a. System analysis i. Initial investigation ii. System survey iii. Feasibility study iv. Information needs & system requirements v. Deliver systems requirements b. Conceptual design i. Identify & evaluate design alternative ii. Develop design specification iii. Deliver conceptual design requirements c. Physical design i. Design output ii. Design database iii. Design input iv. Develop programs v. Develop procedures vi. Design controls vii. Deliver developed system Chapter d. Implementation & conversion i. Develop an implementation & conversion plan 22 ii. Install hardware & software iii. Train personnel iv. Test the system v. Complete documentation vi. Convert from old to new system vii. Deliver operational system e. Operations & maintenance i. Fine-tune & do post-implementation review ii. Operate system iii. Modify system iv. Do ongoing maintenance v. Deliver improved system
2. Planning system development 619
a. 2 systems development plans are needed: i. Project development plan ii. Master plan b. Planning techniques 3. Feasibility analysis 621 a. Economic b. Technical c. Legal d. Scheduling e. Operational
4. Behavioral aspects of change 624
a. Why behavioral problems occur b. How people resist change: i. Aggression ii. Projection iii. Avoidance c. Preventing behavioral problems
2nd part:
5. System Analysis: 626
System development life cycle: a. System analysis i. Initial investigation 626 ii. System survey 627 iii. Feasibility study 629 iv. Information needs & system requirements 629 v. System analysis report 631 Chapter 22:
Continue from 1st step in SDLC process:
2nd Step:
a. Conceptual design 677
1. Evaluate design alternative 677 2. Develop design specification – Prepare design specifications and reports 679 a. Output b. Data storage c. Input d. Processing procedures & operations
3rd Step:
b. Physical system design 679
1. Output design: a. Scheduled reports b. Special-purpose analysis reports c. Triggered exception reports d. Demand reports 2. File & database design 3. Input design: a. Form design b. Computer screen design 4. Program design: a. Determine user needs b. Create & document a development plan c. Write program instructions (Computer code) d. Test the program e. Document the program f. Train program users g. Install the system h. Use & modify the system 5. Procedures & Controls design
4th Step:
c. Implementation & conversion
1. Develop an implementation & conversion plan 2. Install hardware & software 3. Selecting & training personnel 4th Step:
4. Complete documentation: a. Development documentation b. Operations documentation c. User documentation
4th Step:
5. Test the system:
a. Walk-throughs b. Processing test data c. Acceptance tests
4th Step:
6. System conversion: Changing from old to the new one:
a. Direct conversion b. Parallel conversion 7. Deliver operational system
5th Step:
d. Operations & maintenance
1. Fine-tune & do post-implementation review 2. Operate system 3. Modify system 4. Do ongoing maintenance 5. Deliver improved system