties and are in (France) is redesigning the street
Beirut Souks and Cinema City. and urban windows, creating a ibility and efficiency of its inter- the planning phase of develop- furniture. Finally, a signage and
Beirut Souks Cinema City will suspended garden. nal space and embodies the ment, such as Mika Land, a navigation strategy is being
offer the next generation of inte- spirit of Beirut as a crossroads residential project designed by launched for the whole of Beirut
rior design and circulation for Excavation works begin on a where international businesses Foster + Partners (UK) with city center in cooperation with
cinemas around the world. It will new development at the south- establish their headquarters. R & K Consultants. Placemarque (UK).
be managed and operated by eastern edge of Beirut city center Fouad Menem Consultants and
BCD cinemas, a partnership be- in Saifi. Saifi Plaza is designed Partners is selected as the local
tween Cinema City and Solidere. by Nabil Gholam Architects and architecture firm.
comprises two buildings, one
residential and another office,
with surroundings that reflect
the dual character of the site: the
dynamic Ring Road movement
to one side and the calm Saifi

13
setting to the other.

Communication Design Awards The Solidere KidzMondo As part of a temporary usage strategy,
2010 Annual Report “City in Layers” receives the iF following the examples of BIEL and Beirut Exhibition
Gold Communication Design Award, and the Solidere Center, space is leased on the spine leading from
2011 Annual Report “City in Scenes – City in Portraits” Allenby Street to the Waterfront District to Kidz-
wins the Red Dot: Best of the Best Communication Mondo, an edutainment center for children opened
Design Award. in June 2013.
Corporate Infrastructure Development

Due to regional and local tensions The new Information Center In its effort to improve preven- Laceco Architects & Engineers On the fifth floor of a building The Beirut Souks Core tenant Beirut Gardens, Plus Towers One
and in the aftermath of the global in Beirut Souks is inaugurated. tive and corrective efficiency, submits a preliminary infra- near Riad El Solh Square, a mix grows stronger with the and Two, and Beb Beirut are tak-
economic downturn, the devel- Strong Corp Electronic Products Solidere’s facility operation and structure design for the Water- 500 sq m space provides start- opening of new, world-famous ing form, gradually transforming
opment program is partially Co. (UK) delivers the audiovisual maintenance team introduces front District, which it is then ups with a high-tech, relaxed, franchise outlets such as the Gap the long-deserted topography
modified to focus on priorities design and installation, incorpo- an environmentally friendly, mo- asked to finalize. In the mean- efficient work environment. clothing store and the return of the Martyrs’ Square Axis.
and limit negative impact on op- rating infrastructure to provide bile application that monitors time, temporary infrastructure is Cloud 5 can host up to 60 entre- of leading Lebanese bookstore Meanwhile, the five-star Man-
erations, thus preserving liquidity. video and audio distribution as and scans barcodes on equip- provided – electricity, water, and preneurs in the information, Librairie Antoine to its roots in darin Oriental Hotel chain an-
Precedence is given to completing well as system management ment and machinery to obtain drainage – for developers wish- communication, and technology the city center. On the food and nounces that it will open its first
key developments in the Tradi- control. The center features a maintenance requirements ahead ing to begin construction on sold (ICT) sectors, each at an all-in- beverage side, the famed fruit property in Beirut by 2017. The
tional City Center, such as the room with a scale model of the of time. The team also under- plots in the district. clusive low cost per month that cocktail maker Al Intabli cele- estate is a locally-based joint
Entertainment and Cinema city center and a large video takes studies with energy-saving ensures around-the-clock secu- brates its return, accompanying venture between Lebanese and
Complex and Department Store wall; a boardroom with a poly- objectives, carrying out energy The authorities approve the final rity and unlimited high-speed the opening of Brgr Co and Grid Saudi investors on the site of the
in Beirut Souks, and infrastruc- com video conference system to audits (monitoring, measuring, design and layout for the East- internet through the city center’s coffee shop. City Center Building or Dome,
ture in the Waterfront District. conduct global meetings at the and modeling electrical output ern Marina, and the Council for fiber-optic Broadband Network. which will be integrated into the
highest professional level; and of all utilities) at two locations: Development and Reconstruc- BankMed and Solidere agree to hotel’s design.
an auditorium and briefing room. the UN House and Beirut Souks. tion (CDR) selects Bureau Veritas Cloud 5 has already attracted undertake joint marketing and
The audiovisual distribution and In addition, the team has imple- (France) as technical controller. a number of start-ups and ICT promotional efforts pertaining The Pinwheel Project, the anchor
control of the 32 screens through- mented trial adiabatic systems In preparation for construction, companies, such as Wamda, to the bank’s MedMiles Program. that ties the Waterfront District
out the center are fed from up to with positive results, saving en- activity progresses on marine Vinelab, and Procomix. Com- BankMed will offer cardholders and the Traditional City Center
32 sources, including Apple TV, ergy and money while protecting works related to the eastern pany management is in talks additional miles for each purchase together, is in the detailed design
touch panels, and iPads based the environment through lower perimeter of the reclaimed land with Oasis500, an Amman- made at participating Beirut phase. With slight changes to the
on Creston’s DigitalMedia (US). CO2 emissions. These system area, the northern revetment. based business accelerator, and Souks outlets. original plan, phase one of the
The result is a flexible space for trials are collaborative efforts COWI (Denmark) has designed Flat6Labs, a Cairo-based acceler- project comprises a retail build-
meetings and presentations. with the system suppliers. Ulti- the northern revetment to protect ator, for the companies to estab- In the Hotel District, Damac ing, a triple-A office building, and
mately, all developments must the eastern limit of reclaimed lish operations in Cloud 5. Properties announces the an office building with a world-
be “green” from the design stage land from wave action and to completion of substructure class fitness club at ground, mez-
through to completion. demark the eastern edge of the and foundation works by MAN zanine, and first basement levels.
area as per Master Plan require- Enterprises and launches the The buildings are of podium
ments. It consists of a concrete construction of Damac Tower in height with bridges connecting
crown wall founded on structural collaboration with Versace Home their suspended rooftop gardens.
fill and protected by rocks and for interior design.
accropodes. Dredging is required
underneath the structural fill to Nearby, construction begins
rule out the possibility of lique- on Beirut Terraces. Designed
faction from seismic activity. The by Herzog and de Meuron
northern revetment extends from (Switzerland) with Khatib &
the end of the caisson line to the Alami and an interior by Vincent
! — 15

root of the breakwater for the Van Duysen (Belgium), the


marina. building’s multilayered approach
14

offers living spaces of lofty heights


and diverse spatial configurations,
orientations, and dimensions,
creating a kind of vertical village.

Communication Design Awards The 2009 Annual Best Digital Media Installation At a trade-related Planet Discovery In collaboration with the French
Report “Beirut City Center” receives the German De- exhibition in Amsterdam this year, Integrated Systems Institute of Lebanon and Universcience in Paris,
sign Council Gold Award, and the 2010 Annual Report Europe, Strong Corp wins the award for Best Digital Planet Discovery inaugurates a new exhibition titled
“City in Layers” receives the Red Dot Design Award: Media Installation 2012 in its category for the inte- “The Human Puzzle,” based on an exhibition at the
Best of the Best. As a result, the 2010 report begins grated audiovisual system design and installation at Palais de la Découverte in Paris.
touring world museums and exhibition centers. Solidere’s new Information Center.
Beirut Chants EFA In its fifth season, Beirut Chants
International Lighting Design Award Lighting Beirut Exhibition Center A series of youth work- becomes a proud member of the European Festivals
Beirut Architecture is one of 15 winners of the Inter- shops for children between the ages of 7 and 12 to Association. The EFA is a prestigious association com-

12
national Lighting Design Award and one of seven learn about art forms and styles and explore their prised of top international festivals. It is one of the
who earn an Award of Excellence during the 29th An- own creativity. oldest cultural networks in Europe, founded in
nual award ceremony from the International Associa- Geneva, Switzerland in 1952 as a joint initiative of the
tion of Lighting Designers held in Las Vegas, USA. Portal 9 A journal of stories and critical writing about eminent conductor Igor Markevitch and the great
urbanism and the city is launched in the effort to con- philosopher Denis de Rougemont.
GeoSpatial World Excellence Award Solidere and tinually support cultural platforms and interact with
Khatib & Alami win the GeoSpatial World Excellence the intellectual and academic communities. Portal 9, Fête de la Musique Award Launched 12 years ago
Award in the category of Application of Geospatial a semiannual Arabic and English journal, blends cre- and organized in collaboration with the French Embassy
Technology in Facilities Information Systems, for the ative writing, photography, and personal essays with and the Ministry of Culture, Fête de la Musique wins the
design, development, and implementation of the academic scholarship, perceptive journalism, and cul- Best Music Festival Nightlife Awards 2012, Reader’s
Beirut Souks Project. tural critique. Choice, TimeOut Beirut.
Corporate Infrastructure Development Restoration Archeology Landscape

Based on its accomplishments to International marine structure Beirut Souks celebrates the offi- Nearby, works on the Grand Zaitunay Bay inaugurates its The Maghen Abraham Syna- Proposals are solicited from On Uruguay Street, Imad
date, Solidere consolidates its fi- consultancy firm COWI (Den- cial opening of the Jewelry Théâtre are delayed until the quayside restaurant strip. Serv- gogue joins 17 other places of museologists and exhibition Gemayel Architects designs a
nancial and operational poten- mark) presents a preliminary de- Souks with its glittering shops. Landmark of Beirut project nears iced by valet parking and a park- worship – mosques, churches, designers for the 1,345 sq m U-shaped pedestrian area sur-
tial and embarks on a new sign for the Eastern Marina, Planet Discovery, the children’s completion. ing facility underneath the and shrines – that have been re- Phoenico-Persian Quarter site rounding a restored building
development program that which gains approval from the science museum (previously lo- Corniche Road, and also accessi- stored to exhibit their architec- museum in Beirut Souks. The adjacent to the Samir Kassir
spans the coming five years. Council for Development and cated next to the Starco Center), International architectural design ble from seven pedestrian points tural beauty and historical museum houses the foundations Garden; the space takes its
The program concentrates on Reconstruction on the condition reopens in Souk Ayass. The competitions are launched for the along the Corniche Road, Zaitu- significance. Together with the of a residential quarter from the inspiration from the keys of a
the completion of infrastructure that it be tested in a 3D model to Venue, a multipurpose space, mixed-use development on Patri- nay Bay welcomes more than newly developed Mohamad Al late 6th century BC where mer- piano. Relatively narrow in
works and the development of meet wave and stability criteria. begins to host exhibitions and arch Hoyek Street in the Serail 3,000 visitors per day in the first Amin Mosque, they attest to the chants resided and engaged in width, the plaza is dedicated to
major components intended as special events. Corridor and the Triple-A office six months after opening. The spiritual value of central Beirut. maritime trade. Under the direc- open-air seating and pedestrian
poles of attraction in the Water- The 400-space parking garage building in the Hotel District. development’s rich culinary tion and supervision of the Di- activity as extensions of the
front District, such as the East- underneath the Corniche Road, In Wadi Abou Jamil, several scene consists of 17 restaurants rectorate General of Antiquities, ground-level commercial spaces
ern Marina, as well as the land- undertaken on behalf of the developments reach completion and cafes, providing a new en- which has just completed the leased to pubs and restaurants.
scaping of the Corniche prome- State, is open and serving the while others are in their finish- tertainment destination and cre- site’s preservation, the aim is to Uruguay Street and the plaza
nade and the seaside city park. new, adjacent Zaitunay Bay ing stages. Together they give ating numerous employment highlight the archeology by cre- quickly become a hub of after-
In terms of real estate develop- quayside restaurant strip. Two shape to the hillside sector that opportunities. Retail outlets, a ating a multisensory, interactive work activity and nightlife.
ment, the program spans the other parking facilities are under will soon join Saifi as another water sport center, and an art experience.
planning and design of several study in the Waterfront District: low-rise, residential neighbor- workshop complement the din- Two other spaces are inaugu-
key projects of different land- a second lot beneath the Cor- hood based on the Lebanese ing experience and turn the rated around the same time:
uses that complement existing niche Road and a lot beneath vernacular tradition, with narrow promenade into a family- Zeytouneh Square, designed
ones, with particular focus on the planned waterfront city park. streets, tight sightlines, and cul- friendly space. by Gustafson Porter (US/UK) as
enhancing the social and cultural de-sacs that encourage slow part of the Shoreline Walk, and
dimensions in the city center. Following the expansion of the driving. the Gebran Tueni Memorial,
Lebanese international internet designed by Vladimir Djurovic
links, bandwidth capacity allot- Excavations for the Landmark of Landscape Architecture as a space
ted by the Ministry of Telecom- Beirut project in the Ghalghoul for tranquility and reflection.
munications is increased, sector, designed by Jean Nouvel
offering city center tenants the (France), begin and on-site
highest internet speeds available archeological finds are studied
in the country. and documented before con-
struction starts.

The multiuse development will


include a 27-floor hotel and
apartment tower overlooking
Riad El Solh Square, two 10- and
12-floor buildings containing
! — 17

furnished apartments, commer-


cial space, a health club and spa,
16

and a cinema entertainment


complex at basement levels. The
design takes its inspiration from
the daily social life of the city
and includes pedestrian walk-
ways to reflect a continuity of
movement.

Lighting Beirut Architecture Lighting Beirut Architec-


ture is launched as a new architectural lighting concept
using the principle of image projection. The aim is to il-
luminate selected heritage and contemporary buildings
in Beirut city center’s historic core and permanently illu-
minate the city center’s architectural nightscape. The
project is developed with Light Cibles (France), DIAP
(France), Mamari Frères, and Lampo (Italy).
iF Communication Design Award Solidere’s 2009
Annual Report “Beirut City Center” is declared an iF
Communication Design Award winner.

World Architecture Festival The Shoreline Walk


design by Gustafson Porter (US/UK) is shortlisted at
the World Architecture Festival in the category of Fu-
ture Landscape Projects.
11
Corporate Infrastructure Development Archeology Landscape

Solidere reiterates its develop- Solidere is invited to join a net- Moving toward developing the Following the commencement of The concept for Martyrs’ These afford a direct pedestrian Two site-specific archeological Limited design competitions
ment strategy to focus on creat- work of urban operators includ- reclaimed land, an agreement is business for several food and Square Axis is further devel- link, beneath Cadmous Street, to museums reach completion. The are held for the redesign of the
ing shareholder value by ing city mayors and public and signed with Laceco Architects & beverage outlets on the famed oped in a detailed urban design the planned City History Mu- first is the Crypto Portico Mu- Roman Baths Garden and Omar
investing in its land bank, in- private urban development Engineers for the detailed design Ajami Square, as well as numer- study by Renzo Piano Building seum site, Ancient Canaanite seum beneath the Parliamentary Daouk Square, as well as the ini-
creasing recurrent income, diver- agencies, which together repre- of underground infrastructure ous openings of world famous Workshop (Italy/France), sup- Tell, and the waterfront beyond. Office Building, featuring part of tial design for Khan Antoun Bey
sifying into complementary sent a group of cities around the and road asphalting in the Wa- boutiques, Beirut Souks Core ported by transport planning the site of the Roman Forum. An Square in the northern part of
business lines, and expanding its Mediterranean. Initiated by the terfront District. Wilmotte & celebrates its official inaugura- consultant Arup (UK). The pre- While studies are conducted on omphalos (a round granite block Beirut Souks and the 80,000 sq m
presence outside Lebanon. The Med-Cities program in Mar- Associés (France) is selected to tion with four days of spectacu- liminary plans are submitted to the Martyrs’ Square area, a new representing the navel or exact waterfront city park. Gillespies
objective is to shape the market seilles and funded by the Euro- design street furniture, while lar performances and events. The the Council for Development development rises at the north- center of the city from which all (UK) presents the winning de-
and control the supply and qual- pean Investment Bank (EIB), the Chris Blandford Associates (UK) Souks Core reaches near maxi- and Reconstruction, which is western point of the axis. The distances were measured) stands sign for the first two locations,
ity of new development in spe- World Bank, and Caisse des is asked to take charge of land- mum tenancy, and the newly preparing the build-operate- CMA-CGM Merit Corporation before a series of blind arches while PROAP (Portugal) wins the
cific key sectors. This includes Dépots (France), the network scaped features, including side- opened Jewelry Souk is more transfer bid for the Martyrs’ headquarters, designed by Nabil that once lined the street, com- third. No winner is announced
detailed planning and more di- aims to develop a set of shared walks, shared surface and than 50 percent occupied. Mar- Square underground parking fa- Gholam Architects, exemplifies a plete with its original checkered for the waterfront city park.
rect control of temporary uses, guidelines for sustainable urban pedestrian streets, medians, and keting campaigns launch and a cility in cooperation with its con- response to location and func- black-and-white tiled pattern.
which will likely encompass development in a period of cli- traffic islands. number of activities are organ- sultant, Khatib & Alami. tion; like a ship anchored at port, Due to its high-security location, With the Beirut Souks newly
most activities in the Waterfront mate change. Within the net- ized to promote the Souks as an it reflects the maritime world. the museum is not yet open to opened, Ajami Square begins
District for the next five to ten work, the Waterfront District is With increased investor interest international shopping, cultural, Renzo Piano’s proposal recog- the public. to bustle with activity, hosting a
years, serving as testing ground presented as a model for sus- in land in the Waterfront District, and social venue. nizes the national value of this Within the Waterfront District number of restaurants, a weekly
and incubators for new uses that tainable urban development and Ove Arup International (UK) public open space, noting its development program, a tempo- The second institution is the farmers’ market, and several hol-
may emerge in time as perma- a test bed for environmentally undertakes a study on multi- The few land plots still available great importance in relation to rary usage strategy is initiated to Crypt Museum, now open to iday festivities.
nent features of the city center. sound urban futures. modal transportation require- in Saifi undergo concept design. the surrounding built environ- focus on a pedestrian spine link- the public on the site of the for-
ments for the district and One such area, located at Saifi’s ment. The proposal frames the ing the existing city center and mer Byzantine church beneath
Beirut Hospitality Company A strategy is being developed to delivers an area-wide trans- northern end, welcomes the square as a natural space where Souks to the terraced waterfront St. George Greek-Orthodox
Holding is established with the complement the proposed land portation strategy. The study launch of the District //S project. the city expresses its civic life Corniche promenades. This Cathedral on Nejmeh Square.
goal of creating restaurants that uses and provide pedestrian takes into account environmen- Designed by Allies and Morrison and urbanity manifests the con- spine is now open for walking, The museum showcases eight
complement and support real connectivity between key areas tal considerations and provides Architects (US) with R & K Con- junction of shared experience. It jogging, and cycling leading layers of archeological remains
estate development and enhance in the Traditional City Center consultation on suitable infra- sultants, it is planned as a 16- also recognizes the role of Mar- north down to the waterfront including six churches from the
property value, and therefore en- and Waterfront District. This will structural provisions. building, open-gated, pedestrian- tyrs’ Square in particular as a promenade. Hellenistic period to the present.
hance vibrancy in the city center. be achieved by adding green cor- friendly community that draws meeting place where diversity
ridors that run north to the Cor- The Council of Ministers re- people to its outdoor piazzas, becomes an opportunity rather Renzo Piano Building Workshop Near the Ring Road and the Ar-
niche, east to the Beirut Port’s solves to tender the Martyrs’ terraces, and arcaded retail than a problem, where different is asked to study the “Pinwheel menian Catholic Church, exca-
first basin and future Eastern Square parking facility as a stretch through meandering al- routes merge into the enduring Project,” a strategically located vations expose the remains of an
Marina, and northeast toward build-operate-transfer project, leyways. The project will provide life and spirit of Beirut, bringing site in the Waterfront District enclosure wall and tower built in
the view of the mountains. while Beirut Municipality de- a northern extension to Saifi Vil- a sense of belonging to the city. near the Beirut Port’s first basin, the early years of the Roman
cides to cancel the planned lage, following the same design north of the historic Foch-Al- colony of Berytus. They are set to
parking lot underneath Riad El guidelines but in a contemporary The scheme conceives of Mar- lenby area and its modern exten- become part of the landscaped
Solh Square due to archeological architectural expression. tyrs’ Square as a sequence of sion. The site is defined by four surroundings of the residential
18 — 19

considerations. spaces that transition from the main arteries forming a pin- project currently under develop-
The concept design for the city to the sea. It starts at the wheel and is intended to be a ment at the site.
A special software for Digital Grand Théâtre is reviewed with “gateway” beneath the Ring landmark gateway to the new
Asset Management is introduced Roger Stirk Harbour + Partners Road, opening out at the south- district.
to track, archive, and control the (UK) and submitted to the Di- ern end of the square and mov-
use of graphic documents and rectorate General of Urban Plan- ing north past the famous
photographs within the relevant ning. The design proposes the martyrs’ monument, then down,
divisions of the Company. The theatre as a centerpiece of the at the northern end of the
physical network continuously city for performances and public square to the Petit Serail and
undertakes upgrades to supply use, including a ballroom. The Hellenistic remains.
connectivity to new buildings, in- hotel proposal focuses on unit-
stalling the latest switches to up- ing the site with its neighboring
grade its core network functions. historic buildings (to the north
and east) and contemporary ad-
ditions (to the south and west).
The historic arcaded street front
remains occupied by retail units.

Beirut Exhibition Center With the aim of enhancing


the city center as a cultural destination, a 1,200 sq m
space is dedicated to promoting and developing
greater recognition and appreciation of contemporary
art throughout Beirut and the greater region. The non-
profit space provides a collaborative environment for
art museums, galleries, artist collectives, and cultural
institutions. Exhibitions are drawn from artists’ proj-
ects created on-site, collaborations among galleries,
traveling museum shows, and a full calendar of public
art programs. The structure’s design by L.E.FT (US)
embodies the building’s purpose as the mirror facade
reflects the continuously changing landscape of the
Waterfront District and turns the city into a work of art.
Information Center A new, state-of-the-art Infor-
mation Center is under design. It will be located in the
office building in Beirut Souks. In the meantime, the
city center model is moved to a temporary location
near the central square of the Jewelry Souk. 10
Corporate Infrastructure Development Archeology Landscape

The Waterfront District elicits A mandated low-carbon strategy Beirut Municipality reexamines Beirut Souks Core is in a soft Following initial attempts to The rehabilitation of Martyrs’ In the vicinity of Riad El Solh Vladimir Djurovic Landscape Ar-
strong investor interest with is implemented throughout the ways to build the Martyrs’ opening phase with about 149 transform the 1930s Grand Square Axis is of strategic im- Square, burials spanning the chitecture delivers the first of the
land sales totaling 198,735 sq m Waterfront District, which will be Square parking facility, either by (140 retail, 8 food and beverage, Théâtre des Mille et Une Nuits portance for the completion of Omayyad and Ottoman periods Shoreline Walk spaces, Mina El
of built-up area (BUA) to date. planned, designed, and built as a funding it internally, negotiating and 1 food hall) of the 225 out- into a significant, modern-day the Traditional City Center. confirm that the site became a Hosn Square between Platinum
The real estate development is model project of sustainable a build-operate-transfer (BOT) lets occupied or nearing comple- theatre, it is concluded that the Awaiting the construction of the cemetery after the city wall de- and Beirut towers, following
planned to reach an aggregate urban development. The guide- contract with Solidere, or tender- tion. With the help of several endeavor will not be possible parking facility underneath the fined an open area just outside Gustafson Porter’s (US/UK) con-
1.7 million sq m. In-house urban lines, customized to suit Beirut’s ing it out on a BOT basis. It also professional advisors, a specific without partial demolition fol- square, the project is revived. A the Bab Dirke and Bab Yaqoub cept design for the corridor.
studies are in progress on build- climate and environment, in- approves the Landmark of Beirut tenant-mix approach is devel- lowed by faithful reconstruction new urban design study is un- city gates. The corner of a large
ing massing, land use, phasing, clude applying renewable energy project proposal to execute the oped to strategically place exclu- of the street facade. Several site dertaken with leading architec- temple platform is exposed The sloping Rafic Hariri Sculp-
and land sales strategies for the technologies, recycling grey parking lot under Riad El Solh sive concept and stand-alone constraints hamper the possibil- tural firm Renzo Piano Building below the cemetery. Subject to tural Garden near the Grand
district. Permanent development water, and adhering to other so- Square on a BOT basis. boutiques and restaurants ity of obtaining a quality per- Workshop (Italy/France) to in- agreement with the Directorate Serail, redesigned by Vladimir
is set to start around the periph- phisticated environmental regu- among flagship and other traf- formance space: the small size corporate detailed guidelines for General of Antiquities, some of Djurovic Landscape Architecture,
ery of the street grid for the lations. These efforts are All four underground levels in fic-generating stores. of the auditorium and stage, the building massing and land use these vestiges will be incorpo- is executed by Target. A sculpture
planned Eastern Marina. The intended to deliver a combina- the southern part of the Beirut shape and volume of the audito- around the square. A more rated into the various construc- by Meguerditch Mazmanian de-
central blocks will be developed tion of low-carbon output and Souks parking facility are opera- Storefront design specifications rium shell, the lack of backstage human-scale vision emerges to tion projects. picts the late prime minister
gradually, replacing temporary substantial reductions in energy tional with about 2,100 spaces and guidelines are introduced to facilities, poor sight-lines, and soften the square’s memorial walking along the water feature.
uses to house a convention cen- demand. for public use; the northern part provide tenants with clear direc- poor acoustics. and ceremonial character and,
ter, offices, hotels, serviced is reserved for companies work- tion for interior construction with its new green corridor open
apartments, and mixed-use sup- ing in the city center. Solidere works, leading to harmony and While the structure may never to the sea, help recover its role as
port facilities for the special awards the works for a 400- consistency. Site supervisory vis- serve as a successful modern Beirut’s most important public
business district. space parking lot underneath its are conducted on a regular theatre, Solidere is determined space and the center of city life.
the Corniche to Geneco, and basis for quality control. Shop to restore it in order to preserve
construction begins. fitting takes place in coordina- and honor the memory of the Meanwhile, Bab El Saray devel-
tion with architectural consult- Grand Théâtre. Following a lim- opment is inaugurated in the
ant Samir Khairallah & Partners. ited design competition among square’s northwestern section
four international architecture as the Le Gray Hotel, exuding
Even as it follows the ancient firms – Rogers Stirk Harbour + contemporary style while blend-
Roman street grid, the modern Partners (UK), Anouska Hempel ing seamlessly with its historic
Beirut Souks is suitable to a con- Design (UK), Moatti et Rivière surroundings.
temporary lifestyle. The land- (France), and Architecture Stu-
scaping integrates a number of dio (France) – Roger Stirk Har- The proposed Formula One
archeological features and his- bour + Partners emerges as inner-city circuit is abandoned
torical squares and monuments, winner and will collaborate with for security reasons, freeing both
including the sunken courtyard runner-up Anouska Hempel De- the waterfront city park and the
of the medieval wall and moat sign on space planning and inte- street network of the Water-
below Souk Al Jamil, the un- rior design. front District from many oner-
earthed late Phoenico-Persian ous constraints.
! — 21

harborside settlement under The alignment of new develop-


Souk Ayyas, the Zawiyat Ibn ments is almost complete on the After a fast-track approach ac-
20

Arraq Shrine, and the restored Serail Corridor’s main avenue, celerates construction of the
mosaics from Byzantine shops in Francois El Hajj Street, with de- yacht club’s underground struc-
Souk Al Franj. These are further velopments like the Palladium ture, works are completed in the
enhanced by commissioned mixed-use building, designed by development around Beirut Ma-
contemporary public artwork Dash Architects (UK) and R & K rina. Hourie–Profond continues
such as the “Visitor” on Sayyour Consultants; 45 Park Avenue, the dewatering process until the
Square by Arne Quinze (Bel- designed by Laceco; Luna One, beginning of superstructure con-
gium) and sculptures by Xavier designed by Diyar Consultants; struction, negotiated with the
Corbero (Spain) on Bab Idriss and Park Palace, designed by firm to commence midyear,
Square representing Roman fig- Fouad Meneem. while enabling and ground sta-
ures on the way to the Hippo- bilization works on the quayside
drome. strip reach completion. The de-
velopment is marketed and
branded as Zaitunay Bay, and
landscape concept and design is
awarded to Vladimir Djurovic
Landscape Architecture with de-

09
tailing and supervision by CBA
Group.

Beirut World Book Capital Lebanon’s capital city Capital Issues Award Solidere received the Capital
was designated UNESCO World Book Capital 2009. In Issues Award in the category of Architectural Excel-
that regard, several events celebrating books were held lence for Beirut Souks.
around the city center.
Infrastructure Development

In addition to the internet and New developments inspired by The Ministry of Culture an- In developing the lot adjacent to
VPN services, Broadband Net- the surrounding architectural nounces its intention to develop the Souks in the Serail Corridor
work launches its IPTV service styles complete the urban fabric a House of Arts and Culture, a on Patriarch Hoyek Street, the
for Beirut city center residents. of the Conservation Area, space devoted to education, per- initial vision of creating a fifth
This project offers greater value which is predominantly home to formance, fine arts, culture, and retail anchor has evolved in
to customers by providing seam- restored buildings. Among them interactive and multidisciplinary favor of combining hospitality,
less delivery of high-quality are projects such as Fochville exchange. Located near the Ring retail, and entertainment, thus
video, the most promising av- residential development, de- Road, the site will become State complementing rather than
enue for value-added services. signed by R & K Consultants, property as part of a land swap competing with Beirut Souks.
and the Municipality Annex, de- with Solidere. The ministry com- The program envisages a bou-
Mores (Lebanon) is appointed signed by Nabil Azar. The Con- missions Gaia-Heritage to de- tique hotel, an exclusive spa, and
environmental consultant for re- servation Area represents the velop a brief for the House, along adjoining retail. International ar-
mediation and treatment and epitome of urban rejuvenation. with cultural and educational ob- chitects are preselected to partic-
tasked with monitoring the gen- jectives, an architectural program, ipate in a design competition. A
eration of landfill gas from back- and a communications strategy. retail strategy study is conducted
filled materials through Following an open international by MXD Consultants (Canada)
boreholes in the park area. Land architectural design competition, to guide configuration concepts
treatment and reclamation are the project design is awarded to related to the boutique hotel, the
complete, and the Waterfront Alberto Catalano (Italy). The street, and Beirut Souks. Talks
District is ready for infrastructure project receives funding from a with international boutique
works to prepare the land for fu- grant by the Sultanate of Oman hotel operators begin.
ture development. to the Ministry of Culture.
In the nearby Hotel District, a
Triple-A, multi-tenancy office
building is in the planning stage.
The office of Jones Lang LaSalle
(US) undertakes a market re-
search and development advi-
sory study.
! — 23
22

08
Starch Rabih Kayrouz and Tala Hajjar in collaboration Beirut City Center Larry McPherson’s photographic Beirut 1991 (2003) A photography book by Gabriele
with Solidere found Starch, a non-profit organization documentary of the downtown reconstruction docu- Basilico is published as part of a project dedicated to
that helps launch emerging Lebanese fashion design- ments the transition from war-torn capital to refined the memory of the Beirut war. The internationally
ers. Four to six young designers are selected each year city center. The book showcases archeological sites renowned, award-winning Italian urban photographer
and guided through the process of developing and transformed into public areas, meticulously restored reflects upon the destruction of a city and the blue-
then promoting their collections (communication, Ottoman and French architecture, gardens, and seam- print of its future.
marketing, branding, and press). These collections are lessly integrated new construction, conveying both the
then displayed for one year at the Starch boutique in practical and symbolic importance of building again.
Saifi Village. Throughout the year, the designers also
have the chance to participate in design-related work-
shops, seminars, and collaborations.
Rania Sassine In 2007, Solidere established Solidere International to respond to How can cross-generational learning benefit urban planning and
the demand from governments, municipalities, landowners, and design? What does each generation bring to the project?
on Building the Solidere Brand investors seeking to emulate the accomplishments of the Com-
and Learning across Generations pany in Beirut city center in their own cities. What elements of Cross-generational learning is quite important. It ensures that expe-
the project elicited the greatest interest and demand? rience and ideas are transmitted between the generations just as it
Rania Sassine holds a Master's in Urbanism from lessens the negative repercussions of competition between peers.
La Sapienza, Università di Roma, Italy, and a Mas- In undertaking the reconstruction and development of the city center, One cannot invent the wheel every time. Learning is a process that
ters in Architecture from the Academie Libanaise Solidere has had the responsibility of understanding the area’s history accumulates through the generations.
des Beaux-Arts. She joined Solidere International and geography and establishing its future position in the region – The best mentors I’ve ever had are those who taught me
in 2008 soon after its inception and is currently the understanding its surroundings and integrating it within them. That not how to draw but to open my eyes to what is around me, who
head of the Urban Design and Master Plan Unit. is what the company has gained a large amount of experience in – this changed the way I perceive space, challenged me to conceive of mas-
is the expertise that Solidere is exporting outside the city center today. ter planning not as a job but as a vocation that you carry with you
Solidere International is leveraging Solidere’s experience in every time you step outside and walk through the city.
creating“Places for Life.”These are urban environments, primarily Architectural and planning careers involve a long process
mixed-use in nature, that are viable and sustainable over time. The of learning and practice. Although more in terms of experience than
success of any urban development depends on how it prioritizes knowhow is transmitted from the older generations to the younger
basic human and social needs as core principles and adapts planning ones, the latter always brings in fresh ideas and new outlooks, which
and architectural design to a particular context. when intertwined with experience generate amazing results in the
built environment.
How do you as a planner conceive of the relationship that com-
munities create with urban space?

An urban environment, in the words of Yona Friedman, a famous


French architect of the 1950s and 1960s, is about living, working,
recreation, education, and culture. Before you begin designing the
details, you have to plan the greater scheme. You have to study the
urban site’s location and accessibility. Then, a development strategy
is set: the type of development and who it caters to. So there is the
question of lifestyle as well as the social and physical aspects of the
urban environment. In that regard, urban planning must integrate
daily, monthly, and yearly activities in its land use strategy. Solidere
has an extensive multidisciplinary team and consults with experts
when needed, and is thus able to cater to these complexities, to the
layers of human interaction with the space.

Can you give us a personal example of how a relationship grows


with an urban environment? How did your relationship with
Beirut city center evolve?
! — 25

I belong to the generation that was born at the start of the Lebanese
war. I basically had no direct relationship with the city center before
24

the mid 1990s other than knowing that it was destroyed and hearing
the stories that my parents told about it. With the many chapters of
the war behind me, I began building my own story with the place,
forging new ties, first while I was pursuing my studies in architecture
and later on when I started working. The way the city center was
planned helped the familiarity grow. The variety of uses incorporated
into its planning attracted me to the area.

How has Solidere translated the expertise it has gained in city


center rejuvenation to the development of other real estate proj-
ects around the region?

There are certain principles that are implemented in all our projects,
but they are not physically the same. For example, in all urban envi-
ronments there must be a main street where you have certain activi-
ties, including an open space and cafes. In one environment, it could
be made up of heritage buildings and arcaded frontages; in another,
its materials are glass and steel.
In an urban project in Saudi Arabia, there must be a large
retail component, but it cannot look and feel like Beirut Souks in
Lebanon. Another example would be the interpretation of gathering
places. In western societies, it usually is a large axial, open square be-
cause they have such wet winters, and the minute the sun comes out
the people tend to go outside. In warmer climates, such as in the
Gulf countries, people gather in inner courtyards with shaded gal-
leries because the sun is harsh almost all year around. So climate,
culture, and architecture are all interrelated.
Corporate Infrastructure Development Landscape

Following its success in Beirut, The Beirut Municipality starts to Construction begins on develop- Olivier Vidal (France) is commis-
Solidere receives requests from subcontract the operation and ments in the Foch-Allenby re- sioned to design the Bab Idriss
governments, municipalities, maintenance of works handed gion of the Conservation Area, Square and incorporate sculp-
landowners, and investors over by Solidere, which contin- including Foch 126, designed by tures by Xavier Corbero (Spain)
around the world to help them ues to supervise and control the Nabil Gholam Architects; Foch evoking figures on their way to
emulate the Company’s accom- quality of work done by the con- residence, by Batimat Architects; the Hippodrome. The site stands
plishments in Beirut city center. tractors and subcontractors. Fochville, by R & K Consultants; on the street that leads to the re-
After amending its bylaws, the and Starway, by Nachaat mains of the Roman racecourse
Company establishes Solidere Implementation of the Broad- Owaida. gates.
International (SI) as a limited band Network (BBN) is com-
company in shares under the plete. The pilot project begins More projects launch in Saifi,
law of Dubai International Fi- upon receipt of the bandwidth including both restoration and
nancial Center (DIFC), with a from the Ministry of Telecommu- new developments. Among
paid capital of US$700 million; nications for testing. them are Saifi Khan, restored in
Solidere owns 39 percent of SI. accordance with Elias Issa’s de-
The company begins to identify Under a unified communication sign; Saifi Village Two, designed
projects in the Middle East, network, data (internet) and by Nabil Gholam Architects; the
Africa, and around the Mediter- video (TV) is now provided, op- Selwan building, designed by
ranean Basin where it can create erated, and monitored through Nabil Azar; and Al Mashrek
urban destinations and real es- the Network Operation Center Insurance Company, also by
tate developments that form vi- (NOC), which hosts a data cen- Nabil Azar.
able communities. ter, call center (IPCC), and other
equipment and servers for the Berytus Parks, designed by Pierre
various services. Beirut city cen- El Khoury Architects, is inaugu-
ter thus transforms into an rated in the Serail Corridor on
around-the-clock IT zone capa- Francois El Hajj Street, along
ble of attracting multinational with Two Park Avenue, designed
companies and other residents by Samir Khairallah & Partners,
who will benefit from the avail- and other new developments.
ability of multimedia and broad-
band communication services.

All land reclamation, including


excavations, processing of the
materials, and backfilling,
reaches completion. The sorted
plastic stockpile is successfully
! — 27

relocated to an abandoned
quarry site outside Beirut in ac-
26

cordance with permits issued by


the relevant public authorities
and following specifications
from the Ministry of the Envi-
ronment, which fully supervises
and monitors the backfilling of
sorted plastics into the quarry.

Beirut Chants A festival of sacred music that com-


bines spirituality, culture, and history is launched as an
annual end-of-year event. The music performed draws
primarily on spiritual and ethnic musical traditions,
mainly addressing the Nativity. The festival’s concerts
are held in the churches of Beirut city center, presenting
a communal activity in spaces of history and beauty.
Beirut Jazz Festival After its 2004 inauguration fol-
lowed by a three-year intermission, the Beirut Jazz
Festival makes its comeback in the public open space
of Ajami Square in Beirut Souks, which is still under
construction. The Jazz Festival is planned as an annual
three-day concert event hosting local and interna-
tional artists.
GIS Award To acknowledge its outstanding use of
GIS technology, Solidere receives the Special Achieve-
ment in GIS Award from ESRI, world leader in GIS
software and applications.

Aga Khan Award Samir Kassir Square, designed by


Vladimir Djurovic Landscape Architecture, wins the
Aga Khan Award for Architecture.
07
Corporate Infrastructure Development Archeology

Solidere Management Serv- As part of property manage- An agreement is signed with Or- Several amendments to the In Wadi Abou Jamil, the own- The land use strategy is under- Excavations in the Wadi Abou
ices (SMS), a 100 percent owned ment, a high level of control is ange, a member of the France Master Plan are approved by de- ers of a 1911 neo-gothic palace, taken in-house, with Gaia-Her- Jamil area yield vestiges of the
subsidiary, is established to pro- maintained over the implemen- Telecom Group, to build and op- cree in response to more de- originally built as the home of a itage consulting on cultural ancient Roman Hippodrome,
vide construction management tation of safety rules and regula- erate a full IP network. The new tailed urban and traffic studies, Lebanese politician and art col- strategy. It envisages a cultural a large club building used by
and a broad scope of services as- tions as well as the approval of system will use advanced tele- new archeological discoveries, lector, restore the building into axis running through Martyrs’ participants in the chariot races.
sociated with real estate develop- signage and storefront designs. com technology based on a necessities related to the distri- the Robert Mouawad Private Square and linking Saifi Village’s Archeologists uncover two parts
ment: program definition, Solidere continues to offer its fiber-optic backbone with dual bution of public and private do- Museum. The new institution Quartier des Arts with the Dome of the racetrack’s median, or
marketing, design control, client knowhow and services to third- connections to each building in main, and other reasons related houses valuable objects from and the planned Rafic Hariri Li- spina. Subject to agreement with
representation, financial manage- party owners, entering into Beirut city center. to specific developments and to oriental and occidental cultures, brary, City History Museum, the Directorate General of An-
ment, sales, and post-construction agreements through its sub- land swaps between the State as well as a collection of rare Hariri Conference Center, and tiquities, these artifacts will be
operation and maintenance. sidiary Solidere Management To expedite completion of the and Solidere. books. other cultural facilities. incorporated into Wadi Abou
Services for the marketing, man- land treatment and reclama- Jamil Square.
In preparation for the future agement, and maintenance of tion, Hornagold & Hills Interna- Amendments to the detailed Bernard Khoury is commis- Steven Holl Architects (US)
development of the Waterfront their properties. tional–H2i (UK) is appointed as master plan for the Ghalghoul sioned to prepare an alternative teams up with Nabil Gholam Ar-
District as a comprehensive construction manager, and the Sector are ratified by the Council concept design to Jerde’s scheme chitects to complete the detailed
mixed-use area, Beirut city cen- project is split into operations of Ministers. They include the for the mixed-use development design of development around
ter is marketed and promoted as packages awarded to three transposition of a tower south of on Patriarch Hoyek Street in the Beirut Marina, while Dada &
a corporate international busi- separate Lebanese contractors: Amir Amin Square to the site of Serail Corridor. The architect Associates is commissioned to
ness center, based on the city’s Société Contemporaine de a new development north of the adopts a radically different ap- undertake the interior design.
lifestyle assets and skilled human Développement, Assaf & Coex, garden, called the Landmark of proach, creating a landmark Beirut Waterfront Development
resources. Indeed, Beirut’s com- and Alfarah Co. Beirut. The decree approves the building in pyramid form that also launches a design-and-
petitive edge lies in the qualities development concept designed spans across a central courtyard. build tender for the yacht club’s
of its people and services. by Jean Nouvel (France), grant- underground structural work
ing it specific exemptions from The Greek team prepares the and the construction of three
Beirut city center and Lebanese concept design for the under- basement floors. The commis-
construction regulations. These ground parking facility planned sioned contractor, the joint ven-
exemptions involve canceling beneath Martyrs’ Square. The de- ture Hourié–Profond, begins
street-wall controls, building sign will be used to relaunch the enabling works for the structure
height limits, modifying pedes- project on a build-operate-trans- based on a design endorsed by
trian passages, bypassing certain fer basis. Meanwhile, amend- Solétanche Bachy (France).
technical issues, and ignoring ments to the master plan for the
the requirement to provide land- Martyrs’ Square Axis are pre-
scaping on 50 percent of unbuilt pared. A cultural strategy is also
areas. initiated in coordination with
Gaia-Heritage to culminate in
the identification of a series of
cultural sites in the city center,
! — 29

including the Beirut City History


Museum.
28

Habitat II Istanbul Selected as one of the 100


Global Best Practices displayed at the United Na-
tions Conference on Human Settlements, the Beirut
city center resonstruction project was on exhibition
throughout the conference and became the focus of
international media.
Souk El Barghout In its seventh edition, the flea
market held on Martyrs’ Square featured a well-re-
ceived public auction of contemporary Lebanese
paintings. 06
Corporate Infrastructure Development Landscape

After an extraordinary Company In addition to the operation A decree is ratified to regulate Beirut Marina is fully opera- All lots for which designs were The Directorate General of On May 6, Martyrs’ Day, the Two projects reach completion
General Assembly meeting in and maintenance of infrastruc- the use of the municipal public tional in time for the start of its commissioned in Wadi Abou Urban Planning approves the winning concept for the Mar- in Wadi Abou Jamil: the open
1998 approved an amendment ture and public spaces until their domain for commercial pur- fourth season. Pending comple- Jamil are sold to third parties Grand Théâtre’s concept design tyrs’ Square Grand Axis is an- space near St. Elie Church with
to Article 4 of the Articles of In- delivery to the State, the Com- poses in accordance with a plan tion of the buildings surround- along with their respective resi- by Architecture Studio (France). nounced. It comes from a team a sculpture of Pope Jean-Paul II,
corporation to extend Solidere’s pany continually updates its site prepared by Solidere. Areas ad- ing the marina, temporary cabins dential concept designs. Solidere The architect’s concept envisions of four Greek associates: Ago- designed by Thibaud Urbanisme
duration from 25 years to 75 logistics services. In a program to joining Parliament and the are used for harbormaster and Management Services retains a boutique hotel with a rooftop rastidou, Babalou-Noukaki, et Paysage (France), and the
years, the Council of Ministers improve the city center’s image, deputies’ office building are kept public authorities’ activities (cus- the development management swimming pool, restaurants, and Ioannidou, and Noukakis, whose Wadi Abou Jamil Garden, de-
now ratifies a decision to cap the undertaken in collaboration with free of possible obstacles for se- toms, immigration, police, and of two properties: Noor Gar- bars with artistic performances. vision treats the Axis as a se- signed by Rafic El Khoury and
extension at 35 years starting participating property owners curity reasons. Elsewhere in the army intelligence). The works as- dens, designed by Porphyrios Shops are located at street level quence of four differentiated Partners. Among several land-
from the date of inception. and users, a number of services Conservation Area, restaurants signed to Groupe Camille Rayon Associates (UK), and Beirut below the arcades, as was the sections. An exhibition in the scaped areas now open to the
are implemented to supplement and cafes are allowed to use the (France) are complete, with all Square, designed by Giancarlo case before the building’s de- Dome showcases the 137 de- public is Samir Kassir Square,
Seeing a trend of increased seis- those provided by the Munici- adjacent sidewalk or pedestrian utilities – water, electricity, fire De Carlo (Italy). The remaining struction. signs submitted for competition designed by Vladimir Djurovic
mic activity around the globe, pality: surveillance security; areas provided the seating line, telecom/internet, and cable projects are Phoenix Develop- and includes a public forum to Landscape Architecture, with a
Solidere raises its benchmark door-to-door waste collection; arrangements do not block TV – connected and functional. ment and Stow Wadi, designed In the Hotel District, work discuss the top three designs life-sized sculpture of its name-
and establishes a criterion of 0.3 cleaning of the streets, side- building entrances. A four-meter by Porphyrios Associates (UK); commences on two new luxury with the public. sake journalist, writer, and
g acceleration for all new devel- walks, and street furniture; pest wide pedestrian passage will Wadi Grand Residence, designed residential developments, two teacher by Louis Debré (France).
opments, especially those built control; subterranean utilities; remain clear of outdoor furniture by Dar Al Omran–Bassem Bad- international hotels, and a New, residential developments
on reclaimed land. This up- maintenance of open spaces, along the center of each street. ran (Jordan); Wadi Hills, de- mixed-use building: Capital are initiated in the sector, includ-
graded standard is incorporated trees, and planters; and street Outdoor furniture used in the signed by Agence d’Architecture Plaza, designed by Machado and ing Beirut Gardens, designed by
into the Development Briefs. decoration during holidays. public domain must conform to Anthony Béchu (France); and Silvetti Associates (US); Garden Arata Isozaki (Japan) and Erga
Solidere’s specifications. the Courtyard, designed by View, designed by Nabil Gholam Group; Tower Plus One and Two,
Maha Nasrallah. Architects; the Grand Hyatt designed by Arquitectonica (US),
The Foch-Allenby Street private Hotel, designed by Michael also with Erga Group; and Beb
parking, a joint undertaking of All of these residential designs Graves (US) and Dar Al Han- Beirut, designed by Arquitecton-
common works initiated by call for aligned, cohesive facades dasah; the Rotana Hotel, de- ica (US) with Atelier des Archi-
Solidere and owners of other along the streets of the sector, signed by Architecture Studio tectes Anonymes.
lots nearby, is now operational. and most have central court- (France), selected among four
yards or gardens to offer a more competition entries; and Bemo The 2001 sector plan for the Wa-
With the implementation of intimate residential ambience. House, designed by Lo Mauro & terfront District receives official
broadband multimedia The traditional Lebanese house Reggiani Associati (Italy) and approval through a decree by the
telecommunications infrastruc- finds its expression in some of Raed Abillamah. Council of Ministers.
ture, the city center now has the the tripartite arched windows,
potential to become a media and loggias, and pitched roofs. Beirut Waterfront Development
communications hub, stimulat- s.a.l. commissions a market
ing Beirut’s rapid adaptation to Solidere initiates a development study from the restaurant con-
the new economy and globalized of its own (lot 800 Mina El sultation firm Ulysses (France)
world of the Information Age. Hosn), designed by Ayman San- in order to achieve an optimal
! — 31

ioura, combining the restoration mixture of restaurant types


of two twin Levantine houses and sizes, as well as to create
30

with an infill building in a simi- a typical rental agreement for


lar style. the development around
Beirut Marina’s quayside
establishments.

05
Memorial The nearly complete Mohamad Al Amin Middle Eastern City of the Future Beirut wins the
Mosque takes on a much deeper significance for the award for Best Human Resources, as one of the fDi
Lebanese people when Prime Minister Rafic Hariri is (Financial Times) Middle Eastern Cities of the Future
laid to rest there following his assassination. 2005/2006.

Skygate Under the authority of the civil aviation au- Garden of Forgiveness Designed by Gustafson
thorities, the Skygate helium balloon carries passen- Porter, Hadiqat As Samah is one of 23 projects dis-
gers to a height of 150 and 300 m for a 360-degree played at “Groundswell: Constructing the Contempo-
view of the city center and surroundings. rary Landscape,” an exhibition presented by the
Museum of Modern Art (MOMA), New York.
Infrastructure Development Landscape

After the handover of street Groupe Camille Rayon (France) The Conservation Area is al- Through the International Union At the southeastern edge of the Recent landscaping works
lighting, sewage, and storm completes the design of the most complete with a few devel- of Architects, Solidere organizes Axis, the City Center building include adding trees in Weygand
water networks to the State, the Beirut Marina equipment: pon- opments still underway. These the Martyrs’ Square Grand Axis or Dome, previously planned to and Allenby streets with Foch
Municipality takes charge of toons, utilities (water, power, include the Bank of Kuwait and of Beirut international urban de- house the Ministry of the Inte- Street to follow, upgrading trees
their operation and mainte- and telecom), ducting networks, the Arab World designed by ARC sign ideas competition to solicit rior as part of a property swap in the Hotel District and in Wadi
nance. However, Solidere still re- mooring bollards, and service Group in association with a new vision for this prime pub- with the Company, must be Abou Jamil, and upgrading the
tains control of the tunnels and bollards. An additional quay pro- Abdel-Wahed El Wakil (Egypt) lic space and its surrounding de- reconceived. Bernard Khoury open space next to Starco’s
the sewage pumping station, viding boaters with extra com- and the Radium office building, velopment, now open to the sea is commissioned to restore the northwestern corner.
carrying out damage repairs to fort in the case of strong winds is designed by R & K Consultants. in its extention from the Damas- building and its surrounding
street furniture and sending doc- ready for use. To avoid the accu- cus Road gateway to the Beirut spaces as a temporary center
umentation and claims to the mulation of odor in the marina, The underground, 2,500-space Port’s first basin. for the arts and culture, pending
Municipality. Groupe Camille Rayon has de- Beirut Souks parking lot is fully the site’s final development and
vised a flushing system to en- operational, and the detailed de- The competition brief requires land use.
Twenty-one vacant lots now hance the current by injecting sign for the Souks Core is com- candidates to integrate impor-
provide 3,100 parking spaces, fresh water and air. Finally, an plete. After obtaining a building tant archeological sites to the In the Waterfront District,
servicing an average of 10,000 intelligent system will cover the permit for the whole develop- north of the square into the de- Solidere enters a joint venture
customers per day, and the oper- functional aspects of the harbor- ment, the tendering is finalized sign, including the Ancient Tell agreement with Stow Waterfront
ational Beirut Souks under- master’s building, linking to all and Societe d’Entreprises A. R. area and the Beirut City History Development s.a.l. (Stow) to
ground parking facility activities to allow for automatic Hourie receives the construction Museum, for which the French develop the area around Beirut
contributes an additional 2,500 billing. contract for the South Souks. architect Michel Macary has al- Marina. Beirut Waterfront Devel-
spaces. Temporary car parks are ready undertaken a preliminary opment s.a.l. (BWD) is incorpo-
offered on empty lots in the Connections are installed for all In the Serail Corridor, the con- feasibility study. The competition rated in April, with 50 percent
eastern section of the Waterfront utilities: water, electricity, fire cept design for a new mixed-use incorporates urban design, shareholding for each of the two
District with free shuttle service line, telecom/internet, and cable project is commissioned to Jerde transport planning, and land- partners: Solidere contributes in
to the Traditional City Center. TV. Medium-voltage power re- Partnership (US) with MXD scape design components. kind 22,351 sq m of land with
quested from the Electricité du (Canada) as land use consult- about 20,000 sq m of built-up
Liban is distributed throughout ants. Located on Patriarch Hoyek At the intersection of the Axis area, and Stow contributes
the marina via five transformers, Street facing Beirut Souks, the and Weygand Street (Conserva- US$31.6 million. The design
with a 3,500 KVA generator pro- project is envisaged as an addi- tion Area) a new development is submitted by Steven Holl (US) is
viding 100 percent backup tional magnet to the area, offer- under construction, aptly named gradually amended to reflect the
power. ing pedestrian-accessible retail Bab El Saray after the medieval requirements of BWD and Solid-
and leisure uses on the lower city gate that once stood nearby. ere. High-Point Rendel (UK) is
levels and a selection of restau- The building is designed by Dash appointed construction manager.
rants, with a boutique hotel and Architects (UK) and Hani Murad.
nightclub on upper floors.

Martyrs’ Square, also known as


! — 33

the Bourj (tower) or Place des


Canons (Cannon Square), has
32

existed at this location for cen-


turies, evolving with the passage
of civilizations, trauma of war,
and impact of city growth and
social change.

Beirut Jazz Festival The first Beirut Jazz Festival,


scheduled over four nights as the musical highlight of
the year, is organized by Solidere in collaboration with
Radio One. Two stages flank the quayside of Beirut
Marina, surrounded by food and beverage kiosks in-
stalled for the occasion.
Beirut City Center Recovery Solidere publishes Beirut
City Center Recovery: The Foch-Allenby and Etoile Conser-
vation Area by Robert Saliba. Saliba’s volume highlights
the importance of the Conservation Area, which epito-
mizes the civic and business identity of Beirut city cen-
ter as both a national capital and a port.
04
Infrastructure Development Archeology Landscape

The design proposal for two The Embassy Complex has The Grand Théâtre undergoes In the Hotel District, Koetter, A strategic approach is devel- Gustafson Porter (US/UK) is
major road improvements re- now reached full occupancy. a technical study to evaluate the Kim and Associates (US) is com- oped to integrate archeological commissioned to design the
ceives approval from the Council Joining the Japanese and the best approach to restoration. missioned to undertake a further finds into the urban fabric and landscaping of the Hotel District
of Reconstruction and Develop- British embassies are the Aus- A distinctive feature of the urban design study to allow ad- landscaped spaces. These her- and Old Shoreline open spaces.
ment. Their finalization requires tralian, Norwegian, and Danish building is the carving on each ditional height to some towers. itage city layers are a significant These include a series of inter-
a Master Plan amendment to be embassies. At the same time, an column capital depicting a fruit, On completion and approval of cultural asset; their display and connected pedestrian areas and
issued in a decree by the Council agreement is signed with the vegetable, or grain native to a sector plan amendment, de- celebration are an important gardens along the city’s old
of Ministers. The first improve- Council for Development and Lebanon. The Grand Théâtre is sign and building permit proce- visitor attraction and an oppor- shoreline including the Old
ment is a detailed design for the Reconstruction for the entire of historical importance to the dures are registered for a number tunity to project the uniqueness Shoreline Walk: Mina El Hosn
road junction linking the north- floor space of the office building, city of Beirut. Originally a small of large projects, among them of Beirut in comparison with Square, Zeytouneh Square, San-
ern edge of Martyrs’ Square to while the nine-apartment resi- hotel with retail shops along its four high-rise, luxury develop- competing cities in the region. tiyeh Garden, All Saints Square,
Trieste Street while fully integrat- dential complex, decorated by arcaded street-front facade, its ments overlooking the Beirut and the Ottoman Wall Walk.
ing important archeological sites Halim Harmouch, is completely main component was a theatre Marina. Residential Platinum Scientific journals around the
in the Ancient Tell area. The sec- leased or sold. Designed by FM that hosted performances and Tower, designed by Nabil Gho- world publish several articles on Meanwhile, in-house design
ond is a conceptual design aimed Consultants with Dada & Asso- events. The block is being devel- lam Architects in association Beirut’s historical trade relations, work starts on the Heritage
at substantially improving the ciates as internal decorator, the oped as an integrated project with Ricardo Bofill (Spain), written by archeologists from the Trail pedestrian circuit, which
George Haddad–Fouad Chehab health club opens under the that brings together the historic will add a serene silhouette to fourteen teams that have worked links archeological sites, historic
junction, implementing grade operation of Nautilus (US). building and an adjacent build- Beirut’s skyline, alongside the in Beirut city center. The articles public spaces, and heritage
separation at the intersection. ing and vacant lot. Works are Beirut Tower, designed by Samir provide general maps of Beirut’s buildings over a 3.5 km walking
At the heart of Saifi Village undertaken to strengthen the Khairallah & Partners in associa- urban layout during various pe- trail that encircles Beirut’s his-
Sidewalks in the Traditional City evolves the Quartier des Arts. structure of the existing build- tion with Wimberly Allison Tong riods of its history, including for- toric core. Information panels
Center are progressively upgraded Designers and art galleries, ings and carry out repairs to & Goo (US), Marina Towers tifications spanning more than are in preparation, together with
from concrete to durable granite antique and artisan shops, and some of the stone facades. complex, designed by Kohn 3,000 years and the major axes a tourist map of archeological
in all areas where new develop- beauty specialist boutiques are Pedersen Fox Associates (US), of the Roman City. sites and historic buildings.
ment is complete. attracted by a favorable rental and the Four Seasons Hotel,
policy and proactive promotional designed by Dar Al Handasah
The project to build and operate campaign. They are also drawn to with Pierre Yves Rochon (France)
teleport/broadband distribution the backdrop of reconstructed for interior design. Nearby, still
and cable TV networks receives and restored traditional build- in the planning stage, is the
support from the International ings, winding cobblestone streets, Dana of C.C.C., a medium-rise
Telecommunications Vision f ol- and landscaped courtyards that residential building designed by
lowing a presentation at the all contribute to the ambiance Dash Architects (UK) and Al
World Summit on Information of an artisanal village. Solidere Salam.
Society in Geneva. inaugurates its own gallery in the
sector, Pièce Unique, to provide a
platform to local Lebanese artists
for solo exhibitions.
! — 35
34

Beirut International Marathon Lebanon’s capital


hosts the first Beirut International Marathon. Founded
by May El Khalil, the event represents the first major
successful running event in the region, with Solidere
among the event’s official sponsors.
03
Corporate Infrastructure Development Archeology

Extending its services to other As designs and development Following the Japanese Em- A highly positive response to Third-party interest in these Prime Minister Rafic Hariri Following the launch of a limited Core drilling in a Foch-Allenby
property owners, Solidere signs controls for the public domain bassy, the British Embassy Saifi Village provides the impetus “special residential sectors” rises. launches the construction of a design competition for the site reveals the location of the
several agreements to market are generated, plaques with moves into its new quarters in to further invest in residential Developers set in motion several grand mosque at the intersection development around Beirut ancient harbor. The developers
third-party properties prior to newly assigned postal codes are the Embassy Complex. More developments and reinforce new projects in Wadi Abou Jamil, of Martyrs’ Square Axis and Marina as a premier waterfront decide to incorporate a land-
undertaking their full-time mounted on building facades. stringent security arrangements urban integration. Solidere com- for example an exclusive resi- Amir Bachir Street. Inspired by destination, an agreement is scaped area into the develop-
operation and maintenance Solidere creates a signage man- are imposed following the Sep- missions the design and imple- dential development designed the Blue Mosque in Istanbul, the signed with Steven Holl Archi- ment to feature the reconstituted
management. ual and submits it to Beirut Mu- tember 11, 2001 events, causing mentation of clusters of various by Ziad Akl, combining modern Mohamad Al Amin Mosque is tects, a leading American firm. remains under the name Harbor
nicipality. delays in the completion dates sizes for land plots in Wadi luxury and traditional architec- designed by Azmi Fakhuri with The architect’s concept involves Square.
for the remaining space, for Abou Jamil, involving both ture. An adjacent boutique hotel decorative painting and orna- a town quay with waterside
Among the underground park- which other embassies have restoration and infill. groups together a new infill mentation (gilding, calligraphy, restaurants on the curved south-
ing facilities planned for the Wa- signed letters of intent. building with restored and patina, stone, and wood imita- eastern boardwalk of Beirut
terfront District is a garage The architects are carefully reconstructed buildings. In Saifi, tion) by the artist Harout Basta- Marina; a yacht club, summer
beneath the Corniche Road near The two other buildings previ- selected for design approaches new projects include Al Mashrek jian. apartments, and leisure and ma-
Beirut Marina. An agreement is ously planned as administrative that are particularly responsive Insurance Company, designed rina-related shopping facilities
signed with Dar Al Handasah for office buildings in the Conser- to local context, culture, and cli- by Nabil Azar, and Safi Village The higher council for Urban on the eastern edge of the ma-
its design, to coordinate with the vation Area are redesigned by mate. The international firms Two, designed by Nabil Gholam Planning and Beirut Municipal- rina; and a harbormaster, cus-
marina and its surrounding de- Fouad Menem Consultants as a include Porphyrios Associates Architects. ity approves the Waterfront toms, and immigration building.
velopment. The 400-space park- multiuse complex comprising an (UK), Giancarlo De Carlo (Italy), District’s detailed sector plan.
ing is subject to a 50-year office building, three residential Dar Al Omran–Rassem Badran However, the issuance of a
operation agreement with the buildings, and a health club. (Jordan), Abdel-Wahed El Wakil Council of Ministers’ decree to
State, according to which Solid- (Egypt), and Oktay Nayman officially ratify the sector plan is
ere may build and operate the A decision is taken to first (Turkey). Maha Nasrallah, a local a precondition for initiating the
parking facility and retain a develop the southern part of architect, wins the design com- detailed infrastructure and land-
share of the revenue. Beirut Souks – the Souks Core petition for one of the lots. scaping design in the district.
and the Jewelry Souk – on its
own, without recourse to In Saifi, Nabil Gholam Architects
investors. This should allow is commissioned to design two
Solidere to maintain control new extension projects to Saifi
of commercial areas and their Village. The land for one of the
management and secure good projects, lot 146, is sold with its
rental revenues. design concept. The other, 178
Saifi, remains in Solidere’s port-
folio and is planned as five new
buildings organized around an
internal courtyard and a restored,
three-story building from the
1940s.
! — 37
36

Charter Award The Skidmore Owings & Merrill


(US) Waterfront District sector plan wins a Charter
Award from the Congress for the New Urbanism.

Van Alen Institute in New York An exhibition ti-


tled “Renewing, Rebuilding, Remembering” features
seven cities, including Beirut, that have been rebuilt
in the wake of disasters. The section on Beirut features
the city center’s master plan, the concept design by
Gustafson Porter for the Garden of Forgiveness, and
Nadim Karam’s Archaic Procession sculptures.

Solidere online A new website for the Company,


developed for the company by Invivia Inc (US), is
online with fully animated features.
02
Infrastructure Development Landscape

Control of the power substation The number of temporary park- The peaceful residential ambi- Skidmore Owings & Merrill Green open spaces are multiply- Across the street, near the Na-
is transferred to its ultimate op- ing facilities increases to provide ence in Saifi Village derives (US) finalizes detailed plans ing across the city center. An tional Evangelical Church, a new
erator, Electricité du Liban. The 3,000 spaces servicing about from a quiet environment and for sectors A and D of the Wa- area above the Weygand street garden opens featuring a curvi-
water supply and disposal net- 6,000 customers per day. Solid- carefully designed and land- terfront District, adapted to underground parking lot now linear path and stone benches.
works; the Ring Road with its ere pursues its requests to the scaped public realm. Brick Formula One safety and other boasts a large water fountain Hundred-year-old olive trees,
bridges, tunnels, and under- CDR and the Municipality to paving and fountains, seasonal requirements. They receive pre- and a variety of greenery, includ- along with cypress and palm
passes; the primary and second- proceed with the two parking shrubs and flowers, wooden liminary technical approval from ing vines, olive trees, and palm trees, dominate the upper canopy
ary roads; and the utilities in the lots underneath public property benches, and children’s play- the FIA. The sectors plan accom- trees, providing a visual link to while star jasmine, pink roses,
Traditional City Center are deliv- (Riad El Solh and Martyrs’ grounds provide the narrow modating the listed requirements the Municipality building and the and blue lilies of the Nile cover
ered to the Council for Develop- Square), which the CDR has al- tree-lined streets, public squares, includes a 4.8 km track that runs restored Al Omari and Amir Assaf the ground. A 15 m wall of ran-
ment and Reconstruction (CDR). ready tendered out as build-op- and gardens with an appealing clockwise and starts at the coastal mosques. Another 2,000 sq m dom natural stone separates
Solidere continues to operate erate-transfer projects. communal character. The success Corniche. The total area of land public space opens near the the garden from the restored
and maintain the infrastructure of the development is apparent for development in the district Grand Serail entrance. Triangular National Music Conservatory.
pending Beirut Municipality ten- On the private side, Beirut Souks’ as it is completely sold or leased. remains unchanged. in shape with an elevation range Embedded fossils dating back to
dering out the provision of oper- parking garage is partially open, of about 10 m, its landscape de- the cretaceous period blend in
ation and maintenance services. providing 750 parking spaces in Among other new developments In the Waterfront District, leisure, sign incorporates five dominant to the rustic wall as if they had
its fourth basement. The four- in the Serail Corridor are 24 sporting, and tourist activities are stone terraces that help retain always been part of it. At the
level, 108-space underground Avenue du Parc and Park View, dominant in Sector A, while Sec- the soil. An S-shaped, dark green southeast corner of the city cen-
public parking lot on Weygand two low-rise residential develop- tor D, planned as an exemplary lawn covers about half of the ter, in Saifi Village, residential
Street is now open as well. ments that offer ground-level, modern development, is a mixed- space, the rest dotted with low- clusters and internal courtyards
high-end retail, prominently use area with a wide range of growing flowering shrubs such adorn a main square designed
located at the border to the new commercial and retail services; as yellow day lilies, rosemary, by Iliya Stevenson Consultants,
Waterfront District. office, tourist and hotel space; lavender verbenas, and purple meshing together into a pleasant
convention centers; exhibition and red salvias. living environment.
In the Martyrs’ Square Axis, and cultural facilities; and exten-
the first Virgin Megastore in the sive residential development.
Middle East opens in a restored
heritage building, the former
Opera House, adjacent to an-
other building under restoration,
which will house the Union
Franco Arabe d’Assurances et
de Réassurances (UFA) regional
headquarters.
! — 39
38

Best Practices to Improve the Living Environ-


ment The landfill treatment project in the Waterfront
District receives Beirut Municipality’s nomination for
the Dubai International Award for Best Practices to
Improve the Living Environment, established by the
Second United Nations Conference on Human Settle-
ments (Habitat II).
Fête de la Musique Collaborating with the French
Embassy and the Ministry of Culture, Fête de la
Musique is launched on the summer solstice. Span-
ning a number of locations across the city center, the
festival brings together professional and amateur, local
and international musicians for a long evening of per-
formances.
BIEL The eastern part of the new Waterfront District
that does not require land treatment is leveled and
equipped with temporary roads and two surface park-
ing facilities. The land is leased to Beirut International
Exhibition and Leisure Center (BIEL) to host activities
in temporary structures, including a 15,000 sq m cen-
tral exhibition hall and a 600 sq m exhibition room
with a restaurant and a conference room.
01
Twenty years ago, while still in Boston, you were invited to a Given that the capital had been scourged by civil war and that believe the master plan became more humane without them.
Oussama Kabbani How did you sequence real estate development after the major in-
conference about the reconstruction of Beirut in Oxford, England. the society was severely fragmented, what then did you see as the
on Planning the Urban The war in Lebanon had come to an end, and the city center was “fundamentals” of the Beirut city center reconstruction plan? frastructure works were completed in the city center? What were
Regeneration of Beirut in ruins. How and why did you return to Lebanon, your country of the priorities, and how were these priorities determined?
City Center provenance, and end up at the helm of the urban planning effort? I had the passion to help rebuild the city, but the passion was strength-
ened by the leadership, because there was a“Vision,”with a capital V. The sequence of real estate development indeed had to do with the
In 1992, many intellectuals – urban planners, sociologists, and so on There was a destroyed country and a destroyed capital city center and historical spirit of the city center. One of the master plan’s funda-
Oussama Kabbani holds a Master's in Urban Design
– were looking at alternative ways to reconstruct Beirut’s city center. no resources whatsoever. It wasn’t a matter of rehabilitating utilities mental features was to preserve the memory of the city to the extent
degree from the Graduate School of Design at
Two main groups emerged: one was a group led by the new Prime and roads. All governmental institutions needed rehabilitation. The city possible. Beirut Souks and the Conservation Area as a whole were
Harvard University, USA. He is currently a mem-
Minister Rafic Hariri, preparing a master plan for reconstruction with center in particular was important because of its social context. At the therefore a priority. In the Conservation Area, our main task was the
ber of the Board of Directors of Solidere and the
Dar Al Handasah, and the other was made up of the likes of econo- heart of the city, it was an amalgamation of the different communities restoration of the preserved heritage buildings, to turn them into of-
Chairman and partner of Millennium Develop-
mist and historian Georges Corm, architect Assem Salam, and sociol- that made up the Lebanese people. The end result, the completely re- fices with modern amenities, at least on the interior. The exterior was
ment International Holdings. Previously he held
ogist Nabil Beyhum. constructed and developed city center, is still our objective in the long to be faithfully restored. We had no experience in the matter, so we
numerous positions in the development and plan-
I was invited to the conference in Oxford by the second run. But the pieces of the puzzle take time to integrate. had to seek advice from different authorities on the subject, such as
ning fields most notably as Executive Director of
group, who then invited me to another conference in Beirut, where this In developing a plan for reconstruction, it is the fundamen- the Museum of London. We learned on the job and realized that
Saraya Development Group, head of the Town
time I was asked to make a presentation about the master plan for the tals that matter, not the actual physical plan. The fundamentals were those who had the most experience with preservation were Syrian
Planning and Urban Management Division of
city center being prepared by Dar Al Handasah. I accepted on the con- simple. One, whatever was deemed of historical value was to be pre- masons, who were really artists and understood stone.
Solidere, and Senior Planner with the Boston
dition that I would merely comment on the technical aspects of the served, for instance the sector known as the Conservation Area Beirut Souks were important as the heart of trade. Bring
Redevelopment Authority.
plan. Following my presentation, in which I pointed out technical today. Two, with the upcoming land reclamation for the new Water- commerce back to the city center, and you bring back life. But the
problems with the plan, I was approached by the would-be founders front District, the Traditional City Center had to be linked to the sea. Old Souks were completely destroyed, and we decided to run an
of Solidere to join their team in their effort to regenerate the Beirut city Three, the plan had to include as much public open space as possi- open international competition. Out of 350 or so entries, the jury
center. The opportunity was so vast that many were compelled to join, ble. Four, the city center had to be a pedestrian-friendly area. Five, it shortlisted three schemes. Unable to take a consensual decision, to
especially those who wanted to do something on a historical scale. had to have an identity. Six, public transportation had to be im- address decisively the difficult moral and intellectual question of how
After 16 years of war, Beirut city center was a mess. I was proved. Seven, mass densities had to be concentrated together to to rebuild a place of such memory, it left the final decision up to
young, I had studied urban planning, and my city was destroyed. I maintain a certain character across the area. Solidere, the custodian of Beirut city center.
had an aspiration to do something about it. I was going to do what I Planning begins at the city level. The fundamentals are the Another priority was to develop residential nodes, the first
had prepared myself to do. DNA of a new city. Architecture, the physical aspect, is developed at of which were to be Saifi and then Wadi Abou Jamil. All these com-
a later stage, and it tends to change with time as trends change. ponents would bring life back to the city center as it would then ex-
How did your memories of the city center influence your perspec- pand to other areas. This is in a way what happened. After we began
tive on the reconstruction effort? Are you suggesting that the fundamentals of a city remain rela- restoration, third-party developers came along and wanted to create
tively constant but that architecture, the physical manifestation projects in other sectors. We allowed them great leeway in where and
I was born and raised in Beirut, but my relationship with the city cen- of so-called “urban DNA,” varies with time? Why is architectural what they wanted to develop as long as they followed the prescribed
ter is not the same as that of someone born in the 1950s or earlier. form not a so-called fundamental in and of itself? technical guidelines.
My generation, the 1960s generation, had just started to get to know
the city center when the war started; we were around 12 years old. Because planning, over time, gets liberated from the past. At the be- Demographics in Beirut have shifted over the decades, and there
We had not experienced the city center as the older generations had. ginning, we are somewhat apologetic, yet sensitive, really sensitive, is a growing young population looking for apartments they can
Our relationship with the memory of the place is different. The ques- to the past, our history. Over time, as trends and lifestyle demands afford. Can the city center accommodate this type of demand?
tion of memory is fundamental in an undertaking such as the recon- change, we are liberated and the vision takes on new wings. Yet, the
struction of the city center. fundamentals will never change. That is why the small square in Saifi Beirut city center’s real estate properties, like in most downtown
! — 41

The older generations, who had a more emotional rela- will never disappear. The square near Starco will never disappear. urban areas in the world, are the most expensive in the city. They
tionship to the place, considered us harsh in our outlook. We be- These are the fundamentals of the Beirut Central District Master tend to be exclusive, accommodating only the people who can afford
40

lieved the city center needed more than plastic surgery; it required Plan: the streets, views, corridors. They will always be a part of the them. This is the nature of any open market. So, the city center can-
major surgery to be resuscitated. We realized that times had city center. They will always be a part of the city center; they have not solve the problem, which is a national issue. Furthermore, the
changed and that we had to let go of certain nostalgic emotions. The become cast in stone. company has investors, shareholders, who it answers to and to
nature of youth is to have a margin of maneuverability between the whom it promises returns on their investment. What it does give to
old and the new without sacrificing the integrity of either. We had Before you joined Solidere, you gave a presentation at two con- the community are quality and well designed public spaces that will
the ability to move forward, to make what others considered harsh ferences in Beirut and Oxford in which you noted technical prob- last forever. These will culminate in the coming years with the water-
decisions, yet we maintained the relationship with the memory of lems with the master plan under preparation at the time. What front city park, the largest park in the city.
the place without being hostage to it. We were also the link between were those problems, and were you able to implement any If you look at the greater scheme, you realize that Solidere
the older generations and the younger ones, who had no memory of changes? has raised construction standards in Lebanon, introduced a cultural
the place at all. dimension to Beirut with restoration and the planned archeological
Firstly, the initial master plan incorporated a sunken highway around gardens and museums, and garnered international recognition for
When you started working on this project, what models and his- the city center, like the Paris Périphérique, a beltway around the city urbanism and design “made in Lebanon.”
torical precedents did you consider? but below ground level. It would have turned the city center into an
independent entity. It was agreed that the city center had to be a con- Looking back in retrospect on 18 years of development and recon-
There was no real prototype. Of course, postwar reconstruction of tinuation of its surroundings, and the sunken highway was removed. struction, if you had had the benefit of impeccable foresight, what
European cities after World War II is well documented. Most Euro- Secondly, the reclaimed land area on the waterfront was would you as an urban planner have done differently?
pean cities had been rebuilt exactly as they were, but some were planned as an island. From an urban design point of view, it was bril-
completely demolished and rebuilt from scratch. In our research, we liant. It would have provided more waterfront areas. However, from a I look back, and I don’t see any major disasters in terms of develop-
studied all modern cities around the world because, disregarding cul- social point of view, it undermined the cohesiveness of the social fabric. ment progress and architecture. The only thing I regret is not having
tural differences, they share certain values. Most practitioners in the Thirdly, the master plan conceived an icon for the city cen- somehow been able to introduce a subway transit system, not only to
urban planning field agree that it is the fundamentals that make a ter in the form of twin towers. They were planned on the Waterfront the city center but to the city as a whole. It would not have made
good city, wherever it is located in the world. For example, a city that and were quite tall. Beirut did not need such iconography. In away, sense to have one on such a small scale as the city center, and we
you can walk in is a good city. A city that has certain continuity in its the voices of the likes of Corm, Salam, and Beyhum were heard could not find a partner at the national level to support the idea.
layers of memory is a good city. A city with fundamentals in color, through these two conferences, and some of their criticisms were Beirut is growing vertically and is suffocating and con-
texture, views, and public spaces is a good city. And so on. But you taken into account. These are fundamentals that were removed, and I gested at the street level. Public transportation on the existing road
cannot apply all the fundamentals of one city onto another as there network cannot solve the problem. The city needs a subway system:
are some that are contextual. there is no other alternative.
Corporate Infrastructure Development Archeology Landscape

Solidere’s development strat- With approval from the Council Civil works for a secondary Originally designed by Youssef Marketing launches for the resi- The Fédération Internationale The documentation, digitization, Rudy Rahme’s bust of the writer
egy focuses on real estate proj- for Development and Recon- telecommunication network Aftimos in Egyptian-influenced, dential development now called d’Automobile (FIA) approaches and evaluation of the archeolog- and poet turns the landscaped
ects that elicit end users’ interest struction, hardscaping, street in the Foch-Allenby, Nejmeh- neo-Mamluk style, the Beirut Saifi Village. The apartments Solidere with a proposal to build ical finds near their completion. area across from the UN House
either as a place of residence or furniture, and landscaping are Maarad, and Saifi areas are im- Municipality landmark building elicit serious interest, and grad- a Formula One race track in These sites include a corner and into the Gibran Khalil Gibran
as a headquarters for their activi- being upgraded beyond the plemented. The network design in the Foch-Allenby area has ual deliveries begin. Beirut city center. The Formula tower of the Hellenistic City, the Garden. Around the Roman
ties. At this time, the Company scope of the agreement with the is under way for Wadi Abou been restored by Walid Takied- One track would utilize the Roman Baths, a number of pub- Baths, the northern terraced
decides to delay the implemen- State, adding further value to Jamil, Ghalghoul, the Serail dine. The bustle of official busi- Meanwhile, the development of coastal Corniche Road bordering lic and religious buildings and garden is complemented by
tation of new projects in favor city center properties. The policy Corridor, and the Hotel District, ness fills its offices once again. a small residential cluster in the the new Waterfront District, in monuments, and the Cardo the newly complete southern
of pursuing existing ones, pend- of building high-standard and its realization will soon fol- Other completed restorations Zokak El Blatt area of Wadi addition to several internal Maximus. Following the exten- garden.
ing an improvement of market streetscapes and public space low, street after street. and new developments in the Abou Jamil reaches completion, streets in that district and the sive findings related to the latter,
conditions. is amply rewarded. The quality Conservation Area also convey a serene collection of low-rise northern corner of the Tradi- the development rights on a Meanwhile, the tree nursery
of the pedestrianized public Bouygues (France) completes the importance of Beirut city 1960s buildings adjacent to a tional City Center. Meetings 2.3 ha site between Nejmeh is producing 25,000 flowering
Site logistics services are pro- realm and the integrated street and delivers the Beirut city cen- center as a hub of business large communal garden with are held to explore this possibil- Square and Martyrs’ Square plants per month. An increasing
vided, including cleaning, safety, furniture design in Beirut’s his- ter marine works: Beirut Marina activity. club facilities. The apartments ity, and the FIA requests some are relinquished to create the number of streets are lined with
security, the operation and toric core are tangible and along with a breakwater and a are all leased. amendments to the road net- Hadiqat As-Samah (Garden trees, fitted with planters, or
maintenance of electromechan- widely recognized assets of sub- two-line defense structure pro- The development previously work to meet Formula One of Forgiveness), located between reorganized to accommodate
ical systems, traffic management, stantial value. tecting the marina and the new planned as an administrative The first third-party complexes technical specifications. several places of worship. wide medians covered in trees,
and temporary surface parking Waterfront District. Beirut Ma- office building for government to be restored in the Ghalghoul shrubs, and colorful annual
while the permanent parking Ten temporary surface parking rina is able to berth boats (though institutions in the Conservation sector are the landmark Lazarieh The Council of Ministers in- The British-American landscape plantings.
facilities remain under construc- facilities on vacant lots provide not at full capacity), and, under its Area on Serail Hill has been Center on Amir Bachir Street structs the Council for Develop- architects Gustafson Porter
tion. Management and operation 1,600 spaces servicing about 1997 agreement with the State, redesigned by IdepConsult– and the Markazia building, now ment and Reconstruction to (US/UK) win the international
services are also available to 3,000 city center customers Solidere operates the facilities. Mounir Saroufim and executed the Monroe Suites Hotel. They commission a study and accord- landscape design competition
infrastructure, marinas, public per day. Meanwhile, the public by Samir Mokbel and Partners as join the area’s most recent de- ingly propose an amendment to for the garden. British archeolo-
utilities, parking facilities, and administration decides to delay the Embassy Complex. Initially velopment, the UN House. the Waterfront District sectors gists Henry Hurst and Steve
landscaped open areas even the Martyrs’ Square parking lot, delivered as empty shells, the plan. A decree will be issued by Roskams provide a consultancy
after these spaces have been citing several considerations. development now includes the Council of Ministers to this report to the Directorate General
handed over to the authorities. Solidere files a claim for com- electromechanical and other extent, based on a study to be of Antiquities in order to find an
pensation due to the ensuing specifications geared to suit the submitted by Dar Al Handasah. appropriate approach to inte-
major delays in the Martyrs’ requirements of the embassies The physical implementation of grate the archeological remains.
Square Axis sector development. that will occupy it. The Japanese the changes depends on whether A conservation plan includes the
Embassy is the first to move in to the FIA approves the amendment long-term burial of exposed
its new, leased premises within and commits itself to organizing archeology at the northern end
the complex. Negotiations con- the event. of the site, along with on-site
tinue with three other embassies conservation and integration of
that have shown interest and/or features from different periods.
signed letters of intent. These include the Roman Cardo
Maximus and its rediscovered
! — 43

junction with the Decumanus


Maximus; earlier Hellenistic
42

remains; Roman houses and


workshops; evidence of overlap-
ping Hellenistic, Roman, and
Phoenician urban grids; walls
associated with the 17th-century
Fakhreddine palace; and later
Ottoman foundation arches
and walls.

Peace-building Seminar Solidere attends the semi-


nar in Cartagena, Colombia, which was organized by
the US Embassy. The conference presented private
sector initiatives in Central and South America as well
as in other parts of the world.
Expo2000 Hannover Medal A gold medal is
awarded for a model role in urban reconstruction.
00
Corporate Infrastructure Restoration Development Archeology Landscape

The flexibility of Solidere’s Sidewalks are laid across the city Restoration work is taking shape. Following the design phase and The construction of the Saifi Designed by Dash Architects Excavations of the Cardo Sculptures by Salwa Rawda
marketing policy is reflected in center as developments come to Behind elaborately restored ex- after construction begins on the residential development’s (UK), the project includes three Maximus (Roman thoroughfare) Choucair now adorn the garden
a healthy mix of sales and rental completion. Foch-Allenby fea- ternal facades, the buildings’ developments near Serail Hill to parking facility is completed, and contemporary buildings con- continue, along with prepara- across from the UN House, and
operations, geared toward meet- tures sidewalks of granite tile, interiors are completely modern. house agencies affiliated with its electromechanical equipment nected by a top-lit planted tions to expand the site east- sculpted modular benches are
ing existing demand at any given while sidewalks in the rest of the In residential neighborhoods, the Prime Minister’s office in the is installed. The internal parti- atrium together with a restored ward. Additional excavations installed in the adjoining Amir
time. Both strategies aim not city center are made of concrete restoration goes hand in hand Conservation Area, the Council tioning of the apartments fol- historic building adjoined by a covering other portions of the Amin Square. The cascading
only to generate revenue but tile. All are specifically tailored to with great sensitivity to the of Ministers decides to cancel its lows an interior design by public garden court. Roman-Byzantine city begin, green open space under the
also to infuse dynamism into meet everyone’s needs, including Mediterranean typology. In of- agreement with the Company. Michel and Halim Harmouch. following approval by the Direc- Serail preserves the collective
the city center. To that end, and the disabled. Throughout the city fice environments, all restored The project comes to a halt, and The buildings will be equipped The Waterfront District is a torate General of Antiquities and urban memory of the area by
in light of a general economic center, sidewalks are fitted with buildings are fitted with high- ensuing claims from the contrac- with modern amenities and pro- privileged site with panoramic the Maronite Church Council as planting new cypress trees,
slowdown that has had a nega- tree grates featuring decorative tech equipment for functionality, tors are settled while Solidere fessionally managed to reflect views of the Mediterranean and the custodian of the St. George weeping willows, conifers, and
tive impact on sales operations, motifs. comfort, and efficiency, and seeks compensation from the international service standards, a picturesque landscape of hills Orthodox Cathedral near Nejmeh erythrina alongside old ficus
the Company decides to focus open floor plans allow for opti- government for damages and including security and fire safety and mountains across the bay. Square. trees and a wall built in the
on pursuing major works and Street furniture designs sub- mal, flexible use of the area. The losses. networks, accesses for the dis- The proposal for its seaward face 1950s to frame an ancient frieze
projects that ensure occupancy. mitted by Wilmotte & Associés final product is quality space abled, garbage collection, and will introduce an uninterrupted, discovered on the site. At its own
(France) for the areas beyond with a special sense of character. Options are studied to modify central air conditioning for each 2.2 km extension of the Beirut expense, Solidere maintains the
Monitoring the progress of its Foch-Allenby gain approval. The rejuvenation process has the use of the developments. The unit. In Wadi Abou Jamil, the shoreline. Planned as a prime trees and landscaped open
own as well as third-party Additionally, the Dutch joint shaped public awareness of her- building to the west of the Serail established Besançon and Ahlieh district, the new land will ac- spaces and operates and main-
restoration projects, Solidere venture Reklaspits/BRS Premsela itage buildings while creating a is marketed to foreign embassies. schools have been rehabilitated. commodate modern financial, tains the irrigation station and
coordinates with Beirut Munici- Vonk delivers a way-finding sys- demand for restored space. After prospective occupants sign business, and residential facilities. network until their transfer to
pality to implement a quin- tem for cars and pedestrians, as letters of intent, the internal After standing alone for so long It will also include two marinas, the relevant public authorities.
quennial regulation requiring well as location maps. layout is altered to reflect their in the Hotel District, the Starco a waterside park, a seaside drive
buildings to be maintained on requests. The other two build- Center, restored by Addor & Jul- and promenade, and cultural,
a regular basis through general The second phase of land ings take different paths: having liard (Switzerland), is now wit- tourist, and entertainment facili-
cleaning and facade mainte- treatment begins, involving completed civil works on one as nessing the construction of ties. The district will offer unpar-
nance every five years. the excavation, sorting, process- an office building, Solidere looks several surrounding residential alleled investment opportunities.
ing, and treatment of five million for interested parties; the third, it and hotel buildings. Major hotel
cubic meters of construction adapts into a residential building. chains such as The Four Seasons, The waterfront development
debris and domestic solid waste. Ramada, and Hilton are estab- densities are higher than those
Radian International (US), a After the Ministry of Finance an- lishing a presence here, increas- in the Traditional City Center,
member of the Dames & Moore nounces its intention to cancel its ing the international profile of with envelope controls ensuring
Group, is awarded the contract; lease, works are placed on hold the district. Residential and a carefully planned distribution
Fairhurst International (UK) on the two buildings pre-leased tourist developments are in- of floor space and the clustering
takes on the role of construction to the ministries of finance and creasingly drawn to the quality of high-rise development. The
manager with Bureau Veritas the interior within the afore- of the Beirut city center, evident majority of development on park
(France) as controller. mentioned agreement with the in the completion of infrastruc- and sea frontages is of medium
State. A settlement is reached ture and public space. density, limited to 40 m in height.
! — 45

With the completion of most civil with the contractor. Frontages on the Mount Sannine
works for the Beirut Marina on Right below Serail Hill at the be- view corridor reach 52 m in
44

the St. George Bay, including the ginning of the Serail Corridor height. In total, 16 high-rise sites
quays and breakwater, Beirut Ma- leading straight to the sea, a have been planned at distinct
rina basin is now clearly demar- major private-sector develop- locations. Streetwall controls are
cated. Following a development ment reaches completion: Bank applied to main street and
strategy study, the US companies Audi’s new headquarters and boulevard frontages, and man-
Hallmuth, Obata and Kassabaum branch offices. dated view corridors are created
(HOK), EDAW, and Sasaki are to preserve sea and mountain
invited to bid for the marina de- views.
sign. The contract is awarded to
Sasaki in a joint venture with the
Lebanese firm Idea. The design
involves mooring pontoons, a
clubhouse, and a public quay to
accommodate a diversity of
shopping and food kiosks, along
with several other components.

Planet Discovery In collaboration with the French


Cité des Sciences et de l’Industrie de la Villette, the
Planet Discovery children’s science museum opens.
It offers hands-on learning and edutainment opportu-
nities to youth in an innovative, dynamic space.
While temporarily located adjacent to Starco Center,
the museum will later become a permanent feature
in Beirut Souks.
Nejmeh Square The pedestrianized Nejmeh Square
with its restored clock tower and radial cobblestone
streets gradually fills with cafes and restaurants and is
beginning to attract crowds to the city center in search
of outdoor spaces for family outings.
99
Corporate Infrastructure Development

With the delivery of the UN Marking a major milestone in its The water supply system is also Solidere is granted a build-and- While the sea defense structure The recovery of the Conserva- The design-and-build tender for A planning study is underway
House, along with restored contract with the State, Solidere delivered, comprising 30 km operate license for a broadband, is essential to the development tion Area enhances its four the Beirut Trade Center leads for the new Waterfront District,
buildings through sales and re- completes infrastructure works – for drinking water and 38 km fiber-optic network destined to of the reclaimed area, the above- original character areas, each to negotiations with the most which includes the reclaimed
cuperation, attention is turned power and water supply, for landscaping and irrigation, ensure high-speed transmission water component consists of presenting a unique sense of competitive contractor, the joint land and the extension of the
toward ensuring the occupation sewage and rainwater drainage, including a concrete water tank of audio, image, data, and video, three levels of promenades, place. With its largely pedestri- venture Binladin/Al Mabani, to Corniche along the northern
and proper property manage- and roads – throughout the built under the Ring Road bridge. including a cable TV network. extending over 1.5 km between anized streets, the area is recog- reduce construction costs and edge of Beirut city center (Sec-
ment. All Beirut city center Traditional City Center as well This goes hand in hand with a This multimedia platform en- the Hotel District and the Beirut nized as a substantial feat of completion time. Construction tors A and D). The study is
property owners are entitled to as in part of the original landfill water disposal system, consisting ables any building in Beirut city Port. It provides a natural exten- heritage restoration on a global manager Turner/Steiner (US) awarded to American firms
first-class facility management area. Apart from the Ring Road of 26 km of stormwater drainage center to connect directly to high- sion to the existing Beirut Cor- scale. Restored buildings line the teams up with the joint venture, Skidmore Owings & Merrill
services consisting of competi- and the George Haddad Street and 28 km of sewage pipes. capacity broadband services. niche and encourages public streets with beautiful facades contributing its expertise in high- for urban design, Sasaki for
tive sales and rental support, underpass, large avenues now recreation and leisure activities. while also complying to interna- rise buildings. Meanwhile, the landscaping, and Parsons
high-quality technical mainte- cut east–west and north–south. Public lighting with low-voltage In marine works, construction Upon completion of the Beirut tional safety standards and fea- legal and financial structure for Brinckerhoff for traffic. Destined
nance services, cleaning, safety, Park Avenue (Francois Al Haj cables and fixtures is complete, of the sea defense structure Marina town quays, Corniche turing modern amenities. The the project is under development, to evolve into a detailed sector
security, and lease management. Street) constitutes an important together with feeder pillars in the makes h eadway. With “accrop- promenade, Eastern Marina relocation of all Solidere offices and a shareholding company is plan, the study aims to ensure
To that effect, negotiations are axis linking Wadi Abou Jamil to streets, a transformer substation odes” (man-made concrete quayside, and Beirut Port’s first to seven of the buildings in the formed. The project is then placed the acquisition of target devel-
conducted with potential cus- the reclaimed land. Weygand, with standby generators, and blocks) gradually cast on-site basin promenade, the city center Foch-Allenby area heralds the on hold for a number of reasons opment rights on the new land
tomers, all of whom express Zeitouneh, and Port streets have closed-circuit TV in the tunnels. and placed among rocks along will provide an uninterrupted, return of activity to this sector. including the withdrawal of an- through proper urban design. It
interest in expanding an already been widened and now extend the western breakwater, more 3.5 km extension to the Beirut Riad El Solh Street comes back chor tenants. will provide a conceptual design
successful business relationship. toward Trieste Street by the port. The selection of street furniture than 70 percent of the breakwa- shoreline, more than four times to life with six major banks oper- as well as design and landscap-
They form major boulevards designs in the Traditional City ter is finished. The completion the area of public seafront space ating again and others under In the Hotel District, the finished ing guidelines for the new seg-
cutting east–west across the city Center is based on the character of the landfill dredging works currently available on the entire restoration. With seven of the 10,000 sq m Army Officers’ ment of the Corniche, completing
center, leading to the Souks, the of each sector. A contract is makes way for the construction Beirut peninsula. religious buildings restored and Club building, designed by its connection to the planned
Conservation Area, and the Mar- awarded to the French company of the first defense line, the sub- drawing an increasing number Samir Khairallah & Partners, marinas at both ends.
tyrs’ Square Axis. In order to fa- Générale d’Hydraulique et de merged reef. of worshippers, the city center is opens as the Monroe Hotel.
cilitate access from the Ring Road, Mécanique for cast-iron orna- reaffirming its role as a meeting
streets are widened in Ghalghoul mental street lights in the Con- Works for the second defense place for all Lebanese people. Martyrs’ Square Axis, ravaged
and the northern part of Wadi servation Area. The moulds are structure require a massive by the effects of the war and its
Abou Jamil, where new roads cast from the original designs assembly line. A prefabrication The Grand Serail, originally built aftermath, is planned as a
have been added. prepared for Beirut in the 1920s. yard is built on-site for the pro- in the mid 19th century as an mixed-use sector with the highly
In other parts of the city center, duction of the caissons, working army barrack atop a hill during symbolic civic space at its heart,
the option goes to modern street in parallel to the installation of the Ottoman period, and the now open to the sea. It aims to
lighting designed by Wilmotte the concrete reinforcement. A Council for Development and reconnect and reactivate the city
(France) and manufactured by launching platform is installed Reconstruction, previously an center and enhance and inten-
Hess (Germany) and Eclatec to slide the caissons into the sea. army hospital, are restored to sify the city’s link to the water-
(France). Traffic lights and road The caissons are thus cast suc- their original grandeur. As the front. In the blocks forming the
signs, the latter based on a study cessively on land and then low- Council of Ministers relocates to immediate eastern edge of Mar-
by Dutch consultants Reklaspits/ ered via the launching platform the Grand Serail, works advance tyrs’ Square, the plan envisions a
BRS Premsela Vonk, are installed
! — 47

to float on the water. Once towed on the three Serail Hill adminis- continuous colonnade facing the
within the city center, as well as to position, they are lowered to trative office buildings. Several square. Its objective is to create
46

directional signage along the the sea floor in a controlled hospitality initiatives in the sector a strong urban statement as a
peripheral roads. manner and filled with sand. are transforming Beirut city cen- 21st-century expression of the
Once the western breakwater is ter into a nighttime destination. 1920s Maarad Street colonnade,
The Council for Development complete, the construction of the the signature feature of Beirut’s
and Reconstruction awards the Beirut Marina and its mooring In response to increasing market historic core.
construction of the Martyrs’ quays progresses rapidly. interest, further sector planning is
Square parking lot to Al-Kharafi carried out for Wadi Abou Jamil
& Sons on a build-operate- with consultant Nabil Gholam
transfer basis. The contract for Architects. For the sloping, Lev-
the Serail Hill parking lot has not antine part of town below Serail
yet been awarded. Meanwhile, Hill, the plan is to develop a res-
construction begins on the Foch- idential neighborhood with a
Allenby and the Weygand Street mix of preserved and new town-
parking lots. houses, low-rise apartment
buildings, schools, community-
related shops, and open spaces.
Height controls are imposed on

98
new developments to preserve
view corridors.
Archeology Landscape

Throughout the city center, Michel Macary (France) is com- The first open space in the Other projects are set into mo-
archeology plays a key role in missioned to undertake a design Conservation Area is completed tion this year, among them a
highlighting the area’s value and feasibility study initially for a Tell around the restored archeological 6,000 sq m garden facing the
creating a cultural destination. site museum. Since the present- site of the Roman Baths, land- UN House, marking the central
The Canaanite Tell and the day city center encompasses the scaped by InterScene (France) gateway into the downtown,
Roman Cardo Maximus, re- whole of urbanized Beirut from and Maurice Bonfils to feature designed by Mohamad Halawi.
tained in situ, will form part of ancient times to the 1830s, the two gardens, a cascading foun- The garden features two circular
the public open space design project evolves into a “City His- tain, and a small amphitheater spaces, a water fountain sur-
that includes the Beirut City tory Museum” that can accom- designed to host musical con- rounded by trees, and a viewing
History Museum and the Her- modate finds not only from the certs. To recreate the sights and platform. The same landscape
itage Trail linking archeological Canaanite Tell but also from sites scents of an ancient Roman gar- architect has also designed Omar
and historical sites. throughout the downtown area. den, the architects have planted Daouk Square and a cascading
The museum will also be a key Mediterranean trees and installed garden below the Grand Serail.
site within the Beirut Heritage large clay pots filled with medic-
Trail, now in the research and inal aromatic herbs used in Meanwhile, close to 1,500 trees
design phase by an in-house Roman times, including oregano, are planted around different
team, planned to link archeolog- basil, and thyme, and fragrant parts of the city center, ranging
ical sites and heritage buildings flowers such as violet, jasmine, from the traditional olive, pine,
on a 3.5 km walking tour within and lavender. The northern part and palm trees to revived local
the historic core. of the garden is open to the species such as magnolias and
public, as is Riad El Solh Square, bougainvilleas, chosen for their
now landscaped and housing efflorescence in the spring and
the restored statue of its name- summer.
sake, the first prime minister of
independent Lebanon. To further enhance public space
and instill culture in the city cen-
ter, discussions are ongoing with
the Ministry of Culture to com-
mission sculptors to create pieces
to adorn public areas. The Com-
pany provides space and logis-
tics for the artwork and, in some
cases, takes on a portion of the
sponsorship.
! — 49
48

UN House Inauguration United Nations Secretary-


General Kofi Annan inaugurates the UN House. The
Secretary-General describes the building as“setting an
example for other United Nations offices around the
world.”
98
Corporate Infrastructure Restoration Development

The General Assembly approves In the sale and rental of its The Council for Development After awarding the contract for Concerning marine works, In the most innovative restora- An agreement is concluded with Designed by Malek Mahmassani
a stock split to facilitate trading property, the Company targets and Reconstruction (CDR) ten- power supply to the consortium Maunsell (UK) is replaced by the tion concepts, preserved build- the government, approved by Architectural Practice, the com-
operations and to align the value three main categories of cus- ders out as build-operate-trans- of the Matelec-Melec and GE- British company Rendel, Palmer ings are combined with new the Council of Ministers, which plex includes a new office build-
of the share to national and in- tomers: local and foreign corpo- fer projects the Martyrs’ Square Hitachi, construction of a power & Tritton as engineering consult- construction, often incorporating includes a land swap, the financ- ing and integrates the surviving
ternational trading standards. rate, individual, and institutional and Serail Hill underground substation is initiated to feed ant, while the CDR retains So- an inner landscaped courtyard ing of the Grand Serail, and the adjacent “Dome” structure, to be
The par value becomes US$10 clients. It sells “as is” some of the parking lots, located under gov- electricity in the city center. In cotec as technical controller. as communal open space. These provision of 70,000 sq m of office restored as a 550-seat confer-
after each old share is divided retained built lots whose owner- ernment and municipal prop- the meantime, a temporary 20 Christiani & Nielsen–COWI solutions strive to maintain the space to affiliate agencies of the ence center. A bit further west,
into ten new shares. The Council ship devolved to it; others it re- erty. Meanwhile, the parking lot MW substation provides power (UK/Denmark) continues to accurate restoration of preserved Council of Ministers, Ministry Conceptua (France) and Syrcon-
of Ministers approves the Solid- stores and sells, keeps for office near Riad El Solh Square awaits to buildings and operations cur- serve as construction manager. buildings to their original designs of Finance, and Ministry of the sult provide a concept design for
ere stock split. use, or rents out. Previous prop- the conclusion of on-site arche- rently functioning in the area. To Following positive detailed hy- while providing modern, infill Interior in the Conservation the Ministry of the Interior.
erty owners and tenants are ological excavations. link the Beirut city center with draulic model tests on the ma- development controlled by design Area. The deal stipulates the
Solidere’s capital decreases from attracted back to the city center, the national transmission net- rine works design model, guidelines that respond sensi- delivery of two buildings on the Following an initial master plan
US$1.8 billion to US$1.65 billion including both Lebanese expa- Other projects are under way to work, a 5.5 km 66 KV cable is conducted at Delft Hydraulics tively to the historic context. lower part of Serail Hill on France prepared by Jad Tabet in collabo-
through the retirement of 17 mil- triates and foreign companies. meet the demand for parking installed through a major culvert in the Netherlands, mobilization Street for use by the CDR, the ration with Benjamin Thompson
lion A shares that reverted to spaces by occupants of the re- running from Port Street, north- of the plant and manpower on Damaged by the war, the Mar- Investment Development Au- Architects (US), it is decided that
Company possession after some stored properties. One is a joint east of the city center, to the site begins. tyrs’ Square Monument under- thority of Lebanon (IDAL), and the Beirut Souks project will be
original Beirut city center rights undertaking of common works Fakhreddine Street to the south- goes restoration at the University the Central Administration for designed through five separate
holders decided to recuperate for a 280-space parking lot in west, while a 4.5 km 220 KV An agreement with the State of the Holy Ghost in Kaslik Statistics. Both are designed by commissions to Lebanese and
their properties. At the same the Foch-Allenby area, initiated cable connecting the substation provides the rights to administer under the supervision of Dr. Fouad Menem Consultants based international architects. The
time, an amendment to Article 9 in conjunction with owners of to the main Electricité du Liban the planned Beirut (Western) Issam Khairallah, director of the on a concept by IdepConsult– 146,000 sq m floor space will be
of the Articles of Incorporation other lots nearby; another facility grid in Horch Substation remains Marina water surface and the Restoration Center. British expert Mounir Saroufim. A third build- interspersed with 60,000 sq m
provides international investors is in development on Weygand under construction. Corniche underground parking Rupert Harris joins the project ing, west of the Serail on Army of landscaped pedestrian areas.
with the right to own shares, Street. lot outlined in the Beirut Central as a consultant. The repair works Street, also designed by Idep- Following the ancient, pre-
which was previously restricted Meanwhile, the landfill alters District Master Plan for a 50- include restructuring the statue’s Consult, will house several other Roman street grid and integrat-
to Lebanese and Arab nationals. One of the most important road the shape of the shoreline and year period. At its own expense support base, welding its parts, governmental agencies. All of ing archeological features and
works in the city center, the ex- the topography of Beirut city and with official approval, Solid- treating rust and corrosion, and these buildings are at different gardens, Beirut Souks consecrate
pansion of the Fouad Chehab center. Heavy engineering works ere will construct the installa- restoring its original color. Al- stages of preparation works. the historic value of the place
Avenue Bridge, opens to traffic are actively under way: sea de- tions needed for the marina though the statue is reinforced while relying on the state-of-
nine months ahead of schedule. fense structures to seal and pro- operation that fall within the to prevent further deterioration, Conceptual designs are approved the-art technology of modern
The 3.6 km Ring Road, as it is tect the district’s outer limits as State’s private domain. The bullet holes are retained as a re- for some of the office space for commercial centers.
called, connects to the western well as processes to deliver clean works include access and circu- minder of the damage inflicted the Ministry of Finance, Ministry
end of Fakhreddine Street by development sites. Once cleared lation, breakwater surface park- by war. The monument is the of the Interior, and other gov- The team includes Rafael Moneo
tunnel and links through a and protected, the reclaimed ing, an underground parking lot, work of Italian sculptor Marino ernment agencies. Construction (Spain) with Samir Khairallah
longer tunnel to the Corniche land should offer unparalleled marina boardwalk and pontoons, Mascarati, first unveiled on Mar- begins in accordance with a new & Partners for the southern part’s
Road near the Phoenicia Hotel. development opportunities, a harbormaster’s building, and tyrs’ Day, May 6, 1960. contract providing timetables Souks Core, Dash Architects
planned to accommodate a all essential boat utilities. and broad building specifica- (UK) with Rafic El Khoury and
modern financial and business tions. The Ministry of Finance Partners for the southern part’s
50 — 51

district, retail and commercial Marina by-laws must be estab- project involves the reconstruc- Jewelry Souk and the office block,
services, tourist and hotel space, lished and receive official ap- tion of the former City Center Valode and Pistre (France) with
and an extensive residential proval in order to address issues building southwest of Martyrs’ Annabel Karim Kassar for the
area, enhanced by an 8 ha public such as administration and oper- Square into administrative of- northern part’s Cinema and
park, 7.5 ha of waterside terraces ation of the marina general serv- fices (part of a property swap Entertainment complex, and
and public promenades, and ices, boat traffic, public safety, with the government). Nabil Tabbarah for the Depart-
recreational facilities. environmental protection, and ment Store. Olivier Vidal (France)
vehicular and pedestrian circula- is responsible for designing the
tion. Groupe Camille Rayon Souks’ public spaces. Dimitri
(France) is appointed consultant Alatzas Asociados (Spain) carries
for the Beirut Marina, and con- out the sub-basement parking
struction of the Eastern Marina design and management systems.
facing the first basin of the Beirut
Port is deferred to a later phase.

Information Center The Information Center moves


with the Company offices to Building 149 in the Foch-
Allenby area. It continues to welcome visitors inter-
ested in examining the Beirut city center model and
the sea defense system designed to withstand centen-
nial storms, currently under construction on the
seafront of the reclaimed area.
Beirut Reborn Award Published by Academy Edi-
tions/John Wiley & Sons, Beirut Reborn wins the inter-
nationally prestigious Donside Design and Print Gold
Award. The authors embark on a European and North
American lecture tour, which, combined with the publi-
cation’s global distribution, establishes worldwide
recognition for the Solidere project as a model of high-
quality urban development and inner-city regeneration.
Global Best Practises As one of the 100 projects
acknowledged as Global Best Practices, the Beirut city
center reconstruction and development project was
included in the United Nations Habitat II conference
in Istanbul in 1995. As a result of this exposure, a UN-
commissioned film highlighting the project is broad-
cast worldwide in six languages.
97
Landscape

The detailed design for the entire After a record fast-track con- Recognizing the importance The tree nursery welcomes the
project is complete. It takes into struction period of 14 months, of the sectors in the extension first new trees of various species,
account the needs of identified the handover of the UN House of Beirut city center toward the selected for their Mediterranean
users as well as the results of reaffirms the goal of delivering new seafront, the study lays out origin and historical association
marketing studies on the Souks’ made-to-measure new construc- the principal planning objective with Beirut. Trees that have
retail and entertainment poten- tion. The complex reflects mod- of providing mixed-use develop- never grown in the city center
tial. Approval is obtained from ern technical specifications. ment of primarily residential, before are tested for adaptability
the Directorate General of Urban Designed as a rectangle with a office, hotel, and commercial to the environment.
Planning. Following shoring and landscaped open atrium, the buildings with special emphasis
excavation works in the south building represents a “gateway” on retail use on the ground floor.
parking lot, an agreement is fi- into the city center. The study also focuses on the
nalized with the Arabian Con- relationship of parcels and their
struction Company, and works Following a tender involving five development to surrounding
get underway. regional and international con- streets and public spaces, the
tractors for the Beirut Trade formation of open spaces, and
The findings of a marketing sur- Center, negotiations are ongo- the general identity of develop-
vey to assess housing demand ing to optimize construction ment within the sectors.
and identify requirements help technology and completion time.
finalize the preliminary designs At the same time, surrounding The first area to be developed in
of the Saifi residential devel- land is identified to be integrated the Serail Corridor is adjacent to
opment. Excavation and shoring into the project, and subdivision, Beirut Souks, with projects such
works are complete, and after a regrouping, and building permit as the restored Sabbagha and
successful launch of the tender files receive approval from the Fotiades building by Joseph
during the summer, the building relevant authorities. Ingea and Ahli Bank by Simone
contract is awarded to Société Kosremelli, as well as new con-
Mouawad-Eddé. Koetter, Kim and Associates (US) struction such as the Semiramis
is commissioned to conduct mixed-use development by
urban design studies, and City Adam Architecture (UK), Fouad
Formation International (Canada) Hanna, and Fadlallah Dagher
is hired as advisor for develop- and the Medgulf building by
ment to study and prepare de- Nachaat Owaida.
tailed sector plans for the Hotel
District and Serail Corridor.
The Serail Corridor will comprise
two rows of towers, stepping
down in height from the water-
front southward and built around
! — 53

a shared green linear park.


52

Archaic Procession Solidere backs Lebanese artist


Nadim Karam’s Archaic Procession, an ambitious
urban art installation of metal statues. The proces-
sion’s movement across Beirut symbolizes the cycle
of destruction and renewal: 20 monumental figures
of man and beast advance across the city to the
Mediterranean waterfront. The figures stand on demo-
lition debris, dance along streets, and pass through
residential districts. The exhibition slogan, according
to the artist, is “Believe in beauty and the future,” em-
bodying the spirit of Beirut in the face of the many
tribulations it has overcome throughout history.
97
Corporate Infrastructure Restoration Development Archeology

Solidere shares begin trading These include earthquake-proof As priority is placed on the The contract for marine works, Among 40 buildings designated In the Conservation Area, a In Ghalghoul, construction is Archeological finds and treasures
on the Beirut Stock Exchange. foundations for all new buildings delivery of infrastructure in the the sea defense structure and the as architecturally significant in the large number of the buildings advancing rapidly on the major in Beirut city center suggest that
The number of shares listed to- and bridges and, when feasible, historic core and its surround- Western Marina, is awarded on a Riad El Solh and Foch-Allenby designated as architecturally office development near Riad El Beirut became a significant urban
tals 100,000,000 in Class A and for restored buildings. ings, all utility works comprised design-and-build basis to the areas, well-known landmarks significant are under restoration. Solh Square. The complex, now center in the third millennium
65,000,000 in Class B. of water supply, storm water, French company Bouygues in such as the Capitole, Arab Bank, Other new, third-party develop- named UN House, will house BC; since then, it has been home
At the early stages of reconstruc- and sewage networks are com- joint venture with its subsidiary, and Lazarieh Center have started ments begin to take shape, such several regional and local UN to a large number of civilizations.
A Global Depositary Receipts tion, property management pleted in the Conservation Area, Bouygues Offshore. The design to regain their former distinction as the An Nahar building at the agencies, in particular the Eco-
(GDRs) offering is initiated to had been initiated to cover the Saifi, Ghalghoul, and Wadi Abou offers a simplified engineering as the restoration of their facades intersection with Martyrs’ Square, nomic and Social Commission As excavations in the Souks un-
broaden the investor base by management, leasing, and serv- Jamil. Works are also underway solution to that of Sogreah, which nears completion. designed by Pierre El Khoury for Western Asia (ESCWA), cover a city wall and moat and a
allowing non-Lebanese entities icing of the properties owned by in other parts of the city, where a appears in the master plan with Architects, and the Atrium across whose relocation to Beirut is Phoenico-Persian quarter, work
to buy into the Company stocks. the Company. An effective prop- temporary water supply network its offshore, submerged caissons from Al Omari Mosque, designed scheduled for next year. The around Martyrs’ Square reveals
The GDRs, issued against A erty management program is facilitates reconstruction efforts. and narrow lagoon. The Bouygues by Nabil Azar. 16-story development has a total Hellenistic and Roman remains.
Shares, were purchased by inter- now consolidated to better de- scheme extends the reclamation floor space of 43,000 sq m. Nine The latter are found within the
national investors, principally in fine aspects of the rental policy, In road works, the underpass out to the caisson line, thereby Several major public institutions floors above ground comprise preserved foundation arches of
the United States and the United including technical maintenance below George Haddad Street providing additional public space including the Council of Minis- offices, a library, and language the Petit Serail. Photogrammetry
Kingdom. Merrill Lynch Interna- procedures. This has immediate leading to Port Street reaches to the new Waterfront District. ters and the Beirut Municipality labs, with a lobby and retail serv- and numbering are used to ac-
tional is the lead manager of the relevance for the developments completion, as does the Riad El announce their planned reloca- ices at ground level. Conceived curately record and concisely
offering. The bank syndicate in- about to reach completion, be- Solh underpass leading to Selim The sea defense structure will tion to the city center, which, by Pierre El Khoury Architects, archive discoveries recommended
volved in underwriting the deal ginning with the UN House, the Salam Boulevard and connecting consist of an underwater plat- added to the presence of Parlia- the structure makes use of natu- for dismantling and subsequent
includes Robert Fleming & Co. future headquarters for UN Beirut city center to the capital’s form (submerged reef) as a first ment, deputies’ offices, and the ral light and shade. It is an “in- reassembly. All findings are reg-
Limited, ING Barings, Banque agencies in Lebanon. international airport. defense, approximately 100–140 Council for Development and telligent building” with advanced istered to enable future studies
Paribas Capital Markets, and m wide with an upper surface at Reconstruction, reestablishes technology including a comput- and to reconstruct historical
UBS Limited. The funds raised Plans are in the works to offer Beyond the scope of Solidere’s about 6 m below sea level. The and consecrates Beirut city cen- erized building management continuity for the public.
are used to finance part of the property management services agreement with the State to in- structure will break the waves ter as the administrative center system that controls lighting,
infrastructure and real estate to the owners of recuperated stall communication infrastruc- and absorb part of their energy. of Lebanon. elevators, air handling units, and Based on master plan objectives
development program during buildings while they undergo ture, a decision is taken to provide The second line of defense con- data cabling for voice and audio- and the archeological conclusions
the initial phase of operations. restoration. The Company is ne- value-added services. A strategic sists of a curved line of 80 cais- The planned Saifi residential visual relay. reached by the Directorate Gen-
gotiating co-ownership regula- study is commissioned from sons prefabricated on shore and development comprises 16 eral of Antiquities in accordance
Following extensive land surveys tions on recuperated properties Coopers and Lybrand (US) to each weighing about 2,000 tons. buildings distributed into four Meanwhile, plans are in progress with UNESCO protocols, sev-
and earthquake vulnerability as- where it is one of the rights determine the special infrastruc- These will be floated to their clusters. The buildings have a for the rehabilitation of the Murr eral major discoveries will be re-
sessments, strict development holders. ture services necessary to meet final positions before being maximum of seven floors, and Tower as the Beirut Trade Cen- tained in situ and integrated into
guidelines regarding seismic and accommodate future demand submerged and stabilized with the apartments vary in size to ter, and various preparatory the design of public open space,
safety measures are formulated. The recuperation process al- in the city center. These include a sand. The width of each caisson achieve the most efficient use of studies for the project are under- including the Roman Cardo
lowing former property rights fiber-optic network for broad- (approximately 22 m) as well as space. The development includes way, including the completion of Maximus and adjacent discover-
holders to reacquire their real band telecommunications serv- perforations on its seaward face commercial space at street level preliminary and detailed designs ies, the Phoenician wall encir-
estate comes to a close. A total ices used to promote and will further help to dissipate and underground facilities pro- that take into account new mar- cling the Canaanite Tell, and the
of 146 lots are recuperated, and facilitate high-speed data trans- wave energy. viding 420 parking spaces as ket research on office demand. nearby remains of Beirut’s Cru-
54 — 55

1,180 tenants apply to return to mission of text, image, audio, well as storage units for the Negotiations are proceeding to sader castle. These sites will form
these buildings. Most of the re- and video. apartments. prelease the center in prepara- part of an archeological Heritage
cuperating parties obtain per- tion for construction. Trail to attract both local and for-
mits to restore their properties. The first phase of land treatment The detailed design reinterprets eign visitors. Other vestiges, such
In addition, 114 buildings de- in the reclaimed area includes traditional architectural features. as the ancient mosaics, coins, and
volve to Solidere’s ownership several major works. While waste Colorful facades with triple pottery fragments, are removed
when their rights holders elect extraction and its subsequent arches, decorative cornices and and will be displayed at the Na-
not to recover them, opting in- bio-composting progress, land balconies, red-tiled pitched roofs, tional Museum and other suit-
stead to receive Class A shares. reclamation continues with courtyards, paths, and walkways able places.
backfilling into the sea on the stay faithful to the character of
northeast side of the landfill. Saifi and add to the charm of the
This requires approximately two neighborhood. Bouygues (France)
million cubic meters of debris, and Soltravo oversee the execu-
recycled through a process that tion of site preparation works
clears the concrete rubble of steel and construction of permanent
and iron and crushes it before use. diaphragm walls.

Cadastral Maps A final survey of all plots in the Tra-


ditional City Center, approved by the cadastral author-
ities, is the first to convert hand-drawn cadastral maps
into a fully digital format to facilitate land registration,
subdivision, and property transfer.
Beirut Reborn Angus Gavin and Ramez Maluf cele-
brate the publication of their book Beirut Reborn about
the renewal of Beirut’s city center. The book analyzes
the Beirut Central District Master Plan and the early
progress of city center restoration and reconstruction.
Hamidieh Clock Tower Standing tall in the gardens
of the Grand Serail after being rehabilitated and fitted
with new mechanical parts, the Hamidieh Clock Tower
is the first historical monument to be fully restored in
Beirut city center. The clock tower was named after
Sultan Abdul Hamid II, the 19th-century Ottoman
emperor, and was originally inaugurated during cere-
monies marking the 21st anniversary of his reign.
96
Infrastructure 1995 Priority is placed on the delivery
of infrastructure in the historic core and its surroundings.
Corporate Infrastructure Restoration Development

The Company establishes an in- Sales comprising a variety of land As an example of transforming Solidere undertakes building The Conservation Area con- In Beirut Souks, architect Jad For the city center gateway sec- Planned to preserve an unob-
ternal organizational structure, uses have started one year earlier disaster into opportunity, the damage assessment surveys, sists of four character precincts Tabet is commissioned as lead tor of Ghalghoul and Murr structed view from the Grand
with each division staffed by a than planned in response to the new Waterfront District is an development program prepara- and is planned as the political, master planner for the Tawile, Tower, Koetter, Kim and Associ- Serail plaza over the city center,
professional team of experts. The strong demand for Beirut city expansion of an original landfill tions, and conceptual design financial, and cultural heart of Ayass, and Al Jamil Souks, to ates (US) and City Formation the waterfront city park, and the
changes aim to maximize effi- center property, reflecting the enclosing the Normandy dump- studies of the structures to be the city. The Foch-Allenby dis- work in collaboration with Ben- International (Canada) are com- Mediterranean Sea, the Serail
ciency and goal fulfillment public’s confidence in the entire site that has environmentally preserved in accordance with the trict presents a rich variety of ar- jamin Thompson, an American missioned to prepare a detailed Corridor will be a mixed-use
through coordination and coop- project. These sales ensure a scarred the city center foreshore master plan. As part of the strat- chitectural expressions such as firm of architects and planners master plan. The sector is con- sector of medium density that
eration among the various units. quick revitalization of the Tradi- since the Lebanese war. The egy to revitalize Beirut’s historic French Mandate, Venetian- and with recognized skills in retail ceived as high-density, mixed- bridges the city’s Conservation
tional City Center. The policy is Beirut Central District Master core, restoration and rehabilita- Genovese-inspired triple arch and urban marketplace projects use area to include south and Area and the Hotel District. The
The strategy pursued in land to offer buyers the possibility Plan envisions the district cover- tion works begin on several of windows, Ottoman arcades and in the United States and around southwest gateway towers that latter is planned as a high-den-
sales, as in all other activities, of deferring part of the payment ing more than 60 ha of reclaimed the buildings that have not yet cornices, and Islamic friezes and the world. Samir Khairallah & mark two of the city center’s key sity sector.
stems from basic principles of of the sale price, thus enabling land with spectacular views of been recuperated in the Foch- inscriptions. Lebanese architects Partners take charge of the struc- entry points.
the master plan and the Com- them to better plan their invest- the sea and mountains. In fulfill- Allenby area. As the recupera- of the 1920s and 1930s also cre- tural and mechanical aspects of The second new construction
pany’s stated policy and targets. ment financing. ing its agreement with the State, tion process nears completion, ated buildings in a variety of the project. The Paris office of The conceptual design for the project, the Army Officers’ Club,
Within this framework, Solidere Solidere commissions Dames & Restoration Briefs are issued to neo-Oriental styles to express a Larry Smith (US) acts as the former Murr Tower by the is part of a swap agreement with
retains enough flexibility in its In addition, the Company plans Moore (US) to conduct a study recuperating parties, paving the regional identity in contrast to Souks’ first economic consultant. Canadian Webb Zerafa Menkes the Lebanese Ministry of De-
strategic planning to allow for to lease space it owns in reno- and a geotechnical investigation way for renovation works to the classical architecture of the Meanwhile, a detailed design is Housden Partnership transforms fense. The Company undertakes
adjustment and revision accord- vated or new properties to create of the landfill. Based on its rec- begin on a major scale. French Mandate. prepared and excavation works the tower into the Beirut Trade the design and construction at
ing to market developments and a rental market. Along with space ommendations and specifications begin for the parking structure Center. Technical and financial its own expense, and the min-
other changes. available in recuperated proper- for landfill treatment, Dames & Monitoring of the restoration The Maarad-Nejmeh district, below the souks. feasibility studies are carried out istry relinquishes its rights to
ties and new third-party projects, Moore is retained as supervising process takes place regularly to site of the Parliament and several to complete the design, which another lot in the Hotel District
the rental market is fueled by the engineer. avoid any delays in the work’s key religious structures, revolves An urban village in Saifi is in includes architectural, electro- with a structure formerly used as
unique infrastructural advantages progress. The projects advance around a central axis, Maarad planning with French architect mechanical, and structural plans. the Army Officers’ Club. The
that will be available in the city Three of the eight shortlisted through successive phases of pre- Street, a colonnaded boulevard François Spoerry and the archi- Socotec becomes technical con- ministry will then acquire the
center, as well as the opportunity international contractors submit liminary design approval, restora- in the French Mandate style. tectural engineering firm Erga troller. developed property in accor-
it affords to first-time, short-term, bids for marine works involving tion permit issuance, mobilization Serail Hill, overlooking the city Group. The project comprises 16 dance with specifications de-
and/or small-scale users for the design and construction of of site works, facade sample ap- center, houses the Ottoman- separate infill projects in similar Construction launches on a fined at the time.
maximum flexibility in selecting seafront protection and the con- proval, site inspections, design period Prime Minister’s offices scale to the existing preserved 19,900 sq m major new office
places of residence or business. struction of two marinas. Follow- adjustments, and, finally, occu- and the CDR, originally an buildings that date from the 1880s development near Riad El Solh
ing close evaluation and further pancy permit procedures. Build- Ottoman military hospital. Riad to the 1950s. Each is designed as Square comprising offices, large
To protect properties and the negotiations, the British com- ing facades determined fit for El Solh Street, in contrast, is a unique, individual building in conference facilities, and support
public realm, a series of codes pany Maunsell Consultancy is restoration to their original state home to preserved early modern the vernacular tradition of the services equipped with state-of-
and regulations for safety and appointed as engineering con- are preserved by using surviving buildings that have served as late 19th century. Located at the the-art building technologies,
security in Beirut city center is sultant, Sogreah (France) as proj- elements (old stone, wood, and headquarters for financial and southeastern corner of the city communication facilities, and
authored and implemented in ect advisor, the British-Danish iron) and augmenting them government institutions since center, the Saifi residential audiovisual systems.
conjunction with public authori- joint venture Christiani & wherever needed with new the mid 20th century. project falls within the objective
ties and other official agencies. Nielsen–COWI as construction elements shaped to blend in to restore and maintain continu-
58 — 59

Manuals detailing site security manager, and Winston & Strawn seamlessly. The result is authen- ous life and activity in Beirut city
and safety procedures are pre- (Switzerland) as legal advisor. tic restoration based on high- center. By providing 150 apart-
pared. These include a fire code quality craftsmanship, especially ments for rent and sale, the proj-
in collaboration with the Direc- in stonemasonry. ect contributes to the creation of
torate General of Urban Planning, a new rental market.
the Council for Development
and Reconstruction (CDR), and
Libnor (The Lebanese Standards
Institution); a manual concerning
facilities for the disabled, co-
authored by the Economic and
Social Commission for Western
Asia (ESCWA); and a standard
developer’s kit as general refer-
ence for sales, construction, de-
sign, development, and other
related tasks.

Temporary Activities With the addition of a Ra-


madan tent and Christmas fair, activities continue
on Martyrs’ Square, attracting an increasing number
of visitors.
Surface Parking Lots Pending the construction of
the underground public parking lots mandated in the
master plan, temporary surface parking is provided on
vacant lots throughout the city center.
95
Corporate Infrastructure Restoration

The Lebanese Company for the Solidere is incorporated on May Solidere’s activities are manifold. In reconstructing and developing An agreement is signed with the Regulations prepared for the city Based on studies carried out in Approved by the Directorate
Development and Reconstruc- 5 with capital in the amount of They include acquiring real estate Beirut city center, the develop- Council for Development and center require developers to in- 1993 by Dar Al Handasah for the General of Urban Planning, the
tion of Beirut Central District US$1,820,001,290, following a properties and rights within ment strategy is to start by fo- Reconstruction (CDR) to finance corporate parking spaces into subsequently approved master specifications vary according to
s.a.l. (La Societé Libanaise pour statutory general meeting of Beirut city center, financing and cusing on the historic core or and execute infrastructure works building plots and provide ade- plan, the number of salvageable the sector involved and the his-
le Development et la Recon- shareholders. The assembled executing infrastructure works Conservation Area, then move to in Beirut city center in accordance quate parking to serve the uses commercial and residential torical or architectural impor-
struction du centre ville de Bey- body ratifies the Articles of In- on behalf of and at the expense the mixed-use Hotel District and with the approved Master Plan, of each project. The standards buildings in Beirut city center tance of the building. They are
routh, or Solidere) is created for corporation and all pre-forma- of the State, developing and re- residential Saifi to test the mar- ratified by the Council of Minis- assume the gradual introduction amount to 292, including 27 described and illustrated in the
the purpose of reconstructing tion actions undertaken by the constructing Beirut city center by ket. While the Company plans to ters. The infrastructure works in- of effective public transportation public and religious buildings. Restoration Briefs prepared
the Beirut Central District (Beirut Board of Founders, including the restoring existing structures and develop some of the project floor clude a vast array of construction within the city. In addition to Public buildings include the for every building set for preser-
city center) in accordance with share issue and pre-formation building new ones in accordance area itself, it hopes to achieve a projects: primary and secondary these designated parking facili- Grand Serail, seat of the Council vation.
Law 117 of 1991. The Company expenses. It then elects the first with the approved master plan, balanced mix of projects by other roads; bridges and tunnels; a ties, the master plan envisages of Ministers, the Lebanese Par-
comprises a shareholder major- Board of Directors for a three- and selling, leasing, utilizing, developers for the remaining seaside boulevard; public squares three major underground public liament, the Beirut Municipality, A recuperation policy is adopted
ity of former owners and tenants year period and appoints Com- managing, and maintaining these space. As supervisory body and and gardens; water distribution, parking lots in the Traditional the Central Post Office, and sev- to salvage material such as cob-
in city center property, as well as pany auditors. properties. Furthermore, the lead developer, it plans to con- sewage, and rainwater disposal City Center, under Martyrs’ eral ministries. Religious build- blestones and granite curb-
some new shareholders. All for- Company will work to reclaim trol the pace, components, and networks; a power substation and Square and Riad El Solh Square ings comprise 17 churches, stones, structural and decorative
mer stakeholders are required by The Company’s share capital land from the sea according to quality of each development from high-voltage line to the Horch and near the Grand Serail, with mosques, and a synagogue rep- wooden and cast iron elements,
government decree to relinquish consists of the following cate- its agreement with the State; this inception to completion. In that Substation; civil engineering more to come in the reclaimed resenting all religious denomi- terrazzo and decorative ceramic
their property rights in exchange gories: entails land preparation, financing, regard, it initiates Development works for electricity and tele- land area. nations in Lebanon. tiles, and wooden doors and
for shares in the company. and infrastructure development Briefs for new projects, providing communications networks; road windows with traditional value
“A” shares: Contributions in kind on the reclaimed land, and in standardized documentation of lighting and traffic signals; land- Within the reconstruction and The objective is to set a high from buildings that are not pre-
By virtue of Law 117/1991, the to the Company capital are val- consideration thereof, being al- technical guidelines for the de- fill treatment and backfilling on development of the Beirut city benchmark for the renovation of served. These salvaged materials
Company capital will consist of ued at US$1,170,001,290. A located a share in the reclaimed velopment and calculation of the reclaimed area; marine center, marine works include these properties. Solidere insists will be used in the restoration
real estate properties in Beirut maximum of 11,700,012 Class A area in the form of private land floor space for each parcel in works and two new marinas; the design and construction of upon prequalifying local and in- of preserved buildings and the
city center and the rights therein shares valued at US$100 each for development, the construction Beirut city center. and urban and street furniture. seafront protection at the water- ternational consultants and con- pedestrian streets.
(contributions in kind), as well will be issued at par to the prop- of buildings there, and the sale, The agreement stipulates that front marking the area to be tractors with special expertise in
as cash subscriptions. The Com- erty rights holders against their leasing, usage, management, and Solidere will undertake the reclaimed from the sea, as well the restoration of old buildings.
pany’s duration is set at 25 years contributions in kind following maintenance of these properties. works above on behalf and on as the construction of two mari- It establishes clear and strict
starting from the date of incor- the appraisal and distribution account of the State; in return, nas, one to the west and one to urban design and technical
poration. resolution by the Appraisal the Company is granted owner- the east of this reclaimed land. guidelines for restoration work
Committee, appointed by the ship of 291,800 sq m of re- From the outset, the CDR com- in all preserved buildings, whether
Ministry of Justice. The Class A claimed land. missions Sogreah (France) to conducted internally or by out-
shares are issued upon receipt of design the seafront protection side parties who have recuper-
the final distribution decisions In a joint venture with the structure. Sogreah’s preliminary ated or purchased the properties.
by the Distribution Committees Italian Consorzio Cooperative design consists of a double de- Regulations include retaining or
for the relevant property lots. Costruzioni, the Lebanese con- fense line made up of an outer reinstating the original external
tracting firm Klat and Maouad set of large, submerged concrete fabric and applying detailed
“B” shares: Following an offering receives the contract to execute blocks (caissons), a lagoon, and a specifications for all materials
60 — 61

by the Board of Founders for a infrastructure works in the Tradi- series of promenades adjacent to and workmanship. They also re-
cash subscription of US$650 mil- tional City Center. The French the inner set of small box caissons. quire that renovations adhere to
lion, 6.5 million Class B shares company Méthodes et Pilotage Following hydraulic model test- fire and safety regulations and
of US$100 each are issued at par is selected as construction man- ing of the design in Sogreah’s provide access for the disabled.
upon the Company’s establish- ager, while Dar Al Handasah will laboratories in France, as well as
ment. handle detailed design and act several studies including a geo-
as supervising engineer. The technical investigation of the sea
CDR hires Socotec to oversee bed, tendering documents are
technical control on its behalf. prepared for a design-and-build
scheme. Solidere asks eight
shortlisted companies to submit
offers based on the Sogreah de-
sign and allows them to propose
their own alternative designs.

Temporary Activities To introduce a new social des- Information Centers Beirut city center is a must-see Fairuz Concert Solidere launches its activities in the

94
tination to the city’s residents (and later to visitors) for Lebanese and international visitors who want to city center with a concert for Lebanese singer Fairuz.
and to give life to Beirut city center prior to the avail- witness the extent of destruction and observe devel- Held in Martyrs’ Square, the concert attracts over
ability of habitable buildings, Solidere decides to use opment efforts. To provide these visitors with a vision 40,000 fans and rates highly on television stations in
empty lots for exhibitions and other purposes. An of the master plan, Solidere sets up two information the Arab world, with over 125 million viewers.
agreement is signed with the Municipality to use centers. One is located in the Company’s temporary
11,000 sq m in the Martyrs’ Square area for social pro- offices on Riad El Solh Street and houses a 25 sq m
grams and cultural activities, including a monthly flea model of the project, directed primarily at rights hold-
market (Souk El Barghout) and an exhibition of chil- ers, under a banner reading “Beirut is yours, ask about
dren’s drawings from a competition organized by the it.” The second information center is in Martyrs’
Company on the reconstruction of the city center. Square to welcome visitors to the city center and ex-
plain the Company’s vision.
Development Archeology Landscape

Early in the year, the Council In terms of urban planning, the In preparation for future con- Saifi and Wadi Abou Jamil are Like many other ancient cities, Beirut city center turns into the Landscaping is a key part of the Providing an extensive framework
of Ministers ratifies a decree master plan stresses the topog- struction and land sales, parcel- planned as “special residential Beirut is built on the remains of largest urban archeology site in Beirut Central District Master of landscaped public spaces and
approving the Beirut Central raphy of Beirut city center, as well lation and massing studies are policy”districts. Consultant Habib earlier settlements. In an effort the world, with Lebanese and Plan, destined to contribute pedestrian areas is foreseen as a
District Master Plan prepared as the surviving and heritage undertaken for all new develop- Debs undertakes the detailed to shed light on Beirut’s rich past foreign teams of experts from significantly to creating a quality magnet to attract citizens and
by Dar Al Handasah, which has buildings, townscape views, ment areas inside the Traditional sector plan and guidelines for and integrate this past into the many different countries leading environment in the Lebanese visitors to the downtown, mak-
developed out of extensive stud- neighborhood fabric, and the City Center. The work entails Saifi, while Francis Tibbalds (UK) city’s reconstruction, Solidere field operations. Contributors to capital. Beirut as a whole has a ing it Beirut’s main meeting
ies and public debate involving many layers of historical mem- transforming the master plan into develops a similar urban village works with the Hariri Founda- the project include the Lebanese poor pedestrian environment and point. Quality public spaces are
local and foreign specialists. ory forming the city’s heritage. development parcels, building plan and guidelines for Wadi tion and UNDP to help coordi- University, the American Univer- a very limited supply of green, also perceived as having a major
Solidere begins to chart out the Furthermore, it ensures an effec- footprints, and three-dimensional Abou Jamil. The aim is to produce nate and finance archeological sity of Beirut, the Institut Français public spaces. positive impact on land sales.
implementation of the master tive connection between the massing, with proposals for land- the framework for high-quality surveys and excavations in the d’Archéologie du Proche-Orient, With green public spaces and
plan. Traditional City Center and the use mix based on the planning city housing areas where compa- Old City. The Lebanese Direc- the City of Paris, the Museum of pedestrian promenades covering
Waterfront District (the reclaimed objectives for each sector. rably scaled infill development torate General of Antiquities London, Amsterdam University, 39 ha of land, the city center,
The extent of destruction of Beirut land) and between the whole carefully complements a large appoints site archeologists for Leiden University, and the Lev- representing 10 percent of mu-
city center produces a need and project and its surrounding areas. Beirut Souks, named after the number of preserved buildings each excavation. erhulme Foundation. nicipal Beirut, will contain half
opportunity for comprehensive The project includes the recon- Ottoman bazaar that once occu- and an attractive pedestrian en- of the capital’s green areas.
urban planning based on a care- struction and development of a pied its site, is perceived as the vironment of courts and squares, All archeological excavations Extensive work takes place in
fully drawn, detailed, phased, and maximum 4.69 million sq m of focal point of future retail and with special measures to calm are to be carried out under a the area of the Old Souks, in These outdoor escapes play an
coordinated plan of action. On floor space, accommodating a commerce. The total destruction traffic. The sector plans also UNESCO protocol specifically Martyrs’ Square, at the St George integral role in the full experi-
the one hand, Solidere’s primary broad, sustainable, and flexible of the Old Souks paves the way introduce a detailed set of urban devised for Beirut city center Maronite Cathedral, and behind ence of the city center and are
role is to restore the city’s his- land use mix. for their reconstruction. New design and landscaping guide- and approved by the Govern- the former Rivoli building, intertwined with a greater urban
toric buildings and preserve its sections include the Ayass, Tawile, lines to ensure architectural ment. The protocol establishes where remains are found of vision. As an essential aspect of
townscape features; on the other The city center is conceived of Al Jamil, and other former souks, quality and harmony in scale, a delicate balance between pre- what experts believe to be a urban regeneration, each will
hand, it must prepare the land not as a single, homogeneous whose names refer to specialty massing, and facade detail, ma- serving high-value heritage and Canaanite-Phoenician Tell. enhance the beauty and envi-
and infrastructure needed to central district but as a cluster of goods, an anchor retailer, or terials, and color. permitting the city to recover ronmental quality of the area
attract and enable new property city quarters or sectors. Informed well-known family names in and develop. and forge a special relationship
developments of its own or by by natural boundaries and land- business. Following an interna- After its design in the early 1970s with the growing community of
third parties. A main goal is to forms, street patterns and visual tional design competition with as the tallest building in Beirut, residents, workers, and visitors.
enhance the city’s intrinsic quali- corridors, past neighborhood 357 entries from 42 countries, a construction on the Murr Tower, Following a consultancy tender,
ties in order to attract investors, structure, and preserved fabrics, detailed master plan for the Souks a landmark at the western edge the InterScene (France) and
visitors, and residents. it comprises ten sectors, each develops, synthesizing the tradi- of Wadi Abou Jamil, came to a Maurice Bonfils consortium be-
with its own detailed plan and tional features of the old areas halt with the advent of war. Con- gins work on a landscape master
regulations, as well as its own with the requirements of mod- cepts are developed for the plan to include street and av-
unique character. The Traditional ern commercial activity. tower’s rehabilitation with Fos- enue tree planting, promenades,
City Center includes eight sec- ters & Partners (UK) following a public squares, open spaces, and
tors: Conservation Area, Beirut limited design competition. The gardens.
Souks, Wadi Abou Jamil, Saifi, structural engineers request de-
Hotel District, Serail Corridor, tailed testing of the existing
! — 63

Ghalghoul and Murr Tower, and building’s belowground structure.


Martyrs’ Square Axis. The Water-
62

front District is divided into sec-


tors A and D.

94
In 1991, a 16-year war had just ended. What can you tell us about land and property values and evaluate the percentages that would be If archeology remains are uncovered, two possible scenarios follow. If
Ghaleb Mahmassani appropriated to the different rights holders. The results of these studies the findings are not deemed of high importance and can be re-
the reality back then?
on Structuring the Legal determined the current market value of land and properties at the moved, they are either sent to the National Museum or temporarily
Framework of Solidere At the end of the Lebanese war , the state of destruction in many time, to be transformed into shares in the private company that would removed and then reinstated within the landscape of the develop-
areas of Lebanon, but particularly in Beirut’s city center , needed to be established to reconstruct and develop the city center. The capital of ment. If the remains are considered of high importance, the Govern-
Dr. Ghaleb Mahmassani gained his Doctorate in be addressed. There were several problems that needed to be re- the company would consist of the value of land translated into shares ment may place them on the national archeology inventory list. It
Law from the University of Lyon, France. He estab- solved, and it was necessary to develop a framework to implement a for the rights holders (contributions in kind) and cash money raised then has to be decided whether to stop development on the plot of
lished his law firm in Beirut in 1962 and currently comprehensive solution. In the city center, the problems were mainly through an initial public offering of shares (cash contributions), the lat- land in question. If development is stopped, the Government must
holds a number of prominent positions including related to town planning and architecture, to identifying sources to ter part being the cash required for the company to begin operations. repossess this land at current market value.
General Legal Counsel of Solidere since 1998, Vice- finance rehabilitation and reconstruction, to clarifying ownership of
President and acting President of the Beirut Stock property and land and relationships between owners and tenants, This gave rise to controversies. There were many who questioned Who took the initial decision to reclaim land along the city cen-
Exchange, and International Arbitrator and member and to attending to the displaced as well as environmental hazards the legalities of such a valuation and challenged the whole idea, ter’s Mediterranean shoreline, and who is responsible for the en-
of the Permanent Arbitration Court in The Hague. and challenges related to culture and heritage. which they perceived as the takeover of the city center by one vironmental viability of the area that has become known as the
company. Can you explain? Waterfront District?
Why was the reconstruction of the city center of prime importance?
There were some people who questioned the idea of one company Under normal circumstances, it would have been up to the Govern-
Beirut city center was considered of prime importance in reposition- taking control of the reconstruction and development of the city cen- ment to carry out a general impact study for land reclamation. In the
ing Lebanon on the world map. The city center represented the eco- ter. In particular, owners in the city center who had the necessary fi- case of the Beirut city center, the Government gave Solidere full
nomic heart of the country and the focus of coexistence and nances to manage the restoration of their own properties were rights over researching, studying, and commandeering such a proj-
interaction between the various religious communities of the coun- among the objectors. Others questioned the valuation results. In ect. The issue was not about reclaiming land; it was about turning an
try. Lebanon and its people needed to move beyond warfare and its their opinion, properties were undervalued. We questioned this issue environmental hazard into an opportunity. The site in question was
inter-communal strife, and the city center was the best place to have ourselves, but our consultants informed us that land and property that of a 16-year-old dump, containing everything from carcasses to
that happen. The city center was, before the war, home to at least 17 had to be valued at prevailing market value in their current condi- unexploded bombs. It was a costly venture, and the Company did an
places of worship, serving various religious communities. It has dili- tion, as in other cities around the world. Valuation experts could not accomplished job of clearing all the waste, recycling what was usable
gently regained that distinction. predict what would happen to land and property in the long term. At and destroying what was not in an orderly manner. Thereafter, it re-
the same time, it was normal for rights holders to be skeptical. claimed the land area under the guidance of and in collaboration
It was that same year, 1991, that the Lebanese government with the best international expertise available.
passed Law 117 to lay the legal framework for the creation of How could Solidere assuage the rights holders’ fears?
Solidere. What was the reasoning behind such a law? Eighteen years of reconstruction and development have passed.
Once the Company was formed and the shares distributed among Eighteen years from the Company’s 35-year lifespan have passed.
If the reconstruction of Beirut city center was to be left up to the right rights holders and cash subscribers , the shares were immediately What happens after the 35 years are over?
holders, it would most likely have been disorganized. At the end of placed on the Beirut Stock Exchange, which is not usually the case.
the war, the majority of land and property owners and tenants in the Under normal circumstances, shares can only be floated three years Initially, the vision was for a rapid reconstruction and development of
city center did not have the finances to rebuild. Furthermore, without after a company is established. In our case, it was to acknowledge our Beirut city center, and 25 years seemed like a good limit to set. As
a proper plan and guidance, any reconstruction effort would have responsibilities to our shareholders. They could at any time pull out or work progressed, we asked for a 50-year extension and received ten.
been haphazard. Were it not for such a comprehensive solution, the buy into the Company as they followed its daily share activities. Experience has demonstrated that unforeseen circumstances beyond
historic core would have remained half rebuilt to this day, and proba- the Company’s control may emerge, and that the project could take
bly with fewer retained heritage buildings. What is the meaning of recuperation and how was it imple- longer to be completed. If the need arises in the future, we will ask for
Bearing this in mind, the Lebanese authorities adopted mented? Furthermore, there was a general consensus that recuper- a further extension to complete our objective, which is the complete
! — 65

Law 117 to provide the legal framework for the formation of real es- ation was costly to rights holders. How do you explain that? development of the city center into a viable, sustainable area.
tate companies with the objective of reconstructing damaged areas in However, in legal form, at the end of the Solidere’s life, a liq-
64

accordance with a master plan approved by the Government. Recuperation was the act of taking back ownership of a property in the uidator is appointed to sell off the land and properties that the Com-
Regarding Beirut city center, this solution satisfied several objectives. city center by an owner, tenant, or other rights holder. It was foreseen pany owns. Once everything has been liquidated, the profits will be
Primarily, it would ensure that the area would be developed in an that some owners or tenants could recuperate properties if they had the distributed among shareholders based on their percentage ownership.
orderly fashion. It would also ensure that the city center would regain necessary funds to rehabilitate them. However, they had to take into
its past role as a lively melting pot with mixed land uses, that the account the other beneficiaries, according to the rental law still enacted
state would not have to contribute to the financing of reconstruction, at the time. So the owner, tenant, or associate who wanted to recuper-
and that issues pertaining to the rights of landowners and other right ate a property had to offer the other benificiaries the right to come back
holders would be addressed. against a participation in the recuperation costs, which amount to the
In retrospect, the framework for the reconstruction of value of the property as evaluated by the judicial committees plus a 10
Beirut city center has introduced and familiarized the people of percent premium. Additionally, recuperation was conditional upon
Lebanon with serious and extensive urban planning and has given restoration based on Solidere’s guidelines, which were put in place to
birth to an effective system of construction and rehabilitation. ensure a harmoniously preserved and regenerated city center.

You mentioned landowners and rights holders. What is the differ- The issue of archeology is one that keeps recurring. Layers of civi-
ence between the two, and how do they relate to one another? lizations continue to be uncovered in the city center. Though im-
What is the relationship between both groups and the Company? portant, it is also hindering the development process. What are
Who are the rights holders in the city center? the related legalities and responsibilities?

Rights holders are primarily the land or property owners. However, The archeological issue is complex. The law that prevails today per-
under the old Lebanese rental law, tenants are also rights holders, taining to archeological findings in Lebanon dates back to 1933. In
and they have the right to a certain percentage of a property that that regard, the Beirut Central District Master Plan development
they occupy. In the wake of the war, questions of inheritance also guidelines stipulate that every developer must inform the Directorate
emerged as, in some cases, there were also the owners’ heirs and General of Antiquities and Ministry of Culture before beginning exca-
other beneficiaries. It was not an easy process to evaluate and divide vations on a plot of land. Both authorities send an emissary to over-
these rights. The idea was to place all rights holders — owners, ten- see excavations and then give clearance for construction, usually
ants, and other public rights — into one large company. Judicial com- within a six-month period.
mittees of reputable international experts were appointed to estimate
Corporate

Beirut city center bears the brunt The metropolitan plan for Greater The Lebanese Government
of destruction from the Lebanese Beirut, completed in 1986 during passes Law 117, providing the
war, with the entire infrastruc- the war, recognized the vital im- legal framework to create real
ture and two-thirds of the urban portance of restoring and rede- estate companies with the main
fabric assessed in postwar sur- veloping the city center, both objective of reconstructing areas
veys as being beyond salvage. to symbolize postwar national damaged during the hostilities.
In addition, the Normandy dump renewal and to help recover Reconstruction can only take
site occupies a vast area of the Beirut’s lost regional preemi- place in accordance with a mas-
city center shoreline and creates nence. It is clear that this cannot ter plan, which must receive pre-
a major environmental hazard to be achieved through small-scale, vious approval from the
Beirut as a whole. Displaced per- piecemeal redevelopment. What Government. The Government
sons illegally populate unsafe Beirut needs is a grand vision. commissions Dar Al Handasah
structures. (Shair and Partners) to prepare a
Mindful of these factors and master plan for the Beirut Cen-
Fifteen years of war have left an stepping up to the challenge, tral District.
institutional vacuum; no public the country’s first postwar Gov-
sector agency is capable of taking ernment under Prime Minister
on such complex, large-scale Rafic Hariri is determined to
urban restructuring. The Gov- turn Beirut’s downtown disaster
ernment’s resources are already into a rising phoenix through a
stretched to their limit in an unique form of public–private
ambitious, nationwide postwar partnership. Lebanon’s modern
recovery program of physical economy has always been heav-
and social infrastructure and ily service oriented and private
institutional investment. sector driven. Beirut’s postwar
urban recovery is therefore best
directed through neither con-
ventional public sector invest-
ment and management nor a
reliance on funding from aid
agencies, but rather through
concerted and rapid private
sector investment in a carefully
constructed institutional frame-
work, regulated by government
decree.
! — 67
66

Beirut City Center Photographic Mission Six


photographers – Gabriele Basilico (Italy), Raymond
Depardon (France), Fouad El Khoury (Lebanon),
René Burri (Switzerland), Josef Koudelka (Czech Re-
public), and Robert Frank (Switzerland) – are invited
to Beirut for a special photographic mission to
record visual traces of the city center after the end of
the war and before reconstruction efforts. The collec-
tive project is financed by the Hariri Foundation and
a book Beyrouth centre-ville is published with Edition
du Cyprès (1992).
91
Corporate Structure
THE REPORT
Corporate Structure

Board of Directors and General Management Organizational Chart

Corporate Finances
Corporate Funding
Liquidity
Exchange Listing and Ticker Symbols
Analysis of Share Prices
Dividend Distribution
Investor Relations
SHAREHOLDERS
Consolidated Financial Highlights
Summary of Operations in US$ million
BOARD OF
Stock Data per Share in US$ DIRECTORS
Financial Data in US$ million
Financial Ratios in %
GENERAL
MANAGEMENT
Independent Auditors’ Report

CHAIRMAN AND GENERAL MANAGER


Consolidated Financial statements
Consolidated Statement of Financial Position
Consolidated Statement of Income STRATEGY
AND PLANNING
Consolidated Statement of Comprehensive Income GENERAL MANAGER
Consolidated Statement of Changes in Equity
Consolidated Statement of Cash Flows
Notes to the Consolidated Financial Statements GENERAL MANAGER
FOR DEVELOPMENT
Solidere Annual Report 2012:
The Chronicle

INVESTOR RELATIONS
AND CAPITAL MARKETS

CHIEF FINANCIAL OFFICER ASSISTANT GENERAL MANAGERS

CORPORATE TENDERING, BUSINESS OPERATIONS


AFFAIRS CONTRACTING, OPERATIONS
PROCUREMENT, AND RELATIONS
AND SPECIAL WITH PUBLIC
CORPORATE AUTHORITIES
ASSIGNMENTS

URBAN DESIGN ARCHITECTURE LANDSCAPING URBAN REAL ESTATE INFORMATION CORPORATE FINANCIAL TREASURY AND CORPORATE BOARD OF TENDERING PROPERTY QUALITY INFRA- OPERATIONS PROJECT LEGAL ADMINIS- COMMERCIAL URBAN CORPORATE COMMUNI- MULTI-
AND MASTER AND INTERIOR AND PUBLIC PLANNING DEVELOPMENT TECHNOLOGY MANAGEMENT ACCOUNTING FINANCIAL FINANCE DIRECTORS CONTRACTING ADMINISTRA- CONTROL STRUCTURE MAINTENANCE MANAGEMENT TRATION SALES, LEASING MANAGEMENT REPORTING CATIONS DISCIPLINARY
PLANNING DESIGN SPACE DESIGN ACTIVITIES CONTROL ADMINISTRA- AND TION AND SITE AND TECHNICAL AND RETAIL AND AND PUBLIC DESIGN
TIVE AFFAIRS PROCUREMENT LOGISTICS SERVICES MANAGEMENT PUBLICATIONS RELATIONS

Site Architectural Landscaping Urban Planning Strategy Network Risk General Treasury Financial Corporate Tendering for Contract Design Infrastructure Real Estate Restoration Legal Human Land Sales Town Corporate Promotion and Corporate
Assessment Assessment Assessment Assessment Formulation on Administration Management Accounting and Cash Analysis and Documentation Infrastructure Administration Control Execution and Operations and Counsel Resources Planning Research Advertising and Cultural
of Real Estate of Real Estate Real Estate Management Modeling and Archiving and Construction Maintenance Maintenance New Real Estate Reporting Publishing
Master Plan Projects Projects Strategic Land Projects Enterprise Business Taxation System Activities Recuperation Execution Developments Contract General Leasing Quality and Editorial Media Relations
Vision and Use Planning Resource Development Budget Control Business Control Landscape Technical Structuring and Services Control and Corporate
Concept Design Design Real Estate Planning Financial Planning Corporate Procurement of Public Execution and Support Third-Party Management Beirut Souks Supervision Specialized Events and Communication
Development Development Data Analysis and Parameters Waterfront Statements Stock Systems and Services and Services Technical Maintenance Services Developments Management Publications Activities Design
Master Plan Briefs Briefs Urban Planning Corporate District Management Corporate Procedures Supplies Control Site
Development Research Marketing and Application Development Audit Funding Property Third-Party Car Parking Beirut Retail Management Website Corporate Editing
Design Design Commercial Development Relations Financial Special Management Facilities Marina Management and Building Development Social
Regulatory Development Development Archeology Strategy Broadband Reporting Financial Corporate Services Control Responsibility Production
Master Plan and Management Management Heritage Formulation Enterprise Network Markets Assignments Site CCTV
Urban Design and Cultural Project Systems Relations with Logistics Surveillance Design Review
Guidelines Third-Party Landscaping Developments Business Management Public Support Network
Investors of Public Spaces Development Authorities Geographic
Computer Project Reviews Management Corporate Information
Graphics Document Property System
Production Hospitality Real Management Fiscal
Estate Concept Management Signage
and Program Control
Development

Exploratory
Relations and
Negotiations
with Strategic
Partners

Corporate and Financial Report Solidere issues an- The report includes a summary about the company's
nual reports to its shareholders that summarize its ac- corporate finances, consolidated financial highlights,
tivities during a specific year and highlight milestones auditors’ report, and consolidated financial statements.
achieved over the years.
Board of Directors
and General management
Corporate Management

CHAIRMAN VICE CHAIRMAN VICE CHAIRMAN


AND GENERAL MANAGER Fadi Boustany Maher Beydoun
Nasser Chammaa

MEMBER OF THE BOARD MEMBER OF THE BOARD MEMBER OF THE BOARD


AND GENERAL MANAGER Oussama Kabbani Raphael Sabbagha
Mounir Douaidy

MEMBER OF THE BOARD MEMBER OF THE BOARD MEMBER OF THE BOARD


Raja Salemeh Mosbah Kanafani Joseph Asseily

MEMBER OF THE BOARD MEMBER OF THE BOARD MEMBER OF THE BOARD


Basile Yared Maher Daouk Makram Abboud

73
Corporate Finances CORPORATE FUNDING

Treasury, Shares, and Investor Relations In 2012, Solidere pursued the practice of It is worth noting that the share price
resorting to flexible short-term credit bounced back every time market prices
arrangements, mainly temporary overdrafts neared the $12.00 level throughout the year.
at competitive interest rates. All short-term This represents the market’s recognition of
bank facility signed in previous years were the Company’s strong fundamentals, which
renewed. allow it to weather this temporary period of
instability in the region.
LIQUIDITY
Class A shares closed the year at $13.00, rep-
The consolidated balance sheet at year end resenting a 9.59% decrease over the closing
shows positions of US$ 163.5 million for price of the previous year and Class B shares
cash and cash balances and US$ 554.1 mil- closed at $12.93, a 10.82% decrease from the
lion for accounts and notes receivable, and 2011 closing level. Similarly, the GDRs
US$ 646.9 million for bank overdrafts and traded on the London Stock Exchange
short-term facilities. closed the year down at $13.00, a 9.02% de-
crease compared to 2011. A S H A R E S - D A I LY T R A D E S 2 0 1 2
The Company maintained its policy of invest-
ing its liquid funds in assets presenting mini- Both classes of shares fluctuated between a SHARE PRICE US$ VOLUME
mum risk and with top ranking banking and high of $15.35 and a low of $12.04. Trading
financial institutions in the domestic and was relatively sluggish, with a total of around 1,051,789
international markets. For efficient cash 10 million shares changing hands for a cu- 15 200,000
management, Solidere also arranged with mulative value of about $133 million. This
local banks certain revolving current overdraft represents about 6% of the Company’s capi-
facilities, utilized and refunded according to tal. The average daily volume was about 14 150,000
cash needs and availability. 41,000 shares, worth around $551,000 in
total. Thus, the average price for the year was 13 100,000
An annualized interest rate of about 4.11% about $13.22, a 14.7% decrease compared to
was earned on aggregate cash placements the previous year.
for the year. 12 50,000

EXCHANGE LISTINGS AND TICKER DIVIDEND DISTRIBUTION


11 0
SYMBOLS
03 Jan 04 May 31 Aug 31 Dec
Since inception, Solidere has distributed div-
Beirut Stock Exchange idends in 11 out of its 19 years of operations
share price - in us$
Solidere A shares: SOLA.BY for a total value of US$ 1.12 billion (out of an volume of shares traded
Solidere B shares: SOLB.BY aggregate net income of US$ 1.52 billion).
London Stock Exchange Solidere stands by its commitment to distrib-
GDRs: SOLAq.L ute dividends to shareholders depending on
the level of profits and the available liquidity
A N A LY S I S O F S H A R E P R I C E S after providing capital expenditure for infra-
structure and real estate development projects.
The slow, downward drift in share prices
B S H A R E S - D A I LY T R A D E S 2 0 1 2
continued over the year as regional turmoil INVESTOR RELATIONS
worsened and local political bickering inten-
sified. Solidere shares were under pressure As part of its ongoing efforts to achieve wider SHARE PRICE US$ VOLUME

as well, declining throughout the year and and more diversified exposure to the invest-
eventually reaching a seven-year low on rel- ment community, Solidere engaged with 1,006,150
atively quiet market. institutional investors/analysts in meetings 15 200,000
in various local, regional, and international
The share prices witnessed a mild rally dur- investor conferences, with the aim to inform
14 150,000
ing the month of May following the release and provide updates on the Company’s oper-
of the Company’s performance results on the ational and financial developments. Attending
high end of market estimates. However, the investors were mainly from the United States, 13 100,000
share prices then decreased after a serious the United Kingdom and the Middle East and
security event in the country that pulled back North Africa region.
12 50,000
most market participants to the sidelines.
This occurred in spite of many recommenda- Solidere welcomed representatives from a
tions from reputable local and international number of investment funds, research houses 11 0
financial institutions that estimated the value and other financial institutions throughout 03 Jan 04 May 31 Aug 31 Dec
of the shares to be higher than current mar- the year. Citi, BlomInvest, and FFA published
ket prices. Toward the end of the year, an- equity coverage on the Company. share price - in us$
other price rally succeeded in pushing the volume of shares traded
shares above their lows, helping to close the
year on a positive note.

74 75
Consolidated Financial Independent
Highlights Auditors’ Report
To the shareholders
Summary of Results
12 11 The Lebanese Company for the
Development and Reconstruction
of Beirut Central District s.a.l.
Beirut - Lebanon We have audited the accompanying consolidated financial statements of The Lebanese Com-
SUMMARY OF OPERATIONS IN US$ MILLION
pany for the Development and Reconstruction of Beirut Central District s.a.l. (the Company)
and its Subsidiaries (the Group), which comprise the consolidated statement of financial posi-
Gross land sales 49.6 241.7 tion as at December 31, 2012, and the consolidated statement of income, statement of compre-
Gross rental income 58.1 49.9
hensive income, statement of changes in equity and statement of cash flows for the year then
General and administrative expenses 38.0 38.2
ended, and a summary of significant accounting policies and other explanatory information.
Net income 17.5 158.8

M A NAG E M E N T ’ S R E S P O N S I B I L I T Y F O R T H E F I NA N C I A L S TAT E M E N T S

S T O C K DA T A P E R S H A R E I N U S $
Management is responsible for the preparation and fair presentation of these financial state-
ments in accordance with International Financial Reporting Standards and for such internal
Earnings 0.1104 1.0285
control as management determines is necessary to enable the preparation and fair presentation
Shareholders’ equity 11.92 12.3
Stock closing price range of financial statements that are free from material misstatement, whether due to fraud or error.
A shares 14.99 - 12.15 20.40 - 13.40
B shares 14.82 - 12.13 20.07 - 13.11 AUDITOR’S RESPONSIBILITY
GDRs 15.00 - 12.00 20.24 - 13.35
Our responsibility is to express an opinion on these financial statements based on our audit.
We conducted our audit in accordance with International Standards on Auditing. Those stan-
F I N A N C I A L DA T A I N U S $ M I L L I O N dards require that we comply with ethical requirements and plan and perform the audit to ob-
tain reasonable assurance about whether the financial statements are free from material
Cash and securities 163.5 174.1 misstatement.
Accounts and notes receivable 554.1 551.3
Inventory of land and projects in progress 1,249.0 1,178.3 An audit involves performing procedures to obtain audit evidence about the amounts and dis-
Investment properties, net 457.0 444.6 closures in the financial statements. The procedures selected depend on the auditor’s judgment,
including the assessment of the risks of material misstatement of the financial statements,
Retained earnings 196.8 263.1
whether due to fraud or error. In making those risk assessments, the auditor considers internal
Legal reserves 150.4 148.2
control relevant to the entity’s preparation and fair presentation of the financial statements in
Treasury stock (84.2) (134.9)
Total shareholders’ equity 1,909.3 1,935.9 order to design audit procedures that are appropriate in the circumstances, but not for the pur-
pose of expressing an opinion on the effectiveness of the entity’s internal control. An audit also
includes evaluating the appropriateness of accounting policies used and the reasonableness of
F I NA N C I A L R AT I O S I N %
accounting estimates made by management, as well as evaluating the overall presentation of
the financial statements.

Gross profit margin - land sales 85.63 83.72


We believe that the audit evidence we have obtained is sufficient and appropriate to provide a
Return on liquid assets 4.11 4.16
Debt to equity 37.51 30.48 basis for our audit opinion.

OPINION

In our opinion, the consolidated financial statements present fairly, in all material respects, the fi-
nancial position of The Lebanese Company for the Development and Reconstruction of Beirut
Central District s.a.l. and its Subsidiaries (the Group) as of December 31, 2012, and of its consol-
idated financial performance and its cash flows for the year then ended in accordance with Inter-
national Financial Reporting Standards.

Beirut, Lebanon
May 27, 2013 Deloitte & Touche Ernst & Young

76 77
Consolidated Statement Consolidated Statement
of Financial Position of Income
The accompanying notes form an integral part The accompanying notes form an integral part
of these consolidated financial statements of these consolidated financial statements

DECEMBER 31, 2012 2011 YEAR ENDED DECEMBER 31, 2012 2011
notes US$ US$ notes US$ US$

ASSETS Revenues from land sales 49,580,377 241,722,548


Revenues from rented properties 58,132,896 49,862,775
Cash and banks balances 7 163,463,816 174,138,680
Revenues from rendered services 23 6,141,662 5,280,128
Prepayments and other debit balances 8 55,628,848 47,658,853
Revenues from hospitality 6,593,970 6,681,294
Accounts and notes receivables, net 9 554,078,045 551,341,792
Cost of land sales (7,122,763) (39,344,564)
Inventory of land and projects in progress 10 1,248,961,424 1,178,348,256
Charges on rented properties 24 (27,541,099) (21,166,871)
Investment properties, net 11 457,015,039 444,629,160
Cost of rendered services 25 (6,855,684) (5,901,952)
Investment in associates 12 314,965,852 317,731,762
Cost of hospitality (10,590,675) (9,896,404)
Fixed assets, net 13 72,181,096 70,316,628
Gain on sale and disposal of investment
Total Assets 2,866,294,120 2,784,165,131
properties 4,376,528 625,809
Net revenues from operations 72,715,212 227,862,763
Share result from associates 12 3,266,683 3,967,997
General and administrative expenses 26 (37,960,180) (38,196,142)
LIABILITIES
Depreciation of fixed assets 13 (8,160,418) (6,422,073)
Bank overdrafts and short term facilities 14 646,886,436 520,049,200 Provision for contingencies 15 (7,986,410) -
Accounts payable and other liabilities 15 121,132,130 144,809,477 Other expenses 28 (233,877) (5,066,404)
Dividends payable 16 78,776,194 84,195,863 Other income 587,656 613,570
Deferred revenue and other credit balances 17 40,835,805 29,058,568 Taxes, fees and stamps 15(c) (3,956,465) (2,874,543)
Loans from banks and financial institutions 18 69,320,670 70,095,747
Total Liabilities 956,951,235 848,208,855
Interest income 27 29,077,466 24,687,011
Interest expense (27,496,818) (21,081,965)
Profit before tax 19,852,849 183,490,214
Income tax expense 15 (2,322,812) (24,691,842)
SHAREHOLDERS’ EQUITY Profit for the year 17,530,037 158,798,372
Issued capital at par value US$10 per share: 19 Basic/diluted earnings per share 29 0.1104 1.0285
100,000,000 class (A) shares 1,000,000,000 1,000,000,000
65,000,000 class (B) shares 650,000,000 650,000,000 Attributable to:
1,650,000,000 1,650,000,000 Equity owners of the parent 17,945,447 159,029,668
Non-controlling interest (415,410) (231,296)
Profit for the year 17,530,037 158,798,372
Legal reserve 20 150,411,796 148,210,183
Retained earnings 196,787,910 263,104,931
Cumulative foreign currency translation reserve (470,351) (295,169)
(Deficit)/surplus on treasury shares’ activity (2,446,798) 10,166,079
Less: Treasury shares 21 (84,210,286) (134,915,772)
Total equity attributable to the owners of the parent 1,910,072,271 1,936,270,252

Non-controlling interest 22 (729,386) (313,976)


Total Equity 1,909,342,885 1,935,956,276

Total Liabilities and Shareholders’ Equity 2,866,294,120 2,784,165,131

78 79
80
Attributable to:
Profit for the year
YEAR ENDED DECEMBER 31,

Non-controlling interest
Equity owners of the parent
Other comprehensive income:

Total comprehensive income


Foreign currency translation reserve
Consolidated Statement

of these consolidated financial statements

Other comprehensive loss for the year


of Comprehensive Income
The accompanying notes form an integral part

12
notes

17,354,855
17,770,265
17,354,855
17,530,037
US$
2012

(415,410)
(175,182)
(175,182)

158,653,989
158,885,285
158,653,989
158,798,372
US$
2011

(231,296)
(144,383)
(144,383)

Consolidated Statement
of Changes In Equity
The accompanying notes form an integral part
of these consolidated financial statements

TOTAL EQUITY ATTRIBUTABLE TO OWNERS OF THE PARENT

(DEFICIT)
CUMULATIVE SURPLUS ON
SHARE LEGAL RETAINED FOREIGN CURRENCY TREASURY TREASURY NON-CONTROLLING
CAPITAL RESERVE EARNINGSTRANSLATION RESERVE SHARES’ ACTIVITY SHARES TOTAL INTEREST TOTAL
US$ US$ US$ US$ US$ US$ US$ US$ US$

Balance at December 31, 2010 1,650,000,000 131,952,540 267,233,047 (150,786) 13,770,056 (224,507,599) 1,838,297,258 (82,680) 1,838,214,578
Allocation to legal reserve from
2011 profit - 16,257,643 (16,257,643) - - - - - -

Total comprehensive income - - 159,029,668 (144,383) - - 158,885,285 (231,296) 158,653,989


Dividends - Note 16 - - (146,900,141) - (3,603,977) 89,591,827 (60,912,291) - (60,912,291)
Balance at December 31, 2011 1,650,000,000 148,210,183 263,104,931 (295,169) 10,166,079 (134,915,772) 1,936,270,252 (313,976) 1,935,956,276
Allocation to legal reserve from
2012 profit - 2,201,613 (2,201,613) - - - - - -
Total comprehensive income - - 17,945,447 (175,182) - - 17,770,265 (415,410) 17,354,855
Dividends - Note 16 - - (82,060,855) - (12,612,877) 50,705,486 (43,968,246) - (43,968,246)
Balance at December 31, 2012 1,650,000,000 150,411,796 196,787,910 (470,351) (2,446,798) (84,210,286) 1,910,072,271 (729,386) 1,909,342,885
81
Formation and Objective Adoption of New and Revised
Consolidated Statement Notes to the Consolidated
of Cash Flows
The accompanying notes form an integral part
Financial Statements
Year ended December 31, 2012
1 of the Company
2 International Financial Report-
ing Standards (Ifrss)

of these consolidated financial statements 2 . 1 S TA N DA R D S A N D I N T E R P R E TA -


The Lebanese Company for the Develop- TIONS EFFECTIVE FOR THE
ment and Reconstruction of Beirut Central CURRENT PERIOD
District s.a.l. (SOLIDERE) (the Company)
was established as a Lebanese joint stock The following revised standard has been ap-
company on May 5, 1994 based on Law No. plied in the current year with no material
2012 117/91, and was registered on May 10, 1994 impact on the disclosures and amounts re-
YEAR ENDED DECEMBER 31, 2011
notes US$ US$ under Commercial Registration No. 67000. ported for the current and prior years, but
The articles of incorporation of the Company may affect the accounting for future transac-
CASH FLOWS USED IN OPERATING ACTIVITIES were approved by Decree No. 2537 dated tions or arrangements:
July 22, 1992.
Profit for the year before income tax 19,852,849 183,490,214 Amendments to IAS 12 Income Taxes pro-
Adjustments to reconcile profit to net cash used in vide an exception to the general principles of
The objective of the Company, is to acquire
operating activities: IAS 12 for investment property measured
real estate properties, to finance and ensure
Depreciation 30 17,757,671 13,538,734 using the fair value model in IAS 40 Invest-
the execution of all infrastructure works in
Gain on sale of investment properties 11 (4,376,528) (625,809) ment Property by the introduction of a re-
the Beirut Central District (BCD) area, to
Loss on sale of fixed assets 526 - buttable presumption that the carrying
prepare and reconstruct the BCD area, to re-
Loss of ownership of investment properties - 1,275,219 amount of the investment property will be
construct or restore the existing buildings, to
Provision for problematic receivables (290,136) 290,136 recovered entirely through sale.
erect buildings and sell, lease or exploit such
Provision for end-of-service indemnity and other charges 15(d) 2,348,327 2,298,404
buildings and lots and to develop the landfill
Provision for contingencies 7,986,410 - 2 . 2 N E W A N D R E V I S E D S TA N DA R D S
on the seaside.
Additional tax assessment 2,500,000 - IN ISSUE BUT NOT YET EFFECTIVE
Share result from an associate 12 (3,266,683) (3,967,997)
The duration of the Company is 25 years,
Interest income 27 (29,077,466) (24,687,011) The Group has not applied the following
beginning from the date of establishment.
Interest expense 30 30,737,755 24,353,558 new standards, amendments and interpreta-
An extraordinary general assembly dated
Changes in working capital: tions that have been issued but not yet effec-
June 29, 1998 resolved to amend the dura-
Prepayments and other debit balances 8,659,589 8,653,835 tive:
tion of the Company to be 75 years begin-
Accounts and notes receivable (3,142,061) (65,019,448)
ning from the date of establishment. During
Inventory of land and projects in progress 30 (94,487,825) (103,690,054)
2005, the Council of Ministers approved the
Accounts payable and other liabilities (13,447,113) 3,055,245
extension of the duration of the Company
Deferred revenues and other credit balances 17 11,777,237 (17,151,577)
for 10 years.
Interest received 12,447,883 13,175,981
The Company, based on law No.117/91
Income tax paid (24,691,842) (35,288,373)
mentioned above, was exempt from income
Net cash used in operating activities (58,711,407) (298,943)
tax for a period of ten years beginning on the
date of formation. As such beginning May
10, 2004, the Company became subject to in-
CASH FLOWS FROM/(USED IN) INVESTING ACTIVITIES come tax.
Short term deposit 1,353,808 (269,317)
Pledged term deposits with banks - (19) An extraordinary general assembly dated
Receivable from recuperated properties - 191,773 November 13, 2006 resolved to amend the
Acquisition of fixed assets 13&30 (8,497,552) (17,500,628) objective of the Company to include provid-
Acquisition of investment properties 11&30 (2,542,737) (2,059,649) ing services and consultancy in real estate
Proceeds from sale of investment properties 11 6,129,002 1,231,472 development for projects outside the BCD
Proceeds from sale of fixed assets 11 1,153,929 1,002,330 area and all over the world.
Investment in associates 12 5,857,411 (3,978)
Net cash provided by/(used in) investing activities 3,453,861 (17,408,016) During 2007, the Company granted Solidere
International Limited (an associate) the right
to use the “Solidere” brand in the execution
CASH FLOWS USED IN FINANCING ACTIVITIES
of real estate projects outside the Beirut Cen-
tral District area of Lebanon.
Bank loans (775,077) 61,847,227
Dividends paid 16 (44,735,908) (63,044,305) The Company’s shares are listed on the
Treasury shares (4,652,007) - Beirut stock exchange and Global Depository
Interest paid (30,737,755) (24,353,558) Receipts (GDR) are listed on the London
Short term facilities 39,360,646 44,603,822 stock exchange (International Trading List).
Net cash used in financing activities (41,540,101) 19,053,186

Net change in cash and cash equivalents (96,797,647) 1,346,227


Cash and cash equivalents — Beginning of the year 82,980,898 81,634,671
Cash and cash equivalents — End of the year 30 (13,816,749) 82,980,898

82 83
EFFECTIVE FOR ANNUAL PERIODS EFFECTIVE FOR ANNUAL PERIODS
BEGINNING ON OR AFTER BEGINNING ON OR AFTER

> Amendments to IAS 1 – Presentation of Other Comprehensive Income. The amendments retain the
> January 1, 2015 July 1, 2012
IFRS 9 Financial Instruments issued in November 2009 and amended in October 2010 intro- option to present profit or loss and other comprehensive income in either a single statement or in
duces new requirements for the classification and measurement of financial assets and finan- two separate statements. However, items of other comprehensive income are required to be
cial liabilities and for derecognition. IFRS 9 requires all recognized financial assets that are grouped into those that will and will not subsequently be reclassified to profit or loss with tax on
within the scope of IAS 39 to be subsequently measured at amortized cost or fair value. Specif- items of other comprehensive income required to be allocated on the same basis.
ically, debt investments that are held within a business model whose objective is to collect
the contractual cash flows, and that have contractual cash flows that are solely payments of
principal and interest on the principal outstanding are generally measured at amortized cost. Amendments to IAS 19 Employee Benefits eliminate the“corridor approach”and therefore require January 1, 2013
All other debt investments and equity investments are measured at their fair values. Financial an entity to recognize changes in defined benefit plan obligations and plan assets when they
assets representing equity securities designated at fair value through profit or loss or fair value occur.
through other comprehensive income cannot be reclassified after initial recognition. At initial
recognition, an entity may make an irrevocable election to present in other comprehensive Amendments to IFRS 7 Financial Instruments: Disclosures enhancing disclosures about offsetting January 1, 2013
income subsequent changes in the fair value of an investment in an equity instrument that is of financial assets and liabilities.
not held for trading. The gain or loss that is presented in other comprehensive income includes
any related foreign exchange component. Dividends on such investments are recognized in
profit or loss in accordance with IAS 18 Revenue unless the dividend clearly represents a re- > Amendments to IAS 32 Financial Instruments: January 1, 2014
covery of part of the cost of the investment. Amounts presented in other comprehensive in- - Presentation relating to application guidance on the offsetting of financial assets and financial
come shall not be subsequently transferred to profit or loss. However, the entity may transfer liabilities.
the cumulative gain or loss within equity. - Resulting from Annual Improvements 2009, 2011 cycle (tax effect of equity distributions)

> IFRS 10 Consolidated Financial Statements* replaces the parts of IAS 27 Consolidated and Sepa- January 1, 2013 IAS 27 Separate Financial Statements (as revised in 2011) as a consequence of the new IFRS 10 January 1, 2013
rate Financial Statements that deal with consolidated financial statements, and SIC 12 Consol- and IFRS 12, what remains in IAS 27 is limited to accounting for subsidiaries , jointly controlled
idation - Special Purpose Entities. IFRS 10 uses control as the single basis for consolidation, entities and associates in separate financial statements.
irrespective of the nature of the investee and includes a new definition of control. IFRS 10 re-
quires retrospective application subject to certain transitional provisions providing an alter-
native treatment in certain circumstances. IAS 27 Consolidated and Separate Financial IAS 28 Investment in Associates and Joint Ventures (as revised in 2011): As a consequence of the January 1, 2013
Statements* and IAS 28 Investments in Associates and Joint Ventures* have been amended for new IFRS 11 and 12, IAS 28 has been renamed IAS 28 Investments in Associates and Joint Ventures,
the issuance of IFRS 10 and SIC – 12 consolidation Special Purpose Entities will be withdrawn and describes the application of the equity method to investments in joint ventures in addition
upon the effective date of IFRS 10. to associates.

> IFRS 11 Joint Arrangements* replaces IAS 31 Interests in Joint Ventures and SIC-13 Jointly Con- January 1, 2013
trolled Entities - Non monetary Contributions by Venturers. IFRS 11 establishes two types of joint
arrangements: Joint operations and joint ventures. The two types of joint arrangements are
distinguished by the rights and obligations of those parties to the joint arrangement. In addi-
tion, joint ventures under IFRS 11 are required to be accounted for using the equity method
of accounting, whereas jointly controlled entities under IAS 31 can be accounted for using
the equity method of accounting or proportionate. IAS 28 Investments in Associates and Joint
Ventures has been amended for the issuance of IFRS 11 and SIC – 13 Jointly Control Entities
will be withdrawn upon the effective date of IFRS 11.

> IFRS 12 Disclosure of Interests in Other Entities* is a disclosure standard and is applicable to January 1, 2013
entities that have interests in subsidiaries, joint arrangements, associates and/or unconsoli-
dated structured entities. In general, the disclosure requirements in IFRS 12 are more extensive
than those in the current standards.

> Amendment to IFRSs 10, 11 and 12 on transition guidance: These amendments provide ad- January 1, 2013
ditional transition relief to IFRSs 10, 11 and 12, limiting the requirement to provide adjusted
comparative information to only the preceding comparative period. For disclosures related to
unconsolidated structured entities, the amendments will remove the requirement to present
comparative information for periods before IFRS 12 is first applied.

> IFRS 13 Fair Value Measurement defines fair value, establishes a single framework for measuring January 1, 2013
fair value, and requires disclosures about fair value measurement. The scope of IFRS 13 is
broad and applies to both financial and non-financial items for which other IFRSs require or
permit fair value measurement and disclosures about fair value measurements, except in spec-
ified circumstances. In general, the disclosure requirements in IFRS 13 are more extensive
than those required in the current standards.

84 85
Annual Improvements May 2012 IAS 34 Interim Financial Reporting Changes in the Group’s ownership interests in exchange rates fluctuate significantly during cial assets or financial liabilities with another
Summary of Significant

3 Accounting Policies
These improvements will not have an impact The amendment aligns the disclosure require- subsidiaries that do not result in the Group los- that period, in which case the exchange rates at entity under conditions that are potentially
on the Group, but include: ments for total segment assets with total seg- ing control over the subsidiaries are accounted the dates of the transactions are used. Exchange unfavorable to the issuer.
ment liabilities in interim financial statements. for as equity transactions. The carrying amounts differences arising, if any, are recognized in
IFRS 1 First-time Adoption of International This clarification also ensures that interim dis- of the Group’s interests and the non-controlling other comprehensive income and accumulated (b) If the instrument will or may be settled
Financial Reporting Standards closures are aligned with annual disclosures. interests are adjusted to reflect the changes in in equity (attributed to non-controlling interests from the Group’s own equity instruments; it
This improvement clarifies that an entity that These improvements are effective for annual The consolidated financial statements have their relative interests in the subsidiaries. Any as appropriate). Such exchange differences are is a non-derivative that includes no contrac-
stopped applying IFRS in the past and periods beginning on or after 1 January 2013. been prepared in accordance with Interna- difference between the amount by which the recognized in profit or loss in the period in tual obligation for the Group to deliver a vari-
chooses, or is required, to apply IFRS, has the tional Financial Reporting Standards. non-controlling interests are adjusted and the which the foreign operation is disposed of. able number of its own equity instruments; or
option to re-apply IFRS 1. If IFRS 1 is not re- * In May 2011, a package of five Standards on fair value of the consideration paid or received a derivative that will be settled only by the
applied, an entity must retrospectively restate consolidation, joint arrangements, associates The consolidated financial statements are pre- is recognized directly in equity and attributed to C . I M PA I R M E N T A N D Group exchanging a fixed amount of cash or
UNCOLLECTIBILITY
its financial statements as if it had never and disclosures was issued, consisting of sented in U.S. Dollars. owners of the Company. OF FINANCIAL ASSETS: another financial asset for a fixed number of
stopped applying IFRS. IFRS 10, IFRS 11, IFRS 12, IAS 27 (as revised its own equity instruments.
in 2011) and IAS 28 (as revised in 2011). The consolidated financial statements are pre- Upon the loss of control, the Group derecog- An assessment is made at each consolidated
IAS 1 Presentation of Financial Statements These five standards are effective for annual pared under the historical cost convention as nizes the assets and liabilities of the subsidiary, statement of financial position date to deter- Financial assets within the scope of IAS 39 are
This improvement clarifies the difference be- periods beginning on or after 1 January modified for the measurement at fair value of any non-controlling interests and the other mine whether there is objective evidence that a classified as financial assets at fair value
tween voluntary additional comparative infor- 2013. Earlier application is permitted pro- available-for-sale financial assets and deriva- components of equity related to the subsidiary. financial asset or group of financial assets may through profit or loss, loans and receivables,
mation and the minimum required comparative vided that all of these five standards are ap- tives, as applicable. Any surplus or deficit arising on the loss of con- be impaired. If such evidence exists, the esti- held-to-maturity investments or available-for-
information. Generally, the minimum required plied early at the same time. trol is recognized in profit or loss. If the Group mated recoverable amount of that asset and any sale financial assets, as appropriate. When fi-
comparative information is the previous period. The consolidated financial statements incor- retains any interest in the previous subsidiary, impairment loss are determined based on the nancial assets are recognized initially, they are
Management anticipates that the adoption of porate the financial statements of The then such interest is measured at fair value at present value of expected future cash flows. Im- measured at fair value, plus, in the case of in-
IAS 16 Property Plant and Equipment the above Standards and Interpretation will Lebanese Company for the Development and the date that control is lost. pairment losses are recognized in the consoli- vestments not at fair value through profit or
This improvement clarifies that major spare have no material impact on the financial state- Reconstruction of Beirut Central District s.a.l. dated statement of income. loss, directly attributable transaction costs.
parts and servicing equipment that meet the ments of the Group in the period of initial ap- and its controlled subsidiaries drawn up to The significant accounting policies adopted
December 31 of each year. Control is achieved D. ACCOUNTS AND NOTES
definition of property, plant and equipment plication, except for IFRS 9 and IFRS 13 which are set here below: R E C E I VA B L E : The Group determines the classification of its
are not inventory. may affect the amounts reported in the finan- where the Group has the power to govern the financial assets on initial recognition and,
cial statements and result in more extensive financial and operating policies of an entity so A . BA S I S O F P R E S E N TAT I O N : Accounts and notes receivable which are orig- where allowed and appropriate, re-evaluates
IAS 32 Financial Instruments, Presentation disclosures in the financial statements. as to obtain benefits from its activities. inated by the Group are stated at amortized this designation at each financial year end.
In view of the long term nature and particulars
This improvement clarifies that income taxes cost less any amount written off and provisions
Where necessary, adjustments are made to the of the Group’s operations, the consolidated fi-
arising from distributions to equity holders are for impairment. An assessment is made at each All regular way purchases and sales of finan-
financial statements of subsidiaries to bring nancial statements are presented on the basis
accounted for in accordance with IAS 12 In- consolidated statement of financial position cial assets are recognised on the trade date,
their accounting policies in line with those that the operations have realization and liqui-
come Taxes. date to determine whether there is objective which is the date that the Group commits to
used by other members of the Group. dation periods spread over the duration of the
evidence that accounts or notes receivable may purchase the asset. Regular way purchases or
Group and which are subject to market condi-
be impaired. If such evidence exists, the esti- sales are purchases or sales of financial assets
All intra-Group balances, transactions, in- tions and other factors commonly associated
mated recoverable amount of that asset is de- that require delivery of assets within the pe-
come and expenses and profits and losses re- with development projects; as such, the assets
termined and any impairment loss, based on riod generally established by regulation or
sulting from intra-Group transactions are and liabilities are reflected in the statement of
the net present value of future anticipated cash convention in the marketplace.
eliminated in full. financial position without distinction between
flows discounted at original effective interest
current and long-term classifications.
rates, is included in the consolidated statement Loans and Receivables:
B. FOREIGN CURRENCIES: of income. Loans and receivables are non-derivative fi-
nancial assets with fixed or determinable pay-
The functional and presentation currency The carrying amount of the asset is adjusted ments that are not quoted in an active market.
is the U.S. Dollar, in accordance with the through the use of an allowance account. After initial measurement, loans and receiv-
applicable law, which reflects the economic ables are carried at amortized cost using the
substance of the underlying events and cir- E. FINANCIAL INSTRUMENTS:
effective interest method less any allowance
cumstances of the Group. Transactions denom- for impairment. Gains and losses are recog-
Financial assets and financial liabilities are
inated in other currencies are translated into nized in profit and or loss when the loans and
recognized in the Group’s consolidated state-
Group entities comprise the following: U.S. Dollar at the exchange rates prevailing at receivables are derecognized or impaired as
OWNERSHIP DATE OF
ment of financial position when the Group
the dates of the transactions. Monetary assets well as through the amortization process.
COMPANY SHARE ESTABLISHMENT ACTIVITY becomes a party to the contractual provisions
and liabilities stated in currencies other than
% of the instrument.
the U.S. Dollar are translated at the rates of ex- Fair Value:
change prevailing at the end of the year. The re- The fair value of investments that are actively
Beirut Water Front Development s.a.l. (Joint Venture) When a financial instrument gives rise to a con-
sulting exchange gain or loss which is not traded in organized financial markets is deter-
(Proportionate consolidation) 50 April 2004 Real Estate tractual obligation on the part of the Group to
material is reflected in the consolidated state- mined by reference to quoted market bid prices
Development deliver cash or another financial asset or to ex-
ment of income. at the close of business on the consolidated
Beirut Real Estate Management and Services s.a.l. change another financial instrument under
(Joint Venture), (Proportionate consolidation) 45 September 2005 Real Estate conditions that are potentially unfavorable, it is statement of financial position date. For invest-
For the purposes of presenting consolidated fi- ments where there is no active market, fair
Management classified as a financial liability. The instrument
nancial statements, the assets and liabilities of value is determined using valuation techniques.
Solidere Management Services s.a.l. 100 June 2006 Real Estate is an equity instrument if, and only if, both con-
the Group’s foreign operations are translated Such techniques include using recent arm’s
Management ditions (a) and (b) below are met:
into Lebanese Pound using exchange rates pre- length market transactions, reference to the
Solidere Management Services (Offshore) s.a.l. 100 March 2007 Real Estate
(a) The instrument includes no contractual ob-
vailing at the end of each reporting period. In- current market value of another instrument,
Management
come and expense items are translated at the which is substantially the same, discounted
Solidere International Holdings s.a.l. 100 May 2007 Holding ligation to deliver cash or another financial
average exchange rates for the period, unless cash flow analysis and other pricing models.
BHC Holding s.a.l. and its Subsidiaries 100 March 2010 Hospitality asset to another entity; or to exchange finan-

86 87
Derecognition: Offsetting: Transfers are made from investment proper- J. FIXED ASSETS: L. TREASURY SHARES: N. COST OF SALES:
Financial assets Financial assets and financial liabilities are ties when, and only when, there is a change
A financial asset (or where applicable, a part only offset and the net amount is reported in in use, evidenced by commencement of owner Fixed assets are stated at cost net of accumu- Own equity instruments which are reacquired Cost of properties sold is determined on the
of a financial asset or part of a group of similar the consolidated statement of financial posi- occupation or commencement of develop- lated depreciation and any impairment in (treasury shares) are deducted from equity. No basis of the built up area (BUA) - permitted
financial assets) is derecognized where: tion when there is a legally enforceable right ment with a view to sell. value. Depreciation is computed using the gain or loss is recognized in profit or loss on right to build in square meters - on the sold
to set-off the recognized amounts and the straight-line method over the estimated useful the purchase, sale, issue or cancellation of the plots based on the terms of the sales agree-
> The rights to receive cash flows from the Group intends to either settle on a net basis, H. INTEREST IN JOINT VENTURES: lives of the assets based on the following an- Group’s own equity instruments. ments. The cost of one square meter of BUA is
asset have expired, or or to realize the asset and the liability simul- nual rates: arrived at by dividing, total estimated cost of the
taneously. The Group has interests in joint ventures. A Gains on sale of treasury shares are recorded land development project over total available
> The Group has transferred its rights to re- joint venture is a contractual arrangement Buildings 2% under a reserve account in equity. Losses in BUA after deduction of the BUA relating to re-
ceive cash flows from the asset, or has as- F. INVENTORY OF LAND AND whereby two or more parties undertake an Marina 2% excess of previously recognized gains are cuperated properties and those relating to the
sumed an obligation to pay the received PROJECTS IN PROGRESS: economic activity that is subject to joint con- Furniture and fixtures 9% charged to retained earnings. religious and public administrations.
cash flow in full without material delay to a trol. The Group recognizes its share in joint Freehold improvements 9%
third party under a ‘pass through’ arrange- Inventory of land and projects in progress are ventures by using the proportionate consoli- Plant 10% M. REVENUE RECOGNITION: O. CA S H A N D CA S H E Q U I VA L E N T S :
ment, and stated at the lower of cost and estimated net dation method. Machines and equipment 15%-20%
realizable value. Costs include appraisal values Revenue on land and real estate sales trans- For the purpose of the statement of cash
> Either (a) the Group has transferred sub- of real estate plots constituting the contribu- Investments in joint ventures are accounted Expenditure incurred to replace a component actions is recognized on the basis of the full flows, cash and cash equivalents consists of
stantially all the risks and rewards of the tions in kind to capital (A shares), in addition for in the standalone financial statements of an item of fixed assets that is accounted for accrual method as and when the following cash in hand, bank balances, and short-term
asset, or (b) the Group has neither trans- to capitalized costs. Capitalized costs comprise using historical cost net of any impairment separately is capitalized and the carrying conditions are met: deposits with an original maturity of three
ferred nor retained substantially all the risks the following: loss. Impairment loss is recognized in the amount of the component that is replaced is - A sale is consummated and contracts are months or less, net of outstanding bank over-
and rewards of the asset, but has transferred - Project direct costs and overheads related to statement of income. written off. Other subsequent expenditure is signed. drafts and short-term facilities with an original
control of the asset. the properties development, construction and capitalized only when it increases future eco- - The buyer’s initial (in principle over 25% of maturity of three months or less.
project management as a whole, as well as ac- The Group consolidates its share in assets, li- nomic benefits of the related item of fixed as- sales price) and continuing investments are
When the Group has transferred its rights to re- quisition, zoning, and eviction costs. abilities, revenues and expenses with related sets. All other expenditure is recognized in the adequate to demonstrate a commitment to P. B O R R O W I N G C O S T S :
ceive cash flows from an asset and has neither - Indirect costs, such as overheads, which captions in the consolidated financial state- consolidated statement of income as the ex- pay for the property.
transferred nor retained substantially all the were partially allocated to inventory of land ments. pense is incurred. - The Group’s receivable is not subject to fu- Borrowing costs directly attributable to the ac-
risks and rewards of the asset nor transferred and projects in progress. ture subordination. quisition, construction or production of qual-
control of the asset, the asset is derecognized to Financial statements of joint ventures are pre- K . I M PA I R M E N T O F T A N G I B L E A S S E T S : - The Group has transferred to the buyer the ifying assets, which are assets that necessarily
the extent of the Group’s continuing involve- G. INVESTMENT PROPERTIES: pared for the same fiscal year, using the same usual risks and rewards of ownership in a take a substantial period of time to be ready
ment in the asset. Continuing involvement that accounting policies. At each consolidated statement of financial transaction that is in substance a sale and for their intended use, are added to the cost of
takes the form of a guarantee over the trans- Investment properties which represent prop- position date, the carrying amounts of tangi- the Group does not have a substantial con- those assets, until such time that the assets are
ferred asset is measured at the lower of the orig- erties held to earn rent and/or for capital ap- When the Group contributes or sells assets to ble assets (investment properties and fixed as- tinuing involvement with the property. substantially ready for their intended use.
inal carrying amount of the asset and the preciation are measured initially at cost and the joint venture, any portion of gain or loss sets) are reviewed to determine whether there
maximum amount of consideration that the subsequent to initial recognition are stated at from the transaction is recognized based on is any indication that these assets have suf- If any of the above conditions is not met, the ini- All other borrowing costs are reflected in the
Group could be required to repay. their cost less accumulated depreciation and the substance of the transaction. When the fered an impairment loss. If any such indica- tial payments received from buyers are recorded consolidated statement of income in the pe-
any impairment in value. Group sells assets to the joint venture, the tion exists, the recoverable amount of the asset under deferred revenues and other credit bal- riod in which they are incurred.
When continuing involvement takes the form Group does not recognize its share of the is estimated in order to determine the extent ances. Amounts are released to revenue as and
of a written and/or purchased option (including Depreciation is computed using the straight- profits from the transaction until the joint ven- of the impairment loss, if any. when the above conditions are fulfilled. Q. BANK BORROWINGS:
a cash settled option or similar provision) on the line method over the estimated useful lives of ture resells the assets to an independent party.
transferred asset, the extent of the Group’s con- the properties, excluding the cost of land, Recoverable amount is defined as the higher Financial assets (including treasury shares) re- Interest-bearing bank loans and overdrafts are
tinuing involvement is the amount of the trans- based on the following annual rates: The joint venture is proportionately consolidated of: ceived in return for the sale of land and real initially measured at the fair value of the con-
ferred asset that the Group may repurchase, until the date on which the Group ceases to - Fair value that reflects market conditions at estate are valued at fair market value. sideration received, less directly attributable
except that in the case of a written put option Buildings 2% have joint control over the joint venture. the balance sheet date less cost to sell, if any. costs and are subsequently measured at amor-
(including a cash settled option or similar pro- Furniture, fixtures, equipment - Value in use assessed as the present value of Rental income from operating leases is recog- tized cost, using the effective interest rate
vision) on an asset measured at fair value, the and other assets 4%-15% I. INVESTMENTS IN ASSOCIATES: estimated future cash flows expected to arise nized on a straight-line basis over the term of method. Any difference between the proceeds
extent of the Group’s continuing involvement from the continuing use of the asset and the relevant lease. (net of transaction costs) and the settlement or
is limited to the lower of the fair value of the The carrying amount includes the cost of replac- The Group’s investments in associates are ac- from its disposal at the end of its useful life, redemption of borrowings is recognized in
transferred asset and the option exercise price. ing part of an existing investment property at counted for under the equity method of ac- only for applicable assets with cash genera- Interest income is recognized as interest ac- profit or loss over the term of the borrowings
the time that cost is incurred if the recognition counting. These are entities over which the tion units, as applicable. crues using the effective interest method, by through the amortization process, using the ef-
Financial liabilities criteria are met. Other subsequent expenditure Group exercises significant influence and which reference to the principal outstanding and the fective interest rate method.
A financial liability is derecognized when the is capitalized only when it increases future eco- are neither subsidiaries nor joint ventures. Where an impairment loss subsequently re- applicable interest rate.
obligation under the liability is discharged or nomic benefits of the related item of investment verses, the carrying amount of the asset is in- R . T R A D E A N D O T H E R PA Y A B L E S :
cancelled or expires. Where an existing finan- properties. All other expenditure is recognized Under the equity method of accounting, the creased to the revised estimate of its recoverable Revenue from rendering of services is recog-
cial liability is replaced by another from the in the consolidated statement of income as the interest in the associate is carried in the con- amount, but so that the increased carrying nized when the outcome of the transaction Trade and other payables are initially measured
same lender on substantially different terms, expense is incurred. solidated statement of financial position at amount does not exceed the carrying amount can be estimated reliably, by reference to the at fair value. Due to their short-term nature, the
or the terms of an existing liability are sub- cost as adjusted for post acquisition changes that would have been determined had no im- stage of completion of the transaction at the carrying amount of trade and other payables
stantially modified, such an exchange or mod- Transfers are made to investment properties in the Group’s share of the net assets of the pairment loss been recognized for the asset in consolidated statement of financial position approximates their fair values as of the date of
ification is treated as a derecognition of the when, and only when, there is a change in associate, less any impairment in the value of prior years. A reversal of an impairment loss is date. the statement of financial position. Average
original liability and the recognition of a new use, evidenced by the end of owner occupa- the individual investment. recognized immediately in statement of income, maturity dates of trade payables range between
liability and the difference in the respective tion, commencement of an operating lease to unless the relevant asset is carried at a revalued Revenue from hospitality consist mainly of 30-90 days. Short duration payables with no
carrying amount is recognized in statement of another party or completion of construction amount, in which case the reversal of the im- foods and beverage revenue, are recognized stated interest rate are measured at original in-
income. or development. pairment loss is treated as a revaluation increase. when the related services are provided. voice amount unless the effect of imputing in-
terest is significant.
The impairment loss is recognized in the con-
solidated statement of income.

88 89
S. TA X AT I O N : Taxes payable on unrealized revenues are de- the Group’s share. The main activity of the (BREMS), with a 45% stake in the joint venture’s
Critical Accounting Judgments Interest in Joint Ventures

4 and Use of Estimates


5
ferred until the revenue is realized. joint venture is to develop, operate, manage, capital amounting to US$19,900. The main ac-
Current Tax exploit and sell real estate properties in the tivity of the joint venture is to manage and mar-
Income tax is determined and provided for in Current tax and deferred tax relating to items Marina area in Beirut Central District. ket “Beirut Souks” which is owned by the
accordance with the Lebanese tax laws. In- that are credited or charged directly to other Lebanese Company for the Development and
come tax expense is calculated based on the comprehensive income are recognized directly As per the terms of the agreement, on December Reconstruction of Beirut Central District s.a.l.
taxable profit for the year. Taxable profit differs In the application of the accounting policies The Group has interest in joint ventures as fol-
in other comprehensive income. 31, 2005, the Group sold properties with an ag- On December 7, 2011, the board of directors of
from net profit as reported in the consolidated described in Note 3 above, management is re- lows: gregate cost of US$10,100,000 from properties BREMS resolved to cease the operations of the
statement of income because it excludes items quired to make judgments, estimates and as-
Value added tax (VAT) held for development and sale, to the joint ven- company as of January 2012.
of income or expense that are taxable or de- Revenues, expenses and assets are recognized
sumptions about the carrying amounts of (a) The Group entered into a joint venture ture for a total consideration of US$31,600,000.
ductible in future years and it further excludes assets and liabilities that are not readily ap- agreement on February 11, 2004, with Stow
net of the amount of VAT except: The other venturer contributed in cash an The Group’s share of the assets, liabilities, in-
items that are never taxable or deductible. The parent from other sources. The estimates and Waterfront s.a.l. (Holding) to establish Beirut amount of US$31,600,000 to the joint venture. come and expenses of the jointly controlled
>
Group’s liability for current tax is calculated associated assumptions are based on historical Waterfront Development s.a.l. with a 50%
Where the VAT incurred on a purchase of as- entities at December 31, 2012 and 2011, in-
(b) The Group entered into a joint venture agree-
using tax rates enacted at the consolidated experience and other factors that are consid- stake in the joint venture’s total capital
sets or services is not recoverable from the cluded in the consolidated financial state-
statement of financial position date. Provision ered to be relevant. Actual results may differ amounting to US$19,900. During the year
taxation authority, in which case the VAT is ment on December 23, 2005, with Aswaq Man- ments, are as follows:
for income tax is reflected in the consolidated from these estimates. 2006, the capital of the joint venture was in-
recognized as part of the cost of acquisition agement and Services L.L.C. to establish Beirut
statement of financial position net of taxes pre- of the asset or as part of the expense item as creased to US$12,819,900 without changing Real Estate Management and Services s.a.l.
viously settled in the form of withholding tax. The estimates and underlying assumptions are
applicable; and
reviewed on an ongoing basis. Revisions to ac-
>
Tax on the holding subsidiary is provided for in counting estimates are recognized in the period
Receivables and payables that are stated
accordance with Article 6 of Legislative Decree in which the estimate is revised if the revision
with the amount of VAT included.
number 45 dated June 24, 1983 (as adjusted in affects only that period, or in the period of the
decree number 89 dated September 7, 1991). The revision and future periods if the revision affects
The net amount of VAT recoverable from, or
tax is capped at USD3,317 (LBP5million). both current and future periods.
payable to the taxation authority is included
as part of receivables or payables in the con-
Tax on the offshore subsidiary is provided for The most significant estimate made by the DECEMBER 31, 2012 2011
solidated statement of financial position.
in accordance by Legislative Decree number Group is the determination of the aggregate US$ US$

46 dated June 24, 1983 amended by Decree cost of the Beirut Central District Project.
T. P R OV I S I O N S :
ASSETS
number 85 dated September 7, 1991. The tax
is set at a flat rate of USD663 (LBP1million). I M PA I R M E N T O F A C C O U N T S
Provisions are recognized when the Group Cash and bank balances 1,894,468 1,467,201
A N D N O T E S R E C E I VA B L E
has a present obligation (legal or constructive) Prepayments and other debit balances 4,712,752 3,330,744
Rental income is subject to the built property as a result of a past event, it is probable that Accounts and notes receivables, net 1,339,790 14,222
tax in accordance with the Lebanese tax law. An estimate of the collectible amount of ac-
an outflow of resources embodying economic Inventory of land and projects in progress 40,712,633 46,225,752
counts and notes receivable is made when
benefits will be required to settle the obliga- Fixed assets, net 103,775 97,835
Deferred tax collection of the full amount is no longer
tion and a reliable estimate can be made of the Investment properties, net 20,376,677 -
69,140,095 51,135,754
Deferred income tax is provided, using the li- probable. For individually significant amounts,
amount of the obligation.
ability method, on all temporary differences at this estimation is performed on an individual
LIABILITIES
the consolidated statement of financial posi- basis. Amounts which are not individually sig-
The amount recognized as a provision is the best
nificant, but which are past due, are assessed Bank overdrafts and short term facilities 13,863,026 221,749
tion date between the tax bases of assets and estimate of the consideration required to settle
collectively and a provision is set up according Accounts payable and other liabilities 11,770,050 9,098,683
liabilities and their carrying amounts. the present obligation at the consolidated state-
to the length of time past due, based on his- Deferred revenue and other credit balances 9,236,529 2,716,288
ment of financial position date, taking into ac-
Loans from banks and financial institutions 19,377,613 20,095,747
54,247,218 32,132,467
Deferred income tax assets and liabilities are torical recovery rates.
count the risks and uncertainties surrounding the
measured at the tax rates that are expected to obligation. Where a provision is measured using
USEFUL LIVES OF FIXED ASSETS AND INCOME AND EXPENSES
apply to the period when the asset is realized the cash flows estimated to settle the present ob-
or the liability is settled, based on laws that INVESTMENT PROPERTIES Revenues from rented properties 3,812,012 -
ligation, its carrying amount is the present value
have been enacted at the consolidated state- of these cash flows. Revenues from consulting services - 103,090
ment of financial position date. The Group’s management determines the es- Charges on rented properties (2,490,467) -
timated useful lives of its fixed assets for calcu- General and administrative expenses (1,245,282) (1,258,731)
U. E M P L OY E E S ’ E N D - O F - S E RV I C E
Deferred income tax assets are recognized for lating depreciation. The estimate is determined Depreciation (31,913) (25,825)
BENEFITS:
all deductible temporary differences and carry- after considering the expected usage of the as- Other expenses - (127,448)
forward of unused tax assets and unused tax sets or physical wear and tear. Management re- Other income 35,501 49,966
The Group provides end-of-service benefits to
losses to the extent that it is probable that tax- views the residual value and useful lives Other taxes (140,592) (109,995)
its employees. The entitlement to these bene-
able profit will be available against which the annually and future depreciation charge would Interest income (4,235) 141,259
fits is based upon the employees’ final salary
deductible temporary differences and the be adjusted where the management believes Interest expense (349,239) (15,871)
and length of service, subject to the comple-
carry-forward of unused tax assets and unused the useful lives differ from previous estimates. Loss for the year before income tax (414,215) (1,243,555)
tion of a minimum service period. The ex-
tax losses can be utilized. Income tax - (38,556)
Loss for the year (414,215) (1,282,111)
pected costs of these benefits are accrued over
the period of employment.
The carrying amount of deferred income tax
assets is reviewed at each consolidated state-
ment of financial position date and reduced to
the extent that it is no longer probable that
sufficient taxable profit will be available to
allow all or part of the deferred income tax
asset to be utilized.

90 91
as follows: results of its business units separately for the The Group’s revenues, profits, total assets and total liabilities are segregated by geographical area as follows:
Operating Segment >

6
Real estate sales purpose of making decisions about resource
> Real estate rental allocation and performance assessment. Seg-
> Hospitality ment performance is evaluated based on op- LEBANON MIDDLE EAST EUROPE TOTAL
erating profit and loss and is measured US$ US$ US$ US$

For management purposes, the Group is or- No operating segments have been aggregated consistently with operating profit or loss in the
ganized into business units according to their 2012
Revenues 120,448,905 - - 120,448,905
to form the above reportable operating seg- consolidated financial statements.
operations and has three reportable segments
Profit for the year 14,267,320 3,262,717 - 17,530,037
ments. Management monitors the operating

Total assets 2,549,751,090 314,961,817 1,581,213 2,866,294,120


Total liabilities 956,951,236 - - 956,951,236
REAL ESTATE
2011
Revenues 303,546,745 - - 303,546,745
SALES AND REAL ESTATE

Profit for the year 154,830,375 3,967,997 - 158,798,372


RENDERED SERVICES RENTAL HOSPITALITY TOTAL
US$ US$ US$ US$
Total assets 2,463,850,270 317,731,762 2,583,099 2,784,165,131
2012 Total liabilities 848,208,855 - - 848,208,855
Total assets 2,348,663,056 495,747,195 21,883,869 2,866,294,120
Total liabilities 762,559,890 165,511,937 28,879,408 956,951,235

Cash and Bank


2011
Total assets 2,278,329,656 478,022,891 27,812,584 2,784,165,131
Total liabilities 676,735,879 145,498,986 25,973,990 848,208,855
7 Balances

REAL ESTATE
SALES AND REAL ESTATE DECEMBER 31, 2012 2011
RENDERED SERVICES RENTAL HOSPITALITY TOTAL US$ US$
US$ US$ US$ US$
Cash on hand 157,385 176,840
2012 Current accounts 27,390,085 19,307,100
Revenues 55,722,039 58,132,896 6,593,970 120,448,905 Short term deposits 135,859,346 154,157,060
Cost of revenues (6,276,928) (21,157,779) (18,292,194) (45,726,901) Checks for collection - 440,680
Gain on sale of investment properties - 4,376,528 - 4,376,528 163,406,816 174,081,680
Net revenues from operations 49,445,111 41,351,645 (11,698,224) 79,098,532 Pledged term deposits 57,000 57,000
Share results from associates 3,270,649 - (3,966) 3,266,683
General and administrative expenses (33,281,852) (3,914,741) (763,587) (37,960,180) Short term deposits mature between January March 2012). The average yield on the term year ended December 31, 2011).
Depreciation of fixed assets (5,445,988) - (2,714,430) (8,160,418) and March 2013 (December 31, 2011: Short deposits for the year ended December 31,
Provision for contingencies (7,986,410) - - (7,986,410) term deposits mature between January and 2012 was approximately 4.11% (4.16% for the
Other taxes (3,777,740) - (178,725) (3,956,465)
Other expenses, net (121,661) - (112,216) (233,877)

Prepayments and
Other income 543,785 - 43,871 587,656

8 Other Debit Balances


Interest income 29,040,850 - 36,616 29,077,466
Interest expense (26,558,524) - (938,294) (27,496,818)
Profit/(loss) before tax 5,128,220 37,436,904 (16,328,955) 26,236,169
Income tax expense (2,322,812) (6,383,320) - (8,706,132)
Profit/(loss) for the year 2,805,408 31,053,584 (16,328,955) 17,530,037
DECEMBER 31, 2012 2011
US$ US$

2011
Advance payments to contractors 15,583,684 17,161,217
Revenues 247,002,676 49,862,775 6,681,294 303,546,745 Advances to employees 3,749,425 2,714,195
Cost of revenues (45,246,516) (16,066,528) (9,896,404) (71,209,448) Accrued interest income (a) 16,629,583 11,583,120
Gain on sale of investment properties - 625,809 - 625,809 Prepaid expenses 7,705,805 6,677,383
Net revenues from operations 201,756,160 34,422,056 (3,215,110) 232,963,106 Deferred tax assets (b) 1,612,500 1,612,500
Share results from associates 3,967,997 - - 3,967,997 Due from related parties (c) 3,480,211 1,488,505
General and administrative expenses (36,519,310) (601,766) (1,075,066) (38,196,142) Other debit balances 6,867,640 6,421,933
Depreciation of fixed assets (5,124,270) - (1,297,803) (6,422,073) 55,628,848 47,658,853
(a) Accrued
Other taxes (2,703,534) - (171,009) (2,874,543) interest income consists of the following:
Other expenses (5,054,664) - (11,740) (5,066,404)
Other income 566,603 - 46,967 613,570 DECEMBER 31, 2012 2011
Interest income 24,642,878 - 44,133 24,687,011 US$ US$
Interest expense (20,988,686) - (93,279) (21,081,965)
Profit before tax 160,543,174 33,820,290 (5,772,907) 188,590,557 Interest on bank deposits 1,087,911 1,099,991
Income tax expense (24,691,842) (5,100,343) - (29,792,185) Interest on notes and accounts receivables 15,541,672 10,483,129
Profit for the year 135,851,332 28,719,947 (5,772,907) 158,798,372 16,629,583 11,583,120

92 93
(a)
(b) This (c) Due from related parties consists of the fol-
caption represents deferred tax assets Land and land development works include the following cost items:
on unrealized profits from sales to a joint ven- lowing:
DECEMBER 31, 2012 2011
ture Note 5 (a).
US$ US$

DECEMBER 31, 2012 2011


US$ US$ Acquired properties (a.1) 967,201,064 967,201,064
Pre-acquisition costs (a.2) 9,412,802 9,412,802
Solidere International Limited 2,784,646 1,488,505 Infrastructure costs (a.3) 799,223,411 777,395,720
City Makers s.a.r.l 520,241 - Eviction costs (a.4) 260,242,988 260,242,988
Beirut Waterfront Development s.a.l. 55,324 - Capitalized costs (a.5) 79,147,542 69,553,153
BCD Cinema s.a.l. 120,000 - Cumulative costs 2,115,227,807 2,083,805,727
3,480,211 1,488,505 Less: Cost of land sold, net (953,984,812) (946,936,702)
Less: Cost of land transferred to real estate
The above balances are interest free. development projects (132,855,734) (132,855,734)
Less: Cost of infrastructure transferred to
real estate development projects (6,353,121) (6,353,121)
1,022,034,140 997,660,170
Accounts and

9 Notes Receivable, Net


a.1Acquired properties consist mainly of the
aggregate initial appraised value attributed
which was established in accordance with
Law No. 117/91). Acquired properties include
were recuperated by original owners and
properties appraised at US$133million were
to the plots included in the BCD area of the value of purchased and exchanged prop- not claimed for recuperation.
DECEMBER 31, 2012 2011
US$1,170,001,290 net of the recuperated erties as well.
a.2 Pre-acquisition costs include technical and
US$ US$
properties. The aggregate appraised value is
Notes receivable 487,366,725 494,877,861 determined in accordance with Decree No. Law No. 117/91 stated the requirements for master plan studies incurred during the set up
Accounts receivable 115,990,246 119,989,346 2236 (dated February 19, 1992 based on the property recuperation and exemption. In this period of the Group.
Receivables from tenants 40,071,945 33,393,731 decision of the Higher Appraisal Committee, respect properties appraised at US$255million
a.3 Infrastructure costs consists of the following:
Less: Unearned interest (79,899,551) (87,177,690)
Less: Provision for problematic receivables (451,320) (741,456)
Less: Provision for impairment on collectively DECEMBER 31, 2012 2011
assessed accounts receivable (9,000,000) (9,000,000) US$ US$

554,078,045 551,341,792
Sea front defense 295,279,683 288,886,655
The Group’s credit risk exposure is spread December 31, 2012 (as of December 31, 2011, Notes receivable, which resulted mainly from Work executed in the traditional BCD area 171,534,879 160,248,695
mainly over 44 counter-parties; 10 customers 48 counter-parties; 10 customers constitute sales carry the following maturities: Land reclamation and treatment 100,182,203 98,314,581
constitute 93% of the total exposure and 34 93% of the total exposure and 38 customers Electricity power station 42,753,906 42,270,889
customers constitute the remaining 7% as of constitute the remaining 7%). Borrowing costs (Note 30) 44,011,502 43,305,585
Other costs 145,461,238 144,369,315
DECEMBER 31, 2012 2011
799,223,411 777,395,720
US$ US$

a.4 Eviction costs represent the costs of relocat- ated properties appraised values collected from US$9.8million (US$8.2million for the year
Doubtful balances 617,272 617,272
ing previous settlers out of the BCD area which original owners other than religious and gov- ended December 31, 2011) (Note 26).
Overdue 48,101,552 31,212,527
were mainly paid through the Central Fund for ernmental recuperated properties.
(b)
2012 - 89,486,613
the Displaced (a public authority). This caption Real estate development projects include
a.5 Capitalized costs represent allocation of di-
2013 85,931,590 85,129,316
is stated net of US$22.2million as of December the following:
2014 101,852,297 83,170,219
31, 2012 (US$22.2million as of December 31, rect overheads. Costs capitalized during the
2015 and above 250,864,014 205,261,914
487,366,725 494,877,861
2011) representing a 10% charge on recuper- year ended December 31, 2012 amounted to

The average yield on accounts and notes re- Subsequent to the date of the statement of fi- whereby it securitized notes receivable with DECEMBER 31, 2012 2011
US$ US$
ceivable is mainly dependent on the Libor nancial position, the Company signed an an aggregate nominal value of US$185million
rate. agreement with a local financial institution relating to 4 customers.
Construction and rehabilitation of buildings 712,760,844 642,646,989
Cost of land 133,244,015 133,244,015
Cumulative costs 846,004,859 775,891,004
Inventory of Land and Less: Cost transferred to investment properties, net (545,254,302) (521,379,645)

10 Projects in Progress Cost transferred to fixed assets


Cost of real estate sold
(29,659,018)
(44,164,255)
226,927,284
(29,659,018)
(44,164,255)
180,688,086
DECEMBER 31, 2012 2011
US$ US$
During 2012, the Group transferred an ing the cost of land, building and other assets During 2012, the Group allocated interest ex-
Land and land development works, net (a) 1,022,034,140 997,660,170 amount of US$23,874,657 (US$9,548,449 dur- of the “Beirut Souks” and “Zaitunay Bay” proj- pense to real estate development project in
Real estate development projects, net (b) 226,927,284 180,688,086 ing 2011) to investment properties represent- ects (Note 11). the amount of US$2,535,020 (US$2,113,796
1,248,961,424 1,178,348,256 during 2011) (Note 30).

94 95
Investment Investment in

11 Properties, Net
12 Associates

BALANCE AS AT BALANCE AS AT
DECEMBER 31, DISPOSALS DECEMBER 31, DECEMBER 31, 2012 2011
2011 ADDITIONS TRANSFERS AND SALES 2012 US$ US$
US$ US$ US$ US$ US$
Solidere International Limited (SI) 314,961,818 317,727,785
COST BCD Cinemas s.a.l. 4,034 -
Land 91,490,073 - - (512,575) 90,977,498 Other - 3,977
Buildings 359,132,751 1,661,001 19,806,590 (1,396,278) 379,204,064 314,965,852 317,731,762
Other assets 35,860,849 881,736 1,097,668 (3,000) 37,837,253
486,483,673 2,542,737 20,904,258 (1,911,853) 508,018,815 Details of the Group’s associate SI are as follows:

ACCUMULATED DEPRECIATION 2012 2011


Buildings 34,891,155 7,437,299 (251,472) (159,379) 41,917,603 COUNTRY OF OWNERSHIP GROUP’S SHARE GROUP’S SHARE

Other assets 6,963,358 2,159,954 (37,138) - 9,086,174 INCORPORATION INTEREST COST OF EQUITY COST OF EQUITY

41,854,513 9,597,253 (288,610) (159,379) 51,003,777


% US$ US$ US$ US$

Net Book Value 444,629,160 457,015,038


Solidere International
Limited (i) UAE 39.05 237,789,902 314,961,818 237,209,580 317,727,785
BCD Cinemas s.a.l. (ii) Lebanon 40.00 8,000 4,034 - -
237,797,902 314,965,852 237,209,580 317,727,785
BALANCE AS AT BALANCE AS AT
DECEMBER 31, DISPOSALS DECEMBER 31,
2010 ADDITIONS TRANSFERS AND SALES 2011
US$ US$ US$ US$ US$
Summarized financial information in respect
COST of the Group’s associates is set out below:
Land 92,450,011 - - (959,938) 91,490,073
Buildings 350,937,563 898,452 9,548,449 (2,251,713) 359,132,751 DECEMBER 31, 2012 2011
Other assets 34,676,699 1,161,197 43,320 (20,367) 35,860,849 US$ US$

478,064,273 2,059,649 9,591,769 (3,232,018) 486,483,673


Total assets 872,169,518 875,440,867
ACCUMULATED DEPRECIATION Total liabilities (9,725,177) (4,720,441)
Buildings 29,842,158 5,378,602 - (329,605) 34,891,155 Non-controlling interest (55,834,658) (55,559,716)
Other assets 5,244,500 1,738,059 - (19,201) 6,963,358 Net assets 806,609,683 815,160,710
35,086,658 7,116,661 - (348,806) 41,854,513 Group’s share of net assets 314,965,852 317,727,785
Net Book Value 442,977,615 444,629,160
Initial price of investment 237,797,902 237,209,580
Group’s share of results-Gain 3,266,683 3,967,997
Group’s share of comprehensive loss (175,182) (144,383)
Carrying amount of the investment 314,965,852 317,727,785
Investment properties include rented and Disposal of land, building and other assets re- Other disposals of other assets resulted in a
available for rent properties. These represent sulted in a gain of US$4,376,528 recorded loss of US$1,194 recorded under “Loss of

(i) During the first half of the year 2007, Solid-


“Beirut Souks”, a property leased out to the under “Gain on sale and disposal of invest- ownership of investment properties” under
The private placement memorandum and During 2009, the Group increased its direct
Ministry of Foreign Affairs and Emigrants, for ment properties” in the consolidated state- “Other expenses” (Note 28).
ere established Solidere International Hold- other signed agreements between Solidere ownership in Solidere International Limited
use by an international agency, residential ment of income for the year ended December
ings s.a.l. (SIH) which in turn established and SI stipulate that Solidere and Solidere to 38.98% by acquiring 86,900 shares for an
complexes, an embassy complex, and other 31, 2012 (US$625,809 for the year ended De- Depreciation for investment properties in the
Solidere International Limited (SI) in the Management Services s.a.l. will transfer to SI amount of US$6,997,000.
restored buildings and“Zaitunay Bay” project. cember 31, 2011). amount of US$9,597,253 for the year 2012
Dubai International Financial Center (DIFC) all the projects that they had outside the
(US$7,116,661 for the year 2011) is recorded
with an initial capital of US$50,000. The main Lebanese territories. In addition, Solidere will During 2012, the Group increased its percent-
During the year ended December 31, 2012, the During the year ended December 31, 2011, the under “Charges on rented properties” in the
activity of SI is to promote, invest in, develop, grant SI the right to use the Solidere brand age of ownership to 39.05% by acquiring
Group transferred US$23,874,657 from real Group lost the ownership of a property having consolidated statement of income (Note 24).
market and manage, as well as provide con- name through a license agreement and a none 7,786 shares for an amount of US$580,322.
estate development projects to investment an aggregate net book value of US$1,693,234
sulting services with respect to real estate compete right.
(ii) During 2012, the Group subscribed into the
properties (US$9,548,449 for the year ended for total proceeds of US$1,002,330 which re- The fair value of the investment properties is
projects outside the Beirut Central District
December 31, 2011) representing the cost al- sulted in a loss of US$690,904 recorded under estimated by management at approximately
area of Lebanon. On June 7, 2007, the Group further subscribed capital of BCD Cinemas s.a.l. at a total cost of
located to the “Beirut Souks” and “Zaitunay “Loss of ownership of investment properties” US$1.25billion based on current market prices
into the capital of Solidere International Lim- US$8,000 representing a 40% equity stake in
Bay” projects (Note 10 (b) ). under“Other expenses”caption in the consol- (US$1.26billion as of December 31, 2011).
During the same year, SIH raised additional ited for an amount of US$3,000,060 represent- the associate’s capital of US$20,000.
idated statement of income (Note 28). Fur- There has been no valuation of these proper-
funds for SI through a private placement. ing a 0.4286% equity stake.
During the year ended December 31, 2012, the thermore, the Group recorded a loss ties by an independent valuer.
Group transferred a total net book value of representing the net rental revenue related to
As a result of the private placement SI’s share During 2008, the Group increased its direct
US$2,681,789 from investment properties to the property from June 2008 to April 2011
capital and share premium amounted to ownership in Solidere International Limited
fixed assets (US$43,320 from fixed assets to amounting to US$583,121 recorded under
US$700,050,000 out of which SIH settled to 38.18% by acquiring 66,849 shares for an
investment properties for the year ended De- “Loss of ownership of investment properties”
US$216million against an ownership percent- amount of US$10,784,850.
cember 31, 2011) (Note 13). under“Other expenses”caption in the consol-
age of 37.19%.
idated statement of income (Note 28).

96 97
Fixed Assets, Net Bank Overdrafts

13 14 and Short Term


Facilities

Fixed assets are composed of the following: Bank overdrafts and short term facilities consist of the following:

BALANCE AS AT BALANCE AS AT DECEMBER 31, 2012 2011


DECEMBER 31, DISPOSALS DECEMBER 31, US$ US$
2011 ADDITIONS TRANSFERS AND SALES 2012
US$ US$ US$ US$ US$ Bank overdrafts 177,223,565 89,746,974
Short term facilities 469,662,871 430,302,226
COST 646,886,436 520,049,200
Land 5,722,047 - 450,191 - 6,172,238
Buildings 23,678,118 3,717,682 2,577,105 (1,140,258) 28,832,647 Short term facilities consist of the following:
Marina 7,866,624 - - - 7,866,624
Furniture and fixure 10,036,098 717,877 65 (33,264) 10,720,776 OUTSTANDING BALANCE
Freehold improvements 26,716,862 2,897,237 38,467 - 29,652,566 FACILITY MATURITY INTEREST DECEMBER 31,
Machines and equipment 36,130,572 1,164,756 6,862 (83,985) 37,218,205 AMOUNT DATE RATE COVENANTS 2012 2011

Advances on fixed assets 364,226 - - - 364,226 US$ % US$ US$

Work in progress - - (102,291) - (102,291)


110,514,547 8,497,552 2,970,399 (1,257,507) 120,724,991 100,000,000 August 4, 2015 4.05 (a) 109,658,838 109,256,980
75,000,000 August 3, 2013 5.00 (b) 74,999,646 74,999,638
ACCUMULATED DEPRECIATION 35,000,000 August 3, 2013 5.00 (b) 34,999,885 34,999,897
Buildings 3,232,651 2,504,808 251,472 (40,684) 5,948,247 100,000,000 October 11, 2013 4.50 99,999,477 99,999,957
Marina 861,913 159,955 - - 1,021,868 100,000,000 July 31, 2013 5.50 (c) 100,005,025 100,005,958
50,000,000 July 10, 2013 5.00 50,000,000 -
469,662,871 419,262,430
Furniture 3,414,708 247,261 17 (4,990) 3,656,996
Freehold improvements 4,701,801 884,902 30,259 - 5,616,962
Machines and equipment 27,986,846 4,363,492 6,862 (57,378) 32,299,822
40,197,919 8,160,418 288,610 (103,052) 48,543,895 (a) The covenants of the agreement stipulate (b) The
Net Book Value 70,316,628 72,181,096
covenants of the agreements stipulate US$5,915,816 and recorded under interest ex-
that the Group maintain a maximum debt to that the Group maintains a maximum debt to pense in the consolidated statement of in-
equity ratio and banks’ loans, overdrafts and equity ratio of 1:2 and a minimum equity bal- come (US$5,089,450 for the year ended
other facilities to equity ratio of 1:3 and 1:4 re- ance of US$1billion. December 31, 2011).
spectively.
BALANCE AS AT BALANCE AS AT (c)The covenant of the facility stipulates that Interest expense on short term facilities for the
DECEMBER 31, DISPOSALS DECEMBER 31,
Also, the covenants of the facility stipulate that the Group maintains a minimum equity bal- year ended December 31, 2012 amounted to
2010 ADDITIONS TRANSFERS AND SALES 2011
US$ US$ US$ US$ US$
the Group maintains a minimum of US$75mil- ance of US$1billion, a minimum equity to as- US$21,373,031 (US$18,339,449 for the year
lion in notes and accounts receivables and sets ratio of 40% and a maximum debt to ended December 31, 2011) and recorded under
COST
maintain a minimum of 750,000 square meters equity ratio of 50%. interest expense in the consolidated statement
Land 5,722,047 - - - 5,722,047 of built properties and US$1billion in net tan- of income.
Buildings 20,580,049 3,098,069 - - 23,678,118 gible assets free from any liens. Interest expense on bank overdrafts for the
Marina 7,866,624 - - - 7,866,624 year ended December 31, 2012 amounted to
Furniture and fixture 5,565,204 4,470,894 - - 10,036,098
Freehold improvements 12,685,396 7,770,200 6,261,266 - 26,716,862

Accounts Payable
Machines and equipment 33,969,107 2,161,465 - - 36,130,572
Advances on fixed assets
Work in progress
4,180,894
2,487,918
93,057,239
-
-
17,500,628
(3,816,668)
(2,487,918)
(43,320)
-
-
-
364,226
-
110,514,547
15 and Other Liabilities

ACCUMULATED DEPRECIATION: Accounts payable and other liabilities consist of the following:
Buildings 2,915,757 316,894 - - 3,232,651
Marina 704,456 157,457 - - 861,913 DECEMBER 31, 2012 2011
Furniture and fixture 2,845,147 569,561 - - 3,414,708 US$ US$
Freehold improvements 3,331,787 1,370,014 - - 4,701,801
Machines and equipment 23,978,699 4,008,147 - - 27,986,846 Accounts payable (a) 57,081,716 68,969,445
33,775,846 6,422,073 - - 40,197,919 Accrued charges and other credit balances (b) 18,615,340 18,820,774
Net Book Value 59,281,393 70,316,628 Taxes payable (c) 13,691,324 34,533,002
Provision for end-of-service indemnity and other charges (d) 15,154,077 13,608,683
Provision for previously recognized sales (e) 7,007,910 7,007,910
During the year ended December 31, 2012, the erties to fixed assets (US$43,320 from fixed as- The depreciation for the year ended Decem- Provision for contingences 7,986,410 -
Group transferred assets of total net book sets to investment properties for the year ber 31, 2012 and 2011 was charged to the con- Due to related parties (f) 211,123 482,155
value of US$2,681,789 from investment prop- ended December 31, 2011) (Note 11). solidated statement of income. Accrued interest payable 1,384,230 1,387,508
121,132,130 144,809,477

98 99
(a) Accounts
payable as of December 31, 2012 Lebanese Government in consideration of the (b) Accrued charges and other credit balances (e)During the year ended December 31, 2009, lating to a previously recognized sale where cer- (f)
Due to related parties consists of the fol-
and 2011 include balances in the aggregate exchange of assets agreement explained in consists of the following: the Group booked a provision of US$7,007,910 tain legal and regulatory conditions might lead lowing:
amount of US$13.8million due to the Note 32(f). to account for the effect of an expected loss re- to the cancellation of this sale agreement.

DECEMBER 31, 2012 2011


DECEMBER 31, 2012 2011 US$ US$
US$ US$
Beirut Real Estate Management and Services s.a.l. - 394,956
Deposits from tenants 3,080,220 3,101,497 Mr. Selim El Zyr 367 605
Accrued municipality expenses 3,326,425 3,326,425 Mr. Rami Ariss - 8,058
Other 12,208,695 12,392,852 City Markers s.a.r.l. 128,262 50,193
18,615,340 18,820,774 Loulyas Holding s.a.l. 82,494 28,343
211,123 482,155
(c) Taxes payable consist of the following: The above balances are interest free.

DECEMBER 31, 2012 2011


US$ US$

Dividends Payable
Accrued income tax
Additional tax assessment
Value added tax (VAT) payable
2,054,773
2,500,000
486,184
24,402,559
-
1,194,525
16 SETTLED/
DISTRIBUTED UP TO DECEMBER 31,
Taxes withheld 1,909,150 3,175,779
Property tax payable 6,734,013 5,752,935 GENERAL ASSEMBLY DIVIDEND DECEMBER 31, 2012 2011
DATE PER SHARE DECLARED 2012 PAYABLE PAYABLE
Other accrued taxes 7,204 7,204
13,691,324 34,533,002
US$ US$ US$ US$ US$

June 29, 1996 0.20 30,918,413 29,404,342 1,514,071 1,538,654


Income Tax
June 30, 1997 0.25 40,367,172 37,599,211 2,767,961 2,805,099
The applicable tax rate in Lebanon is 15% ac- The accrued income tax for the years 2012 and
June 29, 1998 0.25 39,351,753 36,013,256 3,338,497 3,377,746
cording to the Lebanese tax laws. 2011 was estimated as follows:
June 23, 2003 Stock dividend 19,625,550 19,606,235 19,315 19,315
June 12, 2006 0.6 94,831,106 90,083,339 4,747,767 4,976,531
2012 2011
June 22, 2007 1.00 155,093,702 147,164,618 7,929,084 10,478,193
US$ US$
July 15, 2008 1.00 155,090,832 139,598,339 15,492,493 18,101,474
July 13, 2009 1.15 176,479,956 161,658,694 14,821,262 15,711,241
Profit before tax 19,852,849 183,490,214
July 19, 2010 1.15 175,228,434 158,800,100 16,428,334 18,000,472
Less: Income of subsidiaries (1,490,585) 3,739,507
August 1, 2011 0.40 60,912,291 55,582,248 5,330,043 9,187,138
Add: Non-deductible provisions and charges 26,393,401 5,748,285
August 1, 2011 Stock dividend 85,987,850 85,987,850 - -
Less: Non-taxable revenues (29,270,255) (28,622,769)
July 30, 2012 0.25 39,316,239 32,928,872 6,387,367 -
Taxable income 15,485,410 164,355,237
July 30, 2012 Stock dividend 42,744,616 42,744,616 - -
1,115,947,914 1,037,171,720 78,776,194 84,195,863
Applicable tax rate 15% 15%
Accrued income tax 2,322,812 24,653,286
Add: Income tax provision for subsidiaries - 38,556
Total accrued income tax 2,322,812 24,691,842
Less: Tax on interest previously settled (268,039) (289,283) The General Assembly held on July 30, 2012 of approximately US$33million was settled up recorded cash dividends payable in the amount
Accrued income tax payable 2,054,773 24,402,559 decided to distribute dividends on the basis of to December 31, 2012. of US$53.6million net of distribution tax in the
US$0.25 per share and to distribute Class (B) amount of US$7.3million. An amount of ap-
shares from its treasury shares on the basis of The General Assembly held on August 1, 2011 proximately US$56million was settled up to
Additional tax assessment years 2008 to 2010 is still pending. Any addi- Value Added Tax (VAT) 1 share for every 50 shares for a total consid- decided to distribute dividends on the basis of December 31, 2012 (US$52million was settled
During 2012, the Company’s accounts for the tional tax liability is subject to the results of The VAT declarations for the years 2005 until eration of US$43million and issued the related US$0.4 per share and to distribute class (A) up to December 31, 2011).
years 2007 to 2010 were reviewed by the tax this review. 2012 are still subject to examination and final share certificates. Accordingly, the Group shares from its treasury shares on the basis of 1
authorities. The review for the year 2007 re- tax assessment by the tax authorities. Any ad- recorded cash dividends payable in the share for every 30 shares for a total considera- The outstanding balance of unpaid dividends
sulted in an additional tax liability in the The Company’s tax returns for the years 2011 ditional tax liability is subject to the results of amount of US$35million net of distribution tion of US$86million and issued the related relates mostly to unclaimed dividends and
amount of US$ 2,500,000 which was recorded and 2012 are still subject to examination and this review. tax in the amount of US$4million. An amount share certificates. Accordingly, the Group dividends pertaining to undelivered class (A)
under “Taxes, fees and stamps” in the consoli- final tax assessment by the tax authorities. Any shares.
dated statement of income. The outcome of additional tax liability is subject to the results (d) The movement of provision for end-of-ser-

Deferred Revenue
the review of the Company’s accounts for the of this review. vice indemnity and other charges is as follows:

2012
US$
2011
US$
17 and Other Credit
Balances

Balance at the beginning of the year 13,608,683 11,394,853 DECEMBER 31, 2012 2011
Additions 2,348,327 2,298,404 US$ US$

Settlements (106,989) (84,574)


Write-off (695,944) - Cash down payments and commitments on sale contracts 12,252,587 5,841,989
Balance at the end of the year 15,154,077 13,608,683 Deferred rental revenue and related deposits 28,583,218 23,216,579
40,835,805 29,058,568

100 101
Cash down payments and commitments on flected in the consolidated financial state- ventory of land and project in progress (Note ment of income and the remaining balance
Capital Legal Reserve

19 20
sale contracts include balances aggregating to ments (50% proportionate consolidation). The 11). The repayment of the loan will be through amounting to US$54 thousand was capital-
approximately US$11million that relate to 5 term of the loan is seven years with 2 years 32 equal quarterly installments of USD466,418 ized under inventory of land and projects in
sales contracts with an aggregate potential grace period, and bears an annual interest rate each beginning on September 30, 2013. progress (Note 10).
gross sales value of US$52.76million as of De- of 3 months Libor + 2.5% before the subsidy,
cember 31, 2012 (US$4.6million relating to 4 not exceeding 6.5% per annum. Interest is The joint venture entity did not receive the ap- During 2012, a wholly owned subsidiary of the
sale contract with an aggregate potential gross computed on a quarterly basis starting the proval of the Central Bank of Lebanon regard- Group signed a loan agreement with a local Capital consists of 165,000,000 shares of In conformity with the Company’s articles of
sales value of US$46million as of December date of first withdrawal. Interest for the year ing this loan and accordingly, it was considered bank in the amount of US$2,839,492. The loan US$10 par value, authorized and fully paid incorporation and the Lebanese Code of
31, 2011). ended December 31, 2012 in the amount of part of the overdraft facility as per the new loan principal was fully withdrawn during 2012. The and divided in accordance with Law 117/91 Commerce, 10 % of the annual net income is
US$37thousand (US$41thousand for the year contract signed during 2012. term of loan is five years. This loan bears an in- into the following: required to be transferred to legal reserve until
Deferred rental revenue and related deposits 2011) net of subsidized interest in the amount terest rate of 4.64% per annum. Interest is com- - Class “A”, amounting to 100,000,000 shares this reserve equals one third of capital. This re-
represent down payments on lease and rental of US$251thousand (US$281thousand for the On March 16, 2012, a joint venture entity of the puted on a quarterly basis. The repayment of represented contribution in kind of proper- serve is not available for dividend distribution.
agreements and reservation deposits for the year 2011) of which US$9.7 thousand was Group signed a loan agreement with the same loan will be through 19 equal quarterly install- ties in the BCD, based on the resolutions of
rental of real estate properties. recorded under “Interest expense” in the con- local bank in the amount of US$15,000,000. The ment of US$140,000 each and one last install- the High Appraisal Committee. All Class A

Treasury Shares
solidated statement of income and the re- term of the loan is two years. This loan bears an ment of US$179,497 beginning on January 1, shares were deemed to have been issued

21
maining balance amounting to US$27.3 was interest rate equivalent to cost of funds + 1.2% 2013 and ending on September 30, 2017. Inter- and outstanding since the establishment of

Loans from Banks and


capitalized under inventory of land and proj- per annum. Interest is computed on quarterly est expense for the year ended December 31, the Group.

18 Financial Institutions
ects in progress (Note 10). The repayment of
the entire loan will be through 19 equal quar-
terly installments of USD500,000 each and
one last installment of USD450,249 beginning
basis starting the date of the first withdrawal.
The loan will be paid in four semi-annual pay-
ment of US$750,000 starting June 30, 2013 and
ending June 30, 2015. The loan was fully with-
2012 amounted to US$72,314 and was
recorded under “Interest expense” in the con-
solidated statement of income.
- Class “B”, amounting to 65,000,000 shares
represented capital subscription in cash and
are all issued and fully paid at the establish-
ment of the Group.
This caption includes 4,846,204 shares class (A)
and (B) as of December 31, 2012 out of which
On November 5, 2012 the Group signed a on December 31, 2011 and ending September drawn during 2012. Interest for the year ended During 2012, a wholly owned subsidiary of the 396,344 shares represent Global Depository
loan agreement with a resident foreign bank 30, 2016. Settlements made during 2012 December 31, 2012 amounted to US$166 thou- Group signed a loan agreement with a local Class “A” and Class “B” shares have the same
Receipts (GDR) (7,643,249 shares out of which
for an amount of US$12.5million. The two amounted to US$1.5million. sand of which US$43 thousand was recorded bank in the amount of US$9,500,000. The loan rights and obligations.
396,344 shares represent Global Depository
years loan bears an interest of 3-months Libor under “Interest expense” in the consolidated principal was fully withdrawn during 2012. Receipts (GDR) as of December 31, 2011).
+ 2.5% not exceeding 4.5% p.a. Interest is During 2009, a joint venture entity of the statement of income and the remaining balance The term of loan is five years. This loan bears As of December 31, 2012, the Company had
computed on a quarterly basis starting the Group signed another loan agreement with amounting to US$123 thousand was capitalized an interest rate of 3 months LIBOR + 2.5% per 12,462,906 “A” shares listed on the London
The treasury shares outstanding as of Decem-
date of the loan withdrawal. The loan was fully the same local bank in the amount of under inventory of land and projects in progress annum. Interest is computed on a quarterly Stock Exchange in the form of Global Depos-
ber 31, 2012 and 2011 were stated at the
withdrawn during the year 2012. The repay- US$30,000,000. The loan was fully withdrawn (Note 10). The joint venture entity granted the losses. The repayment of loan will be through itory Receipts (GDR) (13,557,687“A”shares as
weighted average cost.
ment of the loan will be through 2 equal an- during 2011. The term of the loan is four years bank a first degree mortgage over plots #1455 20 equal quarterly installments of US$475,000 of December 31, 2011).
nual installments of US$6.25million each, with two years, grace period. The loan bears and #1456 in Mina El Hosn. each beginning on January 1, 2013 and ending According to its articles of incorporation, the
starting 1 year after the date of the first with- an interest rate equivalent to cost of funds + on September 30, 2017. Interest expense for Group may purchase up to 10% of its share
drawal. The covenants of the loan stipulate 2%, not to exceed 3.9% annually. Interest is On September 21, 2012, a joint venture entity the year ended December 31, 2012 amounted capital without the existence of free reserves,
that the Company should maintain a maxi- computed on a quarterly basis starting the of the Group signed another loan agreement to US$574,415 and was recorded under“Inter- provided that it shall resell these shares within
mum debt to equity ratio of 1:1 and a mini- date of the first withdrawal. Interest for the with the same local bank in the amount of est expense” in the consolidated statement of a period not exceeding eighteen months.
mum current ratio of 1.2:1. Interest for the year ended December 31, 2012 in the amount US$40,000,000. The term of the loan is seven income.
year 2012 in the amount of US$48,438 was of US$211thousand (US$240thousand for the years and matures on December 31, 2019. The As of December 31, 2012 and 2011, this cap-
recorded under“Interest expense from banks” year 2011 capitalized under inventory of land loan bears an annual interest rate ranging tion includes 3,685,000 shares that were ac-
in the consolidated statement of income. and projects in progress (Note 10) ) out of from 7% to 7.5% depending on the sales vol- quired from sale of properties.
which US$55thousand was recoded under umes. Interest is computed on a semi-annual
On October 12, 2011 the Group signed a loan “Interest expense” in the consolidated state- basis starting the date of first withdrawal.
agreement with a resident foreign bank for an ment of income and the remaining balance in
amount of US$50million. The two years loan the amount of US$156thousand was capital- The loan will be repaid on March and Sep-

Non-Controlling
bears an interest of 3-months Libor + 2.5% not ized under inventory of land and projects in tember of each year starting September 30,
exceeding 3.95% p.a. Interest is computed on a
quarterly basis starting the date of first with-
drawal. The loan was fully withdrawn during
the year 2011. The repayment of the loan will
progress (Note 10). The agreement was
amended during 2011 to decrease the loan
amount to US$15,000.000 to be repaid
through 4 equal semi-annual repayments of
2012 as follows:

USD
22 Interest

Non-controlling interest consists of the following


be through 4 equal semi-annual installments US$3,750,000 each starting on December 31, 2012 1,600,000
of US$12.5million each starting 6 months after 2011 and ending on June 30, 2013. 2013 4,000,000
the date of the first withdrawal. The Company 2014 5,200,000 YEAR ENDED DECEMBER 31, 2012 2011
settled an amount of US$25million during During 2011, a joint venture entity of the 2015 5,600,000 US$ US$
2012. The covenants of the loan stipulate that Group signed another loan agreement with 2016 5,800,000
the Company should maintain a maximum the same local bank in the amount of 2017 6,400,000 Issued capital 3,980 3,980
debt to equity ratio of 1:1 and a minimum cur- US$14.9million. The term of the loan is ten 2018 6,800,000 Accumulated losses (317,956) (86,660)
years with a grace period starting on the date 2019 4,600,000
40,000,000
rent ratio of 1.2:1. Interest for the year 2012 in Loss for the year (415,410) (231,296)
the amount of US$1,761,861 (US$394,999 for of first withdrawal and ending on June 30, (729,386) (313,976)
the year 2011) was recorded under“Interest ex- 2013. This loan bears an annual interest rate
pense from banks” in the consolidated state- of 2.7% per annum which may increase in
ment of income. case of change in the compulsory reserves re- Total withdrawals up to December 31, 2012
quirements imposed by the Central Bank of amounted to US$9,550,000. Settlements made
During 2009, a joint venture entity of the Lebanon. Interest is computed on a quarterly during 2012 amounted to US$1,600,000. In-
Group signed a subsidized loan agreement basis at the end of each quarter and starting terest for the year ended December 31, 2012
with a local bank in the amount of the date of the first withdrawal. Interest for the amounted to US$73 thousand of which an
US$9,950,249. The loan principal was fully year ended December 31, 2011 in the amount amount US$19 thousand was recorded under
withdrawn during 2011 of which 50% was re- of US$158thousand was capitalized under in- “Interest expense” in the consolidated state-

102 103
The Group reallocated salaries, benefits and (US$8.2million during the year ended Decem- charges on rented property during the year
Revenues from

23 Rendered Services
related charges and administrative expenses ber 31, 2011) (Note 10). ended December 31, 2012 (US$4,563,622 dur-
amounting to US$9.8million to construction The Group reallocated salaries, benefits and re- ing the year ended December 31, 2011).
cost during the year ended December 31, 2012 lated charges amounting to US$5,706,462 to

YEAR ENDED DECEMBER 31, 2012 2011


US$ US$

Interest Income
Services rendered to related parties (Note 31)
Services rendered to clients
Broadband network revenues
2,527,995
1,052,861
2,560,806
1,904,854
922,293
2,452,981
27
6,141,662 5,280,128
YEAR ENDED DECEMBER 31, 2012 2011
US$ US$

Charges on Rented Interest income from notes and accounts receivable 24,473,575 19,186,689

24 Properties Interest income from banks 4,603,891


29,077,466
5,500,322
24,687,011

YEAR ENDED DECEMBER 31, 2012 2011


US$ US$
Other Expenses

Depreciation expense (Note 11)


Property taxes
9,597,253
6,383,320
7,116,661
5,752,935
28
Manpower 4,654,208 3,563,243 YEAR ENDED DECEMBER 31, 2012 2011
Advertising 1,404,101 1,628,560 US$ US$

Electricity, maintenance and other related changes, net 5,502,217 3,105,472


27,541,099 21,166,871 Amicable settlements - 3,414,155
Loss of ownership of investment properties (Note 11) - 1,275,219
Other 233,877 377,030
233,877 5,066,404
Cost of Services

25 Rendered

During 2011, the Group settled an amount of


YEAR ENDED DECEMBER 31, 2012 2011
US$3.4million representing amicable settle-
US$ US$
ments as a goodwill gesture for the with-
drawal of claims concerning offers regarding
Cost of services rendered to related parties 2,527,995 1,927,253
the “Beirut Souks”.
Cost of services rendered to clients 1,090,421 763,421
Broad band network cost of services rendered 3,237,268 3,211,278
6,855,684 5,901,952

Basic/Diluted Earnings

General and
29 Per Share

26 Administrative Expenses
The computation of earnings per share is
based on net income for the period and the
YEAR ENDED DECEMBER 31, 2012 2011
weighted average number of outstanding class
US$ US$ (A) and (B) shares during each period net of
treasury shares held by the Group.
Salaries, benefits and related charges 22,470,944 22,881,088
Board of directors’ remuneration 285,417 275,000 The weighted average number of shares to
Professional services 1,644,557 2,419,556 compute basic and diluted earnings per share
Promotion and advertising 6,716,712 5,880,820 is 158,846,753 shares for the year 2012
Utilities, office, maintenance and other similar expenses 4,401,359 4,096,190 (154,395,737 shares for the year 2011).
Travel and accommodation 952,241 1,077,376
Other expenses 1,488,950 1,566,112
37,960,180 38,196,142

104 105
Total benefits paid to executives and members (e) The Group is a defendant in various legal
Notes to the Cash Flow Related Party

30 Statement
31 Transactions
of the Board of Directors (including salary, proceedings and has litigations pending be-
bonus and others), included within “General fore the courts and faces several claims raised
and administrative expenses”, for the year by contractors. On the basis of advice received
ended December 31, 2011 amounted to from the external legal counsel and the
US$2,267,607 (US$3,481,100 for the year Group’s technical department, the directors
(a) Depreciation was applied as follows: These represent transactions with related par- ended December 31, 2010). are of the opinion that any negative outcome
ties, i.e. significant shareholders, directors and thereof, if any, would not have a material ad-
YEAR ENDED DECEMBER 31, 2012 2011 senior management of the Group, and com-
US$ US$
Income arising and expenses incurred from verse effect on the financial condition of the
panies of which they are principal owners and the Group’s transactions with other related Group.
entities controlled, jointly controlled or signif- parties, other than those disclosed in the fi-
Depreciation of fixed assets - Note 13 8,160,418 6,422,073
icantly influenced by such parties. Pricing nancial statements, do not form a significant (f)On June 7, 1997, the Group signed an ex-
Depreciation of investment properties - Note 11 & 24 9,597,253 7,116,661
Depreciation charge for the year 17,757,671 13,538,734
policies and terms of these transactions are portion of the Group’s operations. change agreement with the Lebanese Gov-
approved by the Group’s management. ernment. By virtue of this agreement, the
(b) Interest expense consists of the following: Group acquired additional built up area of
Cash and bank balances include US$
Commitments and
approximately 58,000m² and 556,340 Class A
55,384,003 as of December 31, 2012

32 Contingencies
YEAR ENDED DECEMBER 31, 2012 2011 shares in exchange for approximately
US$ US$
(US$59,908,080 as of December 31, 2011) rep- 15,000m² and the payment of US$38.7million
resenting current bank accounts with a local to restore governmental buildings. US$25mil-
Interest charged as period cost 27,496,818 21,081,965 bank who is a significant but minority share- lion has already been paid and accounted for
holder of the Group.
(a) An
Interest expense allocated to inventory of land and the balance of US$13.8million continues
agreement between the Company and
and projects in progress – Note 10 3,240,937 3,271,593 to be included under accounts payable. Ac-
Total interest expense 30,737,755 24,353,558 Bank overdraft and short term facilities in- the Council for Development and Reconstruc-
cording to the terms of the agreement, the
clude US$115,340,045 as of December 31, tion (“CDR”) was promulgated through De-
Group undertook to build a governmental
2012 (US$115,629,936 as of December 31, cree No. 5665 dated September 21, 1994, duly
building and to conclude ten finance leases
2011) representing short term facilities with a approved by the Council of Ministers. By
(c) Non-cash transactions in operating and in-
over seven years for certain buildings belong-
31, 2012 (US$9,548,449 for the year ended De- to fixed assets (US$43,320 from fixed assets to local bank who is a significant but minority virtue of this agreement, the Company was
ing to the Lebanese Government. In 1999, the
vesting activities include transfers from inven- cember 31, 2011). investment properties for the year ended De- shareholder of the Group. granted 291,800m² of the reclaimed land sur-
government canceled the exchange and fi-
tory of land and projects in progress to cember 31, 2011). face (totaling 608,000 sqm) against the execu-
(d) During the year ended December 31, 2012,
nance lease agreement. The implementation
investment properties in the amount of Included under “Interest expense” in the con- tion by the Company of the sea landfill and
(e) Cash
and the effect of cancellation is not yet deter-
US$23,874,657 for the year ended December the Group transferred a total of net book value and cash equivalents comprise of the solidated statement of income an amount of infrastructure works.
mined and has not been reflected in the ac-
of US$2,681,789 from investment properties following: US$5,151,785 for the year ended December
(b)
companying financial statements.
31, 2012 (US$5,577,288for the year ended De- The total projected cost for completion of

(g)
cember 31, 2011) representing interest ex- the BCD project has been estimated by man-
In prior periods, the Group submitted to
YEAR ENDED DECEMBER 31, 2012 2011
pense on short term facilities with a local bank agement to be approximately US$2billion.
US$ US$ the Ministry of Culture and Higher Education
who is a significant but minority shareholder This amount is used as a base for the deter-
claims totaling US$17.7million representing
of the Group. mination of cost of sales.
Cash 157,385 617,520 compensation for delays that resulted from

(c) Commitments for contracted works not ex-


Current accounts 27,390,085 19,307,100 excavation works. These claims were not yet
Certain directors are members of the boards approved nor confirmed by the concerned au-
Short term deposits 135,916,347 152,803,252 ecuted as of December 31, 2012 amounted to
of directors of banks with whom the Group thorities nor recorded as receivables in the ac-
Bank overdrafts (177,223,565) (89,746,974)
(13,759,748) 82,980,898
has various banking activities. approximately US$142million (US144million
companying financial statements.
as of December 31, 2011).
General and administrative expenses include (h) For the purpose of enhancing and improv-
legal fees in the amount of US$120,000 for the (d)A lawsuit was raised in 1999 against the
ing land value in Zokak Al Blat area and to
year ended December 31, 2012 related to one Group by the “CDR” claiming reimbursement
settle the recuperation of a lot in that area, the
of the firm’s legal counselors who was a mem- of an amount of LL5.4billion (US$3.6million)
Group signed in 2002 an agreement with the
ber in the Company’s board of directors plus interest. This balance represents pay-
Armenian Orthodox prelacy to demolish the
(US$125,000 for the year ended December 31, ments previously made by the “CDR” in con-
building on the recuperated lot and to transfer
2011). nection with the appraisal of the properties in
corresponding building rights to another ad-
the BCD area and other tender documents.
jacent lot with minimum building rights of
The Group incurred various expenses on behalf No provision was set up against this claim
4,900m² against ceding of owners’ shares from
of its related parties whose total net debit bal- since, on the basis of the advice received from
both lots. Additionally, a built up area of
ances due amounted to US$3,269,088 as of De- the Group’s legal advisor, the directors are of
5,335m² (US$2,700,000) remains as a contin-
cember 31, 2012 (US$1,006,350 as of December the opinion that this claim is not based on
gent loss to the Group in case the prelacy de-
31, 2011) (Note 8 and 15). sound legal grounds. During 2011, the Group
cides to build this area within the next 10 years
paid an amount of LBP11.5billion (US$7.6mil-
following this agreement.
During 2012, the Group charged Solidere In- lion) in settlement of the above claims

(i) The Group has commitments and contingen-


ternational Limited, an associate, administra- recorded under infrastructure costs (Note 10a).
tive expenses amounting to US$2,062,072 cies in the form of letters of guarantee in the
(US$1,904,854 for the year 2011) (Note 23), in The Group has submitted to the “CDR” claims
amount of US$4,024,060 as at December 31,
addition to an amount of US$238,158 aggregating US$13.6million representing
2012 (as at December 31, 2011 commitments
(US$29,459 for the year 2011) representing mainly change orders to infrastructure works in
and contingencies in the form of letters of guar-
payments on its behalf. the traditional BCD which were incurred by the
antee the amount of US$11,275,811).
Group on behalf of the Government. These
During 2012, the Group rendered services to claims were neither approved nor confirmed by
City Makers s.a.r.l., a related party, for an ag- the concerned party nor recorded as receivables
gregate amount of US$465,923 (Note 23). in the accompanying financial statements.

106 107
The Group manages its capital structure and cumulative foreign currency transactions, cu- (b) Foreign Currency Risk: The Group’s liquid funds are placed with prime (d) Liquidity Risk:
Capital

33 Management
makes adjustments to it in light of changes in mulative change in fair value and surplus on Currency risk is the risk that the value of a fi- banks. Investments in securities are not covered Liquidity risk is the risk that an institution will
economic conditions. No changes were made treasury shares’ activity less treasury shares. nancial instrument will fluctuate due to by collaterals. Other debit balances consist be unable to meet its net funding require-
in the objectives, policies or processes during changes in foreign exchange rates. The Group mainly of amounts due from related parties. ments. Liquidity risk can be caused by market
the years ended December 31, 2012 and 2011. The Group monitors capital on the basis of the is not materially exposed to currency risk since disruptions or credit downgrades, which may
debt-to-capital ratio (gearing ratio). The gear- the majority of its financial assets and liabili- The Group trades mostly with recognized, credit cause certain sources of funding to dry up im-
The primary objective of the Group’s capital The capital structure of the company consists ing ratio as at December 31, 2012 and 2011 ties are denominated in U.S. Dollar or in cur- worthy third parties and monitors receivable mediately.
management is to ensure that it maintains a of debt and equity. Debt consists of total lia- was as follows: rencies pegged to the U.S. Dollar. balances and collection on an ongoing basis.
strong credit rating and healthy capital ratios bilities less cash and bank balances. Equity The Group’s objective is to maintain a balance
in order to support its business and maximize comprises capital, reserves, retained earnings, (c) Credit Risk: The Group’s credit risk exposure is spread over between continuity of funding and flexibility
shareholder value. The Group’s credit risk is primarily attributable 44 counter-parties; 10 customers constitute through the use of bank overdrafts and bank
to its liquid funds receivables, other debit bal- 93% of the total exposure and 34 customers loans.
ances and investments in securities. The constitute the remaining 7%. The maximum
amounts presented in the balance sheet are exposure is the carrying amount as disclosed The table below summarizes the maturity profile
stated at net realizable value, estimated by the in Note 9. of the Group’s liabilities as of December 31,
DECEMBER 31, 2012 2011 Group’s management based on prior experi- based on contractual undiscounted liabilities:
US$ US$ ence and the current economic conditions. The Group’s revenues, profits, total assets and
total liabilities segregated by geographical area
Total consolidated liabilities 956,951,236 848,208,855 is disclosed under Note 6.
Less: Cash and bank balances (163,463,816) (174,138,680)
Total debt 793,487,420 674,070,175

Total equity 1,910,072,270 1,936,270,252


Gearing ratio 0.42 0.35
LESS THAN 3-12 1 TO 5
NO MATURITY 3 MONTHS MONTHS YEARS TOTAL
USD USD USD USD USD

DECEMBER 31, 2012

Bank overdrafts and short


term facilities - - 646,886,436 - 646,886,436
Accounts payable and other liabilities 980,490 31,339,614 6,693,986 30,544,057 69,558,147
purpose of these financial liabilities is to raise (a) Interest Rate Risk:
Risk
Dividends payable 78,776,194 - - - 78,776,194

34 Management
finance for the Group’s operations. The Group The Group’s exposure to the risk of changes Deferred revenues and other
has various assets such as accounts and notes in market interest rates relates primarily to the credit balances 40,835,805 - - - 40,835,805
receivable and cash and bank balances, which Group’s long-term debt obligations with Loans from banks and financial
arise directly from its operations. The main floating interest rates. The following table institutions - - - 69,320,670 69,320,670
risks arising from the Group’s financial instru- demonstrates the sensitivity to a reasonably Non-financial liabilities 51,573,983 - - - 51,573,983
172,166,472 31,339,614 653,580,422 99,864,727 956,951,235
The Group’s principal financial liabilities, ments are interest rate risk, liquidity risk, for- possible change in interest rates, with all other
other than derivatives, comprise bank loans eign currency risk and credit risk. The Board of conditions held constant, of the Group’s profit
and overdrafts, deferred revenues and other Directors reviews and approves policies for before tax. DECEMBER 31, 2011
credit balances, dividends payable and ac- managing each of these risks which are sum-
counts payable and other liabilities. The main marized below: Bank overdrafts and short
term facilities - - 520,049,200 - 520,049,200
Accounts payable and other liabilities 980,490 33,965,008 28,500,664 32,085,386 95,531,548
Dividends payable 84,195,863 - - - 84,195,863
INCREASE/ EFFECT ON Deferred revenues and other
DECREASE IN PROFIT BEFORE credit balances 29,058,568 - - - 29,058,568
BASIS POINTS TAX
Loans from banks and financial
USD
institutions - - 17,000,000 53,095,747 70,095,747
Non-financial liabilities 49,277,929 - - - 49,277,929
163,512,850 33,965,008 565,549,864 85,181,133 848,208,855
2012
US Dollars +20 589,920
US Dollars -15 442,440

2011
US Dollars +20 508,918
US Dollars -15 381,688
Fair Value of Financial Approval of Financial

35 Instruments
36 Statements

The Board of Directors approved the financial


The fair values of financial instruments are not statements for the year ended December 31,
materially different from their carrying values. 2012 on May 27, 2013

108 109
COLOPHON
Design, Editing and Production
Multidisciplinary Design Department

Photography Archive
Communications and Public Relations Division

Photography
Mosbah Assi

Prewar Photography
Pierre Madendjian

Prepress
Leogravure s.a.l.

Printing
Anis Commercial Printing Press s.a.l.

Binding
Fouad Baayno Book Bindery s.a.r.l.
Solidere Annual Report 2012:
The Chronicle

Copyright © 2013 Solidere

All rights reserved. No part of this publication can


be reproduced or transmitted in any form or by
any means, whether by photocopying, recording
or facsimile machine or otherwise howsoever
without prior written permission from Solidere.

Printed in Lebanon

Auditors Legal Counsel Solidere

Deloitte & Touche Ernst & Young P.C.C. Sami Nahas Registered Office
Arabia House, 131 Phoenicia Street Commerce and Finance Bldg, Kantari Attorney-at-Law Solidere Bldg 149, Saad Zaghloul Street
PO Box 961, Beirut, Lebanon PO Box 11 1639, Beirut 1107 2090, Lebanon 34 Clemenceau Street, BBAC bldg PO Box 11 9493, Beirut 2012 7305, Lebanon
T 00961 1 364 700, T 00961 1 760 800, PO Box 11 4570, Beirut, Lebanon T 00961 1 980 650, 00961 1 962 000
F 00961 1 367 087 F 00961 1 760 822/823 T 00961 1 364 990, 00961 1 374 990 F 00961 1 980 661, 00961 1 980 662
F 00961 1 369 663
T H E C H R O N I C L E

13 While the develop- 10 Hospitality ventures 06 In preparation for 02 Focusing on real 98 All infrastructure 94 Comprehensive
ment strategy fo- come to complement the development estate develop- works in the Tradi- urban planning
cuses on revenue- and support real of the Waterfront ments that attract tional City Center stresses the topog-
generating and added- estate development District – the reclaimed tenants and residents to are complete including raphy of Beirut city center
value ventures to com- and enhance property expansion of the tradi- the city center, and fol- the expansion of the and ensures a connection
plete the Traditional City value. Hotels, cafes, tional city center – Beirut lowing the positive Ring Road and the cre- between the project and
Center, the future devel- and restaurants blossom is promoted as an inter- response to Saifi Village, ation of primary east– its surrounding areas,
opment frontier is the alongside office and res- national corporate busi- the impetus to invest in west and north–south accommodating a broad,
Waterfront District, with idential neighborhoods, ness center. Further other residential devel- avenues, which organize sustainable, flexible
gateway projects set to promoting the city cen- detailed urban and traffic opments increases. This accessibility and con- land-use mix.
bridge the transition from ter as a welcoming and studies are carried out, trend also underlines the serve air and view corri-
historic to new. friendly, mixed-use space. resulting in amendments importance of full-time dors. 91 Beirut’s postwar
to the Master Plan. property maintenance urban recovery is to
12 After Saifi, Wadi 09 Beirut Souks, a flag- and operations services, 97 Restoration is car- be directed through
Abou Jamil is taking ship retail project, 05 The seafront Beirut which begin to be offered ried out based on concerted private sector
shape as a new opens its doors. Marina is fully oper- to third-party developers. clear urban design, investment into a care-
calm, urban, residential This signature shopping, ational, berthing a technical guidelines, and fully constructed institu-
neighborhood, while the hospitality, entertain- large number of vessels 01 As businesses, architectural briefs, pre- tional framework,
construction of several ment, and cultural meet- on annual and seasonal commercial outlets, serving facades and regulated by government
high-rise and large-scale ing point boosts the bases. The planning and and landscaped adapting interiors to the decree. It is set to become
developments are economic vitality and construction of several open spaces multiply, needs of contemporary one of the largest inner-
launched in the Hotel social vibrancy of the city real estate projects rush a number of vacant lots life and business. Mean- city and waterfront
District, Serail Corridor, center. The expansive site forward, especially in provide temporary park- while, following a fast- renewal projects in the
and Saifi, all evolving to is a prime example of Wadi Abou Jamil, the ing spaces to accommo- track approach, the first world.
complete the Traditional how layers of the city can Hotel District, and the date the mobility of the major new development
City Center cityscape. be incorporated into a Serail Corridor. growing number of ten- reaches completion.
contemporary design. ants and visitors, in
11 Zaitunay Bay inau- 04 An international anticiplation of the 96 Beirut city center
gurates its quayside 08 With the Conserva- urban design com- completion of under- becomes a large
restaurant strip and tion Area’s urban petition solicits new ground parking facilities archeological site,
welcomes more than fabric almost com- visions for Martyrs’ Square prescribed in the city cen- with excavations uncov-
3,000 visitors per day in plete and the remaining and its surroundings. ter’s Master Plan. ering major discoveries
the first six months. At parts of the Traditional The objective is to open dating back to several
the other end of town, City Center more than the axis toward the sea 00 With archeological past civilizations. These
the newly landscaped halfway developed, a cul- with respect to the urban documentation and excavations are carried
Uruguay Street vitalizes tural strategy is imple- grid and reposition the evaluation in full out following a UNESCO
nightlife activity in the mented to promote square as a national swing, and following protocol specifically
Conservation Area, where culture, arts, and heritage meeting point. extensive findings related devised for the area in
selected buildings are il- as tremendous resources to the Cardo Maximus, a coordination with a
luminated in the for the local and interna- 03 In establishing large site between several number of agencies and
nightscape through an tional communities. the city center as a places of worship is dedi- teams of experts from
image projection system. culture and leisure cated to be a landscaped several different countries.
07 With the completion destination, a strategic public space as the
of land reclamation approach is taken to Hadiqat As-Samah (Gar- 95 Informed by natu-
and the visible integrate archeological den of Forgiveness). ral boundaries and
demarcation of the new finds within the urban landforms, street
Waterfront District, along fabric. Meanwhile, a 99 The city center is patterns, visual corri-
with a continuous rise in Quartier des Arts evolves pulsing with life. dors, past neighborhood
developers’ and investors’ against the backdrop Landmark buildings structures, and preserved
interest in real estate of reconstructed and are being restored and fabrics, the city center is
development, requests restored traditional cafes and restaurants are envisioned as a cluster of
come in to emulate the buildings in Saifi Village. multiplying. Businesses sectors, each with its own
success of Beirut city and institutions relocating detailed master plan.
center’s regeneration to the area are drawn by
enterprise in other parts the amenities and serv-
of the world. ices such as the state-of-
the-art communication
network, security, and
maintenance.

Solidere Annual Report 2012:


an account of facts and events in the reconstruction
and development of beirut city center
12
A series of photographs documenting the reconstruction
and development of Beirut city center

The photo book documents the regeneration of Beirut city


center over twenty years. It is a testimony to the resurgence
of the Lebanese capital, a precious archive of urban history.
While revenue-generating and added-
value ventures come to complete the
Traditional City Center, the future
development frontier is the Waterfront
District, with gateway projects set to
bridge the transition from historic to new.

13
04 — 05

13
The yacht club structure seems to emerge naturally
out of the land and transcends the boundary be-
tween city and sea. The project exemplifies the rich-
ness of the urban shoreline.
06 — 07

13
Zaitunay Bay’s rich culinary scene consists of 17
restaurants and cafes, offering a new entertainment
scene and creating a number of employment oppor-
tunities. Retail outlets, a water sport center, and an
art workshop complement the food experience and
turn the promenade into a family-friendly place
08 — 09

13
In its twelfth season, Beirut Marina provided moor-
ing for over 250 boats. The port’s total berth capacity
currently stands at 222 boats with a size of 5 to 65 m,
with 60 percent of the mooring area reserved for
boats over 25 m in length.
10 — 11

13
The Corniche promenade provides a natural exten-
sion to the existing Beirut Corniche and encourages
public recreation and leisure activities.
12 — 13

13
To date, temporary uses on the northeastern part
of the Waterfront District include the Beirut Interna-
tional Exhibition and Leisure Center (BIEL), Beirut
Exhibition Center, and a walking, jogging, and cy-
cling trail. KidzMondo, an edutainment center for
children, opened recently.
14 — 15

13
In the Hotel District, 3 Beirut, Damac Tower, and
Beirut Terraces are among several developers’ projects
under construction.
16 — 17

13
The Cinema and Entertainment Complex will soon
open in the northern part of Beirut Souks. The vol-
ume of its outer skin is composed of four metal rib-
bons that generate a dynamic sculptural form.
18 — 19

13
With its contemporary design and semi-open charac-
ter, Beirut Souks are an architectural marvel that re-
define and revitalize the traditional oriental bazaar.
Situated at the city’s core, they serve as a meeting
point that merges the capital’s many different parts
into one organic whole.
20 — 21

13
Beirut Souks (left) and the restored facades of pre-
served buildings (right) are an example of the harmo-
nious combination of modernity with historicity on
Fakhry Bey Street.
22 — 23

13
Martyrs’ Square is planned as a sequence of spaces
that move from the city to the sea. It starts at the
southern end of the square and moves north past the
famous Martyrs’ Monument and northward through
the archeological site – the Petit Serail and the
Canaanite Tell – to the water.
24 — 25

13
The District //S project is planned as a 16-building,
open-gated, pedestrian-friendly community that
draws people to its outdoor piazzas, terraces, and ar-
caded retail stretch through meandering alleyways.
The project will provide a northern extension to Saifi
Village, following the same design guidelines but in a
contemporary architectural expression.
26 — 27

13
The Gebran Tueni Memorial (right) faces the Samir
Kassir Square (right) on Weygand Street, where two
large ficus trees shade a water feature.
28 — 29

13
On Uruguay Street a U-shaped pedestrian area sur-
rounding a restored building is dedicated to open-air
seating and pedestrian activity as extensions of the
ground-level commercial spaces leased to pubs and
restaurants. Uruguay Street and the plaza have be-
come a hub of after-work activity and nightlife.
30 — 31

13
With the recovery of the Conservation Area and Beirut
Souks, the city center is reaffirming its role as the
focal point of economic, social, and cultural activities.
32 — 33

13
The Rafic Hariri Sculptural Garden facing the Na-
tional Evangelical Church, with a life-size sculpture
of the late Prime Minister, is officially named Na-
tional Unity Square.
34 — 35

13
The near-completed fabric of the Conservation Area
showcases streetwall control and alignment on main
street and boulevard frontages, with street level dedi-
cated to retail units.
2012 Completed and Ongoing Developments

Wadi Abou Jamil takes shape as a new


calm, urban, hillside neighborhood,
while the construction of several high-
rise and large-scale developments are
launched in the Hotel District, Serail
Corridor, and Saifi, all evolving to com-
plete the Traditional City Center
cityscape.

12
38 — 39

12
Zaitunay Bay inaugurates its quayside restaurant strip
and welcomes more than 3,000 visitors per day in the
first six months after opening while the yacht club is
planned to open its doors in 2013.
40 — 41

12
New developments are initiated in the Martyrs’
Square Axis, including Beirut Gardens, Tower Plus
One and Two, and Beb Beirut.
42 — 43

12
Saifi Village reinterprets traditional architectural fea-
tures. Colorful facades with triple arches, decorative
cornices and balconies, red-tiled pitched roofs, court-
yards, paths, and walkways stay faithful to the char-
acter of Saifi and add to the charm of the
neighborhood.
44 — 45

12
In Wadi Abou Jamil, several developments reach
completion, some are in their finishing stages, and
others are just commencing execution. Together they
give shape to the hillside urban neighborhood.
2011 Completed and Ongoing Developments

Zaitunay Bay inaugurates its quay-


side restaurant strip and welcomes
more than 3,000 visitors per day in six
months. At the other end of town,
the newly landscaped Uruguay Street
becomes another hub of nightlife ac-
tivity in the Conservation Area,
where selected buildings are illumi-
nated in the night-scape through an
image projection system.

11
48 — 49

11
Zaitunay Bay’s yacht club, with a total of 14,000 sq m
of floor space, nears completion. It consists of four
stories and three basements, accommodating com-
mercial space at ground level, 53 serviced and fur-
nished apartments, and a yacht club on upper levels.
50 — 51

11
Facing the Wadi Abou Jamil (right) upcoming resi-
dential district is the Hotel District, where many of
the previously available land plots are now under
construction or planning by developers for a variety
of land uses.
52 — 53

11
The Maghen Abraham Synagogue joins 17 other
places of worship – mosques, churches, and shrines –
that have been restored to exhibit their architectural
beauty and historical significance.
54 — 55

11
The Jewellery Souk is inaugurated. Two-floor pavil-
ions are linked by a network of charming passages
and squares. Shops are tightly packed along shaded
lanes with glass shop fronts that are reminiscent of
the old gold souk.
2010 Completed and Ongoing Developments

Hospitality ventures come to comple-


ment and support real estate develop-
ment and enhance property value.
Hotels, cafes, and restaurants blossom
alongside office and residential
neighborhoods, promoting the city
center as a welcoming and friendly,
mixed-use space.

10
58 — 59

10
Moving toward developing the reclaimed land, an
agreement is signed for the detailed design of under-
ground infrastructure and road asphalting, street fur-
niture, and other hardscaping in the Waterfront
District. A study on multimodal transportation re-
quirements for the district is undertaken to deliver
an area-wide transportation strategy.
60 — 61

10
Following the commencement of business for several
food and beverage outlets on the famed Ajami Square,
as well as numerous openings for world-famous
boutiques, Beirut Souks Core celebrates its official
inauguration with four days of spectacular perform-
ances and events. The Souks Core reaches near maxi-
mum tenancy, and the newly opened Jewelry Souk is
more than 50 percent occupied.
62 — 63

10
Amir Bachir Street with the landmark Lazarieh Com-
mercial Center (right) facing the pedestrian Bechara
Al Mouhandess Street, created along restaurants and
cafes to form a promenade overlooking Hadiqat As-
Samah (Garden of Forgiveness).
2009 Completed and Ongoing Developments

Beirut Souks, a flagship project, opens


its doors. This signature shopping, hos-
pitality, entertainment, and cultural
meeting point enhances the economic
vitality and social vibrancy of the city
center. The expansive site is a prime
example of how historical layers of the
city can be incorporated into a contem-
porary design.

09
66 — 67

09
The real estate development of the Waterfront Dis-
trict, now fully reclaimed, is planned to reach an ag-
gregate 1.7 million sq m. Permanent development is
set to start around the periphery of the street grid
while the central blocks will be developed gradually.
68 — 69

09
Designed as a rectangle with a landscaped open
atrium, the UN House (right) represents a south-
eastern “gateway” into the city center.
70 — 71

09
Wadi Abou Jamil is witnessing a wave of construction
activity on lots for which designs were commissioned
and then sold to third parties along with their respec-
tive residential concept proposals.
72 — 73

09
Storefront design specifications and guidelines are
introduced to provide tenants with clear direction for
interior construction works, leading to harmony and
consistency.
2008 Completed and Ongoing Developments

With the Conservation Area’s urban


fabric almost complete and the
remaining parts of the Traditional
City Center more than halfway
developed, a strategy is implemented
to preserve, create, and promote cul-
ture, arts, and heritage as tremendous
resources for the local and interna-
tional communities.

08
76 — 77

08
Serail Corridor and Hotel District from left to right:
24 Avenue du Parc, Park View, the Four Seasons Hotel,
Marina Tower, Beirut Tower, Platinum Tower, and
Monroe Hotel.
78 — 79

08
A new prayer hall on the left, topped by a small dome,
creates a virtual portal to Beirut Souks by mirroring
the form and scale of the Mamluk Zawiyat Ibn Arraq
Shrine on the right.
80 — 81

08
Olivier Vidal (France) is commissioned to design the
Bab Idriss Square (near right) and incorporate sculp-
tures by Xavier Corbero (Spain) evoking figures on
their way to the Hippodrome. The site stands on the
street that leads to the remains of the Roman race-
course gates.
82 — 83

08
Early modern buildings on Riad El Solh Street have
served as headquarters for financial institutions since
the mid-twentieth century.
2007 Completed and Ongoing Developments

Land reclamation is complete and


the demarcation of the new Water-
front District is visible. Among a
continuous rise in interest by third
parties in land for real estate devel-
opment, requests come in to emulate
the success of Beirut city center’s
regeneration program in other parts
of the world.

07
86 — 87

07
All land reclamation, including excavations, process-
ing of the materials, and backfilling, reaches comple-
tion, including the monitoring the generation of
landfill gas from backfilled materials through bore-
holes. The new Waterfront District is ready for infra-
structure works to prepare the land for future
development.
88 — 89

07
The integration of heritage and modernity is evident
as one approaches the main Beirut Souks entrance at
Imam Ouzai Square.
2006 Completed and Ongoing Developments

In preparation for the development of


the Waterfront District, Beirut city center
is promoted as an international corporate
business center. Further detailed urban
and traffic studies are carried out, result-
ing in amendments to the master plan.

06
92 — 93

06
The construction of the south part of Beirut Souks
(center) is progressing rapidly. Internally, it retains
the ancient street grid and is composed of a series
of structures creating urban spaces in an intricate
three-dimensional network fully integrated with
the city fabric.
94 — 95

06
With several residential, office, and hotel high-rise
developments under construction across from Beirut
Marina, the skyline of the Hotel District is gradually
changing.
2005 Completed and Ongoing Developments

In its fourth season, Beirut Marina


becomes fully operational, berthing a
large number of vessels on annual and
seasonal bases. The planning and con-
struction of several real estate projects
rush forward, especially in Wadi Abou
Jamil, the Hotel District, and the Serail
Corridor.

05
98 — 99

05
Construction of the Beirut Souks south part (Souks
Core and Jewelry Souk) advances. With the help of
professional advisors, a specific tenant-mix approach
is being developed to strategically place exclusive
concept and stand-alone boutiques and restaurants
among flagship and other traffic-generating stores.
100 — 101

05
The Conservation Area is almost complete with a few
developments still underway. These include the Bank
of Kuwait and the Arab World (Fenicia Bank), across
from the Municipality building on Foch Street and
the Radium office building.
102 — 103

05
Inspired by the Blue Mosque in Istanbul, the nearly
complete Mohamad Al Amin Mosque takes on a
deep, national significance when Prime Minister
Rafic Hariri is laid to rest there following his
assassination.
2004 Completed and Ongoing Developments

An international urban design competi-


tion solicits new visions for the Martyrs’
Square Axis and its surroundings.
The objective is to open the axis toward
the sea and reposition the square as a
national meeting point.

04
106 — 107

04
In the Hotel District, further urban design study is
undertaken to allow additional height to some tow-
ers. On completion and approval of a sector plan
amendment, design and building permit procedures
are registered for a number of large projects.
108 — 109

04
The Martyrs’ Square Grand Axis of Beirut interna-
tional urban design ideas competition is organized to
solicit a new vision for this prime public space and its
surrounding development, now open to the sea in its
extention from the Damascus Road gateway to the
Beirut Port’s first basin.
2003 Completed and Ongoing Developments

In establishing the city center as a


culture and leisure destination, a strate-
gic approach is taken to integrate
archeological finds within the urban
fabric. At the same time, a Quartier des
Arts evolves against the backdrop of
reconstructed and restored traditional
buildings in Saifi Village.

03
112 — 113

03
A highly positive response to Saifi Village provides
the impetus to further invest in residential develop-
ments and reinforce urban integration. The design
and implementation of clusters of various sizes for
land plots in Wadi Abou Jamil is commissioned, in-
volving both restoration and infill.
114 — 115

03
The peaceful residential ambience in Saifi Village de-
rives from a quiet environment and carefully de-
signed and landscaped public realm. The success of
the development is apparent as it is completely sold
or leased.
116 — 117

03
Prime Minister Rafic Hariri launches the construction
of a grand mosque at the intersection of Martyrs’
Square Axis and Amir Bachir Street, adjacent to the
restored St. George Maronite Cathedral and the
planned Hadiqat As Samah (Garden of Forgiveness).
118 — 119

03
The pedestrianized Nejmeh Square with its restored
clock tower and radial cobblestone streets gradually
fills with cafes and restaurants and attracts visitors in
search of outdoor recreational spaces.
2002 Completed and Ongoing Developments

Focusing on real estate developments


that attract tenants and residents to the
city center, and following the positive
response to Saifi Village, the impetus to
invest in other residential developments
increases. This trend also underlines
the importance of full-time property
operation and maintenance services,
which begin to be offered to third-party
developers.

02
122 — 123

02
Developments take shape in the Serail Corridor adja-
cent to the Beirut Souks, such as the Medgulf and
Semiramis developments, while lots along the main
Francois El Hajj Street (right) are still bare of con-
struction activity.
124 — 125

02
Further sector planning for the sloping Wadi Abou
Jamil sector contrives the development of a residen-
tial neighborhood with a mix of preserved and new
townhouses, low-rise apartment buildings, schools,
shops, and open spaces. Height controls are imposed
on new developments to preserve view corridors.
126 — 127

02
The number of temporary parking facilities increases
to provide 3,000 spaces servicing about 6,000 cus-
tomers per day.
2001 Completed and Ongoing Developments

As businesses, commercial outlets, and


landscaped open spaces multiply, an
increasing number of vacant lots provide
temporary parking spaces for the grow-
ing number of tenants and visitors,
awaiting the completion of underground
parking facilities prescribed in the city
center’s Master Plan.

01
130 — 131

01
The restored Starco Center (right) continues to
overlook the sea as the planned, high-density
Hotel District is still undeveloped.
132 — 133

01
Harmonious alignment of restored and new develop-
ments on Omar Daouk Street.
134 — 135

01
Parallel to Riad El Solh Street, Bank Street shows
the back facades of the restored financial institutions,
overlooking the Roman Baths and the cascading
gardens below the Grand Serail on Capuchin
Church Street.
136 — 137

01
Landscaping is a key part of the Beirut Central Dis-
trict Master Plan, destined to contribute significantly
to creating a quality environment in the Lebanese
capital. A garden above the Weygand Street under-
ground parking lot now boasts a large water fountain
and a variety of greenery, including vines, olive trees,
and palm trees.
2000 Completed and Ongoing Developments

With archeological documentation and


evaluation in full swing, and following
extensive findings related to the Cardo
Maximus, a large site between several
places of worship is dedicated to be land-
scaped as the Hadiqat As-Samah (Gar-
den of Forgiveness), conceived as part
of the generative framework for the city
center’s comprehensive redevelopment.

00
140 — 141

00
With the completion of marine and most civic works
including a breakwater, a two-line defense structure,
and quays, Beirut Marina is able to berth boats
(though not at full capacity).
142 — 143

00
The second phase of land treatment begins, involving
the excavation, sorting, processing, and treatment of
five million cubic meters of construction debris and
domestic solid waste.
1999 Completed and Ongoing Developments

The city center is pulsing with life.


Landmark buildings are being restored
and cafes and restaurants are multiply-
ing, giving the people of Beirut and the
country as a whole a new destination
filled with landscaped, pedestrian-
friendly spaces.

99
146 — 147

99
Construction of the large underground parking facili-
ties of Beirut Souks continues while the art deco fa-
cades on Fakhry Bey Street (right) are fully restored.
148 — 149

99
In the blocks forming the immediate eastern edge of
Martyrs’ Square, the plan envisions a continuous
colonnade facing the square. Its objective is to create
a strong urban statement as a 21st-century expres-
sion of the 1920s Maarad Street colonnade.
150 — 151

99
The construction of Bank Audi’s headquarters and
branch offices nears completion. The project includes
three contemporary buildings connected by a top-lit
planted atrium together with a restored historic
building adjoined by a public garden court.
152 — 153

99
An increasing number of streets are lined with trees,
fitted with planters, or reorganized to accommodate
wide medians covered in trees, shrubs, and colorful
annual plantings.
1998 Completed and Ongoing Developments

All infrastructure works in the Traditional


City Center are complete including the
expansion of the Ring Road and the
creation of primary east–west and
north–south avenues, which organize
accessibility and conserve air and view
corridors.

98
156 — 157

98
Construction of the sea defense structure makes
headway. Man-made concrete blocks,“accropodes,”
are gradually cast on-site and placed among rocks
along the western breakwater to form the breakwa-
ter. A prefabrication yard is built on-site for the pro-
duction of the caissons, which will form the second
defense line.
158 — 159

98
The underground parking structure is under con-
struction and the design of Beirut Souks is underway,
planned to follow the ancient, pre-Roman street grid
and integrate archeological features and open land-
scaped gathering spaces.
160 — 161

98
At the beginning of the Serail Corridor, Bank Audi’s
new headquarters and branch offices are under con-
struction.
162 — 163

98
In the most innovative restoration concepts, such as
the BankMed building on Foch Street, the facade of
heritage buildings is preserved while the interior is
totally revamped to accommodate underground car
parks and flexible office space.
1997 Completed and Ongoing Developments

Restoration is being carried out based


on clear urban design and technical
guidelines, preserving facades and
adapting interiors to the needs of
contemporary life and business.
Meanwhile, following a fast-track
approach, the first major new develop-
ment nears completion.

97
166 — 167

97
While waste extraction and its subsequent bio-com-
posting progress, land reclamation continues with
backfilling into the sea on the northeast side of the
landfill.
168 — 169

97
Ongoing works on the expansion of the Ring Road
and addition of tunnels to ensure its opening to traf-
fic by the end of the year.
170 — 171

97
While infrastructure works accelerate on the Ring
Road, a fast-track approach is adopted to the con-
struction of the UN House building (center left) in
the Ghalghoul sector.
172 — 173

97
Excavations uncover a city wall and moat and a
Phoenico-Persian quarter, to be incorporated into the
design of the Beirut Souks, with the aim to highlight
the archeology and create a multisensory experience
that is educational and interactive.
174 — 175

97
Excavations around Martyrs’ Square reveal Hellenistic
and Roman remains. The latter are found within the
preserved foundation arches of the Ottoman Petit
Serail. Along with the Canaanite Tell and other find-
ings, they will be incorporated in the planned Beirut
City History Museum.
176 — 177

97
Infrastructure works on Weygand Street with the
preserved Amir Assaf Mosque in front of the Al
Omari Mosque (left) and Beirut Municipality (right).
1996 Completed and Ongoing Developments

Beirut city center becomes a large


archeological site, with excavations un-
covering major discoveries dating back
to several past civilizations. These exca-
vations are carried out following a UN-
ESCO protocol specifically devised for
the area in coordination with a number
of agencies and teams of experts from
several countries.

96
180 — 181

96
The Grand Serail, originally built in the mid 19th
century as an army barrack atop a hill during the
Ottoman period, is under restoration to become
the seat of the Council of Ministers.
182 — 183

96
Construction of the tunnel linking the Fouad Chehab
Avenue Bridge to the Corniche Road near the
Phoenicia Hotel.
184 — 185

96
One of the most important road works in the city
center is the expansion of the Fouad Chehab Avenue
Bridge. The 3.6 km Ring Road, as it is called, connects
to the western end of Fakhreddine Street by tunnel
and links through a longer tunnel to the Corniche
Road near the Phoenicia Hotel.
186 — 187

96
At the western edge of the Conservation Area bor-
dering Wadi Abou Jamil, St Louis Capuchin Church
(center) stands across from the Ottoman structure
that houses the Council for Development and Re-
construction, both restored.
188 — 189

96
Excavation is complete for the major office develop-
ment near Riad El Solh Square. The complex, named
UN House, will house several regional and local UN
agencies, in particular the Economic and Social Com-
mission for Western Asia (ESCWA).
190 — 191

96
The buildings on Fakhry Bey Street are being restored
while the Beirut Souks project is under design
through five separate commissions to Lebanese and
international architects.
192 — 193

96
Priority is placed on the delivery of infrastructure in
the historic core and its surroundings, including util-
ity works comprised of water supply and stormwater
and sewage networks, here underway on Weygand
Street in front of the Beirut Municipality building.
1995 Completed and Ongoing Developments

Informed by natural boundaries and


landforms, street patterns, visual corri-
dors, past neighborhood structures, and
preserved fabrics, the city center is envi-
sioned as a cluster of sectors, each with
its own detailed master plan.

95
196 — 197

95
In terms of the road network, works undertaken on
behalf and on account of the State include rehabilita-
tion of existing and construction of new primary and
secondary roads as well as bridges and tunnels to al-
leviate congestion at the main entrances to the city
center. Above, work progresses on the underpass
linking the old Hotel District to its new extension.
198 — 199

95
Underground utility works prepare the way to the
widening of the George Haddad Street in Saifi, de-
limiting the city center to the east.
200 — 201

95
The state of devastation after the war in Wadi Abou
Jamil before its reconstruction and development.
202 — 203

95
Infrastructure works on the underpass and
interchange leading to Selim Salam Boulevard
and connecting Beirut city center to the airport.
204 — 205

95
For the Beirut Souks, an initial master plan is com-
missioned for the Tawila, Ayass, and Al Jamil Souks.
Meanwhile, excavation works begin for the related
underground parking structure.
206 — 207

95
Ongoing infrastructure works in the Conservation
Area on Foch Street and its surroundings.
1994 Completed and Ongoing Developments

Comprehensive urban planning stresses


the topography of Beirut city center and
ensures a connection between the project
and its surrounding areas, accommodat-
ing a broad, sustainable, flexible land-
use mix.

94
210 — 211

94
As an example of transforming disaster into opportu-
nity, the new Waterfront District is planned as an ex-
pansion of an original landfill enclosing the Normandy
dumpsite (left) that has environmentally scarred the
city center foreshore since the Lebanese war.
212 — 213

94
Following an international design competition with
357 entries from 42 countries, a detailed master plan
for the Beirut Souks develops, synthesizing the tradi-
tional features of the old areas with the requirements
of modern commercial activity.
214 — 215

94
As the war ended and clearing works begin, an
agreement is signed with the Beirut Municipality to
use 11,000 sq m in the Martyrs’ Square area for social
programs and cultural activities. In the meantime, the
area welcomes informal cafes.
216 — 217

94
Most retained heritage buildings such as the Amir
Assaf Mosque (left) and Beirut Municipality (right)
will be restored in accordance with the guidelines set
in cooperation with the concerned national authori-
ties. Buildings considered of heritage value must be
faithfully restored to match their original external
fabric. Other buildings are allowed a certain flexibil-
ity, although they are subject to the prevailing height
and massing control criteria applicable in the sector.
218 — 219

94
Saifi, with a large number of retained buildings, is
planned as a “special residential policy” district of
medium density, with a network of pedestrian links,
small squares, landscaped streets, and gardens to
recreate a traditional urban neighborhood.
220 — 221

94
Riad El Solh Square, named after the first Prime Min-
ister of independent Lebanon, here without the
statue, removed during the war years.
Beirut’s postwar urban recovery is to be
directed through concerted private sector
investment into a carefully constructed
institutional framework, regulated by
government decree. It is set to become
one of the largest inner-city and water-
front renewal projects in the world.

91
224 — 225

91
The Beirut Central District Master Plan stresses the
topography of the city center, as well as the surviving
and heritage buildings, townscape views, neighbor-
hood fabric, and the many layers of historical mem-
ory forming the city’s heritage. Furthermore, it
ensures an effective connection between the Tradi-
tional City Center, such as Port Street above, and the
Waterfront District (the reclaimed land) and between
the whole project and its surrounding areas.
226 — 227

91
The Beirut Central District Master Plan provides an
urban design framework for both the restoration of
old buildings and the construction of new ones. It
recognizes Beirut’s rich heritage and aims to preserve
the city’s historical buildings and townscape features.
Allenby Street (right) is one of the maintained view
and air corridors leading from the Traditional City
Center to the new Waterfront District.
228 — 229

91
The state of destruction of the Old Souks after the war.
230 — 231

91
Martyrs’ Square and its surroundings before being
opened to the Mediterranean Sea with the aim to
reactivate the city center and enhance its link to
the waterfront.
232 — 233

91
The site of the planned Hadiqat As Samah (Garden
of Forgiveness), between Martyrs’ Square (far right
behind the preserved Opera House) and Nejmeh
Square (left, outside picture frame).
The Souks that formed the traditional
Levantine marketplace in Beirut’s city
center, had each a distinctive identity
and were mostly named after the goods
they specialized in, an anchor retailer,
or known family-names in business.

prewar
236 — 237
238 — 239

Anda mungkin juga menyukai