CUADRO RESUMEN DE AMORTIZACION Y DEDUCCION POR MATERIALES

Mes de Octubre del 2007

CONCURSO PRIVADO Nº : 0001-2007-MDM "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS DE AGUA POTABLE Y ALCANTARILLADO DE MORROPE"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MORROPE
UBICACIÓN : MORROPE - LAMBAYEQUE - LAMBAYEQUE
VALOR REFERENCIAL : S/. 5'273,875.31 incluido I.G.V.
PRESUPUESTO OFERTA : S/. 5'261,500.00 incluido I.G.V.

FORMULA POLINOMICA N° 01: POZO TUBULAR


ADELANTO AMORTIZACION DEDUCCION
INDICE MATERIAL
OTORGADO ACTUAL ACUMULADA SALDO ACTUAL ACUMULADA

05 TUBERIA DE PVC PARA AGUA 0.00 0.00 #REF! #REF! #REF! #REF!
21 CEMENTO PORTLAND TIPO I 0.00 0.00 -7,527.95 7,527.95 #REF! #REF!

TOTAL 0.00 0.00 #REF! #REF! #REF! #REF!

FORMULA POLINOMICA N° 02: CASETA DE BOMBEO, EQUIPAMIENTO Y CERCO PERIMETRICO


ADELANTO AMORTIZACION DEDUCCION
INDICE MATERIAL
OTORGADO ACTUAL ACUMULADA SALDO ACTUAL ACUMULADA

03 ACERO DE CONSTRUCCION CORRUGADO 0.00 #REF! -42,437.18 42,437.18 #REF! #REF!


78 VALVULA DE FIERRO FUNDIDO NACIONAL 0.00 Err:509 -20,967.25 20,967.25 Err:509 Err:509
05 AGREGADO GRUESO 0.00 Err:509 -6,885.34 6,885.34 Err:509 Err:509
21 CEMENTO PORTLAND TIPO I 0.00 Err:509 -9,039.43 9,039.43 Err:509 Err:509

TOTAL 0.00 #REF! -79,329.20 79,329.20 #REF! #REF!

FORMULA POLINOMICA N° 03: REDES DE ALCANTARILLADO Y CONEXIONES DOMICILIARIAS


ADELANTO AMORTIZACION DEDUCCION
INDICE MATERIAL
CUADRO RESUMEN DE AMORTIZACION Y DEDUCCION POR MATERIALES
Mes de Octubre del 2007

CONCURSO PRIVADO Nº : 0001-2007-MDM "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS DE AGUA POTABLE Y ALCANTARILLADO DE MORROPE"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MORROPE
UBICACIÓN : MORROPE - LAMBAYEQUE - LAMBAYEQUE
VALOR REFERENCIAL : S/. 5'273,875.31 incluido I.G.V.
PRESUPUESTO OFERTA : S/. 5'261,500.00 incluido I.G.V.
INDICE MATERIAL
OTORGADO ACTUAL ACUMULADA SALDO ACTUAL ACUMULADA

72 TUBO DE PVC 0.00 #REF! -275,046.28 275,046.28 #REF! #REF!


21 CEMENTO PORTLAND TIPO I 0.00 #REF! -92,135.08 92,135.08 #REF! #REF!
03 ACERO DE CONSTRUCCION CORRUGADO 0.00 Err:509 -24,730.71 24,730.71 #REF! #REF!
05 AGREGADO GRUESO 0.00 Err:509 -24,992.80 24,992.80 #REF! #REF!

TOTAL 0.00 #REF! -416,904.87 416,904.87 #REF! #REF!

FORMULA POLINOMICA N° 04: REDES DE AGUA POTABLE Y CONEXIONES DOMICILIARIAS


ADELANTO AMORTIZACION DEDUCCION
INDICE MATERIAL
OTORGADO ACTUAL ACUMULADA SALDO ACTUAL ACUMULADA

72 TUBO DE PVC 0.00 #REF! -349,916.70 349,916.70 #REF! #REF!


21 CEMENTO PORTLAND TIPO I 0.00 0.00 -5,707.82 5,707.82 0.00 #REF!

TOTAL 0.00 #REF! -355,624.52 355,624.52 #REF! #REF!


REINTEGRO QUE NO CORRESPONDE POR EL ADELANTO DE MATER
#REF!

CONCURSO PRIVADO Nº : 0001-2007-MDM "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS DE AGUA POTABLE Y ALCANTARILLADO DE MORROPE"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MORROPE
UBICACIÓN : MORROPE - LAMBAYEQUE - LAMBAYEQUE
VALOR REFERENCIAL : S/. 5'273,875.31 incluido I.G.V.
PRESUPUESTO OFERTA : S/. 5'261,500.00 incluido I.G.V.

Formula 01 POZO TUBULAR


IU 72
Material TUBERIA DE PVC PARA AGUA
Adelanto Nº 01 24,899.17
Fecha Pago Jun-07

ADELANTO Incidencia Io Ia Reajuste Monto Saldo


Valorización Nº IU FOR
Nº Coef . % Sep-06 Jun-07 Mes Ir Valorizado Adelanto

01 01 72 01 0.141 100.00% #REF! 1,260.01 may-07 #REF! 132,289.66 #REF!


02 0.141 100.00% #REF! 1,260.01 jun-07 #REF! 0.00 #REF!
03 0.141 100.00% #REF! 1,260.01 jul-07 #REF! 0.00 #REF!
04 0.141 100.00% #REF! 1,260.01 ago-07 #REF! 0.00 #REF!
05 0.141 100.00% #REF! 1,260.01 sep-07 #REF! Err:509 #REF!
06 0.141 100.00% #REF! 1,260.01 oct-07 #REF! Err:509 #REF!
REINTEGRO QUE NO CORRESPONDE POR EL ADELANTO DE MATER
#REF!

CONCURSO PRIVADO Nº : 0001-2007-MDM "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS DE AGUA POTABLE Y ALCANTARILLADO DE MORROPE"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MORROPE
UBICACIÓN : MORROPE - LAMBAYEQUE - LAMBAYEQUE
VALOR REFERENCIAL : S/. 5'273,875.31 incluido I.G.V.
PRESUPUESTO OFERTA : S/. 5'261,500.00 incluido I.G.V.

Formula 01 POZO TUBULAR


IU 21
Material CEMENTO PORTLAND TIPO I
Adelanto Nº 01 7,527.95
Fecha Pago Jun-07

ADELANTO Incidencia Io Ia Reajuste Monto Saldo


Valorización Nº IU FOR
Nº Coef . % Sep-06 Jun-07 Mes Ir Valorizado Adelanto

01 01 21 01 0.042 100.00% 380.07 308.70 may-07 #REF! 132,289.66 9,268.38


02 0.042 100.00% 380.07 308.70 jun-07 #REF! 0.00 3,712.21
03 0.042 100.00% 380.07 308.70 jul-07 #REF! 0.00 3,712.21
04 0.042 100.00% 380.07 308.70 ago-07 #REF! 0.00 3,712.21
05 0.042 100.00% 380.07 308.70 sep-07 #REF! Err:509 3,712.21
06 0.042 100.00% 380.07 308.70 oct-07 #REF! Err:509 -
REINTEGRO QUE NO CORRESPONDE POR EL ADELANTO DE MATER
#REF!

CONCURSO PRIVADO Nº : 0001-2007-MDM "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS DE AGUA POTABLE Y ALCANTARILLADO DE MORROPE"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MORROPE
UBICACIÓN : MORROPE - LAMBAYEQUE - LAMBAYEQUE
VALOR REFERENCIAL : S/. 5'273,875.31 incluido I.G.V.
PRESUPUESTO OFERTA : S/. 5'261,500.00 incluido I.G.V.

Formula 02 CASETA DE BOMBEO, EQUIPAMIENTO Y CERCO PERIMETRICO


IU 03
Material ACERO DE CONSTRUCCION CORRUGADO
Adelanto Nº 01 42,437.18
Fecha Pago Jun-07

ADELANTO Incidencia Io Ia Reajuste Monto Saldo


Valorización Nº IU FOR
Nº Coef . % Sep-06 Jun-07 Mes Ir Valorizado Adelanto

01 01 3 02 0.167 100.00% #REF! 443.97 may-07 #REF! Err:509 #REF!


02 0.167 100.00% #REF! 443.97 jun-07 #REF! Err:509 #REF!
03 0.167 100.00% #REF! 443.97 jul-07 #REF! Err:509 #REF!
04 0.167 100.00% #REF! 443.97 ago-07 #REF! Err:509 #REF!
05 0.167 100.00% #REF! 443.97 sep-07 #REF! Err:509 #REF!
06 0.167 100.00% #REF! 443.97 oct-07 #REF! Err:509 #REF!
REINTEGRO QUE NO CORRESPONDE POR EL ADELANTO DE MATER
#REF!

CONCURSO PRIVADO Nº : 0001-2007-MDM "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS DE AGUA POTABLE Y ALCANTARILLADO DE MORROPE"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MORROPE
UBICACIÓN : MORROPE - LAMBAYEQUE - LAMBAYEQUE
VALOR REFERENCIAL : S/. 5'273,875.31 incluido I.G.V.
PRESUPUESTO OFERTA : S/. 5'261,500.00 incluido I.G.V.

Formula 02 CASETA DE BOMBEO, EQUIPAMIENTO Y CERCO PERIMETRICO


IU 78
Material VALVULA DE FIERRO FUNDIDO NACIONAL
Adelanto Nº 01 20,967.25
Fecha Pago Jun-07

ADELANTO Incidencia Io Ia Reajuste Monto Saldo


Valorización Nº IU FOR
Nº Coef . % Sep-06 Jun-07 Mes Ir Valorizado Adelanto

01 01 78 02 0.076 100.00% 3,125.47 325.14 may-07 407.37 Err:509 0.00


02 0.076 100.00% 3,125.47 325.14 jun-07 408.05 Err:509 Err:509
03 0.076 100.00% 3,125.47 325.14 jul-07 408.05 Err:509 Err:509
04 0.076 100.00% 3,125.47 325.14 ago-07 408.05 Err:509 Err:509
05 0.076 100.00% 3,125.47 325.14 sep-07 408.05 Err:509 Err:509
06 0.076 100.00% 3,125.47 325.14 oct-07 408.05 Err:509 Err:509
REINTEGRO QUE NO CORRESPONDE POR EL ADELANTO DE MATER
#REF!

CONCURSO PRIVADO Nº : 0001-2007-MDM "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS DE AGUA POTABLE Y ALCANTARILLADO DE MORROPE"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MORROPE
UBICACIÓN : MORROPE - LAMBAYEQUE - LAMBAYEQUE
VALOR REFERENCIAL : S/. 5'273,875.31 incluido I.G.V.
PRESUPUESTO OFERTA : S/. 5'261,500.00 incluido I.G.V.

Formula 02 CASETA DE BOMBEO, EQUIPAMIENTO Y CERCO PERIMETRICO


IU 05
Material AGREGADO GRUESO
Adelanto Nº 01 6,885.34
Fecha Pago Jun-07

ADELANTO Incidencia Io Ia Reajuste Monto Saldo


Valorización Nº IU FOR
Nº Coef . % Sep-06 Jun-07 Mes Ir Valorizado Adelanto

01 01 05 02 0.059 42.20% 124.25 135.14 may-07 381.68 Err:509 6,330.50


02 0.059 42.20% 124.25 135.14 jun-07 371.99 Err:509 Err:509
03 0.059 42.20% 124.25 135.14 jul-07 371.99 Err:509 Err:509
04 0.059 42.20% 124.25 135.14 ago-07 371.99 Err:509 Err:509
05 0.059 42.20% 124.25 135.14 sep-07 371.99 Err:509 Err:509
06 0.059 42.20% 124.25 135.14 oct-07 371.99 Err:509 Err:509
REINTEGRO QUE NO CORRESPONDE POR EL ADELANTO DE MATER
#REF!

CONCURSO PRIVADO Nº : 0001-2007-MDM "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS DE AGUA POTABLE Y ALCANTARILLADO DE MORROPE"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MORROPE
UBICACIÓN : MORROPE - LAMBAYEQUE - LAMBAYEQUE
VALOR REFERENCIAL : S/. 5'273,875.31 incluido I.G.V.
PRESUPUESTO OFERTA : S/. 5'261,500.00 incluido I.G.V.

Formula 02 CASETA DE BOMBEO, EQUIPAMIENTO Y CERCO PERIMETRICO


IU 21
Material CEMENTO PORTLAND TIPO I
Adelanto Nº 01 9,039.43
Fecha Pago Jun-07

ADELANTO Incidencia Io Ia Reajuste Monto Saldo


Valorización Nº IU FOR
Nº Coef . % Sep-06 Jun-07 Mes Ir Valorizado Adelanto

01 01 21 02 0.059 57.80% 532.12 518.32 may-07 380.07 Err:509 9,280.10


02 0.059 57.80% 532.12 518.32 jun-07 380.07 Err:509 Err:509
03 0.059 57.80% 532.12 518.32 jul-07 380.07 Err:509 Err:509
04 0.059 57.80% 532.12 518.32 ago-07 380.07 Err:509 Err:509
05 0.059 57.80% 532.12 518.32 sep-07 380.07 Err:509 Err:509
06 0.059 57.80% 532.12 518.32 oct-07 380.07 Err:509 Err:509
REINTEGRO QUE NO CORRESPONDE POR EL ADELANTO DE MATER
#REF!

CONCURSO PRIVADO Nº : 0001-2007-MDM "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS DE AGUA POTABLE Y ALCANTARILLADO DE MORROPE"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MORROPE
UBICACIÓN : MORROPE - LAMBAYEQUE - LAMBAYEQUE
VALOR REFERENCIAL : S/. 5'273,875.31 incluido I.G.V.
PRESUPUESTO OFERTA : S/. 5'261,500.00 incluido I.G.V.

Formula 03 REDES DE ALCANTARILLADO Y CONEXIONES DOMICILIARIAS


IU 72
Material TUBO DE PVC
Adelanto Nº 01 275,046.28
Fecha Pago Jun-07

ADELANTO Incidencia Io Ia Reajuste Monto Saldo


Valorización Nº IU FOR
Nº Coef . % Sep-06 Jun-07 Mes Ir Valorizado Adelanto

01 01 72 03 0.303 100.00% #REF! 360.12 may-07 #REF! Err:509 #REF!


02 0.303 100.00% #REF! 360.12 jun-07 #REF! Err:509 #REF!
03 0.303 100.00% #REF! 360.12 jul-07 #REF! Err:509 #REF!
04 0.303 100.00% #REF! 360.12 ago-07 #REF! Err:509 #REF!
05 0.303 100.00% #REF! 360.12 sep-07 #REF! Err:509 #REF!
06 0.303 100.00% #REF! 360.12 oct-07 #REF! Err:509 #REF!

Formula 03 REDES DE ALCANTARILLADO Y CONEXIONES DOMICILIARIAS


IU 21
Material CEMENTO PORTLAND TIPO I
Adelanto Nº 01 92,135.08
Fecha Pago Jun-07
REINTEGRO QUE NO CORRESPONDE POR EL ADELANTO DE MATER
#REF!

CONCURSO PRIVADO Nº : 0001-2007-MDM "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS DE AGUA POTABLE Y ALCANTARILLADO DE MORROPE"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MORROPE
UBICACIÓN : MORROPE - LAMBAYEQUE - LAMBAYEQUE
VALOR REFERENCIAL : S/. 5'273,875.31 incluido I.G.V.
PRESUPUESTO OFERTA : S/. 5'261,500.00 incluido I.G.V.

ADELANTO Incidencia Io Ia Reajuste Monto Saldo


Valorización Nº IU FOR
Nº Coef . % Sep-06 Jun-07 Mes Ir Valorizado Adelanto

01 01 21 03 0.100 100.00% #REF! 318.07 may-07 #REF! Err:509 #REF!


02 0.100 100.00% #REF! 318.07 jun-07 #REF! Err:509 #REF!
03 0.100 100.00% #REF! 318.07 jul-07 #REF! Err:509 #REF!
04 0.100 100.00% #REF! 318.07 ago-07 #REF! Err:509 #REF!
05 0.100 100.00% #REF! 318.07 sep-07 #REF! Err:509 #REF!
06 0.100 100.00% #REF! 318.07 oct-07 #REF! Err:509 #REF!
REINTEGRO QUE NO CORRESPONDE POR EL ADELANTO DE MATER
#REF!

CONCURSO PRIVADO Nº : 0001-2007-MDM "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS DE AGUA POTABLE Y ALCANTARILLADO DE MORROPE"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MORROPE
UBICACIÓN : MORROPE - LAMBAYEQUE - LAMBAYEQUE
VALOR REFERENCIAL : S/. 5'273,875.31 incluido I.G.V.
PRESUPUESTO OFERTA : S/. 5'261,500.00 incluido I.G.V.

Formula 03 REDES DE ALCANTARILLADO Y CONEXIONES DOMICILIARIAS


IU 03
Material ACERO DE CONSTRUCCION CORRUGADO
Adelanto Nº 01 24,730.71
Fecha Pago Jun-07

ADELANTO Incidencia Io Ia Reajuste Monto Saldo


Valorización Nº IU FOR
Nº Coef . % Sep-06 Jun-07 Mes Ir Valorizado Adelanto

01 01 03 03 0.054 51.85% 157.58 150.47 may-07 #REF! Err:509 25,899.28


02 0.054 51.85% 157.58 150.47 jun-07 #REF! Err:509 25,899.28
03 0.054 51.85% 157.58 150.47 jul-07 #REF! Err:509 Err:509
04 0.054 51.85% 157.58 150.47 ago-07 #REF! Err:509 Err:509
05 0.054 51.85% 157.58 150.47 sep-07 #REF! Err:509 Err:509
06 0.054 51.85% 157.58 150.47 oct-07 #REF! Err:509 Err:509
REINTEGRO QUE NO CORRESPONDE POR EL ADELANTO DE MATER
#REF!

CONCURSO PRIVADO Nº : 0001-2007-MDM "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS DE AGUA POTABLE Y ALCANTARILLADO DE MORROPE"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MORROPE
UBICACIÓN : MORROPE - LAMBAYEQUE - LAMBAYEQUE
VALOR REFERENCIAL : S/. 5'273,875.31 incluido I.G.V.
PRESUPUESTO OFERTA : S/. 5'261,500.00 incluido I.G.V.

Formula 03 REDES DE ALCANTARILLADO Y CONEXIONES DOMICILIARIAS


IU 05
Material AGREGADO GRUESO
Adelanto Nº 01 24,992.80
Fecha Pago Jun-07

ADELANTO Incidencia Io Ia Reajuste Monto Saldo


Valorización Nº IU FOR
Nº Coef . % Sep-06 Jun-07 Mes Ir Valorizado Adelanto

01 01 05 03 0.054 48.15% 325.14 302.15 may-07 #REF! Err:509 26,894.45


02 0.054 48.15% 325.14 302.15 jun-07 #REF! Err:509 26,894.45
03 0.054 48.15% 325.14 302.15 jul-07 #REF! Err:509 Err:509
04 0.054 48.15% 325.14 302.15 ago-07 #REF! Err:509 Err:509
05 0.054 48.15% 325.14 302.15 sep-07 #REF! Err:509 Err:509
06 0.054 48.15% 325.14 302.15 oct-07 #REF! Err:509 Err:509
REINTEGRO QUE NO CORRESPONDE POR EL ADELANTO DE MATER
#REF!

CONCURSO PRIVADO Nº : 0001-2007-MDM "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS DE AGUA POTABLE Y ALCANTARILLADO DE MORROPE"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MORROPE
UBICACIÓN : MORROPE - LAMBAYEQUE - LAMBAYEQUE
VALOR REFERENCIAL : S/. 5'273,875.31 incluido I.G.V.
PRESUPUESTO OFERTA : S/. 5'261,500.00 incluido I.G.V.

Formula 04 REDES DE AGUA POTABLE Y CONEXIONES DOMICILIARIAS


IU 72
Material TUBO DE PVC
Adelanto Nº 01 349,916.70
Fecha Pago Jun-07

ADELANTO Incidencia Io Ia Reajuste Monto Saldo


Valorización Nº IU FOR
Nº Coef . % Sep-06 Jun-07 Mes Ir Valorizado Adelanto

01 01 72 04 0.407 100.00% #REF! 360.18 may-07 #REF! Err:509 #REF!


02 0.407 100.00% #REF! 360.18 jun-07 #REF! Err:509 #REF!
03 0.407 100.00% #REF! 360.18 jul-07 #REF! Err:509 #REF!
04 0.407 100.00% #REF! 360.18 ago-07 #REF! Err:509 #REF!
05 0.407 100.00% #REF! 360.18 sep-07 #REF! Err:509 #REF!
06 0.407 100.00% #REF! 360.18 oct-07 #REF! Err:509 #REF!
REINTEGRO QUE NO CORRESPONDE POR EL ADELANTO DE MATER
#REF!

CONCURSO PRIVADO Nº : 0001-2007-MDM "AMPLIACION Y MEJORAMIENTO DE LOS SERVICIOS DE AGUA POTABLE Y ALCANTARILLADO DE MORROPE"
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MORROPE
UBICACIÓN : MORROPE - LAMBAYEQUE - LAMBAYEQUE
VALOR REFERENCIAL : S/. 5'273,875.31 incluido I.G.V.
PRESUPUESTO OFERTA : S/. 5'261,500.00 incluido I.G.V.

Formula 04 REDES DE AGUA POTABLE Y CONEXIONES DOMICILIARIAS


IU 21
Material CEMENTO PORTLAND TIPO I
Adelanto Nº 01 5,707.82
Fecha Pago Jun-07

ADELANTO Incidencia Io Ia Reajuste Monto Saldo


Valorización Nº IU FOR
Nº Coef . % Sep-06 Jun-07 Mes Ir Valorizado Adelanto

01 01 21 04 0.110 100.00% #REF! 381.25 may-07 380.07 Err:509 #REF!


02 0.110 100.00% #REF! 381.25 jun-07 380.07 Err:509 #REF!
03 0.110 100.00% #REF! 381.25 jul-07 #REF! Err:509 #REF!
DE POR EL ADELANTO DE MATERIALES
#REF!

Incidencia 0.141
% 100.00%
Io #REF!
Ia 1,260.01 #REF!
Saldo Deflatado #REF!

Adelanto
A Deduccion Amortización
Utilizado

18,652.84 #REF! #REF! #REF!


- #REF! #REF! #REF!
- #REF! #REF! #REF!
- #REF! #REF! #REF!
Err:509 #REF! #REF! #REF!

Sub total #REF! #REF!


DE POR EL ADELANTO DE MATERIALES
#REF!

Incidencia 0.042
% 100.00%
Io 380.07
Ia 308.70 #REF!
Saldo Deflatado 9,268.38

Adelanto
A Deduccion Amortización
Utilizado

5,556.17 5,556.17 #REF! 4,512.83


- - #REF! -
- - #REF! -
- - #REF! -
Err:509 3,712.21 #REF! 3,015.13

Sub total #REF! 0.00

RESUMEN FORMULA POLINOMICA Nº 01


ADELANTO DE MATERIALES Nº 01

FOR Val Deduccion Amortización


DE POR EL ADELANTO DE MATERIALES
#REF!

01 01 #REF! #REF!
01 02 #REF! #REF!
01 03 #REF! #REF!
01 04 #REF! #REF!
01 05 #REF! #REF!
01 06 - -

SUB TOTAL #REF! -


DE POR EL ADELANTO DE MATERIALES
#REF!

Incidencia 0.167
% 100.00%
Io #REF!
Ia 443.97 #REF!
Saldo Deflatado #REF!

Adelanto
A Deduccion Amortización
Utilizado

Err:509 #REF! #REF! #REF!


Err:509 #REF! #REF! #REF!
Err:509 #REF! #REF! #REF!
Err:509 #REF! #REF! #REF!
Err:509 #REF! #REF! #REF!
Err:509 #REF! #REF! #REF!

Sub total #REF! 0.00


DE POR EL ADELANTO DE MATERIALES
#REF!

Incidencia 0.076
% 100.00%
Io 3,125.47
Ia 325.14
Saldo Deflatado 0.00

Adelanto
A Deduccion Amortización
Utilizado

Err:509 Err:509 Err:509 Err:509


Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509

Sub total Err:509 0.00


DE POR EL ADELANTO DE MATERIALES
#REF!

Incidencia 0.059
% 42.20%
Io 124.25
Ia 135.14
Saldo Deflatado 6,330.50

Adelanto
A Deduccion Amortización
Utilizado

Err:509 Err:509 Err:509 Err:509


Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509

Sub total Err:509 0.00


DE POR EL ADELANTO DE MATERIALES
#REF!

Incidencia 0.059
% 57.80%
Io 532.12
Ia 518.32
Saldo Deflatado 9,280.10

Adelanto
A Deduccion Amortización
Utilizado

Err:509 Err:509 Err:509 Err:509


Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509

Sub total Err:509 0.00

RESUMEN FORMULA POLINOMICA Nº 02


ADELANTO DE MATERIALES Nº 01

FOR Val Deduccion Amortización


DE POR EL ADELANTO DE MATERIALES
#REF!

02 01 #REF! #REF!
02 02 #REF! #REF!
02 03 #REF! #REF!
02 04 #REF! #REF!
02 05 #REF! #REF!
02 06 #REF! #REF!

SUB TOTAL #REF! 0.00


DE POR EL ADELANTO DE MATERIALES
#REF!

Incidencia 0.303
% 100.00%
Io #REF!
Ia 360.12
Saldo Deflatado #REF!

Adelanto
A Deduccion Amortización
Utilizado

- #REF! #REF! #REF!


Err:509 #REF! #REF! #REF!
Err:509 #REF! #REF! #REF!
Err:509 #REF! #REF! #REF!
Err:509 #REF! #REF! #REF!
Err:509 #REF! #REF! #REF!

Sub total #REF! 0.00

Incidencia 0.100
% 100.00%
Io #REF!
Ia 318.07
DE POR EL ADELANTO DE MATERIALES
#REF!

Saldo Deflatado #REF!

Adelanto
A Deduccion Amortización
Utilizado

- #REF! #REF! #REF!


Err:509 #REF! #REF! #REF!
Err:509 #REF! #REF! #REF!
Err:509 #REF! #REF! #REF!
Err:509 #REF! #REF! #REF!
Err:509 #REF! #REF! #REF!

Sub total #REF! 0.00


DE POR EL ADELANTO DE MATERIALES
#REF!

Incidencia 0.054
% 51.85%
Io 157.58
Ia 150.47
Saldo Deflatado 25,899.28

Adelanto
A Deduccion Amortización
Utilizado

- - #REF! -
Err:509 Err:509 #REF! Err:509
Err:509 Err:509 #REF! Err:509
Err:509 Err:509 #REF! Err:509
Err:509 Err:509 #REF! Err:509
Err:509 Err:509 #REF! Err:509

Sub total #REF! 0.00


DE POR EL ADELANTO DE MATERIALES
#REF!

Incidencia 0.054
% 48.15%
Io 325.14
Ia 302.15
Saldo Deflatado 26,894.45

Adelanto
A Deduccion Amortización
Utilizado

- - #REF! -
Err:509 Err:509 #REF! Err:509
Err:509 Err:509 #REF! Err:509
Err:509 Err:509 #REF! Err:509
Err:509 Err:509 #REF! Err:509
Err:509 Err:509 #REF! Err:509

Sub total #REF! 0.00

RESUMEN FORMULA POLINOMICA Nº 03


ADELANTO DE MATERIALES Nº 01

FOR Val Deduccion Amortización


DE POR EL ADELANTO DE MATERIALES
#REF!

03 01 #REF! #REF!
03 02 #REF! #REF!
03 03 #REF! #REF!
03 04 #REF! #REF!
03 05 #REF! #REF!
03 06 #REF! #REF!

SUB TOTAL #REF! -


DE POR EL ADELANTO DE MATERIALES
#REF!

Incidencia 0.407
% 100.00%
Io #REF!
Ia 360.18
Saldo Deflatado #REF!

Adelanto
A Deduccion Amortización
Utilizado

- #REF! #REF! #REF!


Err:509 #REF! #REF! #REF!
Err:509 #REF! #REF! #REF!
Err:509 #REF! #REF! #REF!
Err:509 #REF! #REF! #REF!
Err:509 #REF! #REF! #REF!

Sub total #REF! 0.00


DE POR EL ADELANTO DE MATERIALES
#REF!

Incidencia 0.110
% 100.00%
Io #REF!
Ia 381.25
Saldo Deflatado #REF!

Adelanto
A Deduccion Amortización
Utilizado

- #REF! #REF! #REF!


Err:509 #REF! #REF! #REF!
Err:509 #REF! #REF! #REF!

Sub total #REF! 0.00

RESUMEN FORMULA POLINOMICA Nº 04


ADELANTO DE MATERIALES Nº 01

FOR Val Deduccion Amortización


04 01 #REF! #REF!
DE POR EL ADELANTO DE MATERIALES
#REF!

04 02 #REF! #REF!
04 03 #REF! #REF!
04 04 #REF! #REF!
04 05 #REF! #REF!
04 06 #REF! #REF!

SUB TOTAL #REF! #REF!


ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS

CONTRATISTA : CONSORCIO VICHON


ENTIDAD : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
UBICACIÓN :SAN PEDRO DE CHANA - HUARI - ANCASH
VALOR REFERENCIAL s/. 298,697.59
PRESUPUESTO CONTRATADO DE OBRA s/. 298,697.59
FECHA BASE 5/31/2017

CUADRO RESUMEN DE
VALORIZACIÓN Nº
DEL 01 AL 30 DE NOVIEMBRE 20

CONCEPTO

Monto valorizado en el presente mes :


. Valorización del Mes

Reajuste de las valorizaciones :


. Reajuste de la valorización No. 02

Amortizaciones :
. Del Adelanto en Efectivo en la Valorización
. Del Adelanto de Materiales en la Valorización

Deducción del reajuste que no corresponde :


. Por Adelanto en Efectivo en la Valorización
. Por Adelanto de Materiales de la Valorización

I.- COSTO DIRECTO (Sin IGV)


Otros :
. Retención por Retraso en la Obra
. Multas

II.- TOTAL RETENCIONES Y MULTAS

III.- MONTO LIQUIDO A PAGAR ( I - II )

IV.- I.G.V. ( 18% de I )

V.- MONTO TOTAL A FACTURAR

VI.- RETENCION REMYPE de (MONTO TOTAL CONTRACTUAL)

VII.- IMPORTE CANCELAR AL CONTRATISTA ( V - VI )


SPCH-CS

SUPERVISOR
STRITAL DE SAN PEDRO DE CHANA
ANA - HUARI - ANCASH RESIDENTE

PLAZO EJECUCIÓN
INICIO PLAZO CONTRACTUAL
TERMINO PROGRAMADO DE OBRA

CUADRO RESUMEN DE PAGO


VALORIZACIÓN Nº 02
DEL 01 AL 30 DE NOVIEMBRE 2017

ente mes :

no corresponde :
OTAL CONTRACTUAL)

TISTA ( V - VI )
: AGROCONSTRUCTORA H&J S.R.L. - FIDEL
GREGORIO APARICIO ROQUE
: FLORENTINO ANTONIO ANTUNEZ CELMI

: 60 DIAS CALENDARIOS
:02/10/2017
:30/11/2017

MONTO (S/.)

S/. 112,109.88
S/. 112,109.88

S/. 0.00
S/. 0.00

S/. 0.00
S/. 0.00
S/. 0.00

S/. 0.00
S/. 0.00
S/. 0.00

S/. 112,109.88
S/. 0.00
S/. 0.00

S/. 0.00

S/. 112,109.88

S/. 20,179.78

S/. 132,289.66

S/. 0.00

S/. 132,289.66
RESUMEN TOTAL DE PAGOS A CUENTA - VALO
DEL 01 AL 30 DE NOVIEMBRE 2017

ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS


CONTRATISTA : CONSORCIO VICHON
ENTIDAD : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA RESIDENTE
VALOR REFERENCIAL s/. 298,697.59 SUPERVISOR
PRESUPUESTO CONTRATADO DE OBRA s/. 298,697.59 FECHA BASE
INICIO DE PLAZO CONTRACTUAL :02/10/2017 PLAZO DE EJECUCIÓN
TERMINO PROGRAMADO DE OBRA :30/11/2017

VALORIZACIÓN
DESCRIPCIÓN MONTO DEL
CONTRATOS/IGV
ANTERIOR ACTUAL

VALORIZACIÓN CONTRACTUAL (V)

FORMULA Nº 01 253,133.55 141,023.67 112,109.88

TOTAL CONTRACTUAL 253,133.55 141,023.67 112,109.88

AVANCE DE LA OBRA A LA FECHA 141023.67 112,109.88


AVANCE DE LA OBRA PROGRAMADO 0.00 124,293.88

REAJUSTES (S)
VALORIZACIÓN N° ANTERIOR 0.00 0.00

TOTAL REAJUSTES 0.00 0.00

DEDUCCIÓN QUE NO CORRESPONDE (D)


POR ADELANTO EFECTIVO 0.00 0.00
POR ADELANTO DE MATERIALES 0.00 0.00

TOTAL DEDUCCIONES 0.00 0.00

VALORIZACIÓN BRUTA (VB = V + S - D) 253,133.55 141,023.67 112,109.88

AMORTIZACIONES (A)
AMORTIZACIÓN ADELANTO EN EFECTIVO 0.00 0.00 0.00
AMORTIZACIÓN ADELANTO DE MATERIALES 0.00 0.00 0.00

TOTAL AMORTIZACIONES 0.00 0.00 0.00

VALORIZACIÓN NETA (VN = VB - A) 253,133.55 141,023.67 112,109.88

MONTOS A PAGAR AL CONTRATISTA


EN EFECTIVO (VN ) 253,133.55 141,023.67 112,109.88
I.G.V. 45,564.04 25,384.26 20,179.78
MONTO TOTAL CON IGV 298,697.59 166,407.93 132,289.66

TOTAL COMPROMISO A FAVOR DEL CONTRATISTA S/RETENCION 298,697.59 166,407.93 132,289.66

RETENCION REMYPE (10% DEL MONTO CONTRATADO) 29,869.76 29,869.76 0.00

TOTAL COMPROMISO A FAVOR DEL CONTRATISTA CON RETENCION 268,827.83 136,538.17 132,289.66
OS A CUENTA - VALORIZACIÓN Nº 02
1 AL 30 DE NOVIEMBRE 2017

: FLORENTINO ANTONIO ANTUNEZ CELMI


: AGROCONSTRUCTORA H&J S.R.L. - FIDEL GREGORIO APARICIO ROQUE
5/31/2017
: 60 DIAS CALENDARIOS

ACUMULADO SALDO

ANTERIOR ACTUAL % MONTO %

141,023.67 253,133.55 100.00% 0.00 0.00%

141,023.67 253,133.55 100.00% 0.00 0.00%

141023.67 253,133.55 100.00% 0.00 0.00%


0.00 124,293.88 49.10% 128,839.67 50.90%

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

141,023.67 253,133.55

0.00 0.00
0.00 0.00

0.00 0.00

141,023.67 253,133.55

141,023.67 253,133.55
25,384.26 45,564.04
166,407.93 298,697.59

166,407.93 298,697.59

29,869.76 0.00 0.00% 29,869.76 10.00%

136,538.17 298,697.59
VALORIZACION N°02
DEL 01 AL 30 DE NOVIEMBRE
ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS
ENTIDAD : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
UBICACIÓN :SAN PEDRO DE CHANA - HUARI - ANCASH PLAZO EJECUCION : 60 DIAS CALENDARIOS
VALOR REFERENCIAL s/. 298,697.59 FECHA DE INICIO : 02 DE OCTUBRE DEL 2017
PRESUPUESTO CONTRATADO DE OBRA s/. 298,697.59 FECHA DE TERMINO PROGRAMADO : 30 DE NOVIEMBRE DEL 2017
FECHA BASE 5/31/2017
PRESUPUESTO CONTRATADO ACUMULADO ANTERIOR
ITEM DESCRIPCION DE PARTIDAS
UND METRADO PRECIO TOTAL METRADO MONTO %
01 OBRAS PROVISIONALES
01.01 ALMACEN Y OFICINAS glb 1.00 795.66 S/. 795.66 1.00 S/. 795.66 100.00%
01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m u 1.00 777.96 S/. 777.96 1.00 S/. 777.96 100.00%
01.03 MOVILIZACION DE EQUIPOS Y HERRAMIENTAS est 1.00 1,694.91 S/. 1,694.91 1.00 S/. 1,694.91 100.00%
02 SEGURIDAD Y SALUD
02.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD glb 1.00 1,271.19 S/. 1,271.19 0.50 S/. 635.60 50.00%
02.02 EQUIPOS DE PROTECCION INDIVIDUAL u 10.00 113.94 S/. 1,139.40 10.00 S/. 1,139.40 100.00%
02.03 EQUIPOS DE PROTECCION COLECTIVA glb 1.00 127.10 S/. 127.10 1.00 S/. 127.10 100.00%
02.04 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 572.10 S/. 572.10 1.00 S/. 572.10 100.00%
02.05 CAPACITACION EN SEGURIDAD Y SALUD. mes 2.00 1,016.95 S/. 2,033.90 0.50 S/. 508.48 25.00%
03 CAPTACION TIPO I C-1-SECTOR YURAQ PUQUIO
03.01 OBRAS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m2 10.64 1.19 S/. 12.66 10.64 S/. 12.66 100.00%
03.01.02 TRAZO NIVELACION Y REPLANTEO m2 5.75 1.19 S/. 6.84 5.75 S/. 6.84 100.00%
03.01.03 DEMOLICION DE CAPTACION EXISTENTE glb 1.00 735.00 S/. 735.00 1.00 S/. 735.00 100.00%
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 14.06 28.84 S/. 405.49 14.06 S/. 405.49 100.00%
03.02.02 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 15.47 12.02 S/. 185.95 15.47 S/. 185.95 100.00%
03.02.03 SUMINISTRO E INSTALACION DE PIEDRA SELECIONADA m3 5.18 130.02 S/. 673.50 5.18 S/. 673.50 100.00%
03.03 OBRAS DE CONCRETO SIMPLE
03.03.01 CONCRETO f'c= 140 kg/cm2 PARA SOLADOS Y/O DADOS m3 2.59 293.77 S/. 760.86 - S/. 0.00 0.00%
03.03.02 SOLADOS CONCRETO f'c=100 kg/cm2 h=3" m2 0.04 21.18 S/. 0.85 0.04 S/. 0.85 100.00%
03.04 OBRAS DE CONCRETO ARMADO
03.04.01 CONCRETO F'C=210 KG/CM2 m3 3.52 507.70 S/. 1,787.10 3.52 S/. 1,787.10 100.00%
03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 25.93 37.56 S/. 973.93 25.93 S/. 973.93 100.00%
03.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 100.51 6.28 S/. 631.20 100.51 S/. 631.20 100.00%
03.05 REVOQUES ENLUCIDOS Y MOLDURAS

Página 41
VALORIZACION N°02
DEL 01 AL 30 DE NOVIEMBRE
ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS
ENTIDAD : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
UBICACIÓN :SAN PEDRO DE CHANA - HUARI - ANCASH PLAZO EJECUCION : 60 DIAS CALENDARIOS
VALOR REFERENCIAL s/. 298,697.59 FECHA DE INICIO : 02 DE OCTUBRE DEL 2017
PRESUPUESTO CONTRATADO DE OBRA s/. 298,697.59 FECHA DE TERMINO PROGRAMADO : 30 DE NOVIEMBRE DEL 2017
FECHA BASE 5/31/2017
PRESUPUESTO CONTRATADO ACUMULADO ANTERIOR
ITEM DESCRIPCION DE PARTIDAS
UND METRADO PRECIO TOTAL METRADO MONTO %
03.05.01 TARRAJEO INTERIOR m2 1.20 14.43 S/. 17.32 1.20 S/. 17.32 100.00%
03.05.02 TARRAJEO EN EXTERIORES m2 19.21 12.11 S/. 232.63 19.21 S/. 232.63 100.00%
03.05.03 TARRAJEO CON IMPERMEABILIZANTES EN INTERIORES m2 8.25 18.25 S/. 150.56 8.25 S/. 150.56 100.00%
03.06 CARPINTERIA METALICA
03.06.01 TAPA METALICA 0.60X0.60 M SEGUN DISEÑO u 1.00 195.92 S/. 195.92 1.00 S/. 195.92 100.00%
03.06.02 TAPA METALICA 0.45X0.45 M SEGUN DISEÑO u 1.00 108.80 S/. 108.80 1.00 S/. 108.80 100.00%
03.07 PINTURA
03.07.01 PINTURA DE MURO EXTERIOR C/LATEX VINILICO m2 9.76 8.51 S/. 83.06 - S/. 0.00 0.00%
03.08 SUMINISTRO E INSTALACION DE TUBERIAS
03.08.01 SUM. E INST. TUBERIA PVC C-10 4" INC. PRUEBA m 10.00 29.35 S/. 293.50 3.00 S/. 88.05 30.00%
03.08.02 SUM. E INST. TUBERIA PVC C-10 3" INC. PRUEBA m 4.00 18.55 S/. 74.20 4.00 S/. 74.20 100.00%
03.09 SUMINISTRO E INSTALACION DE ACCESORIOS PARA CAPTACION
03.09.01 SUMINISTRO E INSTALACION DE ACCESORIOS glb 1.00 646.62 S/. 646.62 0.50 S/. 323.31 50.00%
03.10 SUMINISTRO E INSTALACION DE VALVULAS
03.10.01 SUMINISTRO E INSTALACION VALVULA COMPUERTA 3" u 1.00 70.56 S/. 70.56 1.00 S/. 70.56 100.00%
03.11 CERCO DE SEGURIDAD
03.11.01 TRAZO NIVELACION Y REPLANTEO m2 1.80 1.07 S/. 1.93 - S/. 0.00 0.00%
03.11.02 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 4.50 28.84 S/. 129.78 - S/. 0.00 0.00%
03.11.03 CONCRETO f'c=100 kg/cm2 (CERCO DE SEGURIDAD) m3 4.50 267.77 S/. 1,204.97 - S/. 0.00 0.00%
03.11.04 ANCLAJE DE ACERO CORRUGADO Fy=4200 KG/CM2 CON PLANCHA DE ACERO u 5.00 32.00 S/. 160.00 - S/. 0.00 0.00%
03.11.05 CERCO DE TUBO NEGRO Y MALLA OLIMPICA m2 29.40 72.54 S/. 2,132.68 - S/. 0.00 0.00%
04 CAPTACION TIPO II-SECTOR CHAUPIMONTE
04.01 OBRAS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 18.00 1.19 S/. 21.42 18.00 S/. 21.42 100.00%
04.01.02 TRAZO NIVELACION Y REPLANTEO m2 18.00 1.19 S/. 21.42 18.00 S/. 21.42 100.00%
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 11.34 28.84 S/. 327.05 11.34 S/. 327.05 100.00%

Página 42
VALORIZACION N°02
DEL 01 AL 30 DE NOVIEMBRE
ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS
ENTIDAD : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
UBICACIÓN :SAN PEDRO DE CHANA - HUARI - ANCASH PLAZO EJECUCION : 60 DIAS CALENDARIOS
VALOR REFERENCIAL s/. 298,697.59 FECHA DE INICIO : 02 DE OCTUBRE DEL 2017
PRESUPUESTO CONTRATADO DE OBRA s/. 298,697.59 FECHA DE TERMINO PROGRAMADO : 30 DE NOVIEMBRE DEL 2017
FECHA BASE 5/31/2017
PRESUPUESTO CONTRATADO ACUMULADO ANTERIOR
ITEM DESCRIPCION DE PARTIDAS
UND METRADO PRECIO TOTAL METRADO MONTO %
04.02.02 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 12.48 12.02 S/. 150.01 12.48 S/. 150.01 100.00%
04.03 OBRAS DE CONCRETO SIMPLE
04.03.01 CONCRETO CICLOPEO f'c=175 kg/cm2 + 30 % PM. m3 11.11 373.19 S/. 4,146.14 5.00 S/. 1,865.95 45.00%
04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 20.23 37.56 S/. 759.84 10.00 S/. 375.60 49.43%
04.04 OBRAS DE CONCRETO ARMADO
04.04.01 CONCRETO F'C=210 KG/CM2 m3 0.72 507.70 S/. 365.54 - S/. 0.00 0.00%
04.04.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 17.52 6.28 S/. 110.03 17.52 S/. 110.03 100.00%
04.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 1.67 37.56 S/. 62.73 - S/. 0.00 0.00%
04.05 REVOQUES ENLUCIDOS Y MOLDURAS
04.05.01 TARRAJEO EN EXTERIORES m2 11.78 12.11 S/. 142.66 - S/. 0.00 0.00%
04.05.02 TARRAJEO CON IMPERMEABILIZANTES EN INTERIORES m2 10.12 18.25 S/. 184.69 - S/. 0.00 0.00%
04.06 CARPINTERIA METALICA
04.06.01 COMPUERTA METALICA DE 0.55x0.30 m u 1.00 95.97 S/. 95.97 - S/. 0.00 0.00%
04.07 PINTURA
04.07.01 PINTURA DE MURO EXTERIOR C/LATEX VINILICO m2 10.12 8.51 S/. 86.12 - S/. 0.00 0.00%
05 MEJORAMIENTO DE LA CAPTACION-SECTOR CAPULIPAMPA
05.01 OBRAS PRELIMINARES
05.01.01 LIMPIEZA DE TERRENO MANUAL m2 15.93 1.19 S/. 18.96 15.93 S/. 18.96 100.00%
05.02 CARPINTERIA METALICA
05.02.01 TAPA METALICA 0.60X0.60 M SEGUN DISEÑO u 1.00 195.92 S/. 195.92 1.00 S/. 195.92 100.00%
05.02.02 TAPA METALICA 0.45X0.45 M SEGUN DISEÑO u 1.00 108.80 S/. 108.80 1.00 S/. 108.80 100.00%
05.03 PINTURA
05.03.01 PINTURA DE MURO EXTERIOR C/LATEX VINILICO m2 16.99 8.51 S/. 144.58 - S/. 0.00 0.00%
05.04 SUMINISTRO E INSTALACION DE TUBERIAS
05.04.01 SUM. E INST. TUBERIA PVC C-10 4" INC. PRUEBA m 10.00 29.35 S/. 293.50 10.00 S/. 293.50 100.00%
05.04.02 SUM. E INST. TUBERIA PVC C-10 3" INC. PRUEBA m 4.00 18.55 S/. 74.20 4.00 S/. 74.20 100.00%
05.05 SUMINISTRO E INSTALACION DE ACCESORIOS PARA CAPTACION

Página 43
VALORIZACION N°02
DEL 01 AL 30 DE NOVIEMBRE
ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS
ENTIDAD : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
UBICACIÓN :SAN PEDRO DE CHANA - HUARI - ANCASH PLAZO EJECUCION : 60 DIAS CALENDARIOS
VALOR REFERENCIAL s/. 298,697.59 FECHA DE INICIO : 02 DE OCTUBRE DEL 2017
PRESUPUESTO CONTRATADO DE OBRA s/. 298,697.59 FECHA DE TERMINO PROGRAMADO : 30 DE NOVIEMBRE DEL 2017
FECHA BASE 5/31/2017
PRESUPUESTO CONTRATADO ACUMULADO ANTERIOR
ITEM DESCRIPCION DE PARTIDAS
UND METRADO PRECIO TOTAL METRADO MONTO %
05.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS glb 1.00 646.62 S/. 646.62 1.00 S/. 646.62 100.00%
05.06 SUMINISTRO E INSTALACION DE VALVULAS
05.06.01 SUMINISTRO E INSTALACION VALVULA COMPUERTA 3" u 1.00 70.56 S/. 70.56 1.00 S/. 70.56 100.00%
05.07 CERCO DE SEGURIDAD
05.07.01 TRAZO NIVELACION Y REPLANTEO m2 2.52 1.07 S/. 2.70 2.52 S/. 2.70 100.00%
05.07.02 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 3.78 28.84 S/. 109.02 3.78 S/. 109.02 100.00%
05.07.03 CONCRETO f'c=100 kg/cm2 (CERCO DE SEGURIDAD) m3 3.78 267.77 S/. 1,012.17 3.78 S/. 1,012.17 100.00%
ANCLAJE DE ACERO CORRUGADO Fy=4200 KG/CM2 CON PLANCHA DE ACERO
05.07.04
(CERCO DE SEGURIDAD)
u 7.00 32.00 S/. 224.00 S/. 224.00 100.00%
7.00
05.07.05 CERCO DE TUBO NEGRO Y MALLA OLIMPICA m2 23.94 72.54 S/. 1,736.61 23.94 S/. 1,736.61 100.00%
06 DESARENADOR-SECTOR CHAUPIMONTE
06.01 OBRAS PRELIMINARES
06.01.01 LIMPIEZA DE TERRENO MANUAL m2 11.10 1.19 S/. 13.21 11.10 S/. 13.21 100.00%
06.01.02 TRAZO NIVELACION Y REPLANTEO m2 11.10 1.19 S/. 13.21 11.10 S/. 13.21 100.00%
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 12.74 28.84 S/. 367.42 12.74 S/. 367.42 100.00%
06.02.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 15.70 3.57 S/. 56.05 15.70 S/. 56.05 100.00%
06.02.03 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 14.01 12.02 S/. 168.40 14.01 S/. 168.40 100.00%
06.03 OBRAS DE CONCRETO SIMPLE
06.03.01 CONCRETO f'c= 140 kg/cm2 PARA SOLADOS Y/O DADOS m3 1.57 293.77 S/. 461.22 1.57 S/. 461.22 100.00%
06.04 OBRAS DE CONCRETO ARMADO
06.04.01 CONCRETO F'C=210 KG/CM2 m3 5.27 507.70 S/. 2,675.58 5.20 S/. 2,640.04 98.67%
06.04.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 83.95 6.28 S/. 527.21 83.95 S/. 527.21 100.00%
06.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 36.82 37.56 S/. 1,382.96 36.82 S/. 1,382.96 100.00%
06.05 REVOQUES ENLUCIDOS Y MOLDURAS
06.05.01 TARRAJEO EN EXTERIORES m2 17.92 12.11 S/. 217.01 17.92 S/. 217.01 100.00%
06.05.02 TARRAJEO CON IMPERMEABILIZANTES EN INTERIORES m2 18.91 18.25 S/. 345.11 18.91 S/. 345.11 100.00%

Página 44
VALORIZACION N°02
DEL 01 AL 30 DE NOVIEMBRE
ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS
ENTIDAD : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
UBICACIÓN :SAN PEDRO DE CHANA - HUARI - ANCASH PLAZO EJECUCION : 60 DIAS CALENDARIOS
VALOR REFERENCIAL s/. 298,697.59 FECHA DE INICIO : 02 DE OCTUBRE DEL 2017
PRESUPUESTO CONTRATADO DE OBRA s/. 298,697.59 FECHA DE TERMINO PROGRAMADO : 30 DE NOVIEMBRE DEL 2017
FECHA BASE 5/31/2017
PRESUPUESTO CONTRATADO ACUMULADO ANTERIOR
ITEM DESCRIPCION DE PARTIDAS
UND METRADO PRECIO TOTAL METRADO MONTO %
06.06 CARPINTERIA METALICA
06.06.01 COMPUERTA METALICA DE 0.30x0.30 m u 1.00 95.97 S/. 95.97 - S/. 0.00 0.00%
07 LINEA DE CONDUCCION-SECTOR YURAQ PUQUIO, CHAUPIMONTE Y CAPULIPAMPA
07.01 OBRAS PROVISIONALES
07.01.01 LIMPIEZA DE TERRENO MANUAL m2 72.96 1.19 S/. 86.82 48.64 S/. 57.88 66.67%
07.01.02 TRAZO NIVELACION Y REPLANTEO m2 72.96 1.19 S/. 86.82 48.64 S/. 57.88 66.67%
07.02 MOVIMIENTO DE TIERRAS
07.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 35.02 28.84 S/. 1,009.98 23.35 S/. 673.41 66.68%
07.02.02 EXCAVACION MANUAL EN ROCA SUELTA m3 23.35 56.92 S/. 1,329.08 15.57 S/. 886.24 66.68%
07.02.03 REFINE Y NIVELACION EN TERRENO NORMAL m2 72.96 3.57 S/. 260.47 - S/. 0.00 0.00%
07.02.04 CAMA DE TIERRA ZARANDEADA E=0.10M. ZANJA P/TUBO m 182.40 1.35 S/. 246.24 - S/. 0.00 0.00%
07.02.05 RELLENO Y COMPACTADO ZANJA CON MATERIAL SELECCIONADO EN CAPAS DE m3 28.77 32.01 S/. 920.93 - S/. 0.00 0.00%
07.02.06 RELLENO Y COMPACTADO ZANJA CON MATERIAL PROPIO SELECCIONADO m3 28.77 31.31 S/. 900.79 - S/. 0.00 0.00%
07.02.07 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 11.54 12.02 S/. 138.71 - S/. 0.00 0.00%
07.03 SUMINISTRO E INSTALACION DE TUBERIAS
07.03.01 SUM. E INST. TUBERIA PVC C-10 3" INC. PRUEBA m 182.40 18.55 S/. 3,383.52 - S/. 0.00 0.00%
07.04 SUMINISTRO E INSTALACION DE ACCESORIOS PARA RED
07.04.01 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC u 1.00 243.20 S/. 243.20 - S/. 0.00 0.00%
07.05 PRUEBA HIDRAULICA Y DESINFECCION
07.05.01 PRUEBA HIDRAULICA + DESINFECCION DE TUB. ZANJA TAPADA m 182.40 0.55 S/. 100.32 - S/. 0.00 0.00%
08 MEJORAMIENTO DEL RESERVORIO-SECTOR CAPULIPAMPA
08.01 OBRAS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL m2 88.55 1.19 S/. 105.37 - S/. 0.00 0.00%
08.02 CARPINTERIA METALICA
08.02.01 TAPA METALICA 0.80X0.80 M SEGUN DISEÑO u 2.00 215.92 S/. 431.84 - S/. 0.00 0.00%
08.02.02 ESCALERA METALICA TIPO MARINERA pza 1.00 271.20 S/. 271.20 - S/. 0.00 0.00%
08.03 PINTURA

Página 45
VALORIZACION N°02
DEL 01 AL 30 DE NOVIEMBRE
ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS
ENTIDAD : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
UBICACIÓN :SAN PEDRO DE CHANA - HUARI - ANCASH PLAZO EJECUCION : 60 DIAS CALENDARIOS
VALOR REFERENCIAL s/. 298,697.59 FECHA DE INICIO : 02 DE OCTUBRE DEL 2017
PRESUPUESTO CONTRATADO DE OBRA s/. 298,697.59 FECHA DE TERMINO PROGRAMADO : 30 DE NOVIEMBRE DEL 2017
FECHA BASE 5/31/2017
PRESUPUESTO CONTRATADO ACUMULADO ANTERIOR
ITEM DESCRIPCION DE PARTIDAS
UND METRADO PRECIO TOTAL METRADO MONTO %
08.03.01 PINTURA DE MURO EXTERIOR C/LATEX VINILICO m2 113.72 8.21 S/. 933.64 - S/. 0.00 0.00%
08.04 SUMINISTRO E INSTALACION DE TUBERIAS
08.04.01 SUM. E INST. TUBERIA PVC C-7.5 3" INC. PRUEBA m 10.00 12.08 S/. 120.80 - S/. 0.00 0.00%
08.04.02 SUM. E INST. TUBERIA PVC C-10 3" INC. PRUEBA m 4.00 29.35 S/. 117.40 - S/. 0.00 0.00%
08.05 SUMINISTRO E INSTALACION DE ACCESORIOS
08.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS u 1.00 1,974.45 S/. 1,974.45 - S/. 0.00 0.00%
08.06 SUMINISTRO E INSTALACION DE VALVULAS
08.07 SUMINISTRO E INSTALACION VALVULA COMPUERTA 3" u 4.00 178.72 S/. 714.88 - S/. 0.00 0.00%
09 RED DE DISTRIBUCION-SECTOR CAPULIPAMPA
09.01 OBRAS PROVISIONALES
09.01.01 LIMPIEZA DE TERRENO MANUAL m2 682.15 1.19 S/. 811.76 682.15 S/. 811.76 100.00%
09.01.02 TRAZO NIVELACION Y REPLANTEO m2 682.15 1.19 S/. 811.76 682.15 S/. 811.76 100.00%
09.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 470.68 28.84 S/. 13,574.41 470.68 S/. 13,574.41 100.00%
09.02.02 EXCAVACION MANUAL EN ROCA SUELTA m3 313.79 56.92 S/. 17,860.93 305.00 S/. 17,360.60 97.20%
09.02.03 REFINE Y NIVELACION EN TERRENO NORMAL m2 272.86 3.57 S/. 974.11 265.00 S/. 946.05 97.12%
09.02.04 CAMA DE TIERRA ZARANDEADA E=0.10M. ZANJA P/TUBO m 1,364.30 1.35 S/. 1,841.81 1,227.00 S/. 1,656.45 89.94%
09.02.05 RELLENO Y COMPACTADO ZANJA CON MATERIAL SELECCIONADO EN CAPAS DE m3 268.89 32.01 S/. 8,607.17 - S/. 0.00 0.00%
09.02.06 RELLENO Y COMPACTADO ZANJA CON MATERIAL PROPIO SELECCIONADO m3 405.32 31.31 S/. 12,690.57 - S/. 0.00 0.00%
09.02.07 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 89.55 12.02 S/. 1,076.39 - S/. 0.00 0.00%
09.03 SUMINISTRO E INSTALACION DE TUBERIAS
09.03.01 SUM. E INST. TUBERIA PVC C-10 6" INC. PRUEBA m 220.35 66.82 S/. 14,723.79 220.35 S/. 14,723.79 100.00%
09.03.02 SUM. E INST. TUBERIA PVC C-10 4" INC. PRUEBA m 297.85 29.35 S/. 8,741.90 291.00 S/. 8,540.85 97.70%
09.03.03 SUM. E INST. TUBERIA PVC C-10 3" INC. PRUEBA m 64.10 18.55 S/. 1,189.06 - S/. 0.00 0.00%
09.03.04 SUM. E INST. TUBERIA PVC C-10 2" INC. PRUEBA m 370.95 12.08 S/. 4,481.08 190.28 S/. 2,298.58 51.30%
09.03.05 SUM. E INST. TUBERIA PVC C-10 1 1/2" INC. PRUEBA m 411.05 6.73 S/. 2,766.37 90.00 S/. 605.70 21.90%
09.04 SUMINISTRO E INSTALACION DE ACCESORIOS PARA RD

Página 46
VALORIZACION N°02
DEL 01 AL 30 DE NOVIEMBRE
ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS
ENTIDAD : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
UBICACIÓN :SAN PEDRO DE CHANA - HUARI - ANCASH PLAZO EJECUCION : 60 DIAS CALENDARIOS
VALOR REFERENCIAL s/. 298,697.59 FECHA DE INICIO : 02 DE OCTUBRE DEL 2017
PRESUPUESTO CONTRATADO DE OBRA s/. 298,697.59 FECHA DE TERMINO PROGRAMADO : 30 DE NOVIEMBRE DEL 2017
FECHA BASE 5/31/2017
PRESUPUESTO CONTRATADO ACUMULADO ANTERIOR
ITEM DESCRIPCION DE PARTIDAS
UND METRADO PRECIO TOTAL METRADO MONTO %
09.04.01 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC PARA REDES DE DISTRI u 1.00 1,988.35 S/. 1,988.35 0.50 S/. 994.18 50.00%
09.05 PRUEBA HIDRAULICA Y DESINFECCION
09.05.01 PRUEBA HIDRAULICA + DESINFECCION DE TUB. ZANJA TAPADA m 1,364.30 0.55 S/. 750.37 - S/. 0.00 0.00%
10 CASETA DE CONTROL (9 UND)-SECTOR CAPULIPAMPA
10.01 OBRAS PRELIMINARES
10.01.01 LIMPIEZA DE TERRENO MANUAL m2 10.80 1.19 S/. 12.85 2.40 S/. 2.86 22.26%
10.01.02 TRAZO NIVELACION Y REPLANTEO m2 10.80 1.19 S/. 12.85 2.40 S/. 2.86 22.26%
10.02 MOVIMIENTO DE TIERRAS
10.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 8.64 28.84 S/. 249.18 1.92 S/. 55.37 22.22%
10.02.02 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 9.50 12.02 S/. 114.19 2.11 S/. 25.36 22.21%
10.03 OBRAS DE CONCRETO SIMPLE
10.03.01 CONCRETO ARMADO f'c=175 kg/cm2. m3 5.13 438.00 S/. 2,246.94 1.14 S/. 499.32 22.22%
10.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 42.84 37.56 S/. 1,609.07 9.52 S/. 357.57 22.22%
10.04 REVOQUES ENLUCIDOS Y MOLDURAS
10.04.01 TARRAJEO EN EXTERIORES m2 17.64 21.11 S/. 372.38 3.92 S/. 82.75 22.22%
10.05 CARPINTERIA METALICA
10.05.01 TAPA METALICA 0.60X0.80 M SEGUN DISEÑO u 9.00 194.96 S/. 1,754.64 9.00 S/. 1,754.64 100.00%
10.06 SUMINISTRO E INSTALACION DE ACCESORIOS
10.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC u 9.00 1,385.32 S/. 12,467.88 2.00 S/. 2,770.64 22.22%
10.07 SUMINISTRO E INSTALACION DE VALVULAS
10.07.01 SUMINISTRO E INSTALACION VALVULA DE AIRE 1" u 9.00 45.46 S/. 409.14 2.00 S/. 90.92 22.22%

Página 47
VALORIZACION N°02
DEL 01 AL 30 DE NOVIEMBRE
ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS
ENTIDAD : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
UBICACIÓN :SAN PEDRO DE CHANA - HUARI - ANCASH PLAZO EJECUCION : 60 DIAS CALENDARIOS
VALOR REFERENCIAL s/. 298,697.59 FECHA DE INICIO : 02 DE OCTUBRE DEL 2017
PRESUPUESTO CONTRATADO DE OBRA s/. 298,697.59 FECHA DE TERMINO PROGRAMADO : 30 DE NOVIEMBRE DEL 2017
FECHA BASE 5/31/2017
PRESUPUESTO CONTRATADO ACUMULADO ANTERIOR
ITEM DESCRIPCION DE PARTIDAS
UND METRADO PRECIO TOTAL METRADO MONTO %
10.07.02 SUMINISTRO E INSTALACION VALVULA COMPUERTA 4" u 9.00 144.34 S/. 1,299.06 2.00 S/. 288.68 22.22%
11 HIDRANTES (32 UND)-SECTOR CAPULIPAMPA
11.01 OBRAS PRELIMINARES
11.01.01 LIMPIEZA DE TERRENO MANUAL m2 9.60 1.19 S/. 11.42 9.60 S/. 11.42 100.00%
11.01.02 TRAZO NIVELACION Y REPLANTEO m2 9.60 1.19 S/. 11.42 9.60 S/. 11.42 100.00%
11.02 MOVIMIENTO DE TIERRAS
11.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 6.72 28.84 S/. 193.80 6.72 S/. 193.80 100.00%
11.02.02 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 7.39 12.02 S/. 88.83 7.39 S/. 88.83 100.00%
11.03 OBRAS DE CONCRETO SIMPLE
11.03.01 CONCRETO ARMADO f'c=175 kg/cm2. m3 5.63 438.00 S/. 2,465.94 1.06 S/. 464.28 18.83%
11.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 92.16 37.56 S/. 3,461.53 17.28 S/. 649.04 18.75%
11.04 REVOQUES ENLUCIDOS Y MOLDURAS
11.04.01 TARRAJEO EN EXTERIORES m2 35.84 21.11 S/. 756.58 6.72 S/. 141.86 18.75%
11.05 CARPINTERIA METALICA
11.05.01 TAPA METALICA 0.40X0.30 M SEGUN DISEÑO u 32.00 89.86 S/. 2,875.52 32.00 S/. 2,875.52 100.00%
11.06 SUMINISTRO E INSTALACION DE VALVULAS
11.06.01 SUMINISTRO E INSTALACION VALVULA DE ACOPLE 1" u 32.00 15.16 S/. 485.12 6.00 S/. 90.96 18.75%
11.06.02 SUMINISTRO E INSTALACION VALVULA UNIVERSAL DE PVC 1" u 64.00 10.28 S/. 657.92 12.00 S/. 123.36 18.75%
11.07 SUMINISTRO E INSTALACION DE ACCESORIOS
11.07.01 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC u 1.00 2,712.85 S/. 2,712.85 0.18 S/. 488.31 18.00%
12 VALVULAS DE PURGA (9 UND)-SECTOR CAPULIPAMPA
12.01 OBRAS PRELIMINARES
12.01.01 LIMPIEZA DE TERRENO MANUAL m2 2.70 1.19 S/. 3.21 2.70 S/. 3.21 100.00%
12.01.02 TRAZO NIVELACION Y REPLANTEO m2 2.70 1.19 S/. 3.21 2.70 S/. 3.21 100.00%
12.02 MOVIMIENTO DE TIERRAS
12.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 1.62 28.84 S/. 46.72 1.62 S/. 46.72 100.00%
12.02.02 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 1.78 12.02 S/. 21.40 1.78 S/. 21.40 100.00%

Página 48
VALORIZACION N°02
DEL 01 AL 30 DE NOVIEMBRE
ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS
ENTIDAD : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
UBICACIÓN :SAN PEDRO DE CHANA - HUARI - ANCASH PLAZO EJECUCION : 60 DIAS CALENDARIOS
VALOR REFERENCIAL s/. 298,697.59 FECHA DE INICIO : 02 DE OCTUBRE DEL 2017
PRESUPUESTO CONTRATADO DE OBRA s/. 298,697.59 FECHA DE TERMINO PROGRAMADO : 30 DE NOVIEMBRE DEL 2017
FECHA BASE 5/31/2017
PRESUPUESTO CONTRATADO ACUMULADO ANTERIOR
ITEM DESCRIPCION DE PARTIDAS
UND METRADO PRECIO TOTAL METRADO MONTO %
12.03 OBRAS DE CONCRETO SIMPLE
12.03.01 CONCRETO ARMADO f'c=175 kg/cm2. m3 1.19 438.00 S/. 521.22 - S/. 0.00 0.00%
12.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 19.44 37.56 S/. 730.17 - S/. 0.00 0.00%
12.04 REVOQUES ENLUCIDOS Y MOLDURAS
12.04.01 TARRAJEO EN EXTERIORES m2 7.56 21.11 S/. 159.59 - S/. 0.00 0.00%
12.05 CARPINTERIA METALICA
12.05.01 TAPA METALICA 0.40X0.30 M SEGUN DISEÑO u 9.00 89.86 S/. 808.74 - S/. 0.00 0.00%
12.06 SUMINISTRO E INSTALACION DE VALVULAS
12.06.01 SUMINISTRO E INSTALACION VALVULA COMPUERTA 11/2" u 9.00 36.24 S/. 326.16 - S/. 0.00 0.00%
12.07 SUMINISTRO E INSTALACION DE ACCESORIOS
12.07.01 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC u 1.00 2,807.90 S/. 2,807.90 - S/. 0.00 0.00%
13 MODULOS DE RIEGO (10 UND)-SECTOR CAPULIPAMPA
13.01 BRAZO PORTATIL DE RIEGO u 10.00 340.67 S/. 3,406.70 - S/. 0.00 0.00%
14 CAPACITACION
14.01 CAPACITACION glb 1.00 2,542.37 S/. 2,542.37 0.50 S/. 1,271.19 50.00%
15 MITIGACION Y CONTROL AMBIENTAL
15.01 MITIGACION DE IMPACTO AMBIENTAL glb 1.00 2,542.37 S/. 2,542.37 0.50 S/. 1,271.19 50.00%
16 FLETE
16.01 FLETE TERRESTRE glb 1.00 4,541.99 S/. 4,541.99 0.90 S/. 4,087.79 90.00%
16.02 ACARREO EN OBRA glb 1.00 5,056.06 S/. 5,056.06 0.80 S/. 4,044.85 80.00%

COSTO DIRECTO S/. 201,575.95 S/.112,300.33


GASTOS GENERALES VARIABLES S/. 31,400.00 S/.17,493.31
UTILIDAD S/. 20,157.60 S/.11,230.03 55.71%

SUB-TOTAL x F.RELACION (1.00) S/. 253,133.55 S/.141,023.67


I.G.V. (18.00 %) S/. 45,564.04 S/.25,384.26

Página 49
VALORIZACION N°02
DEL 01 AL 30 DE NOVIEMBRE
ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS
ENTIDAD : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
UBICACIÓN :SAN PEDRO DE CHANA - HUARI - ANCASH PLAZO EJECUCION : 60 DIAS CALENDARIOS
VALOR REFERENCIAL s/. 298,697.59 FECHA DE INICIO : 02 DE OCTUBRE DEL 2017
PRESUPUESTO CONTRATADO DE OBRA s/. 298,697.59 FECHA DE TERMINO PROGRAMADO : 30 DE NOVIEMBRE DEL 2017
FECHA BASE 5/31/2017
PRESUPUESTO CONTRATADO ACUMULADO ANTERIOR
ITEM DESCRIPCION DE PARTIDAS
UND METRADO PRECIO TOTAL METRADO MONTO %

TOTAL S/. 298,697.59 S/.166,407.93

Página 50
RIZACION N°02
AL 30 DE NOVIEMBRE

CONTRATISTA : CONSORCIO VICHON


RESIDENTE : FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - FIDEL GREGORIO APARICIO ROQUE

AVANCE ACTUAL ACUMULADO ACTUAL SALDO CONTRACTUAL


METRADO MONTO % METRADO MONTO % METRADO MONTO %

- S/. 0.00 0.00% 1.00 S/. 795.66 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 1.00 S/. 777.96 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 1.00 S/. 1,694.91 100.00% - S/. 0.00 0.00%

0.50 S/. 635.59 50.00% 1.00 S/. 1,271.19 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 10.00 S/. 1,139.40 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 1.00 S/. 127.10 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 1.00 S/. 572.10 100.00% - S/. 0.00 0.00%
1.50 S/. 1,525.42 75.00% 2.00 S/. 2,033.90 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 10.64 S/. 12.66 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 5.75 S/. 6.84 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 1.00 S/. 735.00 100.00% - S/. 0.00 0.00%
S/. 0.00
- S/. 0.00 0.00% 14.06 S/. 405.49 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 15.47 S/. 185.95 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 5.18 S/. 673.50 100.00% - S/. 0.00 0.00%

2.59 S/. 760.86 100.00% 2.59 S/. 760.86 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 0.04 S/. 0.85 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 3.52 S/. 1,787.10 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 25.93 S/. 973.93 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 100.51 S/. 631.20 100.00% - S/. 0.00 0.00%

Página 51
RIZACION N°02
AL 30 DE NOVIEMBRE

CONTRATISTA : CONSORCIO VICHON


RESIDENTE : FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - FIDEL GREGORIO APARICIO ROQUE

AVANCE ACTUAL ACUMULADO ACTUAL SALDO CONTRACTUAL


METRADO MONTO % METRADO MONTO % METRADO MONTO %
- S/. 0.00 0.00% 1.20 S/. 17.32 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 19.21 S/. 232.63 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 8.25 S/. 150.56 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 1.00 S/. 195.92 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 1.00 S/. 108.80 100.00% - S/. 0.00 0.00%

9.76 S/. 83.06 100.00% 9.76 S/. 83.06 100.00% - S/. 0.00 0.00%

7.00 S/. 205.45 70.00% 10.00 S/. 293.50 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 4.00 S/. 74.20 100.00% - S/. 0.00 0.00%

0.50 S/. 323.31 50.00% 1.00 S/. 646.62 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 1.00 S/. 70.56 100.00% - S/. 0.00 0.00%

1.80 S/. 1.93 100.00% 1.80 S/. 1.93 100.00% - S/. 0.00 0.00%
4.50 S/. 129.78 100.00% 4.50 S/. 129.78 100.00% - S/. 0.00 0.00%
4.50 S/. 1,204.97 100.00% 4.50 S/. 1,204.97 100.00% - S/. 0.00 0.00%
5.00 S/. 160.00 100.00% 5.00 S/. 160.00 100.00% - S/. 0.00 0.00%
29.40 S/. 2,132.68 100.00% 29.40 S/. 2,132.68 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 18.00 S/. 21.42 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 18.00 S/. 21.42 100.00% - S/. 0.00 0.00%
- S/. 0.00
- S/. 0.00 0.00% 11.34 S/. 327.05 100.00% - S/. 0.00 0.00%

Página 52
RIZACION N°02
AL 30 DE NOVIEMBRE

CONTRATISTA : CONSORCIO VICHON


RESIDENTE : FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - FIDEL GREGORIO APARICIO ROQUE

AVANCE ACTUAL ACUMULADO ACTUAL SALDO CONTRACTUAL


METRADO MONTO % METRADO MONTO % METRADO MONTO %
- S/. 0.00 0.00% 12.48 S/. 150.01 100.00% - S/. 0.00 0.00%

6.11 S/. 2,280.19 55.00% 11.11 S/. 4,146.14 100.00% - S/. 0.00 0.00%
10.23 S/. 384.24 50.57% 20.23 S/. 759.84 100.00% - S/. 0.00 0.00%

0.72 S/. 365.54 100.00% 0.72 S/. 365.54 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 17.52 S/. 110.03 100.00% - S/. 0.00 0.00%
1.67 S/. 62.73 100.00% 1.67 S/. 62.73 100.00% - S/. 0.00 0.00%

11.78 S/. 142.66 100.00% 11.78 S/. 142.66 100.00% - S/. 0.00 0.00%
10.12 S/. 184.69 100.00% 10.12 S/. 184.69 100.00% - S/. 0.00 0.00%

1.00 S/. 95.97 100.00% 1.00 S/. 95.97 100.00% - S/. 0.00 0.00%

10.12 S/. 86.12 100.00% 10.12 S/. 86.12 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 15.93 S/. 18.96 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 1.00 S/. 195.92 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 1.00 S/. 108.80 100.00% - S/. 0.00 0.00%

16.99 S/. 144.58 100.00% 16.99 S/. 144.58 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 10.00 S/. 293.50 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 4.00 S/. 74.20 100.00% - S/. 0.00 0.00%

Página 53
RIZACION N°02
AL 30 DE NOVIEMBRE

CONTRATISTA : CONSORCIO VICHON


RESIDENTE : FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - FIDEL GREGORIO APARICIO ROQUE

AVANCE ACTUAL ACUMULADO ACTUAL SALDO CONTRACTUAL


METRADO MONTO % METRADO MONTO % METRADO MONTO %
- S/. 0.00 0.00% 1.00 S/. 646.62 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 1.00 S/. 70.56 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 2.52 S/. 2.70 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 3.78 S/. 109.02 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 3.78 S/. 1,012.17 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 7.00 S/. 224.00 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 23.94 S/. 1,736.61 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 11.10 S/. 13.21 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 11.10 S/. 13.21 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 12.74 S/. 367.42 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 15.70 S/. 56.05 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 14.01 S/. 168.40 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 1.57 S/. 461.22 100.00% - S/. 0.00 0.00%

0.07 S/. 35.54 1.33% 5.27 S/. 2,675.58 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 83.95 S/. 527.21 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 36.82 S/. 1,382.96 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 17.92 S/. 217.01 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 18.91 S/. 345.11 100.00% - S/. 0.00 0.00%

Página 54
RIZACION N°02
AL 30 DE NOVIEMBRE

CONTRATISTA : CONSORCIO VICHON


RESIDENTE : FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - FIDEL GREGORIO APARICIO ROQUE

AVANCE ACTUAL ACUMULADO ACTUAL SALDO CONTRACTUAL


METRADO MONTO % METRADO MONTO % METRADO MONTO %

1.00 S/. 95.97 100.00% 1.00 S/. 95.97 100.00% - S/. 0.00 0.00%

24.32 S/. 28.94 33.33% 72.96 S/. 86.82 100.00% - S/. 0.00 0.00%
24.32 S/. 28.94 33.33% 72.96 S/. 86.82 100.00% - S/. 0.00 0.00%

11.67 S/. 336.57 33.32% 35.02 S/. 1,009.98 100.00% - S/. 0.00 0.00%
7.78 S/. 442.84 33.32% 23.35 S/. 1,329.08 100.00% - S/. 0.00 0.00%
72.96 S/. 260.47 100.00% 72.96 S/. 260.47 100.00% - S/. 0.00 0.00%
182.40 S/. 246.24 100.00% 182.40 S/. 246.24 100.00% - S/. 0.00 0.00%
28.77 S/. 920.93 100.00% 28.77 S/. 920.93 100.00% - S/. 0.00 0.00%
28.77 S/. 900.79 100.00% 28.77 S/. 900.79 100.00% - S/. 0.00 0.00%
11.54 S/. 138.71 100.00% 11.54 S/. 138.71 100.00% - S/. 0.00 0.00%

182.40 S/. 3,383.52 100.00% 182.40 S/. 3,383.52 100.00% - S/. 0.00 0.00%

1.00 S/. 243.20 100.00% 1.00 S/. 243.20 100.00% - S/. 0.00 0.00%

182.40 S/. 100.32 100.00% 182.40 S/. 100.32 100.00% - S/. 0.00 0.00%

88.55 S/. 105.37 100.00% 88.55 S/. 105.37 100.00% - S/. 0.00 0.00%

2.00 S/. 431.84 100.00% 2.00 S/. 431.84 100.00% - S/. 0.00 0.00%
1.00 S/. 271.20 100.00% 1.00 S/. 271.20 100.00% - S/. 0.00 0.00%

Página 55
RIZACION N°02
AL 30 DE NOVIEMBRE

CONTRATISTA : CONSORCIO VICHON


RESIDENTE : FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - FIDEL GREGORIO APARICIO ROQUE

AVANCE ACTUAL ACUMULADO ACTUAL SALDO CONTRACTUAL


METRADO MONTO % METRADO MONTO % METRADO MONTO %
113.72 S/. 933.64 100.00% 113.72 S/. 933.64 100.00% - S/. 0.00 0.00%

10.00 S/. 120.80 100.00% 10.00 S/. 120.80 100.00% - S/. 0.00 0.00%
4.00 S/. 117.40 100.00% 4.00 S/. 117.40 100.00% - S/. 0.00 0.00%

1.00 S/. 1,974.45 100.00% 1.00 S/. 1,974.45 100.00% - S/. 0.00 0.00%

4.00 S/. 714.88 100.00% 4.00 S/. 714.88 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 682.15 S/. 811.76 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 682.15 S/. 811.76 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 470.68 S/. 13,574.41 100.00% - S/. 0.00 0.00%
8.79 S/. 500.33 2.80% 313.79 S/. 17,860.93 100.00% - S/. 0.00 0.00%
7.86 S/. 28.06 2.88% 272.86 S/. 974.11 100.00% - S/. 0.00 0.00%
137.30 S/. 185.36 10.06% 1,364.30 S/. 1,841.81 100.00% - S/. 0.00 0.00%
268.89 S/. 8,607.17 100.00% 268.89 S/. 8,607.17 100.00% - S/. 0.00 0.00%
405.32 S/. 12,690.57 100.00% 405.32 S/. 12,690.57 100.00% - S/. 0.00 0.00%
89.55 S/. 1,076.39 100.00% 89.55 S/. 1,076.39 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 220.35 S/. 14,723.79 100.00% - S/. 0.00 0.00%
6.85 S/. 201.05 2.30% 297.85 S/. 8,741.90 100.00% - S/. 0.00 0.00%
64.10 S/. 1,189.06 100.00% 64.10 S/. 1,189.06 100.00% - S/. 0.00 0.00%
180.67 S/. 2,182.50 48.70% 370.95 S/. 4,481.08 100.00% - S/. 0.00 0.00%
321.05 S/. 2,160.67 78.10% 411.05 S/. 2,766.37 100.00% - S/. 0.00 0.00%

Página 56
RIZACION N°02
AL 30 DE NOVIEMBRE

CONTRATISTA : CONSORCIO VICHON


RESIDENTE : FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - FIDEL GREGORIO APARICIO ROQUE

AVANCE ACTUAL ACUMULADO ACTUAL SALDO CONTRACTUAL


METRADO MONTO % METRADO MONTO % METRADO MONTO %
0.50 S/. 994.17 50.00% 1.00 S/. 1,988.35 100.00% - S/. 0.00 0.00%

1,364.30 S/. 750.37 100.00% 1,364.30 S/. 750.37 100.00% - S/. 0.00 0.00%

8.40 S/. 9.99 77.74% 10.80 S/. 12.85 100.00% - S/. 0.00 0.00%
8.40 S/. 9.99 77.74% 10.80 S/. 12.85 100.00% - S/. 0.00 0.00%

6.72 S/. 193.81 77.78% 8.64 S/. 249.18 100.00% - S/. 0.00 0.00%
7.39 S/. 88.83 77.79% 9.50 S/. 114.19 100.00% - S/. 0.00 0.00%

3.99 S/. 1,747.62 77.78% 5.13 S/. 2,246.94 100.00% - S/. 0.00 0.00%
33.32 S/. 1,251.50 77.78% 42.84 S/. 1,609.07 100.00% - S/. 0.00 0.00%

13.72 S/. 289.63 77.78% 17.64 S/. 372.38 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 9.00 S/. 1,754.64 100.00% - S/. 0.00 0.00%

7.00 S/. 9,697.24 77.78% 9.00 S/. 12,467.88 100.00% - S/. 0.00 0.00%

7.00 S/. 318.22 77.78% 9.00 S/. 409.14 100.00% - S/. 0.00 0.00%

Página 57
RIZACION N°02
AL 30 DE NOVIEMBRE

CONTRATISTA : CONSORCIO VICHON


RESIDENTE : FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - FIDEL GREGORIO APARICIO ROQUE

AVANCE ACTUAL ACUMULADO ACTUAL SALDO CONTRACTUAL


METRADO MONTO % METRADO MONTO % METRADO MONTO %
7.00 S/. 1,010.38 77.78% 9.00 S/. 1,299.06 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 9.60 S/. 11.42 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 9.60 S/. 11.42 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 6.72 S/. 193.80 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 7.39 S/. 88.83 100.00% - S/. 0.00 0.00%

4.57 S/. 2,001.66 81.17% 5.63 S/. 2,465.94 100.00% - S/. 0.00 0.00%
74.88 S/. 2,812.49 81.25% 92.16 S/. 3,461.53 100.00% - S/. 0.00 0.00%

29.12 S/. 614.72 81.25% 35.84 S/. 756.58 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 32.00 S/. 2,875.52 100.00% - S/. 0.00 0.00%

26.00 S/. 394.16 81.25% 32.00 S/. 485.12 100.00% - S/. 0.00 0.00%
52.00 S/. 534.56 81.25% 64.00 S/. 657.92 100.00% - S/. 0.00 0.00%

0.82 S/. 2,224.54 82.00% 1.00 S/. 2,712.85 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 2.70 S/. 3.21 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 2.70 S/. 3.21 100.00% - S/. 0.00 0.00%

- S/. 0.00 0.00% 1.62 S/. 46.72 100.00% - S/. 0.00 0.00%
- S/. 0.00 0.00% 1.78 S/. 21.40 100.00% - S/. 0.00 0.00%

Página 58
RIZACION N°02
AL 30 DE NOVIEMBRE

CONTRATISTA : CONSORCIO VICHON


RESIDENTE : FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - FIDEL GREGORIO APARICIO ROQUE

AVANCE ACTUAL ACUMULADO ACTUAL SALDO CONTRACTUAL


METRADO MONTO % METRADO MONTO % METRADO MONTO %

1.19 S/. 521.22 100.00% 1.19 S/. 521.22 100.00% - S/. 0.00 0.00%
19.44 S/. 730.17 100.00% 19.44 S/. 730.17 100.00% - S/. 0.00 0.00%

7.56 S/. 159.59 100.00% 7.56 S/. 159.59 100.00% - S/. 0.00 0.00%

9.00 S/. 808.74 100.00% 9.00 S/. 808.74 100.00% - S/. 0.00 0.00%

9.00 S/. 326.16 100.00% 9.00 S/. 326.16 100.00% - S/. 0.00 0.00%

1.00 S/. 2,807.90 100.00% 1.00 S/. 2,807.90 100.00% - S/. 0.00 0.00%

10.00 S/. 3,406.70 100.00% 10.00 S/. 3,406.70 100.00% - S/. 0.00 0.00%

0.50 S/. 1,271.18 50.00% 1.00 S/. 2,542.37 100.00% - S/. 0.00 0.00%

0.50 S/. 1,271.18 50.00% 1.00 S/. 2,542.37 100.00% - S/. 0.00 0.00%

0.10 S/. 454.20 10.00% 1.00 S/. 4,541.99 100.00% - S/. 0.00 0.00%
0.20 S/. 1,011.21 20.00% 1.00 S/. 5,056.06 100.00% - S/. 0.00 0.00%

S/.89,275.63 S/.201,575.95 S/. 0.00


S/.13,906.69 S/.31,400.00 S/.0.00
S/.8,927.56 44.29% S/.20,157.60 100.00% S/.0.00 0.00%

S/.112,109.88 S/.253,133.55 S/. 0.00


S/.20,179.78 S/.45,564.04 S/.0.00

Página 59
RIZACION N°02
AL 30 DE NOVIEMBRE

CONTRATISTA : CONSORCIO VICHON


RESIDENTE : FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - FIDEL GREGORIO APARICIO ROQUE

AVANCE ACTUAL ACUMULADO ACTUAL SALDO CONTRACTUAL


METRADO MONTO % METRADO MONTO % METRADO MONTO %

S/.132,289.66 S/.298,697.59 S/. 0.00

Página 60
ADJUDICACION SIMPLIFICADA N° :AS N° 003 - 2016 - CS - MDM/CS
PLANILLADELDE
01 METRADOS EJECUTADO
AL 30 DE SETIEMBRE
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MASIN
UBICACIÓN :MASIN - HUARI - ANCASH
VALOR REFERENCIAL s/. 1588515.94
PRESUPUESTO CONTRATADO DE OBRA s/.1588515.84
FECHA BASE 4/1/2016
ITEM DESCRIPCION DE PARTIDAS M
U.M. CANTIDAD N° DE VECES LARGO (M)
ADJUDICACION SIMPLIFICADA N° :AS N° 003 - 2016 - CS - MDM/CS
PLANILLADELDE
01 METRADOS EJECUTADO
AL 30 DE SETIEMBRE
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MASIN
UBICACIÓN :MASIN - HUARI - ANCASH
VALOR REFERENCIAL s/. 1588515.94
PRESUPUESTO CONTRATADO DE OBRA s/.1588515.84
FECHA BASE 4/1/2016
ITEM DESCRIPCION DE PARTIDAS M
U.M. CANTIDAD N° DE VECES LARGO (M)
ADJUDICACION SIMPLIFICADA N° :AS N° 003 - 2016 - CS - MDM/CS
PLANILLADELDE
01 METRADOS EJECUTADO
AL 30 DE SETIEMBRE
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MASIN
UBICACIÓN :MASIN - HUARI - ANCASH
VALOR REFERENCIAL s/. 1588515.94
PRESUPUESTO CONTRATADO DE OBRA s/.1588515.84
FECHA BASE 4/1/2016
ITEM DESCRIPCION DE PARTIDAS M
U.M. CANTIDAD N° DE VECES LARGO (M)
ADJUDICACION SIMPLIFICADA N° :AS N° 003 - 2016 - CS - MDM/CS
PLANILLADELDE
01 METRADOS EJECUTADO
AL 30 DE SETIEMBRE
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MASIN
UBICACIÓN :MASIN - HUARI - ANCASH
VALOR REFERENCIAL s/. 1588515.94
PRESUPUESTO CONTRATADO DE OBRA s/.1588515.84
FECHA BASE 4/1/2016
ITEM DESCRIPCION DE PARTIDAS M
U.M. CANTIDAD N° DE VECES LARGO (M)
ADJUDICACION SIMPLIFICADA N° :AS N° 003 - 2016 - CS - MDM/CS
PLANILLADELDE
01 METRADOS EJECUTADO
AL 30 DE SETIEMBRE
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MASIN
UBICACIÓN :MASIN - HUARI - ANCASH
VALOR REFERENCIAL s/. 1588515.94
PRESUPUESTO CONTRATADO DE OBRA s/.1588515.84
FECHA BASE 4/1/2016
ITEM DESCRIPCION DE PARTIDAS M
U.M. CANTIDAD N° DE VECES LARGO (M)
ADJUDICACION SIMPLIFICADA N° :AS N° 003 - 2016 - CS - MDM/CS
PLANILLADELDE
01 METRADOS EJECUTADO
AL 30 DE SETIEMBRE
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MASIN
UBICACIÓN :MASIN - HUARI - ANCASH
VALOR REFERENCIAL s/. 1588515.94
PRESUPUESTO CONTRATADO DE OBRA s/.1588515.84
FECHA BASE 4/1/2016
ITEM DESCRIPCION DE PARTIDAS M
U.M. CANTIDAD N° DE VECES LARGO (M)
ADJUDICACION SIMPLIFICADA N° :AS N° 003 - 2016 - CS - MDM/CS
PLANILLADELDE
01 METRADOS EJECUTADO
AL 30 DE SETIEMBRE
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MASIN
UBICACIÓN :MASIN - HUARI - ANCASH
VALOR REFERENCIAL s/. 1588515.94
PRESUPUESTO CONTRATADO DE OBRA s/.1588515.84
FECHA BASE 4/1/2016
ITEM DESCRIPCION DE PARTIDAS M
U.M. CANTIDAD N° DE VECES LARGO (M)
ADJUDICACION SIMPLIFICADA N° :AS N° 003 - 2016 - CS - MDM/CS
PLANILLADELDE
01 METRADOS EJECUTADO
AL 30 DE SETIEMBRE
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MASIN
UBICACIÓN :MASIN - HUARI - ANCASH
VALOR REFERENCIAL s/. 1588515.94
PRESUPUESTO CONTRATADO DE OBRA s/.1588515.84
FECHA BASE 4/1/2016
ITEM DESCRIPCION DE PARTIDAS M
U.M. CANTIDAD N° DE VECES LARGO (M)
ADJUDICACION SIMPLIFICADA N° :AS N° 003 - 2016 - CS - MDM/CS
PLANILLADELDE
01 METRADOS EJECUTADO
AL 30 DE SETIEMBRE
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MASIN
UBICACIÓN :MASIN - HUARI - ANCASH
VALOR REFERENCIAL s/. 1588515.94
PRESUPUESTO CONTRATADO DE OBRA s/.1588515.84
FECHA BASE 4/1/2016
ITEM DESCRIPCION DE PARTIDAS M
U.M. CANTIDAD N° DE VECES LARGO (M)
ADJUDICACION SIMPLIFICADA N° :AS N° 003 - 2016 - CS - MDM/CS
PLANILLADELDE
01 METRADOS EJECUTADO
AL 30 DE SETIEMBRE
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MASIN
UBICACIÓN :MASIN - HUARI - ANCASH
VALOR REFERENCIAL s/. 1588515.94
PRESUPUESTO CONTRATADO DE OBRA s/.1588515.84
FECHA BASE 4/1/2016
ITEM DESCRIPCION DE PARTIDAS M
U.M. CANTIDAD N° DE VECES LARGO (M)
ADJUDICACION SIMPLIFICADA N° :AS N° 003 - 2016 - CS - MDM/CS
PLANILLADELDE
01 METRADOS EJECUTADO
AL 30 DE SETIEMBRE
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MASIN
UBICACIÓN :MASIN - HUARI - ANCASH
VALOR REFERENCIAL s/. 1588515.94
PRESUPUESTO CONTRATADO DE OBRA s/.1588515.84
FECHA BASE 4/1/2016
ITEM DESCRIPCION DE PARTIDAS M
U.M. CANTIDAD N° DE VECES LARGO (M)
ADJUDICACION SIMPLIFICADA N° :AS N° 003 - 2016 - CS - MDM/CS
PLANILLADELDE
01 METRADOS EJECUTADO
AL 30 DE SETIEMBRE
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MASIN
UBICACIÓN :MASIN - HUARI - ANCASH
VALOR REFERENCIAL s/. 1588515.94
PRESUPUESTO CONTRATADO DE OBRA s/.1588515.84
FECHA BASE 4/1/2016
ITEM DESCRIPCION DE PARTIDAS M
U.M. CANTIDAD N° DE VECES LARGO (M)
ADJUDICACION SIMPLIFICADA N° :AS N° 003 - 2016 - CS - MDM/CS
PLANILLADELDE
01 METRADOS EJECUTADO
AL 30 DE SETIEMBRE
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MASIN
UBICACIÓN :MASIN - HUARI - ANCASH
VALOR REFERENCIAL s/. 1588515.94
PRESUPUESTO CONTRATADO DE OBRA s/.1588515.84
FECHA BASE 4/1/2016
ITEM DESCRIPCION DE PARTIDAS M
U.M. CANTIDAD N° DE VECES LARGO (M)
ADJUDICACION SIMPLIFICADA N° :AS N° 003 - 2016 - CS - MDM/CS
PLANILLADELDE
01 METRADOS EJECUTADO
AL 30 DE SETIEMBRE
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MASIN
UBICACIÓN :MASIN - HUARI - ANCASH
VALOR REFERENCIAL s/. 1588515.94
PRESUPUESTO CONTRATADO DE OBRA s/.1588515.84
FECHA BASE 4/1/2016
ITEM DESCRIPCION DE PARTIDAS M
U.M. CANTIDAD N° DE VECES LARGO (M)
ADJUDICACION SIMPLIFICADA N° :AS N° 003 - 2016 - CS - MDM/CS
PLANILLADELDE
01 METRADOS EJECUTADO
AL 30 DE SETIEMBRE
ENTIDAD : MUNICIPALIDAD DISTRITAL DE MASIN
UBICACIÓN :MASIN - HUARI - ANCASH
VALOR REFERENCIAL s/. 1588515.94
PRESUPUESTO CONTRATADO DE OBRA s/.1588515.84
FECHA BASE 4/1/2016
ITEM DESCRIPCION DE PARTIDAS M
U.M. CANTIDAD N° DE VECES LARGO (M)
S EJECUTADO
EMBRE

METRADOS
ANCHO (M) ALTO (M) AREA (M2) VOL. (M3) FACTOR DIAMETRO PARCIAL Metrado

###

###
S EJECUTADO
EMBRE

METRADOS
ANCHO (M) ALTO (M) AREA (M2) VOL. (M3) FACTOR DIAMETRO PARCIAL Metrado

###

###
S EJECUTADO
EMBRE

METRADOS
ANCHO (M) ALTO (M) AREA (M2) VOL. (M3) FACTOR DIAMETRO PARCIAL Metrado

###

###
S EJECUTADO
EMBRE

METRADOS
ANCHO (M) ALTO (M) AREA (M2) VOL. (M3) FACTOR DIAMETRO PARCIAL Metrado

###

###
S EJECUTADO
EMBRE

METRADOS
ANCHO (M) ALTO (M) AREA (M2) VOL. (M3) FACTOR DIAMETRO PARCIAL Metrado

###

###
S EJECUTADO
EMBRE

METRADOS
ANCHO (M) ALTO (M) AREA (M2) VOL. (M3) FACTOR DIAMETRO PARCIAL Metrado

###

###
###
###
###
###
###

###
S EJECUTADO
EMBRE

METRADOS
ANCHO (M) ALTO (M) AREA (M2) VOL. (M3) FACTOR DIAMETRO PARCIAL Metrado

###

###
S EJECUTADO
EMBRE

METRADOS
ANCHO (M) ALTO (M) AREA (M2) VOL. (M3) FACTOR DIAMETRO PARCIAL Metrado
###

###

###

###

###
###
###

###

###
###
S EJECUTADO
EMBRE

METRADOS
ANCHO (M) ALTO (M) AREA (M2) VOL. (M3) FACTOR DIAMETRO PARCIAL Metrado ###

###
###

###
###
###

###
###
###

###

###

###
S EJECUTADO
EMBRE

METRADOS
ANCHO (M) ALTO (M) AREA (M2) VOL. (M3) FACTOR DIAMETRO PARCIAL Metrado

###

###

###

###
S EJECUTADO
EMBRE

METRADOS
ANCHO (M) ALTO (M) AREA (M2) VOL. (M3) FACTOR DIAMETRO PARCIAL Metrado

###

###

###

###
###
###

###
S EJECUTADO
EMBRE

METRADOS
ANCHO (M) ALTO (M) AREA (M2) VOL. (M3) FACTOR DIAMETRO PARCIAL Metrado

###
###
###
###
###
###
###

###
###

###

###
S EJECUTADO
EMBRE

METRADOS
ANCHO (M) ALTO (M) AREA (M2) VOL. (M3) FACTOR DIAMETRO PARCIAL Metrado

###

###

###

###

###
S EJECUTADO
EMBRE

METRADOS
ANCHO (M) ALTO (M) AREA (M2) VOL. (M3) FACTOR DIAMETRO PARCIAL Metrado

###

###

###
###
###
###
###

###
S EJECUTADO
EMBRE

METRADOS
ANCHO (M) ALTO (M) AREA (M2) VOL. (M3) FACTOR DIAMETRO PARCIAL Metrado

###

###
###
###

###
CUADRO DE METRADOS EJECUTADOS
DEL 01 AL 30 DE NOVIEMBRE

ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS

ENTIDAD: MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA


UBICACIÓN: CHANA-HUARI-ANCASH
VALOR REFERENCIAL : s/. 298,697.59
PRESUPUESTO CONTRATADO DE OBRA: s/. 298,697.59
FECHA BASE: 31/05/2017

METRADOS
ITEM DESCRIPCION DE PARTIDAS Metrados
Unidad
Ejecutados
01 OBRAS PROVISIONALES
01.01 ALMACEN Y OFICINAS glb -
01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m u -
01.03 MOVILIZACION DE EQUIPOS Y HERRAMIENTAS est -
02 SEGURIDAD Y SALUD
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE
02.01
SEGURIDAD Y SALUD EN EL TRABAJO
glb 0.50
02.02 EQUIPOS DE PROTECCION INDIVIDUAL u -
02.03 EQUIPOS DE PROTECCION COLECTIVA glb -
02.04 SEÑALIZACION TEMPORAL DE SEGURIDAD glb -
02.05 CAPACITACION EN SEGURIDAD Y SALUD. mes 1.50
03 CAPTACION TIPO I C-1-SECTOR YURAQ PUQUIO
03.01 OBRAS PRELIMINARES
03.01.01 LIMPIEZA DE TERRENO MANUAL m2 -
03.01.02 TRAZO NIVELACION Y REPLANTEO m2 -
03.01.03 DEMOLICION DE CAPTACION EXISTENTE glb -
03.02 MOVIMIENTO DE TIERRAS
03.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 -
03.02.02 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 -
03.02.03 SUMINISTRO E INSTALACION DE PIEDRA SELECIONADA m3 -
03.03 OBRAS DE CONCRETO SIMPLE
03.03.01 CONCRETO f'c= 140 kg/cm2 PARA SOLADOS Y/O DADOS m3 2.59
03.03.02 SOLADOS CONCRETO f'c=100 kg/cm2 h=3" m2 -
03.04 OBRAS DE CONCRETO ARMADO
03.04.01 CONCRETO F'C=210 KG/CM2 m3 -
03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 -
03.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg -
03.05 REVOQUES ENLUCIDOS Y MOLDURAS
03.05.01 TARRAJEO INTERIOR m2 -
03.05.02 TARRAJEO EN EXTERIORES m2 -
03.05.03 TARRAJEO CON IMPERMEABILIZANTES EN INTERIORES m2 -
03.06 CARPINTERIA METALICA
03.06.01 TAPA METALICA 0.60X0.60 M SEGUN DISEÑO u -
03.06.02 TAPA METALICA 0.45X0.45 M SEGUN DISEÑO u -
03.07 PINTURA
03.07.01 PINTURA DE MURO EXTERIOR C/LATEX VINILICO m2 9.76
03.08 SUMINISTRO E INSTALACION DE TUBERIAS
03.08.01 SUM. E INST. TUBERIA PVC C-10 4" INC. PRUEBA m 7.00
03.08.02 SUM. E INST. TUBERIA PVC C-10 3" INC. PRUEBA m -
03.09 SUMINISTRO E INSTALACION DE ACCESORIOS PARA CAPTACION
CUADRO DE METRADOS EJECUTADOS
DEL 01 AL 30 DE NOVIEMBRE

ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS

ENTIDAD: MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA


UBICACIÓN: CHANA-HUARI-ANCASH
VALOR REFERENCIAL : s/. 298,697.59
PRESUPUESTO CONTRATADO DE OBRA: s/. 298,697.59
FECHA BASE: 31/05/2017

METRADOS
ITEM DESCRIPCION DE PARTIDAS Metrados
Unidad
Ejecutados
03.09.01 SUMINISTRO E INSTALACION DE ACCESORIOS glb 0.50
03.10 SUMINISTRO E INSTALACION DE VALVULAS
03.10.01 SUMINISTRO E INSTALACION VALVULA COMPUERTA 3" u -
03.11 CERCO DE SEGURIDAD
03.11.01 TRAZO NIVELACION Y REPLANTEO m2 1.80
03.11.02 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 4.50
03.11.03 CONCRETO f'c=100 kg/cm2 (CERCO DE SEGURIDAD) m3 4.50
ANCLAJE DE ACERO CORRUGADO Fy=4200 KG/CM2 CON PLANCHA
03.11.04
DE ACERO (CERCO DE SEGURIDAD)
u 5.00
03.11.05 CERCO DE TUBO NEGRO Y MALLA OLIMPICA m2 29.40
04 CAPTACION TIPO II-SECTOR CHAUPIMONTE
04.01 OBRAS PRELIMINARES
04.01.01 LIMPIEZA DE TERRENO MANUAL m2 -
04.01.02 TRAZO NIVELACION Y REPLANTEO m2 -
04.02 MOVIMIENTO DE TIERRAS
04.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 -
04.02.02 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 -
04.03 OBRAS DE CONCRETO SIMPLE
04.03.01 CONCRETO CICLOPEO f'c=175 kg/cm2 + 30 % PM. m3 6.11
04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 10.23
04.04 OBRAS DE CONCRETO ARMADO
04.04.01 CONCRETO F'C=210 KG/CM2 m3 0.72
04.04.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg -
04.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 1.67
04.05 REVOQUES ENLUCIDOS Y MOLDURAS
04.05.01 TARRAJEO EN EXTERIORES m2 11.78
04.05.02 TARRAJEO CON IMPERMEABILIZANTES EN INTERIORES m2 10.12
04.06 CARPINTERIA METALICA
04.06.01 COMPUERTA METALICA DE 0.55x0.30 m u 1.00
04.07 PINTURA
04.07.01 PINTURA DE MURO EXTERIOR C/LATEX VINILICO m2 10.12
05 MEJORAMIENTO DE LA CAPTACION-SECTOR CAPULIPAMPA
05.01 OBRAS PRELIMINARES
05.01.01 LIMPIEZA DE TERRENO MANUAL m2 -
05.02 CARPINTERIA METALICA
05.02.01 TAPA METALICA 0.60X0.60 M SEGUN DISEÑO u -
05.02.02 TAPA METALICA 0.45X0.45 M SEGUN DISEÑO u -
05.03 PINTURA
05.03.01 PINTURA DE MURO EXTERIOR C/LATEX VINILICO m2 16.99
05.04 SUMINISTRO E INSTALACION DE TUBERIAS
CUADRO DE METRADOS EJECUTADOS
DEL 01 AL 30 DE NOVIEMBRE

ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS

ENTIDAD: MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA


UBICACIÓN: CHANA-HUARI-ANCASH
VALOR REFERENCIAL : s/. 298,697.59
PRESUPUESTO CONTRATADO DE OBRA: s/. 298,697.59
FECHA BASE: 31/05/2017

METRADOS
ITEM DESCRIPCION DE PARTIDAS Metrados
Unidad
Ejecutados
05.04.01 SUM. E INST. TUBERIA PVC C-10 4" INC. PRUEBA m -
05.04.02 SUM. E INST. TUBERIA PVC C-10 3" INC. PRUEBA m -
05.05 SUMINISTRO E INSTALACION DE ACCESORIOS PARA CAPTACION
05.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS glb -
05.06 SUMINISTRO E INSTALACION DE VALVULAS
05.06.01 SUMINISTRO E INSTALACION VALVULA COMPUERTA 3" u -
05.07 CERCO DE SEGURIDAD
05.07.01 TRAZO NIVELACION Y REPLANTEO m2 -
05.07.02 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 -
05.07.03 CONCRETO f'c=100 kg/cm2 (CERCO DE SEGURIDAD) m3 -
ANCLAJE DE ACERO CORRUGADO Fy=4200 KG/CM2 CON PLANCHA
05.07.04
DE ACERO (CERCO DE SEGURIDAD)
u -
05.07.05 CERCO DE TUBO NEGRO Y MALLA OLIMPICA m2 -
06 DESARENADOR-SECTOR CHAUPIMONTE
06.01 OBRAS PRELIMINARES
06.01.01 LIMPIEZA DE TERRENO MANUAL m2 -
06.01.02 TRAZO NIVELACION Y REPLANTEO m2 -
06.02 MOVIMIENTO DE TIERRAS
06.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 -
06.02.02 REFINE Y NIVELACION EN TERRENO NORMAL m2 -
06.02.03 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 -
06.03 OBRAS DE CONCRETO SIMPLE
06.03.01 CONCRETO f'c= 140 kg/cm2 PARA SOLADOS Y/O DADOS m3 -
06.04 OBRAS DE CONCRETO ARMADO
06.04.01 CONCRETO F'C=210 KG/CM2 m3 0.07
06.04.02 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg -
06.04.03 ENCOFRADO Y DESENCOFRADO NORMAL m2 -
06.05 REVOQUES ENLUCIDOS Y MOLDURAS
06.05.01 TARRAJEO EN EXTERIORES m2 -
06.05.02 TARRAJEO CON IMPERMEABILIZANTES EN INTERIORES m2 -
06.06 CARPINTERIA METALICA
06.06.01 COMPUERTA METALICA DE 0.30x0.30 m u 1.00
LINEA DE CONDUCCION-SECTOR YURAQ PUQUIO, CHAUPIMONTE Y
07
CAPULIPAMPA
07.01 OBRAS PROVISIONALES
07.01.01 LIMPIEZA DE TERRENO MANUAL m2 24.32
07.01.02 TRAZO NIVELACION Y REPLANTEO m2 24.32
07.02 MOVIMIENTO DE TIERRAS
07.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 11.67
CUADRO DE METRADOS EJECUTADOS
DEL 01 AL 30 DE NOVIEMBRE

ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS

ENTIDAD: MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA


UBICACIÓN: CHANA-HUARI-ANCASH
VALOR REFERENCIAL : s/. 298,697.59
PRESUPUESTO CONTRATADO DE OBRA: s/. 298,697.59
FECHA BASE: 31/05/2017

METRADOS
ITEM DESCRIPCION DE PARTIDAS Metrados
Unidad
Ejecutados
07.02.02 EXCAVACION MANUAL EN ROCA SUELTA m3 7.78
07.02.03 REFINE Y NIVELACION EN TERRENO NORMAL m2 72.96
07.02.04 CAMA DE TIERRA ZARANDEADA E=0.10M. ZANJA P/TUBO m 182.40
RELLENO Y COMPACTADO ZANJA CON MATERIAL SELECCIONADO
07.02.05
EN CAPAS DE 0.10M
m3 28.77
RELLENO Y COMPACTADO ZANJA CON MATERIAL PROPIO
07.02.06
SELECCIONADO
m3 28.77
07.02.07 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 11.54
07.03 SUMINISTRO E INSTALACION DE TUBERIAS
07.03.01 SUM. E INST. TUBERIA PVC C-10 3" INC. PRUEBA m 182.40
07.04 SUMINISTRO E INSTALACION DE ACCESORIOS PARA RD
07.04.01 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC u 1.00
07.05 PRUEBA HIDRAULICA Y DESINFECCION
07.05.01 PRUEBA HIDRAULICA + DESINFECCION DE TUB. ZANJA TAPADA m 182.40
08 MEJORAMIENTO DEL RESERVORIO-SECTOR CAPULIPAMPA
08.01 OBRAS PRELIMINARES
08.01.01 LIMPIEZA DE TERRENO MANUAL m2 88.55
08.02 CARPINTERIA METALICA
08.02.01 TAPA METALICA 0.80X0.80 M SEGUN DISEÑO u 2.00
08.02.02 ESCALERA METALICA TIPO MARINERA pza 1.00
08.03 PINTURA
08.03.01 PINTURA DE MURO EXTERIOR C/LATEX VINILICO m2 113.72
08.04 SUMINISTRO E INSTALACION DE TUBERIAS
08.04.01 SUM. E INST. TUBERIA PVC C-7.5 3" INC. PRUEBA m 10.00
08.04.02 SUM. E INST. TUBERIA PVC C-10 3" INC. PRUEBA m 4.00
08.05 SUMINISTRO E INSTALACION DE ACCESORIOS
08.05.01 SUMINISTRO E INSTALACION DE ACCESORIOS u 1.00
08.06 SUMINISTRO E INSTALACION DE VALVULAS
08.07 SUMINISTRO E INSTALACION VALVULA COMPUERTA 3" u 4.00
09 RED DE DISTRIBUCION-SECTOR CAPULIPAMPA
09.01 OBRAS PROVISIONALES
09.01.01 LIMPIEZA DE TERRENO MANUAL m2 -
09.01.02 TRAZO NIVELACION Y REPLANTEO m2 -
09.02 MOVIMIENTO DE TIERRAS
09.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 -
09.02.02 EXCAVACION MANUAL EN ROCA SUELTA m3 8.79
09.02.03 REFINE Y NIVELACION EN TERRENO NORMAL m2 7.86
09.02.04 CAMA DE TIERRA ZARANDEADA E=0.10M. ZANJA P/TUBO m 137.30
CUADRO DE METRADOS EJECUTADOS
DEL 01 AL 30 DE NOVIEMBRE

ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS

ENTIDAD: MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA


UBICACIÓN: CHANA-HUARI-ANCASH
VALOR REFERENCIAL : s/. 298,697.59
PRESUPUESTO CONTRATADO DE OBRA: s/. 298,697.59
FECHA BASE: 31/05/2017

METRADOS
ITEM DESCRIPCION DE PARTIDAS Metrados
Unidad
Ejecutados
RELLENO Y COMPACTADO ZANJA CON MATERIAL SELECCIONADO
09.02.05
EN CAPAS DE 0.10M
m3 268.89
RELLENO Y COMPACTADO ZANJA CON MATERIAL PROPIO
09.02.06
SELECCIONADO
m3 405.32
09.02.07 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 89.55
09.03 SUMINISTRO E INSTALACION DE TUBERIAS
09.03.01 SUM. E INST. TUBERIA PVC C-10 6" INC. PRUEBA m -
09.03.02 SUM. E INST. TUBERIA PVC C-10 4" INC. PRUEBA m 6.85
09.03.03 SUM. E INST. TUBERIA PVC C-10 3" INC. PRUEBA m 64.10
09.03.04 SUM. E INST. TUBERIA PVC C-10 2" INC. PRUEBA m 180.67
09.03.05 SUM. E INST. TUBERIA PVC C-10 1 1/2" INC. PRUEBA m 321.05
09.04 SUMINISTRO E INSTALACION DE ACCESORIOS PARA RED
SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC PARA REDES
09.04.01
DE DISTRIBUCION
u 0.50
09.05 PRUEBA HIDRAULICA Y DESINFECCION

09.05.01 PRUEBA HIDRAULICA + DESINFECCION DE TUB. ZANJA TAPADA m 1,364.30

10 CASETA DE CONTROL (9 UND)-SECTOR CAPULIPAMPA


10.01 OBRAS PRELIMINARES
10.01.01 LIMPIEZA DE TERRENO MANUAL m2 8.40
10.01.02 TRAZO NIVELACION Y REPLANTEO m2 8.40
10.02 MOVIMIENTO DE TIERRAS
10.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 6.72
10.02.02 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 7.39
10.03 OBRAS DE CONCRETO SIMPLE
10.03.01 CONCRETO ARMADO f'c=175 kg/cm2. m3 3.99
10.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 33.32
10.04 REVOQUES ENLUCIDOS Y MOLDURAS
10.04.01 TARRAJEO EN EXTERIORES m2 13.72
10.05 CARPINTERIA METALICA
10.05.01 TAPA METALICA 0.60X0.80 M SEGUN DISEÑO u -
10.06 SUMINISTRO E INSTALACION DE ACCESORIOS
10.06.01 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC u 7.00
10.07 SUMINISTRO E INSTALACION DE VALVULAS
10.07.01 SUMINISTRO E INSTALACION VALVULA DE AIRE 1" u 7.00
10.07.02 SUMINISTRO E INSTALACION VALVULA COMPUERTA 4" u 7.00
11 HIDRANTES (32 UND)-SECTOR CAPULIPAMPA
11.01 OBRAS PRELIMINARES
11.01.01 LIMPIEZA DE TERRENO MANUAL m2 -
11.01.02 TRAZO NIVELACION Y REPLANTEO m2 -
CUADRO DE METRADOS EJECUTADOS
DEL 01 AL 30 DE NOVIEMBRE

ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS

ENTIDAD: MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA


UBICACIÓN: CHANA-HUARI-ANCASH
VALOR REFERENCIAL : s/. 298,697.59
PRESUPUESTO CONTRATADO DE OBRA: s/. 298,697.59
FECHA BASE: 31/05/2017

METRADOS
ITEM DESCRIPCION DE PARTIDAS Metrados
Unidad
Ejecutados
11.02 MOVIMIENTO DE TIERRAS
11.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 -
11.02.02 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 -
11.03 OBRAS DE CONCRETO SIMPLE
11.03.01 CONCRETO ARMADO f'c=175 kg/cm2. m3 4.57
11.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 74.88
11.04 REVOQUES ENLUCIDOS Y MOLDURAS
11.04.01 TARRAJEO EN EXTERIORES m2 29.12
11.05 CARPINTERIA METALICA
11.05.01 TAPA METALICA 0.40X0.30 M SEGUN DISEÑO u -
11.06 SUMINISTRO E INSTALACION DE VALVULAS
11.06.01 SUMINISTRO E INSTALACION VALVULA DE ACOPLE 1" u 26.00
11.06.02 SUMINISTRO E INSTALACION VALVULA UNIVERSAL DE PVC 1" u 52.00
11.07 SUMINISTRO E INSTALACION DE ACCESORIOS
11.07.01 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC u 0.82
12 VALVULAS DE PURGA (9 UND)-SECTOR CAPULIPAMPA
12.01 OBRAS PRELIMINARES
12.01.01 LIMPIEZA DE TERRENO MANUAL m2 -
12.01.02 TRAZO NIVELACION Y REPLANTEO m2 -
12.02 MOVIMIENTO DE TIERRAS
12.02.01 EXCAVACION MANUAL EN TERRENO CONGLOMERADO m3 -
12.02.02 ELIMINACION MATERIAL EXCEDENTE EN CARRETILLA (50 m) m3 -
12.03 OBRAS DE CONCRETO SIMPLE
12.03.01 CONCRETO ARMADO f'c=175 kg/cm2. m3 1.19
12.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 19.44
12.04 REVOQUES ENLUCIDOS Y MOLDURAS
12.04.01 TARRAJEO EN EXTERIORES m2 7.56
12.05 CARPINTERIA METALICA
12.05.01 TAPA METALICA 0.40X0.30 M SEGUN DISEÑO u 9.00
12.06 SUMINISTRO E INSTALACION DE VALVULAS
12.06.01 SUMINISTRO E INSTALACION VALVULA COMPUERTA 11/2" u 9.00
12.07 SUMINISTRO E INSTALACION DE ACCESORIOS
12.07.01 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC u 1.00
13 MODULOS DE RIEGO (10 UND)-SECTOR CAPULIPAMPA
13.01 BRAZO PORTATIL DE RIEGO u 10.00
14 CAPACITACION
14.01 CAPACITACION glb 0.50
15 MITIGACION Y CONTROL AMBIENTAL
15.01 MITIGACION DE IMPACTO AMBIENTAL glb 0.50
16 FLETE
16.01 FLETE TERRESTRE glb 0.10
16.02 ACARREO EN OBRA glb 0.20
CUADRO DE VALORIZACIONES EJECUTANDO. EN TRAMITE
DEL 01 AL 30 DE NOVIEMBRE

ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS

CONTRATISTA : CONSORCIO VICHON


ENTIDAD : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA RESIDENTE : FLORENTINO ANTON
UBICACIÓN :SAN PEDRO DE CHANA - HUARI - ANCASH SUPERVISOR : AGROCONSTRUCTO
VALOR REFERENCIAL s/. 298,697.59 PLAZO DE EJECUCIÓN : 60 DIAS CALENDARIOS
PRESUPUESTO CONTRATADO DE OBRA s/. 298,697.59 INICIO DE PLAZO CONTRACTUAL : 02 DE OCTUBRE DEL 20
FECHA BASE 31/05/2017 TERMINO PROGRAMADO DE OBR : 30 DE NOVIEMBRE DEL 2

CALCULO DEL MONTO TOTAL CONTRACTUAL VALORIZADO

VAL-1 VAL-2 VAL-3 VAL-6


VAL-7
VAL-8

132,289.66

MONTO TOTAL VALORIZADO DEL MES 132,289.66 ###


###
###
CIONES EJECUTANDO. EN TRAMITE
AL 30 DE NOVIEMBRE

: FLORENTINO ANTONIO ANTUNEZ CELMI


: AGROCONSTRUCTORA H&J S.R.L. - FIDEL GREGORIO APARICIO ROQUE
: 60 DIAS CALENDARIOS
: 02 DE OCTUBRE DEL 2017
: 30 DE NOVIEMBRE DEL 2017

TOTAL CONTRACTUAL VALORIZADO

TOTAL

132,289.66

132,289.66
CRONOGRAMA VALORIZADO DE AVANCE DE OBRA
ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS
CONTRATISTA : CONSORCIO VICHON
ENTIDAD : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
UBICACIÓN :SAN PEDRO DE CHANA - HUARI - ANCASH
VALOR REFERENCIAL s/. 298,697.59
PRESUPUESTO CONTRATADO E OBRA s/. 298,697.59
FECHA BASE May-17
INICIO PLAZO CONTRACTUAL :02/10/2017
TERMINO PROGRAMADO DE OBRA :30/11/2017
PLAZO EJECUCION : 60 DIAS CALENDARIOS

60 DIAS CALENDARIOS
DESCRIPCIÓN OCTUBRE NOVIEMBRE
2017 2017
FORMULA N° 01
AVANCE MENSUAL PROGRAMADO sin IGV 98,978.02 102,597.93
AVANCE ACUM. PROGRAMADO sin IGV 98,978.02 201,575.95
% MENSUAL 49.10% 50.90%
% ACUMULADO 49.10% 100.00%

AVANCE MENS. PROGRAMADO con IGV 116,794.06 121,065.56


AVANCE ACUM. PROGRAMADO con IGV 116,794.06 237,859.62
% MENSUAL 49.10% 50.90%
% ACUMULADO 49.10% 100.00%
ALORIZADO DE AVANCE DE OBRA
:AS Nº08-2017-MDSPCH-CS

: MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA

TOTAL

201,575.95

100.00%

237,859.62

100.00%
CURVA DE AVANCE DE OBRA
ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS

CONTRATISTA : CONSORCIO VICHON


ENTIDAD : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
VALOR REFERENCIAL s/. 298,697.59
PRESUPUESTO CONTRATADO DE OBRA s/. 298,697.59

100.0%

90.0%

80.0%
80.0%

70.0%

60.0%

50.0%

40.0%

30.0%

20.0%

10.0%

0.0%
Oct-2017 Oct-17
0.0%
Oct-2017 Oct-17

Oct-2017 Oct-17 Nov-17


VALORIZACIÓN PROGRAMADO 0.00% 49.10% 100.00%
ACUMULADA(%) REAL 0.00% 55.71% 100.00%

SITUACIÓN ACTUAL DE LA OBRA


OBRA CULMINADA
DE OBRA

UBICACIÓN
:SAN PEDRO DE CHANA - HUARI - ANCASH
RESIDENTE : FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - FIDEL GREGORIO APARICIO ROQUE
PLAZO DE EJECUCIÓN : 60 DIAS CALENDARIOS
FECHA DE INICIO : 02 DE OCTUBRE DEL 2017
FECHA DE TERMINO PROGR : 30 DE NOVIEMBRE DEL 2017
|

LEYENDA

CURVA DE AVANCE
PROGRAMADO

CURVA DE AVANCE
REAL

Nov-17
Nov-17
CALENDARIO DE AVANCE DE OBRA VALO
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.

P
01 OBRAS PROVISIONALES 3,268.53
E

P
02 SEGURIDAD Y SALUD 5,143.69
CALENDARIO DE AVANCE DE OBRA VALO
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.

P
02 SEGURIDAD Y SALUD 5,143.69
E

P
03 CAPTACION TIPO I C-1-SECTOR YURAQ PUQUIO 11,675.91
E
CALENDARIO DE AVANCE DE OBRA VALO
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.


03 CAPTACION TIPO I C-1-SECTOR YURAQ PUQUIO 11,675.91
E

P
04 CAPTACION TIPO II-SECTOR CHAUPIMONTE 6,473.62
E

P
MEJORAMIENTO DE LA CAPTACION-SECTOR
05 4,637.64
CAPULIPAMPA
CALENDARIO DE AVANCE DE OBRA VALO
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.

P
MEJORAMIENTO DE LA CAPTACION-SECTOR
05 4,637.64
CAPULIPAMPA
E

P
06 DESARENADOR-SECTOR CHAUPIMONTE 6,323.35
E
CALENDARIO DE AVANCE DE OBRA VALO
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.


06 DESARENADOR-SECTOR CHAUPIMONTE 6,323.35
E
CALENDARIO DE AVANCE DE OBRA VALO
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.

P
LINEA DE CONDUCCION-SECTOR YURAQ PUQUIO,
07 8,706.88
CHAUPIMONTE Y CAPULIPAMPA
E

P
MEJORAMIENTO DEL RESERVORIO-SECTOR
08 4,669.58
CAPULIPAMPA
CALENDARIO DE AVANCE DE OBRA VALO
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.

MEJORAMIENTO DEL RESERVORIO-SECTOR


08 4,669.58
CAPULIPAMPA
E

P
09 RED DE DISTRIBUCION-SECTOR CAPULIPAMPA 92,889.83
E
CALENDARIO DE AVANCE DE OBRA VALO
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.

P
CASETA DE CONTROL (9 UND)-SECTOR
10 20,548.18
CAPULIPAMPA
E

P
11 HIDRANTES (32 UND)-SECTOR CAPULIPAMPA 13,720.93
CALENDARIO DE AVANCE DE OBRA VALO
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.

11 HIDRANTES (32 UND)-SECTOR CAPULIPAMPA 13,720.93


E

P
VALVULAS DE PURGA (9 UND)-SECTOR
12 5,428.32
CAPULIPAMPA
E
CALENDARIO DE AVANCE DE OBRA VALO
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.

P
MODULOS DE RIEGO (10 UND)-SECTOR
13 3,406.70
CAPULIPAMPA
E

P
14 CAPACITACION 2,542.37
CALENDARIO DE AVANCE DE OBRA VALO
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.

14 CAPACITACION 2,542.37
E
CALENDARIO DE AVANCE DE OBRA VALO
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.

P
15 MITIGACION Y CONTROL AMBIENTAL 2,542.37
E

P
16 FLETE 9,598.05
CALENDARIO DE AVANCE DE OBRA VALO
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.

16 FLETE 9,598.05
E
COSTO DIRECTO PROGRAMADO 201,575.95

PORCENTAJE DE AVANCE MENSUAL PROGRAMADO


PORCENTAJE DE ACUMULADO PROGRAMADO
CALENDARIO DE AVANCE DE OBRA VALO
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.

COSTO DIRECTO EJECUTADO


PORCENTAJE DE AVANCE MENSUAL EJECUTADO
PORCENTAJE DE AVANCE ACUMULADO EJECUTADO
DESFACE DE EJECUCION
LA OBRA SE ENCUENTRA
A VALORIZADO PROGRAMADO VS EJECUTADO
GO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)


S/. 3,268.53

S/.3,268.53

S/. 2,571.85 S/. 2,571.85


A VALORIZADO PROGRAMADO VS EJECUTADO
GO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)

S/.2,982.68 S/.2,161.01

S/. 10,508.32 S/. 1,167.59

S/. 6,673.87 S/. 5,002.04


A VALORIZADO PROGRAMADO VS EJECUTADO
GO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)

S/. 5,178.90 S/. 1,294.72

S/. 2,871.48 S/. 3,602.14

S/. 2,318.82 S/. 2,318.82


A VALORIZADO PROGRAMADO VS EJECUTADO
GO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)

S/. 4,493.06 S/. 144.58

S/. 5,691.02 S/. 632.34

S/. 6,191.84 S/. 131.51


A VALORIZADO PROGRAMADO VS EJECUTADO
GO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)


A VALORIZADO PROGRAMADO VS EJECUTADO
GO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)


S/. 2,612.06 S/. 6,094.82

S/. 1,675.41 S/. 7,031.47

S/. 4,669.58
A VALORIZADO PROGRAMADO VS EJECUTADO
GO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)


S/. 4,669.58

S/. 46,444.92 S/. 46,444.92

S/. 62,324.13 S/. 30,565.70


A VALORIZADO PROGRAMADO VS EJECUTADO
GO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)


S/. 8,219.27 S/. 12,328.91

S/. 5,930.97 S/. 14,617.21

S/. 5,488.37 S/. 8,232.56


A VALORIZADO PROGRAMADO VS EJECUTADO
GO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)


S/. 5,138.80 S/. 8,582.13

S/. 1,085.66 S/. 4,342.66

S/. 74.54 S/. 5,353.78


A VALORIZADO PROGRAMADO VS EJECUTADO
GO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)


S/. 3,406.70

S/. 3,406.70

S/. 2,542.37
A VALORIZADO PROGRAMADO VS EJECUTADO
GO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)


S/. 1,271.19 S/. 1,271.18
A VALORIZADO PROGRAMADO VS EJECUTADO
GO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)


S/. 1,271.19 S/. 1,271.19

S/. 1,271.19 S/. 1,271.18

S/. 4,319.12 S/. 5,278.93


A VALORIZADO PROGRAMADO VS EJECUTADO
GO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)


S/. 8,132.64 S/. 1,465.41

S/. 98,978.02 S/. 102,597.93

49.10% 50.90%
49.10% 100.00%
A VALORIZADO PROGRAMADO VS EJECUTADO
GO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)


S/. 112,300.33 S/. 89,275.62
55.71% 44.29%
55.71% 100.00%
6.61%
ADELANTADA CULMINADA
DO VS EJECUTADO
PIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

S4 (24-30)

S/. 2,571.85
DO VS EJECUTADO
PIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

S4 (24-30)

S/.2,161.01

S/. 1,167.59

S/. 5,002.04
DO VS EJECUTADO
PIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

S4 (24-30)

S/. 1,294.72

S/. 3,602.14

S/. 2,318.82
DO VS EJECUTADO
PIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

S4 (24-30)

S/. 144.58

S/. 632.34

S/. 131.51
DO VS EJECUTADO
PIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

S4 (24-30)
DO VS EJECUTADO
PIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

S4 (24-30)
S/. 6,094.82

S/. 7,031.47

S/. 4,669.58
DO VS EJECUTADO
PIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

S4 (24-30)
S/. 4,669.58

S/. 46,444.92

S/. 30,565.70
DO VS EJECUTADO
PIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

S4 (24-30)
S/. 12,328.91

S/. 14,617.21

S/. 8,232.56
DO VS EJECUTADO
PIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

S4 (24-30)
S/. 8,582.13

S/. 4,342.66

S/. 5,353.78
DO VS EJECUTADO
PIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

S4 (24-30)
S/. 3,406.70

S/. 3,406.70

S/. 2,542.37
DO VS EJECUTADO
PIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

S4 (24-30)
S/. 1,271.18
DO VS EJECUTADO
PIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

S4 (24-30)
S/. 1,271.19

S/. 1,271.18

S/. 5,278.93
DO VS EJECUTADO
PIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

S4 (24-30)
S/. 1,465.41

S/. 102,597.93

50.90%
100.00%
DO VS EJECUTADO
PIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

S4 (24-30)
S/. 89,275.62
44.29%
100.00%

CULMINADA
PROGRAMACIÓ
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO R
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.

01 OBRAS PROVISIONALES 3,268.53 P

02 SEGURIDAD Y SALUD 5,143.69 P

03 CAPTACION TIPO I C-1-SECTOR YURAQ PUQUIO 11,675.91 P


PROGRAMACIÓ
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO R
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.

04 CAPTACION TIPO II-SECTOR CHAUPIMONTE 6,473.62 P


MEJORAMIENTO DE LA CAPTACION-SECTOR
05 4,637.64 P
CAPULIPAMPA
06 DESARENADOR-SECTOR CHAUPIMONTE 6,323.35 P
PROGRAMACIÓ
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO R
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.

LINEA DE CONDUCCION-SECTOR YURAQ PUQUIO,


07 8,706.88 P
CHAUPIMONTE Y CAPULIPAMPA
MEJORAMIENTO DEL RESERVORIO-SECTOR
08 4,669.58 P
CAPULIPAMPA
09 RED DE DISTRIBUCION-SECTOR CAPULIPAMPA 92,889.83 P
PROGRAMACIÓ
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO R
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.

09 RED DE DISTRIBUCION-SECTOR CAPULIPAMPA 92,889.83 P


CASETA DE CONTROL (9 UND)-SECTOR
10 20,548.18 P
CAPULIPAMPA
11 HIDRANTES (32 UND)-SECTOR CAPULIPAMPA 13,720.93 P
VALVULAS DE PURGA (9 UND)-SECTOR
12 5,428.32 P
CAPULIPAMPA
PROGRAMACIÓ
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO R
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.

VALVULAS DE PURGA (9 UND)-SECTOR


12 5,428.32 P
CAPULIPAMPA
MODULOS DE RIEGO (10 UND)-SECTOR
13 3,406.70 P
CAPULIPAMPA
PROGRAMACIÓ
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO R
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.

14 CAPACITACION 2,542.37 P

15 MITIGACION Y CONTROL AMBIENTAL 2,542.37 P

16 FLETE 9,598.05 P
PROGRAMACIÓ
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNI
CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHAN
FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO R
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localida

ITEM PARTIDAS PRESUP S/.

COSTO DIRECTO PROGRAMADO 201,575.95

PORCENTAJE DE AVANCE MENSUAL PROGRAMADO


PORCENTAJE DE ACUMULADO PROGRAMADO
AMACIÓN DE OBRA
EGO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)


S/. 3,268.53

S/. 2,571.85 S/. 2,571.85

S/. 10,508.32 S/. 1,167.59


AMACIÓN DE OBRA
EGO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)


S/. 5,178.90 S/. 1,294.72

S/. 2,318.82 S/. 2,318.82

S/. 5,691.02 S/. 632.34


AMACIÓN DE OBRA
EGO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)


S/. 2,612.06 S/. 6,094.82

S/. 4,669.58

S/. 46,444.92 S/. 46,444.92


AMACIÓN DE OBRA
EGO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)

S/. 8,219.27 S/. 12,328.91

S/. 5,488.37 S/. 8,232.56

S/. 1,085.66 S/. 4,342.66


AMACIÓN DE OBRA
EGO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)

S/. 3,406.70
AMACIÓN DE OBRA
EGO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)


S/. 2,542.37

S/. 1,271.19 S/. 1,271.19

S/. 4,319.12 S/. 5,278.93


AMACIÓN DE OBRA
EGO TECNIFICADO EN LO SECTORES CHAUPIMONTE, YURAQ PUQUIO UTRILLA Y
O DE CHANA - HUARI - ANCASH"
S/. 298,697.59
11/30/2017
APARICIO ROQUE
Localidad: VICHON PERIODO : Del 01 al 30 de Noviembre del 2017
OCTUBRE NOVIEMBRE

S1 (01-07) S2 (08-14) S3 (15-21) S4 (23-31) S1 (01-07) S2 (08-14) S3 (15-23)


S/. 98,978.02 S/. 102,597.93

49.10% 50.90%
49.10% 100.00%
UPIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

NOVIEMBRE

S4 (24-30)

S/. 2,571.85

S/. 1,167.59
UPIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

NOVIEMBRE

S4 (24-30)
S/. 1,294.72

S/. 2,318.82

S/. 632.34
UPIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

NOVIEMBRE

S4 (24-30)
S/. 6,094.82

S/. 4,669.58

S/. 46,444.92
UPIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

NOVIEMBRE

S4 (24-30)

S/. 12,328.91

S/. 8,232.56

S/. 4,342.66
UPIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

NOVIEMBRE

S4 (24-30)

S/. 3,406.70
UPIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

NOVIEMBRE

S4 (24-30)
S/. 2,542.37

S/. 1,271.19

S/. 5,278.93
UPIMONTE, YURAQ PUQUIO UTRILLA Y

S/. 298,697.59
11/30/2017

NOVIEMBRE

S4 (24-30)
S/. 102,597.93

50.90%
100.00%
RESUMEN DE VALORIZACION DE OBRA N° 02 NOVIE
PROYECTO: "MEJORAMIENTO DEL SERVICIO DE AGUA DEL SISTEMA DE RIEGO TECNIFICADO EN LO SECTORES CHAUPIMONTE,
YURAQ PUQUIO UTRILLA Y CAPULIPAMPA DEL CENTRO POBLADO DE VICHON, DISTRITO DE SAN PEDRO DE CHANA - HUARI -
ANCASH"

FINANCIA : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA


EJECUTA : CONSORCIO VICHON
RESIDENTE DE OBRA : INGº FLORENTINO ANTONIO ANTUNEZ CELMI
SUPERVISOR : AGROCONSTRUCTORA H&J S.R.L. - INGº FIDEL GREGORIO APARICIO ROQUE
UBICACIÓN: Region: ANCASH Prov: HUARI Dist: SAN PEDRO DE CHANA Localidad: VICHON
MONTO VALORIZACION
DESCRIPCION CONTRACTUAL
(S/IGV) ANTERIOR ACTUAL

A: VALORIZACION CONTRACTUAL
1 OBRAS PROVISIONALES S/. 3,268.53 S/. 3,268.53 S/. 0.00
2 SEGURIDAD Y SALUD S/. 5,143.69 S/. 2,982.68 S/. 2,161.01
3 CAPTACION TIPO I C-1-SECTOR YURAQ PUQUIO S/. 11,675.91 S/. 6,673.87 S/. 5,002.04
4 CAPTACION TIPO II-SECTOR CHAUPIMONTE S/. 6,473.62 S/. 2,871.48 S/. 3,602.14
5 MEJORAMIENTO DE LA CAPTACION-SECTOR CAPULIPAMPA S/. 4,637.64 S/. 4,493.06 S/. 144.58
6 DESARENADOR-SECTOR CHAUPIMONTE S/. 6,323.35 S/. 6,191.84 S/. 131.51
7 LINEA DE CONDUCCION-SECTOR YURAQ PUQUIO, CHAUPIMONTE Y CAPULIPAM S/. 8,706.88 S/. 1,675.41 S/. 7,031.47
8 MEJORAMIENTO DEL RESERVORIO-SECTOR CAPULIPAMPA S/. 4,669.58 S/. 0.00 S/. 4,669.58
9 RED DE DISTRIBUCION-SECTOR CAPULIPAMPA S/. 92,889.83 S/. 62,324.13 S/. 30,565.70
10 CASETA DE CONTROL (9 UND)-SECTOR CAPULIPAMPA S/. 20,548.18 S/. 5,930.97 S/. 14,617.21
11 HIDRANTES (32 UND)-SECTOR CAPULIPAMPA S/. 13,720.93 S/. 5,138.80 S/. 8,582.13
12 VALVULAS DE PURGA (9 UND)-SECTOR CAPULIPAMPA S/. 5,428.32 S/. 74.54 S/. 5,353.78
13 MODULOS DE RIEGO (10 UND)-SECTOR CAPULIPAMPA S/. 3,406.70 S/. 0.00 S/. 3,406.70
14 CAPACITACION S/. 2,542.37 S/. 1,271.19 S/. 1,271.18
15 MITIGACION Y CONTROL AMBIENTAL S/. 2,542.37 S/. 1,271.19 S/. 1,271.18
16 FLETE S/. 9,598.05 S/. 8,132.64 S/. 1,465.41
COSTO DIRECTO S/. 201,575.95 S/. 112,300.33 S/. 89,275.62
GASTOS GENERALES ( 29.636 %) S/. 31,400.00 S/. 17,493.31 S/. 13,906.69
UTILIDAD ( 10.00 %) S/. 20,157.60 S/. 11,230.03 S/. 8,927.56
SUB TOTAL S/. 253,133.55 S/. 141,023.67 S/. 112,109.87
FACTOR DE RELACION (1.0) S/. 253,133.55 S/. 141,023.67 S/. 112,109.87
EN I.G.V (18%*VN) S/. 45,564.04 S/. 25,384.26 S/. 20,179.78
TOTAL S/. 298,697.59 S/. 166,407.93 S/. 132,289.65
PORCENTAJE DE AVANCE 55.71% 44.29%

PORCENTAJE DE AVANCE FISICO DEL MES ANTERIOR 55.71%


PORCENTAJE DE AVANCE FISICO DEL MES ACTUAL 44.29%
PORCENTAJE DE AVANCE FISICO ACUMULADO A LA FECHA 100.00%
PORCENTAJE DE SALDO A LA FECHA 0.00%

PORCENTAJE DE AVANCE PROGRAMADO MENSUAL 49.10%


PORCENTAJE DE AVANCE PROGRAMADO ACUMULADO 49.10%
DESFACE DE EJECUCION 0.00%
LA OBRA SE ENCUENTRA CULMINADA
N DE OBRA N° 02 NOVIEMBRE 2017

MONTO CONTRACTUAL S/. 298,697.59

FECHA DE INICIO DE OBRA 10/2/2017


FECHA DE TERMINO DE OBRA 11/30/2017
TIEMPO DE EJECUCIÓN: 60 Dias
PERIODO : Del 01 al 30 de Noviembre del 2017

VALORIZACION % DE AVANCE
SALDO
ACUMULADO ACUMULADO

S/. 3,268.53 100.00% S/. 0.00


S/. 5,143.69 100.00% S/. 0.00
S/. 11,675.91 100.00% S/. 0.00
S/. 6,473.62 100.00% S/. 0.00
S/. 4,637.64 100.00% S/. 0.00
S/. 6,323.35 100.00% S/. 0.00
S/. 8,706.88 100.00% S/. 0.00
S/. 4,669.58 100.00% S/. 0.00
S/. 92,889.83 100.00% S/. 0.00
S/. 20,548.18 100.00% S/. 0.00
S/. 13,720.93 100.00% S/. 0.00
S/. 5,428.32 100.00% S/. 0.00
S/. 3,406.70 100.00% S/. 0.00
S/. 2,542.37 100.00% S/. 0.00
S/. 2,542.37 100.00% S/. 0.00
S/. 9,598.05 100.00% S/. 0.00
S/. 201,575.95 S/. 0.00
S/. 31,400.00 S/. 0.00
S/. 20,157.60 S/. 0.00
S/. 253,133.55 S/. 0.00
S/. 253,133.55 S/. 0.00
S/. 45,564.04 S/. 0.00
S/. 298,697.59 S/. 0.00
100.00% 0.00%
SITUACIÓN DE LA OBRA (CONDICIÓN DE ATRASO O ADELANTO)
ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS
CONTRATISTA : CONSORCIO VICHON
ENTIDAD : MUNICIPALIDAD DISTRITAL DE SAN PEDRO DE CHANA
UBICACIÓN :SAN PEDRO DE CHANA - HUARI - ANCASH
VALOR REFERENCIAL s/. 298,697.59
PRESUPUESTO CONTRATADO E OBRA s/. 298,697.59
FECHA BASE May-17
PLAZO EJECUCION : 60 DIAS CALENDARIOS

60 DIAS CALENDARIOS
GRONOGRAMA OCTUBRE NOVIEMBRE
2017 2017
PROGRAMADO ACUMULADO 49.10% 100.00%
EJECUTADO ACUMULADO 55.71% 100.00%
CONDICION ADELANTADA CULMINADA
CURVA DE AVANCE DE
De acuerdo al Calendario Acelerado de av
ADJUDICACION SIMPLIFICADA N° :AS Nº08-2017-MDSPCH-CS
0 0

100.0%

90.0%
|

80.0%

70.0%

60.0%
70.0%

60.0%

50.0%

40.0%

30.0%

20.0%

10.0%

0.0%
May-07 Jun-07 Jul-07 Aug-07 Sep-07 Oct-07

May-07 Jun-07 Jul-07 Aug-07


VALORIZACION PROGRAMADO 3.07% 7.07% 25.66% 54.56%
ACUMULADA(%) REAL 3.07% 7.07% 21.94% 37.18%

SITUACION ACTUAL DE LA OBRA


OBRA ATRASADA EN 39.33%
ANCE DE OBRA
Acelerado de avance de obra

LEYENDA

CURVA DE AVANCE
PROGRAMADO
CURVA DE AVANCE
REAL

7 Sep-07 Oct-07 Nov-07 Dec-07

Sep-07 Oct-07 Nov-07 Dec-07


74.80% 90.25% 96.33% 0.00%
41.41% #REF!
CRONOGRAMA VALORIZADO ACELERADO DE AVANCE

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

AÑO 2006
DESCRIPCIÓN MAYO JUNIO JULIO AGOSTO

FORMULA POLINÓMICA N° 01
AVANCE MENS. PROGRAMADO S/IGV 0.00 1,877.93 61,147.35 75,985.34
AVANCE ACUM. PROGRAMADO S/IGV 0.00 1,877.93 63,025.28 139,010.62
% MENSUAL 0.00% 1.05% 34.12% 42.39%
% ACUMULADO 0.00% 1.05% 35.16% 77.56%

FORMULA POLINÓMICA N° 02
AVANCE MENS. PROGRAMADO S/IGV 373.45 0.00 0.00 0.00
AVANCE ACUM. PROGRAMADO S/IGV 373.45 373.45 373.45 373.45
% MENSUAL 0.14% 0.00% 0.00% 0.00%
% ACUMULADO 0.14% 0.14% 0.14% 0.14%

FORMULA POLINÓMICA N° 03
AVANCE MENS. PROGRAMADO S/IGV 118,202.70 59,320.45 316,592.09 388,360.82
AVANCE ACUM. PROGRAMADO S/IGV 118,202.70 177,523.15 494,115.24 882,476.06
% MENSUAL 11.37% 5.71% 30.45% 37.36%
% ACUMULADO 11.37% 17.08% 47.53% 84.89%

FORMULA POLINÓMICA N° 04
AVANCE MENS. PROGRAMADO S/IGV 10,132.61 931.44 208,720.63 359,569.23
AVANCE ACUM. PROGRAMADO S/IGV 10,132.61 11,064.05 219,784.68 579,353.91
CRONOGRAMA VALORIZADO ACELERADO DE AVANCE

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

AÑO 2006
DESCRIPCIÓN MAYO JUNIO JULIO AGOSTO

% MENSUAL 1.15% 0.11% 23.64% 40.73%


% ACUMULADO 1.15% 1.25% 24.90% 65.63%

FORMULA POLINÓMICA N° 05
AVANCE MENS. PROGRAMADO S/IGV 6,123.79 111,390.99 138,438.40 18,206.63
AVANCE ACUM. PROGRAMADO S/IGV 6,123.79 117,514.78 255,953.18 274,159.81
% MENSUAL 0.79% 14.40% 17.90% 2.35%
% ACUMULADO 0.79% 15.19% 33.09% 35.44%

FORMULA POLINÓMICA N° 06
AVANCE MENS. PROGRAMADO S/IGV 0.00 0.00 12,950.12 43,213.00
AVANCE ACUM. PROGRAMADO S/IGV 0.00 0.00 12,950.12 56,163.12
% MENSUAL 0.00% 0.00% 3.23% 10.78%
% ACUMULADO 0.00% 0.00% 3.23% 14.01%

FORMULA POLINÓMICA N° 07
AVANCE MENS. PROGRAMADO S/IGV 0.00 0.00 2,107.50 36,468.40
AVANCE ACUM. PROGRAMADO S/IGV 0.00 0.00 2,107.50 38,575.90
% MENSUAL 0.00% 0.00% 5.01% 86.62%
% ACUMULADO 0.00% 0.00% 5.01% 91.62%
CRONOGRAMA VALORIZADO ACELERADO DE AVANCE

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

AÑO 2006
DESCRIPCIÓN MAYO JUNIO JULIO AGOSTO

FORMULA POLINÓMICA N° 08
AVANCE MENS. PROGRAMADO S/IGV 691.17 3,514.67 81,927.01 355,961.08
AVANCE ACUM. PROGRAMADO S/IGV 691.17 4,205.84 86,132.85 442,093.93
% MENSUAL 0.10% 0.50% 11.76% 51.10%
% ACUMULADO 0.10% 0.60% 12.36% 63.46%

FORMULA POLINÓMICA N° 09
AVANCE MENS. PROGRAMADO S/IGV 0.00 0.00 0.00 0.00
AVANCE ACUM. PROGRAMADO S/IGV 0.00 0.00 0.00 0.00
% MENSUAL 0.00% 0.00% 0.00% 0.00%
% ACUMULADO 0.00% 0.00% 0.00% 0.00%

FORMULA POLINÓMICA N° 10
AVANCE MENS. PROGRAMADO S/IGV 0.00 0.00 0.00 0.00
AVANCE ACUM. PROGRAMADO S/IGV 0.00 0.00 0.00 0.00
% MENSUAL 0.00% 0.00% 0.00% 0.00%
% ACUMULADO 0.00% 0.00% 0.00% 0.00%

FORMULA POLINÓMICA N° 11
AVANCE MENS. PROGRAMADO S/IGV 0.00 0.00 0.00 0.00
AVANCE ACUM. PROGRAMADO S/IGV 0.00 0.00 0.00 0.00
CRONOGRAMA VALORIZADO ACELERADO DE AVANCE

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

AÑO 2006
DESCRIPCIÓN MAYO JUNIO JULIO AGOSTO

% MENSUAL 0.00% 0.00% 0.00% 0.00%


% ACUMULADO 0.00% 0.00% 0.00% 0.00%

FORMULA POLINÓMICA N° 12
AVANCE MENS. PROGRAMADO S/IGV 0.00 0.00 0.00 0.00
AVANCE ACUM. PROGRAMADO S/IGV 0.00 0.00 0.00 0.00
% MENSUAL 0.00% 0.00% 0.00% 0.00%
% ACUMULADO 0.00% 0.00% 0.00% 0.00%

FORMULA POLINÓMICA N° 13
AVANCE MENS. PROGRAMADO S/IGV 0.00 0.00 0.00 0.00
AVANCE ACUM. PROGRAMADO S/IGV 0.00 0.00 0.00 0.00
% MENSUAL 0.00% 0.00% 0.00% 0.00%
% ACUMULADO 0.00% 0.00% 0.00% 0.00%

TOTAL
AVANCE MENS. PROGRAMADO S/IGV 135,523.72 177,035.48 821,883.10 1,277,764.50
AVANCE ACUM. PROGRAMADO S/IGV 135,523.72 312,559.20 1,134,442.30 2,412,206.80
% MENSUAL 3.07% 4.00% 18.59% 28.90%
% ACUMULADO 3.07% 7.07% 25.66% 54.56%
IZADO ACELERADO DE AVANCE DE OBRA

AÑO 2006
SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE

38,348.43 0.00 0.00 1,877.93


177,359.05 177,359.05 177,359.05 179,236.98
21.40% 0.00% 0.00% 1.05%
98.95% 98.95% 98.95% 100.00%

0.00 60,231.51 60,661.76 144,176.98


373.45 60,604.96 121,266.72 265,443.70
0.00% 22.69% 22.85% 54.32%
0.14% 22.83% 45.68% 100.00%

156,203.82 0.00 0.00 873.57


1,038,679.88 1,038,679.88 1,038,679.88 1,039,553.45
15.03% 0.00% 0.00% 0.08%
99.92% 99.92% 99.92% 100.00%

299,798.75 1,505.06 1,170.72 938.16


879,152.66 880,657.72 881,828.44 882,766.60
IZADO ACELERADO DE AVANCE DE OBRA

AÑO 2006
SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE

33.96% 0.17% 0.13% 0.11%


99.59% 99.76% 99.89% 100.00%

122,659.67 293,903.16 76,581.73 6,266.13


396,819.48 690,722.64 767,304.37 773,570.50
15.86% 37.99% 9.90% 0.81%
51.30% 89.29% 99.19% 100.00%

50,804.84 293,099.92 698.87 0.00


106,967.96 400,067.88 400,766.75 400,766.75
12.68% 73.13% 0.17% 0.00%
26.69% 99.83% 100.00% 100.00%

3,060.33 465.90 0.00 0.00


41,636.23 42,102.13 42,102.13 42,102.13
7.27% 1.11% 0.00% 0.00%
98.89% 100.00% 100.00% 100.00%
IZADO ACELERADO DE AVANCE DE OBRA

AÑO 2006
SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE

224,037.98 29,825.65 698.87 0.00


666,131.91 695,957.56 696,656.43 696,656.43
32.16% 4.28% 0.10% 0.00%
95.62% 99.90% 100.00% 100.00%

0.00 939.18 32,144.08 3,543.66


0.00 939.18 33,083.26 36,626.92
0.00% 2.56% 87.76% 9.68%
0.00% 2.56% 90.32% 100.00%

0.00 790.31 23,549.10 1,120.60


0.00 790.31 24,339.41 25,460.01
0.00% 3.10% 92.49% 4.40%
0.00% 3.10% 95.60% 100.00%

0.00 1,156.28 30,033.45 1,050.97


0.00 1,156.28 31,189.73 32,240.70
IZADO ACELERADO DE AVANCE DE OBRA

AÑO 2006
SETIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE

0.00% 3.59% 93.15% 3.26%


0.00% 3.59% 96.74% 100.00%

0.00 1,189.73 9,091.55 0.00


0.00 1,189.73 10,281.28 10,281.28
0.00% 11.57% 88.43% 0.00%
0.00% 11.57% 100.00% 100.00%

0.00 0.00 34,233.73 2,489.38


0.00 0.00 34,233.73 36,723.11
0.00% 0.00% 93.22% 6.78%
0.00% 0.00% 93.22% 100.00%

894,913.82 683,106.70 268,863.86 162,337.38


3,307,120.62 3,990,227.32 4,259,091.18 4,421,428.56
20.24% 15.45% 6.08% 3.67%
74.80% 90.25% 96.33% 100.00%