Anda di halaman 1dari 8

Grafik-grafik pada Percobaan Kavitasi

Tabel 1. Aliran langsung (tanpa loop)

Q ΔP
0,00173 13,543
0,00164 13,411
0,00144 15,28
0,00162 9,175
0,0008 9,622

Grafik hubungan antara Δp dengan Q


18

16
15.28
14 y = 3069.2x + 7.7682
13.411 13.543
R² = 0.1867
12
Δp ( mka)

10 9.622 9.175
8 Δp

6 Linear(Δp)

0
0 0.0005 0.001 0.0015 0.002

Debit Q (m³/s)
Tabel 2. Aliran dibelokan (1 loop)

Q ΔP
0,00136 12,27936842
0,00151 13,27936842
0,001515 17,14778947
0,00111 18,98989474
0,00096 19,54252632

Grafik hubungan antara Δp dengan Q


25

19.54252632
20
18.98989474
17.14778947
Δp ( mka)

15 y = -9416.8x + 28.405
R² = 0.4971 13.27936842
12.27936842 Δp
10
Linear (Δp)

0
0 0.0005 0.001 0.0015 0.002
Debit Q (m³/s)
Tabel 3. Aliran dibelokan (2 loop)

Q ΔP
0,00165 10,14778947
0,00143 10,34778947
0,0014 11,082
0,001225 7,384631579
0,00085 18,93726316

Grafik hubungan antara Δp dengan Q


20
18.93726316
18
16
14
Δp ( mka)

12 11.082
y = -10387x + 25.197
10 R² = 0.5097 10.34778947
10.14778947
Δp
8
7.384631579 Linear (Δp)
6
4
2
0
0 0.0005 0.001 0.0015 0.002

Debit Q (m³/s)
Tabel 4. Aliran dibelokan (3 loop)

Q ΔP
0,0013 10,882
0,00135 11,27936842
0,00145 12,27936842
0,00117 15,54778947
0,00081 19,59515789

Grafik hubungan antara Δp dengan Q


25

20 19.59515789
Δp ( mka)

15 15.54778947

12.27936842
y = -13667x + 30.536 11.27936842 Δp
10 R² = 0.8574 10.882 Linear (Δp)

0
0 0.0005 0.001 0.0015 0.002

Debit Q (m³/s)
TABEL PERCOBAAN ALIRAN TANPA LOOP

TEKANAN SISI ISAP TEKANAN SISI TEKAN


POSISI DEBIT ALIRAN T
VALVE PI P2 P3 P4 P5 P6
mmH mmH mmH mmH
kg/cm² kg/cm² m³/dt ᵒc
g g g g
BUKA PENUH 195 230 360 60 1,4332 1,1532 0,00173 31

TUTUP 10 ᵒ 210 220 365 70 1,4332 1,2332 0,00164 32

TUTUP 20ᵒ 200 240 365 80 1,6332 1,4332 0,00144 33

TUTUP 30ᵒ 200 330 420 240 1,2332 1,9332 0,00162 33,1

TUTUP 40ᵒ 210 560 480 510 1,6332 1,5332 0,0008 33,2

TABEL PERHITUNGAN ALIRAN TANPA LOOP


NPSH (m)
P4 (m) P5 (m) ΔP (m) YANG YANG
POSISI VALVE
TERSEDIA DIBUTUHKAN

BUKA PENUH 0,789 14,332 13,543 -5,582000 0,027500

TUTUP 10 ᵒ 0,921 14,332 13,411 -5,478000 0,026600

TUTUP 20ᵒ 1,052 16,332 15,28 -7,375000 0,024400

TUTUP 30ᵒ 3,157 12,332 9,175 -1,273000 0,026300

TUTUP 40ᵒ 6,71 16,332 9,622 -1,722000 0,016400


TABEL PERCOBAAN ALIRAN DIBELOKAN 1 LOOP

TEKANAN SISI ISAP TEKANAN SISI TEKAN


POSISI DEBIT ALIRAN T
VALVE PI P2 P3 P4 P5 P6
mmH mmH mmH mmH
kg/cm² kg/cm² m³/dt ᵒc
g g g g
BUKA PENUH 220 200 360 80 1,3332 1,1332 0,00136 32

TUTUP 10 ᵒ 260 200 360 80 1,4332 1,2332 0,00151 33

TUTUP 20ᵒ 250 200 360 90 1,8332 1,6332 0,001515 34,5

TUTUP 30ᵒ 430 400 460 330 2,3332 2,2332 0,00111 34

TUTUP 40ᵒ 520 490 520 440 2,5332 2,4332 0,00096 34

TABEL PERHITUNGAN ALIRAN DIBELOKAN 1 LOOP

NPSH (m)
YANG YANG
POSISI VALVE P4 (m) P5 (m) ΔP (m)
TERSEDIA DIBUTUHKAN

BUKA PENUH 1,0526316 13,332 12,27937 -4,318622 0,023484

TUTUP 10 ᵒ 1,0526316 14,332 13,27937 -5,346622 0,025181

TUTUP 20ᵒ 1,1842105 18,332 17,14779 -9,243043 0,025236

TUTUP 30ᵒ 4,3421053 23,332 18,98989 -11,087949 0,020510

TUTUP 40ᵒ 5,7894737 25,332 19,54253 -11,643380 0,018618


TABEL PERCOBAAN ALIRAN DIBELOKAN 2 LOOP

TEKANAN SISI ISAP TEKANAN SISI TEKAN


POSISI DEBIT ALIRAN T
VALVE PI P2 P3 P4 P5 P6
mmH mmH mmH mmH
kg/cm² kg/cm² m³/dt ᵒc
g g g g

BUKA PENUH 320 180 340 90 1,1332 1,0832 0,00165 35,5

TUTUP 10 ᵒ 320 180 340 90 1,1532 1,1132 0,00143 35

TUTUP 20ᵒ 318 180 342 95 1,2332 1,2832 0,0014 35

TUTUP 30ᵒ 450 355 400 300 1,1332 2,6332 0,001225 35,5

TUTUP 40ᵒ 540 450 465 410 2,4332 2,3832 0,00085 35,5

TABEL PERHITUNGAN ALIRAN DIBELOKAN 2 LOOP

NPSH (m)
YANG YANG
POSISI VALVE P4 (m) P5 (m) ΔP (m)
TERSEDIA DIBUTUHKAN

BUKA PENUH 1,1842105 11,332 10,14779 -2,187043 0,026714

TUTUP 10 ᵒ 1,1842105 11,532 10,34779 -2,415043 0,024283

TUTUP 20ᵒ 1,25 12,332 11,082 -3,177254 0,023942

TUTUP 30ᵒ 3,9473684 11,332 7,384632 0,517315 0,021903

TUTUP 40ᵒ 5,3947368 24,332 18,93726 -11,038117 0,017167


TABEL PERCOBAAN ALIRAN DIBELOKAN 3 LOOP

TEKANAN SISI ISAP TEKANAN SISI TEKAN


POSISI DEBIT ALIRAN T
VALVE PI P2 P3 P4 P5 P6
mmH mmH mmH mmH
kg/cm² kg/cm² m³/dt ᵒc
g g g g

BUKA PENUH 363 252 353 95 1,2132 1,0532 0,0013 34,5

TUTUP 10 ᵒ 404 252 355 80 1,2332 1,0632 0,00135 34,7

TUTUP 20ᵒ 364 250 330 80 1,3332 1,1832 0,00145 35,1

TUTUP 30ᵒ 360 240 330 90 1,6732 1,5332 0,00117 35,4

TUTUP 40ᵒ 520 240 400 360 2,4332 2,3332 0,00081 35,5

TABEL PERHITUNGAN ALIRAN DIBELOKAN 3 LOOP

NPSH (m)
YANG YANG
POSISI VALVE P4 (m) P5 (m) ΔP (m)
TERSEDIA DIBUTUHKAN

BUKA PENUH 1,25 12,132 10,882 -2,921254 0,022788

TUTUP 10 ᵒ 1,0526316 12,332 11,27937 -3,346622 0,023369

TUTUP 20ᵒ 1,0526316 13,332 12,27937 -4,374622 0,024509

TUTUP 30ᵒ 1,1842105 16,732 15,54779 -7,645843 0,021242

TUTUP 40ᵒ 4,7368421 24,332 19,59516 -11,696012 0,016624