Anda di halaman 1dari 1

D1 Calculation - Cobbins Nursery - 070415.

xlsm
1 Boiler 100%

Calculation of Chimney Height Using Method in Technical Guidance Note D1


Uniconfort Global G90 Biomass Boiler
Calculations Based on Data Supplied by Eco Link & Kiwa
April 7, 2015

Gas Temp C 104.9 Heat Release MWth


Gas Temp K 377.9 XS Area 0.13 Q<1 a -0.94
Stack Diameter 0.450 0.1591 m2 b 0.49
Gas Rate m3/s 1.46 0.99 Nm3/s @ 11% O2, dry, STP Q>1 a -1.01
Gas Velocity m/s 9.19 b 0.48
FG O2 (%) NA If emissions data available, x -2.70
Building Height m 7.95 enter in appropriate Cell in y 5.27
FG H2O (%) NA Column C (19 to 27). z -4.08
Std O2 (%) NA Otherwise Enter Discharge Rates

Discharge Discharge Discharge Guideline Background Pollution


Conc. Conc. Rate Concentration Concentration Index
(mg/Sm3) (mg/m3) (g/s) (mg/m3) (mg/m3) (m3/s)
NOx 332 0.329 4.40 0.030 75 NOx
NO2 116 0.115 0.2 0.023 651 NO2
NO 216 0.214 1 0.007 215 NO
CO 36 0.036 57 0.300 1 CO
PM10 8 0.008 0.05 0.016 227 PM10
Total 651 Total

Case for Single Building

Ub M Min Um Um U Corrected Height


(m) (m4/s2) (m) (m) Chimney Height Above Building
(Metres) (Metres)
2.7 10.1 1.7 3.8 11.0 3.1
0
Case for Multiple Buildings within 5Um
5Um = 19.1 metres CHECK THAT D<5Um

Building No. Distance Height Height Width Length K T


(metres) (metres) (H) (B) (metres) (Min H & B) (H+1.5K)
Boilerhouse Building 0 1 7.95 7.95 41.8 36.3 8.0 19.9
Glasshouse 1 10 1 7.95 7.95 41.8 60.0 8.0 19.9
Glasshouse 2 10 1 5.94 5.94 25.6 112.0 5.9 14.9

Hm Tm U Is U>Tm? Corr. Disch. Ht.


(Hmax) (Tmax) Min Um&Ub (1=Y, 0=N) (Metres)

7.95 19.9 2.7 0 12.0

Prepared by G Fynes 08/04/15 Page 1