PEMBAHASAN
P = 2 x L = 2 x 0,54 m = 1,08 m
V = L2 . t
0,24 m3 = 0,54m(2) . t
0,24 m3 = 0,30 m . t
0,30
t= = 1,25 m2
0,24
2. Equalisasi
Diasumsikan berbentuk silinder dengan tinggi bak 3 m
Q = 1,5 m3/jam = 12 m3/hari
Dt = 2 jam
h=3m
pompa submerable, kapasitas 10.000 L/jam
18
19
P = 2 x L = 2 x 0,74 m2 = 1,48 m
5,4
t= = 3,06 m
1,76
P = 4.320 N.m/detik
KT = 4,0 (Untuk propeller pitch of 1,3 blades sesuai reynold and
richard, 1996)
n = 500 rpm ( kriteria menurut reynold and richard pengaduk jenis
propeller nilai putaran permenit berkisar 400-1750 rpm)
100 rpm = 1,667 rps, sehingga 500 rpm = 8,33 rps
P
Di = ( )
KT.n3.ρ
4,320 N.m/detik
=( )1/5
4,0 .(8,335)3 .995,0 kg/m3
4,320 N.m/detik
=( )1/5
4,0 .579,05 .995,0 kg/m3
4,320 N.m/detik 1/5
=( )
2304,6 kg/m3
e. Cek nilai Re
Di2 .n .ρ
nRe =
µ
(0,4m)2 .8,335 rps .995,0 kg/m3
=
0,80x10−3 N.s/m2
1326,9
= = 1.658 = aliran laminer
µ0,80x10−3
f. Kebutuhan tawas
Pada saat uji Jartest terhadap 600 mL air limbah laundry didapatkan
hasil kebutuhan tawas 5% sebanyak 20 mL yang ditambahkan pada
600 mL limbah menghasilkan pH kembali netral yaitu 7, pada proses
penambahan koagulan :
Debit pada proses pengolahan adalah , Q tawas optimum hasil jartest =
3 mg/L maka :
100
Vv = Q . Qtawas optimum . ( )
c
100 1 gr 1L
= 1,5 m3/jam . 3 mg/L . . .
10 gr/mL 1000 mg 1000 mL
lebar = 1,61 m
tinggi 1,61 m, dibuat 1,71 agar sejajar dengan sedimentasi
Menentukan kebutuhan oksigen yang akan ditimbulkan ke limbah laundry
Q = 1,5 m3/jam = 12 m3/hari
Konsentrasi BOD yang masuk = 167,4 mg/L = 167,4 gr/m3
Beban BOD dalam air limbah :
= debit limbah . konsentrasi BOD yang masuk
= 1,5 m3/jam . 167,4 gr/m3 = 251,1 gr/jam
Kebutuhan oksigen, oksigen di dalam bak aerasi sebanding dengan jumlah
BOD yang dihilangkan
a. Kebutuhan udara teoritis = jumlah BOD yang dihilangkan = 251,1
gr/jam
b. Kebutuhan oksigen teoritis, faktor keamanan ditetapkan kurang lebih
1,5
= 1,5 . 251,1 gr/jam = 376,65 gr/jam = 9 kg/hari
c. Kebutuhan udara teoritis
Temperatur udara rata-rata = 280C
Berat jenis udara pada suhu 280C = 1,1724 kg/m3
Diasumsikan jumlah oksigen didalam udara 20,9 %
Jumlah kebutuhan udara teoritis :
kebutuhan oksigen teoritis
=
berat jenis udara pada 28oC .persentase oksigen dalam udara
9 kg/hari
= kg gro2 = 37,5 m3/hari
1,1724 .0,209 udara
m3 gr
5. Sedimentasi
Q = 1,5 m3/jam = 12 m3/hari
Lebar = 1 m
Kedalaman (h) = 2 m
AF (avarage flow) = 10 m3/m2.hari
Perhitungan dimensi unit sedimentasi
Q 12 m3/hari
A= = = 1,2 m2
AF 10 m3/m2.hari
A A 1,2 m2
Panjang = = = = 0,6 m
W 2xL 2x1
Volume bak
= t . 2 (PxL)
= 2m . 2 (0,6mx1m)
= 2,4 m3
V 2,4m3 .24jam/hari
dt = = = 4,8 jam
Q 12 m3/hari
6. Bak bioindikator
Q = 1,5 m3/jam = 12 m3/hari
dt = 1 jam
P=L=T = 1:1:1
Freeboard = 10%
a. Volume limbah pada bak bioindikator
V = Q . dt
= 1,5 m3/jam . 1 jam
= 1,5 m3 . 1,1 (freeboard 10%)
= 1,65 m3
b. Volume limbah pada bak bioindikator adalah 1,65 m3, sehingga
perhitungan dimensi bak adalah :
V = PxLxT
24
V = P3
3
P = √1,65 = 1,18 m
Dimensi kolam bioindikator
Panjang = 1,18 m = 1,20 m
Lebar = 1,18 m = 1,20 m
Tinggi = 1,18 m = 1,20 m
7. Drying Bed
Q = 1,5 m3/jam = 12 m3/hari
BOD (sebelum pengolahan) = 167,4 mg/L
Panjang = lebar = tinggi = 1:1:1
Perhitungan dimensi unit bak drying bed :
a. Konsentrasi effluent (cef)
= (100%-80%) x BOD
= 0,2 x 167,4 mg/L
= 33,48 mg/L
b. Konsentrasi lumpur (cs)
= 80% x BOD
= 0,8 x 167,4 mg/L
= 133,92 mg/L
c. Berat lumpur tiap harinya (Ws= weight sludge)
Ws = Q . Cs . 86.400 detik/hari
= 0,10 L/det . 133,92 mg/L . 10-6 kg/mg . 86.400 detik/hari
= 1,15 kg/hari
d. Debit lumpur kering (Qds)
Ws 1,15 kg/hari
Qds = = = 0,00766 m3/hari
Ps 1500 kg/m3
2. Equalisasi
P = 1,48 m
L = 0,74 m
T=3m
V1 = PxLxT = 1,48 m x 0,74 m x 3 m = 3,2 m3
P = 1,68 m , L = 0,94 m , T= 3,2 m
V2 = PxLxT = 1,68 m x 0,94 m x 3,2 m = 5,05 m3
Volume galian :
P = 1,68 m , L = 0,94 m , T= 3,2 m
V = PxLxT = 1,68 m x 0,94 m x 3,2 m = 5,05 m3
Volume pekerjaan = V2-V1 = 5,05 m3 – 3,2 m3 = 1,85 m3
3. Koagulasi Flokulasi
r = 0,75 m t = 3,06 m
V1 = π . r2 . t = 3,14 . 0,752 m2 . 3,06 m = 5,40 m3
r = 0,85 m t = 3,16 m
V1 = π . r2 . t = 3,14 . 0,852 m2 . 3,16 m = 7,16 m3
Volume pekerjaan = V2-V1 = 7,16 m3 – 5,40 m3 = 1,76 m3
4. Aerasi
P = 1,61 m
L = 1,61 m
T = 1,61 m
V1 = PxLxT = 1,61 m x 1,61 m x 1,61 m = 4,17 m3
P = 1,81 m , L = 1,81 m , T= 1,81 m
V2 = PxLxT = 1,81 m x 1,81 m x 1,81 m = 5,92 m3
Volume galian :
P = 1,61 m , L = 1,61 m , T= 0,5 m
V = PxLxT = 1,61 m x 1,61 m x 0,5 m = 1,29 m3
Volume pekerjaan = V2-V1 = 5,92 m3 – 4,17 m3 = 1,75 m3
27
5. Sedimentasi
P = 0,6 m
L=1m
T=2m
V1 = PxLxT = 0,6 m x 1 m x 2 m = 1,2 m3
P = 0,8 m , L = 1,2 m , T= 2,2 m
V2 = PxLxT = 0,8 m x 1,2 m x 2,2 m = 2,1 m3
Volume galian :
P = 0,8 m , L = 1,4 m , T = 1,4 m
V = PxLxT = 0,8 m x 1,4 m x 1,4 m = 1,56 m3
Volume pekerjaan = V2-V1 = 2,1 m3 – 1,2 m3 = 0,9 m3
6. Drying Bed
P = 2,5 m
L = 0,75 m
T = 0,7 m
V1 = PxLxT = 2,5 m x 0,75 m x 0,7 m = 1,3 m3
P = 2,7 m , L = 0,95 m , T= 0,9 m
V2 = PxLxT = 2,7 m x 0,75 m x 0,7 m = 2,3 m3
Volume galian :
P = 2,5 m , L = 0,95 m , T= 0,9 m
V = PxLxT = 2,5 m x 0,95 m x 0,9 m = 2,3 m3
Volume pekerjaan = V2-V1 = 2,3 m3 – 1,3 m3 = 1 m3
7. Bak Bioindikator
P = 1,20 m
L = 1,20 m
T = 1,20 m
V1 = PxLxT = 1,20 m x 1,20 m x 1,20 m = 1,7 m3
P = 1,4 m , L = 1,4 m , T= 1,4 m
V2 = PxLxT = 1,4 m x 1,4 m x 1,4 m = 2,7 m3
28
Volume galian :
P = 1,22 m , L = 1,22 m , T= 1,22 m
V = PxLxT = 1,22 m x 1,22 m x 1,22 m = 1,8 m3
Volume pekerjaan = V2-V1 = 2,7 m3 – 1,7 m3 = 1 m3
TOTAL E 872.000
f.) Plesteran dan Acian
(tebal 10 mm)
UPAH :
Pekerja 0,4 55.000 22.000
Mandor 0,02 80.000 1.600
BAHAN :
Semen Portland 0,042 1.475 61,95
Pasir 0,014 150.000 1.710
TOTAL F 25.371
g.) Pengecatan dinding
UPAH :
Tukang Cat 0,12 70.000 8.400
Kepala Tukang 0,012 80.000 960
Pekerja 0,188 55.000 10.340
Mandor 0,094 80.000 752
BAHAN :
Cat Tembok 0,3 14.333 42.999
Cat Plamur 0,11 32.833 361.163
Kertas Amplas 0,05 3.500 175
TOTAL G 424.789
TOTAL PEKERJAAN UNIT KOAGULASI- 3.238.006
FLOKULASI (A+B+C+D+E+F+G)
7 3
1 m PEKERJAAN UNIT AERASI
a.)Galian Tanah Biasa
UPAH :
Tukang Gali 0,563 70.000 39.410
Mandor 0,019 80.000 1.520
TOTAL A 40.930
b.) Lantai Kerja
UPAH :
Pekerja 1,200 55.000 66.000
Tukang Batu 0,200 70.000 14.000
Kepala Tukang 0,020 80.000 1.600
Mandor 0,060 80.000 4.800
BAHAN :
Pc 230 1.475 339.250
Pb 893 216,64 193.459
Kr 0,761 175.000 133.175
TOTAL B 752.284
c.) Pembesian
UPAH :
Pekerja 0,700 55.000 38.500
Tukang Besi 0,700 70.000 49.000
Kepala Tukang 0,070 80.000 5.600
Mandor 0,040 80.000 3.200
37
BAHAN :
Besi Beton 105 10.080 1.058
Kawat Beton 1,50 14.500 21.750
TOTAL C 119.108
d.) Bekesting
UPAH :
Pekerja 0,200 55.000 11.000
Tukang Kayu 0,500 75.000 37.500
Kepala Tukang 0,050 80.000 4.000
Mandor 0,010 80.000 800
BAHAN :
Multiflex 18 mm 0,20 180.000 36.000
Kaso 5x7 cm 0,015 8.214.285 123.214
Paku 5 cm dan 7 cm 0,25 21.500 5.375
Minyak Bekisting 1,600 16.000 25.600
TOTAL D 243.489
e.) Pengecoran
UPAH :
Pekerja 1,650 55.000 90.750
Tukang Batu 0,275 70.000 19.250
Kepala Tukang 0,028 80.000 2.240
Mandor 0,083 80.000 6.640
BAHAN :
Pc 247 1.475 364.325
Pb 869 216,64 188.260
Kr 0,740 175.000 129.500
TOTAL E 800.965
f.) Plesteran dan Acian
(tebal 10 mm)
UPAH :
Pekerja 0,4 55.000 22.000
Mandor 0,02 80.000 1.600
BAHAN :
Semen Portland 0,042 1.475 61,95
Pasir 0,014 150.000 1.710
TOTAL F 25.371
g.) Pengecatan dinding
UPAH :
Tukang Cat 0,12 70.000 8.400
Kepala Tukang 0,012 80.000 960
Pekerja 0,188 55.000 10.340
Mandor 0,094 80.000 752
BAHAN :
Cat Tembok 0,3 14.333 42.999
Cat Plamur 0,11 32.833 361.163
Kertas Amplas 0,05 3.500 175
38
TOTAL G 424.789
TOTAL PEKERJAAN UNIT AERASI 2.406.936
(A+B+C+D+E+F+G)
8 1 m3 PEKERJAAN UNIT SEDIMENTASI
a.) Lantai Kerja
UPAH :
Pekerja 1,200 55.000 66.000
Tukang Batu 0,200 70.000 14.000
Kepala Tukang 0,020 80.000 1.600
Mandor 0,060 80.000 4.800
BAHAN :
Pc 230 1.475 339.250
Pb 893 216,64 193.459
Kr 0,761 175.000 133.175
TOTAL A 752.284
b.) Pembesian
UPAH :
Pekerja 0,700 55.000 38.500
Tukang Besi 0,700 70.000 49.000
Kepala Tukang 0,070 80.000 5.600
Mandor 0,040 80.000 3.200
BAHAN :
Besi Beton 105 10.080 1.058
Kawat Beton 1,50 14.500 21.750
TOTAL B 119.108
c.) Bekesting
UPAH :
Pekerja 0,200 55.000 11.000
Tukang Kayu 0,500 75.000 37.500
Kepala Tukang 0,050 80.000 4.000
Mandor 0,010 80.000 800
BAHAN :
Multiflex 18 mm 0,20 180.000 36.000
Kaso 5x7 cm 0,015 8.214.285 123.214
Paku 5 cm dan 7 cm 0,25 21.500 5.375
Minyak Bekisting 1,600 16.000 25.600
TOTAL C 243.489
d.) Pengecoran
UPAH :
Pekerja 1,650 55.000 90.750
Tukang Batu 0,275 70.000 19.250
Kepala Tukang 0,028 80.000 2.240
Mandor 0,083 80.000 6.640
BAHAN :
Pc 247 1.475 364.325
Pb 869 216,64 188.260
39
c.) Bekesting
UPAH :
Pekerja 0,200 55.000 11.000
Tukang Kayu 0,500 75.000 37.500
Kepala Tukang 0,050 80.000 4.000
Mandor 0,010 80.000 800
BAHAN :
Multiflex 18 mm 0,20 180.000 36.000
Kaso 5x7 cm 0,015 8.214.285 123.214
Paku 5 cm dan 7 cm 0,25 21.500 5.375
Minyak Bekisting 1,600 16.000 25.600
TOTAL C 243.489
d.) Pengecoran
UPAH :
Pekerja 1,650 55.000 90.750
Tukang Batu 0,275 70.000 19.250
Kepala Tukang 0,028 80.000 2.240
Mandor 0,083 80.000 6.640
BAHAN :
Pc 247 1.475 364.325
Pb 869 216,64 188.260
Kr 0,740 175.000 129.500
TOTAL D 800.965
e.) Plesteran dan Acian
(tebal 10 mm)
UPAH :
Pekerja 0,4 55.000 22.000
Mandor 0,02 80.000 1.600
BAHAN :
Semen Portland 0,042 1.475 61,95
Pasir 0,014 150.000 1.710
TOTAL E 25.371
f.) Pengecatan dinding
UPAH :
Tukang Cat 0,12 70.000 8.400
Kepala Tukang 0,012 80.000 960
Pekerja 0,188 55.000 10.340
Mandor 0,094 80.000 752
BAHAN :
Cat Tembok 0,3 14.333 42.999
Cat Plamur 0,11 32.833 361.163
Kertas Amplas 0,05 3.500 175
TOTAL F 424.789
TOTAL PEKERJAAN UNIT BAK 2.366.006
BIOINIDIKATOR (A+B+C+D+E+F)
10 1 m3 PEKERJAAN UNIT DRYING BED
41
kelengkapan
UPAH :
Pekerja 2,000 55.000 110.000
Tukang listrik 11,00 70.000 770.000
Mandor 2,050 80.000 164.500
TOTAL PEKERJAAN INSTALASI LISTRIK / 15.153.200
ELEKTRIK