SAUDI ARAMCO ID/Project Inspection Engineering Support Unit Rev. 2014.09.

00 30-Sep-14
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
BUILDING SPRINKLER AND STANDPIPE SYSTEM SATIP- S-050-01 8-Nov-15 Plumbing
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
SUBCNTR CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

Welding Procedures and Welders See See


1.1 See-SATIP-W-011-01 Welding-On-Plot Piping
Qualifications Remarks Remarks

See See
1.2 Brazing Procedures See SATIP-S-060-08 Copper Piping
Remarks Remarks
RTR & Thermoplastic Installer See See
1.3 See-SATIP-S-070-03 Thermoplastic and RTR Piping
Qualifications Remarks Remarks

2.0 MATERIAL RECEIVING

Sprinkler System Component and Hardware include


but are not necessarily limited to:
Sprinkler System Components and SAIC SAIC Sprinklers, Pipe and Tube, Fittings, Hangers and
2.1
Hardware Receiving Inspection S-4022 S-4022 H W W Valves.
Contractor & Saudi Aramco to be notified on initial
delivery of each item by type or manufacturer

Standpipe System Component and Hardware include


but are not necessarily limited to:
Sprinklers, Pipe and Tube, Fittings, Hangers and
Standpipe System Components and SAIC SAIC
2.2
Hardware Receiving Inspection S-4022 S-4022 H W W Valves, Hose Stations and Hose Connections.

Contractor & Saudi Aramco shall be notified on


delivery of each item by type or manufacturer

See See
2.3 Fire Water/Jockey Pump (If Applicable) See SATIP-G-005-01 Centrifugal Pump
Remarks Remarks

Sprinkler and Standpipe Systems


SAIC SAIC
2.4 Components and Hardware
S-4022 S-4022 W S S Subcontractor QA/QC to perform Weekly Inspection
Handling, Storage and Preservation

3.0 INSTALLATION

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/Project Inspection Engineering Support Unit Rev. 2014.09.00 30-Sep-14
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
BUILDING SPRINKLER AND STANDPIPE SYSTEM SATIP- S-050-01 8-Nov-15 Plumbing
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
SUBCNTR CNTRCTR
ARAMCO

See SATIP-L-350-01 Metallic On Plot Piping,


SATIP-S-060-08 Copper Piping, SATIP-S-070-03 RTR
and Thermoplastic Piping and SATIP L-350-07
SAIC SAIC
3.1 Piping and Tubing Installation
S-4023 S-4023 W W W Carbon Steel Cement Line as applicable

Contractor & Saudi Aramco shall be notified on start of


this activity for each Building / Area

See SATIP-H-002-06 APCS-113 Epoxy Coating,


SATIP-H-002-02 FBE Coating of Carbon Steel
See See
3.2 Coating and SATIP-H-100-01 Paint Application of Liquid
Remarks Remarks
Coating systems for Industrial Facilities
as applicable

See See
3.3 Cathodic Protection Refer to SATIP-X series as applicable
Remarks Remarks

SAIC SAIC Contractor & Saudi Aramco shall be notified on start of


3.4 Sprinkler and Standpipe Installation
S-4062 S-4062 W W W this activity for each Building / Area

Hangers and supports Installation SAIC SAIC Contractor & Saudi Aramco shall be notified on start of
3.5
Inspection S-4061 S-4061 W W W this activity for each Building / Area

Water flow Alarms & Fire Department SAIC SAIC


3.6
connection Inspection S-4063 S-4063 W W W

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/Project Inspection Engineering Support Unit Rev. 2014.09.00 30-Sep-14
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
BUILDING SPRINKLER AND STANDPIPE SYSTEM SATIP- S-050-01 8-Nov-15 Plumbing
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
SUBCNTR CNTRCTR
ARAMCO

Location and Spacing Installation SAIC SAIC Contractor & Saudi Aramco shall be notified on start of
3.7
Inspection S-4024 S-4024 W W W this activity for each Building / Area

Contractor & Saudi Aramco to be notified on start of


SAIC SAIC
3.8 Valve Installation Inspection
S-4025 S-4025 W W W this activity for each building and/or room. Also see
SATIP-L-108-01

SAIC SAIC Contractor & Saudi Aramco to be notified on start of


3.9 Thrust Block Installation
S-4009 S-4009 W W W this activity for each area

See SATIP-G-005-01 Centrifugal Pump


See See and SATIP-P-116-06 Fire Water Pump / Motor /
3.10 Fire Water / Jockey Pump
Remarks Remarks Controller
as applicable

See SATIP-J-100-01 Flow


SATIP-J-200-01 Pressure
See See
3.11 Instrumentation SATIP-J-400-01 Temperature and
Remarks Remarks
SATIP-J-300-01 Liquid Level
as applicable

See See
3.12 Fire Detection and Alarm System See SATIP-B-014-01 Fire Detection / Alarm
Remarks Remarks

Motor Operated Valves and Control See See See SATIP-J-700-01 Motor Operated Valves and
3.13
Valves Remarks Remarks Control Valves

Piping See See


3.14 See SATIP-A-004-02 Pressure Testing
Hydrostatic Test Remarks Remarks

Application of Safety Color Coding &


See See See SATIP-H-100-01 paint Application of Liquid
3.15 Stenciling of Equipment/Piping
Remarks Remarks Coating System for Industrial Facilities
Identification

4.0 PRE-COMMISSIONING

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/Project Inspection Engineering Support Unit Rev. 2014.09.00 30-Sep-14
SATIP No. APPROVED DATE DISCIPLINE:
SAUDI ARAMCO TYPICAL INSPECTION PLAN
BUILDING SPRINKLER AND STANDPIPE SYSTEM SATIP- S-050-01 8-Nov-15 Plumbing
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
SUBCNTR CNTRCTR
ARAMCO

NFPA-13
Fig. 8-1 (a) Requirements for Hydrostatic Test of the system shall
4.1 Sprinkler System Acceptance Test NFPA-13 93
Fig. 8-1 (b) H H H be in accordance with SATIP-A-004-002
Forms

NFPA-14
Fig. 8-1 (a) Requirements for Hydrostatic Test of the system shall
4.2 Standpipe System Acceptance Test NFPA-14 96
Fig. 8-1 (b) H H H be in accordance with SATIP-A-004-002
Forms

SAIC SAIC
4.3 Final system Inspection
S-4026 S-4026 H H H

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may
1 adjust the levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4 attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Subcontractor Inspection

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/Project Inspection Engineering Support Unit

Saudi Aramco: Company General Use


Rev. 2014.09.00

8-Nov-15

Saudi Aramco: Company General Use


30-Sep-14

Saudi Aramco: Company General Use


8-Nov-15 8-Nov-15

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/Project Inspection Engineering Support Unit

Saudi Aramco: Company General Use


Rev. 2014.09.00

8-Nov-15

Saudi Aramco: Company General Use


30-Sep-14

Saudi Aramco: Company General Use


8-Nov-15 8-Nov-15

Saudi Aramco: Company General Use