BF
Review of offer for HV
Electrical Package 23.11.17 5.12.17
SwitchBoard
Preparation of Technical
Instrumentation specification for Pressure & 21.11.17 22.12.17
DP Tx
Preparation of Technical
Instrumentation specification for Vortex 20.11.17 29.12.17
Flowmeters
Preparation of Technical
Instrumentation specification for Level 22.11.17 29.12.17
Sensors
Preparation of Technical
Instrumentation specification for Humidity 23.11.17 22.12.17
analyser
RMHS
Review of Technical
Review of TS specification for CRP of 23.10.17 27.10.17
33KV GIS for Pellet Plant