Anda di halaman 1dari 41

Harga Satuan Bahan, Upah dan Alat

DAFTAR HARGA SATUAN UPAH


LOKASI KEGIATAN : KAMPUNG WASUR - DISTRIK MERAUKE

KEGIATAN : HARGA SATUAN DINAS PEKERJAAN UMUM


PEKERJAAN : PERHITUNGAN HARGA SATUAN BAHAN, UPAH, PEKERJAAN DAN KEGIATAN
LOKASI : KAMPUNG WASUR - DISTRIK MERAUKE
KABUPATEN / PROPINSI : MERAUKE - PAPUA
TAHUN ANGGARAN : 2016
SUMBER DANA : ---

PERIODE : JANUARI - JUNI 2016

Harga Dasar Harga Satuan Harga Satuan


No. Uraian Tenaga Kode Tenaga on Site Project on Site Project
(per hari) (per hari) (per jam)
1 2 3 4 5 6

1 Mandor Bangunan / Lapangan L-1 160,000.00 184,000.00 26,286.00


2 Kepala Tukang (Batu, Pasir, Kayu, dsb) L-2 146,000.00 168,000.00 24,000.00
3 Tukang (Batu, Pasir, Kayu, dsb) L-3 131,000.00 151,000.00 21,572.00
4 Pekerja L-4 102,000.00 118,000.00 16,858.00
5 Mandor Alat Berat (F. Equipment) L-5 216,000.00 249,000.00 35,572.00
6 Operator Alat Berat L-6 146,000.00 168,000.00 24,000.00
7 Pembantu Operator L-7 102,000.00 118,000.00 16,858.00
8 Sopir / Driver L-8 131,000.00 151,000.00 21,572.00
9 Pembantu Sopir / Driver L-9 102,000.00 118,000.00 16,858.00
10 Mekanik L - 10 131,000.00 151,000.00 21,572.00
11 Pembantu Mekanik L - 11 102,000.00 118,000.00 16,858.00
12 Surveyor L - 12 146,000.00 168,000.00 24,000.00
13 Pembantu Surveyor L - 13 102,000.00 118,000.00 16,858.00

Jam kerja efektif per hari = 7.00 Jam


Jumlah hari per bulan = 25.00 Hari
Harga termasuk Overhead + profit = 15.00%

DAFTAR HARGA SATUAN ALAT

Harga Beli Biaya Alat


No. Uraian Alat Kode Alat Satuan on Site Project
(Rupiah) (Rupiah/Jam)
1 2 3 8 4 4

1 DUMP TRUCK 3-4 M3 E-1 391,000,000.00 Jam 313,354.00


2 EXCAVATOR 80-140 HP E-2 1,751,530,000.00 Jam 684,174.00
3 BULLDOZER 100-150 HP E-3 3,315,180,000.00 Jam 1,096,320.00
4 MOTOR GRADER >100 HP E-4 2,381,500,000.00 Jam 837,222.00
5 VIBRATOR ROLLER 5-8 T. E-5 1,240,000,000.00 Jam 503,436.00
6 PNEUMATIC T. ROLLER 8-15 T. E-6 1,423,300,000.00 Jam 594,753.00
7 TANDEM ROLER 6-8 T E-7 1,315,000,000.00 Jam 494,231.00
8 CONCRETE MIXER 0.3-0.6 M3 E-8 75,515,000.00 Jam 75,336.00
9 WATER PUMP 70-100 mm E-9 7,500,000.00 Jam 56,128.00
10 WATER TANKER 3000-4500 L. E - 10 350,000,000.00 Jam 311,414.00
11 CHAIN SAW (MESIN POTONG KAYU) E - 11 5,500,000.00 Jam 59,338.00
12 COMPRESSOR 4000-6500 L\M E - 12 50,000,000.00 Jam 184,449.00
13 ASPHALT SPRAYER E - 13 45,000,000.00 Jam 78,722.00
14 FARM TRACTOR (ROTARI) M 5000 E - 14 295,000,000.00 Jam 211,107.00
15 STAMPER E - 15 32,500,000.00 Jam 59,132.00
16 WHELL LOADER E - 16 1,696,580,000.00 Jam 709,338.00
17 ASPHALT FINIZHER E - 17 1,977,960,000.00 Jam 873,837.00
18 GENERATOR ZET E - 18 35,000,000.00 Jam 132,150.00
19 ASPHAL MIXING PLANT (AMP) E - 19 3,220,525,000.00 Jam 7,218,161.00
20 MINI EXCAVATOR - COBELCO E - 20 554,400,000.00 Jam 374,062.00

Catatan :
- Harga satuan belum termasuk pajak PPN dan PPH
- Harga satuan sudah termasuk Over Head + Profit
- Harga - harga hanya sebagai pedoman / pendukung, dalam perhitungan konstruksi ( tidak mengikat ).
- Undang -undang no. 13 tahun 2003 tentang Ketenagakerjaan (Bab X Pasal 77)
Jika dalam 1 hari bekerja selama 8 jam (5 hari kerja/ senin s/d jumat) maka dalam 1 bulan bekerja selama 21 hari
Jika dalam 1 hari bekerja selama 7 jam (6 hari kerja/ senin s/d sabtu) maka dalam 1 bulan bekerja selama 25 hari
Harga Satuan Bahan, Upah dan Alat

Keterangan

HPS PU. 2016


HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016

Keterangan

HPS PU. 2016


HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
HPS PU. 2016
Harga Satuan Bahan, Upah dan Alat

DAFTAR HARGA SATUAN BAHAN


LOKASI PEKERJAAN : KAMPUNG WASUR - DISTRIK MERAUKE

KEGIATAN : HARGA SATUAN DINAS PEKERJAAN UMUM


PEKERJAAN : PERHITUNGAN HARGA SATUAN BAHAN, UPAH, PEKERJAAN DAN KEGIATAN
LOKASI : KAMPUNG WASUR - DISTRIK MERAUKE
KABUPATEN / PROPINSI : MERAUKE - PAPUA
TAHUN ANGGARAN : 2016
SUMBER DANA : ---

PERIODE : JANUARI - JUNI 2016 LOKASI : KAMPUNG WASUR - D


Kode Harga Tingkat Sumber Jarak Angkut Ongkos Harga Dasar + Overhead
No. Nama Bahan/Barang Barang Satuan Dasar Inflasi Bahan Darat Tracktor Angkut Inflasi + +
( Rp. ) ( %. ) (Km) (Km) (Rp) Ongkos angkut Profit
1 2 3 4 5 6 7 8 9 10 11 12

A. BAHAN BAKAR DAN PENCAMPUR


1 Bensin Industri MA.1 Liter 8,952.00 0.00% Merauke 8.00 - 317.00 9,269.00 1,390.00
2 Solar Industri MA.2 Liter 8,481.00 0.00% Merauke 8.00 - 317.00 8,798.00 1,319.00
3 Minyak Tanah Industri MA.3 Liter 9,210.00 0.00% Merauke 8.00 - 317.00 9,527.00 1,429.00
4 Minyak Pelumas / Olie MA.4 Liter 30,000.00 0.00% Merauke 8.00 - 317.00 30,317.00 4,547.00
5 Minyak Bekisting / Oli Bekas MA.5 Buah 500.00 0.00% Merauke 8.00 - 317.00 817.00 122.00
6 Polimer MA.6 Liter 17,500.00 0.00% Merauke 8.00 - 458.00 17,958.00 2,693.00
7 Aspal MA.7 Kg 16,566.00 0.00% Merauke 8.00 - 339.00 16,905.00 2,535.00
8 Residu / Teer MA.8 Liter 16,566.00 0.00% Merauke 8.00 - 678.00 17,244.00 2,586.00

B. BAHAN PASIR, BATU DAN SEMEN


1 Pasir semen (Import) MB.1 M3 1,188,000.00 0.00% Merauke 8.00 - 56,381.00 1,244,381.00 186,657.00
2 Pasir semen (Pasang-lokal) MB.2 M3 600,000.00 0.00% Urumb 34.00 - 211,760.00 811,760.00 121,764.00
3 Pasir semen ayakan/ halus (lokal) MB.3 M3 685,000.00 0.00% Urumb 34.00 - 211,760.00 896,760.00 134,514.00
4 Tanah timbun biasa/urug MB.4 M3 200,000.00 0.00% Quarry 10.00 - 78,450.00 278,450.00 41,767.00
5 Tanah pilihan (Selmat) MB.5 M3 250,000.00 0.00% Quarry 10.00 - 78,450.00 328,450.00 49,267.00
6 Batu kerikil/ koral beton (Import) MB.6 M3 1,188,000.00 0.00% Merauke 8.00 - 83,610.00 1,271,610.00 190,741.00
7 Batu kali/Gunung - Import MB.7 M3 1,188,000.00 0.00% Merauke 8.00 - 83,610.00 1,271,610.00 190,741.00
8 Batu bata merah MB.8 Buah 1,200.00 0.00% Wasur 3.00 - 80.00 1,280.00 192.00
9 Batu cetak 10 x 20 x 30 Cm MB.9 Buah 1,500.00 0.00% Wasur 3.00 - 170.00 1,670.00 250.00
10 Paving blok (tidak Warna) MB.10 Buah 6,000.00 0.00% Merauke 8.00 - 230.00 6,230.00 934.00
11 Semen Portland (PC) @ 50 Kg MB.11 Zak 101,250.00 0.00% Merauke 8.00 - 7,910.00 109,160.00 16,374.00
12 Semen PC Putih / Warna MB.12 Zak 118,000.00 0.00% Merauke 8.00 - 7,910.00 125,910.00 18,886.00
13 Tepung Gypsum MB.13 Zak 88,000.00 0.00% Merauke 8.00 - 4,500.00 92,500.00 13,875.00

C. BAHAN KAYU, TRIPLEKS DLL


1 Balok Kayu Kelas III (Kayu Bus) MC.1 M3 2,750,000.00 0.00% Merauke 12.00 - 143,730.00 2,893,730.00 434,059.00
2 Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 3,583,333.00 0.00% Merauke 12.00 - 165,840.00 3,749,173.00 562,375.00
3 Balok Kayu Kelas I (Kayu Besi) MC.3 M3 6,500,000.00 0.00% Merauke 12.00 - 187,960.00 6,687,960.00 1,003,194.00
4 Balok Kayu Kelas IV (Kayu Putih, Susu, dll) MC.4 M3 2,250,000.00 0.00% Merauke 12.00 - 110,560.00 2,360,560.00 354,084.00
5 Papan Kayu Kelas III (Kayu Bus) t = 2-5 cm MC.5 M3 2,750,000.00 0.00% Merauke 12.00 - 143,730.00 2,893,730.00 434,059.00
6 Papan Kayu Kelas II (Kayu Rahay) t = 2 cm MC.6 M3 3,333,333.00 0.00% Merauke 12.00 - 165,840.00 3,499,173.00 524,875.00
7 Papan Kayu Kelas II (Kayu Rahay) t = 3 cm MC.7 M3 3,666,666.00 0.00% Merauke 12.00 - 165,840.00 3,832,506.00 574,875.00
8 Papan Kayu Kelas I (Kayu Besi) t = 2 - 3 cm MC.8 M3 7,000,000.00 0.00% Merauke 12.00 - 187,960.00 7,187,960.00 1,078,194.00
9 Papan Kayu Kelas IV (tebal = 2-5 cm) MC.9 M3 1,850,000.00 0.00% Merauke 12.00 - 110,560.00 1,960,560.00 294,084.00
10 Kayu Lat/Reng/List, Kayu Kelas II MC.10 Batang 20,000.00 0.00% Merauke 12.00 - 340.00 20,340.00 3,051.00
11 Tripleks (1,22 x 2,44) cm - tebal 3 mm MC.11 Lembar 62,142.00 0.00% Merauke 8.00 - 1,240.00 63,382.00 9,507.00
12 Tripleks (1,22 x 2,44) cm - tebal 4 mm MC.12 Lembar 79,700.00 0.00% Merauke 8.00 - 1,660.00 81,360.00 12,204.00
13 Tripleks (1,22 x 2,44) cm - tebal 6 mm MC.13 Lembar 103,583.00 0.00% Merauke 8.00 - 2,490.00 106,073.00 15,910.00
14 Tripleks (1,22 x 2,44) cm - tebal 9 mm MC.14 Lembar 166,833.00 0.00% Merauke 8.00 - 3,740.00 170,573.00 25,585.00
15 Tripleks (1,22 x 2,44) cm - tebal 12 mm MC.15 Lembar 214,166.00 0.00% Merauke 8.00 - 4,980.00 219,146.00 32,871.00
16 Tripleks (1,22 x 2,44) cm - tebal 15 mm MC.16 Lembar 258,750.00 0.00% Merauke 8.00 - 6,230.00 264,980.00 39,747.00
17 Tripleks (1,22 x 2,44) cm - tebal 18 mm MC.17 Lembar 291,000.00 0.00% Merauke 8.00 - 7,890.00 298,890.00 44,833.00
18 Tripleks (1,22 x 2,44) cm - tebal 22 mm MC.18 Lembar 300,000.00 0.00% Merauke 8.00 - 9,140.00 309,140.00 46,371.00
19 Teak - Wood (1.22 x 2.44 Cm) - 3 mm MC.19 Lembar 136,400.00 0.00% Merauke 8.00 - 1,240.00 137,640.00 20,646.00
20 Teak - Wood (0.92 x 2.44 Cm) - 4 mm MC.20 Lembar 104,000.00 0.00% Merauke 8.00 - 1,660.00 105,660.00 15,849.00
21 Plywood - Multiplex MC.21 Lembar 286,250.00 0.00% Merauke 8.00 - 3,060.00 289,310.00 43,396.00
22 Melamin MC.22 Lembar 110,416.00 0.00% Merauke 8.00 - 3,060.00 113,476.00 17,021.00
23 Formika Polos (122 x 244) Cm MC.23 Lembar 300,000.00 0.00% Merauke 8.00 - 2,490.00 302,490.00 45,373.00
24 Pelat Asbes Tebal 6 mm MC.24 Lembar 70,000.00 0.00% Merauke 8.00 - 2,590.00 72,590.00 10,888.00
25 Pelat Asbes Tebal 5 mm MC.25 Lembar 65,000.00 0.00% Merauke 8.00 - 2,160.00 67,160.00 10,074.00
26 Pelat Asbes Tebal 4 mm MC.26 Lembar 60,000.00 0.00% Merauke 8.00 - 2,160.00 62,160.00 9,324.00
27 Gypsum Board tebal 9 mm MC.27 Lembar 94,333.00 0.00% Merauke 8.00 - 2,290.00 96,623.00 14,493.00
28 List profil Gypsum Lebar Sampai 5 cm MC.28 M' 35,000.00 0.00% Merauke 8.00 - 255.00 35,255.00 5,288.00
29 Hard Board MC.29 Lembar 80,000.00 0.00% Merauke 8.00 - 2,290.00 82,290.00 12,343.00
30 Tiang Kayu Bulat (Dia 20 cm, L=4-6 m) MC.30 Batang 100,000.00 0.00% Sumber 10.00 5.00 19,250.00 119,250.00 17,887.00
31 Tiang Kayu Bulat (Dia 25-30 cm, L=4-6 m) MC.31 Batang 125,000.00 0.00% Sumber 10.00 5.00 72,810.00 197,810.00 29,671.00
32 Kayu dolken Ø 8-10, L=4 M Kayu Bus MC.32 Batang 12,500.00 0.00% Sumber 10.00 5.00 3,620.00 16,120.00 2,418.00
33 Patok kayu bulat (Dia = 3 cm, L= 1 m) MC.33 Batang 3,000.00 0.00% Sumber 3.00 3.00 - 3,000.00 -
34 Patok kayu bulat (Dia = 5 cm, L= 5 m) MC.34 Batang 5,000.00 0.00% Sumber 3.00 3.00 - 5,000.00 -
35 Kayu Bakar (Bus Campuran) MC.35 M3 500,000.00 0.00% Sumber 10.00 5.00 - 500,000.00 -

D. BAHAN BESI, PAKU DAN KAWAT


1 Besi Beton Dia.6 mm (SNI) MD.1 Kg 12,512.00 0.00% Merauke 8.00 - 210.00 12,722.00 1,908.00
2 Besi Beton Dia.8 mm (SNI) MD.2 Kg 10,852.00 0.00% Merauke 8.00 - 240.00 11,092.00 1,663.00
3 Besi Beton Dia.10 mm (SNI) MD.3 Kg 10,783.00 0.00% Merauke 8.00 - 250.00 11,033.00 1,654.00
4 Besi Beton Dia.12 mm (SNI) MD.4 Kg 10,696.00 0.00% Merauke 8.00 - 340.00 11,036.00 1,655.00
5 Besi Beton Dia.14 mm (SNI) MD.5 Kg 11,019.00 0.00% Merauke 8.00 - 300.00 11,319.00 1,697.00
6 Besi Beton Dia.16 mm (SNI) MD.6 Kg 11,155.00 0.00% Merauke 8.00 - 430.00 11,585.00 1,737.00
7 Besi Beton Dia.19 mm (SNI) MD.7 Kg 11,584.00 0.00% Merauke 8.00 - 360.00 11,944.00 1,791.00
8 Besi Beton Dia.22 mm (SNI) MD.8 Kg 11,884.00 0.00% Merauke 8.00 - 320.00 12,204.00 1,830.00
9 Kawat Beton MD.9 Kg 18,583.00 0.00% Merauke 8.00 - 250.00 18,833.00 2,824.00
10 Kawat beton / bindrat 4 mm MD.10 KG 18,500.00 0.00% Merauke 8.00 - 250.00 18,750.00 2,812.00
11 Paku 1" MD.11 Kg 18,000.00 0.00% Merauke 8.00 - 250.00 18,250.00 2,737.00
12 Paku 2" MD.12 Kg 14,071.00 0.00% Merauke 8.00 - 250.00 14,321.00 2,148.00
13 Paku 3" MD.13 Kg 14,357.00 0.00% Merauke 8.00 - 250.00 14,607.00 2,191.00
14 Paku 4" MD.14 Kg 14,357.00 0.00% Merauke 8.00 - 250.00 14,607.00 2,191.00
15 Paku 5" MD.15 Kg 14,357.00 0.00% Merauke 8.00 - 250.00 14,607.00 2,191.00
16 Paku Campur MD.16 Kg 14,400.00 0.00% Merauke 8.00 - 250.00 14,650.00 2,197.00
17 Paku Seng MD.17 Kg 20,928.00 0.00% Merauke 8.00 - 280.00 21,208.00 3,181.00
18 Paku Ardex Ulir MD.18 Kg 32,500.00 0.00% Merauke 8.00 - 250.00 32,750.00 4,912.00
19 Paku Sirap MD.19 Buah 15,000.00 0.00% Merauke 8.00 - 250.00 15,250.00 2,287.00
20 Paku Ondoline MD.20 Kg 20,000.00 0.00% Merauke 8.00 - 250.00 20,250.00 3,037.00
21 Paku Tembok / Kecil 2/3 MD.21 Buah 500.00 0.00% Merauke 8.00 - 250.00 750.00 112.00
Harga Satuan Bahan, Upah dan Alat

PERIODE : JANUARI - JUNI 2016 LOKASI : KAMPUNG WASUR - D


Kode Harga Tingkat Sumber Jarak Angkut Ongkos Harga Dasar + Overhead
No. Nama Bahan/Barang Barang Satuan Dasar Inflasi Bahan Darat Tracktor Angkut Inflasi + +
( Rp. ) ( %. ) (Km) (Km) (Rp) Ongkos angkut Profit
1 2 3 4 5 6 7 8 9 10 11 12
22 Paku/Skrup 5 cm MD.22 KG 27,500.00 0.00% Merauke 8.00 - 250.00 27,750.00 4,162.00
23 Kawat Nyamuk (Plastik / Nylon) MD.23 M 21,800.00 0.00% Merauke 8.00 - 146.00 21,946.00 3,291.00
24 Kawat Has / Bankhas dia 12 mm MD.24 M2 35,000.00 0.00% Merauke 8.00 - 163.00 35,163.00 5,274.00
25 Kawat Harmonika Has 40x40 mm MD.25 M 41,000.00 0.00% Merauke 8.00 - 810.00 41,810.00 6,271.00
26 Kawat burung MN.26 M² 22,000.00 0.00% Merauke 8.00 - 810.00 22,810.00 3,421.00
27 Kawat Duri Baja 30 M MD.27 KG 15,280.00 0.00% Merauke 8.00 - 230.00 15,510.00 2,326.00
28 Kawat Las 0.26 MD.28 Dos 155,000.00 0.00% Merauke 8.00 - 250.00 155,250.00 23,287.00
29 Timah Solder MD.29 Kg 56,250.00 0.00% Merauke 8.00 - 80.00 56,330.00 8,449.00
30 Baut Jembatan Dia. 19 mm MD.30 Kg 15,000.00 0.00% Merauke 8.00 - 250.00 15,250.00 2,287.00
31 Baut Dia, 3/8" - 17.5 + Mur - Ring MD.31 Buah 4,500.00 0.00% Merauke 8.00 - 250.00 4,750.00 712.00
32 Baut Dia, 3/8" - 12.0/15.0 + Mur - Ring MD.32 Buah 3,333.00 0.00% Merauke 8.00 - 250.00 3,583.00 537.00
33 Baut Dia, 3/8" - 20.0 + Mur - Ring MD.33 Buah 4,262.00 0.00% Merauke 8.00 - 250.00 4,512.00 676.00
34 Baut Dia, 3/8" - 35.0 + Mur - Ring MD.34 Buah 6,000.00 0.00% Merauke 8.00 - 250.00 6,250.00 937.00
35 Besi angkur dia. 8 mm MN.35 Buah 10,000.00 0.00% Merauke 8.00 - 250.00 10,250.00 1,537.00
36 Kasa (Ram Ayam) Dia, 10 mm MD.36 M 21,375.00 0.00% Merauke 8.00 - 325.00 21,700.00 3,255.00
37 Besi Siku 30 . 30 . 3 - L = 6 Meter MD.37 Batang 74,833.00 0.00% Merauke 8.00 - 2,300.00 77,133.00 11,569.00
38 Besi Siku 50 . 50 . 5 - L = 6 Meter MD.38 Batang 159,375.00 0.00% Merauke 8.00 - 6,760.00 166,135.00 24,920.00
39 Besi Siku 50 . 50 . 6 - L = 6 Meter MD.39 Batang 189,000.00 0.00% Merauke 8.00 - 7,140.00 196,140.00 29,421.00
40 Besi Siku 40 . 40 . 4 - L = 6 Meter MD.40 Batang 128,750.00 0.00% Merauke 8.00 - 3,640.00 132,390.00 19,858.00
41 Besi Siku 40 . 40 . 5 - L = 6 Meter MD.41 Batang 95,000.00 0.00% Merauke 8.00 - 6,380.00 101,380.00 15,207.00
42 Besi Siku 20 . 20 . 3 - L = 6 Meter MD.42 Batang 67,500.00 0.00% Merauke 8.00 - 1,420.00 68,920.00 10,338.00
43 Besi Plat 1.0 mm - 120 x 240 Cm MD.43 Lembar 330,000.00 0.00% Merauke 8.00 - 6,680.00 336,680.00 50,502.00
44 Besi Plat 1.2 mm - 120 x 240 Cm MD.44 Lembar 376,250.00 0.00% Merauke 8.00 - 7,040.00 383,290.00 57,493.00
45 Besi Plat 2.0 mm - 120 x 240 Cm MD.45 Lembar 556,750.00 0.00% Merauke 8.00 - 10,890.00 567,640.00 85,146.00
46 Besi Plat 3.0 mm - 120 x 240 Cm MD.46 Lembar 874,500.00 0.00% Merauke 8.00 - 13,050.00 887,550.00 133,132.00
47 Besi Plat 12 mm -120 x 240 cm MD.47 Lembar 400,000.00 0.00% Merauke 8.00 - 43,560.00 443,560.00 66,534.00
48 Besi Strip 20.2 MD.48 Batang 30,166.00 0.00% Merauke 8.00 - 380.00 30,546.00 4,581.00
49 Besi Strip 30.3 MD.49 Batang 43,500.00 0.00% Merauke 8.00 - 890.00 44,390.00 6,658.00
50 Besi Strip 40.4 MD.50 Batang 50,166.00 0.00% Merauke 8.00 - 1,710.00 51,876.00 7,781.00
51 Besi Strip 50.5 MD.51 Batang 72,500.00 0.00% Merauke 8.00 - 2,380.00 74,880.00 11,232.00
52 Waltermur Dia 16 mm MD.52 Buah 13,500.00 0.00% Merauke 8.00 - 3,410.00 16,910.00 2,536.00
53 Gording lips chanel 150.65.20.2,3 ( 6 N ) MD.53 Batang 725,000.00 0.00% Merauke 8.00 - 3,410.00 728,410.00 109,261.00
54 Baja profil IWF MD.54 KG 21,000.00 0.00% Merauke 8.00 - 210.00 21,210.00 3,181.00
55 Besi gording canal MD.55 KG 21,500.00 0.00% Merauke 8.00 - 210.00 21,710.00 3,256.00
56 Water mur MD.56 KG 5,000.00 0.00% Merauke 8.00 - 210.00 5,210.00 781.00
57 Sealent MD.57 Tube 15,000.00 0.00% Merauke 8.00 - 210.00 15,210.00 2,281.00

E. BAHAN PENUTUP ATAP


1 Seng Gelombang BJLS 0,30 ME.1 Lembar 65,000.00 0.00% Merauke 8.00 - 650.00 65,650.00 9,847.00
2 Seng Gelombang BJLS 0,22 ME.2 Lembar 59,500.00 0.00% Merauke 8.00 - 590.00 60,090.00 9,013.00
3 Seng Gelombang BJLS 0,20 ME.3 Lembar 45,428.00 0.00% Merauke 8.00 - 520.00 45,948.00 6,892.00
4 Atap Seng Plastik Gelombang Kecil ME.4 Lembar 58,500.00 0.00% Merauke 8.00 - 280.00 58,780.00 8,817.00
5 Atap Seng Gelombang Besar Fiber Glass ME.5 Lembar 66,333.00 0.00% Merauke 8.00 - 1,190.00 67,523.00 10,128.00
6 Seng Plat BJLS 0.30 ME.6 Lembar 40,000.00 0.00% Merauke 8.00 - 650.00 40,650.00 6,097.00
7 Seng Plat BJLS 0.20 ME.7 Lembar 44,250.00 0.00% Merauke 8.00 - 520.00 44,770.00 6,715.00
8 Genteng Metal - Multiroof ME.8 Lembar 53,166.00 0.00% Merauke 8.00 - 1,180.00 54,346.00 8,151.00
9 Nok Genteng Metal - Multiroof ME.9 Bh 26,000.00 0.00% Merauke 8.00 - 1,180.00 27,180.00 4,077.00
10 Atap Allumunium Gelombang ME.10 M2 60,000.00 0.00% Merauke 8.00 - 1,180.00 61,180.00 9,177.00
11 Nok Atap Allumunium ME.11 M 60,000.00 0.00% Merauke 8.00 - 1,180.00 61,180.00 9,177.00
12 Karet Talang ME.12 M1 14,000.00 0.00% Merauke 8.00 - 250.00 14,250.00 2,137.00

F. BAHAN KERAMIK
1 Ubin Abu-Abu 20 x 20 Cm MF.1 Buah 2,606.00 0.00% Merauke 8.00 - 110.00 2,716.00 407.00
2 Ubin Abu-Abu 30 x 30 Cm MF.2 Buah 6,590.00 0.00% Merauke 8.00 - 190.00 6,780.00 1,017.00
3 Ubin Abu-Abu 40 x 40 Cm MF.3 Buah 14,208.00 0.00% Merauke 8.00 - 350.00 14,558.00 2,183.00
4 Ubin Warna 20 x 20 Cm MF.4 Buah 2,650.00 0.00% Merauke 8.00 - 110.00 2,760.00 414.00
5 Ubin Warna 30 x 30 Cm MF.5 Buah 5,848.00 0.00% Merauke 8.00 - 190.00 6,038.00 905.00
6 Ubin Warna 40 x 40 Cm MF.6 Buah 13,958.00 0.00% Merauke 8.00 - 350.00 14,308.00 2,146.00
7 Ubin Teraso Ukuran 30 x 30 cm MF.7 Buah 6,045.00 0.00% Merauke 8.00 - 190.00 6,235.00 935.00
8 Ubin Teraso Ukuran 40 x 40 cm MF.8 Buah 14,958.00 0.00% Merauke 8.00 - 350.00 15,308.00 2,296.00
9 Ubin Granito Ukuran 30 x 30 cm MF.9 Buah 5,909.00 0.00% Merauke 8.00 - 190.00 6,099.00 914.00
10 Ubin Granito Ukuran 40 x 40 cm MF.10 Buah 22,500.00 0.00% Merauke 8.00 - 350.00 22,850.00 3,427.00
11 Ubin Teralux Kerang Ukuran 30 x 30 cm MF.11 Buah 6,704.00 0.00% Merauke 8.00 - 190.00 6,894.00 1,034.00
12 Ubin Teralux Kerang Ukuran 40 x 40 cm MF.12 Buah 13,958.00 0.00% Merauke 8.00 - 350.00 14,308.00 2,146.00
13 Ubin Teralux Marmer Ukuran 30 x 30 cm MF.13 Buah 8,750.00 0.00% Merauke 8.00 - 190.00 8,940.00 1,341.00
14 Ubin Teralux Marmer Ukuran 40 x 40 cm MF.14 Buah 21,458.00 0.00% Merauke 8.00 - 350.00 21,808.00 3,271.00
15 Ubin Teralux Marmer Ukuran 60 x 60 cm MF.15 Buah 63,500.00 0.00% Merauke 8.00 - 1,350.00 64,850.00 9,727.00
16 Keramik Artistik 10x20; 15x15 cm MF.16 Buah 1,175.00 0.00% Merauke 8.00 - 90.00 1,265.00 189.00
17 Keramik Artistik 10x10 atau 5x20 cm MF.17 Buah 650.00 0.00% Merauke 8.00 - 80.00 730.00 109.00
18 Keramik Lantai 20 x 20 cm MF.18 Buah 2,686.00 0.00% Merauke 8.00 - 110.00 2,796.00 419.00
19 Keramik Lantai 20 x 30 cm MF.19 Buah 3,750.00 0.00% Merauke 8.00 - 150.00 3,900.00 585.00
20 Keramik Lantai 30 x 30 cm MF.20 Buah 5,962.00 0.00% Merauke 8.00 - 190.00 6,152.00 922.00
21 Keramik Lantai 30 x 30 berglasir MF.21 Buah 5,909.00 0.00% Merauke 8.00 - 190.00 6,099.00 914.00
22 Keramik Lantai 30 x 30 berglasir (Mozaik) MF.22 Buah 6,136.00 0.00% Merauke 8.00 - 190.00 6,326.00 948.00
23 Keramik Lantai 40 x 40 cm MF.23 Buah 12,847.00 0.00% Merauke 8.00 - 350.00 13,197.00 1,979.00
24 Keramik Lantai 50 x 50 cm MF.24 Buah 22,937.00 0.00% Merauke 8.00 - 690.00 23,627.00 3,544.00
25 Keramik Lantai 60 x 60 cm MF.25 Buah 65,555.00 0.00% Merauke 8.00 - 1,350.00 66,905.00 10,035.00
26 Keramik Dinding 10 x 20 cm MF.26 Buah 1,250.00 0.00% Merauke 8.00 - 90.00 1,340.00 201.00
27 Keramik Dinding 20x20 atau 20x25 cm MF.27 Buah 2,753.00 0.00% Merauke 8.00 - 110.00 2,863.00 429.00
28 Ubin Dinding Porselin 11 x 11 MF.28 Buah 670.00 0.00% Merauke 8.00 - 80.00 750.00 112.00
29 Ubin Dinding Porselin 10 x 20 cm MF.29 Buah 853.00 0.00% Merauke 8.00 - 90.00 943.00 141.00
30 Ubin Dinding Porselin 20 x 20 MF.30 Buah 2,650.00 0.00% Merauke 8.00 - 110.00 2,760.00 414.00
31 Plint Ubin Abu-Abu 15 x 20 cm MF.31 Buah 12,500.00 0.00% Merauke 8.00 - 140.00 12,640.00 1,896.00
32 Plint Ubin Abu-Abu 10 x 30 cm MF.32 Buah 10,000.00 0.00% Merauke 8.00 - 140.00 10,140.00 1,521.00
33 Plint Ubin Abu-Abu 10 x 40 cm MF.33 Buah 11,500.00 0.00% Merauke 8.00 - 140.00 11,640.00 1,746.00
34 Plint Ubin Warna 10 x 20 cm MF.34 Buah 5,000.00 0.00% Merauke 8.00 - 90.00 5,090.00 763.00
35 Plint Ubin Warna 10 x 30 cm MF.35 Buah 7,500.00 0.00% Merauke 8.00 - 140.00 7,640.00 1,146.00
36 Plint Ubin Warna 10 x 40 cm MF.36 Buah 7,500.00 0.00% Merauke 8.00 - 140.00 7,640.00 1,146.00
37 Plint Ubin Teraso 10 x 30 cm MF.37 Buah 7,500.00 0.00% Merauke 8.00 - 140.00 7,640.00 1,146.00
38 Plint Ubin Teraso 10 x 40 cm MF.38 Buah 12,500.00 0.00% Merauke 8.00 - 140.00 12,640.00 1,896.00
39 Plint Ubin Granito 10 x 40 cm MF.39 Buah 12,500.00 0.00% Merauke 8.00 - 140.00 12,640.00 1,896.00
40 Plint Ubin Granito 10 x 30 cm MF.40 Buah 7,500.00 0.00% Merauke 8.00 - 140.00 7,640.00 1,146.00
41 Plint Ubin Teralux Kerang 10 x 40 cm MF.41 Buah 7,500.00 0.00% Merauke 8.00 - 140.00 7,640.00 1,146.00
42 Plint Ubin Teralux Kerang 10 x 30 cm MF.42 Buah 7,500.00 0.00% Merauke 8.00 - 140.00 7,640.00 1,146.00
43 Plint Ubin Teralux Marmer 10 x 60 cm MF.43 Buah 15,000.00 0.00% Merauke 8.00 - 150.00 15,150.00 2,272.00
44 Plint Ubin Teralux Marmer 10 x 40 cm MF.44 Buah 10,000.00 0.00% Merauke 8.00 - 140.00 10,140.00 1,521.00
45 Plint Ubin Teralux Marmer 10 x 30 cm MF.45 Buah 7,500.00 0.00% Merauke 8.00 - 140.00 7,640.00 1,146.00
Harga Satuan Bahan, Upah dan Alat

PERIODE : JANUARI - JUNI 2016 LOKASI : KAMPUNG WASUR - D


Kode Harga Tingkat Sumber Jarak Angkut Ongkos Harga Dasar + Overhead
No. Nama Bahan/Barang Barang Satuan Dasar Inflasi Bahan Darat Tracktor Angkut Inflasi + +
( Rp. ) ( %. ) (Km) (Km) (Rp) Ongkos angkut Profit
1 2 3 4 5 6 7 8 9 10 11 12
46 Plint Keramik Artistik 10 x 20 cm MF.46 Buah 4,750.00 0.00% Merauke 8.00 - 90.00 4,840.00 726.00
47 Plint Keramik Artistik 10 x 10 cm MF.47 Buah 4,500.00 0.00% Merauke 8.00 - 80.00 4,580.00 687.00
48 Plint Keramik Artistik 5 x 20 cm MF.48 Buah 4,000.00 0.00% Merauke 8.00 - 80.00 4,080.00 612.00
49 Plint Keramik Artistik 10 x 30 cm MF.49 Buah 7,500.00 0.00% Merauke 8.00 - 140.00 7,640.00 1,146.00
50 Marmer Ukuran 100 x 100 cm MF.50 Buah 350,000.00 0.00% Merauke 8.00 - 7,590.00 357,590.00 53,638.00
51 Wall paper (Lebar 50 cm) MF.51 M2 155,000.00 0.00% Merauke 8.00 - 302.00 155,302.00 23,295.00
52 Batu Paras MF.52 Buah 15,000.00 0.00% Merauke 8.00 - 190.00 15,190.00 2,278.00
53 Batu Tempel Hitam MF.53 Buah 15,000.00 0.00% Merauke 8.00 - 190.00 15,190.00 2,278.00

G. BAHAN KACA
1 Kaca Polos 3 mm MG.1 M2 150,000.00 0.00% Merauke 8.00 - 1,680.00 151,680.00 22,752.00
2 Kaca Polos 5 mm MG.2 M2 173,000.00 0.00% Merauke 8.00 - 2,410.00 175,410.00 26,311.00
3 Kaca Buram 3 mm MG.3 M2 100,000.00 0.00% Merauke 8.00 - 1,680.00 101,680.00 15,252.00
4 Kaca Buram 4 mm MG.4 M2 150,000.00 0.00% Merauke 8.00 - 2,040.00 152,040.00 22,806.00
5 Kaca Buram 5 mm MG.5 M2 190,000.00 0.00% Merauke 8.00 - 2,410.00 192,410.00 28,861.00
6 Kaca Naco / Louver - 7 Clips (polos) MG.6 Buah 137,200.00 0.00% Merauke 8.00 - 2,680.00 139,880.00 20,982.00
7 Kaca Naco / Louver - 8 Clips (polos) MG.7 Buah 157,000.00 0.00% Merauke 8.00 - 3,030.00 160,030.00 24,004.00
8 Kaca Naco / Louver - 9 Clips (polos) MG.8 Buah 173,333.00 0.00% Merauke 8.00 - 3,380.00 176,713.00 26,506.00
9 Kaca Naco / Louver - 10 Clips (polos) MG.9 Buah 196,500.00 0.00% Merauke 8.00 - 3,730.00 200,230.00 30,034.00
10 Kaca Rayban 25 % - tebal 5 mm MG.10 M2 150,000.00 0.00% Merauke 8.00 - 2,410.00 152,410.00 22,861.00
11 Kaca Acrylic (Kaca Plastik) - 5 mm MG.11 Lembar 1,000,000.00 0.00% Merauke 8.00 - 2,300.00 1,002,300.00 150,345.00

H. BAHAN/ALAT PENGGANTUNG
1 Kunci Tanam (Setara Cap Kuda Terbang) MH.1 Set 73,642.00 0.00% Merauke 8.00 - 280.00 73,922.00 11,088.00
2 Kunci Tanam - 2 Slaagh MH.2 Set 122,500.00 0.00% Merauke 8.00 - 280.00 122,780.00 18,417.00
3 Kunci Tanam - 1 Slaagh MH.3 Set 50,000.00 0.00% Merauke 8.00 - 280.00 50,280.00 7,542.00
4 Kunci Tanam (Setara Cap Anchor / Yale) MH.4 Set 83,000.00 0.00% Merauke 8.00 - 280.00 83,280.00 12,492.00
5 Kunci Gembok 1" MH.5 Set 85,000.00 0.00% Merauke 8.00 - 140.00 85,140.00 12,771.00
6 Engsel 4" Kuningan (Untuk Pintu) MH.6 Pasang 24,200.00 0.00% Merauke 8.00 - 140.00 24,340.00 3,651.00
7 Engsel 3" Kuningan (Untuk Jendela) MH.7 Pasang 18,700.00 0.00% Merauke 8.00 - 140.00 18,840.00 2,826.00
8 Engsel Kupu-Kupu T MH.8 Pasang 13,500.00 0.00% Merauke 8.00 - 140.00 13,640.00 2,046.00
9 Engsel Nylon Kuningan 4" MH.9 Pasang 11,625.00 0.00% Merauke 8.00 - 140.00 11,765.00 1,764.00
10 Engsel Biasa 3" (Untuk Jendela) MH.10 Pasang 8,333.00 0.00% Merauke 8.00 - 140.00 8,473.00 1,270.00
11 Hak Angin / Kait Angin MH.11 Buah 7,000.00 0.00% Merauke 8.00 - 140.00 7,140.00 1,071.00
12 Espagnolet MH.12 Set 65,000.00 0.00% Merauke 8.00 - 140.00 65,140.00 9,771.00
13 Grendel Tanam (Pintu) MH.13 Buah 66,875.00 0.00% Merauke 8.00 - 140.00 67,015.00 10,052.00
14 Grendel Besar / Kecil MH.14 Buah 14,666.00 0.00% Merauke 8.00 - 140.00 14,806.00 2,220.00
15 Tarikan Pintu MH.15 Buah 3,333.00 0.00% Merauke 8.00 - 140.00 3,473.00 520.00
16 Tarikan Jendela MH.16 Buah 2,833.00 0.00% Merauke 8.00 - 140.00 2,973.00 445.00

I. BAHAN CAT
1 Amplas Kertas (Amplas Kayu) MI.1 Lembar 4,142.00 0.00% Merauke 8.00 - 14.00 4,156.00 623.00
2 Amplas Besi MI.2 Lembar 4,214.00 0.00% Merauke 8.00 - 14.00 4,228.00 634.00
3 Dempul Kayu MI.3 Kg 30,285.00 0.00% Merauke 8.00 - 260.00 30,545.00 4,581.00
4 Cat Meny Kayu MI.4 Kg 29,714.00 0.00% Merauke 8.00 - 260.00 29,974.00 4,496.00
5 Cat Meny Besi MI.5 Kg 29,671.00 0.00% Merauke 8.00 - 260.00 29,931.00 4,489.00
6 Cat Kayu MI.6 Kg 58,785.00 0.00% Merauke 8.00 - 260.00 59,045.00 8,856.00
7 Cat Besi MI.7 Kg 58,500.00 0.00% Merauke 8.00 - 260.00 58,760.00 8,814.00
8 Cat Kilat LN MI.8 Kg 55,000.00 0.00% Merauke 8.00 - 260.00 55,260.00 8,289.00
9 Minyak Cat / Thinner (Setara Lauguer) MI.9 Kg 28,000.00 0.00% Merauke 8.00 - 260.00 28,260.00 4,239.00
10 Minyak Cat / Thinner (Biasa) Afduner MI.10 Kg 21,220.00 0.00% Merauke 8.00 - 260.00 21,480.00 3,222.00
11 Palmur Tembok MI.11 Zak 186,750.00 0.00% Merauke 8.00 - 7,030.00 193,780.00 29,067.00
12 Cat Tembok (1 Klg @ 5 Kg) MI.12 Kaleng 54,125.00 0.00% Merauke 8.00 - 1,470.00 55,595.00 8,339.00
13 Cat Besi Crom MI.13 Kg 44,928.00 0.00% Merauke 8.00 - 260.00 45,188.00 6,778.00
14 Cat Besi (Setara Nippon Paint) MI.14 Kg 61,500.00 0.00% Merauke 8.00 - 260.00 61,760.00 9,264.00
15 Politur Kaleng (Setara Apache) MI.15 Kg 61,900.00 0.00% Merauke 8.00 - 260.00 62,160.00 9,324.00
16 Floor Hardener MI.16 KG 60,000.00 0.00% Merauke 8.00 - 260.00 60,260.00 9,039.00

J. BAHAN LISTRIK DAN ELEKTRONIKA


1 Kabel Listrik NYM/NYA 3x2.5 mm MJ.1 Roll 1,096,666.00 0.00% Merauke 8.00 - 19,600.00 1,116,266.00 167,439.00
2 Kabel Listrik NYM/NYA 2x1.5 mm MJ.2 Roll 384,000.00 0.00% Merauke 8.00 - 19,600.00 403,600.00 60,540.00
3 Pipa Listrik dia, 5/8 MJ.3 Batang 7,750.00 0.00% Merauke 8.00 - 100.00 7,850.00 1,177.00
4 Saklar Double - Tempel MJ.4 Buah 18,214.00 0.00% Merauke 8.00 - 420.00 18,634.00 2,795.00
5 Saklar Tunggal / Engkel - Tempel MJ.5 Buah 15,071.00 0.00% Merauke 8.00 - 420.00 15,491.00 2,323.00
6 Stop Kontak 500 Watt - Tempel MJ.6 Buah 15,625.00 0.00% Merauke 8.00 - 420.00 16,045.00 2,406.00
7 Stop Kontak 1000 Watt - Tempel MJ.7 Buah 30,000.00 0.00% Merauke 8.00 - 420.00 30,420.00 4,563.00
8 Home Saklar 1 Fase Komplit MJ.8 Buah 400,000.00 0.00% Merauke 8.00 - 680.00 400,680.00 60,102.00
9 Lampu TL 1 x 40 Watt Komplit MJ.9 Buah 130,333.00 0.00% Merauke 8.00 - 80.00 130,413.00 19,561.00
10 Lampu TL 1 x 20 Watt Komplit MJ.10 Buah 87,333.00 0.00% Merauke 8.00 - 80.00 87,413.00 13,111.00
11 Lampu Pijar 40 Watt Komplit MJ.11 Buah 11,500.00 0.00% Merauke 8.00 - 80.00 11,580.00 1,737.00
12 Lampu Pijar 60 Watt Komplit MJ.12 Buah 14,000.00 0.00% Merauke 8.00 - 80.00 14,080.00 2,112.00
13 Lampu Pijar 100 Watt Komplit MJ.13 Buah 9,000.00 0.00% Merauke 8.00 - 80.00 9,080.00 1,362.00
14 Vitting Lampu MJ.14 Buah 14,500.00 0.00% Merauke 8.00 - 80.00 14,580.00 2,187.00
15 Lampu XL 40 Watt MJ.15 Set 90,000.00 0.00% Merauke 8.00 - 80.00 90,080.00 13,512.00
16 Lampu XL 20 Watt MJ.16 Set 44,500.00 0.00% Merauke 8.00 - 80.00 44,580.00 6,687.00
17 Lampu SL 23 Watt MJ.17 Set 45,333.00 0.00% Merauke 8.00 - 80.00 45,413.00 6,811.00
18 Lampu SL 14 Watt MJ.18 Set 37,000.00 0.00% Merauke 8.00 - 80.00 37,080.00 5,562.00
19 Sekring Kas 1 Group (Biasa) MJ.19 Buah 50,000.00 0.00% Merauke 8.00 - 250.00 50,250.00 7,537.00
20 Klem Kabel MJ.20 Dus 16,500.00 0.00% Merauke 8.00 - 140.00 16,640.00 2,496.00
21 Isolasi Listrik MJ.21 Buah 10,000.00 0.00% Merauke 8.00 - 140.00 10,140.00 1,521.00
22 Sekrup MJ.22 Dus 10,000.00 0.00% Merauke 8.00 - 140.00 10,140.00 1,521.00
23 Panil Distribusi MJ.23 Buah 500,000.00 0.00% Merauke 8.00 - 680.00 500,680.00 75,102.00

K. BAHAN PIPA DAN SANITAIR


1 Pipa GIP (Leideng) Dia. 1/2" - 6 Meter MK.1 Batang 96,000.00 0.00% Merauke 8.00 - 1,000.00 97,000.00 14,550.00
2 Pipa GIP (Leideng) Dia. 3/4" - 6 Meter MK.2 Batang 126,750.00 0.00% Merauke 8.00 - 1,370.00 128,120.00 19,218.00
3 Pipa GIP (Leideng) Dia. 1" - 6 Meter MK.3 Batang 156,500.00 0.00% Merauke 8.00 - 1,960.00 158,460.00 23,769.00
4 Pipa GIP (Leideng) Dia. 1.25" - 6 Meter MK.4 Batang 211,250.00 0.00% Merauke 8.00 - 3,030.00 214,280.00 32,142.00
5 Pipa GIP (Leideng) Dia. 1.5" - 6 Meter MK.5 Batang 243,750.00 0.00% Merauke 8.00 - 3,760.00 247,510.00 37,126.00
6 Pipa GIP (Leideng) Dia. 2" - 6 Meter MK.6 Batang 304,750.00 0.00% Merauke 8.00 - 5,290.00 310,040.00 46,506.00
7 Pipa GIP (Leideng) Dia. 3" - 6 Meter MK.7 Batang 473,750.00 0.00% Merauke 8.00 - 15,480.00 489,230.00 73,384.00
8 Pipa GIP (Leideng) Dia. 4" - 6 Meter MK.8 Batang 628,750.00 0.00% Merauke 8.00 - 18,450.00 647,200.00 97,080.00
9 Pipa PVC Dia. 5" - 4 Meter (AW) MK.9 Batang 345,000.00 0.00% Merauke 8.00 - 2,300.00 347,300.00 52,095.00
10 Pipa PVC Dia. 4" - 4 Meter (AW) MK.10 Batang 302,250.00 0.00% Merauke 8.00 - 1,450.00 303,700.00 45,555.00
11 Pipa PVC Dia. 4" - 4 Meter (D) MK.11 Batang 177,583.00 0.00% Merauke 8.00 - 1,450.00 179,033.00 26,854.00
12 Pipa PVC Dia. 3" - 4 Meter (D) MK.12 Batang 127,333.00 0.00% Merauke 8.00 - 860.00 128,193.00 19,228.00
13 Pipa PVC Dia. 2" - 4 Meter (D) MK.13 Batang 61,083.00 0.00% Merauke 8.00 - 500.00 61,583.00 9,237.00
Harga Satuan Bahan, Upah dan Alat

PERIODE : JANUARI - JUNI 2016 LOKASI : KAMPUNG WASUR - D


Kode Harga Tingkat Sumber Jarak Angkut Ongkos Harga Dasar + Overhead
No. Nama Bahan/Barang Barang Satuan Dasar Inflasi Bahan Darat Tracktor Angkut Inflasi + +
( Rp. ) ( %. ) (Km) (Km) (Rp) Ongkos angkut Profit
1 2 3 4 5 6 7 8 9 10 11 12
14 Pipa PVC Dia. 1" - 4 Meter (D) MK.14 Batang 40,333.00 0.00% Merauke 8.00 - 250.00 40,583.00 6,087.00
15 Pipa PVC Dia. 1/2" - 4 M MK.15 Batang 24,916.00 0.00% Merauke 8.00 - 120.00 25,036.00 3,755.00
16 Pipa PVC Dia. 3/4" - 4 M MK.16 Batang 30,833.00 0.00% Merauke 8.00 - 180.00 31,013.00 4,651.00
17 Pipa PVC Dia. 2,5" - 4 M MK.17 Batang 88,400.00 0.00% Merauke 8.00 - 670.00 89,070.00 13,360.00
18 Talang PVC Oval 6" - 4 Meter MK.18 Batang 80,250.00 0.00% Merauke 8.00 - 1,270.00 81,520.00 12,228.00
19 Talang PVC Oval 8" - 4 Meter MK.19 Batang 102,833.00 0.00% Merauke 8.00 - 1,700.00 104,533.00 15,679.00
20 Talang PVC Kotak 4" - 6 Meter MK.20 Batang 120,333.00 0.00% Merauke 8.00 - 2,010.00 122,343.00 18,351.00
21 Talang PVC Kotak 8" - 6 Meter MK.21 Batang 342,750.00 0.00% Merauke 8.00 - 2,440.00 345,190.00 51,778.00
22 Closed Duduk Porselin Komplit MK.22 Buah 1,602,000.00 0.00% Merauke 8.00 - 3,680.00 1,605,680.00 240,852.00
23 Closet duduk (siram) MK.23 Buah 541,000.00 0.00% Merauke 8.00 - 2,920.00 543,920.00 81,588.00
24 Closed Jongkok Porselin (Standar) MK.24 Buah 188,333.00 0.00% Merauke 8.00 - 2,960.00 191,293.00 28,693.00
25 Closed Jongkok Fiber Glass / Plastik MK.25 Buah 84,083.00 0.00% Merauke 8.00 - 1,460.00 85,543.00 12,831.00
26 Urinoir MK.26 Buah 1,147,500.00 0.00% Merauke 8.00 - 2,370.00 1,149,870.00 172,480.00
27 Wastafel Porselin MK.27 Buah 465,000.00 0.00% Merauke 8.00 - 2,370.00 467,370.00 70,105.00
28 Bak Air / Fiber Glass 1 M3 MK.28 Buah 495,000.00 0.00% Merauke 8.00 - 2,960.00 497,960.00 74,694.00
29 Bak Air / Fiber Glass 1/2 M3 MK.29 Buah 250,000.00 0.00% Merauke 8.00 - 2,370.00 252,370.00 37,855.00
30 Bak Air / Fiber Glass 1/4 M3 MK.30 Buah 277,500.00 0.00% Merauke 8.00 - 1,970.00 279,470.00 41,920.00
31 Tangki Air / Fiber Glass 1 M3 MK.31 Buah 1,842,500.00 0.00% Merauke 8.00 - 5,930.00 1,848,430.00 277,264.00
32 Kran Air 3/4" MK.32 Buah 24,250.00 0.00% Merauke 8.00 - 130.00 24,380.00 3,657.00
33 Kran Air 1/2" MK.33 Buah 19,916.00 0.00% Merauke 8.00 - 130.00 20,046.00 3,006.00
34 Kran Air 1" MK.34 Buah 22,000.00 0.00% Merauke 8.00 - 130.00 22,130.00 3,319.00
35 Stop Kran 1/2" MK.35 Buah 17,875.00 0.00% Merauke 8.00 - 130.00 18,005.00 2,700.00
36 Doble Neple GIP 1/2" MK.36 Buah 47,500.00 0.00% Merauke 8.00 - 130.00 47,630.00 7,144.00
37 Soccet 1/2" MK.37 Buah 20,000.00 0.00% Merauke 8.00 - 130.00 20,130.00 3,019.00
38 Elbow GIP 90º x 1/2" ( PE ) MK.38 Buah 17,500.00 0.00% Merauke 8.00 - 130.00 17,630.00 2,644.00
39 Tee 1/2" x 1/2" MK.39 Buah 17,500.00 0.00% Merauke 8.00 - 130.00 17,630.00 2,644.00
40 Hand Kran 1/2" Besi MK.40 Buah 100,000.00 0.00% Merauke 8.00 - 130.00 100,130.00 15,019.00
41 Dop GIP 1/2" MK.41 Buah 17,500.00 0.00% Merauke 8.00 - 130.00 17,630.00 2,644.00
42 Water Meter 1/2" MK.42 Buah 450,000.00 0.00% Merauke 8.00 - 980.00 450,980.00 67,647.00
43 Clamp Sadle 2" mm x 1/2" ( PE ) MK.43 Buah 80,000.00 0.00% Merauke 8.00 - 980.00 80,980.00 12,147.00
44 Pengaman Box Meter MK.44 Buah 250,000.00 0.00% Merauke 8.00 - 980.00 250,980.00 37,647.00
45 Pipa HDPE Ø 150 mm MK.45 M 398,000.00 0.00% Merauke 8.00 - 1,720.00 399,720.00 59,958.00
46 Pipa HDPE Ø 100 mm MK.46 M 196,000.00 0.00% Merauke 8.00 - 670.00 196,670.00 29,500.00
47 Pipa HDPE Ø 75 mm MK.47 M 107,000.00 0.00% Merauke 8.00 - 310.00 107,310.00 16,096.00
48 Pipa HDPE Ø 50 mm MK.48 M 60,000.00 0.00% Merauke 8.00 - 120.00 60,120.00 9,018.00
49 Tee All Flange Ø 50 x 50 mm MK.49 Buah 450,000.00 0.00% Merauke 8.00 - 4,540.00 454,540.00 68,181.00
50 Tee All Flange Ø 75 x 50 mm MK.50 Buah 475,000.00 0.00% Merauke 8.00 - 4,630.00 479,630.00 71,944.00
51 Tee All Flange Ø 75 x 75 mm MK.51 Buah 500,000.00 0.00% Merauke 8.00 - 4,720.00 504,720.00 75,708.00
52 Tee All Flange Ø 100 x 75 mm MK.52 Buah 650,000.00 0.00% Merauke 8.00 - 4,820.00 654,820.00 98,223.00
53 Bend 90 All Flange Ø 50 mm MK.53 Buah 210,000.00 0.00% Merauke 8.00 - 1,260.00 211,260.00 31,689.00
54 Bend 90 All Flange Ø 75 mm MK.54 Buah 335,000.00 0.00% Merauke 8.00 - 4,100.00 339,100.00 50,865.00
55 Bend 90 All Flange Ø 100 mm MK.55 Buah 50,000.00 0.00% Merauke 8.00 - 4,260.00 54,260.00 8,139.00
56 Gate Valve Flange Ø 50 mm MK.56 Buah 1,850,000.00 0.00% Merauke 8.00 - 10,540.00 1,860,540.00 279,081.00
57 Gate Valve Flange Ø 75 mm MK.57 Buah 2,350,000.00 0.00% Merauke 8.00 - 11,220.00 2,361,220.00 354,183.00
58 Gate Valve Flange Ø 1/2" MK.58 Buah 200,000.00 0.00% Merauke 8.00 - 150.00 200,150.00 30,022.00
59 Stub Flange Ø 50 mm MK.59 Buah 200,000.00 0.00% Merauke 8.00 - 900.00 200,900.00 30,135.00
60 Stub Flange Ø 75 mm MK.60 Buah 600,000.00 0.00% Merauke 8.00 - 1,730.00 601,730.00 90,259.00
61 Stub Flange Ø 100 mm MK.61 Buah 840,000.00 0.00% Merauke 8.00 - 2,150.00 842,150.00 126,322.00
62 End Cap (Dop) Ø 50 mm MK.62 Buah 37,009.00 0.00% Merauke 8.00 - 220.00 37,229.00 5,584.00
63 End Cap (Dop) Ø 75 mm MK.63 Buah 86,873.00 0.00% Merauke 8.00 - 900.00 87,773.00 13,165.00
64 Stop Cock (PIT Kran) 1/2" MK.64 Buah 950,000.00 0.00% Merauke 8.00 - 320.00 950,320.00 142,548.00
65 Reducer All Flange Ø 75 x 75 mm MK.65 Buah 525,000.00 0.00% Merauke 8.00 - 3,190.00 528,190.00 79,228.00
66 Reducer All Flange Ø 75 x 50 mm MK.66 Buah 500,000.00 0.00% Merauke 8.00 - 3,140.00 503,140.00 75,471.00
67 Quil Elbow HDPE (adaptor) Ø 15 mm (1/2") MK.67 Buah 48,000.00 0.00% Merauke 8.00 - 1,260.00 49,260.00 7,389.00
68 Pipa Input HDPE Ø 1/2" MK.68 Buah 38,400.00 0.00% Merauke 8.00 - 1,260.00 39,660.00 5,949.00

M. BETON PRACETAK
1 Dwiker Sumur/Gorong2 Ø 1 m, H 60 cm MM.1 Buah 425,000.00 0.00% Merauke 8.00 - 42,760.00 467,760.00 70,164.00
2 Dwiker Sumur/Gorong2 Ø 0,8 m, H 60 cm MM.2 Buah 375,000.00 0.00% Merauke 8.00 - 35,160.00 410,160.00 61,524.00
3 Dwiker Sumur/Gorong2 Ø 0,6 m, H 80 cm MM.3 Buah 375,000.00 0.00% Merauke 8.00 - 36,720.00 411,720.00 61,758.00
4 Dwiker Sumur/Gorong2 Ø 0,4 m, H 80 cm MM.4 Buah 325,000.00 0.00% Merauke 8.00 - 26,150.00 351,150.00 52,672.00

N. BAHAN BANGUNAN LAIN


1 Lem Aica Aibon MN.1 KG 39,000.00 0.00% Merauke 8.00 - 260.00 39,260.00 5,889.00
2 Lem Fox MN.2 KG 26,500.00 0.00% Merauke 8.00 - 260.00 26,760.00 4,014.00
3 Lem Vinyl MN.3 KG 20,000.00 0.00% Merauke 8.00 - 260.00 20,260.00 3,039.00
4 Ijuk MN.4 KG 45,000.00 0.00% Merauke 8.00 - 320.00 45,320.00 6,798.00
5 Pipa Plastik dia, 3" (AW) MN.5 Batang 181,250.00 0.00% Merauke 8.00 - 240.00 181,490.00 27,223.00
6 Galvanies / Lysplank MN.6 Lembar 56,500.00 0.00% Merauke 8.00 - 2,450.00 58,950.00 8,842.00
7 Mata bor MN.7 Buah 15,000.00 0.00% Merauke 8.00 - 50.00 15,050.00 2,257.00
8 Mata gurinda MN.8 Buah 11,500.00 0.00% Merauke 8.00 - 70.00 11,570.00 1,735.00
9 Gas elpiji (12 KG) MN.9 KG 25,000.00 0.00% Merauke 8.00 - 440.00 25,440.00 3,816.00
10 Oksigen (@50 kg/btl) MN.10 KG 350,000.00 0.00% Merauke 8.00 - 520.00 350,520.00 52,578.00

Merauke, Januar
Koordinator Tim Penyusun :
Kepala Bidang Cipta Karya Dinas Pekerjaan Umum
Kabupaten Merauke Dinas Pekerjaan U

MOCH. YUNUS ANIS, S.ST VICTOR M. HATIGO


NIP. 19700403 199003 1 007 NIP. 19800908 20090

Mengetahui / menyetujui :
Kepala Dinas Pekerjaan Umum
Kabupaten Merauke

Ir. TRI TEGOEH SANTOSA


Pembina Utama Muda (IV/c)
Harga Satuan Bahan, Upah dan Alat

PERIODE : JANUARI - JUNI 2016 LOKASI : KAMPUNG WASUR - D


Kode Harga Tingkat Sumber Jarak Angkut Ongkos Harga Dasar + Overhead
No. Nama Bahan/Barang Barang Satuan Dasar Inflasi Bahan Darat Tracktor Angkut Inflasi + +
( Rp. ) ( %. ) (Km) (Km) (Rp) Ongkos angkut Profit
1 2 3 4 5 6 7 8 9 10 11 12
NIP. 19590821 198603 1 021
Harga Satuan Bahan, Upah dan Alat

LOKASI : KAMPUNG WASUR - DISTRIK MERAUKE


Harga Satuan
on Site Project Keterangan
(Tanpa PPN)
13 14

10,659.00
10,117.00
10,956.00
34,864.00
939.00 -
20,651.00
19,440.00 -
19,830.00 -

1,431,038.00 -
933,524.00 -
1,031,274.00 -
320,217.00 -
377,717.00 -
1,462,351.00 -
1,462,351.00 -
1,472.00 -
1,920.00 -
7,164.00 -
125,534.00 2,511.00
144,796.00 2,896.00
106,375.00 5,319.00

3,327,789.00 -
4,311,548.00 -
7,691,154.00 -
2,714,644.00 -
3,327,789.00 -
4,024,048.00 -
4,407,381.00 -
8,266,154.00 -
2,254,644.00 -
23,391.00 9,746,250.00
72,889.00 24,486.00
93,564.00 31,432.00
121,983.00 40,978.00
196,158.00 65,896.00
252,017.00 84,661.00
304,727.00 102,368.00
343,723.00 115,468.00
355,511.00 119,428.00
158,286.00 53,174.00
121,509.00 54,130.00
332,706.00 -
130,497.00 -
347,863.00 -
83,478.00 -
77,234.00 -
71,484.00 -
111,116.00 -
40,543.00 -
94,633.00 -
137,137.00 -
227,481.00 -
18,538.00 -
3,000.00 -
5,000.00 -
500,000.00 -

14,630.00 33,333.33
12,755.00 51,500.00
12,687.00 79,875.00
12,691.00 114,000.00
13,016.00 160,000.00
13,322.00 211,500.00
13,735.00 310,000.00
14,034.00 425,000.00
21,657.00 -
21,562.00 -
20,987.00 -
16,469.00 -
16,798.00 -
16,798.00 -
16,798.00 -
16,847.00 -
24,389.00 -
37,662.00 -
17,537.00 -
23,287.00 -
862.00 -
Harga Satuan Bahan, Upah dan Alat

LOKASI : KAMPUNG WASUR - DISTRIK MERAUKE


Harga Satuan
on Site Project Keterangan
(Tanpa PPN)
13 14
31,912.00 -
25,237.00 -
40,437.00 -
48,081.00 -
26,231.00 -
17,836.00 -
178,537.00 -
64,779.00 -
17,537.00 -
5,462.00 -
4,120.00 -
5,188.00 -
7,187.00 -
11,787.00 -
24,955.00 -
88,702.00 10,517.00
191,055.00 8,155.00
225,561.00 8,023.00
152,248.00 10,154.00
116,587.00 6,220.00
79,258.00 14,095.00
387,182.00 17,214.00
440,783.00 16,331.00
652,786.00 14,511.00
1,020,682.00 15,127.00
510,094.00 1,890.00
35,127.00 22,489.00
51,048.00 14,525.00
59,657.00 9,549.00
86,112.00 8,821.00
19,446.00 -
837,671.00 -
24,391.00 -
24,966.00 -
5,991.00 -
17,491.00 -

75,497.00 -
69,103.00 -
52,840.00 -
67,597.00 -
77,651.00 -
46,747.00 3,895.58
51,485.00 4,290.42
62,497.00 -
31,257.00 -
70,357.00 -
70,357.00 -
16,387.00 -

3,123.00 -
7,797.00 -
16,741.00 -
3,174.00 -
6,943.00 -
16,454.00 -
7,170.00 -
17,604.00 -
7,013.00 -
26,277.00 -
7,928.00 -
16,454.00 -
10,281.00 -
25,079.00 -
74,577.00 -
1,454.00 -
839.00 -
3,215.00 -
4,485.00 -
7,074.00 -
7,013.00 -
7,274.00 -
15,176.00 -
27,171.00 -
76,940.00 -
1,541.00 -
3,292.00 -
862.00 -
1,084.00 -
3,174.00 -
14,536.00 -
11,661.00 -
13,386.00 -
5,853.00 -
8,786.00 -
8,786.00 -
8,786.00 -
14,536.00 -
14,536.00 -
8,786.00 -
8,786.00 -
8,786.00 -
17,422.00 -
11,661.00 -
8,786.00 -
Harga Satuan Bahan, Upah dan Alat

LOKASI : KAMPUNG WASUR - DISTRIK MERAUKE


Harga Satuan
on Site Project Keterangan
(Tanpa PPN)
13 14
5,566.00 -
5,267.00 -
4,692.00 -
8,786.00 -
411,228.00 -
178,597.00 -
17,468.00 192,148.00
17,468.00 192,148.00

174,432.00 -
201,721.00 -
116,932.00 -
174,846.00 -
221,271.00 -
160,862.00 -
184,034.00 -
203,219.00 -
230,264.00 -
175,271.00 -
1,152,645.00 -

85,010.00 -
141,197.00 -
57,822.00 -
95,772.00 -
97,911.00 -
27,991.00 -
21,666.00 -
15,686.00 -
13,529.00 -
9,743.00 -
8,211.00 -
74,911.00 -
77,067.00 -
17,026.00 -
3,993.00 -
3,418.00 -

4,779.00 -
4,862.00 -
35,126.00 -
34,470.00 -
34,420.00 -
67,901.00 -
67,574.00 -
63,549.00 -
32,499.00 -
24,702.00 -
222,847.00 11,143.00
63,934.00 12,786.80
51,966.00 -
71,024.00 -
71,484.00 -
69,299.00 -

1,283,705.00 12,837.05
464,140.00 4,641.40
9,027.00 -
21,429.00 -
17,814.00 -
18,451.00 -
34,983.00 -
460,782.00 -
149,974.00 -
100,524.00 -
13,317.00 -
16,192.00 -
10,442.00 -
16,767.00 -
103,592.00 -
51,267.00 -
52,224.00 -
42,642.00 -
57,787.00 -
19,136.00 -
11,661.00 -
11,661.00 -
575,782.00 -

111,550.00 18,591.67
147,338.00 24,556.33
182,229.00 30,371.50
246,422.00 41,070.33
284,636.00 47,439.33
356,546.00 59,424.33
562,614.00 93,769.00
744,280.00 124,046.67
399,395.00 99,848.75
349,255.00 87,313.75
205,887.00 51,471.75
147,421.00 36,855.25
70,820.00 17,705.00
Harga Satuan Bahan, Upah dan Alat

LOKASI : KAMPUNG WASUR - DISTRIK MERAUKE


Harga Satuan
on Site Project Keterangan
(Tanpa PPN)
13 14
46,670.00 11,667.50
28,791.00 7,197.75
35,664.00 8,916.00
102,430.00 25,607.50
93,748.00 -
120,212.00 -
140,694.00 -
396,968.00 -
1,846,532.00 -
625,508.00 -
219,986.00 -
98,374.00 -
1,322,350.00 -
537,475.00 -
572,654.00 -
290,225.00 -
321,390.00 -
2,125,694.00 -
28,037.00 -
23,052.00 -
25,449.00 -
20,705.00 -
54,774.00 -
23,149.00 -
20,274.00 -
20,274.00 -
115,149.00 -
20,274.00 -
518,627.00 -
93,127.00 -
288,627.00 -
459,678.00 -
226,170.00 -
123,406.00 -
69,138.00 -
522,721.00 -
551,574.00 -
580,428.00 -
753,043.00 -
242,949.00 -
389,965.00 -
62,399.00 -
2,139,621.00 -
2,715,403.00 -
230,172.00 -
231,035.00 -
691,989.00 -
968,472.00 -
42,813.00 -
100,938.00 -
1,092,868.00 -
607,418.00 -
578,611.00 -
56,649.00 -
45,609.00 -

537,924.00 -
471,684.00 -
473,478.00 -
403,822.00 -

45,149.00 -
30,774.00 -
23,299.00 -
52,118.00 -
208,713.00 -
67,792.00 -
17,307.00 -
13,305.00 -
29,256.00 -
403,098.00 -

Merauke, Januari 2016

Estimator
Dinas Pekerjaan Umum

VICTOR M. HATIGORAN, ST
NIP. 19800908 200909 1 001
HARGA SATUAN PEKERJAAN (HSP)

HARGA SATUAN PEKERJAAN


LOKASI PEKERJAAN : KAMPUNG WASUR - DISTRIK MERAUKE

KEGIATAN : HARGA SATUAN DINAS PEKERJAAN UMUM


PEKERJAAN : PERHITUNGAN HARGA SATUAN BAHAN, UPAH, PEKERJAAN DAN KEGIATAN
LOKASI : KAMPUNG WASUR - DISTRIK MERAUKE
KABUPATEN / PROVINSI : MERAUKE - PAPUA
TAHUN ANGGARAN : 2016
SUMBER DANA : ---

PERIODE : JANUARI - JUNI 2016 LOKASI : KAMPUNG WASUR - DIST


JUMLAH HARGA
NO. JENIS PEKERJAAN ANALISA REFERENSI BAHAN TENAGA/ALAT
(Rp.) (Rp.)
1 2 3 4 5 6

A. PEKERJAAN PERSIAPAN
1 1 M' Pagar Sementara Kayu Tinggi 2 M PU.A.1 RSNI T-12-2002 305,842.98 84,440.00
2 1 M' Pagar Sementara (Seng Gelombang 2 M) PU.A.2 RSNI T-12-2002 369,274.98 84,440.00
3 1 M' Pagar Kawat Duri, Tinggi 1,80 M PU.A.3 RSNI T-12-2002 495,421.67 72,640.00
4 1 M2 Membersihkan Lapangan dan Perataan PU.A.4 RSNI T-12-2002 - 12,720.00
5 1 M' Pengukuran dan Pasangan Bouwplank PU.A.5 RSNI T-12-2002 63,564.93 29,500.00
6 1 M' Pengukuran dan Pematokan Saluran Irigasi/Darainase PU.A.6 HPS.PU. 2016
7 1 M' Pengukuran dan Pematokan Jalan PU.A.7 HPS.PU. 2016
8 1 M2 Kantor Sementara dgn Lantai Plesteran PU.A.8 RSNI T-12-2002 3,972,308.09 630,600.00
9 1 M2 Gudang Semen dan Alat-alat PU.A.9 RSNI T-12-2002 957,078.58 462,800.00
10 1 M2 Rumah Jaga/konstruksi Kayu PU.A.10 RSNI T-12-2002 1,065,136.66 378,900.00
11 1 M2 Bedeng Buruh PU.A.11 RSNI T-12-2002 1,028,048.04 462,800.00
12 1 M2 Camp Darurat Kontsruksi Kayu PU.A.12 HPS.PU. 2016 284,151.30 295,000.00
13 1 Unit Camp Darurat - Terpal PU.A.13 HPS.PU. 2016 1,830,384.30 387,000.00
14 1 M3 Bongkaran Beton Bertulang PU.A.14 RSNI T-12-2002 - 847,978.00
15 1 M3 Bongkaran Dnding Tembok Bata Merah PU.A.15 RSNI T-12-2002 - 792,778.00
16 1 M2 Membersihkan Saluran (Drainase) PU.A.16 HPS.PU. 2016 - 3,634.46
17 1 Ret Pengangkutan Sampah (10 KM) PU.A.17 HPS.PU. 2016 - 91,390.71
18 1 M2 Pembuatan Bak Adukan Ukuran (40 x 50 x 20) cm PU.A.18 RSNI T-12-2002 171,148.16 45,300.00
19 1 M3 Bongkaran dinding tembok bata merah PU.A.19 RSNI T-12-2002 - 847,978.00
20 1 M3 Bongkaran beton bertulang PU.A.20 RSNI T-12-2002 - 847,978.00
21 1 M3 Pembongkaran lantai PU.A.21 HPS.PU. 2016 - 254,400.00
22 1 M2 Mengupas plesteran PU.A.22 HPS.PU. 2016 - 12,720.00

B. PEKERJAAN TANAH DAN PASIR


1 1 M3 Galian Tanah Biasa Sedalam 1 M PU.B.1 SNI 2835:2008 - 93,100.00
2 1 M3 Urug Kembali Tanah Biasa Sedalam 1 M PU.B.2 SNI 2835:2008
3 1 M3 Galian Tanah Biasa Sedalam 1 - 2 M PU.B.3 SNI 2835:2008 - 114,480.00
4 1 M3 Urug Kembali Tanah Biasa Sedalam 1 - 2 M PU.B.4 SNI 2835:2008
5 1 M3 Galian Tanah Biasa Sedalam 2 - 3 M PU.B.5 SNI 2835:2008 - 136,228.00
6 1 M3 Urug Kembali Tanah Biasa Sedalam 2 - 3 M PU.B.6 SNI 2835:2008
7 1 M3 Galian Tanah Keras Sedalam 1 M PU.B.7 SNI 2835:2008 - 123,888.00
8 1 M3 Urug Kembali Tanah Keras Sedalam 1 M PU.B.8 SNI 2835:2008
9 1 M3 Galian Tanah Cadas Sedalam 1 M PU.B.9 SNI 2835:2008 - 129,040.00
10 1 M3 Urug Kembali Tanah Cadas Sedalam 1 M PU.B.10 SNI 2835:2008
11 1 M3 Galian Tanah Lumpur Sedalam 1 M PU.B.11 SNI 2835:2008 - 149,880.00
12 1 M3 Urug Kembali Tanah Lumpur Sedalam 1 M PU.B.12 SNI 2835:2008 - -
13 1 M3 Memadatkan Tanah Per 20 cm PU.B.13 SNI 2835:2008 - 68,200.00
14 1 M3 Urugan Tanah Urug (material didatangkan) PU.B.14 SNI 2835:2008 384,260.40 68,200.00
15 1 M3 Urugan Tanah Pilihan (Selmat) - Manual PU.B.15 SNI 2835:2008 453,260.40 68,200.00
16 1 M3 Urugan Pasir Bawah Pondasi/Lantai/Konstruksi PU.B.16 SNI 2835:2008 1,120,228.80 37,240.00
17 1 M3 Urugan Sirtu / Kerikil PU.B.17 SNI 2835:2008 1,754,821.20 34,100.00
18 1 M3 Pengangkutan Tanah Sampai Dengan Sejauh 15 M PU.B.18 SNI 2835:2008 - 40,780.00
19 1 M3 Lapisan Ijuk Tebal 10 cm Untuk Peresapan PU.B.19 SNI 2835:2008 60,000.00 20,460.00
20 1 M2 Land Clearing (Mekanis) - Bulldozer PU.B.20 HPS.PU. 2016 - 2,249.72
21 1 M3 Galian Tanah (Mekanis) - Excavator PU.B.21 HPS.PU. 2016 - 22,636.94
22 1 M2 Pembentukan dan Pemadatan Badan Jalan - Greder PU.B.22 HPS.PU. 2016 - 10,551.24
23 1 M2 Pembentukan dan Pemadatan Badan Jalan - Mini Grader (Cobelco) PU.B.23 HPS.PU. 2016 - 9,918.71
24 1 M3 Penimbunan dan pemadatan Tanah Biasa (Mekanis) - Greder PU.B.24 HPS.PU. 2016 384,260.40 28,732.09
25 1 M3 Penimbunan dan pemadatan Tanah Biasa Borrow Pit PU.B.25 HPS.PU. 2016 42,000.00 28,732.09
26 1 M3 Timbunan dan pemadatan Tanah Biasa (Mekanis) - Mini Blade (Cobelco) PU.B.26 HPS.PU. 2016 384,260.40 33,188.79
27 1 M3 Timbunan dan pemadatan Tanah Pilihan (Mekanis) - Stamper PU.B.27 HPS.PU. 2016 453,260.40 35,699.84
28 1 M3 Timbunan dan pemadatan Tanah Pilihan (Mekanis) - Grader PU.B.28 HPS.PU. 2016 453,260.40 28,732.09
29 1 M3 Timbunan dan pemadatan Tanah Pilihan (Mekanis) - Mini Grader PU.B.29 HPS.PU. 2016 453,260.40 33,188.79
30 1 M3 Soil Semen (termasuk penghamparan dan pemadatan mekanis) PU.B.30 HPS.PU. 2016 955,396.40 149,229.24
31 1 M' Pembentukan Badan Tanggul (Bulldozer) PU.B.31 HPS.PU. 2016 - 23,198.76
32 1 M' Perapihan Tanggul Saluran (Excavator); lebar melintang 5,57 M PU.B.32 HPS.PU. 2016 - 10,183.10
33 1 M' Perapihan Tanggul Saluran (Excavator); lebar melintang 6,89 M PU.B.33 HPS.PU. 2016 - 12,584.81
34 1 M' Perapihan Tanggul Saluran (Excavator); lebar melintang 8,03 M PU.B.34 HPS.PU. 2016 - 14,666.18
35 1 M' Perapihan Tanggul Saluran (Excavator); lebar melintang 8,94 M PU.B.35 HPS.PU. 2016 - 16,335.62
36 1 M' Perapihan Tanggul Saluran (Excavator); lebar melintang 11,07 M PU.B.36 HPS.PU. 2016 - 16,841.33
37 1 M' Perapihan Tanggul Saluran (Excavator); lebar melintang 12,98 M PU.B.37 HPS.PU. 2016 - 23,703.89
38 1 M' Perapihan Tanggul Saluran (Excavator); lebar melintang 16,06 M PU.B.38 HPS.PU. 2016 - 29,323.38
39 1 M3 Pemindahan Tanah Mekanis (Excavator) PU.B.39 HPS.PU. 2016 - 11,590.11
40 1 M3 Pemindahan Tanah Mekanis (Bulldozer) PU.B.40 HPS.PU. 2016 - 8,141.86
41 1 M' Pemadatan Tanggul (Mekanis) PU.B.41 HPS.PU. 2016 - 28,732.09

C. PEKERJAAN PONDASI PASANGAN BATU


1 1 M3 Pasangan Bata, Camp. 1PC : 2PS - Pasir Import PU.C.1 HPS.PU. 2016 2,257,266.59 629,571.43
2 1 M3 Pasangan Bata, Camp. 1PC : 3PS - Pasir Import PU.C.2 HPS.PU. 2016 2,150,903.25 629,571.43
3 1 M3 Pasangan Bata, Camp. 1PC : 4PS - Pasir Import PU.C.3 HPS.PU. 2016 2,087,085.24 629,571.43
4 1 M3 Pasangan Bata, Camp. 1PC : 2PS - Pasir Lokal PU.C.4 HPS.PU. 2016 2,054,120.96 629,571.43
5 1 M3 Pasangan Bata, Camp. 1PC : 3PS - Pasir Lokal PU.C.5 HPS.PU. 2016 1,922,364.42 629,571.43
6 1 M3 Pasangan Bata, Camp. 1PC : 4PS - Pasir Lokal PU.C.6 HPS.PU. 2016 1,843,310.49 629,571.43
7 1 M3 Pondasi Pasangan Batu Belah, 1PC : 3PS PU.C.7 SNI 2836:2008 2,956,096.63 316,650.00
8 1 M3 Pondasi Pasangan Batu Belah, 1PC : 4PS PU.C.8 SNI 2836:2008 2,908,253.96 316,650.00
9 1 M3 Pasangan Pondasi Batu Kosong (Anstamping) PU.C.9 SNI 2836:2008 1,917,994.94 164,658.00

D. PEKERJAAN COR BETON


1 1 M3 Campuran Beton 1PC : 2PS Pasir Import - Manual PU.D.1 HPS.PU. 2016 3,416,265.00 931,000.00
2 1 M3 Campuran Beton 1PC : 3PS Pasir Import - Manual PU.D.2 HPS.PU. 2016 3,137,169.38 931,000.00
3 1 M3 Campuran Beton 1PC : 4PS Pasir Import - Manual PU.D.3 HPS.PU. 2016 2,969,712.00 931,000.00
4 1 M3 Campuran Beton 1PC : 5PS Pasir Import - Manual PU.D.4 HPS.PU. 2016 2,858,073.75 931,000.00
5 1 M3 Campuran Beton 1PC : 6PS Pasir Import - Manual PU.D.5 HPS.PU. 2016 2,778,332.14 931,000.00
6 1 M3 Campuran Beton 1PC : 2PS Pasir Lokal - Manual PU.D.6 HPS.PU. 2016 2,816,534.00 931,000.00
7 1 M3 Campuran Beton 1PC : 3PS Pasir Lokal - Manual PU.D.7 HPS.PU. 2016 2,462,472.00 931,000.00
8 1 M3 Campuran Beton 1PC : 4PS Pasir Lokal - Manual PU.D.8 HPS.PU. 2016 2,250,034.80 931,000.00
9 1 M3 Campuran Beton 1PC : 5PS Pasir Lokal - Manual PU.D.9 HPS.PU. 2016 2,108,410.00 931,000.00
10 1 M3 Campuran Beton 1PC : 6PS Pasir Lokal - Manual PU.D.10 HPS.PU. 2016 2,007,249.43 931,000.00
11 1 M3 Campuran Beton 1PC : 2PS - Pasir Import (mekanis) PU.D.11 HPS.PU. 2016 3,416,265.00 722,539.26
12 1 M3 Campuran Beton 1PC : 3PS - Pasir Import (mekanis) PU.D.12 HPS.PU. 2016 3,137,169.38 709,172.84
13 1 M3 Campuran Beton 1PC : 4PS - Pasir Import (mekanis) PU.D.13 HPS.PU. 2016 2,969,712.00 701,152.99
HARGA SATUAN PEKERJAAN (HSP)

PERIODE : JANUARI - JUNI 2016 LOKASI : KAMPUNG WASUR - DIST


JUMLAH HARGA
NO. JENIS PEKERJAAN ANALISA REFERENSI BAHAN TENAGA/ALAT
(Rp.) (Rp.)
1 2 3 4 5 6

14 1 M3 Campuran Beton 1PC : 5PS - Pasir Import (mekanis) PU.D.14 HPS.PU. 2016 2,858,073.75 695,806.43
15 1 M3 Campuran Beton 1PC : 6PS - Pasir Import (mekanis) PU.D.15 HPS.PU. 2016 2,778,332.14 691,987.45
HARGA SATUAN PEKERJAAN (HSP)

PERIODE : JANUARI - JUNI 2016 LOKASI : KAMPUNG WASUR - DIST


JUMLAH HARGA
NO. JENIS PEKERJAAN ANALISA REFERENSI BAHAN TENAGA/ALAT
(Rp.) (Rp.)
1 2 3 4 5 6

16 1 M3 Campuran Beton 1PC : 2PS - Pasir Lokal (mekanis) PU.D.16 HPS.PU. 2016 2,816,534.00 722,539.26
17 1 M3 Campuran Beton 1PC : 3PS - Pasir Lokal (mekanis) PU.D.17 HPS.PU. 2016 2,462,472.00 709,172.84
18 1 M3 Campuran Beton 1PC : 4PS - Pasir Lokal (mekanis) PU.D.18 HPS.PU. 2016 2,250,034.80 701,152.99
19 1 M3 Campuran Beton 1PC : 5PS - Pasir Lokal (mekanis) PU.D.19 HPS.PU. 2016 2,108,410.00 695,806.43
20 1 M3 Campuran Beton 1PC : 6PS - Pasir Lokal (mekanis) PU.D.20 HPS.PU. 2016 2,007,249.43 691,987.45
21 1 M3 Campuran Beton 1PC : 2PS : 3KR, Import - Manual PU.D.21 HPS.PU. 2016 2,926,758.33 931,000.00
22 1 M3 Campuran Beton 1PC : 3PS : 5KR, Import - Manual PU.D.22 HPS.PU. 2016 2,748,326.20 931,000.00
23 1 M3 Campuran Beton 1PC : 4PS : 6KR, Import - Manual PU.D.23 HPS.PU. 2016 2,679,279.09 931,000.00
24 1 M3 Campuran beton 1PC : 2PS : 3KR, Import (mekanis) PU.D.24 HPS.PU. 2016 2,926,758.33 690,178.46
25 1 M3 Campuran beton 1PC : 3PS : 5KR, Import (mekanis) PU.D.25 HPS.PU. 2016 2,748,326.20 683,143.51
26 1 M3 Campuran beton 1PC : 4PS : 6KR, Import (mekanis) PU.D.26 HPS.PU. 2016 2,679,279.09 680,585.34
27 1 M3 Beton mutu f’'c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 PU.D.27 SNI 7394:2008 2,601,372.47 256,025.00
28 1 M3 Beton mutu f’ = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 PU.D.28 SNI 7394:2008 2,646,364.40 256,025.00
29 1 M3 Beton mutu f’'c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 PU.D.29 SNI 7394:2008 2,679,890.58 256,025.00
30 1 M3 Lantai kerja Beton mutu f’'c = 7,4 MPa (K 100), slump (3-6) cm w/c = 0,87 PU.D.30 SNI 7394:2008 2,612,797.79 186,200.00
31 1 M3 Beton mutu f’'c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 PU.D.31 SNI 7394:2008 2,720,821.63 256,025.00
32 1 M3 Beton mutu f’'c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61 PU.D.32 SNI 7394:2008 2,758,631.14 256,025.00
33 1 M3 Beton mutu f’'c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 PU.D.33 SNI 7394:2008 2,789,940.10 256,025.00
34 1 M3 Beton mutu f’'c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 PU.D.34 SNI 7394:2008 2,807,784.30 256,025.00
35 1 M3 Beton mutu f’'c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53 PU.D.35 SNI 7394:2008 2,840,767.04 256,025.00
36 1 M3 Beton mutu f’'c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52 PU.D.36 SNI 7394:2008 2,849,861.42 256,025.00
37 1 M3 Beton mutu f’'c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49 PU.D.37 SNI 7394:2008 2,887,655.20 325,850.00
38 1 M3 Beton mutu f’'c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48 PU.D.38 SNI 7394:2008 2,900,688.35 325,850.00
39 1 KG Pembesian Besi polos/ulir Ø. 6 mm SNI PU.D.39 SNI 7394:2008 15,686.36 2,074.20
40 1 KG Pembesian Besi polos/ulir Ø. 8 mm SNI PU.D.40 SNI 7394:2008 13,717.61 2,074.20
41 1 KG Pembesian Besi polos/ulir Ø. 10 mm SNI PU.D.41 SNI 7394:2008 13,646.21 2,074.20
42 1 KG Pembesian Besi polos/ulir Ø. 12 mm SNI PU.D.42 SNI 7394:2008 13,650.41 2,074.20
43 1 KG Pembesian Besi polos/ulir Ø. 14 mm SNI PU.D.43 SNI 7394:2008 13,991.66 2,074.20
44 1 KG Pembesian Besi polos/ulir Ø. 16 mm SNI PU.D.44 SNI 7394:2008 14,312.96 2,074.20
45 1 KG Pembesian Besi polos/ulir Ø. 19 mm SNI PU.D.45 SNI 7394:2008 14,746.61 2,074.20
46 1 KG Pembesian Besi polos/ulir Ø. 22 mm SNI PU.D.46 SNI 7394:2008 15,060.56 2,074.20
47 1 M2 Bekisting untuk Pondasi PU.D.47 SNI 7394:2008 138,259.56 109,772.00
48 1 M2 Bekisting untuk Sloof PU.D.48 SNI 7394:2008 154,898.51 109,772.00
49 1 M2 Bekisting untuk Kolom PU.D.49 SNI 7394:2008 358,234.48 139,326.00
50 1 M2 Bekisting untuk Balok PU.D.50 SNI 7394:2008 371,169.12 139,326.00
51 1 M2 Bekisting untuk Pelat Lantai PU.D.51 SNI 7394:2008 432,386.48 139,326.00
52 1 M2 Bekisting untuk Pelat Dinding PU.D.52 SNI 7394:2008 445,052.33 139,326.00
53 1 M2 Bekisting untuk Tangga PU.D.53 SNI 7394:2008 324,909.64 139,326.00
54 1 M2 Pasang Jembatan untuk Pengecoran Beton PU.D.54 SNI 7394:2008 107,230.83 27,562.00
55 1 M2 Cetakan Beton / Begisting Memakai Papan PU.D.55 HPS.PU. 2016 176,612.27 109,340.00
56 1 M2 Cetakan Beton / Begisting Memakai Multiplek PU.D.56 HPS.PU. 2016 203,397.43 109,340.00
57 1 M3 Membongkar cetakan / Bekisting Beton PU.D.57 HPS.PU. 2016 - 472,000.00
58 1 Set Stutwerk utk 1 M3 Beton, h = 3 - 4 m (Memakai Kayu Dolken) PU.D.58 HPS.PU. 2016 519,064.00 2,207,100.00
59 1 Set Stutwerk utk 1 M3 Beton, h = 3 - 4 m (Memakai Scafolding) PU.D.59 640,000.00 868,980.00
ANALISA PU.D.60 s/d PU.D.67 UNTUK GAMBAR RENCANA YANG BELUM MEMPUNYAI GAMBAR DETAIL
60 1 M3 Pondasi beton bertulang (150 kg besi + bekisting) PU.D.60 SNI 7394:2008 5,532,751.98 1,114,551.00
61 1 M3 Sloof beton bertulang (200 kg besi + bekisting) PU.D.61 SNI 7394:2008 6,462,962.26 1,261,521.00
62 1 M3 Kolom beton bertulang (300 kg besi + bekisting) PU.D.62 SNI 7394:2008 10,477,167.13 1,572,331.00
63 1 M3 Balok beton bertulang (200 kg besi + bekisting) PU.D.63 SNI 7394:2008 8,482,308.63 1,365,831.00
64 1 M3 Plat beton bertulang (150 kg besi + bekisting) PU.D.64 SNI 7394:2008 8,010,375.42 1,115,055.00
65 1 M3 Dinding beton bertulang (150 kg besi + bekisting) PU.D.65 SNI 7394:2008 7,761,966.72 1,114,551.00
66 1 M3 Dinding beton bertulang (200 kg besi + bekisting) PU.D.66 SNI 7394:2008 7,957,826.42 1,261,521.00
67 1 M3 Tangga beton bertulang (150 kg besi + bekisting) PU.D.67 HPS.PU. 2016 7,725,822.13 1,377,558.00
68 1 M' Kolom penguat/praktis beton bertulang (11 x 11) cm PU.D.68 SNI 7394:2008 77,651.00 32,964.00
69 1 M' Sloof/Ring balok beton bertulang (10 x 15) cm PU.D.69 SNI 7394:2008 105,701.46 54,435.00
70 1 M' Kolom 15 x 15 (1PC : 3PS) - Pasir Import PU.D.70 HPS.PU. 2016
71 1 M' Kolom 15 x 15 (1PC : 3PS) - Pasir Lokal PU.D.71 HPS.PU. 2016
72 1 M' Balok 15 x 15 (1PC : 3PS) - Pasir Import PU.D.72 HPS.PU. 2016
73 1 M' Balok 15 x 15 (1PC : 3PS) - Pasir Lokal PU.D.73 HPS.PU. 2016
74 1 Btg Tiang Pancang Beton 20x20; L=5 M (1PC : 2PS : 3KR) PU.D.74 HPS.PU. 2016 5,619,127.80 -
75 1 M' Bantalan Pelat Beton (1PC : 3PS) - Pasir Import PU.D.75 HPS.PU. 2016
76 1 M' Bantalan Pelat Beton (1PC : 3PS) - Pasir Lokal PU.D.76 HPS.PU. 2016

E. PEKERJAAN DINDING BATU


1 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 2PS - Pasir Lokal PU.E.1 SNI 6897:2008 389,990.42 109,880.00
2 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 3PS - Pasir Lokal PU.E.2 SNI 6897:2008 373,768.13 109,880.00
3 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 4PS - Pasir Lokal PU.E.3 SNI 6897:2008 359,564.78 109,880.00
4 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 5PS - Pasir Lokal PU.E.4 SNI 6897:2008 357,043.65 109,880.00
5 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1 Bata, 1PC : 6PS - Pasir Lokal PU.E.5 SNI 6897:2008 366,423.43 109,880.00
6 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 2PS - Pasir Lokal PU.E.6 SNI 6897:2008 186,097.36 54,940.00
7 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 3PS - Pasir Lokal PU.E.7 SNI 6897:2008 176,464.03 54,940.00
8 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 4PS - Pasir Lokal PU.E.8 SNI 6897:2008 172,058.03 54,940.00
9 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 5PS - Pasir Lokal PU.E.9 SNI 6897:2008 169,355.06 54,940.00
10 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 6PS - Pasir Lokal PU.E.10 SNI 6897:2008 169,674.20 54,940.00
11 1 M2 Bata merah (5 x 11 x 22) cm Tebal 1/2 Bata, 1PC : 8PS - Pasir Lokal PU.E.11 SNI 6897:2008 166,037.70 54,940.00
ANALISA MENGGUNAKAN PASANGAN BATU BATA LOKAL
12 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 2PS - Pasir Import PU.E.12 HPS.PU. 2016 242,081.99 82,328.57
13 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 3PS - Pasir Import PU.E.13 HPS.PU. 2016 230,722.79 82,328.57
14 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 4PS - Pasir Import PU.E.14 HPS.PU. 2016 223,907.28 82,328.57
15 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 2PS - Pasir Lokal PU.E.15 HPS.PU. 2016 220,386.82 82,328.57
16 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 3PS - Pasir Lokal PU.E.16 HPS.PU. 2016 206,315.73 82,328.57
17 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/2 Bata, 1PC : 4PS - Pasir Lokal PU.E.17 HPS.PU. 2016 197,873.08 82,328.57
18 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 2PS - Pasir Import PU.E.18 HPS.PU. 2016 116,187.85 41,164.29
19 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 3PS - Pasir Import PU.E.19 HPS.PU. 2016 111,506.02 41,164.29
20 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 4PS - Pasir Import PU.E.20 HPS.PU. 2016 108,696.92 82,328.57
21 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 2PS - Pasir Lokal PU.E.21 HPS.PU. 2016 107,245.92 41,164.29
22 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 3PS - Pasir Lokal PU.E.22 HPS.PU. 2016 101,446.35 41,164.29
23 1 M2 Bata merah (5 x 10 x 20) cm Tebal 1/4 Bata, 1PC : 4PS - Pasir Lokal PU.E.23 HPS.PU. 2016 97,966.61 82,328.57

F. PEKERJAAN PLESTERAN
1 1 M2 Plesteran 1PC : 1PS, Tebal 15 mm - Pasir Import PU.F.1 SNI 2837:2008 61,827.15 63,330.00
2 1 M2 Plesteran 1PC : 2PS, Tebal 15 mm - Pasir Import PU.F.2 SNI 2837:2008 54,293.22 63,330.00
3 1 M2 Plesteran 1PC : 3PS, Tebal 15 mm - Pasir Import PU.F.3 SNI 2837:2008 52,439.41 63,330.00
4 1 M2 Plesteran 1PC : 4PS, Tebal 15 mm - Pasir Import PU.F.4 SNI 2837:2008 50,013.55 63,330.00
5 1 M2 Plesteran 1PC : 5PS, Tebal 15 mm - Pasir Import PU.F.5 SNI 2837:2008 50,224.01 63,330.00
6 1 M2 Plesteran 1PC : 1PS, Tebal 15 mm - Pasir Lokal PU.F.6 SNI 2837:2008 53,866.93 63,330.00
7 1 M2 Plesteran 1PC : 2PS, Tebal 15 mm - Pasir Lokal PU.F.7 SNI 2837:2008 44,342.94 63,330.00
8 1 M2 Plesteran 1PC : 3PS, Tebal 15 mm - Pasir Lokal PU.F.8 SNI 2837:2008 40,996.59 63,330.00
9 1 M2 Plesteran 1PC : 4PS, Tebal 15 mm - Pasir Lokal PU.F.9 SNI 2837:2008 38,073.22 63,330.00
10 1 M2 Plesteran 1PC : 5PS, Tebal 15 mm - Pasir Lokal PU.F.10 SNI 2837:2008 37,288.65 63,330.00
11 1 M2 Plesteran 1PC : 6PS, Tebal 15 mm - Pasir Lokal PU.F.11 SNI 2837:2008 36,293.72 63,330.00
12 1 M2 Plesteran 1PC : 7PS, Tebal 15 mm - Pasir Lokal PU.F.12 SNI 2837:2008 36,021.97 63,330.00
13 1 M2 Plesteran 1PC : 8PS, Tebal 15 mm - Pasir Lokal PU.F.13 SNI 2837:2008 35,750.21 63,330.00
14 1 M2 Plesteran 1PC : 2PS, Tebal 20 mm - Pasir Import PU.F.14 SNI 2837:2008 72,867.98 84,808.00
HARGA SATUAN PEKERJAAN (HSP)

PERIODE : JANUARI - JUNI 2016 LOKASI : KAMPUNG WASUR - DIST


JUMLAH HARGA
NO. JENIS PEKERJAAN ANALISA REFERENSI BAHAN TENAGA/ALAT
(Rp.) (Rp.)
1 2 3 4 5 6

15 1 M2 Plesteran 1PC : 3PS, Tebal 20 mm - Pasir Import PU.F.15 SNI 2837:2008 70,396.23 84,808.00
16 1 M2 Plesteran 1PC : 4PS, Tebal 20 mm - Pasir Import PU.F.16 SNI 2837:2008 66,684.74 84,808.00
17 1 M2 Plesteran 1PC : 5PS, Tebal 20 mm - Pasir Import PU.F.17 SNI 2837:2008 67,442.36 84,808.00
18 1 M2 Plesteran 1PC : 2PS, Tebal 20 mm - Pasir Lokal PU.F.18 SNI 2837:2008 59,435.10 84,808.00
19 1 M2 Plesteran 1PC : 3PS, Tebal 20 mm - Pasir Lokal PU.F.19 SNI 2837:2008 54,973.29 84,808.00
20 1 M2 Plesteran 1PC : 4PS, Tebal 20 mm - Pasir Lokal PU.F.20 SNI 2837:2008 50,764.29 84,808.00
21 1 M2 Plesteran 1PC : 5PS, Tebal 20 mm - Pasir Lokal PU.F.21 SNI 2837:2008 50,029.37 84,808.00
22 1 M2 Plesteran 1PC : 6PS, Tebal 20 mm - Pasir Lokal PU.F.22 SNI 2837:2008 48,391.63 84,808.00
23 1 M2 Plesteran 1PC : 2PS, Tebal 25 mm - Pasir Import PU.F.23 HPS.PU. 2016 57,523.99 71,260.00
24 1 M2 Plesteran 1PC : 3PS, Tebal 25 mm - Pasir Import PU.F.24 HPS.PU. 2016 79,590.58 71,352.00
25 1 M2 Plesteran 1PC : 4PS, Tebal 25 mm - Pasir Import PU.F.25 HPS.PU. 2016 78,183.72 71,352.00
26 1 M2 Plesteran 1PC : 5PS, Tebal 25 mm - Pasir Import PU.F.26 HPS.PU. 2016 75,747.82 71,352.00
27 1 M2 Plesteran 1PC : 2PS, Tebal 25 mm - Pasir Lokal PU.F.27 HPS.PU. 2016 51,056.31 71,260.00
28 1 M2 Plesteran 1PC : 3PS, Tebal 25 mm - Pasir Lokal PU.F.28 HPS.PU. 2016 62,177.59 71,352.00
29 1 M2 Plesteran 1PC : 4PS, Tebal 25 mm - Pasir Lokal PU.F.29 HPS.PU. 2016 59,278.19 71,352.00
30 1 M2 Plesteran 1PC : 5PS, Tebal 25 mm - Pasir Lokal PU.F.30 HPS.PU. 2016 56,344.78 71,352.00
31 1 M2 Plesteran 1PC : 2PS, Tebal 30 mm - Pasir Import PU.F.31 HPS.PU. 2016 96,916.48 82,470.00
32 1 M2 Plesteran 1PC : 3PS, Tebal 30 mm - Pasir Import PU.F.32 HPS.PU. 2016 91,341.13 82,470.00
33 1 M2 Plesteran 1PC : 2PS, Tebal 30 mm - Pasir Lokal PU.F.33 HPS.PU. 2016 79,503.49 82,470.00
34 1 M2 Plesteran 1PC : 3PS, Tebal 30 mm - Pasir Lokal PU.F.34 HPS.PU. 2016 71,938.09 82,470.00
35 1 M2 Plesteran 1PC : 4PS, Tebal 30 mm - Pasir Lokal PU.F.35 HPS.PU. 2016 67,783.19 82,470.00
36 1 M2 Plesteran 1PC : 5PS, Tebal 30 mm - Pasir Lokal PU.F.36 HPS.PU. 2016 62,573.67 82,470.00
37 1 M2 Barapen 1PC : 3PS, Tebal 30 mm - Pasir Import PU.F.37 HPS.PU. 2016 47,804.57 30,918.00
38 1 M2 Barapen 1PC : 3PS, Tebal 30 mm - Pasir Lokal PU.F.38 HPS.PU. 2016 37,356.77 30,918.00
39 1 M2 Barapen 1PC : 5PS, Tebal 30 mm - Pasir Lokal PU.F.39 HPS.PU. 2016 35,708.42 30,918.00
40 1 M2 Plesteran Batu Kali 1PC : 3PS - Pasir Lokal PU.F.40 HPS.PU. 2016 38,600.13 84,440.00
41 1 M2 Plesteran Batu Kali 1PC : 4PS - Pasir Lokal PU.F.41 HPS.PU. 2016 35,859.77 84,440.00
42 1 M2 Plesteran Skoning 1PC : 2PS, Tebal 10 mm - Pasir Lokal PU.F.42 SNI 2837:2008 13,391.31 77,296.00
43 1 M2 Plesteran Ciprat 1PC : 2PS, Tebal 10 mm - Pasir Lokal PU.F.43 SNI 2837:2008 16,448.66 54,940.00
44 1 M2 Finishing Siar Pasangan Dinding Bata Merah 20 M' PU.F.44 SNI 2837:2008 7,804.19 31,841.00
45 1 M2 Finishing Siar Pasangan Dinding Coneblock Ekspose 8 M' PU.F.45 HPS.PU. 2016 4,017.60 14,953.00
46 1 M2 Finishing Siar Pasangan Batu Kali/Belah Adukan 1PC : 2PS PU.F.46 SNI 2837:2008 27,122.03 63,330.00
47 1 M2 Acian PU.F.47 SNI 2837:2008 8,160.75 42,220.00
48 1 M' Benangan PU.F.48 HPS.PU. 2016 4,394.25 12,042.00

G. PEKERJAAN KAYU
1 1 M3 Kusen Pintu dan Jendela Kayu Kelas I PU.G.1 SNI 3434:2008 8,526,477.15 4,414,200.00
2 1 M3 Kusen Pintu dan Jendela Kayu Kelas II PU.G.2 SNI 3434:2008 5,240,065.35 3,783,600.00
3 1 M3 Kusen Pintu dan Jendela Kayu Kelas III PU.G.3 SNI 3434:2008 4,059,554.55 3,783,600.00
4 1 M2 Pintu Klamp Standar Kayu Kelas II PU.G.4 SNI 3434:2008 161,804.27 220,802.00
5 1 M2 Pintu Klamp Sederhana Kayu Kelas III PU.G.5 SNI 3434:2008 133,953.91 220,802.00
6 1 M2 Daun Pintu Panel Kayu Kelas I PU.G.6 SNI 3434:2008 353,220.66 630,600.00
7 1 M2 Daun Pintu Panel Kayu Kelas II PU.G.7 SNI 3434:2008 183,536.42 630,600.00
8 1 M2 Pintu dan Jendela Kaca, Kayu Kelas I PU.G.8 SNI 3434:2008 433,203.40 504,480.00
9 1 M2 Pintu dan Jendela Kaca, Kayu Kelas II PU.G.9 SNI 3434:2008 331,392.85 504,480.00
10 1 M2 Pintu dan Jendela Jalusi, Kayu Kelas I PU.G.10 SNI 3434:2008 551,608.36 630,600.00
11 1 M2 Pintu dan Jendela Jalusi, Kayu Kelas II PU.G.11 SNI 3434:2008 280,113.57 630,600.00
12 1 M2 Daun Pintu Kayu Lapis (Plywood) Rangkap, Rangka Tertutup PU.G.12 SNI 3434:2008 217,245.11 630,600.00
Kayu Kelas II (Lebar Sampai 90 cm)
13 1 M2 Pintu Plywood Rangkap Rangka Expose, Kayu Kelas I PU.G.13 SNI 3434:2008 328,257.45 504,480.00
14 1 M2 Pintu Plywood Rangkap Rangka Expose, Kayu Kelas II PU.G.14 SNI 3434:2008 219,659.54 504,480.00
15 1 M2 Jalusi Kusen, Kayu Kelas I PU.G.15 SNI 3434:2008 498,496.29 476,300.00
16 1 M2 Jalusi Kusen, Kayu Kelas II PU.G.16 SNI 3434:2008 243,969.93 476,300.00
17 1 M2 Teakwood Rangkap Rangka Expose, Kayu Kelas I PU.G.17 SNI 3434:2008 356,202.45 504,480.00
18 1 M2 Teakwood Rangkap Lapis Formika Rangka Expose, Kayu Kelas II PU.G.18 SNI 3434:2008 432,666.31 504,480.00
19 1 M3 Konstruksi Kuda-Kuda Konvensional, Kayu Kelas I PU.G.19 SNI 3434:2008 8,686,927.60 2,522,400.00
20 1 M3 Konstruksi Kuda-Kuda Konvensional, Kayu Kelas II PU.G.20 SNI 3434:2008 4,969,361.00 2,522,400.00
21 1 M3 Konstruksi Kuda-Kuda Konvensional, Kayu Kelas III PU.G.21 SNI 3434:2008 3,887,226.10 2,522,400.00
22 1 M3 Konstruksi Kuda-Kuda Expose, Kayu Kelas I PU.G.22 SNI 3434:2008 9,456,043.00 4,225,020.00
23 1 M3 Konstruksi Gordeng - Kayu Kelas II PU.G.23 SNI 3434:2008 4,925,558.80 1,513,440.00
24 1 M3 Konstruksi Gordeng - Kayu Kelas III PU.G.24 SNI 3434:2008 3,843,423.90 1,513,440.00
25 1 M2 Rangka Atap Genteng Keramik, Kayu Kelas II PU.G.25 SNI 3434:2008 99,659.92 29,500.00
26 1 M2 Rangka Atap Genteng Beton, Kayu Kelas II PU.G.26 SNI 3434:2008 134,746.42 29,500.00
27 1 M2 Rangka Atap Genteng Sirap, Kayu Kelas II PU.G.27 SNI 3434:2008 714,774.82 35,400.00
28 1 M2 Rangka Plafond (50 x 100), Kayu Kelas II PU.G.28 SNI 3434:2008 69,767.24 81,840.00
29 1 M2 Rangka Plafond (50 x 100), Kayu Kelas III PU.G.29 SNI 3434:2008 54,617.35 81,840.00
30 1 M2 Rangka Plafond (60 x 60), Kayu Kelas II PU.G.30 SNI 3434:2008 74,489.98 75,780.00
31 1 M2 Rangka Plafond (60 x 60), Kayu Kelas III PU.G.31 SNI 3434:2008 58,454.71 75,780.00
32 1 M2 Rangka Plafond (100 x 100), Kayu Kelas II PU.G.32 HPS.PU. 2016 53,423.28 73,450.00
33 1 M2 Rangka Plafond (100 x 100), Kayu Kelas III PU.G.33 HPS.PU. 2016 41,618.17 61,030.00
34 1 M2 Rangka Plafond (60 x 120), Kayu Kelas II PU.G.34 HPS.PU. 2016 58,071.76 66,930.00
35 1 M2 Rangka Plafond (60 x 120), Kayu Kelas III PU.G.35 HPS.PU. 2016 45,282.90 66,930.00
36 1 M' Lisplank Ukuran (3 x 20) cm, Kayu Kelas I PU.G.36 SNI 3434:2008 90,959.16 46,280.00
37 1 M' Lisplank Ukuran (3 x 20) cm, Kayu Kelas II PU.G.37 SNI 3434:2008 45,144.42 46,280.00
38 1 M' Lisplank Ukuran (3 x 30) cm, Kayu Kelas I PU.G.38 SNI 3434:2008 91,770.04 46,280.00
39 1 M' Lisplank Ukuran (3 x 30) cm, Kayu Kelas II PU.G.39 SNI 3434:2008 45,106.88 46,280.00
40 1 M' Lisplank Ukuran (2 x 20) cm, Kayu Kelas I PU.G.40 HPS.PU. 2016 40,688.36 29,500.00
41 1 M' Lisplank Ukuran (2 x 20) cm, Kayu Kelas II PU.G.41 HPS.PU. 2016 20,326.25 29,500.00
42 1 M' Lisplank Ukuran (2x25) cm, Kayu Kelas I PU.G.42 HPS.PU. 2016 50,607.74 29,500.00
43 1 M' Lisplank Ukuran (2x25) cm, Kayu Kelas II PU.G.43 HPS.PU. 2016 25,155.11 29,500.00
44 1 M' Lisplank Ukuran 2 x (3x20) cm, Kayu Kelas I PU.G.44 HPS.PU. 2016 120,870.05 61,030.00
45 1 M' Lisplank Ukuran 2 x (3x20) cm, Kayu Kelas II PU.G.45 HPS.PU. 2016 59,359.52 61,030.00
46 1 M' Lisplank Ukuran (2x20) cm, Kayu Kelas I PU.G.46 HPS.PU. 2016 72,099.74 29,500.00
47 1 M' Lisplank Ukuran (2x20) cm, Kayu Kelas II PU.G.47 HPS.PU. 2016 35,617.63 29,500.00
48 1 M' Lisplank Ukuran (2x20) cm, Kayu Kelas III PU.G.48 HPS.PU. 2016 29,629.81 29,500.00
49 1 M' Papan Ruiter, Kayu Kelas II PU.G.49 HPS.PU. 2016 16,433.13 16,985.60
50 1 M2 Dinding Bilik Bambu, Rangka Kayu Kelas III PU.G.50 SNI 3434:2008 538,594.59 21,110.00
51 1 M2 Dinding Bilik Bambu, Rangka Kayu Kelas IV PU.G.51 SNI 3434:2008 530,010.56 21,110.00
52 1 M2 Rangka Dinding Pemisah (60 x 120) cm, Kayu Kelas II PU.G.52 SNI 3434:2008 123,250.39 94,682.00
53 1 M2 Rangka Dinding Pemisah (60 x 120) cm, Kayu Kelas III PU.G.53 SNI 3434:2008 95,705.14 94,682.00
54 1 M2 Rangka Dinding Pemisah Teakwood Rangkap, PU.G.54 SNI 3434:2008 253,031.57 94,682.00
55 1 M2 Rangka Dinding Pemisah Plywood Rangkap, PU.G.55 SNI 3434:2008 365,268.45 126,120.00
56 1 M2 Lambriziring Dari Papan Kayu Kelas I PU.G.56 SNI 3434:2008 64,334.58 378,360.00
57 1 M2 Lambriziring dari Plywood Ukuran (120 x 240) cm PU.G.57 SNI 3434:2008 101,649.15 15,803.00
58 1 M3 Rangka/kolom dinding kayu - Kelas I PU.G.58 HPS.PU. 2016 8,794,255.40 3,864,800.00
59 1 M3 Rangka/kolom dinding kayu - Kelas II PU.G.59 HPS.PU. 2016 5,076,688.80 3,864,800.00
60 1 M3 Rangka/kolom dinding kayu - Kelas III PU.G.60 HPS.PU. 2016 3,994,553.90 3,864,800.00
61 1 M3 Gelagar bawah lantai - Kayu Kelas I PU.G.61 HPS.PU. 2016 8,493,865.40 3,280,200.00
62 1 M3 Gelagar bawah lantai - Kayu Kelas II PU.G.62 HPS.PU. 2016 4,776,298.80 3,280,200.00
63 1 M3 Gelagar bawah lantai - Kayu Kelas III PU.G.63 HPS.PU. 2016 3,694,163.90 3,280,200.00
64 1 M2 Lantai papan tebal 3,50 cm (bersih 3,00 cm) - Kayu Kelas I PU.G.64 HPS.PU. 2016 301,913.89 119,440.00
65 1 M2 Lantai papan tebal 3,50 cm (bersih 3,00 cm) - Kayu Kelas II PU.G.65 HPS.PU. 2016 166,856.84 119,440.00
66 1 M2 Lantai papan tebal 3,50 cm (bersih 3,00 cm) - Kayu Kelas III PU.G.66 HPS.PU. 2016 129,071.12 119,440.00
67 1 M2 Dinding papan (kayu gergajian) - Kayu Kelas I PU.G.67 HPS.PU. 2016 251,278.42 193,040.00
HARGA SATUAN PEKERJAAN (HSP)

PERIODE : JANUARI - JUNI 2016 LOKASI : KAMPUNG WASUR - DIST


JUMLAH HARGA
NO. JENIS PEKERJAAN ANALISA REFERENSI BAHAN TENAGA/ALAT
(Rp.) (Rp.)
1 2 3 4 5 6

68 1 M2 Dinding papan (kayu gergajian) - Kayu Kelas II PU.G.68 HPS.PU. 2016 135,515.23 193,040.00
69 1 M2 Dinding papan (kayu gergajian) - Kayu Kelas III PU.G.69 HPS.PU. 2016 103,127.47 193,040.00
70 1 M2 Jalusi kayu kelas I + lapis has nyamuk PU.G.70 HPS.PU. 2016 307,283.05 102,736.00
71 1 M2 Jalusi kayu kelas II + lapis has nyamuk PU.G.71 HPS.PU. 2016 164,748.29 102,736.00
72 1 M2 Jalusi kayu kelas III + lapis has nyamuk PU.G.72 HPS.PU. 2016 141,353.99 102,736.00
73 1 M2 Jalusi kayu kelas IV + lapis has nyamuk PU.G.73 HPS.PU. 2016 105,296.32 102,736.00
74 1 Btg Pancang Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) - Manual PU.G.74 HPS.PU. 2016 - 128,847.80
75 1 Btg Pancang Tiang Turap Jembatan (Dia 20 cm, L=4-6 m) - Manual PU.G.75 HPS.PU. 2016 - 111,276.02
76 1 Btg Pancang Tiang Umpak Jembatan (Dia 25-30 cm, L=4-6 m) - Mekanis PU.G.76 HPS.PU. 2016 - 144,006.00
77 1 Btg Pancang Tiang Turap Jembatan (Dia 20 cm, L=4-6 m) - Mekanis PU.G.77 HPS.PU. 2016 - 138,386.67
78 1 Btg Pancang Tiang Cerucuk Kayu (Excavator) PU.G.78 HPS.PU. 2016 - 278,012.00
79 1 Btg Pancang Tiang Cerucuk Beton (Excavator) PU.G.79 HPS.PU. 2016 - 294,870.00
80 1 Btg Pancang Tiang Umpak untuk Pondasi Rumah PU.G.80 HPS.PU. 2016 56,870.25 42,340.57
81 1 M3 Gelagar Melintang Jembatan PU.G.81 HPS.PU. 2016 3,952,851.23 5,044,800.00
82 1 M3 Gelagar Memanjang Jembatan PU.G.82 HPS.PU. 2016 3,786,920.40 5,044,800.00
83 1 M2 Lantai dan Dinding Turap Jembatan PU.G.83 HPS.PU. 2016 195,663.65 214,493.33
84 1 M3 Sandaran dan Balok Pengikat Tiang Pancang Jembatan PU.G.84 HPS.PU. 2016 3,786,920.40 5,044,800.00

H. PEKERJAAN ATAP
1 1 M2 Penutup Atap Seng Gelombang BJLS 0,30 PU.H.1 SNI 03-3436-2002 53,335.68 25,332.00
2 1 M2 Penutup Atap Seng Gelombang BJLS 0,22 PU.H.2 SNI 03-3436-2002 48,859.88 25,332.00
3 1 M2 Penutup Atap Seng Gelombang BJLS 0,20 PU.H.3 SNI 03-3436-2002 37,475.78 25,332.00
4 1 M' Bubungan/Nok Atap Seng Gelombang BJLS 0,30 PU.H.4 SNI 03-3436-2002 33,020.78 57,804.00
5 1 M' Bubungan/Nok Atap Seng Gelombang BJLS 0,20 PU.H.5 SNI 03-3436-2002 34,915.98 57,804.00
6 1 M2 Penutup Atap Fiberglass Gelombang PU.H.6 SNI 03-3436-2002 60,234.21 29,101.00
7 1 M' Bubungan/Nok Atap Fiberglass Gelombang PU.H.7 SNI 03-3436-2002 34,915.98 57,804.00
8 1 M2 Penutup Atap Genteng Metal - Multiroof PU.H.8 SNI 03-3436-2002 68,991.25 40,564.00
9 1 M' Bubungan/Nok Atap Genteng Metal - Multiroof PU.H.9 SNI 03-3436-2002 35,225.05 57,062.00
10 1 M2 Penutup Atap Alumunium Gelombang PU.H.10 SNI 03-3436-2002 87,768.70 25,332.00
11 1 M' Bubungan/Nok Atap Alumunium Gelombang PU.H.11 SNI 03-3436-2002 98,144.70 29,500.00
12 1 M' Talang Datar / Jurai Seng BJLS Lebar 90 cm PU.H.12 SNI 7393-2008 112,565.05 90,040.00
13 1 M' Talang ½ Lingkaran D-15 cm, Seng Plat BJLS 30 45 cm PU.H.13 SNI 7393-2008 15,503.33 69,420.00

I. PEKERJAAN PENUTUP LANTAI DAN DINDING


1 1 M2 Lantai Ubin PC Abu-abu Ukuran 20 x 20 cm PU.I.1 SNI 7395-2008 121,476.47 57,173.00
2 1 M2 Lantai Ubin PC Abu-abu Ukuran 30 x 30 cm PU.I.2 SNI 7395-2008 159,668.97 54,886.00
3 1 M2 Lantai Ubin PC Abu-abu Ukuran 40 x 40 cm PU.I.3 SNI 7395-2008 155,671.40 51,936.00
4 1 M2 Lantai Ubin PC Warna Ukuran 20 x 20 cm PU.I.4 SNI 7395-2008 156,925.50 57,173.00
5 1 M2 Lantai Ubin PC Warna Ukuran 30 x 30 cm PU.I.5 SNI 7395-2008 153,875.99 54,886.00
6 1 M2 Lantai Ubin PC Warna Ukuran 40 x 40 cm PU.I.6 SNI 7395-2008 179,471.20 52,951.00
7 1 M2 Lantai Ubin PC Teraso Ukuran 30 x 30 cm PU.I.7 SNI 7395-2008 156,570.48 54,886.00
8 1 M2 Lantai Ubin PC Teraso Ukuran 40 x 40 cm PU.I.8 SNI 7395-2008 187,095.70 52,951.00
9 1 M2 Lantai Ubin PC Granito Ukuran 30 x 30 cm PU.I.9 SNI 7395-2008 154,706.89 54,886.00
10 1 M2 Lantai Ubin PC Granito Ukuran 40 x 40 cm PU.I.10 SNI 7395-2008 244,597.69 52,951.00
11 1 M2 Lantai Ubin Teralux Kerang Ukuran 30 x 30 cm PU.I.11 SNI 7395-2008 165,567.94 54,886.00
12 1 M2 Lantai Ubin Teralux Kerang Ukuran 40 x 40 cm PU.I.12 SNI 7395-2008 179,471.20 52,951.00
13 1 M2 Lantai Ubin Teralux Marmer Ukuran 60 x 60 cm PU.I.13 SNI 7395-2008 301,646.88 50,664.00
14 1 M2 Lantai Ubin Teralux Marmer Ukuran 40 x 40 cm PU.I.14 SNI 7395-2008 236,654.95 52,951.00
15 1 M2 Lantai Ubin Teralux Marmer Ukuran 30 x 30 cm PU.I.15 SNI 7395-2008 193,498.05 54,886.00
16 1 M2 Lantai Keramik Artistik Ukuran 10 x 20 cm PU.I.16 SNI 7395-2008 152,210.67 147,770.00
17 1 M2 Lantai Keramik Ukuran 15 x 15 cm PU.I.17 HPS.PU. 2016 139,644.87 147,770.00
18 1 M2 Lantai Keramik Artistik Uk. 10 x 10 cm atau 5 x 20 cm PU.I.18 SNI 7395-2008 235,186.87 147,770.00
19 1 M2 Lantai Keramik Ukuran 33 x 33 cm PU.I.19 SNI 7395-2008 138,005.19 147,770.00
20 1 M2 Lantai Keramik Ukuran 30 x 30 cm berglasir PU.I.20 SNI 7395-2008 154,706.89 147,770.00
21 1 M2 Lantai Keramik Ukuran 40 x 40 cm PU.I.21 HPS.PU. 2016 166,660.10 147,770.00
22 1 M2 Lantai Keramik Ukuran 25 x 25 cm PU.I.22 HPS.PU. 2016 144,226.98 147,770.00
23 1 M2 Lantai Keramik Ukuran 20 x 25 cm PU.I.23 HPS.PU. 2016 161,540.87 147,770.00
24 1 M2 Lantai Keramik Ukuran 20 x 20 PU.I.24 SNI 7395-2008 158,012.00 147,770.00
25 1 M2 Lantai Mozaik Uk. 30 x 30 cm, Camp. 1PC : 3PS PU.I.25 SNI 7395-2008 164,072.47 147,770.00
26 1 M2 Lantai Marmer Ukuran 100 x 100 cm PU.I.26 SNI 7395-2008 500,357.75 147,770.00
27 1 M' Plint Ubin PC Abu-abu Ukuran 10 x 30 cm PU.I.27 SNI 7395-2008 47,077.54 26,642.00
28 1 M' Plint Ubin PC Abu-abu Ukuran 10 x 40 cm PU.I.28 SNI 7395-2008 41,387.11 26,642.00
29 1 M' Plint Ubin PC Warna Ukuran 10 x 20 cm PU.I.29 SNI 7395-2008 36,973.61 26,642.00
30 1 M' Plint Ubin PC Warna Ukuran 10 x 30 cm PU.I.30 SNI 7395-2008 36,967.29 26,642.00
31 1 M' Plint Ubin PC Warna Ukuran 10 x 40 cm PU.I.31 SNI 7395-2008 29,235.61 26,642.00
32 1 M' Plint Ubin Teraso Ukuran 10 x 30 cm PU.I.32 SNI 7395-2008 36,967.29 26,642.00
33 1 M' Plint Ubin Teraso Ukuran 10 x 40 cm PU.I.33 SNI 7395-2008 44,473.11 26,642.00
34 1 M' Plint Ubin Granito Ukuran 10 x 40 cm PU.I.34 HPS.PU. 2016 44,473.11 26,642.00
35 1 M' Plint Ubin Granito Ukuran 10 x 30 cm PU.I.35 SNI 7395-2008 36,967.29 26,642.00
36 1 M' Plint Ubin Teralux Kerang Ukuran 10 x 40 cm PU.I.36 SNI 7395-2008 29,235.61 26,642.00
37 1 M' Plint Ubin Teralux Kerang Ukuran 10 x 30 cm PU.I.37 SNI 7395-2008 36,967.29 26,642.00
38 1 M' Plint Ubin Teralux Marmer Ukuran 10 x 60 cm PU.I.38 SNI 7395-2008 35,570.11 26,642.00
39 1 M' Plint Ubin Teralux Marmer Ukuran 10 x 40 cm PU.I.39 SNI 7395-2008 36,854.36 26,642.00
40 1 M' Plint Ubin Teralux Marmer Ukuran 10 x 30 cm PU.I.40 HPS.PU. 2016 36,967.29 26,642.00
41 1 M' Plint Keramik Artistik Ukuran 10 x 20 cm PU.I.41 SNI 7395-2008 35,235.31 26,642.00
42 1 M' Plint Keramik Artistik Ukuran 10 x 10 cm PU.I.42 SNI 7395-2008 61,638.11 26,642.00
43 1 M' Plint Keramik Ukuran 5 x 20 cm PU.I.43 SNI 7395-2008 27,736.80 26,642.00
44 1 M' Plint Keramik Ukuran 10 x 30 CM PU.I.44 HPS.PU. 2016 35,210.09 26,642.00
45 1 M' Plint Kayu Klas II Tebal 2 cm, Lebar 10cm PU.I.45 SNI 7395-2008 10,860.22 35,400.00
46 1 M2 Dinding Porselin Ukuran 11 x 11 cm, (putih/warna) PU.I.46 SNI 7395-2008 118,631.73 211,100.00
47 1 M2 Dinding Porselin Ukuran 15 x 15 cm PU.I.47 HPS.PU. 2016 96,899.73 189,990.00
48 1 M2 Dinding Porselin Ukuran 10 x 20 cm PU.I.48 SNI 7395-2008 105,571.73 189,990.00
49 1 M2 Dinding Porselin Ukuran 20 x 20 cm PU.I.49 SNI 7395-2008 129,884.97 189,990.00
50 1 M2 Dinding Keramik Artistik Ukuran 10 x 20 cm PU.I.50 SNI 7395-2008 125,181.73 189,990.00
51 1 M2 Dinding Keramik Artistik Ukuran 10x10 atau 5x20 cm PU.I.51 SNI 7395-2008 137,488.13 189,990.00
52 1 M2 Dinding Keramik Ukuran 10 x 20 cm PU.I.52 HPS.PU. 2016 129,792.73 189,990.00
53 1 M2 Dinding Keramik Ukuran 20 x 20 cm PU.I.53 SNI 7395-2008 130,971.47 189,990.00
54 1 M2 Dinding Keramik Ukuran 20 x 25 cm PU.I.54 HPS.PU. 2016 111,613.97 189,990.00
55 1 M2 Dinding Batu Paras PU.I.55 SNI 7395-2008 273,540.39 147,770.00
56 1 M2 Dinding Batu Tempel Hitam PU.I.56 SNI 7395-2008 273,540.39 147,770.00
57 1 M2 Dinding Marmer Ukuran 100 x 100 cm PU.I.57 SNI 7395-2008 542,950.56 274,430.00
58 1 M2 Pasang Wallpaper Lebar 50 cm PU.I.58 SNI 7395-2008 404,200.65 70,949.00
59 1 M2 Pasang Paving Block PU.I.59 HPS.PU. 2016 455,134.40 79,040.00

J. PEKERJAAN BESI - ALUMUNIUM


1 1 KG Pasang Besi Profil PU.J.1 SNI 7393-2008 28,049.65 17,700.00
2 1 KG Pasang Kuda-Kuda Baja IWF PU.J.2 SNI 7393-2008 28,049.65 17,700.00
3 1 KG Gording Baja PU.J.3 SNI 7393-2008 28,049.65 17,700.00
4 100 KG Perakitan Besi Baja PU.J.4 SNI 7393-2008 13,603.40 627,988.00
5 1 M2 Pintu Besi Plat Baja Tbl 2 mm Rangkap, Rangka Baja Siku PU.J.5 SNI 7393-2008 662,847.45 309,658.00
6 10 CM Pengelasan Dengan Las Listrik PU.J.6 SNI 7393-2008 75,844.46 8,444.00
7 1 M2 Pasang Sunscreen Alumunium PU.J.7 SNI 7393-2008 150,000.00 144,416.00
8 1 M2 Pasang Rolling Door Alumunium PU.J.8 SNI 7393-2008 2,500,000.00 295,000.00
9 1 M' Pasang Kusen Pintu Alumunium PU.J.9 SNI 7393-2008 199,500.00 12,675.80
HARGA SATUAN PEKERJAAN (HSP)

PERIODE : JANUARI - JUNI 2016 LOKASI : KAMPUNG WASUR - DIST


JUMLAH HARGA
NO. JENIS PEKERJAAN ANALISA REFERENSI BAHAN TENAGA/ALAT
(Rp.) (Rp.)
1 2 3 4 5 6

10 1 M2 Pasang Pintu Kaca Rangka Alumunium PU.J.10 SNI 7393-2008 799,250.00 25,297.00
11 1 M2 Pasang Terali Besi Strip (2 x 3) mm PU.J.11 SNI 7393-2008 367,144.79 492,558.00
12 1 M2 Pasang Kawat Nyamuk (Rangka Besi) PU.J.12 SNI 7393-2008 159,986.90 29,500.00
13 1 M2 Pasang Kawat Nyamuk (Rangka Kayu) PU.J.13 HPS.PU. 2016 35,858.43 28,672.00
14 1 M2 Pasang Kawat Harmonika PU.J.14 HPS.PU. 2016 60,986.83 28,672.00
15 1 M2 Pasang Kawat Kassa PU.J.15 HPS.PU. 2016 35,858.43 28,672.00
16 1 M2 Pasang Kawat Burung PU.J.16 HPS.PU. 2016 52,578.43 28,672.00
17 1 M2 Jendela Nako dan Tralis PU.J.17 SNI 7393-2008 323,285.00 141,480.00
HARGA SATUAN PEKERJAAN (HSP)

PERIODE : JANUARI - JUNI 2016 LOKASI : KAMPUNG WASUR - DIST


JUMLAH HARGA
NO. JENIS PEKERJAAN ANALISA REFERENSI BAHAN TENAGA/ALAT
(Rp.) (Rp.)
1 2 3 4 5 6

18 1 KG Plat Besi Lembaran tebal : 1.0 mm - 120 x 240 Cm PU.J.18 HPS.PU. 2016 19,796.10 17,700.00
19 1 KG Plat Besi Lembaran tebal : 1.2 mm - 120 x 240 Cm PU.J.19 HPS.PU. 2016 18,780.65 17,700.00
20 1 KG Plat Besi Lembaran tebal : 2.0 mm - 120 x 240 Cm PU.J.20 HPS.PU. 2016 16,687.65 17,700.00
21 1 KG Plat Besi Lembaran tebal : 3.0 mm - 120 x 240 Cm PU.J.21 HPS.PU. 2016 17,396.05 17,700.00

K. PEKERJAAN LANGIT - LANGIT


1 1 M2 Langit-langit Triplek Ukuran (120 x 240) tebal 3 mm PU.K.1 SNI 2839:2008 27,838.79 29,500.00
2 1 M2 Langit-langit Triplek Ukuran (120 x 240) tebal 4 mm PU.K.2 SNI 2839:2008 35,591.91 29,500.00
3 1 M2 Langit-langit Triplek Ukuran (120 x 240) tebal 6 mm PU.K.3 SNI 2839:2008 46,249.04 29,500.00
4 1 M2 Langit-langit Lambriziring Kayu, Tebal 9 mm PU.K.4 SNI 2839:2008 60,529.19 236,000.00
5 1 M2 Langit-langit Gypsum Board Ukuran (1200 x 2400 x 9) mm PU.K.5 SNI 2839:2008 44,589.04 21,110.00
6 1 M' Pasang list plafond gypsum profil PU.K.6 SNI 2839:2008 43,368.00 17,700.00
7 1 M' List Langit - langit Kayu lat/profil PU.K.7 SNI 2839:2008 12,448.75 14,842.00

L. PEKERJAAN KUNCI, PENGGANTUNG DAN KACA


1 1 Buah Kunci Pintu Tanam Antik PU.L.1 Pt T-30-2000-C 141,197.00 100,680.00
2 1 Buah Kunci Pintu Tanam Biasa PU.L.2 Pt T-30-2000-C 85,010.00 83,900.00
3 1 Buah Kunci Slot Untuk Kamar Mandi atau WC PU.L.3 Pt T-30-2000-C 97,911.00 41,950.00
4 1 Buah Engsel Pintu PU.L.4 Pt T-30-2000-C 27,991.00 21,059.00
5 1 Buah Engsel Pintu Klamp PU.L.5 Pt T-30-2000-C 27,991.00 73,842.00
6 1 Buah Engsel Jendela PU.L.6 Pt T-30-2000-C 21,666.00 16,780.00
7 1 Buah Kait Angin PU.L.7 Pt T-30-2000-C 8,211.00 16,780.00
8 1 Buah Grendel PU.L.8 Pt T-30-2000-C 77,067.00 16,780.00
9 1 M2 Kaca polos tebal 3 mm PU.L.9 Pt T-30-2000-C 191,875.20 47,200.00
10 1 M2 Kaca mati polos tebal 5 mm PU.L.10 Pt T-30-2000-C 221,893.10 47,200.00
11 1 M2 Kaca raiben tebal 5 mm PU.L.11 Pt T-30-2000-C 192,798.10 47,200.00
12 1 M2 Kaca buram tebal 3 mm PU.L.12 Pt T-30-2000-C 128,625.20 47,200.00
13 1 M2 Kaca buram tebal 5 mm PU.L.13 Pt T-30-2000-C 243,398.10 47,200.00
14 1 Unit Jendela Ungkit (75 x 115 cm), bingkai 3x8 cm, kaca polos 5 mm PU.L.14 HPS.PU. 2016 312,818.52 314,700.00
15 1 Unit Untuk Jendela gantung hanya 1 bh kait angin dan 1 grendel PU.L.15 HPS.PU. 2016 - 627,518.00
16 1 Unit Jendela Jalusi 75 x 120 cm PU.L.16 HPS.PU. 2016 317,735.83 680,000.00
17 1 Unit Pintu Panel 80 x 210 cm PU.L.17 HPS.PU. 2016 486,493.42 1,458,125.00
18 1 Unit Pintu double tripleks 80 x 210 cm, bingkai kayu 3,5 x 9 cm PU.L.18 HPS.PU. 2016 618,929.17 544,400.00
19 1 Unit Pintu double tripleks 80x210 cm, bingkai kayu 3,5x9 cm lapis seng plat PU.L.19 HPS.PU. 2016 1,221,110.27 -
20 1 Unit Pintu double tripleks 70 x 210 cm, bingkai kayu 3,5 x 9 cm PU.L.20 HPS.PU. 2016 588,748.34 544,400.00
21 1 Unit Pintu double tripleks 70x210 cm, bingkai kayu 3,5x9 cm lapis seng plat PU.L.21 HPS.PU. 2016 1,190,929.44 -
22 1 Unit Pintu double tekwood 80 x 210 cm, bingkai kayu 3,5 x 9 cm PU.L.22 HPS.PU. 2016 1,382,045.37 -
23 1 Unit Pintu kisi kaca kayu rahay 80 x 210 cm PU.L.23 HPS.PU. 2016 750,921.62 1,261,200.00
24 1 Unit Pintu klam 80 x 210 cm ( tempel ) PU.L.24 HPS.PU. 2016 696,181.14 811,000.00

M. PEKERJAAN SANITASI DAN AIR


1 1 BH Closet duduk / monoblok PU.M.1 RSNI T-15-2002 1,846,532.00 695,899.92
2 1 BH Closet jongkok porselin PU.M.2 RSNI T-15-2002 649,909.24 399,140.00
3 1 BH Closet jongkok plastik PU.M.3 RSNI T-15-2002 293,275.50 357,280.00
4 1 BH Memasang Urinoir PU.M.4 RSNI T-15-2002 1,346,751.24 868,905.00
5 1 BH Memasang Wastafel PU.M.5 RSNI T-15-2002 561,876.24 468,647.00
6 1 Buah Bak Mandi Fiberglass 0,3 M3 PU.M.6 RSNI T-15-2002 321,390.00 788,910.20
7 1 Buah Bak Air Fiberglass 1 M3 PU.M.7 RSNI T-15-2002 572,654.00 1,419,018.48
8 1 BH Bak Mandi Batu Bata Volume 0,3 M3 PU.M.8 RSNI T-15-2002 1,497,873.20 1,266,600.00
9 1 M Pipa penyalur air limbah jenis pipa tanah Dia. 15 cm PU.M.9 RSNI T-15-2002 974,502.91 17,440.00
10 1 BH Bak Kontrol Pasangan Bata Ukuran (30 x 30) x 50 cm PU.M.10 RSNI T-15-2002 597,796.73 534,061.00
11 1 BH Bak Kontrol Pasangan Bata Ukuran (45 x 45) x 50 cm PU.M.11 RSNI T-15-2002 1,133,674.76 259,943.00
12 1 BH Bak Kontrol Pasangan Bata Ukuran (60 x 60) x 65 cm PU.M.12 RSNI T-15-2002 1,305,520.51 410,668.00
13 1 M Memasang Pipa Galvanis Dia. 1/2" PU.M.13 RSNI T-15-2002 22,310.00 32,949.08
14 1 M Memasang Pipa Galvanis Dia. 3/4" PU.M.14 RSNI T-15-2002 29,467.60 35,036.72
15 1 M Memasang Pipa Galvanis Dia. 1" PU.M.15 RSNI T-15-2002 36,445.80 32,600.83
16 1 M Memasang Pipa Galvanis Dia. 1,5" PU.M.16 RSNI T-15-2002 56,927.20 60,545.37
17 1 M Memasang Pipa Galvanis Dia. 3" PU.M.17 RSNI T-15-2002 112,522.80 76,760.75
18 1 M Memasang Pipa Galvanis Dia. 4" PU.M.18 RSNI T-15-2002 148,856.00 98,352.53
19 1 M Memasang Pipa PVC Tipe AW Dia. 1/2" PU.M.19 RSNI T-15-2002 8,637.30 17,166.41
20 1 M Memasang Pipa PVC Tipe AW Dia. 3/4" PU.M.20 RSNI T-15-2002 10,699.20 17,767.80
21 1 M Memasang Pipa PVC Tipe AW Dia. 1" PU.M.21 RSNI T-15-2002 14,001.00 18,730.83
22 1 M Memasang Pipa PVC Tipe AW Dia. 1,5" PU.M.22 RSNI T-15-2002 21,246.00 20,843.95
23 1 M Memasang Pipa PVC Tipe AW Dia. 2" PU.M.23 RSNI T-15-2002 21,246.00 28,167.55
24 1 M Memasang Pipa PVC Tipe AW Dia. 3" PU.M.24 RSNI T-15-2002 44,226.30 66,276.74
25 1 M Memasang Pipa PVC Tipe AW Dia. 4" PU.M.25 RSNI T-15-2002 61,766.10 71,392.51
26 1 BH Kran air Dia. 3/4" atau 1/2" PU.M.26 RSNI T-15-2002 33,644.40 16,905.00
27 1 Unit Bak air volume 1 m3 - (Pasir Import) PU.M.27 HPS.PU. 2016 3,004,675.00 757,800.00
28 1 Unit Bak air volume 1 m3 - (Pasir Lokal) PU.M.28 HPS.PU. 2016 2,507,161.00 757,800.00
29 1 M Talang air pvc 8" PU.M.29 HPS.PU. 2016 173,075.55 75,780.00
30 1 M Talang jurai/talang got PU.M.30 HPS.PU. 2016 43,030.62 48,310.00
31 1 Unit Septictank (2x1x1,8cm), Pas. Bata 1PC:4PS, Pasir Import PU.M.31 HPS.PU. 2016 8,041,755.45 1,180,000.00
32 1 Unit Septictank (2x1x1,8m), Pas. Bata 1PC:4PS, Pasir Lokal PU.M.32 HPS.PU. 2016 6,797,970.45 1,180,000.00
33 1 Unit Septictank (1,5x1,5x1,5 m) dinding papan PU.M.33 HPS.PU. 2016 4,680,600.95 -
34 1 Unit Septictank 2x(75 x 75) cm, Dalam 1,5 m dan peresapan PU.M.34 HPS.PU. 2016 2,056,128.33 899,720.00
35 1 Unit Bak Peresapan Uk.1 x 1 m, jarak 2 m dari septictank PU.M.35 HPS.PU. 2016 1,102,201.50 -
36 1 Unit Bak air Uk. 60 x 60 x 80 PU.M.36 HPS.PU. 2016 863,730.70 -
37 1 Unit Pompa dragon/pompa tangan PU.M.37 HPS.PU. 2016 1,069,750.82 25,000.00
38 1 M Memasang Pipa HDPE Ø 50 mm - 63 mm PU.M.38 PAHSP PU 2013 - 21,499.00
39 1 M Memasang Pipa HDPE Ø 75 mm PU.M.39 PAHSP PU 2013 - 22,112.50
40 1 M Memasang Pipa HDPE Ø 100 mm PU.M.40 PAHSP PU 2013 - 22,726.00
41 1 M Galian Tanah Pipa HDPE Ø 100 mm (b=30 ; h=80 cm) PU.M.41 HPS.PU. 2016
42 1 M Urug Kembali Galian Tanah Pipa HDPE Ø 100 mm PU.M.42 HPS.PU. 2016
43 1 M Galian Tanah Pipa HDPE Ø 75 mm (b=30 ; h=65 cm) PU.M.43 HPS.PU. 2016 18,154.50
44 1 M Urug Kembali Galian Tanah Pipa HDPE Ø 75 mm PU.M.44 HPS.PU. 2016 5,876.87
45 1 M Galian Tanah Pipa HDPE Ø 50-63 mm (b=25 ; h=65 cm) PU.M.45 HPS.PU. 2016 15,128.75
46 1 M Urug Kembali Galian Tanah Pipa HDPE Ø 50 mm PU.M.46 HPS.PU. 2016 4,965.28
47 1M Pengetesan Pipa PU.M.47 HPS.PU. 2016 900.00 10,476.72
48 1 Unit Box Valve Ukuran (60 x 60) x 65 cm PU.M.48 HPS.PU. 2016 2,552,016.40 -
49 1 Buah Trush Block Beton Ukuran 40 x 30 x 20 cm PU.M.49 HPS.PU. 2016 98,636.06 -
50 1 M2 Bongkaran dan Galian Jalan untuk Pipa PU.M.50 HPS.PU. 2016 - 480,539.00
51 1M Memasang PVC Water Stop Lebar 230 - 320 mm PU.M.51 HPS.PU. 2016 131,250.00 21,308.00

N. PEKERJAAN CAT DAN RESIDU


1 1 M2 Mengikis atau mengerok cat tembok lama (manual) PU.N.1 Pt.T-38-2000-C 250.00 19,172.00
2 1 M2 Lapis Plamir PU.N.2 Pt.T-38-2000-C 3,753.80 7,578.00
3 1 M2 Cat bidang tembok lama (2 lapis dengan kuas) PU.N.3 Pt.T-38-2000-C 3,218.83 10,811.60
4 1 M2 Cat bidang tembok lama (2 lapis dengan roll) PU.N.4 Pt.T-38-2000-C 6,359.80 10,290.00
5 1 M2 Cat Plafond 2 Lapis dgn cat tembok menggunakan kuas PU.N.5 Pt.T-38-2000-C 6,972.63 20,244.00
6 1 M2 Cat Plafond 2 Lapis dgn cat tembok menggunakan roll PU.N.6 Pt.T-38-2000-C 10,113.60 14,344.00
7 1 M2 Pasang Wall Paper dengan perekat PU.N.7 Pt.T-38-2000-C 205,486.50 18,880.00
8 1 M2 Pelapisan Bidang Kayu Dengan Meny PU.N.8 Pt.T-38-2000-C 9,259.80 9,586.00
9 1 M2 Mengecat Dasar 1 Lapis Pada Kayu PU.N.9 Pt.T-38-2000-C 19,722.07 12,669.00
10 1 M2 Mengecat Penutup 2 Lapis Pada Kayu PU.N.10 Pt.T-38-2000-C 27,070.10 44,342.00
HARGA SATUAN PEKERJAAN (HSP)

PERIODE : JANUARI - JUNI 2016 LOKASI : KAMPUNG WASUR - DIST


JUMLAH HARGA
NO. JENIS PEKERJAAN ANALISA REFERENSI BAHAN TENAGA/ALAT
(Rp.) (Rp.)
1 2 3 4 5 6

11 1 M2 Pelapisan Bidang Besi-Baja Dengan Meny PU.N.11 Pt.T-38-2000-C 7,085.00 9,586.00


12 1 M2 Mengecat Penutup 2 Lapis Pada Permukaan Besi (manual) PU.N.12 Pt.T-38-2000-C 16,964.70 44,342.00
HARGA SATUAN PEKERJAAN (HSP)

PERIODE : JANUARI - JUNI 2016 LOKASI : KAMPUNG WASUR - DIST


JUMLAH HARGA
NO. JENIS PEKERJAAN ANALISA REFERENSI BAHAN TENAGA/ALAT
(Rp.) (Rp.)
1 2 3 4 5 6

13 1 M2 Pelapisan Bidang Kayu Dengan Residu / ter PU.N.13 Pt.T-38-2000-C 7,469.18 16,780.00
14 1 M2 Cat tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) PU.N.14 HPS.PU. 2016 5,717.55 13,391.40
15 1 M2 Cat tembok lama (1 lapis cat dasar, 2 lapis cat penutup) PU.N.15 HPS.PU. 2016 3,836.04 10,811.60
16 1 M2 Cat ulang dinding/tembok PU.N.16 HPS.PU. 2016

11 1 M2 Pelapisan Bidang Besi-Baja Dengan Meny PU.N.11 Pt.T-38-2000-C 7,085.00 9,586.00


12 1 M2 Mengecat Penutup 2 Lapis Pada Permukaan Besi (manual) PU.N.12 Pt.T-38-2000-C 16,964.70 44,342.00
13 1 M2 Pelapisan Bidang Kayu Dengan Residu / ter PU.N.13 Pt.T-38-2000-C 7,469.18 16,780.00

O. PEKERJAAN INSTALASI LISTRIK


1 1 Titik Instalasi Lampu SL 18 - 23 VA+ Pitting + Saklar PU.O.1 HPS.PU. 2016 129,069.20 60,000.00
2 1 Titik Instalasi Lampu SL 8 - 14 VA+ Pitting + Saklar PU.O.2 HPS.PU. 2016 119,487.20 60,000.00
3 1 Titik Instalasi Stop Kontak PU.O.3 HPS.PU. 2016 63,121.55 60,000.00
4 1 Unit MCB PU.O.4 HPS.PU. 2016 259,706.75 60,000.00
5 1 Titik Saklar Ganda PU.O.5 HPS.PU. 2016 21,429.00 238,142.90
6 1 Titik Saklar Tunggal PU.O.6 HPS.PU. 2016 17,814.00 237,781.40
7 1 Unit Panel Box PU.O.7 HPS.PU. 2016 575,782.00 582,891.00
8 1 M' Kabel NYA 2.5 mm PU.O.8 HPS.PU. 2016 12,663.18 12,032.07

P. PEKERJAAN ASPAL
1 1 M2 Lapis Resap Pengikat (Prime Coat) - Manual PU.P.1 HPS.PU. 2016 22,592.67 1,773.30
2 1 M2 Lapis Resap Pengikat (Prime Coat) - Mekanis PU.P.2 HPS.PU. 2016 17,592.67 3,522.27
3 1 M2 Lapis Perekat (Tack Coat) - Manual PU.P.3 HPS.PU. 2016 24,731.52 1,773.30
4 1 M2 Lapis Perekat (Tack Coat) - Mekanis PU.P.4 HPS.PU. 2016 19,731.52 4,098.67
5 1 M2 Latasir (SS) Kelas B (Pasir Import) tebal 2 cm PU.P.5 HPS.PU. 2016 193,542.15 35,372.44
6 1 M2 Latasir (SS) Kelas B (Pasir lokal) tebal 2 cm PU.P.6 HPS.PU. 2016 176,917.61 30,908.64
7 1 M2 Latasir (SS) Kelas B (Pasir Import) tebal 1,5 cm PU.P.7 HPS.PU. 2016 160,891.17 19,895.30
8 1 M2 Latasir (SS) Kelas B (Pasir lokal) tebal 1,5 cm PU.P.8 HPS.PU. 2016 148,422.76 22,942.98
9 1 M2 Lapis Permukaan Lataston (Tebal 4 CM) PU.P.9 HPS.PU. 2016 412,924.90 161,219.85

Catatan :
1. Biaya satuan sudah termasuk overhead dan keuntungan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
2. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.

Merauke, Januari 2016


Mengetahui / menyetujui : Koordinator Tim Penyusun :
Kepala Dinas Pekerjaan Umum Kepala Bidang Cipta Karya Dinas Pekerjaan Umum
Kabupaten Merauke Kabupaten Merauke

Ir. TRI TEGOEH SANTOSA MOCH. YUNUS ANIS, S.ST VICTOR M. HATIGORAN, S
Pembina Utama Muda (IV/c) NIP. 19700403 199003 1 007 NIP. 19800908 200909 1 001
NIP. 19590821 198603 1 021
HARGA SATUAN PEKERJAAN (HSP)

LOKASI : KAMPUNG WASUR - DISTRIK MERAUKE


HARGA SATUAN
PEKERJAAN KET.
(Rp.)
7=(5+6) 8

390,282.00
453,714.00
568,061.00
12,720.00
93,064.00
1,108.00
509.00
4,602,908.00
1,419,878.00
1,444,036.00
1,490,848.00
579,151.00
2,217,384.00
847,978.00
792,778.00
3,634.00
91,390.00
216,448.00
847,978.00
847,978.00
254,400.00
12,720.00

93,100.00
31,033.00
114,480.00
38,160.00
136,228.00
45,409.00
123,888.00
41,296.00
129,040.00
43,013.00
149,880.00
49,960.00
68,200.00
452,460.00
521,460.00
1,157,468.00
1,788,921.00
40,780.00
80,460.00
2,249.00
22,636.00
10,551.00
9,918.00
412,992.00
70,732.00
417,449.00
488,960.00
481,992.00
486,449.00
1,104,625.00
23,198.00
10,183.00
12,584.00
14,666.00
16,335.00
16,841.00
23,703.00
29,323.00
11,590.00
8,141.00
28,732.00

2,886,838.00
2,780,474.00
2,716,656.00
2,683,692.00
2,551,935.00
2,472,881.00
3,272,746.00
3,224,903.00
2,082,652.00

4,347,265.00
4,068,169.00
3,900,712.00
3,789,073.00
3,709,332.00
3,747,534.00
3,393,472.00
3,181,034.00
3,039,410.00
2,938,249.00
4,138,804.00
3,846,342.00
3,670,864.00
HARGA SATUAN PEKERJAAN (HSP)

LOKASI : KAMPUNG WASUR - DISTRIK MERAUKE


HARGA SATUAN
PEKERJAAN KET.
(Rp.)
7=(5+6) 8

3,553,880.00
3,470,319.00
HARGA SATUAN PEKERJAAN (HSP)

LOKASI : KAMPUNG WASUR - DISTRIK MERAUKE


HARGA SATUAN
PEKERJAAN KET.
(Rp.)
7=(5+6) 8

3,539,073.00
3,171,644.00
2,951,187.00
2,804,216.00
2,699,236.00
3,857,758.00
3,679,326.00
3,610,279.00
3,616,936.00
3,431,469.00
3,359,864.00
2,857,397.00
2,902,389.00
2,935,915.00
2,798,997.00
2,976,846.00
3,014,656.00
3,045,965.00
3,063,809.00
3,096,792.00
3,105,886.00
3,213,505.00
3,226,538.00
17,760.00
15,791.00
15,720.00
15,724.00
16,065.00
16,387.00
16,820.00
17,134.00
248,031.00
264,670.00
497,560.00
510,495.00
571,712.00
584,378.00
464,235.00
134,792.00
285,952.00
312,737.00
472,000.00
2,726,164.00
1,508,980.00

6,647,302.00
7,724,483.00
12,049,498.00
9,848,139.00
9,125,430.00
8,876,517.00
9,219,347.00
9,103,380.00
110,615.00
160,136.00
202,528.00
185,829.00
202,528.00
185,829.00
5,619,127.00
153,372.00
136,673.00

499,870.00
483,648.00
469,444.00
466,923.00
476,303.00
241,037.00
231,404.00
226,998.00
224,295.00
224,614.00
220,977.00

324,410.00
313,051.00
306,235.00
302,715.00
288,644.00
280,201.00
157,352.00
152,670.00
191,025.00
148,410.00
142,610.00
180,295.00

125,157.00
117,623.00
115,769.00
113,343.00
113,554.00
117,196.00
107,672.00
104,326.00
101,403.00
100,618.00
99,623.00
99,351.00
99,080.00
157,675.00
HARGA SATUAN PEKERJAAN (HSP)

LOKASI : KAMPUNG WASUR - DISTRIK MERAUKE


HARGA SATUAN
PEKERJAAN KET.
(Rp.)
7=(5+6) 8

155,204.00
151,492.00
152,250.00
144,243.00
139,781.00
135,572.00
134,837.00
133,199.00
128,783.00
150,942.00
149,535.00
147,099.00
122,316.00
133,529.00
130,630.00
127,696.00
179,386.00
173,811.00
161,973.00
154,408.00
150,253.00
145,043.00
78,722.00
68,274.00
66,626.00
123,040.00
120,299.00
90,687.00
71,388.00
39,645.00
18,970.00
90,452.00
50,380.00
16,436.00

12,940,677.00
9,023,665.00
7,843,154.00
382,606.00
354,755.00
983,820.00
814,136.00
937,683.00
835,872.00
1,182,208.00
910,713.00
847,845.00

832,737.00
724,139.00
974,796.00
720,269.00
860,682.00
937,146.00
11,209,327.00
7,491,761.00
6,409,626.00
13,681,063.00
6,438,998.00
5,356,863.00
129,159.00
164,246.00
750,174.00
151,607.00
136,457.00
150,269.00
134,234.00
126,873.00
102,648.00
125,001.00
112,212.00
137,239.00
91,424.00
138,050.00
91,386.00
70,188.00
49,826.00
80,107.00
54,655.00
181,900.00
120,389.00
101,599.00
65,117.00
59,129.00
33,418.00
559,704.00
551,120.00
217,932.00
190,387.00
347,713.00
491,388.00
442,694.00
117,452.00
12,659,055.00
8,941,488.00
7,859,353.00
11,774,065.00
8,056,498.00
6,974,363.00
421,353.00
286,296.00
248,511.00
444,318.00
HARGA SATUAN PEKERJAAN (HSP)

LOKASI : KAMPUNG WASUR - DISTRIK MERAUKE


HARGA SATUAN
PEKERJAAN KET.
(Rp.)
7=(5+6) 8

328,555.00
296,167.00
410,019.00
267,484.00
244,089.00
208,032.00
128,847.00
111,276.00
144,006.00
138,386.00
278,012.00
294,870.00
99,210.00
8,997,651.00
8,831,720.00
410,156.00
8,831,720.00

78,667.00
74,191.00
62,807.00
90,824.00
92,719.00
89,335.00
92,719.00
109,555.00
92,287.00
113,100.00
127,644.00
202,605.00
84,923.00

178,649.00
214,554.00
207,607.00
214,098.00
208,761.00
232,422.00
211,456.00
240,046.00
209,592.00
297,548.00
220,453.00
232,422.00
352,310.00
289,605.00
248,384.00
299,980.00
287,414.00
382,956.00
285,775.00
302,476.00
314,430.00
291,996.00
309,310.00
305,782.00
311,842.00
648,127.00
73,719.00
68,029.00
63,615.00
63,609.00
55,877.00
63,609.00
71,115.00
71,115.00
63,609.00
55,877.00
63,609.00
62,212.00
63,496.00
63,609.00
61,877.00
88,280.00
54,378.00
61,852.00
46,260.00
329,731.00
286,889.00
295,561.00
319,874.00
315,171.00
327,478.00
319,782.00
320,961.00
301,603.00
421,310.00
421,310.00
817,380.00
475,149.00
534,174.00

45,749.00
45,749.00
45,749.00
6,415.00
972,505.00
8,428.00
294,416.00
2,795,000.00
212,175.00
HARGA SATUAN PEKERJAAN (HSP)

LOKASI : KAMPUNG WASUR - DISTRIK MERAUKE


HARGA SATUAN
PEKERJAAN KET.
(Rp.)
7=(5+6) 8

824,547.00
859,702.00
189,486.00
64,530.00
89,658.00
64,530.00
81,250.00
464,765.00
HARGA SATUAN PEKERJAAN (HSP)

LOKASI : KAMPUNG WASUR - DISTRIK MERAUKE


HARGA SATUAN
PEKERJAAN KET.
(Rp.)
7=(5+6) 8

37,496.00
36,480.00
34,387.00
35,096.00

57,338.00
65,091.00
75,749.00
296,529.00
65,699.00
61,068.00
27,290.00

241,877.00
168,910.00
139,861.00
49,050.00
101,833.00
38,446.00
24,991.00
93,847.00
239,075.00
269,093.00
239,998.00
175,825.00
290,598.00
627,518.00
627,518.00
997,735.00
1,944,618.00
1,163,329.00
1,221,110.00
1,133,148.00
1,190,929.00
1,382,045.00
2,012,121.00
1,507,181.00

2,542,431.00
1,049,049.00
650,555.00
2,215,656.00
1,030,523.00
1,110,300.00
1,991,672.00
2,764,473.00
991,942.00
1,131,857.00
1,393,617.00
1,716,188.00
55,259.00
64,504.00
69,046.00
117,472.00
189,283.00
247,208.00
25,803.00
28,467.00
32,731.00
42,089.00
49,413.00
110,503.00
133,158.00
50,549.00
3,762,475.00
3,264,961.00
248,855.00
91,340.00
9,221,755.00
7,977,970.00
4,680,600.00
2,955,848.00
1,102,201.00
863,730.00
1,094,750.00
21,499.00
22,112.00
22,726.00
22,344.00
7,137.00
18,154.00
5,876.00
15,128.00
4,965.00
11,376.00
2,552,016.00
98,636.00
480,539.00
152,558.00

19,422.00
11,331.00
14,030.00
16,649.00
27,216.00
24,457.00
224,366.00
18,845.00
32,391.00
71,412.00
HARGA SATUAN PEKERJAAN (HSP)

LOKASI : KAMPUNG WASUR - DISTRIK MERAUKE


HARGA SATUAN
PEKERJAAN KET.
(Rp.)
7=(5+6) 8

16,671.00
61,306.00
HARGA SATUAN PEKERJAAN (HSP)

LOKASI : KAMPUNG WASUR - DISTRIK MERAUKE


HARGA SATUAN
PEKERJAAN KET.
(Rp.)
7=(5+6) 8

24,249.00
19,108.00
14,647.00
12,738.00

16,671.00
61,306.00
24,249.00

189,069.00
179,487.00
123,121.00
319,706.00
259,571.00
255,595.00
1,158,673.00
24,695.00

24,365.00
21,114.00
26,504.00
23,830.00
228,914.00
207,826.00
180,786.00
171,365.00
574,144.00

Merauke, Januari 2016

Estimator
Dinas Pekerjaan Umum

VICTOR M. HATIGORAN, ST
NIP. 19800908 200909 1 001
PEMERINTAH KABUPATEN MERAUKE
DINAS PEKERJAAN UMUM
Jalan Ermasu Merauke 99613 Telp/Fax: (0971) 32

ANALISA HARGA SATUAN ALAT BERAT

KEGIATAN :
HARGA SATUAN DINAS PEKERJAAN UMUM
KABUPATEN MERAUKE

LOKASI :

KAMPUNG WASUR - DISTRIK MERAUKE


KABUPATEN MERAUKE - PAPUA

TAHUN ANGGARAN :
2016

PERIODE
JANUARI - JUNI 2016
AUKE
M
Telp/Fax: (0971) 325559
PEMERINTAH KABUPATEN MERAUKE
DINAS PEKERJAAN UMUM
Jalan Ermasu Merauke 99613 Telp/Fax: (0971) 32

ANALISA HARGA SATUAN PEKERJAAN


AHSP
KEGIATAN :
HARGA SATUAN DINAS PEKERJAAN UMUM
KABUPATEN MERAUKE

LOKASI :

KAMPUNG WASUR - DISTRIK MERAUKE


KABUPATEN MERAUKE - PAPUA

TAHUN ANGGARAN :
2016

PERIODE
JANUARI - JUNI 2016
AUKE PEMERINTAH KABUPATEN MERAUKE
UM DINAS PEKERJAAN UMUM
Telp/Fax: (0971) 325559 Jalan Ermasu Merauke 99613

RJAAN HARGA SATUAN BAHAN, UPAH DAN PERALA

(HSBUP)
KEGIATAN :
HARGA SATUAN DINAS PEKERJAAN UMUM
KABUPATEN MERAUKE

LOKASI :

KAMPUNG WASUR - DISTRIK MERAUKE


KABUPATEN MERAUKE - PAPUA

TAHUN ANGGARAN :
2016

PERIODE
JANUARI - JUNI 2016
INTAH KABUPATEN MERAUKE PEMERINTAH
AS PEKERJAAN UMUM DINAS PE
Telp/Fax: (0971) 325559 Jalan Ermasu Merauke 99613

HAN, UPAH DAN PERALATAN HARGA SATUAN

HSBUP)

DINAS PEKERJAAN UMUM HARGA SATUAN DINAS


PATEN MERAUKE KABUPATEN

UR - DISTRIK MERAUKE KAMPUNG WASUR -


EN MERAUKE - PAPUA KABUPATEN MER

UN ANGGARAN : TAHUN AN

UARI - JUNI 2016 JANUARI -


PEMERINTAH KABUPATEN MERAUKE
DINAS PEKERJAAN UMUM
Telp/Fax: (0971) 325559

ARGA SATUAN PEKERJAAN

(HSP)
KEGIATAN :
ARGA SATUAN DINAS PEKERJAAN UMUM
KABUPATEN MERAUKE

LOKASI :

UNG WASUR - DISTRIK MERAUKE


KABUPATEN MERAUKE - PAPUA

TAHUN ANGGARAN :
2016

PERIODE
JANUARI - JUNI 2016