Project : Abu Alanda Reservoirs Project- Disi Project -

Project Price : 30,000,000 USD


Location : Jordan - Amman

Duties and Responsibilities:-

Monitored and updated schedule.

Generated preliminary construction schedule and manpower histogram .

Studied contract documents to become fully knowledgeable of project


requirements and specifications.

Generated final construction schedule based on construction drawings,


specifications, and contracts.

Prepared a micro-level program of works for the construction department.

Developed recovery/revised programs to reflect the remaining work to ensure


that the schedule is in line with project master schedule.

Prepared daily, weekly, and monthly look ahead schedule and manpower.

Prepared monthly, weekly, and daily progress reports.

Prepared tender schedules.

Prepared extension of time, including prepared support documents and delay


analysis by using
Windows schedule analysis

Planning Engineer
Company NameAlmajal Alarabi Holding
Dates EmployedMar 2012 – Aug 2014

Employment Duration2 yrs 6 mos


LocationSaudi Arabia
Client: Ministry of Health
Project: Hospitals Projects
Project Price: 800,000,000 SAR
Location: Saudi Arabia

Duties and Responsibilities:-

Monitored and tracked of work progress throughout the construction process and
compared this with the baseline schedule.

Prepared bi-weekly progress reports, updated actual vs. baseline schedule.

Created manpower and equipment histograms based on resources loaded in the


schedule.

Analysed and studied current project status and providing necessary corrective
actions.

Prepared weekly and monthly look ahead schedules.

Developed a micro-level program for the construction department.

Developed recovery/revised programs to reflect the remaining work to ensure


that the schedule is in line with project master schedule.

Prepared extension of time, including preparing support documents and delay by


using impacted as planned method.

Assisted the budget and financial manager in controlling capital and operational
budget expenditures for assigned projects.

Prepared monthly and quarterly project cost status report, regularly generating
cost forecasts.

Studied contract documents to become fully knowledgeable of project


requirements and specifications.

Analysed and managed each project’s critical path.

Maintained weekly look-ahead programs while recording potential problems.

Prepared detailed monthly reports including the highlighting delay impacts and
problem areas.

Analysed actual data obtained from the site, compared it with target program and
reported the differences.
Monitored and tracked design, procurement and construction activities.

Liaised with subcontractors to ensure that their activities were well allocated in
the main work program.

Evaluated design changes and their effects on the project schedule.

Analysed deviation, change of contract scope or delay, and reflected it to meet


target dates in coordination with site engineers.

Recognised long lead items and followed-up with the procurement department

Planning Engineer
Company NameEl Seif Engineering Contracting
Dates EmployedOct 2014 – Mar 2017

Employment Duration2 yrs 6 mos


LocationRiyadh , Saudi Arabia

Client : Ministry of Interior


Project: (KAP2A)
Project Price : 2,400,000,000 SAR
Location: Saudi Arabia – Riyadh

Duties and Responsibilities:-

Monitored and tracked work progress throughout the construction process and
compared this with the baseline schedule.

Prepared bi-weekly progress reports, updated actual vs. baseline schedule.

Created manpower and equipment histograms based on resources loaded in the


schedule.

Analysed and studied current project status and provided necessary corrective
actions.

Prepared weekly and monthly look-ahead schedules.


Developed a micro-level program for the construction department.

Developed recovery/revised programs to reflect the remaining work to ensure


that the schedule is in line with project master schedule.

Prepared extension of time, including prepared support documents and delay by


using impacted as planned method.

Assisted the budget and financial manager in controlling capital and operational
budget expenditures for assigned projects.

Prepared monthly and quarterly project cost status reports, regularly generating
cost forecasts.

Studied contract documents to become fully knowledgeable of project


requirements and specifications.

Analysed and managed each project’s critical path.

Maintained weekly look-ahead programs while recording potential problems.

Prepared detailed monthly reports including highlighting delay impacts and


problem areas.

Analysed actual data obtained from the site, compared it with target program and
reported the differences.

Monitored and tracked design, procurement and construction activities.

Liaised with subcontractors to ensure that their activities were well allocated in
the main work program.

Evaluated design changes and their effects on project schedule.

Analysed deviation, change of contract scope or delay, and reflected it to meet


target dates in coordination with site engineers.

Recognised long lead items and followed up with the procurement department.

Dates EmployedMar 2017 – Present

Employment Duration9 mos


LocationSaudi Arabia

Monitored and tracked of work progress throughout the construction process and
comparing this with the baseline schedule.

Prepared bi-weekly progress reports, update actual vs. baseline schedule.

Created manpower & equipment histograms based on resources loaded in the


schedule.

Analysed and studied current project status and provided necessary corrective
actions.

Prepared weekly and monthly look ahead schedules.

Developed a micro-level program for the construction department.

Developed recovery/revised programs to reflect the remaining work to ensure


that the schedule is in line with project master schedule.

Prepared extension of time, including preparing support documents and delay


analysis by using Windows schedule analysis.

Studied contract documents to become fully knowledgeable of project


requirements and specifications.

Analysed and managed each project’s critical path.

Maintained weekly look-ahead programs while recording potential problems.

Prepared detailed monthly reports, including the highlighting of delay impacts and
problem areas.

Analysed actual data obtained from the site, and compare it with target program
and reported the differences.

Monitored and tracked design, procurement and construction activities.

Liaised with subcontractors to ensure that their activities were well allocated in
the main work program.

Evaluated design changes and their effects on project schedule.

Analysed deviation, change of contract scope or delay, and reflected it to meet


target dates in coordination with site engineers.
Recognise long lead items and follow up with the procurement department.

Established a new system to track project progress

After more than 7-year in project management field in Jordan and Saudi Arabia, I
am excited to apply my skills to one of the following roles in UAE.

-Senior Planning Engineer.


-Senior Project Control Engineer.
- Cost Control Engineer.
-Cost Engineer.
-Planning Manager.
-Project Control Manager.

Areas of expertise:-

*Capability to establish a new reporting system to the top management for


decision-making.
*Using Primavera 6 in a professional way.
*Project Management.
*Planning.
*Scheduling.
*Cost Management.
*Risk Management.
*Delay Analysis.
*Claim management.
*Project Control.

Type of Projects:-

* Hospitals Projects.
* Reservoirs Project.
* Commercial Projects.
* Facade Projects.
* Tower Project ( Freelancer ).
* Hotel Project ( Freelancer )