JINDAL POWER LIMITED

CHECKLISTS
Doc. No. TMD/CL/022
TITLE : CHECKLIST FOR PREVENTIVE MAINTENANCE OF EQUIPMENTS Issue No. /
01 / 01-09-2008
Date

TG & BOP MAINTENACE DEPARTMENT Rev No. /


00 / 01-09-2008
Date

UNIT : Equipment Name - Twin Screw Air Compressor with air receiver and dryer
WORK ORDER NO. : DATE :

PERMIT NO. : PTW ISSUE DATE : PTW CLOSING DATE :


Design Actual
Sl. No. Work Instructions Frequency Remarks
Value Value
Work to be done/carried out when the equipment is isolated
Take proper PTW and ensure all mechanical, electrical and C&I
1 Quarterly
isolations have been done.
Check the leakage in air discharge pipe if leakage found then tighten
2 Quarterly
the same.
3 Remove and clean the air suction filter element Quarterly

4 Service the auto drain valve Quarterly

Check the diaphragm of suction unloader & blow down valve, If


5 Quarterly
necessary replace it.
6 Clean and service the valves attached in the system. Quarterly
.
7 Clean oil cooler. Quarterly
Check the coupling in between compressor and motor if found damaged
8 Quarterly
then replaced and realignment the same.
9 House keeping / Clean the surrounding area Quarterly
Spill over oil / water / grease / cotton waste / etc in surrounding area
10 Quarterly
and floor to be cleaned and disposed
Return the PTW and trial run of the equipment. If any leakage persists
11 Quarterly
same is to be rectified.

Signature of Contractor Signature of JPL Engineer Signature of JPL Engineer in charge


Page No. : 01

Prepared By : Reviewed & Approved By :