Month: November
Group: EEI
Number of Resources:
Sahendra
Sahendra
Sahendra
Sahendra
Sahendra
Sahendra
Sahendra
N/A RMHS & LCP- Electrics
Sahendra
Sahendra
Sahendra
Sahendra
Sahendra
Sahendra
Sahendra
Sahendra
Sahendra
13
1 Shashikant
3 Shashikant
4 Shashikant
5 Shashikant
6 Shashikant
7 Shashikant
8 N/A RMHS & LCP- Electrics Shashikant
9 Shashikant
10 Shashikant
11 Shashikant
12 Shashikant
13 Shashikant
Shashikant
Shashikant
Shashikant
Shashikant
Weekly Time Sheet
Engineer
Technical offer evaluation of weigh feeder with FPIL and SCHENCK PROCESS
Data sheet approval for control cable Engineer
Site visit for HT panel extension with Siemens vendor and list down the job for the Engineer
same
Engineer
Site visit for PCC panel extension with L&T vendor and list down the job for the same
Workshop for construction methodology Engineer
Discussion with ABB vendor for MCC feeder extension Engineer
Voltage dip calculation for HT motor and discussion with head Engineer
Feeder load list updation with revised PFD for ORE& FLUX circuit Engineer
Feeder load list updation with revised PFD for Pellet circuit Engineer
Feeder load list updation with revised PFD for Coal circuit Engineer
Feeder load list updation with revised PFD for Coke circuit Engineer
Feeder load list updation with revised PFD for TCC circuit Engineer
Discussion and preparation of flow chart for engineerin drawing and document Engineer
release to team
workshop on finalisation of RMHS execution plan with mech team Engineer
Discussion with siemens vendor and list down the job detail for HT feeder extension Engineer
at RMHS
Technical offer evaluation of FLS stacker reclaimer Engineer
Engineer
Technical offer evaluation of weigh feeder with FPIL and SCHENCK PROCESS
Data sheet approval for control cable Engineer
Site visit for HT panel extension with Siemens vendor and list down the job for the Engineer
same
Engineer
Site visit for PCC panel extension with L&T vendor and list down the job for the same
Workshop for construction methodology Engineer
Discussion with ABB vendor for MCC feeder extension
Voltage dip calculation for HT motor and discussion with head Engineer
Feeder load list updation with revised PFD for ORE& FLUX circuit Engineer
Feeder load list updation with revised PFD for Pellet circuit Engineer
Feeder load list updation with revised PFD for Coal circuit Engineer
Feeder load list updation with revised PFD for Coke circuit Engineer
Feeder load list updation with revised PFD for TCC circuit Engineer
Discussion and preparation of flow chart for engineerin drawing and document Engineer
release to team
workshop on finalisation of RMHS execution plan with mech team Engineer
Hours ---->
WEEK - 46
Activity Type 20-Nov 21-Nov 22-Nov 23-Nov 24-Nov
Basic engineering
Tech offer 2
Tech offer 3
other 2
Basic engineering 2
Basic engineering 2
meeting 2
meeting 2
Basic engineering 2
Basic engineering 2 2
Basic engineering 2 2
Basic engineering 2 2
Basic engineering 1
Basic engineering 2
meeting 2 4
meeting 3
3
other 2
Basic engineering 2
Basic engineering 2
meeting 2
2
Basic engineering 2
Basic engineering 2 2
Basic engineering 2 2
Basic engineering 2 2
Basic engineering 1
Basic engineering 2
Basic engineering 2 4
Basic engineering 3