ENGINEERS INDIA LTD.

IREP PROJECT
BPCL-KR : IREP IREP BPCL-KR, Kochi, Site Grading-II
M/s M/s Bridge & Roof Co (India) Ltd.
BAR CHART FROM : 01.12.2012 TO 31.1.2016
CONTRACT AWARD DATE : 22.11.2012

Permit
Sl. No. DESCRIPTION Duration START DATE FINISH DATE Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16
issued on

I Contract period 22-Nov-12 21-Dec-13 CCD : 21-DEC-13 ACD : 31 Jan-16


III OTHER MAJOR ACTIVITIES 291 DAYS 424DAYS
819 DAYS530 DAYS
1- JUL 2013
10 Dyke wall at Tank farm-III area 1-Jul-13 25-Aug-15 25- AUG 2015

Hindarnce due to pipe crossing over Dyke 13- DEC 2013


wall of Area -20 R-3
15-Oct-13 13-Dec-13 15- OCT 2013

Hindrance due to foam lines at TK-16 by 15- DEC 2013


15-Oct-13 15-Apr-15 15- APR 2015
BPCL-KR

7-Apr-15 25-Jun-15 07- APR 2015 25- JUN 2015


Hindrance for approach for other agencies
& dismantling of existing dyke wall
PRE ENGINEERED WARE HOUSES
11
(3 NOS)

24- APR 2015


A PEB1 25-Jun-13 24-Apr-15 25- JUNE 2013

Shifting the materials & storing the


25-Jun-13 20-Jan-14
materials

B PEB2 4-Sep-13 4-Dec-15 4- SEP 2013

4- DEC 2015
Encounter of hard rock 25-Jun-13 7-May-14

24- APR 2015


C PEB3 7-Nov-13 24-Apr-15 4- SEP2013

Shifting of location from Fire station to Tech 7- NOV 2013


1-Sep-13 7-Nov-13 4- SEP2013
Museum Area

Shifting of piping materials for excavtion


28-FEB 2014
12 BOO PLANT AREA 15-Oct-13 28-Feb-14 15-OCT 2013

DELAY DUE TO EMPTYING THE


CHEMICAL WARE HOUSE and RE 1-Jun-13 15-Oct-13 1-JUN 2013 15-OCT 2013
ROUTING THE FLARE LINE

13 FACT RETAINING WALL 7-Feb-13 15-Oct-15 7-FEB 2013 15-OCT 2015

Piling Front handing over 7-Feb-13 8-Jan-15 7-FEB 2013 8-JAN 2015

Hindrance due to passage restriction due 8-JAN 2015


8-Jan-15 7-Mar-15 7-MAR 2015
to activities by ESSAR, L&T etc.

14 SUB STATION 4-Jul-13 12-Sep-15 04-JUL 2013 12-SEP 2015

Graded area Handed over to L&T -Piling 4-Jul-13

Area Handover after Piling 4-Jul-13 8-Oct-13 04-JUL 2013 08-OCT 2013

12-SEP 2015
Completion and Format-1 was issued 9-Oct-13 12-Sep-15 09-OCT 2013

15 FIRE WATER PUMP HOUSE 15-Dec-13 28-Dec-15 04-JUL 2013


28-DEC 2015

Piling Front Handed over 4-Jul-13 15-Dec-13 04-JUL 2013 15-DEC 2013

Permission for dewatering the pond for


15-Dec-13 10-Nov-14
sump

Other agencies hindrance up to Format-1


10-Nov-14 28-Dec-15 10-NOV 2014
was issued
28-DEC 2015
16 SUB STATION-SS 10 10-Mar-13 12-Dec-13 10-MAR 2013 12-DEC 2013

10-MAR 2013 3-NOV 2014


17 VGO AREA 10-Mar-13 3-Nov-14

18 HRSG AREA 10-Mar-13 7-Oct-13 10-MAR 2013 07-OCT 2013

07-OCT 2013
18 CHITRAPUZHA COMPOUND WALL 1-Feb-13 31-Dec-15

Drawing Changed to Piling from Non Piling


22-Dec-12 1-Feb-13 11-Feb-14 11-FEB 2014
Section 1-FEB 2013

Retaining wall was settled down 11-Feb-14 15-May-14 11-FEB 2014 15-MAY 2014

Piling completed and handed over 12-Jan-14 15-Jul-15 12-JAN 2014 15-JUL 2015
28-DEC 2015
Connecting beam structure completed 15-Apr-15 31-Dec-15 15-APR2015
ENGINEERS INDIA LTD. IREP PROJECT
BPCL-KR : IREP IREP BPCL-KR, Kochi, Site Grading-II
M/s M/s Bridge & Roof Co (India) Ltd.
BAR CHART FROM : 01.12.2012 TO 31.1.2016
CONTRACT AWARD DATE : 22.11.2012

Permit
Sl. No. DESCRIPTION Duration START DATE FINISH DATE Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16
issued on

I Contract period 22-Nov-12 21-Dec-13


ACD : 31 Jan-2016
II MILE STONE ACTIVITIES

Construction of TFWPH including 4 Months


1 foundation and extension of Fire water (8/1/2013 to 26-Dec-12 8-Jan-13 7-May-13 CCD : 21-DEC-13
pond 7/5/2013) 291 DAYS
ACTUAL PERIOD 8-Jan-13 1-Nov-13 1-NOV 2013

a Delays not attributable to B&R


8-JAN 2013

Delay from BPCL fire Dept. in lowering


pond water level for bund filling for piling 11 days 19-Jan-13 8-Jan-13 19-Jan-13
front of the retaining wall
Delay due to Engineering Clarrifications
41 days 19-Jan-13 8-Jan-13 19-Feb-13
and revision of drawings

Site Grading of existing Fire water pond 6 Months


2 in Refinery area for Flare stack, Air (1/3/2013 to 1-Feb-13 1-Aug-13
system, DG set and KOD 1/7/2013) 819 DAYS
ACTUAL PERIOD 28-Feb-13 27-May-15

a Delays not attributable to B&R 30-MAY 2013 19-JAN 2014 18-OCT 2014 27-MAY 2015

Delay in giving the clearence for filling the


90days 1-Jun-13 1-Mar-13 30-May-13
fire pondto ensure the adequecy of water

Time taken for piling and handing over the


269 days 17-Oct-14 20-Jan-14 17-Oct-14
front for construction of retaining wall

Site grading of RWTP area out side 6 Months DELETED


3 18-Feb-15 9-Sep-15
refinery near Chullichira

Dismantling of Existing ETP-II including 7 Months


4 making sumps/ re routing the existing (5/2/2013 to 26-Dec-12 5-Feb-13 5-Sep-13
facilities and site grading for MCR 5/9/2013)
424 DAYS
ACTUAL PERIOD 1-Feb-13 31-Mar-14

Delays not attributable to B&R 1-FEB 2013 25-AUG-2013 5-SEP 2013 31-MAR 2014
Delay from BPCL Operation for MCR area handing
over 10days 4-Sep-13 26-Aug-13 4-Sep-13 26-AUG-2013 4-SEP 2013

7 Months
Dismantling of PIB area and site grading of
5 (8/12/2012 to 26-Dec-12 8-Dec-12 8-Jul-13
RO-DM plant and off site corridor for IREP
8/7/2013) 530 DAYS
ACTUAL PERIOD 8-Jul-13 23-May-14

Delays not attributable to B&R 8-JUL-2013 26-OCT-2013 27-OCT-2013 23-MAY-2014


###
Finalization of plant layout by package
161 days 26-Oct-13 15-May-13 26-Oct-13
vendor/EIL
15-MAY-2013 26-OCT-2013
8 Months
Site Grading for Fabrication Yard and
6 (22/12/2012 22-Dec-12 21-Aug-13
material storage yard
to 22/8/2013
ACTUAL PERIOD 22-Dec-12 23-May-14
7-FEB -2013
12-DEC-2012
Delays not attributable to B&R
8-MAR -2013 15-MAY -2013 15-SEP -2013 23-MAY -2014
Delay due to shifting the materials from the
30days 7-Mar-13 8-Feb-13 7-Mar-13
Tech museum area 8-FEB -2013 7-MAR -2013 15-MAY -2013
Delay in deciding the filling area in newly 15-SEP -2013
aquired area in IREP viz, CPP, DCU,Boiler 120 days On an overall
and MCR areas

Demolision of existing FW pump House,


7 Resorvoirs, construction of retaining walls 15-Jan-13 15-Sep-13
8 Months
and site grading of SRU. 30-SEP -2013 13-DEC -2013 30-JAN -2015
(15/1/2013 to
15/9/2013 22-JUN -2015
ACTUAL PERIOD 15-Jan-13 22-Jun-15

15-JAN -2013 23-APR -2013


Delays not attributable to B&R

Delay in permit for demolision of fire water 24-APR -2013 30-SEP -2013
pump house and resorvoir. due to
160 days 30-Sep-13 24-Apr-13 30-Sep-13
completion of Temp. Fire Water Pump
House
Delay in subsequent handing over and 20-DEC -2014
59 days 20-Dec-14 13-Dec-13 20-Dec-14
taking over of piling fronts
Delay in handing over the piling front 135 days 29-Jan-15 16-Sep-14 29-Jan-15 13-DEC -2013
16-SEP -2014 29-JAN -2015

Construction of Sub way on the PWD road


10 Months
including rerouting of existing rad /existing
8 (14/1/2013 to 17-Dec-12 14-Jan-13 13-Nov-13
facilities and necessery laisoning with
13/11/2013)
Government Department 18-DEC -2015
15-JAN -2013
ACTUAL PERIOD 14-Jan-13 18-Dec-15
Delay due to pre occupation by the other
agency where the proposed road diversion 18days 15-Jan-13 28-Dec-12 15-Jan-13
to be taken place
Delay due to sequential activities, drawing
162 Days 18-Jan-16 14-Jul-13 18-Dec-15 15-JAN -2013
release for Area 201
28-DEC -2012
14-JUL -2013
18-NOV -2015

Site Grading of Chitrapuzha area for coke


9 10 Months 26-Dec-12 15-Jan-13 14-Nov-15
yard and fabrication yard
(15/1/2013 to
15/11/2013)
25-NOV -2013
15-JAN -2013 25-MAY -2013 30-MAY -2014
ACTUAL PERIOD 15-Jan-13 15-Jan-13 31-Jan-16

Delay due to low lying area in monsoon 25-MAY -2013 25-NOV -2013
180days 25-Nov-13 25-May-13 25-Nov-13
period of 2013
ENGINEERS INDIA LTD.
BPCL-KR : IREP

Permit
Sl. No. DESCRIPTION Duration
issued on

Demolision of existing FW pump House,


7 Resorvoirs, construction of retaining walls
8 Months
and site grading of SRU.
(15/1/2013 to
15/9/2013
ACTUAL PERIOD

Construction of Sub way on the PWD road


10 Months
including rerouting of existing rad /existing
8 (14/1/2013 to 17-Dec-12
facilities and necessery laisoning with
13/11/2013)
Government Department

ACTUAL PERIOD

Site Grading of Chitrapuzha area for coke


9
yard and fabrication yard 10 Months 26-Dec-12
(15/1/2013 to
15/11/2013)
10 Months
(15/1/2013 to
15/11/2013)

ACTUAL PERIOD

III OTHER MAJOR ACTIVITIES

10 Dyke wall at Tank farm-III area

11 PRE ENGINEERED WARE HOUSES (3 NOS)

A PEB1

B PEB2

C PEB3

12 BOO PLANT AREA

13 FACT RETAINING WALL

14 SUB STATION

15 FIRE WATER PUMP HOUSE


16 SUB STATION-SS 10

17 VGO AREA

18 HRSG AREA
START DATE FINISH DATE Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13

15-Jan-13 15-Sep-13

15-Jan-13 22-Jun-15

14-Jan-13 13-Nov-13

14-Jan-13 18-Dec-15

15-Jan-13 31-Jan-16
1-Jul-13 12-Apr-15

4-Sep-13 24-Apr-15

4-Sep-13 4-Dec-15

7-Nov-13 24-Apr-15

15-Oct-13 28-Feb-14

7-Feb-13 7-Mar-15

10-Aug-13 9-Dec-15

15-Dec-13 28-Dec-15
10-Mar-13 12-Dec-13

10-Mar-13 3-Nov-14

10-Mar-13 23-Sep-13
IREP PROJECT
IREP BPCL-KR, Kochi, Site
M/s M/s Bridge & Roof Co
BAR CHART FROM : 01.12.2012
CONTRACT AWARD DATE

Jun-13 Jul-13 Aug-13 Sep-13 Oct-13 Nov-13 Dec-13 Jan-14 Feb-14 Mar-14
PROJECT
Kochi, Site Grading-II
Roof Co (India) Ltd.
01.12.2012 TO 31.1.2016
RD DATE : 22.11.2012

Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15
Jan-15 Feb-15 Mar-15 Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15
Nov-15 Dec-15 Jan-16