SUSTENTO DE METRADOS DE OBRAS EXTERIORES

CERCO PERIMETRICOS INCLUYE PORTADA DE INGRESO.

I.E. CLORINDA MATO DE TURNER FECHA : MAYO 2011.


UBICACUSCO - CUSCO

MEDIDAS
PARTIDA DESCRIPCION UND CANT. PARCIAL SUB TOTAL TOTAL
LARGO ANCHO ALTO

ESTRUCTURAS
TRABAJOS PRELIMINARES
TRAZO NIVELES Y REPLANTEO m2 466.86
MURO DE CONTENCION INC. CERCO TRAMO S-R 1.00 59.20 0.80 47.36 466.86
CERCO TRAMO R-Q 1.00 35.61 0.80 28.49
INGRESO POLIDEPORTIVOCERCO TRAMO Q-O 1.00 2.40 0.80 1.92
CERCO MURO A REHABILITAR N-M 1.00 150.00 0.80 120.00
CERCO TIPO UNI TRAMO M-L-K-J 1.00 45.45 0.80 36.36
INGRESO PRIMARIA ADMINISTACION PORTADA J-I 1.00 9.85 0.80 7.88
CERCO TIPO UNI TRAMO I-H-G-F 1.00 32.50 0.80 26.00
INGRESO SECUNDARIA PORTADA F-E 7.25 0.80 0.00
CERCO TIPO UNI TRAMO E-D-CH 1.00 49.40 0.80 39.52
INGRESO Y SALIDA CEPTRO PORTADA CH-C 1.00 5.88 0.80 4.70
PUERTA CORREDIZA ESTACIONAMIENTO 1.00 13.97 0.80 11.18
SOBRECIMIENTO ARMADO Y-X 1.00 37.07 0.80 29.66
MURO DE CONTENCION INC. CERCO TRAMO X-W 1.00 55.62 0.80 44.50
CERCO TRAMO W-V 1.00 27.85 0.80 22.28
SOBRECIMIENTO ARMADO CERCO TRAMO V-U 1.00 9.25 0.80 7.40
MURO DE CONTENCION INC. CERCO TRAMO U-T 1.00 9.25 0.80 7.40
MURO DE CONTENCION EXP. CERCO LADRILLO INC. CERCO TRAMO T-S 1.00 40.26 0.80 32.21
590.81

MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA PARA CIMIENTO m3 613.42
MURO DE CONTENCION INC. CERCO TRAMO S-R (CC-03) 1.00 59.20 0.80 1.35 63.94 613.42
TALUD 1.00 59.20 0.70 1.60 33.15
CERCO TRAMO R-Q (CC-01) 1.00 35.61 0.80 1.00 28.49

CERCO MURO A REHABILITAR N-M 1.00 150.00 0.00 0.00

CERCO TIPO UNI TRAMO M-L-K-J 1.00 45.45 0.80 1.10 40.00

INGRESO PRIMARIA ADMINISTACION PORTADA J-I 9.85 H(m) AREA


2.00 1.90 7.28 27.66
2.00 1.90 2.26 8.59

CERCO TIPO UNI TRAMO I-H-G-F 1.00 32.50 0.80 1.10 28.60

INGRESO SECUNDARIA PORTADA F-E 7.25 H(m) AREA


2.00 2.10 3.38 14.20
2.00 2.10 2.03 8.53

CERCO TIPO UNI TRAMO E-D-CH 1.00 49.40 0.80 1.10 43.47

INGRESO Y SALIDA CEPTRO PORTADA CH-C 5.88 H(m) AREA


2.00 2.10 3.38 14.20
2.00 2.10 2.03 8.53

PUERTA CORREDIZA ESTACIONAMIENTO 1.00 13.97 0.00 0.00

SOBRECIMIENTO ARMADO Y-X (CC-03) 1.00 37.07 0.80 1.35 40.04


MURO DE CONTENCION INC. CERCO TRAMO X-W (CC-03) 1.00 55.62 0.80 1.35 60.07
CERCO TRAMO W-V (CC-03) 1.00 27.85 0.80 1.35 30.08
SOBRECIMIENTO ARMADO CERCO TRAMO V-U (CC-03) 1.00 9.25 0.80 1.35 9.99
MURO DE CONTENCION INC. CERCO TRAMO U-T (CC-03) 1.00 9.25 0.80 1.35 9.99
MURO DE CONTENCION EXP. CERCO LADRILLO INC. CERCO TRAMO T-S (CC-03) 1.00 40.26 0.80 1.35 43.48
TALUD 1.00 179.30 0.70 1.60 100.41

RELLENO MATERIAL PROPIO m3 219.89


MURO DE CONTENCION INC. CERCO TRAMO S-R (CC-03) 1.00 59.20 0.67 0.40 15.87 219.89
TALUD 1.00 59.20 0.70 1.60 33.15
CERCO TRAMO R-Q (CC-01) 1.00 35.61 0.34 0.40 4.84

INGRESO POLIDEPORTIVOCERCO TRAMO Q-O 1.00 2.40 0.00 0.00 0.00


CERCO MURO A REHABILITAR N-M 1.00 150.00 0.00 0.00

Página 1 de 12
SUSTENTO DE METRADOS DE OBRAS EXTERIORES
CERCO PERIMETRICOS INCLUYE PORTADA DE INGRESO.

I.E. CLORINDA MATO DE TURNER FECHA : MAYO 2011.


UBICACUSCO - CUSCO

MEDIDAS
PARTIDA DESCRIPCION UND CANT. PARCIAL SUB TOTAL TOTAL
LARGO ANCHO ALTO

CERCO TIPO UNI TRAMO M-L-K-J 1.00 45.45 0.45 0.20 4.09

INGRESO PRIMARIA ADMINISTACION PORTADA J-I 9.85 H(m) AREA


2.00 0.15 7.28 2.18
2.00 0.15 2.26 0.68

CERCO TIPO UNI TRAMO I-H-G-F 1.00 32.50 0.45 0.20 2.93

INGRESO SECUNDARIA PORTADA F-E 7.25 H(m) AREA


2.00 0.15 3.38 1.01
2.00 0.15 2.03 0.61

CERCO TIPO UNI TRAMO E-D-CH 1.00 49.40 0.45 0.20 4.45

INGRESO Y SALIDA CEPTRO PORTADA CH-C 5.88 H(m) AREA


2.00 0.15 3.38 1.01
2.00 0.15 2.03 0.61

PUERTA CORREDIZA ESTACIONAMIENTO 1.00 13.97 0.00 0.00

SOBRECIMIENTO ARMADO Y-X (CC-03) 1.00 37.07 0.67 0.40 9.93


MURO DE CONTENCION INC. CERCO TRAMO X-W (CC-03) 1.00 55.62 0.67 0.40 14.91
CERCO TRAMO W-V (CC-03) 1.00 27.85 0.67 0.40 7.46
SOBRECIMIENTO ARMADO CERCO TRAMO V-U (CC-03) 1.00 9.25 0.67 0.40 2.48
MURO DE CONTENCION INC. CERCO TRAMO U-T (CC-03) 1.00 9.25 0.67 0.40 2.48
MURO DE CONTENCION EXP. CERCO LADRILLO INC. CERCO TRAMO T-S (CC-03) 1.00 40.26 0.67 0.40 10.79
TALUD 1.00 179.30 0.70 1.60 100.41

ACARREO DE MATERIAL EXCEDENTE PARA POSTERIOR ELIMINACION m3 797.45

EXCAVACION PARA CIMIENTO V. ELIMINACION 613.42 797.45 797.45


ELIMINACION (30%) 184.03

ELIMINACION DE MATERIAL EXCEDENTE m3 797.45

EXCAVACION PARA CIMIENTO V. ELIMINACION 613.42 797.45 797.45


ELIMINACION (30%) 184.03

CONCRETO SIMPLE
SOLADO P/ZAPATAS Y VIGAS DE CIMENTACION DE 2" MEZCLA 1:12
CEMENTO-HORMIGON m2 464.94
MURO DE CONTENCION INC. CERCO TRAMO S-R 1.00 59.20 0.80 47.36 464.94
CERCO TRAMO R-Q 1.00 35.61 0.80 28.49
CERCO MURO A REHABILITAR N-M 1.00 150.00 0.80 120.00
CERCO TIPO UNI TRAMO M-L-K-J 1.00 45.45 0.80 36.36
INGRESO PRIMARIA ADMINISTACION PORTADA J-I 1.00 9.85 0.80 7.88
CERCO TIPO UNI TRAMO I-H-G-F 1.00 32.50 0.80 26.00
INGRESO SECUNDARIA PORTADA F-E 7.25 0.80 0.00
CERCO TIPO UNI TRAMO E-D-CH 1.00 49.40 0.80 39.52
INGRESO Y SALIDA CEPTRO PORTADA CH-C 1.00 5.88 0.80 4.70
PUERTA CORREDIZA ESTACIONAMIENTO 1.00 13.97 0.80 11.18
SOBRECIMIENTO ARMADO Y-X 1.00 37.07 0.80 29.66
MURO DE CONTENCION INC. CERCO TRAMO X-W 1.00 55.62 0.80 44.50
CERCO TRAMO W-V 1.00 27.85 0.80 22.28
SOBRECIMIENTO ARMADO CERCO TRAMO V-U 1.00 9.25 0.80 7.40
MURO DE CONTENCION INC. CERCO TRAMO U-T 1.00 9.25 0.80 7.40
MURO DE CONTENCION EXP. CERCO LADRILLO INC. CERCO TRAMO T-S 1.00 40.26 0.80 32.21
588.41
SUBCIMIENTO, SUBZAPATAS: MEZCLA 1:12 + 30% P.G. m3 32.59

INGRESO PRIMARIA ADMINISTACION PORTADA J-I 9.85 H(m) AREA 15.27


2.00 0.80 7.28 11.65
2.00 0.80 2.26 3.62

INGRESO SECUNDARIA PORTADA F-E 7.25 H(m) AREA 8.66

Página 2 de 12
SUSTENTO DE METRADOS DE OBRAS EXTERIORES
CERCO PERIMETRICOS INCLUYE PORTADA DE INGRESO.

I.E. CLORINDA MATO DE TURNER FECHA : MAYO 2011.


UBICACUSCO - CUSCO

MEDIDAS
PARTIDA DESCRIPCION UND CANT. PARCIAL SUB TOTAL TOTAL
LARGO ANCHO ALTO
2.00 0.80 3.38 5.41
2.00 0.80 2.03 3.25

INGRESO Y SALIDA CEPTRO PORTADA CH-C 5.88 H(m) AREA 8.66


2.00 0.80 3.38 5.41
2.00 0.80 2.03 3.25

CIMIENTOS CORRIDOS: CONCRETO C:H 1:10 + 30% P.G. m3 197.79


MURO DE CONTENCION INC. CERCO TRAMO S-R (CC-03) 1.00 59.20 0.80 0.60 28.42 197.79
CERCO TRAMO R-Q (CC-01) 1.00 35.61 0.80 0.60 17.09

CERCO MURO A REHABILITAR N-M 1.00 150.00 0.00 0.00

CERCO TIPO UNI TRAMO M-L-K-J 1.00 45.45 0.80 0.65 23.63

INGRESO PRIMARIA ADMINISTACION PORTADA J-I 9.85

CERCO TIPO UNI TRAMO I-H-G-F 1.00 32.50 0.80 0.65 16.90

INGRESO SECUNDARIA PORTADA F-E 7.25

CERCO TIPO UNI TRAMO E-D-CH 1.00 49.40 0.80 0.65 25.69

INGRESO Y SALIDA CEPTRO PORTADA CH-C 5.88

PUERTA CORREDIZA ESTACIONAMIENTO 1.00 13.97 0.00 0.00

SOBRECIMIENTO ARMADO Y-X (CC-03) 1.00 37.07 0.80 0.60 17.79


MURO DE CONTENCION INC. CERCO TRAMO X-W (CC-03) 1.00 55.62 0.80 0.60 26.70
CERCO TRAMO W-V (CC-03) 1.00 27.85 0.80 0.60 13.37
SOBRECIMIENTO ARMADO CERCO TRAMO V-U (CC-03) 1.00 9.25 0.80 0.60 4.44
MURO DE CONTENCION INC. CERCO TRAMO U-T (CC-03) 1.00 9.25 0.80 0.60 4.44
MURO DE CONTENCION EXP. CERCO LADRILLO INC. CERCO TRAMO T-S (CC-03) 1.00 40.26 0.80 0.60 19.32
588.41

SOBRECIMIENTO: CONCRETO C:H 1:8 + 25% P.M. m3 9.29

CERCO TRAMO R-Q (CC-01) 1.00 94.81 0.14 0.70 9.29 9.29

SOBRECIMIENTO: ENCOFRADO Y DESENCOFRADO m2 132.73

CERCO TRAMO R-Q (CC-01) 2.00 94.81 0.70 132.73 132.73

OBRAS DE CONCRETO ARMADO


ZAPATAS
ZAPATAS: CONCRETO f`c=210 kg/cm2 m3 28.50
INGRESO PRIMARIA ADMINISTACION PORTADA J-I 9.85 H(m) AREA 13.36
2.00 0.70 7.28 10.19
2.00 0.70 2.26 3.17

INGRESO SECUNDARIA PORTADA F-E 7.25 H(m) AREA 7.57


2.00 0.70 3.38 4.73
2.00 0.70 2.03 2.84

INGRESO Y SALIDA CEPTRO PORTADA CH-C 5.88 H(m) AREA 7.57


2.00 0.70 3.38 4.73
2.00 0.70 2.03 2.84

ZAPATAS: ENCOFRADO Y DESENCOFRADO m2 65.88


INGRESO PRIMARIA ADMINISTACION PORTADA J-I 9.85 L(m) H(m) 28.92
P-1 2.00 6.14 0.70 8.60
P-2 2.00 6.66 0.70 9.32
P-3 2.00 7.86 0.70 11.00

INGRESO SECUNDARIA PORTADA F-E 7.25 L(m) H(m) 18.48


P-4 2.00 6.00 0.70 8.40

Página 3 de 12
SUSTENTO DE METRADOS DE OBRAS EXTERIORES
CERCO PERIMETRICOS INCLUYE PORTADA DE INGRESO.

I.E. CLORINDA MATO DE TURNER FECHA : MAYO 2011.


UBICACUSCO - CUSCO

MEDIDAS
PARTIDA DESCRIPCION UND CANT. PARCIAL SUB TOTAL TOTAL
LARGO ANCHO ALTO
P-5 2.00 7.20 0.70 10.08

INGRESO Y SALIDA CEPTRO PORTADA CH-C 5.88 H(m) AREA 18.48


P-4 2.00 6.00 0.70 8.40
P-5 2.00 7.20 0.70 10.08

ZAPATAS: ACERO Fy=4,200 kg/cm2 kg Cant. long var/zap coeficien 282.95


INGRESO PRIMARIA ADMINISTACION PORTADA J-I
P-1 Fº LONGITUDINALES 1/2" 2.00 2.25 4.00 1.02 18.36 102.85
P-1 Fº TRASVERSALES 1/2" 2.00 0.63 10.00 1.02 12.85

P-2 Fº LONGITUDINALES 1/2" 2.00 2.53 4.00 1.02 20.64


P-2 Fº TRASVERSALES 1/2" 2.00 0.63 10.00 1.02 12.85

P-3 Fº LONGITUDINALES 1/2" 2.00 3.10 4.00 1.02 25.30


P-3 Fº TRASVERSALES 1/2" 2.00 0.63 10.00 1.02 12.85

INGRESO SECUNDARIA PORTADA F-E


P-4 Fº LONGITUDINALES 1/2" 2.00 2.24 4.00 1.02 18.28 90.05
P-4 Fº TRASVERSALES 1/2" 2.00 2.80 9.00 1.02 51.41

P-5 Fº LONGITUDINALES 1/2" 1.00 3.10 4.00 1.02 12.65


P-5 Fº TRASVERSALES 1/2" 1.00 0.63 12.00 1.02 7.71

INGRESO Y SALIDA CEPTRO PORTADA CH-C


P-4 Fº LONGITUDINALES 1/2" 2.00 2.24 4.00 1.02 18.28 90.05
P-4 Fº TRASVERSALES 1/2" 2.00 2.80 9.00 1.02 51.41

P-5 Fº LONGITUDINALES 1/2" 1.00 3.10 4.00 1.02 12.65


P-5 Fº TRASVERSALES 1/2" 1.00 0.63 12.00 1.02 7.71

SOBRECIMIENTO CON VIGAS DE CIMENTACION: CONCRETO f'c= 175 kg/cm2 m3 64.95


64.95
CERCO TIPO UNI TRAMO M-L-K-J 1.00 45.45 0.30 0.35 4.77
1.00 45.45 0.30 1.35 18.41

CERCO TIPO UNI TRAMO I-H-G-F 1.00 32.50 0.30 0.35 3.41
1.00 32.50 0.30 1.35 13.16

CERCO TIPO UNI TRAMO E-D-CH 1.00 49.40 0.30 0.35 5.19
1.00 49.40 0.30 1.35 20.01

SOBRECIMIENTO CON VIGA DE CIMENTACION: ENCOFRADO Y DESENCOFRADO


CARAVISTA m2 433.00
433.00
CERCO TIPO UNI TRAMO M-L-K-J 2.00 45.45 1.00 0.35 31.82
2.00 45.45 1.00 1.35 122.72

CERCO TIPO UNI TRAMO I-H-G-F 2.00 32.50 1.00 0.35 22.75
2.00 32.50 1.00 1.35 87.75

CERCO TIPO UNI TRAMO E-D-CH 2.00 49.40 1.00 0.35 34.58
2.00 49.40 1.00 1.35 133.38

SOBRECIMIENTO CON VIGA DE CIMENTACION: ACERO fy=4,200 kg/cm2 kg Cant. long var/zap coeficien 769.74

CERCO TIPO UNI TRAMO M-L-K-J


fierros longitudinales de 3/8" 16.00 3.36 4.00 0.56 120.42 267.62
fierros transversal de 1/4" 16.00 1.55 16.00 0.26 103.17
fierros longitudinales de 3/8" 17.00 1.10 2.00 1.00 37.40
fierros transversal de 1/4" 17.00 0.15 10.00 0.26 6.63

CERCO TIPO UNI TRAMO I-H-G-F


fierros longitudinales de 3/8" 12.00 3.36 4.00 0.56 90.32 201.37
fierros transversal de 1/4" 12.00 1.55 16.00 0.26 77.38

Página 4 de 12
SUSTENTO DE METRADOS DE OBRAS EXTERIORES
CERCO PERIMETRICOS INCLUYE PORTADA DE INGRESO.

I.E. CLORINDA MATO DE TURNER FECHA : MAYO 2011.


UBICACUSCO - CUSCO

MEDIDAS
PARTIDA DESCRIPCION UND CANT. PARCIAL SUB TOTAL TOTAL
LARGO ANCHO ALTO
fierros longitudinales de 3/8" 13.00 1.10 2.00 1.00 28.60
fierros transversal de 1/4" 13.00 0.15 10.00 0.26 5.07

CERCO TIPO UNI TRAMO E-D-CH


fierros longitudinales de 3/8" 18.00 3.36 4.00 0.56 135.48 300.75
fierros transversal de 1/4" 18.00 1.55 16.00 0.26 116.06
fierros longitudinales de 3/8" 19.00 1.10 2.00 1.00 41.80
fierros transversal de 1/4" 19.00 0.15 10.00 0.26 7.41

MUROS DE CONTENCION f'c= 175 kg/cm2


MUROS DE CONTENCION: CONCRETO f'c= 175 kg/cm2 m3 66.78
MURO DE CONTENCION INC. CERCO TRAMO S-R (CC-03) 1.00 59.20 0.14 2.00 16.58 66.78

SOBRECIMIENTO ARMADO Y-X (CC-03) 1.00 37.07 0.14 2.00 10.38


MURO DE CONTENCION INC. CERCO TRAMO X-W (CC-03) 1.00 55.62 0.14 2.00 15.57
CERCO TRAMO W-V (CC-03) 1.00 27.85 0.14 2.00 7.80
SOBRECIMIENTO ARMADO CERCO TRAMO V-U (CC-03) 1.00 9.25 0.14 2.00 2.59
MURO DE CONTENCION INC. CERCO TRAMO U-T (CC-03) 1.00 9.25 0.14 2.00 2.59
MURO DE CONTENCION EXP. CERCO LADRILLO INC. CERCO TRAMO T-S (CC-03) 1.00 40.26 0.14 2.00 11.27

MUROS DE CONTENCION: ENCOFRADO Y DESENCOFRADO CARAVISTA m2 954.00


MURO DE CONTENCION INC. CERCO TRAMO S-R (CC-03) 2.00 59.20 1.00 2.00 236.80 954.00

SOBRECIMIENTO ARMADO Y-X (CC-03) 2.00 37.07 1.00 2.00 148.28


MURO DE CONTENCION INC. CERCO TRAMO X-W (CC-03) 2.00 55.62 1.00 2.00 222.48
CERCO TRAMO W-V (CC-03) 2.00 27.85 1.00 2.00 111.40
SOBRECIMIENTO ARMADO CERCO TRAMO V-U (CC-03) 2.00 9.25 1.00 2.00 37.00
MURO DE CONTENCION INC. CERCO TRAMO U-T (CC-03) 2.00 9.25 1.00 2.00 37.00
MURO DE CONTENCION EXP. CERCO LADRILLO INC. CERCO TRAMO T-S (CC-03) 2.00 40.26 1.00 2.00 161.04

MUROS DE CONTENCION: ACERO Fy=4,200 kg/cm2 kg Cant. long var/zap coeficien 3,650.60
MURO DE CONTENCION INC. CERCO TRAMO S-R (CC-03) 59.20 908.79
fierros longitudinales de 3/8" 1.00 61.85 12.00 0.56 415.65
fierros transversal de 3/8" 1.00 3.70 238.00 0.56 493.14

SOBRECIMIENTO ARMADO Y-X (CC-03) 37.07


MURO DE CONTENCION INC. CERCO TRAMO X-W (CC-03) 55.62
CERCO TRAMO W-V (CC-03) 27.85
SOBRECIMIENTO ARMADO CERCO TRAMO V-U (CC-03) 9.25
MURO DE CONTENCION INC. CERCO TRAMO U-T (CC-03) 9.25
MURO DE CONTENCION EXP. CERCO LADRILLO INC. CERCO TRAMO T-S (CC-03) 40.26
179.30 2,741.81
fierros longitudinales de 3/8" 1.00 186.62 12.00 0.56 1,254.11
fierros transversal de 3/8" 1.00 3.70 718.00 0.56 1,487.70

COLUMNAS
COLUMNAS: CONCRETO f`c=175 kg/cm2 m3 19.71

C-A 1 59.00 0.25 0.25 2.65 9.77 19.71

C-A 2 60.00 0.25 0.25 2.65 9.94

COLUMNAS: ENCOFRADO Y DESENCOFRADO m2 257.18

C-A 1 59.00 1.00 0.75 2.65 117.26 257.18

C-A 2 60.00 1.00 0.88 2.65 139.92

COLUMNAS: ACERO Fy=4,200 kg/cm2 kg Cant. long var/zap coeficien 1,783.10

C-A 1 fierros longitudinales de 3/8" 59.00 4.60 4.00 0.56 607.94 884.06
fierros transversal de 1/4" 59.00 1.00 18.00 0.26 276.12

C-A 2 fierros longitudinales de 3/8" 60.00 4.60 4.00 0.56 618.24 899.04
fierros transversal de 1/4" 60.00 1.00 18.00 0.26 280.80

PLACAS

Página 5 de 12
SUSTENTO DE METRADOS DE OBRAS EXTERIORES
CERCO PERIMETRICOS INCLUYE PORTADA DE INGRESO.

I.E. CLORINDA MATO DE TURNER FECHA : MAYO 2011.


UBICACUSCO - CUSCO

MEDIDAS
PARTIDA DESCRIPCION UND CANT. PARCIAL SUB TOTAL TOTAL
LARGO ANCHO ALTO
PLACAS: CONCRETO f`c=210 kg/cm2 m3 29.69
AREA ANCHO
PORTICO PRINCIPAL
PL-1 2.00 4.52 0.30 1.00 2.71 12.40
PL-2 2.00 6.00 0.30 1.00 3.60
PL-3 2.00 10.15 0.30 1.00 6.09

PORTICO SECUNDARIO 01 Y 02
PL-4 4.00 5.21 0.30 1.00 6.25 17.29
PL-5 4.00 9.20 0.30 1.00 11.04

PLACAS: ENCOFRADO Y DESENCOFRADO m2 208.11


Nº PL AREA ANCHO Nº CARAS
PORTICO PRINCIPAL
PL-1 2.00 4.52 1.00 2.00 18.08 24.02
2.00 4.90 0.30 1.00 2.94
2.00 5.00 0.30 1.00 3.00

PL-2 2.00 6.00 1.00 2.00 24.00 30.31


2.00 5.20 0.30 1.00 3.12
2.00 5.31 0.30 1.00 3.19

PL-3 2.00 10.13 1.00 2.00 40.52 47.95


2.00 6.13 0.30 1.00 3.68
2.00 6.26 0.30 1.00 3.76

PORTICO SECUNDARIO 01 Y 02
PL-4 4.00 5.21 1.00 2.00 41.68 54.23
4.00 5.20 0.30 1.00 6.24
4.00 5.26 0.30 1.00 6.31

PL-5 4.00 9.20 1.00 1.00 36.80 51.60


4.00 6.13 0.30 1.00 7.36
4.00 6.20 0.30 1.00 7.44

PLACAS: ACERO Fy=4,200 kg/cm2 kg Cant. long var/zap coeficien 2,860.60


PORTICO PRINCIPAL
PL-1
fierros transversal de 3/8" 2.00 3.26 4.00 0.56 14.60 380.29
fierros transversal de 3/8" 2.00 2.37 24.00 0.56 63.71
estribos fierros de 3/8" 2.00 0.35 140.00 0.56 54.88
fierros longitudinal de 5/8" 2.00 4.95 16.00 1.56 247.10

PL-2
fierros transversal de 3/8" 2.00 3.80 4.00 0.56 17.02 408.86
fierros transversal de 3/8" 2.00 3.05 25.00 0.56 85.40
estribos fierros de 3/8" 2.00 0.35 145.00 0.56 56.84
fierros longitudinal de 5/8" 2.00 5.00 16.00 1.56 249.60

PL-3
fierros transversal de 3/8" 2.00 5.00 4.00 0.56 22.40 503.88
fierros transversal de 3/8" 2.00 3.85 28.00 0.56 120.74
estribos fierros de 3/8" 2.00 0.35 160.00 0.56 62.72
fierros longitudinal de 5/8" 2.00 5.97 16.00 1.56 298.02

PL-4
fierros transversal de 3/8" 4.00 3.26 4.00 0.56 29.21 760.59
fierros transversal de 3/8" 4.00 2.37 24.00 0.56 127.41
estribos fierros de 3/8" 4.00 0.35 140.00 0.56 109.76
fierros longitudinal de 5/8" 4.00 4.95 16.00 1.56 494.21

PL-5
fierros transversal de 3/8" 4.00 3.80 4.00 0.56 34.05 806.98
fierros transversal de 3/8" 4.00 3.05 24.00 0.56 163.97
estribos fierros de 3/8" 4.00 0.35 140.00 0.56 109.76

Página 6 de 12
SUSTENTO DE METRADOS DE OBRAS EXTERIORES
CERCO PERIMETRICOS INCLUYE PORTADA DE INGRESO.

I.E. CLORINDA MATO DE TURNER FECHA : MAYO 2011.


UBICACUSCO - CUSCO

MEDIDAS
PARTIDA DESCRIPCION UND CANT. PARCIAL SUB TOTAL TOTAL
LARGO ANCHO ALTO
fierros longitudinal de 5/8" 4.00 5.00 16.00 1.56 499.20

VIGAS
VIGAS: CONCRETO f'c= 175 kg/cm2 m3 8.24
CERCO TRAMO S-R 1.00 59.20 0.15 0.20 1.78 8.24
CERCO TRAMO R-Q 1.00 35.61 0.15 0.20 1.07
CERCO TRAMO Y-X 1.00 37.07 0.15 0.20 1.11
CERCO TRAMO X-W 1.00 55.62 0.15 0.20 1.67
CERCO TRAMO W-V 1.00 27.85 0.15 0.20 0.84
CERCO TRAMO V-U 1.00 9.25 0.15 0.20 0.28
CERCO TRAMO U-T 1.00 9.25 0.15 0.20 0.28
CERCO TRAMO T-S 1.00 40.26 0.15 0.20 1.21
274.11
VIGAS: ENCOFRADO Y DESENCOFRADO m2 109.64
CERCO TRAMO S-R 2.00 59.20 1.00 0.20 23.68 109.64
CERCO TRAMO R-Q 2.00 35.61 1.00 0.20 14.24
CERCO TRAMO Y-X 2.00 37.07 1.00 0.20 14.83
CERCO TRAMO X-W 2.00 55.62 1.00 0.20 22.25
CERCO TRAMO W-V 2.00 27.85 1.00 0.20 11.14
CERCO TRAMO V-U 2.00 9.25 1.00 0.20 3.70
CERCO TRAMO U-T 2.00 9.25 1.00 0.20 3.70
CERCO TRAMO T-S 2.00 40.26 1.00 0.20 16.10
274.11

VIGAS: ACERO Fy=4,200 kg/cm2 kg Cant. long var/zap coeficien 838.32


fierros longitudinales de 3/8" 1.00 285.12 4.00 0.56 638.67 838.32
fierros transversal de 1/4" 1.00 0.70 1,097.00 0.26 199.65

VIGAS
VIGAS: CONCRETO f'c= 210 kg/cm2 m3 2.52
PORTICO PRINCIPAL
VP-01 2.00 1.00 0.40 0.30 0.24 1.20
VP-02 2.00 1.00 0.60 0.30 0.36
VP-03 1.00 4.00 0.50 0.30 0.60

PORTICO SECUNDARIO
VP-02 4.00 1.00 0.60 0.30 0.72 1.32
VP-03 4.00 1.00 0.50 0.30 0.60

VIGAS: ENCOFRADO Y DESENCOFRADO m2 16.60


PORTICO PRINCIPAL LONG. BASE ALTURA
VP-01 2.00 1.00 0.40 0.30 2.00 9.60
VP-02 2.00 1.00 0.60 0.30 2.40
VP-03 1.00 4.00 0.30 0.50 5.20

PORTICO SECUNDARIO
VP-02 4.00 1.00 0.60 0.30 4.80 7.00
VP-03 2.00 1.00 0.50 0.30 2.20

VIGAS: ACERO Fy=4,200 kg/cm2 kg Cant. long var/zap coeficien 362.67


PORTICO PRINCIPAL
VP-01 fierros longitudinales de 1/2" 2.00 1.90 6.00 1.02 23.26
estribos de 3/8" 2.00 1.55 8.00 0.56 13.89 37.15

VP-02 fierros longitudinales de 1/2" 2.00 1.90 8.00 1.02 31.01


estribos de 3/8" 2.00 1.55 10.00 0.56 17.36 48.37

VP-03 fierros longitudinales de 5/8" 1.00 5.10 8.00 1.02 41.62


estribos de 3/8" 1.00 1.55 32.00 0.56 27.78 69.40

PORTICO SECUNDARIO
VP-02 fierros longitudinales de 1/2" 4.00 1.90 8.00 1.02 62.02
estribos de 3/8" 4.00 1.55 10.00 0.56 34.72 96.74

VP-03 fierros longitudinales de 5/8" 2.00 5.10 8.00 1.02 83.23


estribos de 3/8" 1.00 1.55 32.00 0.56 27.78 111.01

Página 7 de 12
SUSTENTO DE METRADOS DE OBRAS EXTERIORES
CERCO PERIMETRICOS INCLUYE PORTADA DE INGRESO.

I.E. CLORINDA MATO DE TURNER FECHA : MAYO 2011.


UBICACUSCO - CUSCO

MEDIDAS
PARTIDA DESCRIPCION UND CANT. PARCIAL SUB TOTAL TOTAL
LARGO ANCHO ALTO

MUROS Y TABIQUES DE ALBAÑILERIA


MURO DE LADRILLO KING-KONG, TIPO IV, CABEZA M:1:1.4 e=1.5 cm m2 622.50
CERCO TRAMO S-R 1.00 52.70 1.00 2.55 134.39 622.50
CERCO TRAMO R-Q 1.00 31.61 1.00 2.55 80.61
CERCO TRAMO Y-X 1.00 33.07 1.00 2.55 84.33
CERCO TRAMO X-W 1.00 49.62 1.00 2.55 126.53
CERCO TRAMO W-V 1.00 24.85 1.00 2.55 63.37
CERCO TRAMO V-U 1.00 8.25 1.00 2.55 21.04
CERCO TRAMO U-T 1.00 8.25 1.00 2.55 21.04
CERCO TRAMO T-S 1.00 35.76 1.00 2.55 91.19
244.11
ACERO DE REFUERZO HORIZONTAL ENTRE MUROS: fy=4,200 kg/cm2 kg por columna 243.95
Cantidad de columnas 119.00 2.05 243.95 243.95

ARQUITECTURA
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO EN MURO INTERIOR Y EXTERIOR m2 1,244.98
CERCO TRAMO S-R 2.00 52.70 1.00 2.55 268.77 1,244.98
CERCO TRAMO R-Q 2.00 31.61 1.00 2.55 161.21
CERCO TRAMO Y-X 2.00 33.07 1.00 2.55 168.66
CERCO TRAMO X-W 2.00 49.62 1.00 2.55 253.06
CERCO TRAMO W-V 2.00 24.85 1.00 2.55 126.74
CERCO TRAMO V-U 2.00 8.25 1.00 2.55 42.08
CERCO TRAMO U-T 2.00 8.25 1.00 2.55 42.08
CERCO TRAMO T-S 2.00 35.76 1.00 2.55 182.38
244.11

TARRAJEO DE COLUMNAS Y PLACAS m2 257.18

C-A 1 59.00 1.00 0.75 2.65 117.26 257.18

C-A 2 60.00 1.00 0.88 2.65 139.92

TARRAJEO DE VIGAS m2 109.64


CERCO TRAMO S-R 2.00 59.20 1.00 0.20 23.68 109.64
CERCO TRAMO R-Q 2.00 35.61 1.00 0.20 14.24
CERCO TRAMO Y-X 2.00 37.07 1.00 0.20 14.83
CERCO TRAMO X-W 2.00 55.62 1.00 0.20 22.25
CERCO TRAMO W-V 2.00 27.85 1.00 0.20 11.14
CERCO TRAMO V-U 2.00 9.25 1.00 0.20 3.70
CERCO TRAMO U-T 2.00 9.25 1.00 0.20 3.70
CERCO TRAMO T-S 2.00 40.26 1.00 0.20 16.10
274.11

SOLAQUEO EN MUROS DE CONCRETO (1:5) m2 477.00


MURO DE CONTENCION INC. CERCO TRAMO S-R (CC-03) 1.00 59.20 1.00 2.00 118.40 477.00

SOBRECIMIENTO ARMADO Y-X (CC-03) 1.00 37.07 1.00 2.00 74.14


MURO DE CONTENCION INC. CERCO TRAMO X-W (CC-03) 1.00 55.62 1.00 2.00 111.24
CERCO TRAMO W-V (CC-03) 1.00 27.85 1.00 2.00 55.70
SOBRECIMIENTO ARMADO CERCO TRAMO V-U (CC-03) 1.00 9.25 1.00 2.00 18.50
MURO DE CONTENCION INC. CERCO TRAMO U-T (CC-03) 1.00 9.25 1.00 2.00 18.50
MURO DE CONTENCION EXP. CERCO LADRILLO INC. CERCO TRAMO T-S (CC-03) 1.00 40.26 1.00 2.00 80.52

CONTRAZOCALOS
CONTRAZOCALO CEMENTO S/COLOREAR H = 30 cm PULIDO e=1.5 cm ml 94.81

Página 8 de 12
SUSTENTO DE METRADOS DE OBRAS EXTERIORES
CERCO PERIMETRICOS INCLUYE PORTADA DE INGRESO.

I.E. CLORINDA MATO DE TURNER FECHA : MAYO 2011.


UBICACUSCO - CUSCO

MEDIDAS
PARTIDA DESCRIPCION UND CANT. PARCIAL SUB TOTAL TOTAL
LARGO ANCHO ALTO

CERCO TRAMO R-Q (CC-01) 1.00 94.81 1.00 1.00 94.81 94.81

CONTRAZOCALO CEMENTO S/COLOREAR H=50 cm PULIDO e=1.5 cm ml 94.81

CERCO TRAMO R-Q (CC-01) 1.00 94.81 1.00 1.00 94.81 94.81

CUBIERTAS
COBERTURA CON TEJA DE ARCILLAS EN CERCO DE LADRILLO ml 244.11
CERCO TRAMO S-R 1.00 52.70 1.00 1.00 52.70 244.11
CERCO TRAMO R-Q 1.00 31.61 1.00 1.00 31.61
CERCO TRAMO Y-X 1.00 33.07 1.00 1.00 33.07
CERCO TRAMO X-W 1.00 49.62 1.00 1.00 49.62
CERCO TRAMO W-V 1.00 24.85 1.00 1.00 24.85
CERCO TRAMO V-U 1.00 8.25 1.00 1.00 8.25
CERCO TRAMO U-T 1.00 8.25 1.00 1.00 8.25
CERCO TRAMO T-S 1.00 35.76 1.00 1.00 35.76
244.11

CARPINTERIA METALICA
PUERTA DE INGRESO PRINCIPAL C/PERFILES 3/16" m2 39.16
1.00 4.00 5.43 21.72 39.16
2.00 1.00 4.50 9.00
2.00 1.00 4.22 8.44

PUERTA DE INGRESO SECUNDARIAC/PERFILES 3/16" m2 28.96


1.00 4.00 5.13 20.52 28.96
2.00 1.00 4.22 8.44

PUERTA M-1 m2 20.26


2.00 2.40 4.22 20.26 20.26

CERRAJERIA
CERRADURA TIPO FORTE DOS GOLPES CON MANIJA 8.00 8.00 8.00
CANDADO TIPO FORTE DE 60 mm INCLUYENDO ALDABAS 8.00 8.00 8.00

PINTURA
PINTURA AL OLEO 2 MANOS EN MUROS Y COLUMNAS m2 1,611.80

VER METRADO 1,611.80


TARRAJEO EN MURO INTERIOR Y EXTERIOR 1,244.98
TARRAJEO DE COLUMNAS Y PLACAS 257.18
TARRAJEO DE VIGAS 109.64

PINTURA ANTICORROSIVA Y ESMALTE DOS MANOS EN CARPINTERIA M m2 88.38

VER METRADO
88.38 88.38

PINTURA ESMALTE DOS MANOS EN MUROS DE CONTENCION , VIGAS


CON SOBRECIMIENTO Y CONTRAZOCALOS m2 985.85
VER METRADO 985.85
SOLAQUEO EN MUROS DE CONCRETO (1:5) 477.00
SOBRECIMIENTO CON VIGA DE CIMENTACION: ACERO fy=4,200 kg/cm2 433.00
CONTRAZOCALO 0.30 94.81 28.44
0.50 94.81 47.41
VARIOS
JUNTAS DE DILATACION EN MUROS Y COLUMNAS ml 360.00
360.00
CANTIDAD DE JUNTAS 72.00 5.00 360.00

CERCO TIPO UNI ml 127.35

Página 9 de 12
SUSTENTO DE METRADOS DE OBRAS EXTERIORES
CERCO PERIMETRICOS INCLUYE PORTADA DE INGRESO.

I.E. CLORINDA MATO DE TURNER FECHA : MAYO 2011.


UBICACUSCO - CUSCO

MEDIDAS
PARTIDA DESCRIPCION UND CANT. PARCIAL SUB TOTAL TOTAL
LARGO ANCHO ALTO
127.35
CERCO TIPO UNI TRAMO M-L-K-J 1.00 45.45 1.00 45.45
CERCO TIPO UNI TRAMO I-H-G-F 1.00 32.50 1.00 32.50
CERCO TIPO UNI TRAMO E-D-CH 1.00 49.40 1.00 49.40

Página 10 de 12
RESUMEN DE OBRAS EXTERIORES
CERCO PERIMETRICOS INCLUYE PORTADA DE INGRESO.

I.E. CLORINDA MATO DE TURNER FECHA : MAYO. 2011.


UBICAC. CUSCO - CUSCO

ITEM DESCRIPCION UND TOTAL

ESTRUCTURAS
TRABAJOS PRELIMINARES
TRAZO NIVELES Y REPLANTEO m2 466.86

MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA PARA CIMIENTO m3 613.42
RELLENO MATERIAL PROPIO m3 219.89
ACARREO DE MATERIAL EXCEDENTE PARA POSTERIOR ELIMINACION m3 797.45
ELIMINACION DE MATERIAL EXCEDENTE m3 797.45

CONCRETO SIMPLE
SOLADO P/ZAPATAS Y VIGAS DE CIMENTACION DE 2" MEZCLA 1:12 m2 464.94
SUBCIMIENTO, SUBZAPATAS: MEZCLA 1:12 + 30% P.G. m3 32.59
CIMIENTOS CORRIDOS: CONCRETO C:H 1:10 + 30% P.G. m3 197.79
SOBRECIMIENTO: CONCRETO C:H 1:8 + 25% P.M. m3 9.29
SOBRECIMIENTO: ENCOFRADO Y DESENCOFRADO m2 132.73

OBRAS DE CONCRETO ARMADO


ZAPATAS
ZAPATAS: CONCRETO f`c=210 kg/cm2 m3 28.50
ZAPATAS: ENCOFRADO Y DESENCOFRADO m2 65.88
ZAPATAS: ACERO Fy=4,200 kg/cm2 kg 282.95

SOBRECIMIENTO CON VIGAS DE CIMENTACION f'c= 175 kg/cm2


SOBRECIMIENTO CON VIGAS DE CIMENTACION: CONCRETO f'c= 175 kg m3 64.95
SOBRECIMIENTO CON VIGA DE CIMENTACION: ENCOFRADO Y DESE m2 433.00
SOBRECIMIENTO CON VIGA DE CIMENTACION: ACERO fy=4,200 kg/cm2 kg 769.74

MUROS DE CONTENCION f'c= 175 kg/cm2


MUROS DE CONTENCION: CONCRETO f'c= 175 kg/cm2 m3 66.78
MUROS DE CONTENCION: ENCOFRADO Y DESENCOFRADO m2 954.00
MUROS DE CONTENCION: ACERO Fy=4,200 kg/cm2 kg 3,650.60

COLUMNAS
COLUMNAS: CONCRETO f`c=175 kg/cm2 m3 19.71
COLUMNAS: ENCOFRADO Y DESENCOFRADO m2 257.18
COLUMNAS: ACERO Fy=4,200 kg/cm2 kg 1,783.10

Página 11 de 12
RESUMEN DE OBRAS EXTERIORES
CERCO PERIMETRICOS INCLUYE PORTADA DE INGRESO.

I.E. CLORINDA MATO DE TURNER FECHA : MAYO. 2011.


UBICAC. CUSCO - CUSCO

ITEM DESCRIPCION UND TOTAL

PLACAS
PLACAS: CONCRETO f`c=210 kg/cm2 m3 29.69
PLACAS: ENCOFRADO Y DESENCOFRADO m2 208.11
PLACAS: ACERO Fy=4,200 kg/cm2 kg 2,860.60

VIGAS
VIGAS: CONCRETO f'c= 175 kg/cm2 m3 8.24
VIGAS: ENCOFRADO Y DESENCOFRADO m2 109.64
VIGAS: ACERO Fy=4,200 kg/cm2 kg 838.32

VIGAS EN PORTICO DE INGRESO


VIGAS: CONCRETO f'c= 210 kg/cm2 m3 2.52
VIGAS: ENCOFRADO Y DESENCOFRADO m2 16.60
VIGAS: ACERO Fy=4,200 kg/cm2 kg 362.67

MUROS Y TABIQUES DE ALBAÑILERIA


MURO DE LADRILLO KING-KONG, TIPO IV, SOGA M:1:1:4 e=1.5 cm m2 622.50
ACERO DE REFUERZO HORIZONTAL ENTRE MUROS: fy=4,200 kg/cm2 kg 243.95

ARQUITECTURA
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO EN MURO INTERIOR Y EXTERIOR m2 1,244.98
TARRAJEO DE COLUMNAS Y PLACAS m2 257.18
TARRAJEO DE VIGAS m2 109.64
SOLAQUEO EN MUROS DE CONCRETO (1:5) m2 477.00

CONTRAZOCALOS
CONTRAZOCALO CEMENTO S/COLOREAR H = 30 CM PULIDO e=1.5 cm m 94.81
CONTRAZOCALO CEMENTO S/COLOREAR H = 50 CM PULIDO e=1.5 cm m 94.81

CUBIERTAS
COBERTURA CON TEJA DE ARCILLAS EN CERCO DE LADRILLO m 244.11

CARPINTERIA METALICA
PUERTA DE INGRESO PRINCIPAL C/PERFILES 3/16" m2 39.16
PUERTA DE INGRESO SECUNDARIA C/PERFILES 3/16" m2 28.96
PUERTA M-1 m2 20.26

CERRAJERIA
CERRADURA TIPO FORTE DOS GOLPES CON MANIJA pza 8.00
CANDADO TIPO FORTE DE 60 mm INCLUYENDO ALDABAS und 8.00