Anda di halaman 1dari 47

PDRB Per Kapita Pertumbuhan

Tahun
(Rp) (%)
2010 34,708,793
2011 37,086,315 6.41
2012 39,022,530 4.96
2013 41,397,009 5.74
2014 42,792,188 3.26
2015 44,669,704 4.20
2016 46,796,651 4.55
Rata-rata 4.85

2018 51448782.2837567
1 minggu
1 tahun

nilai waktu = 24734.99


34 708 793 34 708 793
40 434 182 37 086 315
43 972 637 39 022 530
47 921 388 41 397 009
49 785 279 42 792 188
52 806 421 44 669 704
57 311 861 46 796 651

= 40 jam
= 52 minggu
= 2080 jam/tahun
Jenis Kendaraan Jenis Kendaraan
No Waktu (Ruas Kiri) (Ruas Kanan)
MC MC
PAGI
1 06,00 - 06,15 32 31
2 06,15 - 06,30 32 30
3 06,30 - 06,45 34 32
4 06,45 - 07,00 34 30
5 07,00 - 07,15 35 32
6 07,15 - 07,30 29 31
7 07,30 - 07,45 26 30
8 07,45 - 08,00 32 32
9 08,00 - 08,15 29 30
10 08,15 - 08,30 32 31
11 08,30 - 08,45 34 30
12 08,45 - 09,00 35 32
13 09,00 - 09,15 29 30
14 09,15 - 09,30 32 32
15 09,30 - 09,45 36 32
16 09,45 - 10,00 34 34

SIANG
17 10,00 - 10,15 21 32
18 10,15 - 10,30 28 34
Jenis Kendaraan Jenis Kendaraan
No Waktu (Ruas Kiri) (Ruas Kanan)
MC MC
SIANG
19 10,30 - 10,45 32 31
20 10,45 - 11,00 34 29
21 11,00 - 11,15 35 35
22 11,15 - 11,30 32 31
23 11,30 - 11,45 34 30
24 11,45 - 12,00 31 32
25 12,00 - 12,15 29 30
26 12,15 - 12,30 35 35
27 12,30 - 12,45 34 32
28 13,45 - 13,00 29 34
29 13,00 - 13,15 26 31
30 13,15 - 13,30 32 29
31 13,30 - 13,45 34 35
32 13,45 - 14,00 32 31
33 14,00 - 14,15 34 30
34 14,15 - 14,30 35 32
35 14,30 - 14,45 32 30
36 14,45 - 15,00 34 30

SORE
37 15,00 - 15,15 32 31
38 15,15 - 15,30 34 30
39 15,30 - 15,45 31 32
40 15,45 - 16,00 29 32
41 16,00 - 16,15 35 34
42 16,15 - 16,30 31 31
43 16,30 - 16,45 32 29
44 16,45 - 17,00 34 32
45 17,00 - 17,15 32 34
Jenis Kendaraan Jenis Kendaraan
No Waktu (Ruas Kiri) (Ruas Kanan)
MC MC
SORE
46 17,15 - 17,30 34 30
47 17,30 - 17,45 31 34
48 17,45 - 18,00 29 32
49 18,00 - 18,15 32 33
50 18,15 - 18,30 34 36
51 18,30 - 18,45 36 36
52 18,45 - 19,00 34 34

Total 1668 1652


Total Keseluruhan 3320
Jumlah Pertumbuhan
Tahun
Kendaraan (%)
2011 23589
2012 24478 3.63
2013 48787 49.83
2014 26683 -82.84
2015 25329 -5.35
2016 54210 53.28
Rata-rata 3.71

2018 = 3704
2012 2013 2014 2015
januari 12.34 11.68 12.68 13.31
februari 12.36 11.64 12.86 13.29
maret 12.27 11.58 12.87 13.36
april 12.11 11.53 12.79 13.25
mei 12.06 11.55 13.19 13.2
juni 12.02 11.46 13.29 13.17
juli 12.03 11.85 13.36 13.14
agustus 11.99 11.9 13.43 13.03
september 11.95 12.15 13.43 13
oktober 11.88 12.26 13.39 12.98
november 11.81 12.42 13.41 12.92
desember 11.68 12.55 13.36 12.82
Rata-rata 12.04 11.88 13.17 13.12

Laju pertumbuhan
2012 12.04
2013 11.88 -1.35
2014 13.17 9.80
2015 13.12 -0.37
2016 12.50 -4.96
Rata-rata 12.54 0.78

2018 12.70
2016 2017 Tingkat Suku Bunga
Bulan
12.88 12.07 (%)
12.88 11.96 Januari 12.07
12.81 11.91 Februari 11.96
12.73 11.82 Maret 11.91
12.58 11.73 April 11.82
12.43 11.7 Mei 11.73
12.4 Juni 11.7
12.38 Rata-rata
12.31
12.31
12.22 voc 1999 44.82
12.1 voc 2018 336.74
12.50 11.87

Laju pertumbuhan
januari 12.07
februari 11.96 -0.92
maret 11.91 -0.42
april 11.82 -0.76
mei 11.73 -0.77
juni 11.7 -0.26
-0.62
Jan-18 11.20
Pertumbuhan
(%)

-0.92
-0.42
-0.76
-0.77
-0.26
-0.62

15.5
5.92
21.42

19
divisi 1

Uraian Pekerjaan

Peralatan
Mobilisasi Fasilitas Kontraktor
Mobilisasi Fasilitas Laboratorium
Mobilisasi Lainnya
Demobilisasi
Total Biaya

divisi 3

Uraian Pekerjaan

Galian struktur dengan kedalaman 0-2 meter


Galian struktur dengan kedalaman 2-4 meter
Timbunan pilihan dari sumber pilihan
Total Biaya

divisi 5

Uraian Pekerjaan
Lapis Pondasi agregat kelas A
Lapis Pondasi agregat kelas B
Total Biaya

divisi 6

Uraian Pekerjaan
Lapis resap pengikat - aspal cair
Lapis perekat - aspal cair
Latasir kelas A (SS-A) (u/ atas jembatan, t=2,5 cm)
Lataston Lapis Pondasi (HRS-Base) (u/ Oprit Jembatan)
Total Biaya

divisi 7

Uraian Pekerjaan

Beton mutu sedang fc’30 Mpa


Beton mutu sedang fc’25 Mpa (Pier + Abutment)
Beton mutu sedang fc’20 MPa (Isi Tiang Pancang + Beton Proteksi Oprit + Pintu Gerbang + Taman
Beton Siklop fc' = 15 MPa (Isi Pondasi Sumuran)
Beton mutu rendah fc’10 Mpa (Lantai Kerja Abutment + Pas. Batu)
Baja Tulangan U 32 Ulir
Bekisting
Penyediaan Baja Struktur BJ 37 (Titik Leleh 240 MPa) (Rangka Baja Jembatan)
Penyediaan Baja Struktur BJ 37 (Titik Leleh 240 MPa) (Baja WF 200x100) (Fender)
Penyediaan Baja Struktur BJ 37 (Titik Leleh 240 MPa) (Baja Halte + Balok Fender)
Pemasangan Baja Struktur BJ 37 (Titik Leleh 240 MPa) (Rangka Baja Jembatan)
Pemasangan Baja Struktur BJ 37 (Titik Leleh 240 MPa) (Bracing Fender : WF+Pipa457))
Pemasangan Baja Struktur BJ 37 (Titik Leleh 240 MPa) (Halte + Fender)
Pengangkutan Bahan Jembatan
Penyediaan Tiang Pancang Baja Diameter 457.2 mm dengan tebal 12 mm (u/ Fender)
Penyediaan Tiang Pancang Baja Diameter 609.6 mm dengan tebal 12 mm
Penyediaan Tiang Pancang Baja Diameter 1016 mm dengan tebal 16 mm (u/ Pier 1)
Pemancangan Tiang Pancang Baja Diameter 457,2 mm dengan tebal 12 mm
Pemancangan Tiang Pancang Baja Diameter 609 mm dengan tebal 12 mm
Pemancangan Tiang Pancang Baja Diameter 1016 mm dengan tebal 12 mm
Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(13) s/d 7.6.(18) bila Tiang Pancang dikerjaka
Pasangan Batu
Expansion Joint Tipe Baja Bersudut
Perletakan Elastomerik Sintetis Ukuran 350 mm x 400 mm x 39 mm
Sandaran (Railing) Jembatan & Pagar Halte
Papan Nama Jembatan
Pipa Drainase Baja diameter 75 mm

Total Biaya

divisi 8

Uraian Pekerjaan
Marka Jalan
Rambu Jalan
Total Biaya
Harga Satuan Jumlah Harga
Volume
(Rp) (Rp)
213,450,000 213,450,000
146,000,000 146,000,000
253,000,000 253,000,000
60,000,000 60,000,000
128,370,000 128,370,000
800,820,000

Harga Satuan Jumlah Harga


Satuan Volume
(Rp) (Rp)
m3 106.16 19,665.95 2,087,737
m3 350.00 20,675.90 7,236,565
m3 303.50 488,394.92 148,227,858
157,552,160

Harga Satuan Jumlah Harga


Satuan Volume
(Rp) (Rp)
m3 36.75 845,531.18 31,073,271
m3 49.00 827,699.93 40,557,297
71,630,568

Harga Satuan Jumlah Harga


Satuan Volume
(Rp) (Rp)
liter 184.50 22,635.08 4,176,172
liter 263.76 23,369.27 6,163,773
ton 100.04 1,953,407.50 195,416,078
ton 18.45 1,551,855.08 28,631,726
234,387,750

Harga Satuan Jumlah Harga


Satuan Volume
(Rp) (Rp)
M3 730.25 2,743,985.76 2,003,794,230.70
M 3 1,907.17 2,600,431.43 4,959,453,108.53
M3 1,347.31 2,009,517.30 2,707,448,809.43
M3 83.24 1,410,718.72 117,427,986.46
M 3 22.38 1,502,352.70 33,618,897.58
Kg 488,253.56 23,661.83 11,552,970,286.26
m2 2,780.15 236,140.00 656,504,561.97
Kg 500,000.00 29,335.45 14,667,724,309.49
Kg 7,284.60 28,145.78 205,030,748.99
Kg 67,631.08 29,335.45 1,983,988,072.39
Kg 500,000.00 10,629.45 5,314,726,816.66
Kg 52,734.90 4,459.09 235,149,752.33
Kg 67,631.08 4,459.09 301,573,184.21
Kg 500,000.00 5,524.27 2,762,135,425.84
M1 225.00 2,460,504.71 553,613,558.67
M 1 860.00 3,295,435.80 2,834,074,789.39
M1 820.00 7,228,831.88 5,927,642,142.45
M1 80.55 307,796.36 24,792,996.96
M 1 1,022.28 506,896.45 518,190,101.01
M1 215.39 756,661.0 162,977,217.32
M1 734.40 368,638.41 270,728,048.71
M3 211.20 1,494,123.88 315,558,962.97 ###
M 1 50.00 590,421.00 29,521,050.00
buah 35.00 975,743.00 34,151,005.00
M1 969.96 630,533.50 611,592,273.66 210033948.600
buah 2.00 403,650.00 807,300.00
M' 170.00 78,500.00 13,345,000.00

58,798,540,637

Harga Satuan Jumlah Harga


Satuan Volume
(Rp) (Rp)
m2 85.66 139,960.95 11,988,775
buah 2.00 443,843.96 887,688
12,876,463
Uraian Pekerjaan Jumlah harga Pekerjaan %
Divisi 1 - Umum 800,820,000 1.21
Divisi 3 - Pekerjaan Tanah 157,552,160 0.24
Divisi 5 - Perkerasan Berbutir 71,630,568 0.11
Divisi 6 - Perkerasan Aspal 234,387,750 0.35
Divisi 7 - Struktur 58,798,540,637 88.98
Divisi 8 - Pengembalian Kondisi dan Perbaikan Minor 12,876,463 0.02
Total + PPN 10% 66,083,000,000 100.00

60,075,807,579
6007580757.85957
66,083,388,336
66,083,400,000
IC = 66,083,000,000
Bunga = 11.20
0.1120

Biaya Pemeliharaan (Maintenance Cost), dilakukan setiap tahun


MC=0,05 x IC
MC = 0.05 x 66,083,000,000 = 33,041,500

Biaya Pemeriksaan (Inspection Cost), dilakukan setiap lima tahun sekali


IpC=0,2 x IC
IpC = 0.2 x 66,083,000,000 = 132,166,000

Biaya Penundaan Perjalanan (Driver Delay Cost), terjadi saat dilakukan pemeriksaan lima tahun sekali

𝐷𝐷�=(𝐿/𝑆𝑎−𝐿/𝑆𝑛)×𝐴𝐷𝑇×𝑁×�

L : Panjang jalan yang terkena dampak = 0.48329


Sa : Kecepatan lalu lintas saat kegiatan perbaikan = 5
Sn : Kecepatan lalu lintas normal = 40
ADT : Rata-rata lalu lintas harian (kend/hari) = 3704
N : Jumlah hari selama perbaikan = 4
w : Nilai waktu pengemudi perjam = 12367.50
15,499,042.12

Biaya Operasi Kendaraan (Vehicle Operating Cost), terjadi saat dilakukan pemeriksaan lima tahun sekali

𝑉𝑂�=(𝐿/𝑆𝑎−𝐿/𝑆𝑛)×𝐴𝐷𝑇×𝑁×�

L : Panjang jalan yang terkena dampak = 0.48329


Sa : Kecepatan lalu lintas saat kegiatan perbaikan = 5
Sn : Kecepatan lalu lintas normal = 40
ADT : Rata-rata lalu lintas harian (kend/hari) = 3704
N : Jumlah hari selama perbaikan = 4
r : Biaya operasional kendaraan satuan rata-rata = 524.35
657,124.99

Biaya Perbaikan Masa Depan (Future Rehabilitation Cost)

Elemen 3, Perbaikan Expansion Joint


Volume = 50 m'
Harga satu= 590,421.00
Biaya = volume x harga satuan pekerjaan
= 50 x 590,421.00 = 29,521,050.00

Elemen 4, Penggantian Elastomer


Volume = 35 buah
Harga satu= 975,743.00
Biaya peng= 6,000,000.00
Biaya = volume x harga satuan pekerjaan
= 35 x 6,975,743.00 = 244,151,005.00

Elemen 1, Penggantian lapis aspal


Volume = 1 m2
Harga satu= 240,671,371.73
Biaya = volume x harga satuan pekerjaan
= 1x 240,671,371.73 = 240,671,371.73

Elemen 2, Penggantian marka jalan


Volume = 96.76 m2
Harga satu= 139,960.95
Biaya = volume x harga satuan pekerjaan
= 96.758 x 139,960.95 = 13,542,341.66

Elemen 5, Pengecatan ulang


Volume = 3453.59 m2
Harga satu= 95,000.00 kat.A
195,000.00 kat.B
Galvanis
Biaya = volume x harga satuan pekerjaan
= 3453.59 x 95,000.00 = 328,090,682.54
= 3453.59 195,000.00 673,449,295.74

Non galvanis
Biaya = volume x harga satuan pekerjaan
= 3453.59 x 75,000.00 = 259,018,959.90
= 3453.59 165,000.00 569,841,711.78
tahun sekali

km (asumsi)
km/jam (asumsi)
km/jam (PP 43 tahun 1993)
kend/hari (asumsi)
hari (asumsi)
rupiah (asumsi)

a tahun sekali

km (asumsi)
km/jam (asumsi)
km/jam (PP 43 tahun 1993)
kend/hari (asumsi)
hari (asumsi)
rupiah (asumsi)
tahun 1

tahun 1

tahun 1

tahun 1

tahun 1 kat A
kat B

tahun 1 kat A
kat B
Nilai T0 untuk Pengecatan Ulang Struktur Atas Rangka Jembatan dengan Galvanis

Biaya Agen Biaya Pengguna


Biaya Penundaan Biaya Operasi
Biaya Perawatan Biaya Pemeriksaan Perjalanan Kendaraan
Rp 33,041,500.00 Rp 132,166,000.00 Rp 15,499,042.12 Rp 657,124.99

Nilai T0 untuk Pengecatan Ulang Struktur Atas Rangka Jembatan dengan Non Galvanis

Biaya Agen Biaya Pengguna


Biaya Penundaan Biaya Operasi
Biaya Perawatan Biaya Pemeriksaan Perjalanan Kendaraan
Rp 33,041,500.00 Rp 132,166,000.00 Rp 15,499,042.12 Rp 657,124.99
Biaya Perbaikan Masa Datang
Perbaikan Lapis Perbaikan Marka Perbaikan Siar Muai/ Perbaikan Perletakan/
Perkerasan Aspal Jalan Expansion Joint Elastomer
Rp 240,671,371.73 Rp 13,542,341.66 Rp 29,521,050.00 Rp 244,151,005.00

Biaya Perbaikan Masa Datang


Perbaikan Lapis Perbaikan Marka Perbaikan Siar Muai/ Perbaikan Perletakan/
Perkerasan Aspal Jalan Expansion Joint Elastomer
Rp 240,671,371.73 Rp 13,542,341.66 Rp 29,521,050.00 Rp 244,151,005.00
tang
Pengecatan Ulang Pengecatan Ulang Kategori
Kategori A B
Rp 328,090,682.54 Rp 673,449,295.74

tang
Pengecatan Ulang Pengecatan Ulang Kategori
Kategori A B
Rp 259,018,959.90 Rp 569,841,711.78
REKAPITULASI LIFE CY
JEMBATAN PENYEBRANGAN MUARA TEWEH - JINGAH KABU

Biaya Awal : Rp 66,083,000,000.00


Suku Bunga : 0.13
Umur Rencana : 50 tahun
Tahun ke-0 : 2018

Kebutuhan Biaya
Biaya Agen Biaya Pengguna
Periode (tahun)
Biaya Awal Biaya Penundaan
Biaya Pemeliharaan Biaya Pemeriksaan Perjalanan

0 Rp 66,083,000,000.00
1 Rp 33,041,500.00
2 Rp 70,277,288.01
3 Rp 112,239,786.95
4 Rp 159,529,005.51
5 Rp 212,821,117.46 Rp 240,228,050.60 Rp 28,171,425.89
6 Rp 272,878,130.12
7 Rp 340,558,779.95
8 Rp 416,830,811.48
9 Rp 502,784,814.69
10 Rp 599,649,819.06 Rp 436,644,192.13 Rp 51,205,050.66
11 Rp 708,810,867.10
12 Rp 831,828,818.57
13 Rp 970,462,668.79
14 Rp 1,126,694,699.97
15 Rp 1,302,758,825.19 Rp 793,654,821.08 Rp 93,071,512.34
16 Rp 1,501,172,530.46
17 Rp 1,724,772,871.47
18 Rp 1,976,757,039.78
19 Rp 2,260,728,078.41
20 Rp 2,580,746,400.68 Rp 1,442,565,792.41 Rp 169,168,984.28
21 Rp 2,941,387,848.78
22 Rp 3,347,809,122.30
23 Rp 3,805,821,512.29
24 Rp 4,321,973,995.06
25 Rp 4,903,646,873.99 Rp 2,622,041,736.74 Rp 307,485,550.87
26 Rp 5,559,157,308.18
27 Rp 6,297,878,236.88
28 Rp 7,130,372,400.27
29 Rp 8,068,543,372.76
30 Rp 9,125,805,768.49 Rp 4,765,885,137.01 Rp 558,893,016.92
31 Rp 10,317,277,052.75
32 Rp 11,659,993,701.82
33 Rp 13,173,154,802.33
34 Rp 14,878,396,572.94
35 Rp 16,800,101,733.91 Rp 8,662,585,656.41 Rp 1,015,857,179.24
36 Rp 18,965,748,148.01
37 Rp 21,406,301,717.92
38 Rp 24,156,659,157.99
39 Rp 27,256,146,971.51
40 Rp 30,749,083,768.07 Rp 15,745,320,774.07 Rp 1,846,446,059.20
41 Rp 34,685,413,961.59
42 Rp 39,121,421,909.87
43 Rp 44,120,536,707.11
44 Rp 49,754,239,136.71
45 Rp 56,103,083,752.72 Rp 28,619,067,806.28 Rp 3,356,144,071.44
46 Rp 63,257,850,704.29
47 Rp 71,320,843,772.70
48 Rp 80,407,353,181.20
49 Rp 90,647,304,094.03
50 Rp 102,187,114,375.72 Rp 52,018,695,195.42 Rp 6,100,206,920.29
TOTAL Rp 66,083,000,000.00 Rp 894,175,765,515.80 Rp 115,346,689,162.15 Rp 13,526,649,771.12
PEMBULATAN Rp 66,083,000,000.00 Rp 894,175,765,000.00 Rp 115,346,690,000.00 Rp 13,526,649,000.00
PRESENTASE 4.59% 70.04% 0.98%
REKAPITULASI LIFE CYCLE COST
ENYEBRANGAN MUARA TEWEH - JINGAH KABUPATEN BARITO UTARA KALIMANTAN TENGAH

Kebutuhan Biaya
Biaya Pengguna Biaya Perbaikan Masa Depan

Biaya Operasi Lapis Perkerasan Aspal Marka Jalan Siar Muai/ Expansion Joint Perletakan/ Elastomer
Kendaraan

Rp 1,194,405.94 Rp 437,449,983.10 Rp 24,614,880.80

Rp 2,170,980.52 Rp 795,119,445.82 Rp 44,740,590.10 Rp 76,795,921.08

Rp 3,946,025.59 Rp 1,445,227,929.01 Rp 81,321,555.79


Rp 7,172,389.54 Rp 2,626,880,499.26 Rp 147,811,985.08 Rp 253,714,971.47 Rp 2,664,860,009.34

Rp 13,036,705.04 Rp 4,774,680,186.32 Rp 268,666,563.51

Rp 23,695,823.71 Rp 8,678,571,746.25 Rp 488,334,706.46 Rp 838,212,314.44

Rp 43,070,090.18 Rp 15,774,377,469.44 Rp 887,608,723.69

Rp 78,285,215.58 Rp 28,671,881,943.69 Rp 1,613,338,630.14 Rp 2,769,248,814.89 Rp 29,086,420,796.86

Rp 142,293,061.23 Rp 52,114,691,421.93 Rp 2,932,442,489.60


Rp 258,635,236.85 Rp 94,724,896,933.41 Rp 5,330,076,894.09 Rp 9,148,921,898.07
Rp 573,499,934.19 Rp 210,043,777,558.22 Rp 11,818,957,019.28 Rp 13,086,893,919.95 Rp 31,751,280,806.20
Rp 573,499,000.00 Rp 210,043,778,000.00 Rp 11,818,958,000.00 Rp 13,086,893,000.00 Rp 31,751,281,000.00
0.98% 22.19%
Pengecatan Ulang Struktur Total Biaya
Atas Rangka Jembatan

Kategori B
Rp 66,083,000,000.00
Rp 33,041,500.00
Rp 70,277,288.01
Rp 112,239,786.95
Rp 159,529,005.51
Rp 944,479,863.81
Rp 272,878,130.12
Rp 340,558,779.95
Rp 416,830,811.48
Rp 502,784,814.69
Rp 2,006,325,999.37
Rp 708,810,867.10
Rp 831,828,818.57
Rp 970,462,668.79
Rp 1,126,694,699.97
Rp 1,970,179,561.67 Rp 5,690,160,230.68
Rp 1,501,172,530.46
Rp 1,724,772,871.47
Rp 1,976,757,039.78
Rp 2,260,728,078.41
Rp 9,892,921,032.07
Rp 2,941,387,848.78
Rp 3,347,809,122.30
Rp 3,805,821,512.29
Rp 4,321,973,995.06
Rp 12,889,557,616.46
Rp 5,559,157,308.18
Rp 6,297,878,236.88
Rp 7,130,372,400.27
Rp 8,068,543,372.76
Rp 11,830,898,321.12 Rp 36,310,296,834.40
Rp 10,317,277,052.75
Rp 11,659,993,701.82
Rp 13,173,154,802.33
Rp 14,878,396,572.94
Rp 43,183,600,852.86
Rp 18,965,748,148.01
Rp 21,406,301,717.92
Rp 24,156,659,157.99
Rp 27,256,146,971.51
Rp 110,560,026,002.49
Rp 34,685,413,961.59
Rp 39,121,421,909.87
Rp 44,120,536,707.11
Rp 49,754,239,136.71
Rp 71,044,364,588.64 Rp 214,312,087,191.85
Rp 63,257,850,704.29
Rp 71,320,843,772.70
Rp 80,407,353,181.20
Rp 90,647,304,094.03
Rp 269,768,547,453.85
Rp 84,845,442,471.43 Rp 1,441,251,956,158.33
Rp 84,845,442,000.00 Rp 1,441,251,957,000.00
100.00%
REKAPITULASI LIFE CYCLE CO
JEMBATAN PENYEBRANGAN MUARA TEWEH - JINGAH KABUPATEN

Biaya Awal : Rp 66,083,000,000


Suku Bunga : 0.1269
Umur Rencana : 50 tahun
Tahun ke-0 : 2018

Kebutuhan B
Biaya Agen Biaya Pengguna
Periode (tahun)
Biaya Awal Biaya Penundaan
Biaya Pemeliharaan Biaya Pemeriksaan Perjalanan

0 Rp 66,083,000,000.00
1 Rp 33,041,500.00
2 Rp 70,277,288.01
3 Rp 112,239,786.95
4 Rp 159,529,005.51
5 Rp 212,821,117.46 Rp 240,228,050.60 Rp 28,171,425.89
6 Rp 272,878,130.12
7 Rp 340,558,779.95
8 Rp 416,830,811.48
9 Rp 502,784,814.69
10 Rp 599,649,819.06 Rp 436,644,192.13 Rp 51,205,050.66
11 Rp 708,810,867.10
12 Rp 831,828,818.57
13 Rp 970,462,668.79
14 Rp 1,126,694,699.97
15 Rp 1,302,758,825.19 Rp 793,654,821.08 Rp 93,071,512.34
16 Rp 1,501,172,530.46
17 Rp 1,724,772,871.47
18 Rp 1,976,757,039.78
19 Rp 2,260,728,078.41
20 Rp 2,580,746,400.68 Rp 1,442,565,792.41 Rp 169,168,984.28
21 Rp 2,941,387,848.78
22 Rp 3,347,809,122.30
23 Rp 3,805,821,512.29
24 Rp 4,321,973,995.06
25 Rp 4,903,646,873.99 Rp 2,622,041,736.74 Rp 307,485,550.87
26 Rp 5,559,157,308.18
27 Rp 6,297,878,236.88
28 Rp 7,130,372,400.27
29 Rp 8,068,543,372.76
30 Rp 9,125,805,768.49 Rp 4,765,885,137.01 Rp 558,893,016.92
31 Rp 10,317,277,052.75
32 Rp 11,659,993,701.82
33 Rp 13,173,154,802.33
34 Rp 14,878,396,572.94
35 Rp 16,800,101,733.91 Rp 8,662,585,656.41 Rp 1,015,857,179.24
36 Rp 18,965,748,148.01
37 Rp 21,406,301,717.92
38 Rp 24,156,659,157.99
39 Rp 27,256,146,971.51
40 Rp 30,749,083,768.07 Rp 15,745,320,774.07 Rp 1,846,446,059.20
41 Rp 34,685,413,961.59
42 Rp 39,121,421,909.87
43 Rp 44,120,536,707.11
44 Rp 49,754,239,136.71
45 Rp 56,103,083,752.72 Rp 28,619,067,806.28 Rp 3,356,144,071.44
46 Rp 63,257,850,704.29
47 Rp 71,320,843,772.70
48 Rp 80,407,353,181.20
49 Rp 90,647,304,094.03
50 Rp 102,187,114,375.72 Rp 52,018,695,195.42 Rp 6,100,206,920.29
TOTAL Rp 66,083,000,000.00 Rp 894,175,765,515.80 Rp 115,346,689,162.15 Rp 13,526,649,771.12
PEMBULATAN Rp 66,083,000,000.00 Rp 894,175,765,510.00 Rp 115,346,689,162.15 Rp 13,526,649,770.00
PRESENTASE 4.32% 65.96% 0.92%
REKAPITULASI LIFE CYCLE COST
UARA TEWEH - JINGAH KABUPATEN BARITO UTARA KALIMANTAN TENGAH

Kebutuhan Biaya
Biaya Pengguna Biaya Perbaikan Masa Depan

Biaya Operasi Kendaraan Lapis Perkerasan Aspal Marka Jalan Siar Muai/ Expansion Joint Perletakan/ Elastomer

Rp 1,194,405.94 Rp 437,449,983.10 Rp 24,614,880.80

Rp 2,170,980.52 Rp 795,119,445.82 Rp 44,740,590.10 Rp 76,795,921.08

Rp 3,946,025.59 Rp 1,445,227,929.01 Rp 81,321,555.79


Rp 7,172,389.54 Rp 2,626,880,499.26 Rp 147,811,985.08 Rp 253,714,971.47 Rp 2,664,860,009.34

Rp 13,036,705.04 Rp 4,774,680,186.32 Rp 268,666,563.51

Rp 23,695,823.71 Rp 8,678,571,746.25 Rp 488,334,706.46 Rp 838,212,314.44

Rp 43,070,090.18 Rp 15,774,377,469.44 Rp 887,608,723.69

Rp 78,285,215.58 Rp 28,671,881,943.69 Rp 1,613,338,630.14 Rp 2,769,248,814.89 Rp 29,086,420,796.86

Rp 142,293,061.23 Rp 52,114,691,421.93 Rp 2,932,442,489.60


Rp 258,635,236.85 Rp 94,724,896,933.41 Rp 5,330,076,894.09 Rp 9,148,921,898.07
Rp 573,499,934.19 Rp 210,043,777,558.22 Rp 11,818,957,019.28 Rp 13,086,893,919.95 Rp 31,751,280,806.20
Rp 573,499,000.00 Rp 210,043,777,550.00 Rp 11,818,957,010.00 Rp 13,086,893,919.95 Rp 31,751,280,806.20
0.92% 26.73%
Pengecatan Ulang Struktur Total Biaya
Atas Rangka Jembatan
Kategori B
Rp 66,083,000,000.00
Rp 33,041,500.00
Rp 70,277,288.01
Rp 112,239,786.95
Rp 159,529,005.51
Rp 944,479,863.81
Rp 272,878,130.12
Rp 340,558,779.95
Rp 416,830,811.48
Rp 502,784,814.69
Rp 2,006,325,999.37
Rp 708,810,867.10
Rp 831,828,818.57
Rp 970,462,668.79
Rp 1,126,694,699.97
Rp 4,044,052,784.49 Rp 7,764,033,453.49
Rp 1,501,172,530.46
Rp 1,724,772,871.47
Rp 1,976,757,039.78
Rp 2,260,728,078.41
Rp 9,892,921,032.07
Rp 2,941,387,848.78
Rp 3,347,809,122.30
Rp 3,805,821,512.29
Rp 4,321,973,995.06
Rp 12,889,557,616.46
Rp 5,559,157,308.18
Rp 6,297,878,236.88
Rp 7,130,372,400.27
Rp 8,068,543,372.76
Rp 24,284,475,501.24 Rp 48,763,874,014.53
Rp 10,317,277,052.75
Rp 11,659,993,701.82
Rp 13,173,154,802.33
Rp 14,878,396,572.94
Rp 43,183,600,852.86
Rp 18,965,748,148.01
Rp 21,406,301,717.92
Rp 24,156,659,157.99
Rp 27,256,146,971.51
Rp 110,560,026,002.49
Rp 34,685,413,961.59
Rp 39,121,421,909.87
Rp 44,120,536,707.11
Rp 49,754,239,136.71
Rp 145,827,906,260.89 Rp 289,095,628,864.10
Rp 63,257,850,704.29
Rp 71,320,843,772.70
Rp 80,407,353,181.20
Rp 90,647,304,094.03
Rp 269,768,547,453.85
Rp 174,156,434,546.62 Rp 1,530,562,948,233.52
Rp 174,156,434,540.00 Rp 1,530,562,948,233.50
100.00%
Komponen Biaya

Biaya Awal
Biaya Agen
- Biaya Pemeliharaan
- Biaya Pemeriksaan
Biaya Pengguna
- Biaya Penundaan Perjalanan
- Biaya Operasi Kendaraan
Biaya Perbaikan Masa Depan
- Lapis Aspal
- Marka Jalan
- Siar Muai/ Expansion Joint
- Perletakan/ Elastomer
- Pengecatan Ulang Struktur Rangka Baja Kategori A
Total Biaya Siklus Hidup
Pembulatan

a. Biaya Awal
b. Biaya Agen
c. Biaya Pengguna
d. Biaya Perbaikan Masa Depan
Total Biaya Siklus Hidup

a. Biaya Awal
b. Biaya Agen
c. Biaya Pengguna
d. Biaya Perbaikan Masa Depan
Total Biaya Siklus Hidup
Pengecatan Ulang Struktur Rangka Baja Kategori A Pengecatan Ulang Struktur Rangka Baja Kateg
Biaya Presentase Biaya
Rp 66,083,000,000.00 4.59% Rp 66,083,000,000.00

Rp 894,175,765,515.80 62.04% Rp 894,175,765,515.80


70.04%
Rp 115,346,689,162.15 8.00% Rp 115,346,689,162.15

Rp 13,526,649,771.12 0.94% Rp 13,526,649,771.12


0.98%
Rp 573,499,934.19 0.04% Rp 573,499,934.19

Rp 210,043,777,558.22 14.57% Rp 210,043,777,558.22


Rp 11,818,957,019.28 0.82% Rp 11,818,957,019.28
Rp 13,086,893,919.95 0.91% 24.39% Rp 13,086,893,919.95
Rp 31,751,280,806.20 2.20% Rp 31,751,280,806.20
Rp 84,845,442,471.43 5.89% Rp 174,156,434,546.62
Rp 1,441,251,956,158.33 Rp 1,530,562,948,233.52
100.00% 100.00%
Rp 1,441,251,957,000.00 Rp 1,530,562,949,000.00

= Rp 66,083,000,000.00
= Rp 1,009,522,454,677.94
= Rp 14,100,149,705.32
= Rp 351,546,351,775.07
= Rp 1,441,251,956,158.33

= Rp 66,083,000,000.00
= Rp 1,009,522,454,677.94
= Rp 14,100,149,705.32
= Rp 440,857,343,850.26
= Rp 1,530,562,948,233.52
n Ulang Struktur Rangka Baja Kategori B
Presentase
4.32%

58.42% 62.04% 58.42%


65.96%
7.54% 8.00% 7.54%
70.04% 65.96%
0.88% 0.94% 0.88%
0.92%
0.04% 0.04% 0.04%

13.72% 14.57% 13.72%


0.77% 0.82% 0.77%
0.86% 28.80% 0.91% 0.86%
2.07% 2.20% 2.07%
11.38% 5.89% 11.38%
24.39% 28.80%
100.00% 100.00%
kategori A
Biaya Awal Biaya Agen Biaya pengguna Biaya Perbaikan masa Depan
Rp 66,083,000,000.00 1,009,522,454,677.94 14,100,149,705.32 Rp 351,546,351,775.07
4.59% 70.04% 0.98% 24.39%

Kategori B
Biaya Awal Biaya Agen Biaya pengguna Biaya Perbaikan masa Depan
Rp 66,083,000,000.00 1,009,522,454,677.94 14,100,149,705.32 Rp 440,857,343,850.26
4.32% 65.96% 0.92% 28.80%

28.80%
4.32%
Biaya Awal
0.92% Biaya Agen
Biaya pengguna
Biaya Perbaikan masa
65.96% Depan

24.39%
4.59%
Biaya Awal
0.98% Biaya Agen
Biaya pengguna
Biaya Perbaikan masa
Depan
70.04%
Biaya pengguna
Biaya Perbaikan masa
Depan
70.04%
Total
Rp 1,441,251,956,158.33
100.00%

Rp 1,530,562,948,233.52
100.00%

a Awal
a Agen
a pengguna
a Perbaikan masa
an

aya Awal
aya Agen
aya pengguna
aya Perbaikan masa
pan
aya pengguna
aya Perbaikan masa
pan
Service Life
Komponen Biaya
(tahun)
Biaya Awal
Biaya Agen
- Biaya Pemeliharaan 1
- Biaya Pemeriksaan 5
Biaya Pengguna
- Biaya Penundaan Perjalanan 5
- Biaya Operasi Kendaraan 5
Biaya Perbaikan Masa Depan
- Biaya Perbaikan Lapis Aspal Permukaan 5
- Biaya Perbaikan Marka Jalan 5
- Biaya Perbaikan Siar Muai/ Expansion Joint 10
- Biaya Perbaikan Perletakan / Elastomer 20
- Biaya Perbaikan Pengecatan Ulang Struktur Rangka Jembatan 15
15.00 30
13.85 20
12.69 10
11.54 0
-12.69 -10
-13.85 -20
-15.00 -30

Anda mungkin juga menyukai