DOUBLE WIDTH MOBILE
TOWER SCAFFOLDING
4 Heavy duty stairway for ascent from within tower; makes it safest
scaffolding option
Walk through frame with step
4. Railing for handgrip; allows material to be carried at same time, instead of
less safer-hoisting methods
4. Wider trapdoor to accomodate ascent through staircase
‘Available as a single landing platform or double landing platform
»
4 Single landing platform allows work to be cartied out at diferent levels
and for complete accessibility tll top of the tower, but double landing
platforms used only at the top of the tower
Light weight, easy assembly / disassembly methods
Non-corrosive and visually appealing tower as compared to steel
>>
»
other structure
4. Option to work at several heights at one time by using adcitional
platforms
witHour
\ STAIRWAY
Applications: ‘A. Painting contractors
44. Installation works Construction work
& Maintenance ‘&. Industial use
‘& Cellngand AC works Cleaningjobs
Maximum working height 16m; towers above 10m must be secured to
> hrm
>>
i
36
‘ANY HeIGT AND WEIGHT WE GAN DOM
An 180 9001-2008 eriiee Company
BS EN 1004 Certified Scaffoldings
Double platform tower for wider working space
Ladder frame allows easy ascent to the top
Braces, rugs
Precise uniform tig welding and notching performed to secure
parts firmly
Maximum working height 12m; towers above 10m must be
ssecuted to of
and pipes fluted for extra grip and strength
ther structure
Stabilizets, sand ballast provide further stability
Heavy duty 8" wheels with brake and release option, capable of
holding up to 600 kg load capacity/wheel
Option to work on serveral heights and one time, by using
additional platforms
+91 44 6535 8880 | +9198400 77833
MAAS B lad
PGES eee Real
"
ect cca
Way ane
{360 DEGREE GLOBAL EQUIPMENTS PVTLTD