Dos:-
You should have the DC and Calibration Certificate (Both Soft and Hard Copies)
First You Connect Earth with 2.5 Sqmm Green cable, with Proper lugs.(no
Tolerance)
You should use either AVR or UPS
Before departure to site check all cables and loop cables
You should have 6 No’s of banana pin and 4 no’s of crocodile pins additionally
Give the identification to all cables such as R-phase-Phase-Phase (all should Follow
the same)
Use updated software for communicate with kit.
Use Proper Recommended cables
After completion of test wind all cables properly
Don'ts: