Anda di halaman 1dari 1
DOUBLE WIDTH MOBILE TOWER SCAFFOLDING 4 Heavy duty stairway for ascent from within tower; makes it safest scaffolding option Walk through frame with step 4. Railing for handgrip; allows material to be carried at same time, instead of less safer-hoisting methods 4. Wider trapdoor to accomodate ascent through staircase ‘Available as a single landing platform or double landing platform » 4 Single landing platform allows work to be cartied out at diferent levels and for complete accessibility tll top of the tower, but double landing platforms used only at the top of the tower Light weight, easy assembly / disassembly methods Non-corrosive and visually appealing tower as compared to steel >> » other structure 4. Option to work at several heights at one time by using adcitional platforms witHour \ STAIRWAY Applications: ‘A. Painting contractors 44. Installation works Construction work & Maintenance ‘&. Industial use ‘& Cellngand AC works Cleaningjobs Maximum working height 16m; towers above 10m must be secured to > hrm >> i 36 ‘ANY HeIGT AND WEIGHT WE GAN DOM An 180 9001-2008 eriiee Company BS EN 1004 Certified Scaffoldings Double platform tower for wider working space Ladder frame allows easy ascent to the top Braces, rugs Precise uniform tig welding and notching performed to secure parts firmly Maximum working height 12m; towers above 10m must be ssecuted to of and pipes fluted for extra grip and strength ther structure Stabilizets, sand ballast provide further stability Heavy duty 8" wheels with brake and release option, capable of holding up to 600 kg load capacity/wheel Option to work on serveral heights and one time, by using additional platforms +91 44 6535 8880 | +9198400 77833 MAAS B lad PGES eee Real " ect cca Way ane {360 DEGREE GLOBAL EQUIPMENTS PVTLTD

Anda mungkin juga menyukai