Anda di halaman 1dari 7

GOVERNMENT OF ANDHRA PRADESH

ROADS & BUILDINGS DEPARTMENT

From To
Sri K.S. Raghava Rao, M.Tech., MIE, The District Revenue Officer,
Dy.Executive Engineer (R&B), Collectorate,
R & B East Sub-Division, Kakinada

..
Letter No. Road Safety/Block Spots/HC/2013-14 dated 12.07.2014

Sir,
Sub:-Works R&B dept- Improvements to Black Spots from Km 10/6 to 20/0 of
Kakinada- Rajanagaram (ADB road) road in East Godavari District. –
Proposal for Foundation stone laying ceremony/awareness meeting on
15.07.2014-Protocol for foundation stone- Approval –requested –reg..

Ref :-(1)C.R.Agreement No.18/APRDC/APRSP/NCB/RS/BS/2 dated


31.05.2014 of CE (R&B) /MD, APRDC, Hyderabad.

** ** **
It is to inform that the work “Improvements to Black Spots from Km 10/6 to
20/0 of Kakinada- Rajanagaram (ADB road) road in East Godavari District was
entrusted to M/s.KLR Constructions, Rajahmundry.

It is proposed to conduct foundation laying function/Awareness meeting on


15.07.2014 at Atchampeta Junction by Hon’ble Home Minister of AP, Sh.
Nimmakayala Chinarajappa.

In this regard, it is requested to approve the protocol for engraving the


foundation stone and communicate at an early date.

Yours faithfully,

Dy. Executive Engineer R&B


East Sub-Division, Kakinada.
Encl: Protocol for approval
GOVERNMENT OF ANDHRA PRADESH
ROADS & BUILDINGS DEPARTMENT

From To
Sri K.S. Raghava Rao, M.Tech., MIE, The District Revenue Officer,
Dy.Executive Engineer (R&B), Collectorate,
R & B East Sub-Division, Kakinada

..
Letter No. Road Safety/Block Spots/HC/2013-14 dated 12.07.2014

Sir,
Sub:-Works R&B dept- Improvements to Black Spots from Km 10/6 to 20/0 of
Kakinada- Rajanagaram (ADB road) road in East Godavari District. –
Proposal for Foundation stone laying ceremony/awareness meeting on
15.07.2014-Protocol for foundation stone- Approval –requested –reg..

Ref :-(1)C.R.Agreement No.18/APRDC/APRSP/NCB/RS/BS/2 dated


31.05.2014 of CE (R&B) /MD, APRDC, Hyderabad.

** ** **
It is to inform that the work “Improvements to Black Spots from Km 10/6 to
20/0 of Kakinada- Rajanagaram (ADB road) road in East Godavari District was
entrusted to M/s.KLR Constructions, Rajahmundry.

It is proposed to conduct foundation laying function/Awareness meeting on


15.07.2014 at Atchampeta Junction by Hon’ble Home Minister of AP, Sh.
Nimmakayala Chinarajappa.

In this regard, it is requested to approve the protocol for engraving the


foundation stone and communicate at an early date.

Encl: Protocol for approval

Yours faithfully,

Sd/-

Dy. Executive Engineer R&B


East Sub-Division, Kakinada.

Copy submitted to the Executive Engineer (R&B) Kakinada for favour of information and
necessary action.

Dy. Executive Engineer R&B


East Sub-Division, Kakinada.
GOVERNMENT OF ANDHRA PRADESH
ROADS & BUILDINGS DEPARTMENT
From To
Sri K.S. Raghava Rao, M.Tech., MIE, The Executive Engineer(R&B),
Dy.Executive Engineer (R&B), (R&B) Division,
R & B East Sub-Division, Kakinada
Kakinada

Letter No. Road Safety/Block Spots/Deviations/HC/2013-14 dated 11.08.2014


Sir,
Sub:-Works R&B dept- Improvements to Black Spots from Km 10/6 to 20/0 of
Kakinada- Rajanagaram (ADB road) road in East Godavari District. –
Estt. Rs. 519.00 Lakhs- Deviation proposals -Approval –requested –reg..

Ref :-Agreement No.18/APRDC/APRSP/NCB/RS/BS/2 dated 31.05.2014 of


CE (R&B) /MD, APRDC, Hyderabad.
** ** **
The Estimate for the work “Improvements to Black Spots from Km 10/6 to km
20/0 of Kakinada-Rajanagaram (ADB Road) Road in East Godavari Dt. Was
sanctioned for Rs. 519.00 Lakhs vide T.S. Memo. No. /CRN/MD,APRDC/2013-14,
dated 24.02.2014. The work was entrusted to “M/s KLR Constructions, Rajahmundry
vide reference cited above with agreement contract value of Rs. 5,62,91,309/-.with
stipulation to complete the work within 9months. The work was commenced and is in
progress.
The work mainly involves widening/improvements of junctions in 7 locations in
kms 10/6(light house), 11/10(IOC/Pamugunta),13/8(Kothuru Jn), 14/6 (Atchampeta
Junction), 15/6(Achampeta road Jn),Km 16/10 (Koppavaram Jn), 19/10 (Unduru Jn).

In the sanctioned estimate proposals are made for widening of culverts in Km


11/10 & 16/10 with 2.50 m length only. Whereas widening of pipe culverts found
required also in the junction in km 10/6,13/8,14/6, 15/6 with more barrel lengths up to
widened portions in bell mouths. No pipe culverts require widening/reconstruction in
Km 19/10 except widening of minor bridges/slab culverts as proposed in the
estimate.
While commencing the work, major deviations found necessary with regard to
Widening of existing Pipe culverts so as to facilitate junction improvements as per
standard drawings within the available ROW as per Annexure A. All these culverts
are to be essentially widened or reconstructed for taking up of junction improvements
/black spots. These actual culvert widening / reconstruction requirement identified on
clearing of site for taking up junction improvements.

On opening the existing pipe culverts for taking up of widening work, it has
been noticed that all the existing pipe culverts are encased with VCC M15 grade
concrete because of non availability of sufficient cushion over pipes. The same is to
be provided for the widening portion of the culverts. Accordingly provision is made in
the deviation proposals estimate. The length of body walls also proposed to be
reduced as per the existing body walls and site condition as some of the widened
pipe culvert body walls obstructing the traffic in bell mouth portions due to site
constraints.

In view of the above, actual requirement of widening/reconstruction of pipe


culverts along with details of existing pipe culverts to facilitate improvement of black
spots in Km 10/6,11/10,13/8,14/6,15/6&16/10 is prepared and enclosed as
Annexure-A for obtaining necessary approval.

The detailed cum abstract estimate for Widening /Reconstruction of pipe


Culverts as per actual requirement is prepared and submitted along with
comparative statement for an amount of Rs. 55,77,877/- considering the agreement
rates against the estimate provision of Rs.13,88,939/- & Agreement value of
Rs.16,97,985/- for favour of in principle approval from the competent authority.

The extra financial implication may be met from the overall savings in the
estimate / utilising powers of the competent authority.

Hence it is requested to obtain early approval from the competent authority so


as to proceed with the work as the work is world bank assisted time bound project
under Road Safety programme.

Yours faithfully,

Dy. Executive Engineer (R&B)


East Sub-Division, Kakinada.
Encl: 1. Annexure-A (Deviation statement)

2. Detailed-cum-abstract estimate for Rs. 55,77,877/- along with comparative


Statement
GOVERNMENT OF ANDHRA PRADESH
ROADS & BUILDINGS DEPARTMENT

From To
Sri M. Govind Mohan, B.Tech, The Deputy Executive Engineer(R&B),
Asst Executive Engineer (R&B), (R&B) Sub division,
R & B East Section, Kakinada
Kakinada

Letter No. Road Safety/Block Spots/Deviations/HC/2013-14 dated 11.08.2014


Sir,
Sub:-Works R&B dept- Improvements to Black Spots from Km 10/6 to 20/0 of
Kakinada- Rajanagaram (ADB road) road in East Godavari District. –
Estt. Rs. 519.00 Lakhs- Deviation proposals -Approval –requested –reg..

Ref :-Agreement No.18/APRDC/APRSP/NCB/RS/BS/2 dated 31.05.2014 of


CE (R&B) /MD, APRDC, Hyderabad.
** ** **
The Estimate for the work “Improvements to Black Spots from Km 10/6 to km
20/0 of Kakinada-Rajanagaram (ADB Road) Road in East Godavari Dt. Was
sanctioned for Rs. 519.00 Lakhs vide T.S. Memo. No. /CRN/MD,APRDC/2013-14,
dated 24.02.2014. The work was entrusted to “M/s KLR Constructions, Rajahmundry
vide reference cited above with agreement contract value of Rs. 5,62,91,309/-.with
stipulation to complete the work within 9months. The work was commenced and is in
progress.
The work mainly involves widening/improvements of junctions in 7 locations in
kms 10/6(light house), 11/10(IOC/Pamugunta),13/8(Kothuru Jn), 14/6 (Atchampeta
Junction), 15/6(Achampeta road Jn),Km 16/10 (Koppavaram Jn), 19/10 (Unduru Jn).

In the sanctioned estimate proposals are made for widening of culverts in Km


11/10 & 16/10 with 2.50 m length only. Whereas widening of pipe culverts found
required also in the junction in km 10/6,13/8,14/6, 15/6 with more barrel lengths up to
widened portions in bell mouths. No pipe culverts require widening/reconstruction in
Km 19/10 except widening of minor bridges/slab culverts as proposed in the
estimate.
While commencing the work, major deviations found necessary with regard to
Widening of existing Pipe culverts so as to facilitate junction improvements as per
standard drawings within the available ROW as per Annexure A. All these culverts
are to be essentially widened or reconstructed for taking up of junction improvements
/black spots. These actual culvert widening / reconstruction requirement identified on
clearing of site for taking up junction improvements.

On opening the existing pipe culverts for taking up of widening work, it has
been noticed that all the existing pipe culverts are encased with VCC M15 grade
concrete because of non availability of sufficient cushion over pipes. The same is to
be provided for the widening portion of the culverts. Accordingly provision is made in
the deviation proposals estimate. The length of body walls also proposed to be
reduced as per the existing body walls and site condition as some of the widened
pipe culvert body walls obstructing the traffic in bell mouth portions due to site
constraints.

In view of the above, actual requirement of widening/reconstruction of pipe


culverts along with details of existing pipe culverts to facilitate improvement of black
spots in Km 10/6,11/10,13/8,14/6,15/6&16/10 is prepared and enclosed as
Annexure-A for obtaining necessary approval.

The detailed cum abstract estimate for Widening /Reconstruction of pipe


Culverts as per actual requirement is prepared and submitted along with
comparative statement for an amount of Rs. 55,77,877/- considering the agreement
rates against the estimate provision of Rs.13,88,939/- & Agreement value of
Rs.16,97,985/- for favour of in principle approval from the competent authority.

The extra financial implication may be met from the overall savings in the
estimate / utilising powers of the competent authority.

Hence it is requested to obtain early approval from the competent authority so


as to proceed with the work as the work is world bank assisted time bound project
under Road Safety programme.

Yours faithfully,

Asst Executive Engineer (R&B)


East Section, Kakinada.
Encl: 1. Annexure-A (Deviation statement)

2. Detailed-cum-abstract estimate for Rs. 55,77,877/- along with comparative


Statement
SL. Location Name of junction Existing Distance Proposed Required
No. CD work from the widening of widening of
junction CD work CD work
centre
1 Km 10/6 Light House
centre

2 Km 11/10 Pamugunta
Centre (IOC)

3 Km 13/8 Kothuru Centre

4 Km 14/6 Achampeta
centre

5 Km 15/6 Atchampeta
Village road
centre

6 Km 16/10 Koppavaram
centre

7 Km 19/10 Unduru Centre

Anda mungkin juga menyukai